Energy in Cambodia, explained.

How electricity works in Cambodia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Cambodia: Not yet available.Olmack is not offered in Cambodia yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Cambodia.

Cambodia electricity 2026: EAC-regulated tariffs from 380 riel/kWh, EDC and 370 private licensees, rooftop solar compensation charges, imports and the national grid.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Cambodian riel (KHR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Cambodia energy at a glance.

Key figures for households in Cambodia. Each one links to its source on the full overview below.

  • Electricity price.

    610 KHR per kWh for households, including taxes. Figures for 2025.

  • Household use.

    1,457 kWh a year for a typical household. Figures for 2025.

  • Renewable share.

    50.1% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Cambodia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Cambodia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Cambodia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Cambodia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Cambodia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Cambodia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Cambodia.

Full overview

The energy market in Cambodia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Cambodia’s power sector is governed by the Electricity Law of 2001 (amended in 2007 and 2015), which splits responsibility between the Ministry of Mines and Energy (MME), which sets policy, development plans and technical standards, and the Electricity Authority of Cambodia (EAC), an autonomous regulator that licenses every electricity business, approves tariffs and resolves disputes. The state utility Electricité du Cambodge (EDC) holds the only public-sector licence; it owns and operates the high-voltage national grid, buys almost all the output of independent power producers and imports, and supplies about 1.47 million customers directly.

Distribution is unusually fragmented. Outside EDC’s own areas, electricity reaches homes through several hundred privately owned distribution licensees, many of them small rural electricity enterprises that buy power from EDC’s grid and sell it on within a licensed territory. At the end of 2025 there were 542 valid licences, including 364 distribution licences, and private licensees served about 2.5 million of Cambodia’s 3.97 million connections.

Electrification has expanded very quickly: household connections rose from 27% of households in 2011 to 95.9% in 2025, and 99.1% of villages are now electrified. Domestic generation in 2025 came roughly half from renewables (mainly hydropower, with fast-growing solar) and half from coal and fuel oil, with about 8% of supply imported from Vietnam, Thailand and Laos. Since 2016 the government has pursued a policy of a uniform national tariff, funded in part by subsidies channelled through licensees, so a rural household on a small private network pays the same rates as one in Phnom Penh.

Energy snapshot.

Headline figures for electricity in Cambodia. Each shows its data year and links to its source.

  • Population17,847,982 peopleSource 112025
  • Households3,880,000 householdsSource 22025
  • Average household size4.3 people/householdSource 102019
  • Electricity use per household1,457 kWh/yrSource 22025
  • Household price (KHR)610 KHR/kWhSource 12025
  • Household price (EUR)0.136 EUR/kWhSource 122025
  • Renewable electricity share50.1%Source 22025
  • Solar capacity1.476 GWSource 22025
  • Wind capacity0 GWSource 22025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Electricity Authority of Cambodia (EAC)
System operator
Electricité du Cambodge (EDC), holder of the national transmission and dispatch functions under its consolidated licence
Distribution networks
EDC in Phnom Penh and provincial centres (about 1.47 million consumers) plus several hundred private distribution licensees, mostly rural electricity enterprises, serving about 2.5 million consumers in licensed territories.
Currency
Cambodian riel (KHR)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in Cambodia.

Household price (KHR)
610 KHR/kWh (2025)Source 1National-grid residential rate for monthly consumption of 51–200 kWh, the band containing the largest group of residential consumers (38% in 2025). Rates are 380 riel (1–10 kWh), 480 riel (11–50 kWh), 610 riel (51–200 kWh) and 730 riel (above 200 kWh). The EAC issued its 2026 consumer tariff decision (032.SR.26) on 29 January 2026; its rates could not be verified from the published scan.
Household price (EUR)
0.136 EUR/kWh (2025)Source 12Converted from 610 riel/kWh at 4,000 riel per US dollar (the riel–dollar conversion used in EAC’s own 2025 tariff tables, e.g. 0.037 USD = 148 riel) and the ECB reference rate of 1.1206 USD per euro on 9 October 2026. Indicative only.
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (KHR per kWh).Source 2

610610.561020192025
Cambodia household electricity price, KHR per kWh
2019610 KHR/kWh
2020610 KHR/kWh
2021610 KHR/kWh
2022610 KHR/kWh
2023610 KHR/kWh
2024610 KHR/kWh
2025610 KHR/kWh

Tariffs are approved by the Electricity Authority of Cambodia under its Regulations on General Principles for Regulating Electricity Tariffs (2007), following the government’s annual tariff plan issued by the Ministry of Mines and Energy. For 2025 that plan was set by MME Prakas 0275 of 4 November 2024, and EAC implemented it through Decision 008.SR.25 of 22 January 2025. EAC publishes separate decisions each January for EDC’s consumer tariff, bulk sales to licensees, sub-transmission licensees, special economic zones and areas fed from Vietnam.

