How electricity works in Colombia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 7 October 2026.

Olmack in Colombia: Not yet available.Olmack is not offered in Colombia yet. The market information on this page is provided for reference. Information last checked 7 October 2026.
Energy-market overview

How electricity works in Colombia.

Colombia electricity market 2026: CREG, XM, network operators, stratum-based tariffs and subsidies, CREG 174 self-generation credits, Colombia Solar, AMI and reforms.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Colombian peso (COP) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Colombia energy at a glance.

Key figures for households in Colombia. Each one links to its source on the full overview below.

  • Electricity price.

    875.05 COP per kWh for households, including taxes. Figures for Sep 2026.

  • Renewable share.

    77% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Colombia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Colombia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Colombia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Colombia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Colombia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Colombia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Colombia.

Full overview

The energy market in Colombia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 7 October 2026.

On this page22 sections

Colombia runs a wholesale electricity market (the Mercado de Energía Mayorista) in which generators sell into a spot exchange (the bolsa) and through bilateral contracts. XM, a subsidiary of ISA, dispatches the National Interconnected System (SIN) and settles the market. Local networks are run by regional network operators (operadores de red), and retail is a separate licensed activity: households can in principle change their electricity retailer (comercializador), but almost all buy from the incumbent retailer linked to their local network, at a tariff calculated with a formula set by the regulator, CREG.

What a household pays depends on its socioeconomic stratum (estrato, 1 to 6). Households in strata 1 to 3 receive a subsidy on a basic monthly allowance (consumo de subsistencia) of 173 kWh in hot areas below 1,000 m and 130 kWh in higher areas; stratum 4 pays the full cost; strata 5 and 6 pay a 20% solidarity contribution on top. In Bogotá in September 2026, Enel Colombia’s full cost was COP 875.05/kWh.

Hydropower supplied 69% of electricity in 2025, which makes the system cheap and low-carbon in wet years but exposed to droughts linked to El Niño. Utility-scale solar has grown from almost nothing in 2022 to 1.6 GW connected to the grid by the end of 2025. Households and businesses can generate their own power and export surpluses under CREG Resolution 174 of 2021, and the government’s Colombia Solar programme supports rooftop systems for lower-income households. With El Niño expected in 2026–2027, CREG introduced a temporary consumption-saving scheme for regulated users from September 2026.

Energy snapshot.

Headline figures for electricity in Colombia. Each shows its data year and links to its source.

  • Population53,368,000 peopleSource 12025
  • Households18,952,000 householdsSource 12025
  • Average household size2.82 people/householdSource 12025
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (COP)875.1 COP/kWhSource 2Sep 2026
  • Household price (EUR)0.231 EUR/kWhSource 11Sep 2026
  • Renewable electricity share77%Source 132025
  • Solar capacity1.73 GWSource 152025
  • Wind capacity0.034 GWSource 162025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Partially liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
CREG (Comisión de Regulación de Energía y Gas); Superservicios supervises utilities
System operator
XM (National Dispatch Centre and market administrator); ISA InterColombia is the main transmission owner
Distribution networks
Regional network operators (operadores de red), mostly linked to a retailer: Enel Colombia, EPM group companies, Celsia, Air-e, Afinia and others
Currency
Colombian peso (COP)
Voltage and frequency
120 V / 60 Hz

Electricity prices in Colombia.

Household price (COP)
875.1 COP/kWh (Sep 2026)Source 2Enel Colombia (Bogotá and Cundinamarca) regulated cost of supply (costo unitario, CU) for residential supplies at voltage level 1 on Enel-owned assets, which is what a stratum 4 household pays for every kWh. Strata 1–3 pay less on their subsistence allowance, strata 5–6 pay 20% more. Municipal charges such as the street-lighting tax are billed separately. Tariffs differ between network operators.
Household price (EUR)
0.231 EUR/kWh (Sep 2026)Source 11Converted from COP 875.05/kWh at EUR 1 = COP 3,793.97, derived from the official COP/USD rate (TRM) for 30 September 2026 of COP 3,341.23 and the ECB euro reference rate for 30 September 2026 of USD 1.1355 (source ecb-usd).
Typical annual electricity bill
1,816,597 COP/yr (Sep 2026 rates (annualised))Source 2Illustrative, derived: a stratum 4 household in Bogotá using 173 kWh every month at COP 875.0465/kWh × 12. Excludes the municipal street-lighting tax and any non-electricity items on the bill. A stratum 2 household would pay COP 512.15/kWh within its subsistence allowance.

Household price trend (COP per kWh).Source 4

819.66847.775875.89Mar 2026Apr 2026May 2026Jun 2026Aug 2026Sep 2026
Colombia household electricity price, COP per kWh
Mar 2026824.59 COP/kWh
Apr 2026819.66 COP/kWh
May 2026839.67 COP/kWh
Jun 2026875.89 COP/kWh
Aug 2026863.61 COP/kWh
Sep 2026875.05 COP/kWh

How the tariff is built

Colombian households do not see separate supplier and network bills. Their retailer calculates a single cost of supply per kWh (costo unitario, CU) each month with CREG’s formula, which adds the costs of generation, transmission, distribution, retail, losses and system restrictions. The CU differs by network operator, voltage level and who owns the local assets: in Enel Colombia’s September 2026 schedule, the residential CU at voltage level 1 was COP 875.05/kWh on company-owned assets and COP 825.97/kWh where the customer owns them.

