How electricity works in Bahrain.
Bahrain electricity 2026: EWA tariffs and subsidies, single-buyer grid, IPPs, EWA accounts and meters, net metering for rooftop solar, licensing and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Bahraini dinar (1 BHD = 1,000 fils) (BHD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Bahrain energy at a glance.
Key figures for households in Bahrain. Each one links to its source on the full overview below.
Electricity price.
0.032 BHD per kWh for households, including taxes. Figures for 2026.
Renewable share.
1.5% of electricity from renewable sources. Figures for 2025–26.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Bahrain.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Bahrain below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Bahrain requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Bahrain.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Bahrain, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Bahrain, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Bahrain.
The energy market in Bahrain, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Bahrain has a compact, state-run electricity system. The Electricity and Water Authority (EWA) buys all grid electricity from privately owned independent power producers (IPPs), owns and operates the transmission and distribution networks, and is the only retail supplier, billing every household and business for electricity and water together. There is no competitive retail market and no wholesale exchange.
Household tariffs are set by ministerial resolution and are heavily subsidised for Bahraini citizens on one domestic account: 3 fils/kWh for the first 3,000 kWh a month, rising in steps to 32 fils/kWh above 7,000 kWh. Since January 2026 all other domestic accounts, including expatriate households and Bahrainis with more than one account, pay a flat 32 fils/kWh (about EUR 0.075).
Generation is almost entirely gas-fired. Renewables supply roughly 1.5% of annual electricity production, mostly from distributed rooftop solar connected under net metering and net billing since 2017. The National Energy Transition Plan targets 20% clean energy by 2035, and a draft Electricity and Water Sector Regulation Law before Parliament would replace EWA with an independent regulator and a national operating company.
Energy snapshot.
Headline figures for electricity in Bahrain. Each shows its data year and links to its source.
- Population1,594,654 peopleSource 29Dec 2024
- Households228,972 householdsSource 272020 census
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (BHD)0.032 BHD/kWhSource 12026
- Household price (EUR)0.075 EUR/kWhSource 412026
- Renewable electricity share1.5%Source 92025–26
- Solar capacity0.141 GWSource 9March 2026
- Wind capacity0.003 GWSource 312024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Ministry of Electricity and Water Affairs / Electricity and Water Authority (no independent regulator yet)
- System operator
- Electricity and Water Authority (System Control Centre)
- Distribution networks
- Single national network owned and operated by EWA (400 V to 11 kV distribution, 66–400 kV transmission).
- Currency
- Bahraini dinar (1 BHD = 1,000 fils) (BHD)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Bahrain.
- Household price (BHD)
- 0.032 BHD/kWh (2026)Source 1Flat domestic tariff for non-Bahraini households and Bahrainis with more than one account (32 fils/kWh, all units). Subsidised Bahraini single-account tariff is 3 fils/kWh up to 3,000 kWh/month, 9 fils to 5,000, 16 fils to 7,000 and 32 fils above. No VAT line is shown on EWA tariffs; bills add a BD 1 monthly administration fee per service and municipality fees.
- Household price (EUR)
- 0.075 EUR/kWh (2026)Source 41Converted from 32 fils/kWh using the Central Bank of Bahrain peg (USD 1 = BHD 0.376) and the ECB reference rate of 30 September 2026 (EUR 1 = USD 1.1355). The subsidised first block of 3 fils/kWh equals about EUR 0.007/kWh.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (BHD per kWh).Source 3
| 2015 | 0.003 BHD/kWh |
|---|---|
| 2019 | 0.029 BHD/kWh |
| 2025 | 0.029 BHD/kWh |
| 2026 | 0.032 BHD/kWh |
How tariffs are set
Electricity and water consumption tariffs are fixed by resolution of the Minister of Electricity and Water Affairs after Cabinet approval and published in the Official Gazette. The current framework is Resolution No. (2) of 2025, whose first article was replaced by Resolution No. (1) of 2026 (issued 3 February 2026) to reshape the subsidised bands for Bahraini households. EWA applies the tariffs and bills monthly; there is no separate network charge, standing charge or energy levy on the bill beyond a BD 1 monthly administration fee per meter service and municipality fees collected on behalf of the Ministry of Municipalities Affairs and Agriculture.
Who gets the subsidy
The subsidy applies to one domestic account per eligible Bahraini citizen. It is granted automatically when the account holder is Bahraini and their residential address registered with EWA matches the address on their identity card in the iGA population register, and they live there. Specific categories such as divorced or widowed citizens, single working adults aged 21 or over and beneficiaries of Ministry of Housing units are also covered. Everyone else pays the full domestic rate.
Trend
Before March 2016 almost all households paid 3 fils/kWh. A phased reform raised non-Bahraini domestic tariffs to 29 fils/kWh by 2019 while protecting Bahraini single-account holders. From January 2026 the unsubsidised rate rose again to 32 fils/kWh, and the top subsidised band moved to 32 fils for consumption above 7,000 kWh a month, while the 5,001–7,000 kWh band kept 16 fils. EWA told Parliament in 2026 that the actual production cost is about 33.1 fils/kWh, so even the full domestic rate sits slightly below cost and the subsidised rates far below it.
