How electricity works in Argentina.
Argentina electricity market 2026: ENReGE and provincial regulators, CAMMESA, Edenor and Edesur tariffs, SEF subsidies, net billing under Law 27.424, renewables and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Argentine peso (ARS) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Argentina energy at a glance.
Key figures for households in Argentina. Each one links to its source on the full overview below.
Electricity price.
191.95 ARS per kWh for households, including taxes. Figures for from 1 Aug 2026.
Renewable share.
34.6% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Argentina.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Argentina below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Argentina requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Argentina.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Argentina, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Argentina, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Argentina.
The energy market in Argentina, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Argentina runs a wholesale electricity market (the Mercado Eléctrico Mayorista, MEM) administered and dispatched by CAMMESA, with high-voltage transmission run by Transener and regional transmission companies. Households cannot choose their supplier: each is served by the distribution company or electricity co-operative that holds the concession for its area, at a tariff set by a regulator. In the Buenos Aires metropolitan area the two federal concessions, Edenor and Edesur, are regulated nationally; the rest of the country is regulated province by province.
Tariffs have risen sharply since 2024 as the national government cuts energy subsidies. From 1 August 2026 an Edenor household using 151–400 kWh a month without a subsidy pays a variable charge of ARS 158.64/kWh before tax plus a fixed charge of ARS 3,713.54 a month. Since January 2026 subsidies are targeted through the Subsidios Energéticos Focalizados (SEF) regime, which discounts a base of 300 kWh a month for eligible households.
Gas-fired plants still produce more than half of Argentina’s electricity, but wind and solar supplied 15.5% of generation in 2025 and hydro, nuclear and bioenergy add a further 26%. Since 2025 the government has been reforming the wholesale market, merging the electricity and gas regulators into the Ente Nacional Regulador del Gas y la Electricidad (ENReGE), and contracting the country’s first large battery systems around Buenos Aires.
Energy snapshot.
Headline figures for electricity in Argentina. Each shows its data year and links to its source.
- Population45,892,285 peopleSource 72022 (census)
- Households15,932,302 householdsSource 82022 (census)
- Average household size2.86 people/householdSource 72022 (census)
- Electricity use per householdNot identified from a reliable public source.
- Household price (ARS)192 ARS/kWhSource 1from 1 Aug 2026
- Household price (EUR)0.112 EUR/kWhSource 6from 1 Aug 2026
- Renewable electricity share34.6%Source 122025
- Solar capacity2.59 GWSource 122025
- Wind capacity4.5 GWSource 122025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Limited
- Home equipment in grid services
- Developing
- Regulator
- ENReGE (federal concessions: Edenor, Edesur, transmission); provincial regulators elsewhere
- System operator
- CAMMESA (dispatch and wholesale market administration)
- Distribution networks
- Regional concession monopolies: Edenor and Edesur in Buenos Aires, provincial companies and several hundred co-operatives elsewhere
- Currency
- Argentine peso (ARS)
- Voltage and frequency
- 220 V / 50 Hz
Electricity prices in Argentina.
- Household price (ARS)
- 192 ARS/kWh (from 1 Aug 2026)Source 1Derived: Edenor (Buenos Aires metropolitan area) residential tariff T1-R band R2 (151–400 kWh/month) without subsidy, variable charge ARS 158.636/kWh, plus 21% VAT. Excludes the fixed charge (ARS 3,713.54/month for R2) and provincial and municipal levies, which vary by location. Tariffs differ by distributor and province.
- Household price (EUR)
- 0.112 EUR/kWh (from 1 Aug 2026)Source 6Converted from ARS 191.95/kWh at the Banco Central de la República Argentina reference rate of 30 September 2026 (EUR 1 = ARS 1,719.52).
- Typical annual electricity bill
- 744,939 ARS/yr (Aug 2026 rates (annualised))Source 1Illustrative, derived: an Edenor household without subsidy using 300 kWh every month (band R2: ARS 3,713.54 fixed + 300 × ARS 158.636), plus 21% VAT, × 12. Excludes provincial and municipal levies. A household in the SEF subsidy regime pays ARS 70.851/kWh for its first 300 kWh.
Household price trend (ARS per kWh).Source 3
| Jan 2026 | 140.12 ARS/kWh |
|---|---|
| Feb 2026 | 159.9 ARS/kWh |
| Apr 2026 | 161.35 ARS/kWh |
| May 2026 | 175.33 ARS/kWh |
| Jun 2026 | 178.06 ARS/kWh |
| Aug 2026 | 191.95 ARS/kWh |
How tariffs are built
A residential bill has three regulated building blocks: the seasonal wholesale price of energy and transmission (Precio Estacional), the distributor’s own distribution cost (Costo Propio de Distribución, or VAD), and taxes. For Edenor from 1 August 2026, the distribution element of the R2 variable charge was ARS 16.83/kWh, out of a total unsubsidised variable charge of ARS 158.64/kWh, so most of the variable price is the wholesale energy component. The fixed charge rises steeply with the consumption band: from ARS 1,741 a month for R1 to ARS 64,135 for R6.
Subsidies
For two decades most households paid heavily subsidised energy prices. Decree 943/2025 replaced the earlier income-segmentation scheme with the Subsidios Energéticos Focalizados (SEF) regime from January 2026. Eligible households receive a discount on a base consumption of 300 kWh a month; consumption above it is billed at the full price. In August 2026 an Edenor SEF household paid ARS 70.85/kWh within its base (band R2) against ARS 158.64/kWh without a subsidy, after an extraordinary additional discount of 16.59% for that month.
