Energy in Oman, explained.

How electricity works in Oman: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Oman: Not yet available.Olmack is not offered in Oman yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Oman.

Oman electricity 2026: APSR-regulated tariffs, Nama single buyer, NEDC and Nama Supply accounts, smart meters, rooftop solar export, direct-sale reform and renewables.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Omani rial (1 OMR = 1,000 baisa) (OMR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Oman energy at a glance.

Key figures for households in Oman. Each one links to its source on the full overview below.

  • Electricity price.

    0.014 OMR per kWh for households, including taxes. Figures for 2026.

  • Renewable share.

    9.5% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Oman.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Oman below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Oman requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Oman.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Oman, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Oman, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Oman.

Full overview

The energy market in Oman, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Oman runs an unbundled but state-owned electricity sector under the Sector Law (Royal Decree 78/2004). Privately owned independent power producers (IPPs) sell their output to a single buyer, Nama Power and Water Procurement Company (Nama PWP). The Oman Electricity Transmission Company (OETC) owns the high-voltage grid and dispatches the power stations. Outside Dhofar, Nama Electricity Distribution Company (NEDC) runs the local networks and meters while Nama Electricity Supply Company bills customers; in Dhofar, Nama Dhofar Services does both. The Authority for Public Services Regulation (APSR) licenses every activity and sets tariffs.

Household prices are regulated and low. Since 1 January 2025 a residential primary account pays 14 baisa/kWh for the first 4,000 kWh a month, 18 baisa up to 6,000 kWh and 32 baisa above that. Additional accounts pay 22/26/32 baisa. Since 2022 the same bands have applied to citizens and expatriates. For summer 2026 APSR cut residential primary-account bills by up to 20%.

Gas still produces most of the electricity, but the renewable share is rising quickly, from 1.95% in 2021 to 9.46% of transmitted electricity in 2025, after 1.5 GW of utility solar came online at Ibri and Manah. Government policy targets 30–40% renewable generation by 2030 and 60–70% by 2040. A 2025 policy and APSR Decision 54/2026 now let renewable generators sell directly to large consumers, breaking the single-buyer model for the first time.

Energy snapshot.

Headline figures for electricity in Oman. Each shows its data year and links to its source.

  • Population5,359,557 peopleSource 50End-2025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (OMR)0.014 OMR/kWhSource 12026
  • Household price (EUR)0.032 EUR/kWhSource 552026
  • Renewable electricity share9.46%Source 162025
  • Solar capacity1.572 GWSource 162025
  • Wind capacity0.05 GWSource 162025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter share80%Source 132025
Market structure
Single buyer
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Authority for Public Services Regulation (APSR)
System operator
Oman Electricity Transmission Company (OETC) Load Dispatch Centre; Nama PWP as single buyer and spot-market operator
Distribution networks
Two licensed distributors: NEDC for all governorates except Dhofar (33 kV and below), and Nama Dhofar Services in Dhofar.
Currency
Omani rial (1 OMR = 1,000 baisa) (OMR)
Voltage and frequency
240 V / 50 Hz (415 V three-phase)

Electricity prices in Oman.

Household price (OMR)
0.014 OMR/kWh (2026)Source 1Primary residential account, first band (0–4,000 kWh/month), in force from 1 January 2025 and still applied in 2026. Higher bands: 18 baisa (4,001–6,000 kWh) and 32 baisa (above 6,000 kWh). Electricity is subject to 5% VAT, but the government pays the VAT for citizens with two or fewer residential accounts. Summer discounts of 5–20% applied to single primary accounts from May to August 2026.
Household price (EUR)
0.032 EUR/kWh (2026)Source 55Converted from 14 baisa/kWh at the fixed Omani rial peg (OMR 1 = USD 2.6008) and the ECB reference rate of 30 September 2026 (EUR 1 = USD 1.1355): 0.014 × 2.6008 ÷ 1.1355 = EUR 0.0321. The top band of 32 baisa is about EUR 0.073/kWh.
Typical annual electricity bill
Not identified from a reliable public source.

How tariffs are set

APSR sets the tariffs that licensed suppliers may charge end customers, and publishes each year the detailed calculation of the following year's cost-reflective tariffs. The current residential, non-residential and agricultural tariffs took effect on 1 January 2025 and were still in force in 2026. Suppliers buy power from Nama PWP at the Bulk Supply Tariff, which APSR approves each year. For 2026 the Main Interconnected System (MIS) tariff has four time bands and six seasonal periods, plus a tariff balancing charge. The gap between this cost and the regulated retail tariffs is covered by a government subsidy.

Primary and additional accounts

Residential tariffs depend on how many accounts a subscriber holds, not on nationality. The cheaper primary-account bands apply to a subscriber with two or fewer residential accounts; extra accounts pay the additional-account bands. When the reform began in 2021, expatriates paid higher rates. In January 2022 APSR unified the bands for citizens and expatriates and stretched the subsidy phase-out from five to ten years, with residential rates rising by no more than 2 baisa a year.

Targeted support and VAT

Low-income citizen families can register with the National Subsidy System. As designed in 2020, it paid 33% of the bill up to 4,000 kWh a month for families below set income thresholds (for example a monthly family income under RO 500). Electricity carries 5% VAT, but since April 2021 the government has paid it for citizens with two or fewer residential accounts. In 2026 APSR launched Imtidad, which builds community solar stations so that subsidised households get bill reductions without rooftop panels.

Summer relief and consumer protection

For May–August 2026 APSR cut bills for single primary residential accounts: 15/10/5% in May and 20/15/10% from June to August across the three bands. Suppliers may not disconnect households during those months and must offer instalment plans. Year round, disconnections are banned between 5 pm and 7 am, on the last working day before weekends and holidays, during Ramadan and during General Education Diploma exams.

