How electricity works in Mexico.
Mexico electricity market 2026: CFE, CENACE and the new CNE, subsidised household tariffs, RPU/RMU service numbers, net metering and the 2025 sector reform.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Mexican peso (MXN) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Mexico energy at a glance.
Key figures for households in Mexico. Each one links to its source on the full overview below.
Electricity price.
1.58 MXN per kWh for households, including taxes. Figures for 2024.
Household use.
1,885 kWh a year for a typical household. Figures for 2024.
Renewable share.
23.1% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Mexico.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Mexico below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Mexico requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Mexico.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Mexico, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Mexico, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Mexico.
The energy market in Mexico, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Mexico’s power sector was rebuilt in March 2025. A package of laws published on 18 March 2025 replaced the 2014 Electricity Industry Law with the Ley del Sector Eléctrico (LSE), turned the Comisión Federal de Electricidad (CFE) into a “public enterprise of the State”, abolished the independent Comisión Reguladora de Energía (CRE) and created the Comisión Nacional de Energía (CNE) under the Energy Ministry (SENER). The new law gives the state at least 54% of the energy injected into the grid each year and makes SENER’s planning binding. Implementing regulations followed on 3 October 2025, and the first binding plan, the Plan de Desarrollo del Sector Eléctrico 2025–2039 (PLADESE), on 17 October 2025.
For households, very little has changed in practice. CFE is still the only company allowed to supply homes, at prices set by the state and heavily subsidised. A wholesale electricity market run by the Centro Nacional de Control de Energía (CENACE) still exists, but only large consumers of 1 MW or more can leave CFE’s regulated supply. Transmission and distribution remain a state monopoly run by CFE.
Electricity is cheap for most households but mainly fossil-fuelled. In 2025 natural gas produced 61.6% of Mexico’s electricity and renewables 23.1%, according to Ember. Rooftop solar is the one area of fast private growth: by the end of 2025 more than 600,000 small systems, totalling about 5.2 GW, were connected under the distributed generation scheme for installations below 0.7 MW.
Energy snapshot.
Headline figures for electricity in Mexico. Each shows its data year and links to its source.
- Population130,900,000 peopleSource 32025
- Households38,830,230 householdsSource 42024
- Average household size3.4 people/householdSource 42024
- Electricity use per household1,885 kWh/yrSource 22024
- Household price (MXN)1.58 MXN/kWhSource 22024
- Household price (EUR)0.077 EUR/kWhSource 282024
- Renewable electricity share23.1%Source 12025
- Solar capacity12.9 GWSource 12025
- Wind capacity7.51 GWSource 12025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Restricted
- Regulator
- Comisión Nacional de Energía (CNE), a body of the Energy Ministry (SENER) that replaced the CRE in 2025
- System operator
- Centro Nacional de Control de Energía (CENACE)
- Distribution networks
- Single national distribution network owned and operated by CFE; no private DSOs
- Currency
- Mexican peso (MXN)
- Voltage and frequency
- 127/220 V / 60 Hz
Electricity prices in Mexico.
- Household price (MXN)
- 1.58 MXN/kWh (2024)Source 2Average residential price (precio medio) for 2024 reported by SENER, the highest in 15 years (1.10 MXN/kWh in 2010). This is the billed average after government subsidy; it is not stated whether 16% VAT is included. Unsubsidised high-consumption (DAC) customers pay about 6 MXN/kWh.
- Household price (EUR)
- 0.077 EUR/kWh (2024)Source 28Converted from 1.58 MXN/kWh at the ECB reference rate of 30 September 2026 (EUR 1 = MXN 20.5816).
- Typical annual electricity bill
- 2,978 MXN/yr (2024)Source 2Derived: average residential use of about 1,885 kWh a year multiplied by the 2024 average residential price of 1.58 MXN/kWh. Most households are billed every two months, so a typical bill is about MXN 500 per bimonthly period.
Household price trend (MXN per kWh).Source 7
| Jan 2018 | 0.793 MXN/kWh |
|---|---|
| Jan 2019 | 0.796 MXN/kWh |
| Jan 2020 | 0.831 MXN/kWh |
| Jan 2021 | 0.855 MXN/kWh |
| Jan 2022 | 0.882 MXN/kWh |
| Jan 2023 | 0.945 MXN/kWh |
| Jan 2024 | 1.015 MXN/kWh |
| Jan 2025 | 1.063 MXN/kWh |
| Jan 2026 | 1.11 MXN/kWh |
How household prices are set
Household tariffs are not set by a market or by CFE alone. Under the LSE the Suministro Básico, the regulated service for homes, may be provided only by CFE, which the law says must supply electricity “at the lowest possible price”. The tariff schedules are published as government agreements and updated monthly; CFE publishes each month’s rates on its website. Tariff 1’s basic block rose from 0.793 MXN/kWh in January 2018 to 1.110 MXN/kWh in January 2026 and 1.136 MXN/kWh by September 2026, roughly in line with inflation.
Subsidy
Prices for most households are well below cost. The subsidy is built into the block structure: small consumers and those in hot regions pay low unit prices, and only households that consistently use a lot move to the unsubsidised DAC tariff at around 6 MXN/kWh, more than five times Tariff 1’s basic block. CFE recorded MXN 84,805.5 million of subsidy income from the Finance Ministry (SHCP) in 2025.
Taxes and bills
Domestic tariffs are quoted before 16% VAT (IVA), which is added to the bill. Most households are billed every two months. At September 2026 rates, a Tariff 1 household using 140 kWh a month would pay about MXN 175 a month before VAT, or about 1.45 MXN/kWh including VAT.