A uniform national tariff

Since 2016 EAC has applied a strategic plan to equalise tariffs: all distribution licensees connected to the national grid charge the same consumer rates as EDC. Because small rural networks cost more to run, the Rural Electrification Fund pays subsidies to private licensees to bridge the gap. Since 2016 it has supported 401 rural electricity enterprises with USD 808 million, covering about 2.27 million households outside EDC’s own areas. By 2025, 370 of 378 distribution licensees applied the national-grid tariff.

The residential tariff has been held unchanged since 2020. EAC’s 2025 report states that the government has subsidised the sector by hundreds of millions of dollars to keep consumer tariffs stable while fuel and power costs rose regionally. Most consumer tariffs are expressed in riel, while large-customer tariffs are set in US dollars.

Rooftop solar compensation charge

Since July 2025 customers with rooftop solar pay a compensation charge for using the national grid to back up their systems (EAC Decision 101.SR.25). Systems below 10 kWac pay nothing; the charge then rises from 0.037 USD (148 riel) per kWh of solar generation for 10–50 kWac to 0.060 USD (240 riel) for systems above 1,000 kWac. A customer whose battery discharges at least half as much energy as the solar system generates in a month is exempt for that month. On 2 October 2026 EAC issued Decision 324.SR.26 setting estimated energy quantities by technical standard, used as the basis for calculating the charge.

Electric vehicle charging

EAC sets maximum charging prices for licensed public EV charging stations (Decision 120.SR.25 as amended by Decision 183.SR.25): 1,050 riel/kWh for AC charging, 1,350 riel/kWh for DC charging up to 250 kW and 1,450 riel/kWh above 250 kW.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesResidential low-voltage tariff for national-grid supply, applied by EDC and by private licensees alike: 1–10 kWh a month 380 riel/kWh; 11–50 kWh 480 riel; 51–200 kWh 610 riel; above 200 kWh 730 riel. Unchanged since 2020 (the top band was 740 riel in 2019).
RegulatedLimitedArea tariffs for residential customers supplied from Vietnam at medium voltage outside the national grid: Ratanakiri 670 riel/kWh; Kampong Trach, Ponhea Krek, Memot, Keo Seima and Svay Rieng 650 riel/kWh; Snuol 600 riel/kWh. The few isolated diesel systems charge 2,500–2,900 riel/kWh, and small solar mini-grids 730 riel/kWh.
Off-peakLimitedA preferential 480 riel/kWh rate for night-time use (9 pm to 7 am) at low voltage, for agricultural water pumping, agricultural consumers and consumers who have installed solar PV. The medium-voltage equivalent is 0.12 USD/kWh. Not a general household tariff.
Time-of-useLimitedIndustrial, agricultural and commercial customers connected at high or medium voltage, or metered on a transformer, can choose a time-of-use option with a capacity charge (2.00–3.50 USD/kW/month) and peak (7 am–9 pm) and off-peak (9 pm–7 am) energy rates, e.g. 0.150/0.124 USD/kWh for commercial MV customers. Not offered to households.
DynamicNoThere is no wholesale market; all retail tariffs are approved by EAC.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,457 kWh/yr (2025)Source 2Derived: 5,414 GWh sold to 3,716,220 residential low-voltage consumers in 2025 (EAC). This is consumption per residential connection.
Average daily use per household
3.99 kWh/day (2025)Source 2Derived from 1,457 kWh per residential connection per year.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,086 kWh/person/yr (2024)Source 11All sectors (World Bank, 1,086.2 kWh; 932.4 kWh in 2023).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
0 % of homes (2023)Source 10Households using publicly provided electricity as the main cooking fuel: 0.0% nationally (0.1% rural). Firewood 47.8%, LPG 45.8%, charcoal 5.6%. Electric rice cookers are common as a secondary appliance but are not captured as main fuel.