Subsidy cost and comparison

About RO 2.733 billion went to the electricity sector in subsidies during the 2021–2025 plan, and RO 509 million was budgeted for 2026. At about EUR 0.03/kWh for the first band, Omani household electricity is among the cheapest in the world, which limits the savings a household can make from solar or efficiency measures.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesResidential primary account (from 1 January 2025): 14 baisa/kWh for 0–4,000 kWh a month, 18 baisa for 4,001–6,000 kWh and 32 baisa above 6,000 kWh. Since 2022 the same bands apply to citizens and expatriates.
RegulatedYesResidential additional account (more than two accounts): 22 baisa/kWh for 0–4,000 kWh, 26 baisa for 4,001–6,000 kWh and 32 baisa above 6,000 kWh.
RegulatedYesNon-residential customers using up to 100 MWh a year pay a flat 25 baisa/kWh. Agriculture and fisheries pay 12/16/24 baisa per kWh (0–3,000, 3,001–6,000 and above 6,000 kWh a month).
Time-of-useLimitedOnly through the Cost Reflective Tariff for non-residential customers above 100 MWh a year, about 17,370 NEDC customers in 2025. It passes through the wholesale cost plus transmission, distribution and supply costs. Customers choose a variable cost-reflective tariff, a fixed seasonal tariff or a fixed non-seasonal tariff. Households cannot use it.
DynamicNoNo residential tariff is linked to wholesale prices. The Bulk Supply Tariff that suppliers pay Nama PWP varies by season and time of day, from 12 RO/MWh in winter to 45 RO/MWh at the May–July night peak in 2026, but this is not passed through to households.
PrepaymentLimitedNEDC offers prepaid meters as an option, for example where a meter inside the house cannot be read. The same regulated tariffs apply.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
8,203 kWh/person/yr (2023)Source 52World Bank indicator for electric power consumption per capita, all sectors.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
2,200 vehicles (2026)Source 54About 2,200 electric vehicles and 160 public charging points, according to figures from NCSI and the transport ministry reported in June 2026. The target is more than 350 charging stations by 2027.
Electric cooking
Not identified from a reliable public source.

Electricity demand is driven by cooling. In the MIS, peak demand reached 7,503 MW in 2024, up 5.5% on 2023. Average demand was 4,585 MW, equal to about 40 TWh a year. Peaks fall on hot early afternoons in June, and the night peak is becoming as important as solar output grows. Dhofar, with its monsoon climate, peaked at 801 MW in 2024 after 25.5% growth.

Residential customers used 43.8% of electricity in 2023, commercial and public services 34.2%, industry 20.1% and agriculture 1.9%, according to an I-TRACK country assessment. APSR reports that electricity consumption rose 27% and subscriber numbers 14% between 2021 and 2025. Nama PWP expects MIS energy demand to grow by about 8.1% a year to 2031 as large industrial and commercial loads connect.

Electric vehicles are still rare, though numbers have grown from a few hundred in 2021 to about 2,200. Charger connections are regulated under the 2023 Regulation of Electric Vehicle Charging Activity and APSR's July 2023 technical guidelines.

Housing and households.

Dwellings
969,024 residential units (2020 census)Source 48E-census 2020. Residential units made up 73.8% of 1,312,327 residential and non-residential units. 237,452 units (18.1% of all units) were vacant.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
65.4% (2020 census)Source 48Derived: 633,299 Arabian houses and villas as a share of 969,024 residential units.
Apartments and flats
34.6% (2020 census)Source 48Derived: 335,725 flats as a share of 969,024 residential units.
Urban population
79.5 % of population (2025)Source 51

Most Omani households live in detached villas or traditional Arabian houses, typically owner-occupied and often home to large families. Apartments are concentrated in Muscat and are mostly rented by expatriates. Many expatriate workers live in employer-provided accommodation. Low tariffs make the payback on household solar slow.

The electricity account plays a role in housing administration. Muscat Municipality requires the electricity account number to be recorded in rental contracts, and the 2020 e-census used electricity account information to prove the addresses of people and premises.

How the grid works in Oman.

  1. TransmissionOman Electricity Transmission Company (OETC), OETC Load Dispatch Centre
  2. DistributionTwo licensed distributors: NEDC for all governorates except Dhofar (33 kV and below), and Nama Dhofar Services in Dhofar.
  3. MeteringNEDC / Nama Dhofar Services
  4. Supply2 or more retail suppliers

Physical flow

The Main Interconnected System covers Muscat, both Batinah governorates, Ad Dakhiliyah, both Sharqiyah governorates, Ad Dhahirah, Al Buraimi and, since late 2023, Al Wusta (Duqm). Thirteen privately owned plants are under contract there, with about 9.5 GW of capacity, 18% of it solar. OETC carries power at 400, 220 and 132 kV to grid substations, where NEDC takes it at 33 kV and steps it down to 11 kV and 415 V. Most homes connect at low voltage. Dhofar has its own system (about 1.18 GW, including the 50 MW Dhofar wind farm) and a 150 MW link to the Petroleum Development Oman network. Musandam, an exclave separated by the UAE, runs on a gas and oil-fired plant plus diesel units.

Phase 2 of the 400 kV Rabt North–South interconnector is due to join Dhofar to the MIS by the end of 2026 and create a single national grid. The MIS links to Abu Dhabi and the GCC grid through a 220 kV interconnector, in commercial operation since 2012 (about 400 MW, up to 800 MW in emergencies). A direct 400 kV line from Ibri to Al Silaa (about 530 km, up to 1,600 MW) started construction in early 2026.

