How electricity works in Malaysia.
Malaysia electricity market 2026: TNB, SESB and Sarawak Energy, the July 2025 tariff restructure, ToU, Solar ATAP, CRESS, smart meters, licensing and grid rules.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Malaysian ringgit (MYR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Malaysia energy at a glance.
Key figures for households in Malaysia. Each one links to its source on the full overview below.
Electricity price.
0.279 MYR per kWh for households, including taxes. Figures for Jul 2025 – Dec 2027.
Household use.
4,573 kWh a year for a typical household. Figures for 2023.
Renewable share.
20.7% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Malaysia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Malaysia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Malaysia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Malaysia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Malaysia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Malaysia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Malaysia.
The energy market in Malaysia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Malaysia does not have one electricity market but three regional systems. Peninsular Malaysia is served by Tenaga Nasional Berhad (TNB), regulated by the federal Energy Commission (Suruhanjaya Tenaga, ST). Sabah and the Federal Territory of Labuan are served by Sabah Electricity Sdn Bhd (SESB), which since 3 January 2024 has been regulated by the state-level Energy Commission of Sabah (ECoS). Sarawak runs its own system through the state-owned Sarawak Energy under the state Electricity Ordinance. In every region a single vertically integrated utility owns the grid and supplies households; there is no retail choice.
In Peninsular Malaysia a new tariff schedule took effect on 1 July 2025 for the Fourth Regulatory Period (RP4, to 31 December 2027). The old five-block domestic tariff was replaced by separate energy, capacity, network and retail charges, a monthly Automatic Fuel Adjustment (AFA) and an optional time-of-use (ToU) tariff. A typical household using up to 1,500 kWh a month pays 27.03 sen/kWh for energy, 4.55 sen/kWh for capacity and 12.85 sen/kWh for the network, before incentives, levies and tax. After the Energy Efficiency Incentive and the 1.6% KWTBB levy, a typical household using about 381 kWh a month pays 27.87 sen/kWh all-in.
Generation is still dominated by coal and gas, with large hydro (mostly in Sarawak) providing most of the renewable output. Rooftop solar moved from Net Energy Metering (NEM 3.0) to the Solar Accelerated Transition Action Programme (Solar ATAP) on 1 January 2026, under which exported energy is credited only against the energy component of the bill. TNB is part-way through a smart-meter roll-out, and the first grid-scale battery tenders have been awarded.
Energy snapshot.
Headline figures for electricity in Malaysia. Each shows its data year and links to its source.
- Population34,389,400 peopleSource 92026
- Households9,330,900 householdsSource 122025 (preliminary)
- Average household size3.7 peopleSource 122025 (preliminary)
- Electricity use per household4,573 kWh/yrSource 142023
- Household price (MYR)0.279 MYR/kWhSource 1Jul 2025 – Dec 2027
- Household price (EUR)0.06 EUR/kWhSource 36Jul 2025 – Dec 2027
- Renewable electricity share20.7%Source 182025
- Solar capacity3.07 GWSource 182024
- Wind capacity0 GWSource 182025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter share55%Source 202025
- Market structure
- Single buyer
- Homes can export to the grid
- Limited
- Home equipment in grid services
- Developing
- Regulator
- Energy Commission (Suruhanjaya Tenaga) for Peninsular Malaysia; Energy Commission of Sabah (ECoS) for Sabah and Labuan; Sarawak Ministry of Utility and Telecommunication for Sarawak
- System operator
- Grid System Operator (GSO, ring-fenced within TNB) for the Peninsular grid; SESB and Sarawak Energy operate their own systems
- Distribution networks
- One vertically integrated utility per region: TNB (Peninsular), SESB (Sabah and Labuan), Sarawak Energy (Sarawak)
- Currency
- Malaysian ringgit (MYR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Malaysia.
- Household price (MYR)
- 0.279 MYR/kWh (Jul 2025 – Dec 2027)Source 1All-in average price for a typical Peninsular Malaysia (TNB) Domestic General household using 381 kWh a month (4,573 kWh/yr ÷ 12). Base charges: energy 27.03 + capacity 4.55 + network 12.85 = 44.43 sen/kWh. Energy Efficiency Incentive for the 351–400 kWh band: −17 sen/kWh on all units → 27.43 sen/kWh. KWTBB levy of 1.6% on the bill after discounts (applies above 300 kWh): 27.43 × 1.016 = 27.87 sen/kWh. Bill: 381 × 44.43 = RM169.28 − RM64.77 incentive = RM104.51 + RM1.67 KWTBB = RM106.18, ÷ 381 = RM0.2787/kWh. No AFA, RM10 retail charge or 8% service tax at this level (they apply only above 600 kWh; 800 kWh for September–December 2026). The price is band-sensitive: the incentive falls from 25 sen/kWh (≤200 kWh) to zero above 1,000 kWh. Sabah and Sarawak have separate tariffs.
- Household price (EUR)
- 0.06 EUR/kWh (Jul 2025 – Dec 2027)Source 36Converted from MYR 0.2787/kWh at the ECB reference rate of 1 EUR = 4.6147 MYR on 1 October 2026.
- Typical annual electricity bill
- 1,274 MYR/yr (Jul 2025 – Dec 2027)Source 1Derived: RM106.18 a month for a typical 381 kWh/month TNB Domestic General household (see the price note) × 12 = RM1,274. Assumes a steady 381 kWh each month; months that cross an incentive band or the 600/800 kWh AFA threshold change the bill.
How a Peninsular bill is built
Since 1 July 2025, a TNB domestic bill has four regulated parts. The energy charge (27.03 sen/kWh up to 1,500 kWh a month) covers generation. The capacity charge (4.55 sen/kWh) covers keeping enough generating capacity available. The network charge (12.85 sen/kWh) covers transmission and distribution. A flat retail charge of RM10 a month covers metering, billing and customer service. The Energy Commission approved an average base tariff of 45.40 sen/kWh for RP4, which runs to 31 December 2027 under the Incentive-Based Regulation (IBR) framework.
Several adjustments apply on top. The monthly AFA passes fuel and exchange-rate movements through to customers as a rebate or surcharge; in 2026 it has been a surcharge of between +1.38 and +3.80 sen/kWh. An Energy Efficiency Incentive gives households using 1,000 kWh a month or less a discount on every unit, set by the band that total monthly use falls in: 25 sen/kWh up to 200 kWh, 17 sen/kWh for 351–400 kWh, 9 sen/kWh for 551–600 kWh and 0.5 sen/kWh for 901–1,000 kWh. The Renewable Energy Fund levy (KWTBB) of 1.6% applies to the bill after discounts once use exceeds 300 kWh. Service tax of 8% applies only to the energy, capacity, network and AFA charges for units above 600 kWh.