Strata, subsidies and contributions

Each home is classified by the municipality into a socioeconomic stratum from 1 to 6. Law 142 of 1994 created a cross-subsidy system: higher strata and businesses pay a contribution capped at 20%, and lower strata receive subsidies on a subsistence allowance of 173 kWh a month below 1,000 m altitude or 130 kWh above. In Enel’s September 2026 schedule, stratum 3 paid COP 743.79/kWh within the allowance (85% of the CU), stratum 2 COP 512.15/kWh and stratum 1 COP 409.72/kWh, while strata 5 and 6 paid COP 1,050.06/kWh (120% of the CU). The subsidised prices for strata 1 and 2 are below the CU by less than the maximum 60% and 50% because CREG rules limit how fast they can rise.

Regional differences

Because each retailer passes on its own purchase contracts, losses and network costs, prices vary across the country. The Caribbean coast has had the most acute problems: Air-e, which serves Atlántico, Magdalena and La Guajira, has been under the control of the utilities superintendent (Superservicios) since September 2024, and in July 2026 the superintendent described a stabilisation plan that includes financing for its debts in the wholesale market.

Trend

Prices depend heavily on hydrology and contract costs. Enel’s residential CU moved between COP 819.66/kWh (April 2026) and COP 875.89/kWh (June 2026) during 2026. With XM warning of a shortfall in firm energy for 2026–2027, CREG started a six-month programme in September 2026 that rewards regulated users who consume less than 90% of an individual target and charges extra for consumption above 110% of it.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesRegulated users pay a cost of supply (CU) calculated monthly by their retailer using the CREG formula (Resolution 119 of 2007). Each retailer publishes a monthly tariff schedule (pliego tarifario) by stratum, voltage level and asset ownership.
OtherYesStratum-based subsidies and contributions: strata 1 and 2 receive up to 60% and 50% off their subsistence allowance, stratum 3 receives 15%, stratum 4 pays the CU, and strata 5–6 (plus commercial and industrial users) pay a 20% contribution. Consumption above the subsistence allowance is billed at the full CU.
PrepaymentLimitedSome operators offer prepaid electricity, for example EPM. It is not available from every retailer.
Time-of-useLimitedEnel Colombia’s schedule includes peak and off-peak hourly options (opciones horarias) for non-residential users. Standard residential tariffs are flat per kWh.
FixedNoRegulated residential tariffs change every month with the CU formula; freely negotiated prices are a feature of the non-regulated market for users above 0.1 MW or 55 MWh a month.
DynamicNoNo residential tariffs linked to hourly spot prices were identified. The temporary saving scheme under CREG Resolution 101 120 of 2026 adds incentives and surcharges against an individual consumption target, not hourly pricing.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,715 kWh/person/yr (all sectors) (2025)Source 17Total electricity demand per person (Ember data via Our World in Data).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

National electricity demand was about 91.6 TWh in 2025, or roughly 1,715 kWh per person, low by international standards. Demand on the interconnected system grew 2.6% in 2025 and has risen faster in 2026: XM recorded a peak of 12,475 MW on 7 May 2026, and daily generation reached a record 264.91 GWh on 5 August 2026, with consumption in August 7.43% above August 2025.

Household use is shaped by climate. The subsidised allowance is higher in hot areas below 1,000 m (173 kWh a month) than in cooler highland cities such as Bogotá (130 kWh), reflecting the extra demand for cooling and refrigeration in the lowlands. Ember notes that Colombia has lost its self-sufficiency in gas, which is widely used for cooking.

Electricity access is close to universal: the World Bank puts it at 98.9% of the population in 2024. Remote areas outside the interconnected system (the zonas no interconectadas) are supplied by local systems.

Housing and households.

Dwellings
18,894,000 occupied dwellings (2025)Source 1
Owner-occupied
38.1 % of households (2025)Source 134.8% own outright and 3.3% are still paying. A further 14.5% live rent-free with the owner’s permission, 4.1% occupy without title and 2.4% live in collective property.
Private rented
40.8 % of households (2025)Source 1Rented or sublet; the largest tenure category for the fourth year running.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
78.8 % of population (2025)Source 56World Bank. DANE’s ECV puts 76.6% of people in municipal centres (cabeceras) in 2025 (derived: 40.906 million of 53.368 million).

Renting has overtaken ownership in Colombia. In DANE’s 2025 survey, 40.8% of households rented their home and 38.1% owned it, down from 46.2% owners in 2019. Many households live in informal arrangements, without paying or without formal title, which matters for rooftop solar because installation and financing usually require the owner’s agreement.