Commercial flow

Nama PWP buys all grid output under long-term power purchase agreements, plus the spot market, and sells it to the suppliers at the APSR-approved Bulk Supply Tariff. The suppliers pay NEDC and OETC for network use and bill customers at the regulated tariffs, with a government subsidy covering the gap. The Sector Law bars a licensee from holding more than one regulated activity, which is why generation, procurement, transmission, distribution and supply sit in separate companies within the state-owned Nama Group.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Minerals (MEM)Sets energy policy, including the renewable targets (30–40% by 2030, 60–70% by 2040) and the 2025 Renewable Energy Policy for Self-Generation and Direct Sale. Approves direct-sale projects above 25 MW.
RegulatorAuthority for Public Services Regulation (APSR)Renamed from the electricity regulator by Royal Decree 78/2020, which also gave it gas transport regulation. Issues licences and exemptions under the Sector Law, sets customer tariffs, approves the Bulk Supply Tariff and sets codes, standards and customer protection rules.
TSOOman Electricity Transmission Company (OETC)Owns and operates the 400/220/132 kV transmission grid in the MIS and the 132 kV grid in Dhofar, and is building the Rabt North–South interconnector. 49% was sold to State Grid Corporation of China in 2020.
System operatorOETC Load Dispatch CentreDispatches the contracted power stations on the MIS from Muscat, with control centres in Dhofar and Musandam.
SettlementNama Power and Water Procurement Company (Nama PWP)Single buyer: contracts all new capacity through competitive tenders, buys all grid output and sells it to the licensed suppliers at the Bulk Supply Tariff. Under the Sector Law it alone may contract electricity imports and exports.
ExchangeOman Electricity Spot Market (operated by Nama PWP)Daily market launched in January 2022 with uniform settlement at the system marginal price. Generators with power purchase agreements must submit offers. Captive generators and uncontracted plants can sell surplus output.
DSONama Electricity Distribution Company (NEDC)Sole distribution licensee for every governorate except Dhofar: 33 kV, 11 kV and 415 V networks, about 1.37 million customers, 692 primary substations. Connects customers, PV systems and EV chargers.
DSONama Dhofar ServicesOwns and runs distribution and supply in Dhofar Governorate, about 149,000 customers on the Dhofar Power System.
SupplierNama Electricity Supply CompanySole supplier outside Dhofar: holds the customer accounts, bills, collects and applies tariffs and subsidies.
MeteringNEDC / Nama Dhofar ServicesThe distribution companies own, install, read and test meters, including the national smart meter rollout started in 2021.

Compared with the UK system.

Compared with the UK system.
UK conceptOman equivalentHow it works
DNONEDC (north, centre, south-east and Musandam) and Nama Dhofar Services (Dhofar)Two state-owned distributors, each the only licensee in its area. In 2022–2023 NEDC absorbed the former regional companies (Muscat Electricity Distribution, Majan, Mazoon and the Rural Areas Electricity Company). Network costs sit inside the regulated retail tariff; households do not see separate distribution charges.
National Grid/NESOOETC (grid owner and dispatcher) plus Nama PWP (single buyer and planner)OETC owns the transmission grid and its Load Dispatch Centre dispatches plants. Nama PWP plans capacity and publishes a 7-Year Statement, a similar role to a UK system-operator planning document. There is no balancing market like the UK's.
MPANElectricity account number (with a separate meter number)Each supply point has an electricity account number held by the supplier and a meter with its own serial number. There is no published national standard format like the MPAN. The account number is recorded in rental contracts and used as proof of address.
MPRNNo mains gas to homesHouseholds are not supplied with piped gas, so there is no gas supply-point number. Water is supplied and billed separately by Nama Water Services.
Meter operatorNEDC / Nama Dhofar ServicesThe distributor supplies and maintains the meter. A customer can request a meter test for OMR 10 plus VAT, which is refunded if the meter is faulty. New meters must be on the outer boundary wall of the property.
SupplierNama Electricity Supply Company (or Nama Dhofar Services)There is no supplier choice for households. Large consumers can now contract with renewable generators under APSR Decision 54/2026, but a licensed supplier still provides backup supply at approved tariffs.
Smart-meter infrastructureNational Meter Reading Project (Nama distribution companies)Smart meters are deployed by the distribution companies, which run their own head-end systems. There is no central communications body like the DCC and no national data hub.

How a supply point is identified.

Fictional and illustrative only (Nama does not publish the format): Account no. 2049387615 · Meter no. 19A0457732 · Wilayat Bausher, Muscat

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Electricity account number
Who issues it?Nama Electricity Supply Company (all governorates except Dhofar); Nama Dhofar Services (Dhofar)
FormatNumeric account number assigned by the supplier to a connected premises. It appears on every bill alongside the account holder's name, civil (ID) number and the meter number. The meter carries its own serial number assigned by the distribution company. No national structured standard (like an MPAN or EAN code) is published.
LengthNot published by Nama.
Stays with the property when you switch supplier?Yes
Where to find itOn every monthly electricity bill and in the Nama Services app and website, which show billing history, account details and consumption. It is also written into registered tenancy contracts.
Electronic accessCustomers can view and pay bills, manage several accounts, see consumption and submit self-meter readings through the Nama Services app and the distribution companies' websites. Service requests such as meter tests can also be made at Sanad service centres.
Third-party accessNo open data-access or consent framework for third parties was identified. Account details are used by government bodies, for example Muscat Municipality for tenancy registration and the e-census for address verification.
Who keeps the registerCustomer account register held by the supplier (Nama Electricity Supply Company or Nama Dhofar Services); meter and connection records held by the distribution company.
Register scopePer DSO

Oman identifies a residential connection by an electricity account number rather than a structured national supply-point code. A new connection is applied for to the distribution company (NEDC, or Nama Dhofar Services in Dhofar), which installs the meter on the outer boundary wall; wiring work must be done by a licensed electrician. The supplier then holds the account for that premises.

The account number is effectively the address of the supply. When occupants change, the new occupant updates the account holder details: name, civil number, contact details, a municipality-registered lease for tenants, or proof of ownership (mulkiya) for owners. This ends the outgoing customer's liability so that arrears do not pass to the new occupant. Because Muscat Municipality requires the account number in rental contracts and the 2020 e-census used it to verify addresses, the number stays with the property while the named holder changes.

Tariffs attach to the account. The primary-account bands apply to a subscriber with no more than two residential accounts; further accounts are billed at the additional-account rates. Subsidies such as the National Subsidy System, the government-paid VAT for citizens and the summer discounts are applied through the account and the holder's civil number.