Comparison
At about EUR 0.075/kWh, the unsubsidised domestic price is low by international standards, and the subsidised first block (about EUR 0.007/kWh) is among the lowest residential prices anywhere. This strongly shapes the economics of household solar and efficiency measures.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Subsidised domestic tariff for a Bahraini citizen with one domestic account: 3 fils/kWh (0–3,000 kWh/month), 9 fils (3,001–5,000), 16 fils (5,001–7,000) and 32 fils above 7,000 kWh. Set by Resolution No. (1) of 2026, applied retrospectively from 1 January 2026. |
| Regulated | Yes | Unsubsidised domestic tariff (non-Bahrainis and Bahrainis with more than one account): flat 32 fils/kWh for all units, up from 29 fils from January 2026. |
| Regulated | Yes | Non-domestic/commercial tariff as published by EWA: 22 fils/kWh for the first 5,000 kWh a month and 32 fils/kWh above. |
| Time-of-use | No | EWA publishes no time-of-use, off-peak or seasonal tariffs; all tariffs are monthly consumption blocks. |
| Dynamic | No | There is no wholesale market, so no tariff is linked to wholesale prices. |
| Prepayment | No | EWA does not publish a prepayment tariff. New accounts must set up a payment plan (direct deduction from a bank account or credit card) before service is activated. |
Household prices compared with neighbouring countries (EUR per kWh).
- Bahrain€0.075
- United Arab Emirates€0.073
- Saudi Arabia€0.049
- Oman€0.032
- Qatar€0.027
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 12,160 kWh/person/yr (2025)Source 25Derived: total billed consumption of 19,391.6 GWh in 2025 (all sectors) divided by the December 2024 population of 1,594,654. Residential use alone is about 5,885 kWh per person.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Bahrain billed 19,391.6 GWh of electricity in 2025, a fifth consecutive annual increase. Households were the largest user at 9,384.1 GWh (48.4%), followed by commercial customers at 6,354.0 GWh, industry at 3,603.1 GWh and agriculture at about 50 GWh. Total consumption has roughly doubled since 2008, when it was 9,702 GWh. These figures exclude the large captive generation of the Alba aluminium smelter, which is why international datasets show a much higher national total.
Residential demand is driven by air-conditioning. Monthly consumption rises sharply between May and September, and peak system load is set on hot, humid summer afternoons. Large detached villas, often housing extended families, are common among Bahraini households, and several households may share one meter in family compounds — an issue the draft sector law proposes to address with separate metering.
According to the Ministry, 83% of subsidised accounts stayed below 5,000 kWh a month and up to 99% did so during summer peaks between 2023 and 2025, which is why the subsidised threshold was extended to 7,000 kWh in 2026. Electric vehicles remain rare; Resolution No. (1) of 2025 now regulates how EV chargers connect to the distribution network.
Housing and households.
- Dwellings
- 387,126 housing units (2020 census)Source 28Includes 142,327 vacant units; 244,799 units were occupied.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 44.8% (2020 census)Source 28Derived: occupied villas (96,142), conventional houses (8,135) and traditional houses (5,292) as a share of 244,799 occupied units. A further 5.4% were classed as "others".
- Apartments and flats
- 49.9% (2020 census)Source 28Derived: 122,048 occupied flats out of 244,799 occupied units.
- Urban population
- 100 % of population (2024)Source 30
The 2020 census counted 387,126 housing units, of which 244,799 were occupied. Flats made up roughly half of occupied homes and villas about two-fifths, with smaller numbers of older conventional and traditional houses. Expatriate households are concentrated in flats in the Capital Governorate, while Bahraini households are spread across the Northern, Muharraq and Southern governorates and more often live in villas.
For electricity this matters in two ways. Villas usually have their own meter and a flat roof suitable for solar PV, but the subsidised tariff is tied to the citizen account holder, not the building. Flats are usually metered individually but share roof space, so rooftop solar in apartment buildings is normally a landlord or building-owner decision. The whole population is classified as urban.
How the grid works in Bahrain.
- TransmissionElectricity and Water Authority (EWA), EWA System Control Centre
- DistributionSingle national network owned and operated by EWA (400 V to 11 kV distribution, 66–400 kV transmission).
- MeteringElectricity and Water Authority (EWA), EWA customer system with iGA population and address register
- Supply1 or more retail suppliers
Physical flow
Electricity is generated mainly at gas-fired IPP plants — Al Dur 1 and 2, Hidd, and Al Ezzel — which produced about 20,300 GWh net in 2025. EWA reports total grid production capacity of 5,044 MW. Power is moved across the islands at 400, 220 and 66 kV through largely underground cables and 254 primary substations, then stepped down at more than 10,000 distribution substations to 11 kV and 400/230 V for homes and businesses. Bahrain is linked to Saudi Arabia, and through it to the other GCC states, by double-circuit 400 kV overhead line and submarine cable from Ghunan to Al Jasra; the new 400 kV Al Jasra substation opened in January 2026.