Electricity demand has grown fast. Energy sold to consumers rose from 6.2 TWh in 2016 to 20.3 TWh in 2025, an increase of 11.7% in 2025 alone, and World Bank data put consumption at 1,086 kWh per person in 2024. Industry and commerce dominate: residential customers made up 94% of connections but bought 28% of the electricity sold in 2025.

Residential use is modest but rising. EAC data for 2025 show 3.72 million residential low-voltage consumers using 5,414 GWh, about 1,457 kWh per connection. Of 3.5 million residential accounts analysed by consumption band, 11.9% used 10 kWh a month or less, 32.4% used 11–50 kWh, 38.2% used 51–200 kWh and 17.5% used more than 200 kWh. In Phnom Penh nearly 40% of EDC’s residential customers used more than 200 kWh a month, compared with 7.6% in private licensees’ mainly rural areas.

Electricity is now the main source of lighting for 93% of households (2023 socio-economic survey), up from 14% in 2004, with solar used by 5.4% (8.2% in rural areas). Cooking still relies on firewood and LPG rather than electricity as the main fuel.

Housing and households.

Dwellings
3,986,500 occupied dwellings (2023)Source 10Number of households in the CSES 2023, used as a proxy for occupied dwellings.
Owner-occupied
91.8% (2023)Source 10Phnom Penh 70.0%, other urban 92.9%, rural 96.4%.
Private rented
4.9% (2023)Source 10Phnom Penh 25.9%. A further 3.2% of households occupy dwellings rent-free.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
41.1 % of population (2025)Source 11World Bank estimate. The CSES 2023 classed 39.2% of households as urban.

Cambodian households overwhelmingly own their homes: 91.8% in 2023, rising to 96.4% in rural areas. Renting is concentrated in Phnom Penh, where 25.9% of households rent. Most homes are low-rise; 49% have roofs of galvanised iron or aluminum and 34% of tiles, while concrete roofs, which indicate multi-storey buildings, account for 22% of dwellings in Phnom Penh and under 2% elsewhere.

High home ownership and large areas of sheet-metal roofing are relevant to rooftop solar, but installations on homes must go through the rooftop solar permitting and licensed-installer regime described below. EAC also issued principles in 2022 governing electricity supply and infrastructure investment in condominium and commercial developments.

How the grid works in Cambodia.

  1. TransmissionElectricité du Cambodge (EDC)
  2. DistributionEDC in Phnom Penh and provincial centres (about 1.47 million consumers) plus several hundred private distribution licensees, mostly rural electricity enterprises, serving about 2.5 million consumers in licensed territories.
  3. MeteringNot identified from a reliable public source.
  4. Supply1 or more retail suppliers

Power flows from domestic plants and import points onto EDC’s high-voltage national grid, which at the end of 2025 comprised 177 km of double-circuit 500 kV line, about 2,800 km of 230 kV line and 1,336 km of 115 kV line, feeding 75 grid substations across 25 provinces. EAC classifies supply into three customer types: bulk consumers of 10 MW or more may buy directly from a grid substation; consumers above 500 kVA buy from sub-transmission or distribution licensees over medium-voltage lines; and smaller consumers, including all households, buy from the local distribution licensee.

Below the substations, the network is shared between EDC and private licensees. By December 2025 there were 51,818 km of medium-voltage line (52% EDC-funded), 35,723 distribution transformers and 51,438 km of low-voltage line, of which 77% had been built by private licensees. Overall losses were 10.08% in 2025.

Imports and isolated systems

Cambodia imports from Vietnam (230 kV and many 22/35 kV links), Thailand (115 kV and 22 kV) and Laos (500 kV, 115 kV and 22 kV). Some private companies have MME permission to buy from Thailand’s Provincial Electricity Authority for border areas. By the end of 2025 only four licensees still ran isolated systems with their own diesel or solar generation.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Mines and Energy (MME)Sets energy policy, the power development plan, the annual tariff plan and technical, safety and environmental standards. Approves rooftop solar installation service providers before they apply to EAC for a licence.
RegulatorElectricity Authority of Cambodia (EAC)Autonomous regulator created by the Electricity Law. Issues, revises and revokes all licences, approves tariffs and charges, sets performance standards, resolves consumer complaints and publishes the annual power sector report.
TSOElectricité du Cambodge (EDC)State utility holding licence 001L, a consolidated generation, national transmission and distribution licence. Owns the 115/230/500 kV national grid (4,302 km of lines and 75 grid substations at the end of 2025) and its national control centre, and is the main buyer of power from independent producers and imports.
SupplierEDC (distribution and retail)Supplies 1,469,802 consumers directly (Zone 1 in EAC’s classification), mainly Phnom Penh and provincial towns, and sells in bulk to private licensees.
DSOPrivate distribution licensees364 distribution licences, plus consolidated and retail licensees, were valid at the end of 2025. Most are rural electricity enterprises serving a contiguous licensed territory; together they supplied 2,502,529 consumers (Zone 2) from EDC’s sub-transmission lines or, near borders, from imported medium-voltage supply.
SupplierIndependent power producers32 independent power producers operated 4,058 MW in 2025 and sold power to EDC under power purchase agreements; they include coal, hydropower and a growing number of solar plants.