Taxes and regional differences
Residential electricity carries 21% VAT, plus provincial and municipal charges that differ by location. Outside the Buenos Aires metropolitan area, tariffs are set by provincial regulators for provincial companies and co-operatives, so prices for similar consumption vary considerably between provinces.
Trend
Under the 2025–2030 tariff reviews for Edenor and Edesur (ENRE Resolutions 304/2025 and 303/2025), the distribution component rose 3% in May 2025 and then 0.36% a month until November 2027, on top of monthly indexation to a mix of 67% wholesale prices (IPIM) and 33% consumer prices (CPI). Together with higher wholesale prices, this raised Edenor’s unsubsidised R2 variable charge from ARS 115.80/kWh in January 2026 to ARS 158.64/kWh in August 2026 before tax.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households pay a regulated tariff set by the regulator for their distributor. Edenor and Edesur residential tariff T1-R has six consumption bands (R1 up to 150 kWh/month to R6 above 700 kWh/month), each with its own fixed and variable charge. |
| Other | Yes | Subsidised tariffs under the Subsidios Energéticos Focalizados (SEF) regime: eligible households pay a lower energy price on a monthly base of 300 kWh and the unsubsidised price on anything above it. Households must register to qualify. |
| Prepayment | Limited | Edenor offers MIDE (Medidor Integrado de Energía), a prepayment meter topped up with recharge tickets. Prepayment is not offered by every distributor. |
| Time-of-use | Limited | Peak, rest-of-day and off-peak (valley) energy charges apply to large customers on tariff T3. Standard residential tariffs are not time-of-use. |
| Fixed | No | Households cannot take a fixed-price contract; residential prices are adjusted by the regulator, in 2025–2026 typically every month. |
| Dynamic | No | No residential tariffs linked to wholesale spot prices are offered. |
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 3,540 kWh/person/yr (all sectors) (2025)Source 12Total electricity demand per person.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 26,632 electrified light vehicles registered in 2025 (2025)Source 34ACARA registrations of mild hybrid, hybrid, plug-in hybrid and battery electric vehicles, 4.6% of the market. Non-plug-in hybrids made up about 76% of the total, so plug-in vehicles are a small minority.
- Electric cooking
- 4.5 % of households (2022 (census))Source 10Derived: 718,937 of 15,932,302 households use electricity as their main cooking fuel. 52.7% use mains gas and 38.9% bottled gas.
Residential use is the largest single block of Argentine electricity demand and is very sensitive to the weather. FUNDELEC reported that residential customers accounted for 50% of national demand in December 2025, when demand rose 13.6% year on year in a heatwave, with commercial users at 26% and industry at 24%. The national demand record of 30,257 MW was set on 10 February 2025.
Heating and cooking rely mainly on gas. In the 2022 census, 52.7% of households cooked mainly with mains gas, 38.9% with bottled gas and only 4.5% with electricity. In areas without mains gas, households often depend more on electricity in winter, while air conditioning drives summer peaks across the country.
Annual national demand was 141.2 TWh in 2025, up 0.7% on 2024, according to FUNDELEC. Electric vehicles are at an early stage: electrified vehicles were 4.6% of new registrations in 2025, mostly non-plug-in hybrids.
Housing and households.
- Dwellings
- 17,783,029 private dwellings (2022 (census))Source 815,699,016 occupied (88.0%) and 2,084,013 unoccupied.
- Owner-occupied
- 65.7 % of households (2022 (census))Source 9Derived: 10,462,087 of 15,932,302 households live in their own home. Only 6,519,700 of them hold a registered title deed (escritura).
- Private rented
- 21 % of households (2022 (census))Source 9Derived: 3,341,956 rented households. A further 13.4% live in dwellings lent, provided by an employer or in other arrangements.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 76.7 % of occupied dwellings (2022 (census))Source 11
- Apartments and flats
- 19.6 % of occupied dwellings (2022 (census))Source 11A further 3.7% are other types (ranchos, casillas, rented rooms and similar).
- Urban population
- 92.4 % of population (2025)Source 36
Argentina is highly urbanised, with about 92% of people living in towns and cities, and a third of national electricity consumption is in the Buenos Aires metropolitan area. Even so, most homes are houses: in the 2022 census 76.7% of occupied dwellings were houses and 19.6% apartments.
About two-thirds of households (65.7%) own their home and 21.0% rent. Formal ownership is less complete than the headline suggests: only about 62% of owner households hold a registered title deed, which can matter for financing and for approvals that require proof of ownership.
How the grid works in Argentina.
- TransmissionCAMMESA, Transener and regional transmission companies
- DistributionRegional concession monopolies: Edenor and Edesur in Buenos Aires, provincial companies and several hundred co-operatives elsewhere
- MeteringNot identified from a reliable public source.
- Supply5 or more retail suppliers
Physical flow
Gas-fired, hydro, nuclear, wind and solar plants feed the Argentine Interconnected System (SADI). Transener’s extra-high-voltage network links the main generation regions with the large demand centres, regional trunk transmission companies run the lower transmission voltages, and distributors step down through medium voltage to the 220/380 V low-voltage supply used by homes.
Distribution is organised by concession area. In the Buenos Aires metropolitan area, Edenor and Edesur are federal concessions regulated by ENReGE. Every other province regulates its own distributors: some provinces have one main state or private company, while others rely heavily on local co-operatives. The 50 members of the distributors’ association ADEERA serve about 14.5 million customers.
Commercial flow
Distributors buy most of the energy for their regulated customers from the MEM at seasonal prices set by the Secretaría de Energía, and CAMMESA settles the difference between what generators are paid and what demand pays. Under Resolution 400/2025, from November 2025 generators are paid on a marginal-cost basis, new generation can sell under forward contracts, and large distribution users of 300 kW or more (GUDI) face more cost-reflective prices. Management of fuel for thermal plants, previously centralised at CAMMESA, is being passed back to generators by 1 January 2029.