For a typical household using about 381 kWh a month, the bill is 381 × 44.43 sen = RM169.28, less a RM64.77 incentive (17 sen/kWh), plus RM1.67 KWTBB: RM106.18, or 27.87 sen/kWh all-in (about RM1,274 a year). No AFA, retail charge or service tax applies at that level.
Protection for lower-use households
Most households are shielded from the variable parts of the bill. Households using 600 kWh or less pay no retail charge, no AFA and no service tax. On 17 September 2026 the government raised that threshold to 800 kWh for September to December 2026. It said this covers about 90% of TNB domestic customers. The progressive structure means heavy users (above 1,500 kWh a month) pay a 10 sen/kWh higher energy charge.
Regional differences
Sabah/Labuan and Sarawak have their own tariff schedules, set by different regulators. The figures on this page apply to Peninsular Malaysia, where most of the population lives. Tariffs in all three regions are regulated: there are no competing retailers and no price comparison market.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | TNB Domestic General (Peninsular, 1 July 2025 – 31 December 2027): energy charge 27.03 sen/kWh for monthly use up to 1,500 kWh and 37.03 sen/kWh above; capacity charge 4.55 sen/kWh; network charge 12.85 sen/kWh; retail charge RM10 a month, waived for households using 600 kWh or less. |
| Time-of-use | Yes | Optional TNB Domestic ToU: energy charge 28.52 sen/kWh peak and 24.43 sen/kWh off-peak (up to 1,500 kWh), or 38.52/34.43 sen/kWh above 1,500 kWh. Peak is 14:00–22:00 on weekdays; weekends are off-peak all day. Capacity, network and retail charges are the same as Domestic General. |
| Variable | Yes | The Automatic Fuel Adjustment (AFA) is set monthly by the Energy Commission as a surcharge or rebate per kWh to pass through fuel costs. It was +3.67 sen/kWh in September 2026. Domestic customers using 600 kWh a month or less are not charged AFA; from September to December 2026 that protection was extended to 800 kWh. |
| Other | Yes | Green Electricity Tariff (GET): any TNB customer can buy blocks of renewable electricity (residential minimum 100 kWh, up to 130% of average use) for a premium of 5, 4 or 3 sen/kWh on one-, two- or three-year commitments. GET units are exempt from AFA and the KWTBB levy and come with renewable energy certificates. |
| Dynamic | No | There are no tariffs linked to wholesale or half-hourly prices for households. |
| Prepayment | No | No prepayment tariff for TNB domestic customers was identified. |
Household prices compared with neighbouring countries (EUR per kWh).
- Philippines€0.208
- Malaysia€0.06
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,573 kWh/yr (2023)Source 14Derived: national domestic electricity consumption in 2023 (40,620 GWh, sum of monthly OpenDOSM figures) divided by 8,881,900 households (DOSM 2023 estimate).
- Average daily use per household
- 12.5 kWh/day (2023)Source 14Derived from 4,573 kWh per household per year ÷ 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 5,560 kWh/person/yr (2025)Source 18All sectors (total electricity demand per person), not residential only.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 68.8 % of households (2024)Source 15
- Electric vehicles
- 44,813 electric cars registered in the year (2025)Source 16Computed from JPJ transaction records: 44,813 of 870,188 new car registrations in 2025 (5.1%) were fully electric.
- Electric cooking
- Not identified from a reliable public source.
Household electricity demand is driven by cooling. Air conditioners were found in 68.8% of households in DOSM's 2024 Basic Amenities Survey, and the Energy Commission has pointed to hot weather and haze as reasons for higher consumption in 2026. There is no heating load. Domestic customers accounted for 40,620 GWh in 2023, about 4,600 kWh per household or roughly 380 kWh a month. Usage varies widely: high-rise flats in towns use far less than large detached houses with several air-conditioned rooms.
The 2025 tariff gives two price signals. The 1,500 kWh threshold, above which the energy charge rises by 10 sen/kWh, discourages very high use. The 600 kWh threshold (800 kWh to the end of 2026) decides whether AFA, the retail charge and service tax apply. The optional ToU tariff sets its peak at 14:00–22:00 on weekdays, which covers the evening air-conditioning peak. Peninsular system demand reached a record 22,014 MW at 20:30 on 6 August 2026.
Electric car sales are growing from a low base: 44,813 battery-electric cars were registered in 2025, about 5% of new cars.
Housing and households.
- Dwellings
- 10,900,000 living quarters (2025 (preliminary))Source 12Includes vacant units; 19.4% of living quarters were vacant at the 2020 census.
- Owner-occupied
- 78% (2024)Source 15Share of households living in their own home (DOSM Basic Amenities Survey 2024).
- Private rented
- 18.9% (2020)Source 12Ownership status of living quarters at the 2020 census: individually owned, rented out. Not strictly comparable with the 2024 household figure.
- Social or public housing
- 2.8% (2020)Source 12Government-owned living quarters (2020 census), which include public housing and staff quarters.
- Houses
- 72.7% (2020)Source 12Derived: detached (2,707,979), semi-detached (627,916), terrace/link/cluster (3,598,545) and townhouses (52,218) as a share of 9,614,139 living quarters.
- Apartments and flats
- 22.7% (2020)Source 12Derived: flats/apartments/condominiums (2,084,795) plus service apartments/SOHO (95,333) as a share of 9,614,139 living quarters.
- Urban population
- 77.4 % of population (2025)Source 17
Most Malaysians live in landed houses. Terraced ("link") houses are the single largest type (3.6 million units in 2020), followed by detached houses (2.7 million, many of them rural) and flats, apartments and condominiums (2.1 million). High-rise housing is concentrated in Selangor, Kuala Lumpur and Penang. The 2020 census also counted more than 90,000 longhouse units.
Home ownership is high, at about 78% of households in 2024. Landed, owner-occupied terraced and detached houses with their own roofs and meters are the natural candidates for rooftop solar. Condominium and multi-tenant buildings with sub-metered supply are excluded from Solar ATAP. Under the scheme, new housing developments can apply for solar as a "Domestic Group", planned with the utility at the design stage.
How the grid works in Malaysia.
- TransmissionGrid System Operator (GSO), TNB Grid
- DistributionOne vertically integrated utility per region: TNB (Peninsular), SESB (Sabah and Labuan), Sarawak Energy (Sarawak)
- MeteringTNB (Advanced Metering Infrastructure)
- Supply3 or more retail suppliers
Three separate systems
Peninsular Malaysia, Sabah (with Labuan) and Sarawak are separate electrical systems, and none of them is connected to another. In Peninsular Malaysia, TNB owns most of the chain. It generates about 55% of domestic generating capacity and owns the 29,744 km transmission grid and the distribution network, and it is the only retailer. Independent power producers sell their output to the Single Buyer under long-term contracts and the New Enhanced Dispatch Arrangement (NEDA). GSO dispatches the plants. The grid and retail businesses are regulated by ST under Incentive-Based Regulation, which sets allowed revenues for three-year regulatory periods (RP4 runs from 2025 to 2027).