Average prices and trend
SENER reports that the average residential price reached 1.58 MXN/kWh in 2024, the highest in the 15 years from 2010 (when it was 1.10 MXN/kWh), but still below the average for all consumers. Medium-sized businesses paid 2.75 MXN/kWh and large industry 2.14 MXN/kWh in 2024. The chart shows the Tariff 1 basic-block price each January, before VAT.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households are on CFE’s regulated domestic tariffs. Tariff 1 applies in temperate areas; tariffs 1A to 1F apply in progressively hotter localities (1F where the average summer temperature is at least 33 °C) and give much larger cheap blocks in the six summer months. In September 2026 Tariff 1 charged 1.136 MXN/kWh for the first 75 kWh a month, 1.381 for the next 65 kWh and 4.041 for anything above, before 16% VAT, with a 25 kWh monthly minimum. |
| Other | Yes | High-consumption tariff (DAC): a household whose 12-month average exceeds its locality’s limit (250 kWh/month on Tariff 1, rising to 2,500 kWh/month on Tariff 1F) loses the subsidy. In September 2026 DAC charged a fixed MXN 145.85 a month plus 5.98–6.56 MXN/kWh depending on region, or 6.38–6.95 MXN/kWh in summer in the Baja California peninsula. |
| Time-of-use | No | There is no time-of-use tariff for low-voltage households. Hourly tariffs apply only to customers supplied at medium voltage; the DAC rules allow a high-consumption household to be supplied at medium voltage on the corresponding hourly tariff. |
| Dynamic | No | Households cannot buy at wholesale prices. Only qualified users of 1 MW or more can buy from qualified suppliers or directly in the CENACE wholesale market. |
| Other | Yes | Households with solar panels can sign one of three CFE contracts: net metering (medición neta), net billing (facturación neta) or total sale (venta total). Net metering covers almost all of them. |
Household prices compared with neighbouring countries (EUR per kWh).
- United States€0.161
- Mexico€0.077
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 1,885 kWh/yr (2024)Source 2Derived: residential consumption was 27.1% of 304,011 GWh of final consumption (about 82,390 GWh) and residential users were 89.2% of 49 million users (about 43.7 million); 82,390 GWh ÷ 43.7 million ≈ 1,885 kWh per residential service a year. Use is much higher in hot northern and coastal regions.
- Average daily use per household
- 5.2 kWh/day (2024)Source 2Derived: about 1,885 kWh a year per residential service divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,658 kWh/person/yr (all sectors) (2024)Source 29World Bank electric power consumption per capita. Ember puts 2025 demand at 2.70 MWh per person.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 7 % of new light-vehicle sales (BEV + PHEV) (Q2 2025)Source 2225,869 battery-electric and plug-in hybrid vehicles were sold in the second quarter of 2025: BEVs 3.6% and PHEVs 3.4% of light-vehicle sales.
- Electric cooking
- Not identified from a reliable public source.
Mexican households use little electricity by international standards: about 1,900 kWh a year per residential service, or around 5 kWh a day. The residential sector accounted for 89.2% of electricity users but only 27.1% of final consumption in 2024; medium-sized businesses and large industry used 60.6%.
Climate drives the differences. In hot areas such as Sonora, Sinaloa, Baja California, Nuevo León and Yucatán, air conditioning pushes summer consumption up sharply, which is why tariffs 1A–1F give larger subsidised blocks in summer. The national system peaks in late spring and summer: between 53.9% and 55.1% of annual consumption occurred in the summer months in the years SENER analysed, and the 2024 peak of the main interconnected system came in May at 17:00.
Appliance ownership is rising. The 2025 Encuesta Intercensal found refrigerators in 91.8% of dwellings (up from 88.1% in 2020) and washing machines in 79.1%. Cooking and water heating rely mostly on LPG and natural gas rather than electricity. Electric vehicles are a small but growing share of new car sales, at 7.0% in the second quarter of 2025.
Housing and households.
- Dwellings
- 39,699,242 occupied private dwellings (2025)Source 3Up from 35.2 million in the 2020 Census, an average growth rate of 2.2% a year.
- Owner-occupied
- 67.8 % of dwellings (2020)Source 5Derived: 57.1% owned outright plus 10.7% owned and still being paid for (ENVI 2020).
- Private rented
- 16.4 % of dwellings (2020)Source 5A further 14.2% of dwellings were lent by family, friends or an employer, and 1.7% had another status.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 93.6 % of dwellings (2018)Source 6Derived from ENCEVI 2018 dwelling-type counts: single houses on their own plot (24.8 million), houses sharing a plot (5.7 million) and duplex/triplex/quadruplex units (0.6 million), out of 33.2 million dwellings.
- Apartments and flats
- 4.9 % of dwellings (2018)Source 6Derived: 1.61 million apartments in buildings out of 33.2 million dwellings (ENCEVI 2018). Shared-courtyard housing (vecindades) and rooftop rooms make up most of the remainder.
- Urban population
- 78.1 % of population (2024)Source 4Population in localities of 2,500 or more people (ENIGH 2024). The World Bank estimate for 2025 is 80.0%.
Mexico’s housing is dominated by individual houses, very often self-built. In INEGI’s 2018 energy survey more than nine in ten dwellings were houses, and only about 5% were apartments in buildings. In the 2020 housing survey 57.3% of owner-occupied homes had been built by their owners rather than bought. Flat concrete roofs are common, which makes rooftop solar physically straightforward on most houses.
About two-thirds of homes are owner-occupied (67.8% in 2020), 16.4% are rented and 14.2% are lent by relatives or employers. Because an electricity contract and a solar interconnection are tied to a CFE service at a specific address, the person holding the CFE service contract, normally the occupant, applies for the interconnection.
The number of households is growing faster than the population: occupied dwellings rose from 35.2 million in 2020 to 39.7 million in 2025 while the average number of occupants fell from 3.6 to 3.3.
How the grid works in Mexico.
- TransmissionCentro Nacional de Control de Energía (CENACE), CFE (transmission)
- DistributionSingle national distribution network owned and operated by CFE; no private DSOs
- MeteringCFE
- Supply2 or more retail suppliers
Physical flow
Power stations inject into a national transmission network that CFE owns and CENACE operates. The Sistema Interconectado Nacional (SIN) covers seven regional control areas; the Baja California, Baja California Sur and Mulegé systems are separate. In 2024 the SIN peaked at 52,302 MW in May, and installed capacity connected to the grid was 90,543 MW, 36.9% of it from clean technologies. Losses were 12.3% of net consumption, including electricity theft and metering failures, which are particularly high in the north-east.