There are two registers, not one national database: Nama Electricity Supply Company holds the accounts for all governorates except Dhofar, and Nama Dhofar Services holds Dhofar's. The meter, which the distributor owns and reads, has a separate serial number, and smart meters now cover about 80% of electricity customers.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringLimited
Net billingYes
How exported electricity is paidUnder APSR's small-scale solar framework (Sahim I, since May 2017) generation is used on site first and surplus exported to the grid is credited at the Bulk Supply Tariff, not the retail tariff. NEDC describes the arrangement as net metering for residential, government and commercial customers.
What is the legal basis?The Sector Law (Royal Decree 78/2004) requires a licence or APSR exemption for regulated activities, and only exempts self-supply autogenerators up to 25 MW that cannot export. Grid-connected export from homes therefore runs under APSR's small-scale solar framework launched in May 2017 (Sahim I).
Which technical rules apply?APSR's Technical and Connection Guidelines for small-scale grid-connected PV (May 2017), the Oman Distribution Code and the Oman Electrical Standards (OES), plus any specific NEDC requirements.
How many homes have exporting solar?On the NEDC network, 440 residential systems totalling 5.54 MWac were connected by 30 September 2025, out of 779 small-scale PV systems (71.64 MWac) in all customer classes.
Is self-consumption required first?Yes. NEDC states that systems must first be installed for self-consumption, with only excess generation exported for other customers to use.
Can larger consumers sell or buy renewable power directly?Yes, since APSR Decision 54/2026 (20 April 2026). Qualified renewable sellers may supply qualified subscribers directly at freely negotiated prices, in capacity tiers (up to 0.25 MW reserved for Riyada-certified SMEs; 0.25–25 MW; 25–50 MW with ministry approval; above 50 MW reserved for the state). APSR sets an annual cap each December.
What happened to the Sahim II developer scheme?Sahim II was designed for private developers to fund and install 2–4 kW systems on many homes and recover costs from output. No large-scale rollout under Sahim II was identified.

Connecting a home system.

  1. Appoint a solar PV installer approved by the Distribution Code Review Panel (DCRP): grade S1 for low-voltage plants up to 20 kW, S2 for all low-voltage plants, S3 for medium voltage.
  2. The installer designs the system to APSR's May 2017 Technical and Connection Guidelines for small-scale grid-connected PV and submits a connection application to the distribution company (NEDC, or Nama Dhofar Services in Dhofar).
  3. The distribution company reviews the application and network capacity. Larger systems may need studies for voltage rise and reverse power flow.
  4. The system is installed, tested and commissioned. An approved testing and commissioning engineer must attend on behalf of the installer.
  5. The distributor fits the metering (a main meter for net energy and a PV generation meter) and energises the system, and surplus exports are credited on the bill.

Households can connect rooftop solar and export surplus electricity, but the economics are modest. Because exports are credited at the Bulk Supply Tariff, and retail tariffs are already very low, uptake has been led by commercial and government buildings: by September 2025 these held about 60 MW of the 72 MW connected to the NEDC grid, against 5.5 MW on 440 homes. NEDC had 977 applications for 115 MW on file and expects PV to cause reverse power flow and voltage rise on low-voltage feeders, mainly in winter, if uptake grows.

The bigger change is for large consumers. The 2025 Renewable Energy Policy for Self-Generation and Direct Sale rests on three pillars: self-generation, direct sale and wheeling over the national grid. APSR Decision 54/2026 set the rules: sellers must be licensed renewable generators registered in Oman; OETC studies the grid impact of each project; parties pay connection and reinforcement costs; and the subscriber's licensed supplier provides backup power at approved tariffs.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (utility scale)Generation licence from APSR. New capacity above 75 MW must be procured by Nama PWP through open competition, and Nama PWP buys all output unless APSR decides otherwise.APSR; Nama PWP (procurement)Utility solar and wind IPPs are tendered by Nama PWP on long-term power purchase agreements.
Generate for own use (autogenerator)Exempt from licensing under Article 108 of the Sector Law if total capacity is no more than 25 MW and the plant cannot deliver electricity into a licensee's system. Otherwise a licence or APSR exemption is needed.APSRThe 2025 self-generation policy adds an annual cap on self-generated renewable electricity and a simplified route for small projects.
Rooftop solar with export (households and businesses)No individual generation licence; connection under APSR's 2017 small-scale PV framework with distributor approval and a DCRP-approved installer.APSR / NEDC or Nama Dhofar ServicesInstaller grades: S1 (LV ≤20 kW), S2 (all LV), S3 (MV).
Install solar PV (contractor)DCRP Solar PV Installer approval, valid for three years. Fees are OMR 10 to apply plus a certificate fee of OMR 30 (S1), 60 (S2) or 90 (S3). Staff must have DCRP-approved solar training.Distribution Code Review Panel (DCRP)58 approved installers were listed in August 2026. Ordinary wiring works need a licensed electrician; NEDC publishes a list.
Store electricityNo specific licence category or connection framework for household or stand-alone batteries identified.APSRBattery storage is one of APSR's three strategic projects for 2026. Utility storage is procured by Nama PWP (Ibri III).
Export electricity to the gridSmall-scale: under the APSR PV framework after distributor approval. Cross-border: only Nama PWP may contract imports and exports (Article 75).APSR / Nama PWPSurplus from small PV is credited at the Bulk Supply Tariff.
Sell renewable electricity directly to consumersPermitted since APSR Decision 54/2026 for licensed, locally registered renewable generators selling to qualified subscribers. Projects above 25 MW need MEM approval; above 50 MW is reserved for the state; up to 0.25 MW is reserved for Riyada-certified SMEs.APSR / MEMPrices are freely negotiated. An annual capacity cap is announced each December.
Supply electricity to end customersSupply licence from APSR. In practice Nama Electricity Supply Company and Nama Dhofar Services are the only household suppliers.APSRNo competitive retail market for households.
Wholesale tradingOnly through the Nama PWP spot market, open to licensed generators (with or without PPAs), captive generators with surplus and uncontracted renewable plants.Nama PWP (market operator) / APSRThere is no retail-side participation and no bilateral trading outside the direct-sale framework.
Aggregation, balancing, grid services and VPPsNo licence category exists. Ancillary services are bought by OETC under contracts with large plants (two such contracts in 2025).OETC / APSRNama PWP is studying demand response for large customers; APSR lists demand response among its 2026 projects.
Remote control of distributed assetsNo general framework identified. Direct-sale projects must install protection and curtailment systems so they can be limited to avoid grid overload.APSR / OETCSet in Decision 54/2026.
Connect EV charging equipmentApplication to NEDC under the Regulation of Electric Vehicle Charging Activity (No. 15/2023) and APSR's July 2023 EV charging technical guidelines.APSR / NEDCApplications are submitted by email to NEDC with a connection form.