Commercial flow
EWA acts as the single buyer. It signs long-term power and water purchase agreements with the IPPs, pays them for capacity and energy, and resells electricity to every customer at the government-set tariff. Exchanges with neighbouring systems take place through the GCC Interconnection Authority. There is no wholesale market, power exchange or balancing market, and customers cannot buy from anyone other than EWA. Distributed solar owners offset their own consumption and are credited or paid by EWA under net metering or net billing.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Electricity and Water Affairs | Sets policy and issues the resolutions that fix tariffs, connection rules for renewable generation and EV charging. The minister chairs the sector and EWA reports to it. |
| Regulator | Electricity and Water Authority (EWA) | There is no independent regulator. EWA, established by Decree No. 98 of 2007, performs regulatory functions such as licensing electrical and renewable-energy contractors and setting technical standards, alongside its operational role. A draft law would transfer regulation to a new Electricity and Water Regulatory Authority. |
| TSO | Electricity and Water Authority (EWA) | Builds, owns, operates and maintains the transmission system: underground cables and 254 primary substations at 400 kV, 220 kV and 66 kV. |
| System operator | EWA System Control Centre | Dispatches the IPP power stations, monitors all primary substations and desalination plants, and manages exchanges over the GCC interconnection. |
| DSO | Electricity and Water Authority (EWA) | Sole distribution operator: about 10,497 distribution substations and 13,245 km of lower-voltage underground cable, at 11 kV and 400/230 V. |
| Supplier | Electricity and Water Authority (EWA) | Only retail supplier of electricity (and water) to all customers. Opens and closes accounts, bills monthly and applies government subsidies. |
| Metering | Electricity and Water Authority (EWA) | Owns, installs, reads and tests all revenue meters. Meter installation is requested through an EWA-approved electrical contractor. |
| Data hub / registry | EWA customer system with iGA population and address register | EWA keeps the register of accounts, meters and services. Subsidy eligibility is checked automatically against the Information & eGovernment Authority identity and address register. |
Compared with the UK system.
| UK concept | Bahrain equivalent | How it works |
|---|---|---|
| DNO | Electricity and Water Authority (EWA) | There is one distribution network for the whole kingdom, owned and run by EWA. There are no regional network companies and no separate distribution charges on bills; network costs are recovered through the regulated tariff and state funding. |
| National Grid/NESO | EWA transmission and System Control Centre | EWA owns the 66–400 kV transmission network and its System Control Centre dispatches the privately owned power stations. Bahrain connects to the GCC Interconnection Authority grid at Al Jasra, giving 1,359 MW of interconnection capacity since January 2026. |
| MPAN | EWA account number and electricity service number | Bills show an account number, a separate electricity service number and the electricity meter number. The account belongs to the customer (owner, tenant, heir or authorised occupant) and is opened and closed by them; the service and meter belong to the premises. There is no national supply-point code standard like the MPAN. |
| MPRN | No piped gas supply to homes | Households are not supplied with mains gas, so there is no gas supply-point number. Water is billed on the same EWA account with its own water service and meter numbers. |
| Meter operator | EWA | EWA supplies, installs and maintains meters. Customers apply for meter installation through an EWA-approved contractor, and can request a meter test, relocation, merging or splitting of meters through EWA services. |
| Supplier | EWA (sole supplier) | There is no supplier choice. EWA bills electricity and water together on one monthly bill and collects municipality fees. |
| Smart-meter infrastructure | EWA metering and remote reading programme | EWA runs its own meter-reading systems; there is no central smart-meter communications body like the DCC. Solar customers under net metering receive meters that record both import and export. A current national smart-meter penetration figure has not been published. |
How a supply point is identified.
Fictional and illustrative only (EWA does not publish the number length): Account no. 1234567890 · Supply address Building 1427, Road 3815, Block 938
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | EWA account number (with electricity service number and meter number) |
| Who issues it? | Electricity and Water Authority (EWA) |
| Format | Numeric account number assigned by EWA when a customer opens an account at a premises, printed on the bill with the invoice number; the bill also carries a separate electricity service number, a water service number and the meter numbers. The premises itself is identified by the national address system of building, road and block numbers. |
| Length | Not published by EWA. |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | At the top of every EWA bill (account number, invoice number and issue date), with the electricity service number and meter number in the consumption section. Also shown in the EWA eServices portal and the MyGov app. |
| Electronic access | Customers log in to EWA eServices or the national portal bahrain.bh / MyGov app using their CPR (identity) number and account number to view bills, payment history and consumption for the past year, and to open or close accounts. |
| Third-party access | No open data-access or consent framework for third parties was identified. Contractors and engineering offices act for customers through the Benayat platform for connections and solar applications. |
| Who keeps the register | EWA customer and metering system, cross-checked with the iGA identity and address register for subsidy eligibility. |
| Register scope | National |
Bahrain identifies a residential connection through three linked records held by EWA rather than one standard supply-point code. The account is the customer relationship: an owner, tenant, heir or authorised occupant applies to open an electricity and water account for existing premises, provides their identity card (or passport), a title deed or lease and a bank IBAN or card for direct deduction, and the account is activated within about two working days once the payment plan is in place. Tenants also pay a security deposit.
The electricity service number and meter number belong to the physical connection. A new connection for a building under construction is applied for by an engineering office through the Benayat building-permit platform, with the title deed, address certificate, survey certificate and load details; EWA designs the connection and charges a capital contribution under Law No. 13 of 2006. Once the premises is complete, an EWA-approved contractor requests installation of the permanent meter.