Mexico is linked to the United States, Belize and Guatemala. In 2024 it imported 2,469 GWh and exported 2,818 GWh; Baja California, connected to the Californian grid, accounted for 71.9% of imports.
Commercial flow
Generators sell into CENACE’s wholesale market or under long-term contracts. CFE’s generation business and independent power producers under legacy contracts supply most of the energy that CFE’s basic-supply business resells to households at regulated tariffs. The LSE requires the state to supply at least 54% of the energy injected each year, so new private plants are now built either for self-consumption (autoconsumo), for sale in the market within SENER’s binding plan, or as “mixed development” projects with CFE.
Network services are paid through regulated transmission, distribution and CENACE tariffs set by the regulator and built into the final tariff. Only qualified users can buy energy from a private supplier or directly in the market; everyone else is a CFE basic-supply customer.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Secretaría de Energía (SENER) | Sets energy policy and, since the 2025 reform, issues binding sector planning through the annual PLADESE. It authorises electricity imports and exports, sets the consumption threshold for qualified users and, with the CNE, is responsible for the new distributed generation rules. |
| Regulator | Comisión Nacional de Energía (CNE) | Created in March 2025 as a technically independent body within SENER, replacing the autonomous Comisión Reguladora de Energía (CRE). It grants generation, storage and supply permits, approves regulated network tariffs and final basic-supply tariffs, keeps the qualified-user register, issues contract models for selling surplus energy and publishes distributed generation statistics. |
| System operator | Centro Nacional de Control de Energía (CENACE) | Operates the national grid and the wholesale electricity market (Mercado Eléctrico Mayorista, MEM), runs interconnection studies, instructs network operators to sign interconnection contracts and dispatches generators, storage and controllable demand. The grid is split into eight regional control centres (Gerencias de Control Regional). |
| TSO | CFE (transmission) | Owns and maintains the national transmission network (69 kV to 400 kV): 56,720 km of 161–400 kV lines and 54,418 km of 69–138 kV lines at the end of 2024. Transmission is reserved to the state by the Constitution. |
| DSO | CFE (distribution) | The only distribution network operator, covering medium-voltage (1–69 kV) and low-voltage (up to 1 kV) networks nationwide. Until 2025 it was the subsidiary CFE Distribución; the 2025 CFE law dissolved CFE’s subsidiaries and folded them back into the parent company. It approves small-generator interconnections and installs meters. |
| Supplier | CFE Suministro Básico | Sole supplier of the regulated basic supply to all households and small businesses, billing about 49.8 million customers at the end of 2025. It also buys surplus energy from distributed generators under net metering, net billing or total-sale contracts. |
| Supplier | Qualified suppliers (Suministradoras de Servicios Calificados) | Private suppliers and the CFE affiliate CFE Calificados that sell to qualified users (load centres of at least 1 MW) in competition. Households cannot use them. |
| Metering | CFE | Owns, installs and reads all household meters. There is no independent metering market. |
| Exchange | CENACE wholesale market (MEM) | Short-term energy and ancillary services markets, a capacity balance market and clean energy certificates. Participants are generators, suppliers and qualified users that register directly as market participants. |
Compared with the UK system.
| UK concept | Mexico equivalent | How it works |
|---|---|---|
| DNO | CFE (distribution) | Mexico has one distribution network owner for the whole country: CFE. There are no regional private DSOs and no competitive connections market. CFE’s distribution business studies and approves rooftop solar interconnections, sets the connection works and changes the meter. |
| National Grid/NESO | CFE (transmission) and CENACE | CFE owns the transmission network, as National Grid does in England and Wales, while CENACE plays the system operator role of NESO and also runs the wholesale market. The main interconnected system covers most of the country; the Baja California systems are operated separately and Baja California is linked to the Californian grid. |
| MPAN | Número de servicio (RPU or RMU) | Each CFE supply contract has a service number. Older contracts have a 12-digit Registro Permanente de Usuario (RPU); since 2018 new contracts carry a 27-character Registro Móvil de Usuario (RMU), whose structure was set by the regulator. Unlike an MPAN it is used for billing, payments and interconnection requests rather than supplier switching, because households cannot switch. |
| MPRN | Gas distributor’s account number | Piped natural gas reaches only some cities and is distributed by private permit holders, each using its own account numbers. Most households use LPG bought in cylinders or delivered to a rooftop tank, which has no supply-point number. |
| Meter operator | CFE | CFE owns, installs, reads and replaces household meters. Users can ask for a meter test under the general service conditions, and market participants can ask for read-only local access to backup meters. There is no separate meter-operator licence. |
| Supplier | CFE Suministro Básico | There is no household retail competition. CFE is the only basic-supply provider by law and every home is on a regulated tariff. Competition exists only for qualified users of at least 1 MW. |
| Smart-meter infrastructure | CFE AMI programmes | There is no national smart-meter mandate, no central data hub like the DCC and no consumer data-sharing scheme. CFE installs AMI meters mainly to cut losses and electricity theft, allowing remote reading, disconnection and reconnection. |
How a supply point is identified.
RPU 413170902658; RMU 44100 25-07-14 MELP830215 014 XYZ (both fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Número de servicio: Registro Permanente de Usuario (RPU) or Registro Móvil de Usuario (RMU) (RPU / RMU) |
| Who issues it? | CFE, as basic supplier, when the supply contract is signed. The RMU structure was defined by the former regulator CRE in resolutions RES/999/2015 and RES/1915/2016. |
| Format | RPU: 12 digits. RMU: 5-digit postcode of the end user + contract date (YY-MM-DD) + the holder’s tax ID (RFC) without the final verification characters (XXX0-YYMMDD) + 3-digit folio assigned by the supplier + 3-letter code assigned to the supplier by the regulator. |
| Length | 12 digits (RPU); 27 characters (RMU) |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | At the top of the CFE bill (aviso-recibo), below the customer’s name and address, and again above the barcode at the bottom. It is also shown in the CFE Contigo app. |
| Electronic access | Customers use the service number to view and pay bills on the CFE website and app and to report faults on the 071 helpline. There is no consumption-data download standard for households. |
| Third-party access | Third parties such as installers use the number, with the customer’s bill, to file an interconnection request at a CFE customer centre. Payment platforms accept it as a reference. There is no regulated data-sharing scheme. |
| Who keeps the register | CFE’s commercial system holds the register of basic-supply contracts. Qualified users are identified by the RMU in the CNE register and CENACE’s systems. |
| Register scope | National |
How a home is identified
Every electricity connection in Mexico is a CFE supply contract, and each contract has a número de servicio. Contracts signed before 2018 normally use a 12-digit Registro Permanente de Usuario (RPU). Newer contracts carry a 27-character Registro Móvil de Usuario (RMU), introduced under the 2014 reform so that load centres could be identified in the wholesale market as well as by CFE. CFE treats the two as the same service identifier.