Compared with the UK system.

Compared with the UK system.
UK conceptCambodia equivalentHow it works
DNOEDC or a private distribution licensee (rural electricity enterprise)Each distribution licence covers a defined, contiguous territory, so the local network owner depends on where you live. Unlike a UK DNO, the Cambodian licensee also bills and supplies the customer.
National Grid/NESOEDC (national transmission and dispatch)EDC owns the high-voltage grid and runs dispatch. Grid sections fed from Vietnam, Thailand and Laos cannot run in parallel and are operated as separate systems, with areas switched between them by season.
MPANConsumer account and meter number held by the licenseeThere is no national supply-point number. Each licensee identifies a connection by its own customer account and meter records.
MPRNNo equivalentPiped gas is not distributed to homes; cooking relies on firewood and bottled LPG.
Meter operatorThe distribution licenseeThe licensee installs, reads and maintains the meter; EDC handles meter relocation, testing and reading corrections through its customer service process.
SupplierThe same distribution licenseeThere is no retail competition. A household is supplied by whichever licensee holds the territory, at the uniform EAC-approved tariff.
Smart-meter infrastructureNo national programme identifiedNo national smart-metering programme or central data hub was identified. EDC offers online bill checking through its web portal and mobile app.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Consumer account number and meter number held by the distribution licensee
Who issues it?The distribution licensee serving the territory (EDC or a private licensee)
FormatNot published. Each licensee keeps its own customer and meter numbering; no national format was identified.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the electricity bill issued by the licensee and on the meter itself. EDC customers can view bills through the EDC web portal and app.
Electronic accessEDC offers bill viewing through its web portal (portal.edc.com.kh) and a free mobile app, and accepts payment through around 28 banks and microfinance institutions. Private licensees use their own systems.
Third-party accessNo regulated framework for third-party access to consumption data was identified.
Who keeps the registerEach licensee keeps its own customer register. EAC collects aggregate data on consumers and sales from licensees for its annual report.
Register scopePer DSO

Cambodia does not have a national supply-point identifier like the UK MPAN. A household connection is a contract between the consumer and the licensee that holds the distribution licence for that area, and the licensee identifies it by its own account and meter numbers. Because more than 370 licensees serve different territories, numbering differs between them. No public specification of the format was found, so no example is given here.

How a connection is administered

New connections are requested from the local licensee. EDC’s published services cover new connections and capacity increases, meter relocation, checks of faulty or stuck meters, correction of meter readings, changes of customer name, address or tariff category, temporary suspension, and ending supply with return of the deposit. Connection fees and security deposits are capped by EAC decisions (2010 and 2015), and since 2024 EAC guidelines govern deposits taken to secure payment.

Because EDC offers name-change and end-of-supply services with deposit refunds, a connection appears to be managed as an account at a fixed address that can be transferred or closed. The official sources read do not state whether the account number stays with the property, so that field is left open.