Who regulates what
The national regulator ENReGE oversees transmission and the Edenor and Edesur concessions, while provincial regulators control their distributors and tariffs. ENReGE took over from ENRE and ENARGAS under Law 27.742 and Decree 452/2025, and by July 2026 was signing the monthly Edenor and Edesur tariff schedules.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Secretaría de Energía (Ministry of Economy) | Sets energy policy and wholesale market rules (for example Resolution 400/2025 on normalising the MEM), sets the seasonal wholesale prices passed through to tariffs, runs the distributed generation regime under Law 27.424 and the national user-generator platform, and calls tenders such as AlmaGBA. |
| Regulator | Ente Nacional Regulador del Gas y la Electricidad (ENReGE) | Created under Law 27.742 (Ley Bases) and Decree 452/2025 by merging ENRE and ENARGAS; its board was appointed in 2026. Regulates electricity transmission and the federal distribution concessions (Edenor and Edesur), approves their tariff schedules every month and handles consumer complaints (0800 333 3000). |
| Regulator | Provincial regulators (for example OCEBA in Buenos Aires Province) | Each province regulates the distribution companies and co-operatives in its territory, sets their tariffs and applies the distributed generation rules where the province has adhered to Law 27.424. |
| System operator | CAMMESA | Compañía Administradora del Mercado Mayorista Eléctrico: the dispatch body (Organismo Encargado del Despacho) for the Argentine Interconnected System (SADI). It dispatches generation, administers MEM transactions and settlement, calls demand-reduction events and acts as payment guarantor of last resort for the AlmaGBA storage contracts. |
| TSO | Transener and regional transmission companies | Transener operates almost 12,400 km of extra-high-voltage (500 kV and 220 kV) lines. Its subsidiary Transba runs 6,228 km of trunk lines in Buenos Aires Province; other regions have their own trunk transmission companies. |
| DSO | Edenor and Edesur (Buenos Aires metropolitan area) | Federal concessions regulated by ENReGE. Edenor serves the northern part of the City of Buenos Aires and Greater Buenos Aires; Edesur, part of the Enel group, serves the south. The Buenos Aires metropolitan area accounts for about a third of national consumption. |
| DSO | Provincial distributors and electricity co-operatives | Each province has its own system: state companies such as EPEC (Córdoba) and EPE (Santa Fe), private concessions such as Edelap (La Plata), and many local co-operatives. 357 distributors and co-operatives were registered on the national distributed generation platform in August 2026. |
| Supplier | The local distributor | Households buy electricity from their distributor, which also owns and reads the meter and bills the customer. There is no retail competition for households. Large users above 300 kW can buy energy in the wholesale market. |
| Exchange | MEM spot and forward markets | There is no power exchange. Resolution 400/2025 restored marginal-cost pricing and reopened the forward market (Mercado a Término), suspended since 2013, from 1 November 2025. Renewable generators also sell to large users under the MATER renewable term market. |
| Flexibility market | Demand management programmes (CAMMESA) | Large users above 300 kW (GUMA, GUME and GUDI) can be paid to reduce demand when called by CAMMESA in summer and winter. There is no equivalent for households. |
Compared with the UK system.
| UK concept | Argentina equivalent | How it works |
|---|---|---|
| DNO | Distribuidora (concessionaire) or electricity co-operative | The distributor holds an exclusive concession for its area, owns the network down to the meter, handles outages and new connections, and, unlike a UK DNO, is also the household’s supplier. In Buenos Aires it is Edenor or Edesur; elsewhere a provincial company or co-operative. |
| National Grid/NESO | CAMMESA (system operation) and Transener (transmission) | CAMMESA dispatches the interconnected system and runs the wholesale market; Transener and regional transmission companies own and operate the high-voltage network. Transmission companies may not buy or sell electricity. |
| MPAN | Número de cuenta / número de cliente | There is no national supply-point number. Each distributor gives the supply its own account or customer number, printed on the bill: Edenor uses a 10-digit account number; Edesur a customer number of which payment networks use the first 10 digits. |
| MPRN | Gas distributor’s customer number | Gas is supplied by separate gas distribution companies (such as Metrogas or Naturgy BAN in Buenos Aires) with their own customer numbers. There is no shared identifier between gas and electricity. |
| Meter operator | The distributor | The distributor owns, installs and reads the meter; there is no separate meter operator market. For solar export the distributor installs a bidirectional meter at the customer’s cost. |
| Supplier | The distributor (regulated tariff) | Households cannot switch supplier. Only large users (from 300 kW in the wholesale market rules) can buy energy from generators or traders. |
| Smart-meter infrastructure | None at national level | There is no national smart meter programme or communications network. Distributors run their own pilots, prepayment meters and remote reading for large customers. |
How a supply point is identified.