What the RMU contains
The RMU encodes who and where the contract is, not only the metering point: the 5-digit postcode, the date the supply contract started (YY-MM-DD), the holder’s tax ID (RFC) without its last characters, a 3-digit folio from the supplier and a 3-letter code identifying the supplier. Because the contract date and the holder’s RFC are built in, it is best understood as identifying a supply contract at an address rather than a permanent property identifier; whether a new occupant keeps the same number depends on whether the contract is transferred or a new one is signed. The meter has its own serial number, which is also printed on the bill.
Where it is used
The service number is the key for paying bills, reporting faults, applying for a rooftop solar interconnection and joining government programmes such as Techos Solares para el Bienestar, where applicants enter their service number online. Regulatory forms for large load centres ask for the RMU, or the RPU if no RMU exists.
Register
There is no independent national data hub. CFE’s commercial system is the de facto national register of household supply points, because CFE is the only basic supplier and the only distributor.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Yes |
| How exported electricity is paid | Net metering credits exported kWh against consumption; net billing and total sale pay for exported energy under contract models set by the regulator. Systems below 0.7 MW sell only through CFE. |
| Size limit | Distributed generation means plants below 0.7 MW, which are exempt from a generation permit (LSE articles 19 and 25). The regulation counts installed capacity. Until new distributed generation rules are issued, CFE still applies the 2016 interconnection manual for plants under 0.5 MW. |
| Connection classes | Low voltage: under 50 kW for three-phase systems and under 30 kW for single-phase (Type BT). Medium voltage: under 250 kW (MT1) and 250–500 kW (MT2). |
| Network capacity | On a low-voltage circuit the combined generation connected must not exceed 80% of the capacity of the supplying transformer or feeder. Medium-voltage feeders are limited to 4 MW at 13.8 kV, 8 MW at 23 kV and 10 MW at 34.5 kV unless CFE shows a lower limit. |
| Protection | Systems must have overcurrent, overvoltage, undervoltage, frequency and anti-islanding protection, plus reverse power and loss-of-synchronism protection where relevant; protective devices must comply with NOM-001-SEDE. |
| Larger self-consumption plants | Interconnected self-consumption plants of 0.7 MW or more need a CNE permit (simplified for 0.7–20 MW). Surpluses can be injected without payment or sold only to CFE, which is not obliged to buy; intermittent plants must have their own storage or pay CFE for backup. |
Connecting a home system.
- Size the system below 0.7 MW of installed capacity (distributed generation); larger self-consumption plants need a CNE permit.
- Choose the contract type: net metering, net billing or total sale.
- File the interconnection request at a CFE customer service centre with the latest paid bill (or RMU), a location sketch, a single-line diagram and the technical specifications and certificates of the panels and inverter.
- CFE checks network capacity; it must reply within 13 business days if no study or works are needed, or 18 business days if they are.
- Pay for any network works CFE requires; for medium-voltage systems, obtain an inspection certificate from an approved inspection unit (low-voltage “Type BT” systems are exempt).
- Sign the interconnection and compensation contracts; CFE installs a bidirectional meter and adds the system to the billing system.
Households can connect rooftop solar and send surplus power to the grid without a generation permit, provided the system is below 0.7 MW. The 2025 law raised this threshold from 0.5 MW. CFE offers three contracts. Under net metering, the household’s generation and consumption share one supply contract and exports offset imports. Under net billing, the household is billed for all its consumption and is paid separately for what it exports. Under total sale, the generator sells all its output to CFE and has no supply contract.
Net metering dominates. CNE figures reported for the end of 2025 showed 593,607 net-metering applications totalling 5,113 MW, against 6,540 net-billing contracts (73 MW) and 504 total-sale contracts (3.4 MW). Systems of 50 kW or less made up 98.2% of net-metering contracts, and the average installation was 8.6 kW.