Every activity in the sector needs either an APSR licence or an APSR exemption (Sector Law, Articles 3–5), and no licensee may hold more than one regulated activity. That is why a household cannot simply sell power: Nama PWP holds the exclusive right to buy all capacity and output, and to contract imports and exports, unless APSR decides otherwise. Small-scale solar works within this system through APSR's 2017 framework, in which the distributor connects the system and credits exports.

The 2025 policy and Decision 54/2026 are the first real opening. Licensed renewable generators can now sell to qualified large consumers over the grid, with tiers that reserve the smallest projects for Omani SMEs and the largest for the state. Storage, aggregation and flexibility services still have no licensing route.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Electricity spot market (wholesale)Restricted—NoNama PWP. Daily market since January 2022 with a uniform system marginal price. Open to licensed generators, captive generators with surplus and uncontracted solar and wind; plants on pool-based contracts joined from 2024. Not open to households or distributed assets.
Ancillary servicesRestricted—NoOETC. Provided under bilateral contracts (two in place in 2025) and by contracted plants under their power purchase agreements. No open market.
Demand responseDeveloping—NoNama PWP / APSR. Nama PWP's Demand Response Study completed a first stage on large customers; stage 2 (2025) covers trials and modelling. APSR names demand response with major subscribers as a 2026 strategic project.
Renewable energy certificates (I-REC)Yes—NoNama PWP. Nama PWP registers its contracted renewable plants and auctions I-RECs to consumers; more than 250,000 were sold in three rounds.
GCC power exchangeRestricted—NoGCC Interconnection Authority. Reserve sharing and emergency support via the Abu Dhabi interconnector; Nama PWP alone may contract imports and exports.

Oman has more market machinery than most Gulf states, with a spot market and direct sale, but none of it reaches households yet. Rooftop solar, home batteries and EV chargers operate only behind the meter, and there is no aggregator role, flexibility tender or virtual power plant framework.

Change is coming from the system side. Nama PWP's planning studies conclude that storage will be needed for ancillary services as solar penetration rises, and its Demand Response Study is moving to proof-of-concept trials with large customers. APSR's 2026 priorities include round-the-clock renewables, battery storage and demand response. Any programme is likely to start with large commercial and industrial loads.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Oman Electricity Market (oemo.om)Platform for the spot market run by Nama PWP; its market management system reported 100% availability in 2024.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNational Meter Reading Project since 2021: about 80% of electricity customers by end-2025
Reading intervalNot published; billing is monthly
ProgrammeNational Meter Reading Project (launched 2021)
Installed (31 Dec 2024)1.130 million (NEDC 1,008,958; Nama Dhofar 121,596)
Coverage26% (2022) → 46% (2023) → 75.5% (2024) → 80% (2025)
Actual (not estimated) readingsAbove 97% (2025)
Meter ownerNEDC / Nama Dhofar Services
Central data hubNone; distributors hold meter data

Smart meters are installed by the distribution companies under the National Meter Reading Project, started in 2021. Installations rose from about 255,000 in 2021 to 1.13 million at the end of 2024, a 75.48% deployment rate against a planned 1.2 million meters, and APSR reported 80% adoption for electricity at the end of 2025. The aim is to replace manual and estimated reads. Customers without remote-read meters can still submit readings online, and meters that cannot be read because they sit inside the house can lead to disconnection.

There is no published standard for interval data or customer access to half-hourly data, and no independent data hub; meter data sits with NEDC and Nama Dhofar Services. Prepaid meters are offered as an alternative.

Renewable electricity.

Electricity generation mix (2024).

  • Natural gas: 96.3%
  • Solar: 3.4%
  • Wind: 0.3%
Source 11
Renewable electricity share
9.46% (2025)Source 16Share of electricity transmitted that came from grid-connected renewables (4.26 TWh), as reported by APSR. The share was 1.95% in 2021 and 4.88% at the end of 2024.
Home solar
5.54 MWac (Sep 2025)Source 19440 residential systems (5.94 MWp) on the NEDC network; Dhofar not included.
Solar added each year
Not identified from a reliable public source.
Utility solar PV (Ibri II, Manah I, Manah II)
1,500 MW (2025)Source 16
Small-scale PV on the NEDC network
71.6 MWac (Sep 2025)Source 19779 systems, 83.45 MWp.
Wind (Dhofar Wind I)
50 MW (2025)Source 16
MIS contracted capacity (all technologies)
9,506.5 MW (2025)Source 1213 power purchase agreements; 82% gas-fired, 18% solar.

Targets.

  • 30–40% of electricity generation from renewables by 2030, 60–70% by 2040 and 90–100% by 2050 (Ministry of Energy and Minerals).
  • About 8.8 GW of renewable capacity by 2030.
  • Net zero emissions by 2050 (Royal Directive, October 2022).

In 2024 gas-fired plants produced about 43.6 TWh against 1.54 TWh of solar and 0.12 TWh of wind, so renewables supplied about 3.7% of generation (Nama PWP rounds this to 4%) (APSR quotes 4.88% for the end of 2024). After the 1 GW Manah I and II plants started in early 2025, the renewable share of transmitted electricity reached 9.46% for 2025 and passed 11% in some months.