Número de cuenta: 3456789012 (fictional, Edenor-style)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Número de cuenta (Edenor) / Número de cliente (Edesur and most distributors) |
| Who issues it? | The local distribution company or co-operative when the supply is connected |
| Format | A numeric account or customer number defined by each distributor, with no national structure or check digit standard. The meter number (número de medidor) and the tariff category (for example T1-R, residential) appear alongside it on the bill. |
| Length | Varies by distributor: 10 digits for Edenor accounts; Edesur customer numbers are entered as their first 10 digits in payment networks |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed on the electricity bill together with the meter number and supply address, and shown in the distributor’s online office or app. Edenor MIDE prepayment customers find the details on their recharge ticket. |
| Electronic access | Each distributor runs its own customer systems; there is no national lookup service. The number is used to pay bills (for example Edenor via Red Link with the prefix 04100, or PagoMisCuentas with 00), to register for SEF subsidies and to file complaints with the regulator. |
| Third-party access | No regulated third-party access route exists. Installers and other third parties obtain the number from the customer’s bill. Applications under the distributed generation regime are made on the national digital platform by the customer and the qualified installer, using the supply’s details. |
| Who keeps the register | Each distributor’s commercial register. CAMMESA registers wholesale market agents, not individual household supply points. |
| Register scope | Per DSO |
What identifies a home’s supply
Argentina has no equivalent of a national meter point number. A household supply is identified by the distributor’s own customer or account number, together with the meter number and the supply address. Each distributor and co-operative uses its own numbering, so the same type of number looks different in Buenos Aires, Córdoba or Mendoza.
Edenor and Edesur
Edenor identifies supplies by a 10-digit account number (número de cuenta). Its subsidy guidance tells customers to take the meter number, account number and supply address from the bill. Edesur uses a customer number (número de cliente); for cash machine payments customers enter its first 10 digits. Complaints to the regulator about outages are normally made with the customer number and the last digits of the meter number.
Change of occupant
When a property changes hands or tenants, the new occupant asks the distributor for a change of account holder (cambio de titularidad). Whether the account number is kept or reissued depends on the distributor’s procedures; no national rule was found.
Why the number matters
The account number is the key used to register for SEF subsidies, to apply for a bidirectional meter under the distributed generation regime and to trace consumption history. There is no central data hub, so data held by the distributor can only be obtained from that distributor.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Net billing: injected kWh are valued at the distributor’s wholesale purchase price (seasonal energy plus transport price), deducted from the value of energy imported before taxes; any surplus becomes a credit |
| Is there net metering? | No. Law 27.424 uses net billing (balance neto de facturación): the money value of injected energy is subtracted from the value of energy drawn from the grid. Injected energy is valued at the wholesale price, which is always below the retail price because it excludes the distribution margin. |
| What size bands apply? | Since Resolution 235/2024: small user-generators up to 3 kW, medium from 3 kW to 300 kW and large from 300 kW to 12 MW (previously 2 MW). Within these bands, capacity is normally limited to the customer’s contracted capacity. |
| Does the regime apply everywhere? | No. Provinces must adhere to the national law. In August 2026, 15 jurisdictions had user-generators on the national platform, led by Córdoba, Buenos Aires Province and Entre Ríos. Some provinces apply their own prosumer schemes. |
| Can several users share one installation? | Yes. Resolution 608/2023 added community user-generators and virtual community user-generators, allowing several users to share one larger installation. |
| Are there tax advantages? | The Secretaría de Energía states that the user-generator certificate gives exemption from VAT and income tax on sales of injected energy for users with up to 300 kW contracted. The tax-credit certificates and the FODIS fund were removed when Decree 70/2023 repealed articles 16 to 37 of the law. |
| How common is it? | In August 2026 there were 5,061 user-generators with 174.2 MW on the national platform. Only 2,613 (14.1 MW) were residential; commercial and industrial users had 139.4 MW. |
Connecting a home system.
- Check that the province and the distributor have adhered to Law 27.424; the distributor must be registered on the national distributed generation platform (provinces with their own schemes have separate procedures).
- Engage a qualified installer (instalador calificado): a professional with a recognised electrical qualification registered with the professional council in that province.
- Start the user-generator application online on the national digital platform, giving the supply details and the equipment, which must meet the certified inverter and module standards.
- The distributor reviews the application. The connected capacity may not exceed the customer’s contracted capacity unless the regulator authorises more.
- After installation, request the bidirectional meter through the platform. The distributor installs it, at the customer’s cost.
- The distributor issues the user-generator certificate; injected and consumed kWh then appear separately on each bill.
Households can generate their own renewable electricity and inject surplus into the grid under Law 27.424 and its regulations, but take-up has been slow. The scheme pays for exported energy at the wholesale price rather than the retail price, and for years heavily subsidised tariffs made self-generation hard to justify. As subsidies have been withdrawn, retail prices have moved well above the compensation price, which favours using solar power on site rather than exporting it.