Sabah is in transition. Regulatory powers moved from ST and SEDA to the Energy Commission of Sabah on 3 January 2024, and ownership of SESB, now mostly held by TNB, is being handed over to the state in phases. Sarawak Energy is wholly state-owned and regulated under Sarawak's own Electricity Ordinance. It generates most of its electricity from large hydro dams and plans to export power to the Peninsula and Singapore.
Physical flow
Power flows from coal, gas, hydro and solar plants through the TNB transmission network to its substations, then over medium- and low-voltage networks to customers. Households are supplied at 230 V single-phase, or 400 V three-phase for larger houses. The Peninsular grid connects to Thailand in the north and to Singapore in the south, and a 275 kV link joins Sarawak to West Kalimantan in Indonesia.
Commercial flow
Households pay TNB a regulated tariff. TNB Retail pays the Single Buyer for generation and the grid businesses for network use. Fuel cost changes go through the monthly AFA. Under CRESS (Corporate Renewable Energy Supply Scheme), businesses can buy renewable electricity directly from developers over the TNB grid by paying a system access charge. This is the first form of third-party access, but households cannot use it.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy Transition and Water Transformation (PETRA) | Sets federal energy policy, including the National Energy Transition Roadmap (NETR), Solar ATAP and large-scale solar (LSS) bidding rounds, and set up the Energy Exchange Malaysia (ENEGEM) for cross-border green electricity sales. |
| Regulator | Energy Commission (Suruhanjaya Tenaga, ST) | Regulates electricity supply in Peninsular Malaysia under the Electricity Supply Act 1990 (Act 447). It issues licences, approves tariffs under Incentive-Based Regulation, sets the monthly AFA and issues guidelines such as Solar ATAP and CRESS. It also registers competent persons and electrical contractors. |
| Regulator | Energy Commission of Sabah (ECoS) | State statutory body that has regulated electricity supply and renewable energy in Sabah since 3 January 2024. It took over these roles from ST and SEDA, including licensing and the registration of contractors and competent persons. |
| Regulator | Ministry of Utility and Telecommunication Sarawak | Through its Electricity Supply Division, oversees licensing, technical standards and rural electrification in Sarawak under the state Electricity Ordinance, which was amended in 2023 to promote renewable energy. |
| System operator | Grid System Operator (GSO) | Ring-fenced unit within TNB that schedules and dispatches generation on the Peninsular grid under the Grid Code for Peninsular Malaysia. |
| Settlement | Single Buyer | Ring-fenced unit within TNB that buys power from generators under power purchase agreements and the New Enhanced Dispatch Arrangement (NEDA). It publishes the system marginal price (SMP) used for non-domestic Solar ATAP credits and runs CRESS applications. |
| TSO | TNB Grid | Owns and operates the Peninsular transmission network: 29,744 km of lines and 545 substations (December 2025). |
| DSO | TNB Distribution Network | Owns and operates the Peninsular distribution network (736,015 km of lines and 99,603 substations), approves connections and installs meters, including bi-directional meters for solar customers. |
| Supplier | TNB Retail | Sole retail supplier to 10.66 million customers in Peninsular Malaysia (December 2025), billing through the myTNB portal and app. |
| DSO | Sabah Electricity Sdn Bhd (SESB) | Vertically integrated utility for Sabah and Labuan. It is mostly owned by TNB, and a phased handover to the Sabah state government is under way. |
| DSO | Sarawak Energy Berhad | State-owned, vertically integrated utility for Sarawak. It generates mostly from hydro, acts as the state single buyer and runs its own NEM scheme. |
| Metering | TNB (Advanced Metering Infrastructure) | TNB owns and installs all customer meters in its area. Its AMI roll-out serves more than 5.6 million customers, with the rest due by 2027. |
| Exchange | Energy Exchange Malaysia (ENEGEM) | Platform set up by PETRA in 2024 for cross-border sales of green electricity from Peninsular Malaysia to neighbouring countries, beginning with Singapore. |
Compared with the UK system.
| UK concept | Malaysia equivalent | How it works |
|---|---|---|
| DNO | TNB Distribution Network (Peninsular), SESB, Sarawak Energy | Each region has one distribution business, and it belongs to the same utility that supplies customers. TNB Distribution Network covers all of Peninsular Malaysia. It approves connections (including the Connection Confirmation Check for larger solar systems) and installs meters. There are no separate regional network companies or independent network operators for households. |
| National Grid/NESO | TNB Grid (owner) and the Grid System Operator (GSO, operator) | The Peninsular transmission network is owned by TNB, and real-time dispatch is carried out by GSO, a ring-fenced unit within TNB. The Single Buyer, also within TNB, buys power from generators. Sabah and Sarawak have their own grids, which are not connected to the Peninsula. |
| MPAN | TNB 12-digit account number (No. Akaun) | There is no national supply-point number. The utility's customer account number identifies the connection. In TNB's area it is a 12-digit number printed on every bill and used for payments, myTNB and Solar ATAP applications. Unlike an MPAN, it belongs to the account holder rather than the property: when an occupier changes, the old account is closed and a new number is issued for the same meter. |
| MPRN | No equivalent for households | No national household gas meter-point register comparable to the MPRN system was identified. Household gas is not part of the electricity utilities' identifier systems. |
| Meter operator | The utility itself | TNB, SESB and Sarawak Energy own, install and read the meters in their areas. Under Solar ATAP, TNB supplies and installs the bi-directional (import/export) meter. The customer installs and maintains a separate PV generation meter. |
| Supplier | TNB Retail / SESB / Sarawak Energy (no choice) | Households cannot switch supplier. Tariffs are set by the regulator, and the incumbent utility is the only retailer. The closest thing to choice is optional products from the same utility, such as the Domestic ToU tariff and the Green Electricity Tariff. |
| Smart-meter infrastructure | TNB Advanced Metering Infrastructure (AMI) | There is no central data body like the DCC. TNB runs its own AMI system and gives customers daily and half-hourly usage data through the myTNB app and portal. The roll-out is mandated by the Energy Commission and funded through the regulated tariff. |
How a supply point is identified.
220012345678 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Nombor Akaun (TNB electricity account number) (No. Akaun) |
| Who issues it? | Tenaga Nasional Berhad (in Peninsular Malaysia); SESB and Sarawak Energy issue their own account numbers |
| Format | Numeric customer account number generated by the utility's billing system. TNB replaced its old 14-digit numbers with 12-digit numbers in 2016. It is not a structured code: it carries no region or meter-type information. |
| Length | 12 digits (TNB) |
| Stays with the property when you switch supplier? | No |
| Where to find it | Printed at the top of every TNB bill and shown in the myTNB app and portal. It is also the reference number for bank, e-wallet and over-the-counter bill payments. |
| Electronic access | Account holders can add one or more accounts to a myTNB login using the account number, then view bills, payments and, where a smart meter is fitted, daily and half-hourly consumption. |
| Third-party access | There is no regulated data-sharing scheme for third parties. A Solar ATAP installer (Registered PV Service Provider) uses the account number and a copy of the latest bill to submit the application on the customer's behalf. Banks use it only as a payment reference. |
| Who keeps the register | Each utility's own customer billing system (TNB, SESB or Sarawak Energy). There is no independent national register of supply points. |
| Register scope | Per DSO |
Malaysia has no MPAN-style supply-point identifier that stays with the building. A household connection is identified by the utility account number. In TNB's area this is a 12-digit number that replaced the older 14-digit numbers in 2016. Payments made with old-format numbers stopped being accepted after 19 October 2016.