The legal framework is in transition. The LSE and its regulations require new distributed generation rules from SENER and the CNE, including contract models and methods for valuing the energy CFE buys. Until they are published, interconnection follows the 2016 manual and the CRE’s 2017 rules. Plants of 0.7 MW or more fall under the new self-consumption rules issued by the CNE on 12 December 2025, under which the price for surplus energy is the lower of a percentage of the last long-term auction’s cost or the same percentage of the local marginal price.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (household / small) | No permit below 0.7 MW (Generadora Exenta / distributed generation); interconnection contract with CFE required | CFE (interconnection); CNE (rules) | Generators exempt from a permit can only consume their own power or sell through a supplier, in practice CFE’s basic supplier. Backup generators used only during outages need no permit at any size. |
| Generate electricity (self-consumption, 0.7 MW and above) | CNE generation permit (autoconsumo); simplified procedure for interconnected plants of 0.7–20 MW | CNE; CENACE for interconnection | Isolated self-consumption must not be connected to the public grid. Interconnected self-consumption can sell surplus only to CFE and, if intermittent, must have storage or pay CFE for backup. |
| Generate electricity for the wholesale market | CNE generation permit for plants of 0.7 MW or more, consistent with SENER’s binding plan | CNE; SENER; CENACE | The state must keep at least 54% of injected energy. A 2025 call gave priority to projects in the binding plan; 18 permits were granted. Mixed projects with CFE require at least 54% CFE ownership. |
| Store electricity | Storage permit for standalone systems; no separate permit for storage associated with a plant, a load centre or self-consumption within its limits | CNE | Under the CNE storage rules of 16 April 2026, storage behind a load centre may serve only on-site needs and cannot inject. Self-consumption storage needs no permit if its power does not exceed the site’s demand. Standalone systems of 0.7–20 MW get an expedited assessment. |
| Export to the grid | Interconnection contract and compensation contract with CFE; no licence for systems below 0.7 MW | CFE; CNE (contract models) | Net metering, net billing or total sale. Plants of 0.7 MW or more need a permit and may only sell surplus to CFE. |
| Supply households (basic supply) | Reserved by law to CFE | LSE article 61; CNE | No private company can supply households. Selling electricity from distributed generation located within the buyer’s own installations, and resale within a private network, are not treated as supply. |
| Supply qualified users | CNE permit as qualified supplier (Suministradora de Servicios Calificados) | CNE | Qualified users are load centres registered with the CNE that meet SENER’s demand threshold (1 MW since 2016), with aggregation allowed within a corporate group. |
| Aggregate distributed resources | No household aggregator role; exempt generators must be represented by a licensed supplier | CNE; CENACE | A supplier permit covers representing exempt generators in the market. Basic-supply customers with controllable demand can offer demand reduction only through CFE’s basic supplier. |
| Trade / wholesale participation | Market participant contract with CENACE (generator, marketer or qualified user) | CENACE; CNE | Non-supplying marketers can trade energy and associated products. Generators can sell their own output but cannot supply end users. |
| Import / export electricity across the border | Authorisation from SENER | SENER | Required for any cross-border trade under LSE article 20. |
| Balancing and ancillary services | Registered market participant with qualifying assets under CENACE’s market rules | CENACE | Storage permits must list the services a system may provide, such as regulation, backup or ancillary services, and may set them out in a contract with CENACE. |
| Virtual power plant / remote control of assets | No specific legal framework | CENACE; CNE | All plants and controllable demand must follow CENACE’s instructions through their representative. There is no route for aggregated household devices to join the market. |
Mexican licensing turns on two thresholds: 0.7 MW, below which a power plant is an exempt generator needing no permit, and 1 MW of demand, above which a consumer can register as a qualified user and leave CFE’s regulated supply. Almost everything that touches households, including supply, distribution and metering, is reserved to CFE.
Above 0.7 MW, the 2025 law separates self-consumption, generation for the market and mixed state–private projects, all requiring CNE permits, and ties approvals to SENER’s binding plan. Storage became a regulated activity in its own right, with a permit for standalone systems and a set of “associated” modes that avoid a separate permit.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Short-term energy market (day-ahead and real-time) | Restricted | — | Limited | CENACE. Open to generators, suppliers and qualified users that are market participants. Exempt generators participate only if represented by a licensed supplier; households participate only indirectly through CFE. |
| Ancillary services (reserves and regulation) | Restricted | — | No | CENACE. Procured from generators and permitted storage. The 2026 storage rules let standalone storage take part as a storage operator or be represented by a generator or supplier. |
| Controllable demand | Restricted | — | Limited | CENACE / CFE basic supplier. The law lets qualified users offer controllable demand through their supplier, and basic-supply customers offer demand reduction through CFE, under contract models still to be issued. |
| Capacity (balance of power market) | Restricted | — | No | CENACE. Suppliers and market-participant qualified users must secure capacity. Market rules define how distributed generation is credited against these obligations. |
Flexibility markets are designed around large plants and qualified users. A household’s solar system, battery or air conditioner cannot be aggregated into CENACE’s markets; the law allows basic-supply customers to offer demand reduction only through CFE, and the contract models for this had not been published by October 2026.
Storage has a clearer route. The CNE’s rules of 16 April 2026 define storage associated with power plants, with load centres, with self-consumption and with the transmission and distribution networks, as well as standalone storage that can trade in the wholesale market. SENER’s plan also expects new wind and solar plants from 2031 to carry storage averaging 30% of their capacity.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| CENACE market information | Publishes market prices, demand and grid operating information. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | CFE-led AMI replacement programmes aimed at cutting losses; no national target or published coverage figure |
| Reading interval | Not published; most households are read and billed every two months |
| Ownership | CFE owns and installs all household meters |
| Earlier programme | Target of 2 million AMI meters installed in 2015–2017 in 11 states, read remotely by radio, with remote disconnection and reconnection |
| Solar homes | A bidirectional meter is installed when a rooftop system is interconnected |
| Data access | No household data-download or third-party sharing standard |
Smart metering in Mexico is driven by CFE’s need to reduce losses, not by retail competition. In 2024 total losses were 12.3% of net consumption, and non-technical losses (theft, faulty meters and billing errors) accounted for up to 60.8% of losses in the north-east. CFE’s AMI meters allow remote reading, disconnection and reconnection, and fault monitoring.
There is no published national coverage figure and no consumer smart-meter data scheme. Households on traditional meters are read manually every two months; CFE explains how to read electromechanical and digital meters on its website. Each meter has its own serial number printed on the bill alongside the service number.
Renewable electricity.
Electricity generation mix (2025).
- Gas: 61.6%
- Other fossil: 9.4%
- Hydro: 8.1%
- Solar: 7.4%
- Wind: 6%
- Coal: 3.1%
- Nuclear: 2.9%
- Bioenergy and other renewables: 1.7%
- Renewable electricity share
- 23.1% (2025)Source 1Hydro 8.05%, solar 7.38%, wind 5.99%, bioenergy and other renewables 1.67%. Including nuclear (2.85%), low-carbon sources supplied 25.94%. Up from 21.12% in 2024.
- Home solar
- 5.165 GW (end 2025)Source 21All distributed solar below 0.7 MW (homes, shops and small industry), 600,368 applications, from CNE statistics as reported by pv magazine. Systems of 50 kW or less accounted for 3,251 MW of net-metered capacity. SENER’s official figure for 2024 was 4,423 MW across more than 405,000 contracts.