Every home is placed in a socioeconomic stratum (1 to 6) by the municipality. The stratum attaches to the property, not to the occupant’s income, and it determines whether the electricity bill carries a subsidy or a contribution.

How the grid works in Colombia.

  1. TransmissionXM S.A. E.S.P. (ISA group), ISA InterColombia and other transmission companies
  2. DistributionRegional network operators (operadores de red), mostly linked to a retailer: Enel Colombia, EPM group companies, Celsia, Air-e, Afinia and others
  3. MeteringNot identified from a reliable public source.
  4. Supply5 or more retail suppliers

Physical flow

Large hydro plants, gas and coal plants and a growing fleet of solar parks feed the National Interconnected System (SIN). The national transmission system links them to the demand centres, and regional and local networks run by the network operators carry power down to the 120 V supply used by homes. Isolated regions outside the SIN form the non-interconnected zones.

At 31 December 2025, XM reported 21,028 MW of effective net capacity: 13,209 MW hydro (62.8%), 6,224 MW thermal (29.6%) and 1,594 MW solar (7.6%), with a further 1,426 MW from 104 projects in initial testing. Colombia can export up to 450 MW to Ecuador; exports were halted on 22 January 2026 during a trade dispute, while Ecuador sold electricity to Colombia between February and June 2026.

Commercial flow

Generators sell through the spot market and bilateral contracts. Retailers buy for their regulated users through contracts, auctions and the spot market, and pass the cost through the CU formula. XM settles transactions between market agents and the charges for using the national transmission network. Users with demand of at least 0.1 MW or 55 MWh a month can become non-regulated users and agree prices freely with a retailer.

Who regulates what

CREG regulates tariffs and markets nationally (there are no regional regulators) and Superservicios supervises the companies. UPME plans the system and certifies tax incentives, while the Ministry sets policy and technical regulations.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinisterio de Minas y Energía (MinEnergía)Sets energy policy and technical regulations such as RETIE (Resolution 40117 of 2024), runs the Colombia Solar programme (Decree 972 of 2025 and Resolution 40159 of 2026) and defines long-term energy auctions.
RegulatorComisión de Regulación de Energía y Gas (CREG)Sets the tariff formula, network charges, wholesale market rules, the self-generation and distributed generation regime (Resolution 174 of 2021), the advanced metering framework (Resolution 101 001 of 2022) and demand response mechanisms.
RegulatorSuperintendencia de Servicios Públicos Domiciliarios (Superservicios)Supervises utilities and consumer rights, issues legal opinions on matters such as changing retailer, and can take control of failing companies, as it did with Air-e in September 2024.
System operatorXM S.A. E.S.P. (ISA group)Runs the National Dispatch Centre (CND), the Commercial Exchange System Administrator (ASIC) and the account settlement administrator (LAC), functions it took on under Decree 848 of 2005.
TSOISA InterColombia and other transmission companiesThe National Transmission System (STN) is owned by several regulated transmission companies, of which ISA’s InterColombia is the largest. ISA is also developing the Colombia–Panama interconnection.
MinistryUnidad de Planeación Minero Energética (UPME)Plans generation and transmission expansion, runs transmission and storage tenders, keeps statistics on self-generation and certifies projects for the tax incentives of Law 1715 of 2014.
DSONetwork operators (operadores de red)Each region has a network operator that runs the regional and local networks and approves connections, including self-generators. Examples: Enel Colombia (Bogotá and Cundinamarca), EPM (Antioquia), Celsia (Valle del Cauca, Tolima and parts of Cundinamarca), Air-e (Atlántico, Magdalena and La Guajira) and Afinia (Bolívar, Cesar, Córdoba, Sucre and part of Magdalena).
SupplierRetailers (comercializadores)Retail is a separate regulated activity. In practice the incumbent retailer for households is usually the company that also operates the local network.
ExchangeBolsa de energía (spot market, administered by XM)Generators offer energy daily into the spot market; retailers buy most of their regulated demand through bilateral contracts and auctions. Surplus energy from small self-generators above their own imports is currently valued at the spot price.
Flexibility marketDemand response mechanisms (CREG / XM)CREG has run temporary demand response programmes in which users offer reductions through a representative, with offers of at least 1 MW and aggregation allowed (Resolution 101 084 of 2025). A permanent mechanism was put out for consultation in January 2026.

Compared with the UK system.