The number belongs to the customer contract, not the premises. When a tenant or owner moves in, they apply through myTNB or a Kedai Tenaga customer centre for a change of tenancy. They provide identification and pay a deposit, and TNB closes the outgoing account and opens a new one with a new number for the same meter. The physical meter and installation stay in place.
The same number is used throughout the solar process. The Solar ATAP application, the Connection Confirmation Check and the Solar ATAP contract are all tied to the TNB account. Because a Solar ATAP contract cannot simply pass with the account, a new owner who buys a house with solar must apply to SEDA to continue the programme for the rest of its 10-year term and sign a new contract with TNB.
SESB and Sarawak Energy run separate billing systems and issue their own account numbers. No identifier works across the three utilities, and households in each region deal only with their local utility.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Solar ATAP (Peninsular): exported energy is credited at the energy charge for domestic customers (27.03 sen/kWh up to 1,500 kWh) and at the previous month's average daytime SMP for non-domestic customers. Credits offset only the energy component of the bill, within the same month, and are not paid out in cash. |
| How big can a home system be? | Up to 5 kW for a single-phase home and 15 kW for a three-phase home without further study. Larger systems need a TNB Connection Confirmation Check. Non-domestic systems can be up to 100% of maximum demand, capped at 1,000 kW. |
| Can surplus credits be carried forward? | No. Under Solar ATAP, exported energy that is not used within the same billing period is forfeited. Monthly credit is also capped at the Maximum Allowable Quantity: capacity (kWac) × 5 sun-hours × days in the billing period. A negative net bill is set to zero, with no cash payment. |
| Which charges can export credits offset? | Only the energy charge. Capacity, network and retail charges are still paid in full, and credits cannot offset AFA. |
| How long does the arrangement last? | Ten years from the start date. After that, the system may continue strictly for self-consumption under the self-consumption (SelCo) guidelines, with no export credit. |
| Are batteries allowed? | Yes. Solar ATAP allows a battery energy storage system to be part of the installation, subject to the Electricity Supply Act and related requirements. |
| What about existing NEM 3.0 customers? | Existing NEM contracts continue under revised Energy Commission guidelines dated 19 August 2026. Credits are valued at the prevailing gazetted energy rate and can roll over for up to 12 months within a 10-year term. |
| Can households in Sabah and Sarawak export? | Solar ATAP applies only in Peninsular Malaysia. Sarawak Energy runs its own Net Energy Metering scheme, with rebates of up to RM8,000, RM10,000 or RM12,000 depending on system size for landed homes installing from 2026. Sabah's arrangements are set by ECoS. |
Connecting a home system.
- Check eligibility: an existing TNB domestic customer in Peninsular Malaysia, not on a multi-tenant sub-metered supply, not a co-generator, and not in another solar programme (NEM and self-consumption participants must end their contract first).
- Appoint a Registered PV Service Provider (RPVSP) from the SEDA Malaysia directory.
- For systems above 5 kW (single-phase) or 15 kW (three-phase), obtain a TNB Connection Confirmation Check (RM1,000 study fee).
- The RPVSP submits the application through SEDA's eATAP system with a single-line diagram endorsed by a competent person, the latest bill and the structural drawings. A processing fee of RM7.50/kW is paid within 7 days.
- After approval, install, test and commission the system. The work is certified by a competent person or registered electrical contractor.
- Complete the Energy Commission licensing step: notify an exemption under section 54 of Act 447, or obtain a public generation licence above 24 kWac (single-phase) or 72 kWac (three-phase).
- TNB installs a bi-directional meter, and the Solar ATAP contract starts on the date the meter is installed. Commissioning must be completed within 18 months of approval.
Rooftop solar households in Peninsular Malaysia can export to the grid, but on less generous terms than under the old net metering. NEM 3.0 credited exports one-for-one against the energy rate and allowed rollover. Solar ATAP, which took over on 1 January 2026 under guideline GP/ST/No.60/2025, credits domestic exports at the energy charge only and forfeits any surplus at the end of each month. The scheme is designed to be cost-neutral. Solar owners still pay their share of capacity, network and retail costs, so systems sized to cover daytime use (air-conditioning and appliances) get the best value.
Non-domestic customers are credited at the average system marginal price between 07:00 and 19:00 in the previous month, which the Single Buyer publishes by the 14th of each month. There is no fixed quota, although the government can impose limits if solar penetration threatens grid stability. TNB is expected to manage local integration with voltage-regulating transformers and community energy storage.