The pipeline is large. Under construction for 2027 are Ibri III (500 MW solar with a 100 MWh battery) and several wind farms, including Dhofar II and Jaalan Bani Bu Ali. Tenders cover wind at Duqm, Mahout and Sadah, and solar at Al Kamil, Sinaw and others. Nama PWP plans about 1 GW of new solar IPPs a year from 2029 and expects renewables to reach about 30% of generation by 2030 and 39% by 2031. Distributed solar is growing slowly by comparison, at about 72 MWac on the NEDC network.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage is at an early stage. Ibri III will be the first utility solar plant with an integrated battery, and APSR has named battery storage, round-the-clock renewables and demand response as its strategic energy projects for 2026. Nama PWP is assessing storage for capacity planning and peak shaving, along with pumped hydro and geothermal. There is no specific connection or licensing route yet for household or stand-alone commercial batteries, and low tariffs give little reason to shift load behind the meter.

Storage projects.

  • Ibri III Solar IPP with battery storage: 500 MW PV with a 100 MWh battery, developed by Masdar, Al Khadra Partners, KOMIPO and OQ Alternative Energy for Nama PWP. Financial close in January 2026 (about USD 300 million); scheduled commercial operation Q2 2027.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Nama Electricity Supply CompanySole supplier outside Dhofar (about 1.37 million customers)NoLimitedNoLimited
Nama Dhofar ServicesSole supplier in Dhofar (about 149,000 customers)NoLimitedNoLimited

Households have no choice of supplier. Nama Electricity Supply Company bills every customer outside Dhofar, and Nama Dhofar Services does so in Dhofar, both at APSR tariffs. "Time-of-use" is marked limited because only the Cost Reflective Tariff for non-residential customers above 100 MWh a year varies by time. Large consumers can now also contract renewable power from licensed generators under Decision 54/2026, while their supplier provides backup supply. Corporate buyers can also buy I-REC certificates through Nama PWP auctions.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Authority for Public Services Regulation (APSR)RegulatorElectricity, water and gas transport regulatorLicences, tariffs, small-scale solar guidelines, EV charging rules and direct-sale regulation.
Ministry of Energy and Minerals (MEM)GovernmentEnergy policyRenewable targets and the Renewable Energy Policy for Self-Generation and Direct Sale.
Nama Power and Water Procurement Company (Nama PWP)MarketSingle buyer, capacity planner and spot-market operatorPublishes the 7-Year Statement, Bulk Supply Tariffs, IPP tenders and I-REC auctions.
Oman Electricity Transmission Company (OETC)TransmissionTransmission owner and system operatorGrid connections for large plants, Rabt interconnector, grid impact studies for direct-sale projects.
Nama Electricity Distribution Company (NEDC)DistributionDistribution licensee outside DhofarConnections, meters, PV and EV charger applications, Oman Electrical Standards and the annual Distribution System Capability Statement.
Nama Dhofar ServicesDistributionDistribution and supply in DhofarCustomer accounts and network connections in Dhofar Governorate.
Distribution Code Review Panel (DCRP)SolarDistribution Code review and approval of solar PV installersPublishes the Distribution Code and the list of approved solar PV installers (grades S1–S3).
Oman Net Zero CentreGovernmentCoordination of the national net zero pathwaySet up in December 2024 under MEM to coordinate the 2050 net zero strategy, in which the power sector is a main pillar.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Small-scale solar PV connectionTechnical and Connection Guidelines for small-scale grid-connected solar PV systems (May 2017)APSRMinimum technical standards, connection process, metering and operation; referenced by NEDC as mandatory for installers.
Distribution networkOman Distribution Code (including Distribution Planning Code)Distribution licensees via the Distribution Code Review Panel, approved by APSRApplies to systems below 132 kV.
WiringOES 4 – Electrical Installations in Buildings (third edition)Oman Electrical Standards (published by NEDC)Base wiring standard for buildings; the OES series also covers cables, overhead lines, transformers, switchgear and substations.
EV chargingEV Charging Technical Requirements Guidelines (July 2023) and Regulation of Electric Vehicle Charging Activity No. 15/2023APSRConnection applications handled by NEDC.
Installer accreditationDCRP Solar PV Installer Approval (grades S1, S2, S3)Distribution Code Review PanelS1: LV ≤20 kW; S2: all LV; S3: MV. Engineers need DCRP-approved solar training; certificates last three years.
MeteringDistributor-approved meters (main meter plus PV generation meter)NEDC / Nama Dhofar ServicesMeters must be on the property boundary wall.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Distribution company approval for solar PVYesNationalApplication to NEDC (or Nama Dhofar Services) by a DCRP-approved installer; system tested and commissioned before energisation.
Generation licence for rooftop solarNoNationalSmall systems connect under the APSR small-scale PV framework rather than an individual licence.
New electricity connectionYesNationalApplied for through a licensed electrician to the distribution company; meter installed on the outer boundary wall.
Tenancy registrationLimitedLocalIn Muscat the electricity account number must be recorded in the municipality-registered rental contract; tenants updating account holder details need that contract.
Direct-sale renewable projectYesNationalGeneration licence, APSR direct-sale approval, OETC grid study; MEM approval above 25 MW.

For a household, the main gatekeeper is the distribution company: a DCRP-approved installer designs to the APSR guidelines, applies to NEDC or Nama Dhofar Services, and the distributor inspects, meters and energises the system. No separate generation licence is needed for small rooftop systems. Larger and direct-sale projects add APSR licensing, OETC grid studies and, above 25 MW, ministry approval.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Sahim I small-scale solar export creditActiveExport paymentSurplus from grid-connected rooftop PV, after self-consumption, credited at the Bulk Supply Tariff.May 2017 – ongoing
Primary-account residential tariffActiveTariff subsidySubsidised bands of 14/18/32 baisa per kWh for subscribers with no more than two residential accounts.Current bands from 1 January 2025
Summer residential tariff reductionClosedTariff discountDiscounts of 5–20% by band for single primary residential accounts, May–August 2026, with no disconnections and instalment plans.May – August 2026
National Subsidy SystemActiveTargeted bill supportSupport for registered low-income citizen families; designed in 2020 as 33% of the bill up to 4,000 kWh a month.2021 – ongoing
Government-paid VAT on utilities for citizensActiveVAT reliefThe state pays the 5% VAT on electricity for citizens with two or fewer residential accounts.April 2021 – ongoing
Imtidad community solar programmeActiveCommunity solarRO 5 million for about 20 MW of community solar stations serving households in the National Subsidy System, built by Omani SMEs; the 1.46 MW Imtidad 1 is in Al Wadi Al Kabir, Muscat. APSR estimates bill cuts of up to 40%.Launched June 2026

Data and connectivity.