Compared with the UK system.
UK conceptColombia equivalentHow it works
DNOOperador de red (OR)The network operator owns and runs the regional and local networks, handles faults and approves new connections, including small self-generators under CREG Resolution 174 of 2021. Unlike a UK DNO, it is usually part of the same company as the incumbent retailer, such as Enel Colombia in Bogotá or EPM in Antioquia.
National Grid/NESOXM (system operation and market) and ISA InterColombia (transmission)XM dispatches the interconnected system and settles the wholesale market; ISA InterColombia and other companies own the national transmission network. Expansion is planned by UPME rather than the system operator.
MPANNúmero de cliente / NIU (user identification number)There is no national meter point number in a common format. Each network operator assigns its own user identification number (NIU), which appears on the bill as the customer or contract number, such as Enel Colombia’s número de cliente. Wholesale-market metering points are registered with XM as commercial boundaries (fronteras comerciales).
MPRNGas distributor’s customer or contract numberGas has its own distributors and account numbers. Multi-utilities such as EPM supply several services, but each keeps its own identifier.
Meter operatorNetwork operator or the userThere is no separate meter operator market. Under the advanced metering framework, users may buy their own compliant meter, or the network operator installs and owns it and passes the data to an independent data manager.
SupplierComercializador (retailer)Households can in principle switch retailer after 12 months if they have no debts, but they stay on the regulated tariff formula and switching by households is rare. Users above 0.1 MW or 55 MWh a month can negotiate prices freely.
Smart-meter infrastructureAMI framework with a planned independent data manager (GIDI)CREG Resolution 101 001 of 2022 makes network operators responsible for advanced meter deployment plans to 2030 and creates the Gestor Independiente de Datos e Información (GIDI), a neutral body to hold meter data, give users access and support retailer switching. In 2025 CREG was still reviewing costs and the GIDI design.

How a supply point is identified.

Número de cliente: 2847193-5 (fictional, Enel Colombia style)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Número de cliente / número de contrato (NIU, Número de Identificación del Usuario) (NIU)
Who issues it?The network operator (or its retailer) when the supply is connected
FormatA numeric customer or contract number defined by each company; there is no national structure or common check digit. Enel Colombia’s bills show the customer number followed by a hyphen and further digits, which customers enter when paying online.
LengthVaries by company; no national standard length
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the electricity bill (Enel Colombia prints the customer number at the top right of the front page), in the retailer’s app or online account, and on correspondence about the supply.
Electronic accessThrough each company’s own online services and payment channels. There is no national data hub yet; the planned independent data manager (GIDI) is to give users web and mobile access to advanced meter data.
Third-party accessNo standard third-party access route exists today; installers and new retailers obtain the number from the customer. Under the AMI framework, use of a user’s data beyond service provision requires prior, express and informed consent under Law 1581 of 2012.
Who keeps the registerEach network operator’s and retailer’s commercial system, reported to the regulatory information systems as the NIU. XM (as ASIC) registers commercial boundaries for wholesale-market metering points.
Register scopePer DSO

How a home’s supply is identified

A household supply is identified by the number its network operator assigns to the user, which CREG defines as the NIU (Número de Identificación del Usuario o Suscriptor): “the number the network operator assigned to each of the users connected to its system”. On the bill it appears under the company’s own name for it: Enel Colombia calls it the número de cliente, other companies a contract or account number. The meter number, address, stratum and voltage level appear alongside it.

The format is not standardised nationally. Each company sets its own numbering, so a Bogotá number looks different from a Medellín or Barranquilla one, and there is no national lookup from the address.

Use in practice

The number is used to pay bills, report faults, make claims, apply to connect a solar system under CREG Resolution 174 of 2021 and request a change of retailer. To pay an Enel Colombia bill online without an account, customers enter the customer number and the digits after the hyphen shown on the bill.

Change of occupant and change of retailer

No national rule was found on whether the number is kept or reissued when the occupant changes. A user who switches retailer must have been with the current one for at least 12 months and be up to date with payments; the current retailer must issue a certificate of no debts within five working days.

Wholesale-market boundaries

Larger users and generators that trade in the wholesale market have commercial boundaries (fronteras comerciales) registered with XM, the point where energy is measured for settlement. A small self-generator that exports surpluses also needs an export boundary, represented by its retailer and fitted with a bidirectional meter.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingYes
How exported electricity is paidRenewable self-generators up to 100 kW: exports up to the amount imported in a billing period are swapped 1:1 as energy credits, paying only the retail component; exports above imports are paid at the hourly spot price. Self-generators of 100 kW–1 MW are paid a regulated price for surpluses.
What size counts as small-scale self-generation?Up to 1 MW of installed capacity (autogeneración a pequeña escala, AGPE). Large-scale self-generators below 5 MW also use a simplified connection procedure.
How are surpluses paid?For renewable systems up to 100 kW, surpluses up to the energy imported are swapped 1:1 as credits, and the retailer charges only its retail component on that energy. Surpluses above imports are paid at the spot price. CREG decided in 2025 to value these extra surpluses at an average contract price instead, but in April 2026 it confirmed that the spot price still applies until it defines how the change passes through to tariffs.
Are there limits on how much can connect?Yes. Total distributed generation on a circuit or transformer may not exceed 50% of its nominal capacity, and for solar it must stay within 50% of the average minimum hourly demand between 6 am and 6 pm.
How long is a connection approval valid?Six months for small self-generators and distributed generators.
Can neighbours or communities share a system?Yes. CREG Resolution 101 072 of 2025 lets energy communities act as collective self-generators below 5 MW within the same retail market and local network, represented by one retailer. Remote self-generation is covered by CREG Resolution 101 099 of 2026.

Connecting a home system.