Any value from carbon credits or similar environmental attributes belongs to the Solar ATAP consumer. Larger business systems can also use the self-consumption (SelCo) route, which allows no export, or CRESS to sell to other businesses.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (rooftop solar, self-consumption and export) | Exempt below the thresholds, with notification under section 54 of Act 447. A public generation licence from ST is needed above 24 kWac (single-phase) or 72 kWac (three-phase). | Energy Commission (ST) | Domestic Solar ATAP systems (normally up to 5 or 15 kW) fall under the exemption route. The Solar ATAP workflow allows 28 days for the exemption notification. |
| Generate electricity (utility scale) | Generation licence under section 9 of Act 447. Capacity is allocated through competitive bidding (for example LSS rounds) and power is sold to the Single Buyer under a PPA. | Energy Commission (ST) / PETRA | LSS6, announced on 16 July 2026, offers 2,650 MW of solar, most of it paired with 1,250 MW of battery storage. |
| Store electricity (behind the meter) | No separate storage licence. Batteries may be part of a Solar ATAP or NEM installation, subject to the Act and relevant standards. | Energy Commission (ST) | Under the SelCo guidelines, a battery is required only for systems above 1 MWac. |
| Store electricity (grid scale) | Procured through ST competitive tenders (MyBeST) with contracts to the grid. A licence under Act 447 is required. | Energy Commission (ST) | Four projects were selected in the first MyBeST round from 28 bids. |
| Export to the grid | Allowed through Solar ATAP (domestic and non-domestic), existing NEM contracts, or a PPA with the Single Buyer. A distribution connection approval from TNB is required. | SEDA Malaysia (implementing agency) / TNB / ST | Export earns bill credit only, not cash, for rooftop schemes. |
| Sell or supply electricity to other consumers | Supply licence required. Households cannot sell to neighbours. Businesses can buy renewable power from developers through CRESS, paying a system access charge (RM0.25/kWh firm, RM0.45/kWh non-firm). | Energy Commission (ST) | CRESS was revised on 1 March 2025 to open it to all new and existing customers. Contracts are reviewed by the Single Buyer. |
| Aggregate, run a virtual power plant or remotely control assets | No licence category or market framework exists for aggregators or VPPs. | Energy Commission (ST) | Remote control of customer assets for grid services is not part of any current scheme. |
| Wholesale trading and balancing | No open wholesale market. Generators are dispatched by GSO and paid by the Single Buyer under NEDA, and balancing is handled centrally by GSO. | Energy Commission (ST) / Single Buyer / GSO | The SMP produced under NEDA is used to value non-domestic Solar ATAP exports. |
| Import or export electricity across borders | Licence required. An amendment to Act 447 passed by the Dewan Rakyat on 30 July 2025 sets fines of up to RM30 million for unlicensed cross-border trade. | Energy Commission (ST) / PETRA (ENEGEM) | Cross-border green electricity sales are made through ENEGEM. |
| Install and certify electrical and solar work | Design, installation and commissioning must be certified by a registered competent person or electrical contractor. Solar ATAP applications must go through a SEDA Registered PV Service Provider. | Energy Commission (ST) / SEDA Malaysia / Board of Engineers (structures) | Mounting structures must be certified under the Registration of Engineers Act 1967 or the Architects Act 1967. |
Licensing in Peninsular Malaysia comes from the Electricity Supply Act 1990 (Act 447), administered by ST. The Solar ATAP and NEM guidelines are issued under section 50C of that Act. A household installing rooftop solar needs no generation licence: it notifies an exemption to ST as part of the Solar ATAP workflow. The installation must be designed and certified by registered competent persons, and the application is made through a SEDA-registered installer.
Because the market is a single-buyer model, activities that are licensed separately in liberalised markets, such as retail supply, aggregation and trading, either do not exist for small customers or are reserved for TNB. CRESS is the main exception: it lets renewable developers supply corporate buyers over the grid for a fee. In Sabah, ECoS issues the equivalent licences and registrations, and Sarawak licenses under its own Ordinance.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Ancillary services and balancing (Peninsular grid) | No | — | No | Grid System Operator (GSO). Reserve and frequency control come from contracted power stations and TNB assets dispatched by GSO. No route was identified for households or aggregated distributed assets. |
| Grid-scale battery storage tenders (MyBeST) | Restricted | 100 MW / 400 MWh per project (first round) | No | Energy Commission (ST). Competitive tender for utility-scale batteries connected to the Peninsular grid. Four projects were chosen from 28 bids, with commercial operation targeted for 2027. |
| Time-of-use tariff response | Yes | — | No | TNB. Households can choose the Domestic ToU tariff and move consumption out of the 14:00–22:00 weekday peak. This is a price signal, not a market. |
| Corporate renewable supply (CRESS) | Restricted | — | No | Single Buyer / ST. Bilateral supply between renewable developers and business customers over the TNB grid. It does not provide flexibility services and is not open to households. |
Malaysia has no market in which households or aggregators can sell flexibility. Balancing is centralised: GSO dispatches contracted power stations, and the Single Buyer settles with them under NEDA. There is no capacity market, no demand-flexibility service and no legal category for aggregators or virtual power plants.
The main flexibility measures are large-scale. ST's MyBeST tender is procuring grid-connected batteries, and LSS6 pairs new solar farms with 1,250 MW of storage. Customer-side flexibility is currently limited to the optional ToU tariff and to solar owners using batteries to make better use of their own output, now that monthly surplus exports under Solar ATAP are forfeited.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Single Buyer market data | Publishes Peninsular demand, demand forecasts, installed capacity and the system marginal price. |
| Energy Exchange Malaysia (ENEGEM) | Government platform for cross-border sales of green electricity, not a domestic flexibility market. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | TNB roll-out in progress: more than 5.6 million customers served, about 4.5 million meters still to be installed by 2027 (RP4) |
| Reading interval | 30 minutes (half-hourly data in myTNB) |
| Programme owner | TNB, mandated by the Energy Commission and funded through the regulated tariff |
| Customers served | More than 5.6 million (TNB area) |
| Completion | Remaining ~4.5 million meters scheduled by 2027 under RP4 |
| Consumer data | Daily and half-hourly usage in the myTNB app and portal |
| Sabah / Sarawak | Separate programmes by SESB and Sarawak Energy; no consolidated figures identified |
Smart metering in Malaysia is run by the utilities, not by a national data body. Under its Advanced Metering Infrastructure programme, TNB says more than 5.6 million customers are now served by smart meters, and the remaining 4.5 million or so are due by 2027 under the fourth regulatory period. Customers with a smart meter can see daily and half-hourly consumption in the myTNB app. This supports the optional ToU tariff and helps households check whether rooftop solar would suit their usage.
The meter belongs to TNB and is installed as part of the regulated network. For Solar ATAP, TNB installs a bi-directional meter that records import and export, and the customer pays for and maintains a PV generation meter. Readings from TNB's meter are used for billing and settlement.
Renewable electricity.
Electricity generation mix (2025).
- Coal: 44.6%
- Gas: 33.8%
- Hydro: 17.5%
- Solar: 2.2%
- Other fossil: 1%
- Bioenergy: 0.9%
- Renewable electricity share
- 20.7% (2025)Source 18Share of electricity generation (hydro 17.5%, solar 2.2%, bioenergy 0.9%).
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0.65 GW (2024)Source 18Derived: Ember solar capacity 3.07 GW (2024) minus 2.42 GW (2023).
- Hydro
- 6.27 GW (2025)Source 18
- Solar
- 3.07 GW (2024)Source 18Ember's 2025 value is unchanged from 2024.
- Bioenergy
- 0.93 GW (2025)Source 18
- Wind
- 0 GW (2025)Source 18
- Large-scale solar (Peninsular)
- 2.237 GW (Jul 2025)
Targets.
- Renewable share of installed capacity: 35% by 2030, 40% by 2035 and 70% by 2050 (National Energy Transition Roadmap).
- Net-zero greenhouse gas emissions by 2050.
- The 31% renewable capacity target for 2025 was met in December 2025; the share was nearly 32% in June 2026.
By generation, Malaysia's electricity is still about 80% fossil: coal provided 44.6% and gas 33.8% in 2025. Renewables supplied 20.7%, mostly hydro (17.5%), much of it from Sarawak's large dams. Solar provided 2.2%, and there is no significant wind power. The renewable share of generation has risen slowly, from 17.6% in 2020 to 20.7% in 2025.