When occupants change, the outgoing customer closes their account and the new occupant opens a new one at the same service and meter, so the account number generally follows the customer while the service and meter stay with the property. EWA has not published whether account numbers are ever reused, which is why this profile does not state a firm rule.
Because the government subsidy is linked to a citizen's registered address, the address on the EWA account must match the address on the holder's identity card in the iGA population register. The address itself uses the national system of building, road and block numbers, which EWA and other government bodies use to refer to the same premises.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | Yes |
| How exported electricity is paid | Residential systems up to 100 kW: net metering, with surplus kWh carried forward as credit to later monthly bills. Non-residential systems and residential systems above 100 kW: net billing, with surplus sold to EWA. A published export price for net billing was not identified. |
| What is the legal basis? | Resolution No. (2) of 2017 on regulating the connection of renewable energy generation units to EWA's distribution system, amended by Resolution No. (1) of 2019, which allows simplified connection procedures for units up to 100 kW. |
| Is there a size limit for net metering? | Net metering applies to residential systems up to 100 kW. Larger residential systems and all non-residential systems use net billing. |
| Which technical rules apply? | EWA's 2017 Guidelines for Solar PV Systems connected in parallel with the distribution network: anti-islanding tested to IEC 62116, harmonics to IEC 61000-3-2/-3-12, operation across 47.5–52.5 Hz, and low-voltage ride-through for plants above 11 kW. |
| Are single-phase systems allowed? | Three-phase equipment is required in principle, but plants under 20 kW may use single-phase units; on a three-phase supply they must be spread evenly across the phases. |
| Does EWA need remote access? | Plants above 11 kW must have a bi-directional communication interface for data exchange with EWA, which may require real-time data and operational instructions. |
| Can EVs export to the grid? | Only with EWA's prior approval. Resolution No. (1) of 2025 forbids setting chargers to an export mode without approval and applies an export tariff approved by EWA. |
Connecting a home system.
- Appoint an EWA-licensed renewable-energy contractor of the right level for the system size (levels A–D up to 20 kW; A–C up to 100 kW; A–B above).
- Appoint an EWA-approved engineering office, which submits the design and documents through the Benayat platform.
- Engineering office reviews and approves the application on the platform.
- EWA reviews the request and carries out a field inspection; the Grid-Connected PV Commissioning Form is completed.
- After EWA final approval the system is connected and the meter set up for net metering or net billing. EWA states a service time of 8 working days and no fee.
Rooftop and ground-mounted solar has been allowed to connect to EWA's network since 2017 under a scheme designed by the Sustainable Energy Unit (now the Sustainable Energy Authority) as part of the National Renewable Energy Action Plan. Homes up to 100 kW use net metering: the meter records import and export, and any monthly surplus is carried forward as a kWh credit against later bills rather than paid out. Commercial and industrial sites, and homes above 100 kW, use net billing, where surplus exported to the grid is sold to EWA.
By July 2026 EWA reported 340 completed and 69 ongoing distributed solar projects, with about 140 MW already feeding the grid and around 500 MW completed or under construction, supported by more than 90 approved engineering offices and more than 50 licensed contractors. Very low subsidised tariffs reduce the bill savings for citizen households, so most capacity comes from commercial and industrial roofs.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (utility scale) | No general generation licence regime; capacity is procured by EWA through competitive IPP tenders and long-term purchase agreements. | EWA / Ministry of Electricity and Water Affairs | Example: the 100 MWac Bilaj Al Jazayer Solar IPP on a build-own-operate basis. The draft sector law would introduce production licences issued by a new regulator. |
| Generate on site (rooftop or ground-mounted solar) | No generation licence; EWA connection approval under Resolution No. (2) of 2017 is required for any grid-connected system, with simplified procedures up to 100 kW. | EWA | Design must be submitted by an EWA-approved engineering office and installed by an EWA-licensed renewable-energy contractor. |
| Install renewable-energy systems (contractor) | EWA renewable-energy contractor licence, which requires a valid EWA electrical contractor licence of at least grade G3 and staff who have passed EWA's solar PV training course. | EWA | Contractors and engineering offices are graded by level, which limits the system sizes they may handle. |
| Store electricity | No specific licensing or connection framework for stand-alone or behind-the-meter storage identified. | EWA | The draft Electricity and Water Sector Regulation Law lists storage among licensable activities. |
| Export electricity | Permitted only through net metering (residential up to 100 kW) or net billing (others) after EWA connection approval. | EWA | Export from EV chargers needs separate prior EWA approval. |
| Sell or supply electricity to third parties | No retail supply licence regime exists; EWA is the only supplier to end customers. | EWA | Public EV charging is an exception for charging services: under Resolution No. (1) of 2025 the charger owner sets the service price and EWA may cap it. |
| Aggregate, trade, wholesale, balancing or grid services | No market or licence category exists; EWA dispatches all generation centrally and buys all energy as single buyer. | EWA | No aggregator, virtual power plant or demand-response market framework identified. |
| Remote control of distributed assets | PV plants above 11 kW must provide a bi-directional communication interface so EWA can collect data and send operating instructions. | EWA | Set in the 2017 PV grid-connection guidelines. |
| Connect EV charging equipment | Connection agreement with EWA under Resolution No. (1) of 2025, subject to an annual connection limit on charger capacity set by EWA. | EWA | Technical rules in EWA's 2025 EV charging wiring guidelines. |
| Energy efficiency services (ESCO) | Companies providing energy-efficiency services are regulated under a 2023 resolution and listed by EWA. | EWA | EWA publishes an approved ESCO list. |
Licensing in Bahrain is organised around who may work on the network rather than who may trade energy. Because EWA is the single buyer, network owner and supplier, activities such as wholesale trading, retail supply, aggregation and balancing services have no licence category. What is licensed is the people and firms who design and install equipment: electrical contractors, electricians, renewable-energy contractors, engineering offices and approved equipment.