  1. Check network availability for distributed generation published by the network operator.
  2. Design the installation with a competent person holding a valid professional registration, in line with RETIE.
  3. Submit the connection request through the network operator’s simplified online procedure (systems up to 1 MW).
  4. The network operator reviews the request (15 working days in the simplified procedure) and may visit the site.
  5. Obtain RETIE compliance documents: the declaration of compliance and, where required, an inspection report from an ONAC-accredited body.
  6. Install the bidirectional meter; the retailer represents the export boundary.
  7. Surpluses are settled on the monthly bill as energy credits and, if exports exceed imports, at the spot price.

Law 1715 of 2014 allowed small self-generators to deliver surpluses to the grid. CREG Resolution 174 of 2021 (which replaced Resolution 30 of 2018) sets the technical and commercial rules for systems up to 1 MW and for distributed generators, including a simplified online connection procedure and published network availability.

For a typical home system the key feature is the energy credit: each kWh exported up to the amount imported in the month cancels a kWh bought, apart from the retail charge. Surpluses beyond the household’s own imports are paid at the spot price, which can be high during droughts and low in wet seasons.

Uptake is growing from a low base. The Ministry reported 24,447 rooftop solar systems registered for self-generation and distributed generation by May 2026, with 9,360 new systems registered in 2025.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use (behind the meter)No licence. Systems up to 1 MW follow the AGPE connection procedure with the network operator; larger self-generators follow CREG large-scale rules.Network operator; CREG rulesLaw 142 of 1994 recognises marginal producers who produce for their own use. RETIE compliance is required.
Export surplus electricityPermitted for self-generators after connection approval and installation of a bidirectional meter; the export boundary is represented by a retailer.Network operator; retailer; XMSurplus treatment set by CREG Resolution 174 of 2021 as amended in 2025.
Generate and sell electricity commerciallyMust operate as a public utility company (empresa de servicios públicos, normally a joint-stock company) and register as a market agent with XM. Distributed generators up to 1 MW can sell to the retailer, which must buy their energy.Superservicios; XM; CREGPlants on the interconnected system must meet dispatch and grid code rules.
Store electricityNo specific licence identified for behind-the-meter batteries, which are installations and products subject to RETIE. Grid-scale storage is procured through UPME tenders and energy auctions.MinEnergía (RETIE); UPME; CREGBattery storage entered a long-term energy auction for the first time in July 2026 (hybrid solar plus storage, supply from 2030).
Supply (retail) electricity to customersMust be a public utility company registered as a retailer (comercializador) and market agent with XM.Superservicios; XM; CREGRegulated users are billed with the CREG CU formula whatever the retailer.
Aggregate demand responseUnder the temporary mechanisms, users take part through a demand response representative (Representante RD), which must be a market trading agent; offers must be at least 1 MW.CREG; XMCREG Resolution 101 084 of 2025; a permanent mechanism (draft Resolution 701 115 of 2026) has been consulted on.
Trade in the wholesale marketOnly registered market agents (generators and retailers) trade in the spot market and bilateral contracts.XM (ASIC); CREGNon-regulated users buy through a retailer at freely agreed prices.
Balancing and grid servicesProvided by dispatched generation plants under the CND’s rules; no route was identified for small distributed assets.XM (CND); CREGDemand response is used for energy reductions during supply stress.
Virtual power plant / remote control of household assetsNo specific regime. Collective and remote self-generation are permitted (CREG Resolutions 101 072 of 2025 and 101 099 of 2026), but there is no licence category for aggregating household batteries or inverters for grid services.CREGUse of consumption data needs the user’s consent under Law 1581 of 2012.

Colombian law treats generation, transmission, distribution and retail as separate public-service activities, carried out by public utility companies registered with Superservicios and, to trade, with XM. Households and small businesses that generate mainly for their own use need no licence, only the network operator’s connection approval and a RETIE-compliant installation.

Designers and installers must be competent persons with a valid professional registration (matrícula profesional). Following a Constitutional Court ruling, electrical technicians can no longer design installations on their own.

Flexibility and grid services.

Aggregation of home equipment: Limited

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Demand response in the energy market (temporary mechanisms)Restricted1 MW per daily offerYesXM under CREG rules. CREG Resolution 101 054 of 2024 ran a temporary programme that delivered average reductions of 0.6 GWh a day in October 2024. Resolution 101 084 of 2025 used a similar mechanism during a gas terminal outage in October 2025, with users represented by a trading agent and aggregation allowed.
Permanent demand participation mechanism (proposed)Developing1 MWh per daily offer (draft)YesXM under CREG rules. Draft CREG Resolution 701 115 of 2026 proposes a permanent mechanism with an hourly baseline from 60 days of history, offers through representatives and costs recovered through the restrictions component.
Efficient-use incentive programme (El Niño 2026–2027)Yes—NoRetailers under CREG Resolution 101 120 of 2026. From 1 September 2026, for an initial six months, each regulated user has an individual consumption target; those below 90% can receive incentives when the programme ends, those above 110% pay an extra charge. No sign-up is needed.
Frequency regulation and reservesNo—NoXM (CND). Provided by dispatched generators; no route for small distributed resources was identified.