Government targets are set as shares of installed capacity rather than generation, which is why they look higher. The government says renewables reached 31% of installed capacity in December 2025 and nearly 32% in June 2026. The next milestones are 35% in 2030, 40% in 2035 and 70% in 2050. Growth is driven by large-scale solar auctions (about 2.2 GW of LSS capacity on the Peninsular grid by July 2025, with LSS6 adding up to 2,650 MW by 2029), rooftop solar (about 1.7 GW under NEM schemes) and corporate supply through CRESS. About 1,474 MW of coal capacity is scheduled to retire in 2029.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Energy storage is at an early stage in Malaysia. The first competitive tender for grid-scale batteries (MyBeST) has selected four projects, and the latest large-scale solar round requires batteries alongside most of the new solar capacity. These are intended to help manage the growing midday solar output and the evening demand peak, which reached 22,014 MW at 20:30 on 6 August 2026.
Behind the meter, Solar ATAP and NEM both allow batteries, but there is no subsidy for them and no published count of home batteries. Because Solar ATAP forfeits unused monthly export credit and pays only the energy charge, storing midday surplus for evening use is worth more than it was under NEM 3.0.
Storage projects.
- MyBeST (first grid-scale BESS tender): Energy Commission tender for battery storage on the Peninsular grid. Four projects were selected from 28 bids, including a 100 MW/400 MWh project by the Blueleaf Energy–Universal Peak consortium, with commercial operation targeted for 2027.
- LSS6 solar-plus-storage round: Announced on 16 July 2026: 2,650 MW of solar in three packages, with 1,250 MW of battery storage in Packages 1 and 2, all due in commercial operation by 31 December 2029.
- TNB community energy storage: Under Solar ATAP, TNB is responsible for deploying community energy storage and voltage-regulating transformers where needed to absorb rooftop solar. Housing developers may have to set aside land for these.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Tenaga Nasional Berhad (TNB) | Sole retailer in Peninsular Malaysia; 10.66 million customers (Dec 2025) | Yes | Yes | No | Yes |
| Sabah Electricity Sdn Bhd (SESB) | Sole utility in Sabah and Labuan | Unknown | Unknown | No | Unknown |
| Sarawak Energy Berhad | Sole utility in Sarawak | Unknown | Unknown | No | Yes |
Malaysian households cannot choose their electricity supplier. TNB supplies all of Peninsular Malaysia, SESB supplies Sabah and Labuan, and Sarawak Energy supplies Sarawak. Each utility offers regulated tariffs, so the only household choices are the utility's own options, such as TNB's Domestic ToU tariff, the Green Electricity Tariff and solar export through Solar ATAP.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy Transition and Water Transformation (PETRA) | Government | Federal energy ministry | Owns energy transition policy, Solar ATAP and LSS rounds. |
| Energy Commission (Suruhanjaya Tenaga) | Regulator | Electricity and gas regulator for Peninsular Malaysia | Sets tariffs and AFA, issues licences and the Solar ATAP, NEM and CRESS guidelines, and registers competent persons. |
| Energy Commission of Sabah (ECoS) | Regulator | Electricity and renewable energy regulator for Sabah | Licensing and renewable energy regulation in Sabah since January 2024. |
| Sustainable Energy Development Authority (SEDA Malaysia) | Renewable Energy | Implementing agency for renewable energy programmes | Runs the eATAP application system and the directory of Registered PV Service Providers. |
| Grid System Operator (GSO) | Transmission | Peninsular system operator | Dispatches generation and publishes system demand data. |
| Single Buyer | Market | Central power purchaser for Peninsular Malaysia | Publishes the SMP used for non-domestic Solar ATAP credits and runs CRESS applications. |
| Tenaga Nasional Berhad (TNB) | Distribution | Peninsular grid owner, distributor and retailer | Connects solar systems, installs bi-directional and smart meters, and bills households. |
| Sarawak Energy | Distribution | State utility for Sarawak | Generation, grid and supply in Sarawak, including its own NEM scheme. |
| Federation of Malaysian Consumers Associations (FOMCA) | Consumer | National consumer federation | Comments publicly on electricity tariffs and subsidy changes. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (LV/MV/HV) | Distribution Code for Peninsular Malaysia; Grid Code for Peninsular Malaysia | Energy Commission (ST) | Solar ATAP requires every connection to comply with whichever code applies. |
| Grid-connected PV installation | MS 1837 | Department of Standards Malaysia | Cited in the NEM guidelines for PV system design, including the isolation switch for safe utility work. |
| Inverter utility interface | IEC 61727; IEEE 1547 | IEC / IEEE (adopted by ST and TNB) | Voltage, frequency, harmonics and short-circuit requirements; installers confirm compliance in the application. |
| Anti-islanding | Distribution Code requirements with IEC 61727 / IEEE 1547 | ST / TNB | Inverters must disconnect automatically on loss of mains, and anti-islanding capability must be demonstrated at commissioning. |
| Electrical installation | MS IEC 60364 and MS IEC 60364-7-712 (PV power supply systems) | Department of Standards Malaysia | Wiring and protection for the DC and AC sides of PV systems. |
| Installer accreditation | SEDA Registered PV Service Provider; ST competent person and electrical contractor registration | SEDA Malaysia / Energy Commission | Solar ATAP applications must be submitted by an RPVSP. Electrical design and testing must be certified by a competent person. |
| Structural | Registration of Engineers Act 1967 / Architects Act 1967 | Board of Engineers / Board of Architects Malaysia | Certification of PV mounting structures. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Solar ATAP approval | Yes | National | Application through SEDA eATAP by a Registered PV Service Provider. Approval is decided within two months of submission, and the system must be commissioned within 18 months. |
| Utility connection study (Connection Confirmation Check) | Limited | National | Required by TNB for domestic systems above 5 kW (single-phase) or 15 kW (three-phase), with a RM1,000 study fee. Connection Assessment Studies apply to larger non-domestic systems. |
| Generation licence or exemption | Yes | National | Section 54 exemption notification to ST for small systems; a public generation licence above 24 kWac (single-phase) or 72 kWac (three-phase). |
| Local authority building permit | Limited | Local | Local council rules vary. Structural certification by a professional engineer is required for the mounting. |
| Strata or management body consent | Limited | Local | Needed for stratified properties. Multi-tenant sub-metered supplies are not eligible for Solar ATAP. |
For a landed house in Peninsular Malaysia, the approval path is mostly national and runs through the installer: SEDA approval via eATAP, a TNB study for larger systems, an exemption notification to ST and a bi-directional meter from TNB. Structural safety must be certified by a professional engineer, and local council requirements differ between authorities. Sabah and Sarawak have separate processes run by ECoS and Sarawak Energy.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Solar ATAP | Active | Net billing (export credit) | Exported rooftop solar is credited at the energy charge (domestic) or average SMP (non-domestic) against the same month's energy charge, for up to 10 years. Peninsular Malaysia only. | From 1 January 2026 |
| Net Energy Metering (NEM 3.0: NEM Rakyat and NEM GoMEn) | Closed | Net metering | Replaced by Solar ATAP for new applicants from 1 January 2026. Existing contracts continue for their 10-year terms under guidelines revised on 19 August 2026. | 2021 – 2025 (new applications) |
| Energy Efficiency Incentive (Insentif Cekap Tenaga) | Active | Tariff rebate | Discount of up to 25 sen/kWh for TNB domestic customers using less than 1,000 kWh a month, part of the RP4 tariff. | July 2025 – December 2027 |
| Bill protection up to 800 kWh | Active | Charge exemption | Domestic customers using up to 800 kWh a month are exempt from AFA, the retail charge and service tax (normally the threshold is 600 kWh). | September – December 2026 |
| Sarawak Energy NEM rebate | Active | Rebate | Up to RM8,000 (systems up to 3.5 kW), RM10,000 (3.5–6 kW) or RM12,000 (6–50 kW) for landed domestic customers joining Sarawak's NEM scheme, one installation per account owner. | Installations from 2026 |
| Green Technology Incentives (GITA/GITE) | Active | Tax incentive | Green Technology Incentives are available to eligible companies through MIDA (noted by SEDA for Solar ATAP). They do not apply to households. | — |
Data and connectivity.