The process is managed through a national online platform that links customer, qualified installer and distributor. The distributor checks the request, fits a bidirectional meter and then shows injected and consumed energy on the bill. Because each province must adhere to the law, availability, technical requirements and procedures still differ across the country.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (for the wholesale market) | No concession needed for generation that sells into the transmission system; the generator must register as a MEM agent with CAMMESA and meet Secretaría de Energía rules. | Secretaría de Energía; CAMMESA | Law 24.065, articles 4–5. Generators may not hold controlling stakes in transmission companies. |
| Generate for self-consumption with export (rooftop solar) | No licence. Requires user-generator status under Law 27.424: application through the national platform, installation by a qualified installer, distributor approval and a bidirectional meter. | Distributor; provincial regulator; Secretaría de Energía (platform) | Applies only where the province has adhered. Bands: up to 3 kW, 3–300 kW, 300 kW–12 MW. |
| Store electricity | Law 24.065 recognises storage operators (almacenistas), dispatched like generators, as a separate type of market participant. No specific rule for behind-the-meter household batteries was found. | Secretaría de Energía; CAMMESA | Grid-scale storage has so far been procured through the AlmaGBA tender, with contracts signed with Edenor and Edesur. |
| Export to the grid | No licence for user-generators; export is allowed under the distributor’s connection approval and paid at the wholesale price under net billing. Larger plants export as MEM generators. | Distributor; CAMMESA (MEM agents) | Connected capacity is limited to contracted capacity unless the regulator allows more. |
| Supply (sell) electricity to households | Only the concession-holding distributor can supply regulated customers in its area. No retail licence route exists for households. | ENReGE (federal concessions); provincial governments and regulators | Concessions are granted by the national or provincial executive, with tariffs set by the regulator. |
| Distribute or transmit electricity | Concession from the national or provincial executive, plus a certificate of public convenience for new facilities. | National executive / ENReGE; provincial authorities | Transmission companies may not buy or sell electricity (Law 24.065, article 30). |
| Trade or aggregate (comercializador) | Traders that buy or sell electricity for third parties are recognised MEM participants and must register as agents. No aggregator role for household assets exists. | Secretaría de Energía; CAMMESA | The forward market reopened in November 2025, widening the room for bilateral contracts with large users. |
| Buy in the wholesale market (large users) | Large users register as MEM agents (GUMA, GUME) or as large distribution users (GUDI, from 300 kW) and can contract energy directly with generators or traders. | CAMMESA; Secretaría de Energía | Renewable supply contracts for large users are made under the MATER regime. |
| Balancing, grid services and demand response | Provided by MEM agents under CAMMESA procedures. Users above 300 kW can join demand management programmes with fixed and variable payments. | CAMMESA; Secretaría de Energía | No route exists for households, virtual power plants or remote control of small assets. |
Argentina’s framework law, Law 24.065 of 1992, separates generation, transmission and distribution. Generation is open to private investors without a concession, while transmission and distribution are public services run under concessions. The law also recognises large users, user-generators, traders and storage operators as market participants.
For households, the relevant permissions are not licences but the user-generator procedure under Law 27.424. Supply to households remains a regulated monopoly of each distributor, so activities that need a supply or aggregation licence elsewhere, such as selling surplus to neighbours or pooling home batteries, have no route in Argentina.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Advanced Demand Management Programme | Restricted | 300 kW | No | CAMMESA / Secretaría de Energía. Launched in September 2025 under the 2024–2026 contingency plan. Large users (GUMA, GUME, GUDI) voluntarily commit to cut demand for up to 5 hours a day on up to 14 days a year, for fixed and variable payments. |
| Distributor demand management programmes | Restricted | Large distribution customers (GUDI/GUME) | No | Edenor, Edesur with CAMMESA. Edenor’s programme runs in summer (December–March) and winter (June–August). Customers reduce load when called by CAMMESA; CAMMESA validates the reductions. Non-compliance costs three times the committed fixed charge per day. |
| Battery storage contracts (AlmaGBA) | Restricted | — | No | Secretaría de Energía; Edenor and Edesur. Competitive tender for grid-connected storage in the Buenos Aires area: 667 MW awarded in September 2025, with CAMMESA as payment guarantor of last resort. |
Argentina has no flexibility market for small distributed assets. Demand response exists only for large users of 300 kW or more, through CAMMESA-run programmes designed to protect supply during summer and winter peaks; the government noted that the highest demand is concentrated in about 35 hours a year.
The 2025 wholesale market reforms reopened bilateral forward contracts and moved towards marginal-cost pricing, and storage operators are now recognised in law. Batteries are being added through central procurement (AlmaGBA) rather than through open markets for grid services.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Plataforma Nacional de Generación Distribuida | National online platform for user-generator applications, linking customers, qualified installers and registered distributors. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national rollout; pilots and remote reading for large customers only |
| Reading interval | Not standardised (most homes have meters read for monthly billing) |
| National programme | None |
| Regulatory work | ENRE Resolution 100/2024 set up a study committee on smart meters for Edenor and Edesur |
| Prepayment | Edenor MIDE (Medidor Integrado de Energía) |
| Large customers | Remote reading (telegestión de medición) offered by Edenor |
| Solar export | Bidirectional meter installed by the distributor at the customer’s cost |
Meters belong to the distributor, which chooses, installs and reads them. Conventional meters remain the norm, and there is no national target, data hub or common communications standard for smart meters.
In February 2024 the national regulator set up a committee with Edenor and Edesur to study smart metering in the Buenos Aires area. Distributors use prepayment meters such as Edenor’s MIDE and remote reading for large customers. For user-generators the distributor fits a bidirectional meter recording import and export separately.
Renewable electricity.
Electricity generation mix (2025).
- Gas: 53.7%
- Hydro: 17.1%
- Wind: 12.2%
- Nuclear: 7%
- Other fossil: 3.9%
- Solar: 3.4%
- Bioenergy: 1.9%
- Coal: 0.9%
- Renewable electricity share
- 34.6% (2025)Source 12Share of generation including large hydro (17.1%), wind (12.2%), solar (3.4%) and bioenergy (1.9%). Nuclear adds 7.0%. Law 27.191 targets count only non-conventional renewables, which exclude large hydro.
- Home solar
- 14.1 MW (Aug 2026)Source 132,613 residential user-generators on the national platform (average about 5.4 kW, derived). Excludes provinces with their own schemes.
- Solar added each year
- 0.85 GW (2025)Source 12Net increase in solar capacity during 2025.
- Hydro
- 9.19 GW (2025)Source 12
- Wind
- 4.5 GW (2025)Source 12
- Solar
- 2.59 GW (2025)Source 12
- Bioenergy
- 0.43 GW (2025)Source 12
Targets.
- Law 27.191: at least 20% of national electricity consumption from non-conventional renewable sources by 31 December 2025.
- Law 27.424 regulations: 1,000 MW of distributed renewable generation within 12 years.