This is set to change. The draft Electricity and Water Sector Regulation Law, submitted to Parliament in 2025 and still under committee review in May 2026, would create a licensing regime for production, transmission, storage, distribution, supply and technical installation work, administered by an independent Electricity and Water Regulatory Authority. Existing operators would have six months after enactment, extendable by six months, to obtain licences.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale energy market | No | — | No | EWA (single buyer). No power exchange or bilateral wholesale market. EWA contracts IPPs and dispatches them centrally. |
| Balancing and frequency services | No | — | No | EWA System Control Centre. Reserves are provided by contracted power stations and the GCC interconnection. PV plants must respond automatically to over-frequency under EWA grid rules, but there is no paid service market. |
| Demand response | No | — | No | No demand-response or flexibility programme identified. |
| GCC power trading | Restricted | — | No | GCC Interconnection Authority. Exchanges between member utilities over the GCC grid; open to EWA only, not to customers or distributed assets. |
Distributed energy resources in Bahrain cannot take part in energy, balancing or flexibility markets, because none exist. Rooftop solar, EV chargers and any home storage act only behind the meter, with surplus solar handled by net metering or net billing. EWA can, however, require larger PV plants to accept operating instructions, and its 2025 EV charging resolution anticipates vehicle-to-grid export with EWA approval and an export tariff, which are the first regulatory hooks for controllable distributed assets.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Benayat | Government building-permit platform used by engineering offices and contractors to submit new connections and solar applications to EWA. It is an administrative platform, not a market. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | EWA-led metering modernisation; no published national penetration figure |
| Reading interval | Monthly billing reads; no published interval-data standard |
| Meter owner | EWA |
| Billing cycle | Monthly, actual or estimated reading |
| Solar customers | Meters record import and export for net metering / net billing |
| Customer access | Consumption for the past year via EWA eServices and MyGov app |
| Central data hub | None; EWA holds all meter data |
All electricity meters are owned and read by EWA. Bills state whether each reading is actual or estimated, and consumption is calculated as the difference between readings multiplied by the meter's multiplication factor, which is greater than one on larger current-transformer-connected supplies.
EWA has run metering and remote-reading upgrades for several years, and solar customers receive meters able to measure exported energy. However, EWA has not published a current figure for the share of electricity customers with smart meters or a target completion date, so this profile leaves penetration unstated. Without time-of-use tariffs, interval data is not currently used for billing.
Renewable electricity.
Electricity generation mix (2023).
- Natural gas and other fossil fuels: 99.8%
- Solar: 0.3%
- Wind: 0%
- Renewable electricity share
- 1.5% (2025–26)Source 9Approximate share of annual electricity production stated by the Minister of Electricity and Water Affairs in March 2026. IRENA statistics give 94 GWh of renewable generation out of 37,523 GWh (0.25%) for 2023, a total that includes industrial captive generation.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Solar PV (distributed, connected)
- 141 MW (March 2026)Source 9More than 141 MW across 372 completed projects.
- Solar PV (IRENA)
- 66 MW (2024)Source 31
- Wind
- 3 MW (2024)Source 31
- Gas-fired IPP fleet (grid)
- 5,044 MW (2025)Source 14Total grid production capacity reported by EWA.
Targets.
- 20% clean or renewable energy in the electricity mix by 2035 (National Energy Transition Plan, finalised November 2023).
- 5% renewables by 2025 (National Renewable Energy Action Plan / NETP) — not reached on reported figures.
- Reduce carbon emissions by 30% by 2035 and reach net zero by 2060.
- Reduce natural gas consumption for power by more than 30% and meet over 45% of demand from clean sources by 2040.
Almost all of Bahrain's electricity comes from natural gas. Renewable output is small but growing: about 1.5% of annual production in 2025–26 according to the minister, from distributed solar on commercial, industrial and residential roofs connected since 2017. Wind was tested and judged unfeasible; the ministry said in 2026 that it is studying new solar technologies and the peaceful use of nuclear energy.
The first utility-scale solar projects are now under way. EWA started building a 100 MW solar plant at Al Dur, with about 135,000 panels across two adjoining sites, scheduled for completion in the third quarter of 2026. A 100 MWac Bilaj Al Jazayer Solar IPP on the south-west coast is being tendered as a build-own-operate public–private partnership, with ACWA Power and Yellow Door Energy shortlisted and commercial operation planned for 30 September 2027. Together with the distributed pipeline of about 500 MW, these would raise renewable capacity several-fold.