- Fixed broadband
- 99.6 % of households with internet subscription (2024)Source 15
- 4G coverage
- 98.8 % coverage of populated areas (Jul 2025)Source 32Internet/communications coverage in populated areas under the JENDELA programme (mainly 4G).
- 5G coverage
- 82.4 % coverage of populated areas (Aug 2025)Source 32
Mobile coverage is extensive. Internet coverage in populated areas reached 98.82% by July 2025 under the JENDELA national digital network plan, and the national 5G network operated by Digital Nasional Berhad covered 82.4% of populated areas, with more than 28 million 5G subscriptions. TNB's smart meters send data to TNB's own head-end systems, and consumption data reaches customers through myTNB.
Grid conditions.
- National peak demand
- 22 GW (6 Aug 2026)Source 19Peninsular Malaysia record demand of 22,014 MW at 20:30. Sabah and Sarawak are separate systems.
- Annual electricity demand
- 199.9 TWh (2025)Source 18National electricity demand, all three systems.
- Generation capacity
- 27.3 GW (2026)Source 19Installed capacity on the Peninsular grid (27,333 MW) as published by the Single Buyer. Ember puts national capacity at about 42 GW (2025).
- Interconnection
- 1 GW (2025)Source 29Malaysia–Singapore bi-directional link only (up to 1 GW). Excludes the HVDC link to Thailand and the Sarawak–West Kalimantan line.
- Curtailment
- Not identified from a reliable public source.
Peninsular demand is rising quickly, driven by hot weather. The system set a record of 22,014 MW at 20:30 on 6 August 2026 and a record daily energy of 463,750 MWh on 9 September 2026. The Energy Commission puts the reserve margin at about 25%, but planned outages have at times reduced available generation to just under 25,000 MW. During some periods in 2025 and 2026, about 300 MW has been imported from Thailand.
The Peninsula is connected to Singapore (up to 1 GW in both directions, with a second interconnector of up to 2 GW planned by 2030) and to Thailand. Sarawak is connected to West Kalimantan, and a Sarawak–Peninsula subsea link is planned. Because the evening peak comes after sunset, large amounts of midday solar make storage and evening dispatchable capacity more valuable. This is one reason LSS6 pairs solar with batteries.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| RP4 tariff restructure and AFA | Current | 1 July 2025 | Domestic tariffs split into energy, capacity, network and retail charges; optional ToU tariff introduced; monthly Automatic Fuel Adjustment replaced the six-monthly ICPT. The schedule runs to 31 December 2027. |
| Solar ATAP replaces NEM 3.0 | Current | 1 January 2026 | Rooftop solar exports credited at the energy charge only, with monthly forfeiture of surplus and no fixed quota. |
| Revised NEM guidelines for existing contracts | Current | 19 August 2026 | NEM Rakyat and NEM GoMEn guidelines amended to align credits with the new tariff structure (prevailing gazetted energy rate, 12-month rollover). |
| Bill protection raised to 800 kWh | Current | September – December 2026 | Temporary exemption from AFA, retail charge and service tax for domestic use up to 800 kWh a month. |
| Smart meter roll-out completion | Upcoming | 2027 | TNB plans to install the remaining ~4.5 million smart meters under RP4. |
| Next regulatory period (RP5) | Upcoming | 1 January 2028 | The RP4 tariff schedule expires on 31 December 2027, and the CRESS system access charge is fixed for each three-year IBR period. |
| LSS6 solar-plus-storage | Upcoming | By 31 December 2029 | 2,650 MW of large-scale solar with 1,250 MW of battery storage to reach commercial operation. |
| SESB handover to Sabah | Upcoming | Expected by 2030 | Second phase of the transfer of Sabah's electricity supply, covering ownership of SESB, following the January 2024 transfer of regulatory powers to ECoS. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Medium | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | About 1.7 GW operating under NEM schemes across all segments (2025); export available through Solar ATAP since January 2026, but credits are limited to the energy charge with monthly forfeiture. |
| Distributed energy market | Low | Distributed resources are limited to rooftop solar; 44,813 electric cars registered in 2025 (about 5% of sales); no heat-pump market and no published home battery figures. |
| Grid flexibility market | Low | Single-buyer system with centralised dispatch by GSO; no aggregator licence, capacity market or demand-response market open to distributed assets. |
| Energy storage adoption | Low | First grid-scale BESS tender (MyBeST) awarded with operation targeted for 2027; 1,250 MW tied to LSS6 by 2029; no official operating capacity figure. |
| Renewable growth environment | Medium | Renewable generation share rose from 17.6% (2020) to 20.7% (2025); renewable capacity share 31% at end 2025 with targets of 35% (2030) and 70% (2050). |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 38 sources
- Jadual Tarif Elektrik di Semenanjung bagi Tempoh 1 Julai 2025 hingga 31 Disember 2027. Suruhanjaya Tenaga (Energy Commission), 2025. accessed 1 October 2026.
- Tariff: Domestic General and Domestic ToU. Tenaga Nasional Berhad, 2025. accessed 1 October 2026.
- TNB Raises Electricity Bill Exemption To 800 kWh Until December. RinggitPlus, 2026. accessed 1 October 2026.
- TNB AFA rate September 2026 set at +3.67 sen/kWh. paultan.org, 2026. accessed 1 October 2026.
- Green Energy Tariff: how to subscribe to GET. paultan.org, 2026. accessed 1 October 2026.
- Guidelines for Solar Accelerated Transition Action Programme in Peninsular Malaysia (GP/ST/No. 60/2025). Suruhanjaya Tenaga / SEDA Malaysia, 2025. accessed 1 October 2026.