Rules that protect the consumer

EAC’s Regulations on General Conditions of Supply of Electricity set the rights and duties of licensees and consumers, including connection, metering, billing and disconnection. A third revision took effect in March 2026. Complaints that a licensee has breached its licence conditions can be taken to EAC under its 2004 complaint procedure.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringUnknown
Net billingUnknown
How exported electricity is paidNo payment for exported electricity was identified in the official sources read. Rooftop systems of 10 kWac and above pay a compensation charge per kWh generated for grid backup.
Is rooftop solar allowed?Yes, under MME’s Principles for Permitting the Use of Rooftop Solar Power (2023, updated 18 November 2024) and EAC’s Regulations on Installation and Use of Rooftop Solar PV (12 March 2024, revised 26 December 2024). Annual quotas and system sizes are set by MME.
Who can install?Only companies approved by MME and licensed by EAC under a generation licence for rooftop solar PV installation services. That licence allows installation, testing, operation, maintenance and decommissioning, but not ownership of the system or sale of its electricity.
What do rooftop solar owners pay?From July 2025: nothing below 10 kWac; 0.037 USD/kWh (10–50 kWac), 0.047 (50–100), 0.052 (100–200), 0.055 (200–500), 0.058 (500–1,000) and 0.060 USD/kWh above 1,000 kWac, applied to solar generation. Exempt in any month when battery discharge is at least 50% of solar generation.
Can surplus be sold to the grid?No export payment or net-metering arrangement was identified in the English-language official sources read. The regime is built around self-consumption.
Older rulesEAC’s Regulations on General Conditions for Connecting Solar PV Generation Sources to the National Grid or to a Consumer’s System (26 January 2018) were the first framework; from January to June 2025 solar customers paid capacity and energy charges under Decision 009.SR.23.

Connecting a home system.

  1. Choose an installer holding an EAC generation licence for rooftop solar PV installation services (31 such licences had been issued by the end of 2025).
  2. Apply for permission to install, within the annual system-size and quota limits set by MME prakas.
  3. Installation, testing and connection under EAC’s regulations on the installation and use of rooftop solar PV (2024, revised December 2024).
  4. The licensee applies the applicable compensation charge or night-time tariff on the customer’s bill.

Cambodia treats rooftop solar as a self-consumption technology regulated through installer licensing, quotas and a grid-backup charge rather than through export payments. The installed rooftop base reached 169 MW at the end of 2025 (EAC), generating about 266 GWh, or 1.3% of grid-connected generation.

EAC’s 2025 consumer tables list dozens of high-voltage, medium-voltage and transformer-metered business customers on the tariff options for consumers who install solar PV. The compensation charge does not apply to systems below 10 kWac, which covers most household-scale systems.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (power plant)Generation licence from EAC; 47 valid at the end of 2025. Sale to EDC under a power purchase agreement.EAC (with MME for project approval)Large projects are developed under MME/EDC procurement and PPAs.
Install rooftop solar for customersMME approval followed by an EAC generation licence for rooftop solar PV installation services (30 valid at end-2025, plus one consolidated licence).MME and EACPermits processed through the One Window Service Office within 21 working days of a complete application. The licence does not allow ownership of the system or sale of its electricity.
Self-generate on own premises (rooftop)Permission under the MME rooftop principles and EAC regulations, within annual quotas; installation by a licensed installer.MME and EACCompensation charge applies from 10 kWac.
Store electricity (battery service to the grid)Subcontract licence for providing battery energy storage system services to the national grid; first two issued in 2025.EACBehind-the-meter batteries with rooftop solar need no separate licence identified; they reduce the compensation charge.
Transmit electricityNational transmission licence (state company only, held by EDC) or special purpose transmission licence for specified lines (13 valid).EACSpecial purpose licences governed by a 2006 MME Prakas.
Distribute and supply to consumersDistribution licence for a contiguous territory (364 valid), retail licence (5) or consolidated licence.EACSubcontract licences (53) allow supply within designated market premises under an existing licensee.
Bulk sale / wholesaleBulk sale licence to buy from generators or neighbouring systems and sell to distribution licensees or large customers.EACThere is no wholesale market or power exchange.
Dispatch / system operationDispatch licence; exercised by EDC under its consolidated licence.EAC
Electric vehicle chargingDistribution licence for EV charging services (10 issued in 2025); subcontract licence for EV charging communication systems and apps.EAC (MME prakas of 20 February 2025)Maximum charging prices set by EAC.
Aggregate, trade, provide balancing, grid services or VPP; remotely control assetsNo licence category exists; these activities are not provided for in the current framework.EAC
Export to the grid as a householdNo household export scheme identified.EAC

The Electricity Law states that no one may operate as an electric power utility or provide electric power services without a valid EAC licence. EAC defines eight licence types (generation, transmission, distribution, consolidated, dispatch, bulk sale, retail and subcontract) and has added sub-types for rooftop solar installation, EV charging and battery storage. There were 542 valid licences at the end of 2025.