The Energy Transition Plan expects demand to reach 28 TWh by 2040, more than 40% above 2023, which means renewables must grow quickly simply to raise their share.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Energy storage plays no measurable role in Bahrain's grid today. There is no specific connection or licensing framework for stand-alone or household batteries; behind-the-meter systems would fall under EWA's general wiring and connection rules, and the draft sector law would make storage a licensable activity. System flexibility currently comes from the gas fleet and the GCC interconnection.
Storage projects.
- ACWA Power / Bapco Energies solar-plus-storage joint development: Announced December 2025: a 2.8 GW solar and battery storage project located in Saudi Arabia, developed with Bahrain's national energy group. It is outside Bahrain's grid and storage sizes were not published in the source.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Electricity and Water Authority (EWA) | 100% of retail customers | No | No | No | Limited |
EWA is the only electricity supplier in Bahrain. It sells to households, businesses and industry at the regulated tariffs and bills electricity, water and municipality fees together. Bills can be paid through the EWA eServices portal, bahrain.bh, the MyGov app, direct deduction, BenefitPay, payment kiosks, banks and the STC Pay app. Under the draft sector law, retail supply would pass to a supply business unit of a new National Electricity and Water Company, still under one operator.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Electricity and Water Authority (EWA) | Government | Single buyer, network owner and operator, sole supplier | Publishes tariffs, connection rules, PV guidelines and approved contractor lists. |
| Sustainable Energy Authority (SEA) | Renewable Energy | Renewable energy and energy-efficiency policy body | Created by Legislative Decree No. 87 of 2019; designed the net metering scheme and national renewable and efficiency action plans. |
| GCC Interconnection Authority (GCCIA) | Transmission | Operator of the regional GCC grid | Links Bahrain to Saudi Arabia and the other Gulf states through the Al Jasra substation. |
| Information & eGovernment Authority (iGA) | Government | Statistics office and identity/address register | Publishes census and population data and holds the register used to check tariff subsidy eligibility. |
| Bahrain Open Data Portal | Government | Official open data | Annual electricity consumption by sector and generation by power station. |
| Bapco Energies | Government | National integrated energy company | Supplies gas for power generation and is developing renewable projects with partners. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection of solar PV | Guidelines for Solar PV Systems to be Connected in Parallel with the Distribution Networks of the Kingdom of Bahrain (2017) | EWA | Frequency and voltage ranges, LVRT for >11 kW, interface protection, reactive power, communication interface. |
| Anti-islanding | IEC 62116:2014 | IEC (referenced by EWA) | Test procedure for islanding prevention in grid-connected PV inverters. |
| Power quality | IEC 61000-3-2, IEC 61000-3-12, IEC/TR 61000-3-15 | IEC (referenced by EWA) | Harmonic current limits and EMC for dispersed generation on LV networks. |
| Transmission | Bahrain Grid Code (November 2011) | EWA | Referenced by the PV guidelines. |
| Wiring | Regulations for Electrical Installations (2nd edition, 2004) | Ministry of Electricity and Water, Electricity Distribution Directorate | Base wiring regulations for building installations. |
| Inspection and testing | Inspection and Testing Guidelines for Distributed Solar PV Plants (2017) | EWA | Commissioning checklists used before EWA connection. |
| Fire | Fire Safety Recommendations for Distributed Solar PV Systems (2017) | EWA | Rooftop PV fire safety. |
| EV charging | Guidelines for Electricity Wiring Regulations for Electric Vehicles Charging Systems (2025) | EWA | Applies with Resolution No. (1) of 2025. |
| Installer accreditation | EWA renewable-energy contractor and engineering office approval | EWA | Contractor licence grade G3 or above plus solar PV training certificate; graded levels by system size. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| EWA connection approval for solar PV | Yes | National | Applied for via an approved engineering office on Benayat; EWA inspection before connection. |
| Building permit for a new connection | Yes | Mixed | New electricity connections require a building permit, title deed, address and survey certificates; meter installation needs a municipality no-objection certificate. |
| Aviation assessment for PV | Limited | National | EWA publishes technical guidelines on solar PV impact on aviation (glare), relevant near airports. |
| Landlord consent | Limited | Local | Tenants need the owner's no-objection for new connections and meter work; rooftop works on shared buildings need the owner. |
Permissions are handled almost entirely through EWA and the Benayat building-permit platform. For a typical villa solar system the household appoints a licensed contractor and approved engineering office, which handle the application and EWA inspection; EWA charges no fee for the solar connection service.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering for residential solar | Active | Net metering | Residential systems up to 100 kW offset consumption, with surplus kWh carried forward to later bills. | 2017 – ongoing |
| Net billing for non-residential and large residential solar | Active | Export payment | Surplus electricity exported to the grid is sold to EWA; the purchase price is not published on EWA's pages. | 2017 – ongoing |
| Free EWA solar connection service | Active | Fee waiver | EWA charges no fee for the distributed solar connection service. | — |
| Subsidised domestic tariff for citizens | Active | Tariff subsidy | Automatic subsidy on one domestic account per eligible Bahraini citizen: 3/9/16/32 fils per kWh by monthly band. | Current bands from 1 January 2026 |
Data and connectivity.