- What is the concept of Solar Accelerated Transition Action Programme (ATAP)?. SEDA Malaysia, 2026. accessed 1 October 2026.
- Guidelines for Solar Photovoltaic Installation under the Programme of NEM Rakyat and NEM GoMEn in Peninsular Malaysia, Rev.1 2026. Suruhanjaya Tenaga (Energy Commission), 2026. accessed 1 October 2026.
- Population Table: Malaysia. Department of Statistics Malaysia (OpenDOSM), 2026. accessed 1 October 2026.
- Demographic Statistics Malaysia, First Quarter 2026. Department of Statistics Malaysia, 2026. accessed 1 October 2026.
- Number of Households and Living Quarters. Department of Statistics Malaysia (OpenDOSM), 2024. accessed 1 October 2026.
- Special Report: Living Quarters Malaysia (infographic). Department of Statistics Malaysia, 2026. accessed 1 October 2026.
- Household Income Survey Report, Malaysia & States 2024. Department of Statistics Malaysia, 2025. accessed 1 October 2026.
- Electricity Consumption (monthly, by sector). Department of Statistics Malaysia (OpenDOSM), 2023. accessed 1 October 2026.
- Malaysia logs 78% home ownership in 2024, near-universal access to electricity and water: DOSM. EdgeProp (reporting DOSM Basic Amenities Survey 2024), 2025. accessed 1 October 2026.
- Car Registrations (transaction records). Road Transport Department (JPJ) via data.gov.my, 2025. accessed 1 October 2026.
- Urban population (% of total population): Malaysia. World Bank, 2025. accessed 1 October 2026.
- Malaysia: electricity generation, capacity and demand (Yearly Electricity Data). Ember, 2026. accessed 1 October 2026.
- Market Data: installed capacity and highest demand recorded. Single Buyer, 2026. accessed 1 October 2026.
- ESG stories: TNB Advanced Metering Infrastructure. Tenaga Nasional Berhad, 2025. accessed 1 October 2026.
- TNB smart meter upgrade: daily and half-hourly usage data via myTNB. Bernama, 2025. accessed 1 October 2026.
- TNB Investor Presentation Deck, March 2026. Tenaga Nasional Berhad, 2026. accessed 1 October 2026.
- Energy Commission of Sabah (ECoS) as regulator of electricity supply and renewable energy. Energy Commission of Sabah, 2024. accessed 1 October 2026.
- Revised Guidelines for Corporate Renewable Energy Supply Scheme (CRESS). Rajah & Tann Asia, 2025. accessed 1 October 2026.
- Malaysia: 2026 updates to renewable energy schemes. Baker McKenzie, 2026. accessed 1 October 2026.
- Large Scale Solar Photovoltaic Plant: Sixth Competitive Bidding Round (LSS6). Rajah & Tann Asia, 2026. accessed 1 October 2026.
- Blueleaf Energy–Universal Peak consortium secures 100 MW/400 MWh BESS project under Malaysia's MyBeST programme. SolarQuarter, 2026. accessed 1 October 2026.
- Malaysian utility launches rebate program for residential PV. pv magazine, 2025. accessed 1 October 2026.
- Malaysia, Singapore advance cross-border electricity trade. New Straits Times, 2025. accessed 1 October 2026.
- Malaysia renewable energy installed capacity nearly 32 per cent as of June (Fadillah). Bernama, 2026. accessed 1 October 2026.
- Malaysia amends electricity law to boost cross-border power trade. Reccessary, 2025. accessed 1 October 2026.
- Internet coverage in populated areas reaches 98.82 per cent; 5G at 82.4 per cent. Bernama, 2025. accessed 1 October 2026.
- What is RE Fund (KWTBB)?. Tenaga Nasional Berhad, 2026. accessed 3 October 2026.
- Your New TNB Bill Explained: Understanding the Monthly Tariff Changes. RinggitPlus, 2025. accessed 3 October 2026.
- Lebih 23.6 juta pengguna domestik Semenanjung nikmati kadar lebih adil (Energy Commission example bill). Utusan Malaysia (via TNB news clippings), 2025. accessed 3 October 2026.
- Euro foreign exchange reference rates: Malaysian ringgit (MYR). European Central Bank, 2026. accessed 1 October 2026.
- Update your TNB bill account number (new 12-digit format). Standard Chartered Malaysia, 2016. accessed 1 October 2026.
- TNB change of tenancy: documents and steps. SPEEDHOME, 2026. accessed 1 October 2026.
Questions about energy in Malaysia.
In Peninsular Malaysia, the TNB Domestic General tariff from 1 July 2025 to 31 December 2027 charges 27.03 sen/kWh for energy (up to 1,500 kWh a month), plus 4.55 sen/kWh capacity and 12.85 sen/kWh network charges, which is 44.43 sen/kWh before adjustments. After the Energy Efficiency Incentive and the 1.6% KWTBB levy, a typical household using about 381 kWh a month pays RM106.18, or 27.87 sen/kWh all-in. A RM10 monthly retail charge, the monthly fuel adjustment (AFA) and 8% service tax apply only above 600 kWh a month (800 kWh from September to December 2026). Households using 1,000 kWh or less receive an Energy Efficiency Incentive discount of 0.5 to 25 sen/kWh, depending on monthly use.
In Peninsular Malaysia, households can export surplus solar under Solar ATAP, which replaced NEM 3.0 on 1 January 2026. Exported energy is credited at the energy charge against the same month's bill, unused credit is forfeited, and no cash is paid. The arrangement lasts 10 years. Sarawak Energy runs its own Net Energy Metering scheme with installation rebates, and Sabah is regulated separately by ECoS.
There is no national supply-point number. Each connection is identified by the utility account number, a 12-digit number for TNB customers, printed on every bill and used in myTNB. It belongs to the account holder rather than the property, so a new occupier gets a new account number for the same meter.
No. TNB supplies Peninsular Malaysia, SESB supplies Sabah and Labuan, and Sarawak Energy supplies Sarawak. Tariffs are regulated, and the only household choices are options from the same utility, such as TNB's time-of-use tariff and Green Electricity Tariff.
Under the optional Domestic ToU tariff, peak is 14:00 to 22:00 on weekdays and every other hour is off-peak, including all day at weekends. The peak energy charge is 28.52 sen/kWh and off-peak 24.43 sen/kWh for use up to 1,500 kWh a month.
Under Solar ATAP, up to 5 kW on a single-phase supply and 15 kW on a three-phase supply without an additional TNB study. Larger domestic systems need a Connection Confirmation Check. The application must be made through a SEDA Registered PV Service Provider.
The Energy Commission (Suruhanjaya Tenaga) regulates Peninsular Malaysia, the Energy Commission of Sabah (ECoS) has regulated Sabah since January 2024, and Sarawak regulates its own supply through the Ministry of Utility and Telecommunication under the state Electricity Ordinance.