- Solar added each year
- 0.94 GW (2025)Source 1Derived: Ember solar capacity rose from 11.99 GW in 2024 to 12.93 GW in 2025.
- Gas
- 47.2 GW (2025)Source 1
- Other fossil
- 39.9 GW (2025)Source 1
- Solar
- 12.9 GW (2025)Source 1
- Hydro
- 12.8 GW (2025)Source 1
- Wind
- 7.51 GW (2025)Source 1
- Coal
- 5.38 GW (2025)Source 1
- Nuclear
- 1.61 GW (2025)Source 1
- Geothermal
- 0.976 GW (2024)Source 2
Targets.
- Clean energy: SENER expects clean generation to reach about 38% in 2030, above the 35% goal tied to Mexico’s emissions commitments.
- Distributed solar: PLADESE planning scenario of 14,432 MW by 2039 (20,461 MW in an extended scenario); SENER aims to double capacity by 2030 compared with the first half of 2025.
- Battery storage: 5,551 MW of additions planned for 2025–2030 and 3,096 MW of standalone storage for 2031–2039.
Mexico’s electricity is dominated by natural gas. In 2025 gas supplied 61.6% of generation and other fossil fuels, including fuel oil, a further 9.4%. Renewables reached 23.1%, up from 21.1% in 2024 mainly because hydro output recovered. Mexico also has geothermal plants (976 MW) and the Laguna Verde nuclear station (1.6 GW).
Utility-scale wind and solar grew quickly after the 2013 reform opened generation to private investors: grid-scale PV rose from 145 MW in 2016 to 7,961 MW in 2024 and wind from 3,735 MW to 7,512 MW. Wind capacity was unchanged in 2025. The new framework relies on CFE projects, such as the Puerto Peñasco solar plant in Sonora (420 MW in operation, planned to reach 1,000 MW with battery storage), and on mixed projects with private developers; CFE called for proposals for up to 6,500 MW of renewables in February 2026.
Rooftop solar has kept growing independently of these changes, rising from an estimated 1 MW in 2010 to more than 5 GW at the end of 2025. Jalisco has the most capacity (99,949 installations and 748 MW).
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Battery storage in Mexico is at an early stage but is now central to planning. The 2025 law requires intermittent self-consumption plants that export to have their own storage or pay CFE for backup, and CENACE can require storage as part of renewable projects when assessing interconnection requests.
The CNE’s storage rules of 16 April 2026 set out five modes, from batteries attached to power plants and to customer sites to standalone storage trading in the wholesale market. Home batteries fall into the customer-site mode: they can be used on site but not to export.
Storage projects.
- Central Fotovoltaica Puerto Peñasco (Sonora): CFE solar plant with 420 MW operating after phases one (April 2023) and two (September 2024); a third 300 MW phase is due in July 2027, with a total of 1,000 MW plus battery storage planned.
- PLADESE storage plan 2025–2030: 5,551 MW of battery storage, 2,480 MW by CFE and 3,071 MW by private developers (including a pumped-storage project in the central region), concentrated in the eastern, western, north-eastern and central regions.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| CFE Suministro Básico | Sole household supplier; 49.79 million customers (December 2025) | No | No | No | Yes |
| CFE Calificados | — | Unknown | Unknown | Unknown | No |
Households have no choice of supplier: CFE’s basic supplier serves every home under the regulated tariffs. Competition exists only for qualified users of at least 1 MW, who can buy from CFE’s affiliate CFE Calificados or from private qualified suppliers holding CNE permits, or register as market participants themselves.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Secretaría de Energía (SENER) | Government | Energy ministry | Sets policy, binding planning (PLADESE) and, with the CNE, distributed generation rules. |
| Comisión Nacional de Energía (CNE) | Regulator | Energy regulator | Permits, tariffs, contract models, storage rules and distributed generation statistics. |
| Centro Nacional de Control de Energía (CENACE) | Transmission | System and market operator | Runs the grid, interconnection studies and the wholesale market. |
| Comisión Federal de Electricidad (CFE) | Distribution | State utility: generation, transmission, distribution and basic supply | Owns the networks, supplies every household and signs solar interconnection contracts. |
| Procuraduría Federal del Consumidor (PROFECO) | Consumer | Consumer protection agency | Basic-supply contracts must be registered with PROFECO, which handles consumer complaints. |
| Comisión Nacional para el Uso Eficiente de la Energía (CONUEE) | Government | Energy efficiency agency | Energy-efficiency standards and programmes; co-developed the national household energy survey. |
| Fideicomiso para el Ahorro de Energía Eléctrica (FIDE) | Consumer | Energy-saving trust | Financing and certification programmes for efficient equipment and solar installers. |
| Asociación Mexicana de Energía Solar (ASOLMEX) | Solar | Solar industry association | Represents utility and distributed solar developers. |
| Asociación Nacional de Energía Solar (ANES) | Solar | Solar energy association | Long-standing technical and professional body for solar energy. |
| Asociación Mexicana de Energía Eólica (AMDEE) | Renewable Energy | Wind industry association | Represents wind developers and operators. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (below 0.5 MW) | Manual de Interconexión de Centrales de Generación con Capacidad menor a 0.5 MW (2016) | SENER | Defines connection classes, circuit capacity limits, the procedure and deadlines, and required protections. Still applied pending new distributed generation rules under the LSE. |
| Grid code | Código de Red | Former CRE (now CNE) | Technical requirements for plants and load centres connected to the grid; distributed systems follow the requirements for small (Type A) plants where applicable. |
| Anti-islanding and protection | Annex 1 of the 2016 interconnection manual | SENER | Overcurrent, over/undervoltage, frequency and anti-islanding protection are mandatory; reverse-power and loss-of-synchronism protection where applicable. |
| Electrical installations | NOM-001-SEDE (Instalaciones Eléctricas – Utilización) | SENER | The national wiring standard; switches and protection devices on small plants must comply with the edition in force when the plant starts operating. |
| Installer competence | EC0586.01 Instalación de sistemas fotovoltaicos en residencia, comercio e industria | CONOCER | Voluntary national competence standard (published December 2017) used to certify installers of grid-connected PV. |
| Inspection | Inspection units approved by the regulator | CNE (formerly CRE) | Medium-voltage distributed systems need an inspection certificate before connection; low-voltage Type BT systems are exempt. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Generation permit | Limited | National | Not needed below 0.7 MW; CNE permit required at 0.7 MW and above. |
| Interconnection contract with CFE | Yes | National | Required for any system connected to the grid, filed at a CFE customer centre with the latest bill or service number. |