- Fixed broadband
- 76 % of households (fibre) (Q1 2026)Source 42TRA data: household fibre penetration on a base of 244,976 households; 188,605 fixed broadband subscriptions in total.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Bahrain has dense fibre-to-the-home coverage and three mobile operators (Batelco, stc Bahrain and Zain Bahrain), regulated by the Telecommunications Regulatory Authority. Fibre carried 98.7% of fixed broadband connections in Q1 2026. For grid-connected PV above 11 kW, EWA requires a bi-directional communication interface but leaves the protocol to be specified as needed; no national smart-meter communications standard has been published.
Grid conditions.
- National peak demand
- 3.798 GW (Aug 2023)Source 32Record reported by EWA in August 2023 (previous record 3,708 MW). A secondary source reports a 2025 peak of 4,810 MW, which has not been verified against an EWA publication.
- Annual electricity demand
- 19.4 TWh (2025)Source 25Billed consumption; net generation for the grid was 20.30 TWh.
- Generation capacity
- 5.044 GW (2025)Source 14
- Interconnection
- 1.359 GW (Jan 2026)Source 33GCC interconnection capacity after the 400 kV Al Jasra upgrade (previously 926 MW).
- Curtailment
- Not identified from a reliable public source.
Demand is dominated by summer cooling, and peak load rose from 3,708 MW in 2022 to 3,798 MW in 2023, against grid production capacity of 5,044 MW after Al Dur 2 entered service. Net flows on the GCC interconnection were small in recent years (a net export of about 15 GWh in 2025), and the line serves mainly as a reliability and reserve link. The January 2026 Al Jasra 400 kV substation raised interconnection capacity to 1,359 MW and transformer capacity from 975 MVA to 2,000 MVA, relieving the Riffa area.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| New tariffs for unsubsidised users | Current | January 2026 | Unsubsidised domestic and commercial tariff raised from 29 to 32 fils/kWh; water from 750 to 775 fils/m³. |
| Resolution No. (1) of 2026 on subsidised bands | Current | Issued 3 February 2026, applied from 1 January 2026 | Subsidised Bahraini tariff now 3/9/16/32 fils per kWh with the 16-fil band extended to 7,000 kWh a month. |
| EV charging regulation | Current | October 2025 | Resolution No. (1) of 2025 sets connection agreements, annual capacity limits, price rules for public chargers and approval for EV export to the grid. |
| Al Jasra 400 kV substation and GCC link upgrade | Current | January 2026 | Interconnection capacity raised from 926 MW to 1,359 MW. |
| Electricity and Water Sector Regulation Law | Upcoming | Under parliamentary review (2026) | Would dissolve EWA, create an independent Electricity and Water Regulatory Authority with licensing and tariff powers, and a National Electricity and Water Company with procurement, transmission and distribution, and supply units. |
| Al Dur 100 MW solar plant | Upcoming | Scheduled Q3 2026 | EWA-built utility-scale PV plant. |
| Bilaj Al Jazayer 100 MWac Solar IPP | Upcoming | COD planned 30 September 2027 | Build-own-operate PPP; ACWA Power and Yellow Door Energy shortlisted. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | About 141 MW of distributed solar across a few hundred projects nationally, much of it non-residential; very low subsidised tariffs limit household savings. |
| Distributed energy market | Low | Distributed generation supplies around 1.5% of production; no storage or aggregation framework. |
| Grid flexibility market | Low | Single-buyer system with central dispatch; no wholesale, balancing or demand-response markets. |
| Energy storage adoption | Low | No grid-scale or household battery storage capacity identified. |
| Renewable growth environment | Medium | Pipeline of about 500 MW distributed solar plus two 100 MW utility plants (2026–27) against a 141 MW base and a 20% by 2035 target. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 44 sources
- Tariffs. Electricity and Water Authority, 2026. accessed 1 October 2026.
- Resolution No. (1) of 2026 amending Article (1) of Resolution No. (2) of 2025 concerning electricity and water consumption tariffs. Ministry of Electricity and Water Affairs (Official Gazette 3859), 2026. accessed 1 October 2026.
- Higher electricity and water rates for unsubsidised users. Gulf Daily News, 2025. accessed 1 October 2026.
- Utility tariff increases for expatriates from March 2016. Gulf Daily News, 2016. accessed 1 October 2026.
- Electricity production cost and subsidies disclosed to Parliament. Gulf Daily News, 2026. accessed 1 October 2026.
- Power consumption 'limited'. Gulf Daily News, 2026. accessed 1 October 2026.
- Statistical Book 2022 (number of customer accounts; per capita consumption of domestic sector). Electricity and Water Authority (EWA), 2022. accessed 3 October 2026.
- Average power consumption levels remain low. Gulf Daily News, 2026. accessed 3 October 2026.
- Renewable energy contribution and household consumption (ministerial answer to Parliament). Gulf Daily News, 2026. accessed 1 October 2026.
- Renewable Energy Projects in Bahrain Reach 500MW. Daily Tribune (News of Bahrain), 2026. accessed 1 October 2026.
- Electricity Use Almost Doubles Since 2008. Daily Tribune (News of Bahrain), 2026. accessed 1 October 2026.