Colombia has used demand response mainly as an emergency tool when reservoirs are low or gas supply is interrupted. Each mechanism so far has been temporary, with a 1 MW minimum that small users can reach only through a representative that aggregates them.

Households take part more directly in the 2026 efficient-use programme, which applies automatically to regulated users. A permanent wholesale demand response mechanism and the AMI data manager would be needed before household batteries or smart appliances could be paid for flexibility.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
XM demand response mechanismsXM receives demand reduction offers, dispatches them with generation and settles them through the commercial exchange system.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutFramework in place (CREG Resolution 101 001 of 2022); deployment by network operators at an early stage
Reading interval15 minutes (minimum for advanced meters)
RegulationCREG Resolution 101 001 of 2022 (published 10 March 2022)
Who installsThe network operator, which owns the meter; users may also buy their own compliant meter
Technical standardNTC 6079; 15-minute data, 60 days of storage, last-gasp reporting
Data managerGestor Independiente de Datos e Información (GIDI), still being designed
Planning horizonDeployment plans to 31 December 2030

CREG’s 2022 resolution requires network operators to submit AMI deployment plans to 2030, prioritised by cost-benefit analysis by segment, for example where losses, outages or self-generation are high. Advanced meters must record at least 15-minute data, store it for 60 days, report supply interruptions and deliver 94% of each day’s data to the data manager by 8 am the next day.

The GIDI is meant to be an independent body that collects meter data, gives users web and mobile access to their consumption and comparisons, and supports switching retailer. Funding has been the sticking point: Article 56 of the 2021 Energy Transition Law barred companies from passing meter costs to users until the Constitutional Court struck it down in ruling C-186 of 2022. In January 2025 CREG invited studies on AMI costs and deployment models, and in February 2025 it presented a roadmap that includes setting up the GIDI.

Renewable electricity.

Electricity generation mix (2025).

  • Hydro: 69.2%
  • Gas: 13.8%
  • Coal: 6.1%
  • Solar: 5.1%
  • Oil: 3.1%
  • Bioenergy: 2.6%
  • Wind: 0.2%
Source 14
Renewable electricity share
77% (2025)Source 13Share of generation (Ember data via Our World in Data): hydro 69.2%, solar 5.1%, bioenergy 2.6%, wind 0.2%. The share falls in dry years: it was 61.3% in 2024.
Home solar
24,447 rooftop systems (all customer types) (May 2026)Source 51Rooftop solar systems registered for self-generation and distributed generation, according to UPME figures cited by the Ministry; not limited to homes.
Solar added each year
0.334 GW (2025)Source 20333.87 MW of solar added to the interconnected system in 2025 (XM data), 87.8% of new capacity that year.
Hydro
13.2 GW (31 Dec 2025)Source 19Effective net capacity on the interconnected system (XM).
Solar PV
1.73 GW (2025)Source 15IRENA. XM reported 1.594 GW of solar effective net capacity on the interconnected system.
Wind
0.034 GW (2025)Source 16
Thermal (non-renewable)
6.224 GW (31 Dec 2025)Source 19

Targets.

  • The government’s “6 GW Plus” plan for solar and wind; the Ministry reported 3.1 GW incorporated by September 2025, including distributed systems.
  • Colombia Solar: solar systems for households in strata 1–3, funded by redirecting electricity subsidies (Decree 972 of 2025, Resolution 40159 of 2026).
  • Law 1715 of 2014 and Law 2099 of 2021: promotion of non-conventional renewable energy through tax incentives and grid access.

Large hydro supplied 69.2% of generation in 2025. The renewable share therefore swings with rainfall: it was 77.0% in 2025 but 61.3% in the drought year of 2024, when gas and coal plants ran harder.

Solar is now the main source of new capacity. Installed solar rose from about 0.3 GW in 2022 to 1.7 GW in 2025, and UPME data show solar produced 4,473.8 GWh in 2025, more than coal (3,564.2 GWh). At the end of 2025 a further 98 solar projects totalling 1,365.6 MW were in testing. Wind power remains negligible.

New supply has not kept pace with demand growth. In August 2026 XM estimated that expected consumption for 2026–2027 exceeded the firm energy available by 5,468 GWh a year.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Battery storage is at a very early stage. Policy has focused on grid-scale systems procured through UPME tenders and, from 2026, long-term energy auctions that admit hybrid plants with storage.

Behind-the-meter batteries are allowed as part of a RETIE-compliant installation, but there is no specific payment for household storage: its value comes from greater self-consumption, backup during outages and avoiding surcharges under the 2026 efficient-use programme.

Storage projects.