Licence fees are capped by a 2001 sub-decree, and licences are issued, revised and revoked under EAC procedures last updated in 2024. EAC can impose monetary penalties, disconnect supply or revoke licences for breaches under its 2020 penalty regulations.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energyNo—NoEDC. EDC buys centrally under bilateral PPAs and import agreements; there is no spot market.
Battery storage services to the gridDeveloping—NoEDC. EAC created a subcontract licence for battery energy storage services to the national grid and issued two in 2025; services are contracted bilaterally.
Demand responseNo—NoNo demand-response programme identified. Time-of-use and night-time tariffs for large and agricultural customers are the only price signals.

Cambodia has no balancing, capacity or ancillary-services market, and no rules for aggregators or virtual power plants. Balancing is done by EDC through dispatch of hydro, coal and fuel-oil plants and by switching areas between import supplies by season.

The newest instruments are the battery-storage subcontract licence and the rooftop compensation charge, which rewards customers whose batteries discharge at least half their solar output by waiving the charge.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national smart-meter programme identified
Reading intervalNot published
National programmeNone identified
Meter ownershipDistribution licensee (EDC or private)
Online accessEDC web portal and mobile app for bills

No national smart-metering policy, rollout target or penetration figure was found in EAC, EDC or MME publications. Meters are installed and read by each licensee, and EDC’s customer services include meter testing, relocation and reading corrections.

Renewable electricity.

Electricity generation mix (2025).

  • Coal: 47.7%
  • Hydro: 39.7%
  • Solar (utility-scale): 8.9%
  • Solar (rooftop): 1.3%
  • Fuel oil: 2.2%
  • Biomass: 0.3%
Source 2
Renewable electricity share
50.1% (2025)Source 2Share of energy from sources connected to the national grid (20,596 GWh): hydro 39.66%, solar 10.18% (including rooftop 1.29%), biomass 0.26%. EAC counts within hydro a 460 MW plant in Laos that supplies EDC directly. Imports (1,765 GWh) were 7.9% of total supply; including them, renewables were about 46% of supply (derived).
Home solar
Not identified from a reliable public source.
Solar added each year
0.51 GW (2025)Source 2Derived: 1,476 MW at the end of 2025 against 966 MW at the end of 2024 (EAC).
Hydro
1.801 GW (2025)Source 2Includes a 460 MW plant in Laos supplying EDC directly.
Coal
1.365 GW (2025)Source 2
Solar
1.476 GW (2025)Source 21,307 MW solar power stations plus 169 MW rooftop.
Fuel oil
0.569 GW (2025)Source 2
Biomass
0.049 GW (2025)Source 2

Targets.

  • EAC’s 2026 plan for grid-connected sources is 6,132 MW, of which 67.4% renewable capacity (hydro 2,212 MW, solar 1,873 MW).
  • MME’s National Energy Efficiency Policy 2022–2030 (adopted November 2022) sets the energy-efficiency framework.

Hydropower has been the backbone of Cambodia’s renewable supply since the large dams on the Tatay, Russei Chrum, Kamchay, Atay and Lower Sesan rivers came online; output varies strongly with the monsoon. Five coal-fired plants selling to EDC supply most of the remainder, so the renewable share depends on rainfall.

Solar is growing fastest. Utility-scale and rooftop solar rose from 966 MW in 2024 to 1,476 MW in 2025, and EAC licensed a further 1,280 MW of solar projects in 2025 alone. EDC has also signed PPAs for six 150 MW wind farms in Mondulkiri and several new hydropower schemes, as well as a 900 MW gas-fired plant in Koh Kong and a 1,800 MW coal-fired import project from Laos.

In February 2025 MME issued a Prakas on a Renewable Energy Certificate mechanism, giving buyers a route to certify the renewable origin of their electricity.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage is at an early stage. EAC created a subcontract licence for battery energy storage services to the national grid and issued the first two in 2025, while EDC has contracted a 1 GW / 2 GWh battery project and a 1,000 MW pumped-storage scheme. Reservoir hydropower provides the main existing flexibility.

Behind the meter, the rooftop compensation charge gives an incentive to pair solar with batteries: customers whose batteries discharge at least half their monthly solar generation pay no charge for that month.

Storage projects.