- Distributed Renewable (Solar) Energy. Electricity and Water Authority, 2026. accessed 1 October 2026.
- Distributed Renewable (Solar) Energy Service. Electricity and Water Authority, 2026. accessed 1 October 2026.
- The Electricity Network. Electricity and Water Authority, 2025. accessed 1 October 2026.
- Energy Transition Plan. Electricity and Water Authority, 2026. accessed 1 October 2026.
- Understanding Your Bill. Electricity and Water Authority, 2026. accessed 1 October 2026.
- Open Account Service. Electricity and Water Authority, 2025. accessed 1 October 2026.
- New Electricity Connection Service. Electricity and Water Authority, 2025. accessed 1 October 2026.
- Electricity Meter Installation. Electricity and Water Authority, 2025. accessed 1 October 2026.
- Licensing – Renewable Energy Contractors. Electricity and Water Authority, 2025. accessed 1 October 2026.
- Regulations. Electricity and Water Authority, 2026. accessed 1 October 2026.
- Standards. Electricity and Water Authority, 2026. accessed 1 October 2026.
- Guidelines for Solar PV Systems to be Connected in Parallel with the Distribution Networks of the Kingdom of Bahrain. Electricity and Water Authority, 2017. accessed 1 October 2026.
- Resolution No. (1) of 2025 regulating electric vehicle charging operations. Ministry of Electricity and Water Affairs (Official Gazette 3842), 2025. accessed 1 October 2026.
- Sectorial consumption of electricity (GWh) and electricity consumption. Bahrain Open Data Portal (iGA), 2025. accessed 1 October 2026.
- Electricity Generation by Power Stations. Bahrain Open Data Portal (iGA), 2025. accessed 1 October 2026.
- Private Households by Governorate and Household Nationality – Census 2020. Bahrain Open Data Portal (iGA), 2020. accessed 1 October 2026.
- Housing Units by Housing Type and Occupancy – Census 2020. Bahrain Open Data Portal (iGA), 2020. accessed 1 October 2026.
- Bahrain: Population estimates by nationality (1991–Dec. 2024), from iGA Open Data Portal. Gulf Labour Markets and Migration (GLMM), 2024. accessed 1 October 2026.
- Urban population (% of total population) – Bahrain. World Bank, 2024. accessed 1 October 2026.
- Energy Profile: Bahrain. IRENA, 2025. accessed 1 October 2026.
- Summer: Bahrain records its highest-ever electricity consumption rate. Gulf News, 2023. accessed 1 October 2026.
- Al Jasra 400 kV transmission station inaugurated. Gulf Daily News, 2026. accessed 1 October 2026.
- The GCC Interconnection – Our existing network. GCC Interconnection Authority. accessed 1 October 2026.
- Landmark utilities sector legislation in Parliament. Gulf Daily News, 2025. accessed 1 October 2026.
- Draft law 'aims to reorganise power and water sector'. Gulf Daily News, 2026. accessed 1 October 2026.
- Bahrain launches its energy transition plan, targets 20% renewables by 2035. Enerdata, 2023. accessed 1 October 2026.
- Bahrain reveals qualified bidders for 100 MW BAJ Solar IPP project. pv magazine, 2026. accessed 1 October 2026.
- Middle East & Africa Solar PV News Snippets: Bahrain breaks ground for 100 MW project. TaiyangNews, 2026. accessed 1 October 2026.
- Monetary Policy. Central Bank of Bahrain. accessed 1 October 2026.
- Euro foreign exchange reference rates – US dollar. European Central Bank, 2026. accessed 1 October 2026.
- Fixed fibre drives telecom data consumption growth. Gulf Daily News (TRA data), 2026. accessed 1 October 2026.
- Only one EV for every 1,000 vehicles in Bahrain. Daily Tribune (News of Bahrain), 2026. accessed 1 October 2026.
- Bahrain's Bright And Sustainable Future: A Comparative Exploration. Mondaq, 2022. accessed 1 October 2026.
Questions about energy in Bahrain.
In 2026 Bahraini citizens on one domestic account pay 3 fils/kWh for the first 3,000 kWh a month, 9 fils up to 5,000, 16 fils up to 7,000 and 32 fils above. All other domestic accounts, including expatriates, pay a flat 32 fils/kWh (about EUR 0.075).
The Electricity and Water Authority (EWA) is the only supplier. It buys power from private power plants, runs the grid and bills customers for electricity and water together.
Yes. Homes up to 100 kW use net metering, where surplus is carried forward as credit on later bills. Non-residential systems and homes above 100 kW use net billing and sell surplus to EWA. Systems must be designed by an approved engineering office and installed by an EWA-licensed contractor.
There is no single national supply-point code. Each bill shows an EWA account number (linked to the customer), an electricity service number and a meter number (linked to the premises), along with the building–road–block address.
Yes. The subsidy applies only to one domestic account held by an eligible Bahraini citizen. Expatriate households pay the full domestic tariff of 32 fils/kWh.
About 1.5% of annual production in 2025–26, mainly distributed rooftop solar. The rest comes from natural gas. The national target is 20% clean energy by 2035.
Not yet. EWA and the Ministry of Electricity and Water Affairs set the rules. A draft law under parliamentary review would create an independent Electricity and Water Regulatory Authority.