  • Clean energy auction, July 2026: Awarded 390 MWh a day under 15-year contracts starting in 2030, including about 270 MW of solar and about 100 MW of batteries: the first long-term contracting mechanism in Colombia to include hybrid solar plus storage.
  • Battery storage tender for Barranquilla (UPME): UPME’s tender for a battery energy storage system in Barranquilla attracted ten bidders, including Engie, Celsia, ISA, Grupo Energía Bogotá and Canadian Solar.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Enel ColombiaMore than 4 million customers (2026)NoLimitedNoYes
EPM (Empresas Públicas de Medellín)—NoUnknownNoYes
Celsia—UnknownUnknownNoYes
Air-e—NoNoNoYes
Afinia (Caribemar de la Costa)—NoNoNoYes

Households normally buy from the retailer linked to their network operator, so the supplier is effectively determined by location. All retailers bill regulated users with the same CREG formula, and all must accept surplus energy from small self-generators in their area. No single official source of market shares by customer numbers was found; the figure above is from the company.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministerio de Minas y EnergíaGovernmentEnergy policy, technical regulations and Colombia SolarIssues RETIE and runs the Colombia Solar programme.
UPMEGovernmentEnergy planning and incentive certificationCertifies projects for Law 1715 tax incentives and publishes self-generation statistics.
CREGRegulatorEnergy and gas regulatorSets tariffs, self-generation rules, the AMI framework and demand response mechanisms.
Superintendencia de Servicios Públicos DomiciliariosRegulatorUtility supervision and consumer protectionSupervises network operators and retailers and handles consumer rights questions.
XMMarketSystem operator and market administratorPublishes demand, generation, price and capacity data and runs demand response mechanisms.
ISA InterColombiaTransmissionMain transmission ownerRuns most of the national high-voltage network and is developing the Colombia–Panama link.
AsocodisDistributionAssociation of electricity distributors and retailersRepresents network operators on investment, losses and smart metering.
SER ColombiaRenewable EnergyRenewable energy industry associationRepresents solar and wind developers in regulatory debates.
ONACConsumerNational accreditation bodyAccredits the inspection and certification bodies that issue RETIE inspection reports and product certificates.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Electrical installations and productsRETIE (Reglamento Técnico de Instalaciones Eléctricas), Resolution 40117 of 2024Ministerio de Minas y EnergíaMandatory regulation covering installations and products, including solar PV systems, inverters and batteries. Transitional arrangements under the 2013 RETIE ended on 31 December 2025.
Wiring rulesNTC 2050ICONTEC (referenced by RETIE)National electrical code, including provisions for photovoltaic systems.
Grid connection of distributed generationCREG Resolution 174 of 2021CREGConnection procedure, hosting limits, metering and surplus rules for systems up to 1 MW.
Smart metersNTC 6079; CREG Resolution 101 001 of 2022ICONTEC; CREGFunctional requirements for advanced meters.
Installer competenceMatrícula profesional (professional registration), as required by RETIEProfessional councils; RETIEDesigners and builders must be competent persons; technicians may not design autonomously.
Conformity assessmentDeclaración de cumplimiento and dictamen de inspecciónInstaller; ONAC-accredited inspection bodiesThe installer declares compliance and an accredited body inspects where RETIE requires.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Network operator connection approvalYesRegionalRequired for any grid-connected self-generator; simplified CREG 174 procedure up to 1 MW.
RETIE compliance documentsYesNationalDeclaration of compliance and, where required, an inspection report from an accredited body.
Bidirectional meterLimitedRegionalRequired if the system will export surpluses.
Planning or building permitUnknownLocalNo national rule was identified; depends on the municipality and the building.
UPME certificate for tax incentivesLimitedNationalNeeded only to claim Law 1715 tax benefits.

A household solar installation is mainly an electrical and network matter: it needs a RETIE-compliant design and installation and the network operator’s approval to connect.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Law 1715 tax incentivesActiveTax reliefVAT exclusion, customs duty exemption, a special income tax deduction and accelerated depreciation for investment in non-conventional renewable energy and efficient energy management. UPME certification is required; applications are accepted from 1 February to 15 December each year (UPME Resolution 400 of 2026).Since 2014 (amended by Law 2099 of 2021)
Colombia SolarActiveGrantIndividual or collective solar systems for households in strata 1–3, financed by redirecting electricity subsidies, with operation and maintenance arrangements of up to 25 years. The Ministry cites support of up to 60% of project value or COP 20 million per installation.Regulated March 2026
Energy credits for small self-generatorsActiveNet meteringRenewable self-generators up to 100 kW swap surpluses 1:1 against imports in each billing period, paying only the retail component; any excess is paid at the spot price.Current rules: CREG Resolution 174 of 2021
Efficient-use incentive programmeActiveDemand reduction incentiveRegulated users who consume less than 90% of their individual target can receive an incentive when the programme ends; consumption above 110% carries an extra charge.From 1 September 2026, initially six months

Data and connectivity.

Fixed broadband
17.2 fixed subscriptions per 100 people (2024)Source 57DANE’s 2025 survey found 73.9% of households had internet access (fixed or mobile).
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Household connectivity is improving fast: 73.9% of households had internet access in 2025, up 8.3 points on 2024, but only 56.9% in villages and rural areas. Fixed broadband subscriptions are about 17 per 100 people, so mobile networks are the main connection for many homes.

Advanced meters must deliver daily data to the data manager; network operators choose the communications technology in their deployment plans.