  • SchneiTec 1 GW / 2 GWh battery energy storage system: PPA signed with EDC; located in Pursat and Kampong Chhnang provinces. Listed by EAC among projects under implementation and planning.
  • Upper Tatay pumped-storage hydropower (1,000 MW): Koh Kong province, by China National Heavy Machinery Corporation; PPA signed with EDC.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Electricité du Cambodge (EDC)1,469,802 consumers (37% of connections) and 19,857 GWh sold including bulk sales to licensees (2025)NoLimitedNoUnknown

Households cannot choose a supplier. EDC serves Phnom Penh and provincial towns, and private distribution licensees serve almost all other areas; together the private licensees had 2,502,529 consumers in 2025. All national-grid licensees charge the same EAC-approved residential tariff. Time-of-use options are available only to large customers. Companies can buy certified renewable electricity through the Renewable Energy Certificate mechanism created in 2025.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Mines and Energy (MME)GovernmentEnergy policy, planning, tariff plan and technical standardsIssues the rooftop solar principles, annual quotas, EV charging rules and efficiency regulations.
Electricity Authority of Cambodia (EAC)RegulatorLicensing, tariffs, consumer protectionPublishes all tariff decisions, licences, regulations and the annual power sector report.
Electricité du Cambodge (EDC)TransmissionNational grid owner, single buyer and largest distributorOperates the national grid and supplies Phnom Penh and provincial towns.
Rural Electrification Fund (REF)DistributionRural connection and tariff subsidy programmesFunds tariff subsidies for 401 rural electricity enterprises, grid extension, poor-household connections and solar home systems (121,106 households since 2012).
National Institute of Statistics (NIS)ConsumerCensus and socio-economic surveysSource of household, housing, lighting and cooking-fuel statistics.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
General electrical standardsGeneral Requirements of Electric Power Technical Standards of the Kingdom of Cambodia (2004, revised 2007)Ministry of Industry, Mines and Energy (now MME)Covers generation, transmission, distribution and installations.
Detailed technical requirementsSpecific Requirements of Electric Power Technical Standards (2007)Ministry of Industry, Mines and Energy (now MME)
Grid connectionGrid Code (22 May 2009)EACRules for connection to and operation of the national grid.
Solar PV connectionRegulations on General Conditions for Connecting Solar PV Generation Sources to the National Grid or to a Consumer’s System (26 January 2018)EAC
Rooftop solar installationRegulations on Installation and Use of Rooftop Solar PV in Cambodia (2024, revision 1 December 2024)EACApplies alongside MME’s rooftop principles and annual quotas.
Installer accreditationGeneration licence for rooftop solar PV installation services; MME energy professional registrationEAC and MME
Appliance efficiencyPrakas on efficiency regulation for in-room air conditioners (2025)MME

Permissions.

Permissions.
PermissionRequiredLevelDetail
Rooftop solar permitYesNationalPermission under MME principles and EAC regulations, within annual quotas and size limits.
Licensed installerYesNationalInstallation only by an MME-approved, EAC-licensed rooftop solar installation service provider.
Licensee connection approvalYesNationalConnection and metering through the local distribution licensee under EAC rules.
Building or planning permissionUnknownMixedNo rule specific to rooftop solar identified in the sources read.

Permitting is national. MME approves installation service providers and sets annual rooftop quotas, EAC licenses installers and regulates installation and use, and the local licensee handles connection and billing, including the compensation charge.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Uniform national tariff subsidy (Rural Electrification Fund)ActiveTariff subsidySubsidies to private rural licensees so that their customers pay the national-grid tariff; USD 808 million since 2016 for 401 enterprises.2016 –
Night-time preferential tariffActivePreferential tariff480 riel/kWh from 9 pm to 7 am for agricultural pumping, agricultural consumers and consumers with solar PV.—
Rooftop solar compensation exemption below 10 kWacActiveCharge exemptionNo grid-backup compensation charge for rooftop systems under 10 kWac; battery users exempt in months when discharge reaches 50% of solar output.July 2025 –
Power to the Poor and solar home systems (REF)ActiveGrantWiring kits for poor households (85,162 since 2012) and solar home systems for areas beyond the grid (121,106 households since 2012).—

Data and connectivity.

Fixed broadband
4.15 fixed subscriptions per 100 people (2024)Source 11
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband is limited at about 4 subscriptions per 100 people (World Bank, 2024), so mobile networks carry most connectivity. EDC’s customer services are delivered through its web portal and mobile app, and payment is through banks and mobile banking. No national standard for smart-meter communications was identified.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
22.4 TWh (2025)Source 2Total energy from grid-connected sources and imports (22,361 GWh). Energy sold to consumers was 20,258 GWh (EAC annual report).
Generation capacity
5.259 GW (2025)Source 2Grid-connected sources; 5.932 GW including 672 MW of import capacity.
Interconnection
0.672 GW (2025)Source 2Import capacity: Vietnam 339 MW, Thailand 277 MW, Laos 56 MW (EAC). A 460 MW Lao hydropower plant supplying EDC is counted as generation.
Curtailment
Not identified from a reliable public source.