Argentina’s low-carbon electricity comes mainly from large hydro (17.1% of generation in 2025) and nuclear (7.0%), with wind (12.2%) and solar (3.4%) growing fast. Hydro output varies with rainfall: it fell from 29.7 TWh in 2024 to 26.3 TWh in 2025.
Many recent wind and solar projects supply large users under private contracts through the MATER renewable term market. Wind and solar capacity grew by about 1 GW in 2025, raising their share of generation from 13.2% to 15.5%. Renewables met a record 44.28% of demand on 19 October 2025.
Distributed solar is still marginal: 174 MW of user-generators of all sizes were connected under the national scheme by August 2026, far below the 1,000 MW objective.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 667 MW contracted (not yet operating) (Sep 2025)Source 19Battery capacity awarded in the AlmaGBA tender, expected to enter service within 12–18 months of award.
Large-scale battery storage is new in Argentina. The AlmaGBA tender was designed to reduce summer outages in Buenos Aires by placing batteries at congested points of the Edenor and Edesur networks. The contracts are signed with the two distributors, and CAMMESA acts as payment guarantor of last resort. The government has invited provinces to replicate the model at critical nodes elsewhere.
Law 24.065 now recognises storage operators as market participants dispatched like generators. There is no specific scheme or statistic for home batteries.
Storage projects.
- AlmaGBA (Almacenamiento GBA): Tender called under Resolution 67/2025 for battery storage at critical nodes in the Buenos Aires metropolitan area. 27 bids from 15 companies offered 1,347 MW; 667 MW were awarded, with investment of more than USD 540 million.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Edenor | About 3.4 million customers (north of Buenos Aires metropolitan area) | No | Limited | No | Yes |
| Edesur | About 2.5 million customers (south of Buenos Aires metropolitan area) | No | Limited | No | Yes |
| EPEC (Empresa Provincial de Energía de Córdoba) | — | No | Unknown | No | Yes |
| EPE (Empresa Provincial de la Energía de Santa Fe) | — | No | Unknown | No | Unknown |
| Edelap | — | No | Unknown | No | Unknown |
There are no competing retail suppliers for households: the distributor for the area is the supplier. Edenor and Edesur serve the Buenos Aires metropolitan area, while each province has its own state company, private concessionaire or co-operatives. Customer numbers for Edenor and Edesur are approximate figures reported in the press.
Export compensation is not a supplier product but the regulated net-billing value set under Law 27.424 in adhered provinces. Green tariffs are available only to large users, through MATER contracts with renewable generators.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Secretaría de Energía | Government | Energy policy, wholesale rules and the distributed generation regime | Publishes the monthly distributed generation reports, the user-generator platform and the rules behind wholesale prices and subsidies. |
| ENReGE (Ente Nacional Regulador del Gas y la Electricidad) | Regulator | Federal regulator for electricity and gas | Approves Edenor and Edesur tariffs, regulates transmission and handles consumer complaints in the Buenos Aires area. |
| OCEBA | Regulator | Electricity regulator for Buenos Aires Province | Regulates the provincial distributors and co-operatives in Argentina’s most populous province. |
| CAMMESA | Market | Wholesale market administrator and dispatch body | Dispatches the interconnected system, settles the MEM and publishes operating data. |
| Transener | Transmission | Extra-high-voltage transmission operator | Operates the 500 kV and 220 kV backbone linking generation regions with demand centres. |
| ADEERA | Distribution | Association of Argentine electricity distributors | Represents public, private and co-operative distributors serving most of the country’s customers. |
| CADER (Cámara Argentina de Energías Renovables) | Renewable Energy | Renewable energy industry chamber | Industry body for renewable generators, developers and suppliers, including distributed generation. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Inverters (safety and certification) | IRAM 210013-21, or IEC 62109-2 | IRAM / IEC | Required for grid-connected inverters under the Law 27.424 regime. |
| Anti-islanding | IEC 62116 or VDE 0126-1-1 | IEC / VDE | Accepted alternatives where inverters lack IRAM 210013-21 certification. |
| Grid code compliance | VDE-AR-N 4105 or RD 1699 | VDE (Germany) / Spanish Royal Decree | Inverters must meet one of these international grid codes in the absence of IRAM certification. |
| PV modules | IEC 61730-1/2; IRAM 210013-17 or IEC 61215 (crystalline); IEC 61215 or IEC 61646 (thin film) | IEC / IRAM | Construction, safety and performance certification for modules. |
| Building wiring | AEA 90364 | Asociación Electrotécnica Argentina | Rules for electrical installations in buildings, based on IEC 60364, covering up to 1,000 V AC and 1,500 V DC. |
| Installer qualification | Instalador calificado (Law 27.424) | Provincial professional councils | Installer must hold a recognised electrical qualification and be registered with the professional council of the province where the work is done. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Provincial adherence to Law 27.424 | Yes | Regional | The national net-billing regime applies only in provinces that have adhered and whose distributor is registered on the national platform. |
| Distributor approval and connection | Yes | Mixed | Application through the national platform; capacity limited to contracted capacity unless the regulator authorises more. |
| Bidirectional meter | Yes | Local | Installed by the distributor at the customer’s cost before export is credited. |
| Qualified installer | Yes | Regional | Professional registration (matrícula) in the province where the installation is made. |
| Planning or building permission | Limited | Local | Set by municipalities; no national rule specific to rooftop solar was found. |
Permissions are split between the national regime, the province and the distributor. The Secretaría de Energía runs the national platform and technical standards, provinces decide whether to adhere and regulate their distributors, and the distributor approves the connection and fits the meter. Building rules are municipal.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net billing for user-generators (Law 27.424) | Active | Net billing | Injected energy is credited at the wholesale price against the value of energy consumed, with surpluses carried as credit. Available in adhered provinces. | — |
| Tax exemption on injected energy | Active | Tax exemption | According to the Secretaría de Energía, the user-generator certificate exempts sales of injected energy from VAT and income tax for users with up to 300 kW contracted. | — |
| Subsidios Energéticos Focalizados (SEF) | Active | Bill subsidy | Decree 943/2025: eligible households registered in the regime pay a subsidised energy price on a base of 300 kWh a month. | From January 2026 |
| FODIS fund and tax-credit certificates | Closed | Tax credit / fund | Decree 70/2023 repealed articles 16–37 of Law 27.424, removing the distributed generation fund (FODIS), promotional instruments and the industrial promotion regime. | — |
Data and connectivity.