Fixed broadband
Not identified from a reliable public source.
4G coverage
100 % population coverage (2024)Source 53IMF figure as reported by Telecom Review.
5G coverage
88 % population coverage (2024)Source 53IMF figure as reported by Telecom Review.

Oman has near-universal 4G and high 5G coverage, and Oman Broadband Company is extending fibre to around a million housing units. Smart electricity meters are run by the distribution companies through their own head-end systems; there is no national standard for in-home displays or consumer access to meter data.

Grid conditions.

National peak demand
7.503 GW (2024)Source 11MIS peak. Dhofar peaked separately at 801 MW and Musandam at 91 MW. NEDC records a 2025 MIS distribution-level maximum of 7,179 MW on 23 June 2025.
Annual electricity demand
45 TWh (2024)Source 11Derived: about 40 TWh in the MIS plus 5.0 TWh in Dhofar, at system level including losses.
Generation capacity
10.7 GW (2025)Source 12Derived: 9,506.5 MW contracted in the MIS plus 1,176.4 MW in Dhofar. Excludes Musandam, captive industrial plants and Petroleum Development Oman's network.
Interconnection
0.4 GW (2025)Source 12Abu Dhabi/GCC interconnector, up to 800 MW in emergencies. A 1,600 MW direct link to the GCC grid is under construction.
Curtailment
Not identified from a reliable public source.

Demand is growing fast. Nama PWP forecasts the MIS peak to rise 7.2% a year, from 7,503 MW in 2024 to 12,198 MW in 2031, as bulk loads in Sohar, Duqm and other zones connect. The generation security standard requires no more than 24 hours of expected unserved demand a year (24 LOLH), equal to a reserve margin of about 8.5% in 2025. The night peak is becoming critical because solar output falls away after sunset.