Supply has grown quickly: energy available rose 12.6% in 2025 to 22.5 TWh (EAC annual report), and grid-connected capacity reached 5.26 GW. Imports were about 7–8% of supply in 2025; imports from Thailand fell by 45% that year while those from Vietnam and Laos rose.

The grid is being extended to 2030 with about 1,200 km of new lines, including a 500 kV link from Khsach Kandal to the Laos border and 230 kV lines through Pursat and Koh Kong. Sections supplied from different neighbouring countries still cannot be synchronised, which limits how flexibly imports can be used.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Third revision of the General Conditions of Supply of ElectricityCurrentMarch 2026EAC approved a revised set of supply conditions on 26 February 2026, effective from March 2026, governing connection, metering, billing and disconnection.
2026 tariff decisionsCurrent29 January 2026EAC issued its 2026 tariff decisions (031–039.SR.26) for EDC consumers, bulk sales, sub-transmission licensees, special economic zones and areas supplied from Vietnam.
Estimated rooftop solar output for compensation chargeCurrent2 October 2026EAC Decision 324.SR.26 sets estimated energy quantities by technical standard, used as the basis for calculating the rooftop solar compensation charge.
Rooftop solar compensation chargeCurrentJuly 2025Decision 101.SR.25 replaced earlier capacity and energy charges for solar customers with a per-kWh charge by system size, with exemptions below 10 kWac and for battery users.
Renewable Energy Certificate mechanismCurrent7 February 2025MME Prakas establishing a renewable energy certificate mechanism.
Battery storage and wind projectsUpcomingUnder developmentA 1 GW / 2 GWh battery system, a 1,000 MW pumped-storage plant and six 150 MW wind farms have PPAs with EDC; the 2026 plan raises grid-connected capacity to 6,132 MW.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowRooftop solar of all sizes was 169 MW (1.3% of generation) in 2025 and is subject to quotas and a compensation charge from 10 kWac; no household export scheme identified.
Distributed energy marketLowDistributed generation is limited to quota-controlled rooftop solar and a few isolated mini-grids.
Grid flexibility marketLowNo balancing, ancillary or demand-response market; no aggregator licence category.
Energy storage adoptionLowNo operating grid batteries identified; first two battery-service licences issued in 2025 and a 1 GW / 2 GWh project contracted.
Renewable growth environmentHighSolar capacity grew from 966 MW to 1,476 MW in 2025 and a further 1,280 MW of solar was licensed that year; renewables were 50.1% of grid-connected generation.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 12 sources
  1. Report on Power Sector of the Kingdom of Cambodia for the Year 2025. Electricity Authority of Cambodia, 2026. accessed 9 October 2026.
  2. Salient Features of Power Development in the Kingdom of Cambodia, 2025. Electricity Authority of Cambodia, 2026. accessed 9 October 2026.
  3. Tariff decisions list. Electricity Authority of Cambodia, 2026. accessed 9 October 2026.
  4. Laws and regulations. Electricity Authority of Cambodia. accessed 9 October 2026.
  5. Rural Electrification Fund annual report 2024. Electricité du Cambodge, 2025. accessed 9 October 2026.
  6. Customer services. Electricité du Cambodge. accessed 9 October 2026.
  7. E-services: web portal and EDC app. Electricité du Cambodge. accessed 9 October 2026.
  8. Rooftop solar application. Ministry of Mines and Energy. accessed 9 October 2026.
  9. Recent legislation and regulations (energy). Ministry of Mines and Energy. accessed 9 October 2026.
  10. Cambodia Socio-Economic Survey 2023: Final Report. National Institute of Statistics, Ministry of Planning, 2024. accessed 9 October 2026.
  11. World Development Indicators for Cambodia: population, electricity use per capita, access, broadband, urban population. World Bank, 2026. accessed 9 October 2026.
  12. Euro foreign exchange reference rates, 9 October 2026 (USD). European Central Bank, 2026. accessed 9 October 2026.