| Inspection certificate | Limited | National | Required for medium-voltage systems; low-voltage Type BT systems are exempt. |
| Building or planning permission | Limited | Local | Municipal building rules apply; rooftop systems on houses do not normally need planning consent, but rules vary by municipality and in protected heritage areas. |
| Storage permit | Limited | National | Not needed for behind-the-meter or self-consumption storage within the site’s demand; required for standalone storage. |
For a typical home, the only formal approval is the interconnection contract with CFE. CFE must answer within 13 business days when no study or network works are needed, and low-voltage requests using standard schemes are deemed accepted if CFE misses the deadline through no fault of the applicant. Larger projects need a CNE permit, CENACE studies and, for energy projects, a social impact assessment under rules issued by SENER in February 2026.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Subsidised domestic tariffs | Active | Tariff subsidy | Most households pay subsidised block tariffs funded by the Finance Ministry (MXN 84.8 billion of subsidy income to CFE in 2025). The subsidy is withdrawn for high-consumption households on the DAC tariff. | — |
| Net metering for distributed generation | Active | Net metering | Systems below 0.7 MW can offset their consumption with exported energy under CFE’s net-metering contract; net billing and total sale are alternatives. | — |
| Techos Solares para el Bienestar | Active | Free installation | Government programme installing free 1.2 kW rooftop systems in low-income homes in hot areas. More than 5,140 systems were connected in Mexicali and San Felipe (Baja California) between March 2025 and May 2026; a second phase from July 2026 adds Hermosillo, Sonora. | March 2025 – |
| Immediate tax deduction for renewable equipment | Active | Tax allowance | Income tax law (LISR article 34, section XIII) allows businesses to deduct 100% of the cost of machinery and equipment for renewable generation in one year, provided it stays in operation for five years. | — |
Data and connectivity.
- Fixed broadband
- 21.7 fixed broadband subscriptions per 100 people (2024)Source 3075.7% of dwellings had internet access in 2025 (INEGI Encuesta Intercensal).
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Internet access at home has risen quickly, from 53.9% of dwellings in 2020 to 75.7% in 2025, and 94.5% of dwellings have a mobile phone. The World Bank estimates that 83.1% of people used the internet in 2024. CFE’s AMI meters communicate with its systems by radio frequency; there is no national standard for consumer access to meter data or for connecting home energy devices to the grid.
Grid conditions.
- National peak demand
- 52.3 GW (2024)Source 2Peak integrated demand of the main interconnected system (SIN): 52,302 MW in May 2024 at 17:00. The Baja California systems are additional.
- Annual electricity demand
- 356.7 TWh (2025)Source 1SENER reports 2024 gross consumption of 359,807 GWh and final consumption of 304,011 GWh.
- Generation capacity
- 90.5 GW (December 2024)Source 2Grid-connected capacity, excluding distributed generation; 36.9% clean technologies.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The system peaks in late spring and summer afternoons and evenings, driven largely by cooling demand. SENER plans against an indicative reserve margin of 21.3% for the main interconnected system, 20.9% for Baja California and 35% for Baja California Sur. A priority call published on 17 October 2025 for permits and interconnection of projects in the binding plan temporarily suspended the timelines of interconnection procedures already under way; distributed generation and self-consumption were excluded from the call.
Losses of 12.3% are high by international standards, and in the north-east non-technical losses exceed technical ones. Distribution circuits have hosting limits for small generators (80% of transformer capacity on low-voltage circuits), and CFE can require network works before connecting a system.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Ley del Sector Eléctrico and creation of the CNE | Current | 18 March 2025 | Replaced the 2014 law; at least 54% of injected energy reserved to the state; CFE confirmed as sole basic supplier; distributed generation threshold raised to 0.7 MW; new self-consumption and storage categories; CRE replaced by the CNE. |
| Regulations of the LSE | Current | 3 October 2025 | Detailed rules on generation modes, storage permits, qualified users and metering access; distributed generation capacity defined as installed capacity. |
| PLADESE 2025–2039 binding plan | Current | 17 October 2025 | Sets planned generation, storage and network investment; about 28 GW of new capacity by 2030 and 5.5 GW of battery storage. |
| CNE self-consumption rules | Current | 12 December 2025 | Permit requirements and the model contract for selling surplus to CFE, priced at the lower of a percentage of the last auction cost or of the local marginal price. |
| New interconnection contract model | Current | 17 March 2026 | CNE model contract for connecting plants, storage and load centres to the transmission and distribution networks; distributed generation below 0.7 MW keeps its own contract model. |
| CNE storage integration rules | Current | 16 April 2026 | Five storage modes, permit exemptions for associated storage and wholesale market access for standalone storage. |
| New distributed generation rules | Upcoming | Not yet scheduled | SENER and the CNE must issue new rules, contract models and compensation methods for distributed generation under the LSE; until then the 2016 manual and 2017 rules apply. |
| Migration of legacy permits | Upcoming | Pending | Guidelines for voluntary migration of legacy self-supply, cogeneration and independent power producer permits to the new schemes were in draft in 2026. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | About 600,000 distributed solar installations totalling 5.2 GW at the end of 2025, against 39.7 million occupied dwellings; growth slowed in 2025 during the regulatory transition. |
| Distributed energy market | Medium | Distributed generation below 0.7 MW is permit-free and net metering is widely used, but households cannot sell to anyone but CFE and there is no aggregation route. |
| Grid flexibility market | Low | Wholesale and ancillary markets are open only to registered participants; household demand response and aggregation have no operating framework. |
| Energy storage adoption | Low | No published national storage statistics; 2026 rules and a 5.5 GW plan for 2025–2030 mark the start of deployment. |
| Renewable growth environment | Low | Renewables supplied 23.1% of generation in 2025; solar capacity grew by about 0.9 GW and wind not at all, although large state and mixed projects are planned. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 30 sources
- Yearly electricity data (Mexico). Ember, 2026. accessed 1 October 2026.