- Fixed broadband
- 26.1 fixed broadband subscriptions per 100 people (2024)Source 37In the 2022 census, 76.5% of households had internet at home (derived: 12,185,954 of 15,932,302).
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Internet use is widespread: the World Bank puts internet users at 89.7% of the population in 2024, and 76.5% of households had a home connection in the 2022 census. Fixed broadband subscriptions are lower, at 26.1 per 100 people.
There is no national smart meter communications network or common protocol. Remote reading is offered by distributors to large customers, and monitoring of home solar systems normally relies on the household’s own internet connection.
Grid conditions.
- National peak demand
- 30.3 GW (10 Feb 2025)Source 29National record of 30,257 MW, set during a heatwave.
- Annual electricity demand
- 141.2 TWh (2025)Source 30MEM demand reported by FUNDELEC. Ember reports total demand of 162.4 TWh including net imports and losses on a different basis.
- Generation capacity
- 46.5 GW (2025)Source 12Derived: 28.04 GW fossil plus 18.46 GW clean capacity.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The system is under most strain in summer heatwaves, when air conditioning pushes demand above 30 GW and parts of the Buenos Aires distribution networks become congested, leading to outages. The government’s 2024–2026 contingency plan, the demand management programmes and the AlmaGBA batteries are aimed at these peaks.
Argentina depends heavily on gas-fired generation, which supplied more than half of electricity in 2025, and imports electricity from neighbouring systems: net imports were 9.3 TWh in 2025. Wind and solar output is growing in regions far from Buenos Aires, which increases the need for transmission capacity.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| ENRE and ENARGAS merged into ENReGE | Current | 2026 | Law 27.742 and Decree 452/2025 created a single federal regulator for gas and electricity; its board was appointed by Decree 318/2026 and it issues electricity tariff schedules. |
| Subsidios Energéticos Focalizados (SEF) | Current | January 2026 | Decree 943/2025 replaced income-based subsidy segmentation with a targeted regime subsidising a 300 kWh monthly base for eligible households. |
| Normalisation of the wholesale market (Resolution 400/2025) | Current | 1 November 2025 | Marginal-cost remuneration, reopening of the forward market and more cost-reflective prices for large distribution users. |
| Decentralised fuel management for thermal plants | Upcoming | By 1 January 2029 | Under Resolution 400/2025, generators take over fuel procurement from CAMMESA gradually, ending when the Plan Gas scheme expires. |
| Edenor and Edesur tariff review 2025–2030 | Current | May 2025 – April 2030 | Monthly real increases of 0.36% in the distribution component until November 2027, then indexation only. New quality standards and tariff rules for user-generators were included. |
| AlmaGBA battery systems enter service | Upcoming | Expected late 2026 – 2027 | 667 MW of storage contracted in September 2025 with a 12–18 month delivery period. |
| Higher distributed generation limit | Current | September 2024 | Resolution 235/2024 raised the maximum user-generator size from 2 MW to 12 MW and set the size bands. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | 2,613 residential user-generators with 14.1 MW on the national platform in August 2026, against 15.9 million households. |
| Distributed energy market | Low | 174.2 MW of distributed generation of all sizes connected by August 2026, against 46.5 GW of total capacity. |
| Grid flexibility market | Low | Demand response limited to users above 300 kW through CAMMESA-run programmes; no aggregation or market access for small assets. |
| Energy storage adoption | Low | First large-scale batteries (667 MW, AlmaGBA) were awarded in 2025 and are not yet operating; no data on home batteries. |
| Renewable growth environment | Medium | Wind and solar capacity grew by about 1 GW in 2025 and their share of generation rose from 13.2% to 15.5% (Ember). |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 37 sources
- Cuadro tarifario EDENOR, Tarifa 1-R sin subsidio, vigencia 1 de agosto de 2026 (Resolución ENReGE 375/2026, anexo). Ente Nacional Regulador del Gas y la Electricidad, 2026. accessed 1 October 2026.
- Resolución 375/2026 (EDENOR tariffs from 1 August 2026). Ente Nacional Regulador del Gas y la Electricidad, 2026. accessed 1 October 2026.
- Cuadros tarifarios EDENOR 2026 (January, February, April, May, June and August schedules, Tarifa 1-R sin subsidio, band R2). ENRE / ENReGE, via InfoLEG and Argentina.gob.ar, 2026. accessed 1 October 2026.
- Resoluciones ENRE 303/2025 (EDESUR) and 304/2025 (EDENOR): Revisión Tarifaria Integral 2025–2030. Ente Nacional Regulador de la Electricidad, 2025. accessed 1 October 2026.
- Resolución 22/2026: EDENOR tariffs under the Subsidios Energéticos Focalizados regime (Decreto 943/2025). Ente Nacional Regulador de la Electricidad, 2026. accessed 1 October 2026.
- Cotizaciones de monedas, 30 de septiembre de 2026. Banco Central de la República Argentina, 2026. accessed 1 October 2026.