On the distribution side, NEDC's primary substations had a firm capacity of 11,675.5 MVA against a non-coincident peak load of 8,413 MVA in 2025 (72% utilisation), and technical losses were 5.16%. NEDC connected 19,330 new applications (940 MW) in the first nine months of 2025. Joining Dhofar to the MIS by the end of 2026 and building the direct GCC link will strengthen reserve sharing and let wind and solar from the south and centre flow north.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Residential and non-residential tariff regulationCurrent1 January 2025Primary 14/18/32 and additional 22/26/32 baisa per kWh; non-residential 25 baisa; cost-reflective tariff for non-residential use above 100 MWh a year.
Renewable Energy Policy for Self-Generation and Direct SaleCurrentEarly 2025MEM policy built on self-generation, direct sale and wheeling, with annual caps.
APSR Decision 54/2026 on direct sale of renewable electricityCurrent20 April 2026Qualified renewable sellers may supply qualified subscribers directly at negotiated prices in capacity tiers; APSR announces an annual cap each December.
Imtidad community solarCurrentJune 2026RO 5 million programme of about 20 MW of community solar for subsidised households.
Rabt North–South interconnector Phase 2UpcomingScheduled Q4 2026Connects the Dhofar Power System to the MIS, creating a single national grid (about 860 MW N-1 transfer capability).
Second, direct Oman–GCC interconnectionUpcomingConstruction started early 2026Double-circuit 400 kV line from Ibri to Al Silaa (about 530 km, about USD 700 million), raising transfer capacity to up to 1,600 MW.
Ibri III solar plus storage and new wind IPPsUpcoming2027–2028Ibri III (500 MW + 100 MWh, Q2 2027), Dhofar II, Jaalan Bani Bu Ali, Duqm, Mahout and Sadah wind farms and further solar IPPs.
APSR 2026 strategic projectsUpcoming2026 onwardsRound-the-clock renewable supply, battery storage and demand response with major subscribers.
Residential subsidy phase-outUpcomingTen-year programme from 2021APSR extended the residential subsidy phase-out from five to ten years in 2022, with rises capped at 2 baisa a year.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionHighLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLow440 residential PV systems (5.54 MWac) on the NEDC network by September 2025, out of about 1.37 million customers; exports credited at the Bulk Supply Tariff.
Distributed energy marketLowAbout 72 MWac of small-scale PV in total and no household storage or aggregation framework; direct sale is limited to licensed generators and qualified large consumers.
Grid flexibility marketLowA spot market exists for generators, but there is no DER access, no aggregation and only study-stage demand response.
Energy storage adoptionLowNo operating grid batteries; the first (100 MWh at Ibri III) is due in 2027.
Renewable growth environmentHighRenewable share rose from 1.95% (2021) to 9.46% (2025), with about 7.3 GW in development and a 30–40% by 2030 target.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 55 sources
  1. New electricity tariffs come into effect on Wednesday. Oman Observer, 2024. accessed 1 October 2026.
  2. APSR introduces new electricity tariff regulations. Times of Oman, 2024. accessed 1 October 2026.
  3. Oman announces new power tariff cuts for all consumers. Gulf News, 2022. accessed 1 October 2026.
  4. Subsidy channelled to power sector as distribution and supply services merged in two companies. Oman Observer, 2022. accessed 1 October 2026.
  5. APSR cuts residential power tariffs for summer. Oman Observer, 2026. accessed 1 October 2026.
  6. Oman to gradually phase out water, electricity subsidies. Oman Observer, 2020. accessed 1 October 2026.
  7. VAT social protection initiatives announced. Deloitte Middle East, 2021. accessed 1 October 2026.
  8. Oman spent RO 7.3 bn on subsidies during 10th Plan. Oman Observer, 2026. accessed 1 October 2026.
  9. Oman bans power and water cuts during exams, holidays and night hours. Gulf News, 2025. accessed 1 October 2026.
  10. MIS Bulk Supply Tariff 2026. Nama Power and Water Procurement, 2026. accessed 1 October 2026.
  11. PWP's Power 7-Year Statement (2025–2031), Issue 19. Nama Power and Water Procurement, 2025. accessed 1 October 2026.
  12. Country Assessment Report – Oman. I-TRACK Foundation (Three Pillars Consulting), 2026. accessed 1 October 2026.
  13. Utilities sector sees strong growth, digital transformation in Oman. Times of Oman (APSR results 2021–2025), 2026. accessed 1 October 2026.
  14. Oman APSR unveils three strategic energy projects for 2026. TradeArabia, 2026. accessed 1 October 2026.
  15. 1.13 million electricity smart metres installed across Oman. Oman Observer, 2025. accessed 1 October 2026.
  16. Oman's clean energy share reaches nearly 10% in 2025. Oman Observer, 2025. accessed 1 October 2026.
  17. Renewables share of Oman's total power output climbs to 11.5%. Oman Sustainability Week (from Oman Observer), 2025. accessed 1 October 2026.
  18. Oman's small-scale solar sector projected to reach 130 MW by year-end. Oman Observer, 2025. accessed 1 October 2026.
  19. NEDC Distribution System Capability Statement (2026–2028). Nama Electricity Distribution Company, 2025. accessed 1 October 2026.
  20. About Company. Nama Electricity Distribution Company. accessed 1 October 2026.
  21. FAQs. Nama Electricity Distribution Company. accessed 1 October 2026.
  22. EV Charger. Nama Electricity Distribution Company. accessed 1 October 2026.
  23. Oman Electrical Standards (OES). Nama Electricity Distribution Company. accessed 1 October 2026.
  24. Law for the Regulation and Privatisation of the Electricity and Related Water Sector (Royal Decree 78/2004, English translation). Nama Electricity Distribution Company. accessed 1 October 2026.
  25. Royal Decree 78/2020 amending the name of the electricity regulator. Decree.om, 2020. accessed 1 October 2026.
  26. About DCRP. Distribution Code Review Panel. accessed 1 October 2026.
  27. Registration of Rooftop Solar PV System Installer – Requirements. Distribution Code Review Panel. accessed 1 October 2026.
  28. Solar PV Installers Approval list (August 2026). Distribution Code Review Panel, 2026. accessed 1 October 2026.
  29. The future of rooftop solar in the Middle East: Oman's Sahim II and Shams Dubai. Addleshaw Goddard, 2021. accessed 1 October 2026.
  30. Small-scale solar systems proliferate in Majan licence. Oman Observer, 2021. accessed 1 October 2026.
  31. Oman to launch support scheme for small-sized PV. pv magazine, 2017. accessed 1 October 2026.
  32. Policy reforms to boost Oman's renewables-focused electricity market. Oman Observer, 2025. accessed 1 October 2026.
  33. Oman enhances RE adoption with self-generation and direct sale initiative. Energetica India, 2025. accessed 1 October 2026.
  34. Oman opens renewable power market to direct sales. Zawya, 2026. accessed 1 October 2026.
  35. Oman introduces new rules for direct renewable electricity sales across the Sultanate. SolarQuarter, 2026. accessed 1 October 2026.
  36. Oman launches RO 5 million community solar program to cut power bills. SolarQuarter, 2026. accessed 1 October 2026.
  37. Masdar and consortium partners achieve financial close for Oman's first utility-scale solar and battery storage project. Masdar, 2026. accessed 1 October 2026.
  38. Energy storage powers Oman's renewable drive. Oman Observer, 2026. accessed 1 October 2026.
  39. Oman to advance key power, water schemes in 2025. Oman Sustainability Week, 2025. accessed 1 October 2026.
  40. Oman Electricity Spot Market set to be a reality. Oman Observer, 2022. accessed 1 October 2026.
  41. New Oman-GCCIA direct interconnection to be ready by Q4 2026. Oman Observer, 2024. accessed 1 October 2026.
  42. Oman-GCC direct electrical interconnection. Oman Observer, 2026. accessed 1 October 2026.
  43. Power surge: regulatory developments, grid integration and private financing (The Report: Oman 2025). Oxford Business Group, 2025. accessed 1 October 2026.
  44. Total assets of Nama Electricity Distribution soar to RO 2.16 bn. Oman Observer, 2024. accessed 1 October 2026.
  45. Nama Group urges customers to update electricity account data. Oman Observer, 2019. accessed 1 October 2026.
  46. Electricity account number must in rental contracts. Oman Observer, 2020. accessed 1 October 2026.
  47. Sultanate's population increases 61% in ten years. Oman Observer, 2020. accessed 1 October 2026.
  48. E-census 2020 housing data. Oman Observer, 2021. accessed 1 October 2026.
  49. NCSI household survey reveals that 91.2% Omanis have their own house. Times of Oman, 2020. accessed 1 October 2026.
  50. Oman: End-of-year population by nationality (Omani/non-Omani) and sex (2015–2025), from NCSI. Gulf Labour Markets, Migration and Population (GLMM), 2025. accessed 1 October 2026.
  51. Urban population (% of total population) – Oman. World Bank, 2025. accessed 1 October 2026.
  52. Electric power consumption (kWh per capita) – Oman. World Bank, 2023. accessed 1 October 2026.
  53. Oman's digital transformation: bridging urban and rural connectivity gaps. Telecom Review, 2025. accessed 1 October 2026.
  54. Are limited charging stations impeding EV growth in Oman?. Oman Observer, 2026. accessed 1 October 2026.
  55. Euro foreign exchange reference rates – US dollar. European Central Bank, 2026. accessed 1 October 2026.

Questions about energy in Oman.