- Plan de Desarrollo del Sector Eléctrico 2025–2039. Secretaría de Energía (SENER), 2025. accessed 1 October 2026.
- Encuesta Intercensal 2025 – Comunicado de prensa 54/26. INEGI, 2026. accessed 1 October 2026.
- Encuesta Nacional de Ingresos y Gastos de los Hogares (ENIGH) 2024 – Resultados. INEGI, 2025. accessed 1 October 2026.
- Encuesta Nacional de Vivienda (ENVI) 2020 – Principales resultados. INEGI, 2021. accessed 1 October 2026.
- Infografía: Confort térmico (ENCEVI 2018). Gobierno de México (with INEGI ENCEVI 2018 data), 2018. accessed 1 October 2026.
- Tarifa 1 – Servicio doméstico (2018–2026). Comisión Federal de Electricidad, 2026. accessed 1 October 2026.
- Tarifa DAC – Servicio doméstico de alto consumo. Comisión Federal de Electricidad, 2026. accessed 1 October 2026.
- Reporte trimestral consolidado, cuarto trimestre 2025. Comisión Federal de Electricidad (Bolsa Mexicana de Valores filing), 2026. accessed 1 October 2026.
- Contratación de interconexión para hogar. Comisión Federal de Electricidad. accessed 1 October 2026.
- CFE avanza en la instalación de medidores AMI. Comisión Federal de Electricidad. accessed 1 October 2026.
- Formato de ayuda para la entrega del Plan de Trabajo (Código de Red) – Registro de Usuario RMU/RPU. Comisión Reguladora de Energía. accessed 1 October 2026.
- Manual de Interconexión de Centrales de Generación con Capacidad menor a 0.5 MW. Secretaría de Energía (Diario Oficial de la Federación), 2016. accessed 1 October 2026.
- Ley del Sector Eléctrico, artículo 19 (permit threshold). SDV compendium of the law (DOF 18 March 2025), 2025. accessed 1 October 2026.
- Ley del Sector Eléctrico, artículo 32 (interconnected self-consumption). SDV compendium of the law (DOF 18 March 2025), 2025. accessed 1 October 2026.
- Reglamento de la Ley del Sector Eléctrico, artículo 47. mley.mx (text of the regulation, DOF 3 October 2025), 2025. accessed 1 October 2026.
- El sector eléctrico en México: el marco normativo de 2025 y los desarrollos recientes de 2026. Cuatrecasas, 2026. accessed 1 October 2026.
- México: principales diferencias de la nueva Ley del Sector Eléctrico. Garrigues, 2025. accessed 1 October 2026.
- México: actualización de requisitos de agregación de centros de carga para ser considerados usuarios calificados. Garrigues, 2017. accessed 1 October 2026.
- Disposiciones administrativas para la integración de sistemas de almacenamiento de energía eléctrica. Greenberg Traurig, 2026. accessed 1 October 2026.
- México supera en 2025 los 5 GW solares en generación distribuida. pv magazine, 2026. accessed 1 October 2026.
- Mexico EV market spotlight, Q2 2025. International Council on Clean Transportation, 2026. accessed 1 October 2026.
- Más de 5 mil hogares ya cuentan con paneles solares en Mexicali y San Felipe. El Imparcial, 2026. accessed 1 October 2026.
- Planta solar de Puerto Peñasco opera al 100% en sus dos primeras etapas. El Imparcial, 2026. accessed 1 October 2026.
- Sener acelera meta de más paneles en techos. Expansión, 2026. accessed 1 October 2026.
- Ley del Impuesto sobre la Renta, artículo 34. mley.mx (text of the law). accessed 1 October 2026.
- Estándar de competencia EC0586.01 Instalación de sistemas fotovoltaicos en residencia, comercio e industria. CONOCER, 2017. accessed 1 October 2026.
- Euro foreign exchange reference rates — Mexican peso. European Central Bank, 2026. accessed 1 October 2026.
- Electric power consumption (kWh per capita) – Mexico. World Bank, 2024. accessed 1 October 2026.
- Fixed broadband subscriptions (per 100 people) – Mexico. World Bank, 2024. accessed 1 October 2026.
Questions about energy in Mexico.
Most households pay subsidised CFE tariffs. In September 2026 Tariff 1 charged 1.136 pesos per kWh for the first 75 kWh a month, 1.381 for the next 65 kWh and 4.041 above that, plus 16% VAT. SENER put the 2024 average residential price at 1.58 pesos/kWh. Households classed as high consumers (DAC) pay about 6 pesos/kWh plus a fixed charge.
No. By law only CFE can provide basic supply to homes. Only consumers with demand of at least 1 MW can register as qualified users and buy from private suppliers.
Yes. Systems below 0.7 MW need no generation permit. You sign an interconnection contract with CFE and choose net metering, net billing or total sale. Most households use net metering, where exported energy offsets what they consume.
The CFE service number (número de servicio) printed on the bill: a 12-digit RPU on older contracts or a 27-character RMU on contracts since 2018. The RMU combines the postcode, contract date, the holder’s tax ID, a folio and a supplier code.
The Comisión Nacional de Energía (CNE), created in 2025 within the Energy Ministry, replaced the Comisión Reguladora de Energía. CENACE operates the grid and wholesale market, and CFE owns the transmission and distribution networks.
Not a generation permit, as long as the system is below 0.7 MW. You need an interconnection contract with CFE; low-voltage systems do not need an inspection certificate, and CFE must answer within 13 business days when no network works are required.
Renewables supplied 23.1% of generation in 2025 (hydro 8.1%, solar 7.4%, wind 6.0%), according to Ember. Natural gas supplied 61.6%.