- Censo 2022, resultados definitivos: cuadro resumen de población. INDEC, 2022. accessed 1 October 2026.
- Censo 2022: viviendas particulares ocupadas y hogares (cuadro 2, viviendas). INDEC, 2022. accessed 1 October 2026.
- Censo 2022: hogares por régimen de tenencia (cuadro 6, hogares). INDEC, 2022. accessed 1 October 2026.
- Censo 2022: hogares por combustible utilizado principalmente para cocinar (cuadro 4, hogares). INDEC, 2022. accessed 1 October 2026.
- El 76,7% de las viviendas particulares ocupadas de la Argentina son casas. INDEC (Censo 2022), 2023. accessed 1 October 2026.
- Yearly electricity data: Argentina (generation, capacity, demand). Ember, 2025. accessed 1 October 2026.
- Generación Distribuida: Reporte de avance, agosto de 2026. Secretaría de Energía, 2026. accessed 1 October 2026.
- Generación Distribuida: preguntas frecuentes. Secretaría de Energía. accessed 1 October 2026.
- Se modifica el límite máximo de potencia para los usuarios-generadores renovables (Resolución SE 235/2024). Marval O’Farrell Mairal, 2024. accessed 1 October 2026.
- DNU: qué modificaciones se hicieron a la ley de Generación Distribuida. Diario Río Negro, 2024. accessed 1 October 2026.
- Mercado Eléctrico Mayorista: normalización y modernización (Resolución SE 400/2025). Marval O’Farrell Mairal, 2025. accessed 1 October 2026.
- Ley 24.065: Régimen de la energía eléctrica (texto actualizado). InfoLEG, Ministerio de Justicia. accessed 1 October 2026.
- El Gobierno Nacional adjudicó 660 MW de almacenamiento eléctrico en el AMBA, superando en 30% el objetivo inicial. Argentina.gob.ar, 2025. accessed 1 October 2026.
- El Gobierno Nacional estableció un Programa de Gestión Avanzada de Demanda. Argentina.gob.ar, 2025. accessed 1 October 2026.
- Programa de Gestión de Demanda de Energía. Edenor. accessed 1 October 2026.
- Lugares y medios de pago (número de cuenta de 10 dígitos). Edenor. accessed 1 October 2026.
- Subsidios: preguntas frecuentes. Edenor. accessed 1 October 2026.
- Opciones de pago. Edesur. accessed 1 October 2026.
- El Gobierno designó el directorio del ENRGE y avanza la unificación de los entes reguladores de gas y electricidad. Ámbito, 2026. accessed 1 October 2026.
- Decreto 452/2025: unificación del ENARGAS y del ENRE. Beccar Varela, 2025. accessed 1 October 2026.
- Ente Nacional Regulador del Gas y la Electricidad. Argentina.gob.ar. accessed 1 October 2026.
- El ENRE retoma planes para instalar medidores inteligentes (Resolución 100/2024). Más Energía (LM Neuquén), 2024. accessed 1 October 2026.
- Récord: se alcanzaron nuevos máximos históricos de consumo energético y potencia (FUNDELEC data). El Economista, 2025. accessed 1 October 2026.
- Diciembre al rojo vivo: el consumo eléctrico dio un salto histórico (FUNDELEC data). El Economista, 2026. accessed 1 October 2026.
- Argentina marcó un récord en la generación de renovables. Ámbito, 2025. accessed 1 October 2026.
- Transener: company overview. Transener. accessed 1 October 2026.
- Edgardo Volosin continuará al frente de la Asociación de Distribuidoras de Energía Eléctrica. EconoJournal. accessed 1 October 2026.
- La venta de autos electrificados creció fuerte en Argentina: los números que dejó 2025. InfoNegocios, 2026. accessed 1 October 2026.
- Todo sobre instalaciones eléctricas, todo sobre AEA 90364. Editores (Ingeniería Eléctrica), 2024. accessed 1 October 2026.
- Urban population (% of total population): Argentina. World Bank, 2025. accessed 1 October 2026.
- Fixed broadband subscriptions (per 100 people): Argentina. World Bank, 2024. accessed 1 October 2026.
Questions about energy in Argentina.
It depends on the distributor and on whether the household is subsidised. For Edenor in Buenos Aires from 1 August 2026, an unsubsidised household using 151–400 kWh a month pays ARS 158.64/kWh plus a fixed charge of ARS 3,713.54 a month, before 21% VAT and local levies. That is about ARS 192/kWh including VAT, or roughly EUR 0.11/kWh.
Since January 2026, the Subsidios Energéticos Focalizados regime (Decree 943/2025) gives registered eligible households a lower energy price on a base of 300 kWh a month. Consumption above that is billed at the unsubsidised price.
Yes, in provinces that have adhered to Law 27.424. You become a user-generator through the national online platform, using a qualified installer, and the distributor installs a bidirectional meter. Exported energy is credited at the wholesale price under net billing, not paid at the retail price.
There is no national supply-point number. Each distributor identifies the supply by its own account or customer number printed on the bill: Edenor uses a 10-digit account number and Edesur a customer number. The meter number and supply address are also used.
No. Households are supplied by the distribution company or co-operative that holds the concession for their area, at a regulated tariff. Only large users can buy energy in the wholesale market.
The Secretaría de Energía sets policy and wholesale rules, CAMMESA runs dispatch and the wholesale market, ENReGE regulates transmission and the Edenor and Edesur concessions, and provincial regulators oversee distributors elsewhere.
Not at scale. There is no national rollout; distributors run pilots, prepayment meters such as Edenor’s MIDE and remote reading for large customers. User-generators get a bidirectional meter.