Grid conditions.

National peak demand
12.5 GW (7 May 2026)Source 23Record maximum power demand on the interconnected system (XM).
Annual electricity demand
91.6 TWh (2025)Source 18Ember data via Our World in Data.
Generation capacity
21 GW (31 Dec 2025)Source 19Effective net capacity on the interconnected system (XM).
Interconnection
0.45 GW (2026)Source 43Export capacity to Ecuador; Colombian exports suspended from 22 January 2026. A 400 MW link to Panama is planned (source prensalatina-panama).
Curtailment
Not identified from a reliable public source.

The main constraint is firm supply rather than network congestion. In dry El Niño years hydro output falls and the system relies on thermal plants and gas. XM estimated a deficit of 5,468 GWh a year in firm energy for 2026–2027, which led to the 2026 saving programme and to efforts to add solar, storage and imports.

Interconnections are limited. The Ecuador link has been used in both directions but interrupted by politics: Ecuador sold Colombia 313,768 MWh between February and June 2026. Colombia and Panama planned to start building their interconnection in the second half of 2026, and Colombia and Venezuela signed agreements in 2026 to work towards reactivating their links.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Efficient-use incentive programme (CREG Resolution 101 120 of 2026)Current1 September 2026Six-month programme for regulated users during El Niño 2026–2027: individual consumption targets, incentives below 90% and extra charges above 110%. The first period is informative only.
Colombia Solar regulated (Resolution 40159 of 2026)Current19 March 2026Implements Decree 972 of 2025, redirecting part of the subsidy budget to solar systems for strata 1–3.
New RETIE fully in forceCurrent1 January 2026Transitional arrangements for products, installations and inspectors under the 2013 RETIE ended on 31 December 2025 (Resolution 40304 of 2025).
Energy communities and changes to surplus rules (CREG Resolutions 101 072 and 101 087 of 2025)Current2025Allow collective self-generation by energy communities below 5 MW, and change the valuation of excess surpluses to an average contract price once CREG defines its tariff pass-through.
Permanent demand response mechanismUpcomingDraft January 2026Draft CREG Resolution 701 115 of 2026 would create a permanent route for users, through representatives, to sell demand reductions in the wholesale market.
Battery storage in long-term auctionsUpcomingSupply from 2030Contracts awarded in July 2026 for hybrid solar plus storage plants start delivering in 2030.
AMI deployment and independent data manager (GIDI)UpcomingTo 2030CREG is reviewing AMI costs and the GIDI design; deployment plans run to 31 December 2030.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLow24,447 rooftop systems of all customer types registered by May 2026 against about 19 million households, although 9,360 were added in 2025.
Distributed energy marketMediumComplete framework for self-generation up to 1 MW with energy credits, collective and remote self-generation rules (2025–2026) and a government programme for lower-income households.
Grid flexibility marketLowOnly temporary demand response mechanisms with a 1 MW minimum have operated; the permanent mechanism was still a draft in 2026.
Energy storage adoptionLowNo official operating capacity figure; about 100 MW of batteries contracted in July 2026 for delivery from 2030.
Renewable growth environmentMediumSolar capacity grew from 0.31 GW in 2022 to 1.73 GW in 2025, but wind remains negligible and the renewable share depends on hydrology (61% in 2024, 77% in 2025).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 58 sources
  1. Encuesta Nacional de Calidad de Vida (ECV) 2025: boletín técnico. DANE, 2026. accessed 7 October 2026.
  2. Tarifas de energía eléctrica: septiembre de 2026 (pliego tarifario). Enel Colombia, 2026. accessed 7 October 2026.
  3. Tarifas de energía eléctrica: agosto de 2026 (pliego tarifario). Enel Colombia, 2026. accessed 7 October 2026.
  4. Tarifas de energía eléctrica: junio de 2026 (pliego tarifario; series also uses the March, April, May, August and September schedules). Enel Colombia, 2026. accessed 7 October 2026.
  5. Tarifas de energía eléctrica: mayo de 2026 (pliego tarifario). Enel Colombia, 2026. accessed 7 October 2026.
  6. Tarifas de energía eléctrica: abril de 2026 (pliego tarifario). Enel Colombia, 2026. accessed 7 October 2026.
  7. Tarifas de energía eléctrica: marzo de 2026 (pliego tarifario). Enel Colombia, 2026. accessed 7 October 2026.
  8. Subsidio en la factura de energía: cómo funciona y quiénes lo reciben. Noticias RCN, 2026. accessed 7 October 2026.
  9. Subsidios de tarifas eléctricas para hogares con menores ingresos: Decreto 0972 de 2025 del MME. CMS, 2025. accessed 7 October 2026.
  10. Ley 142 de 1994: régimen de los servicios públicos domiciliarios. CRA normative database. accessed 7 October 2026.
  11. Tasa de Cambio Representativa del Mercado (TRM): historical series. Superintendencia Financiera via datos.gov.co, 2026. accessed 7 October 2026.
  12. Euro foreign exchange reference rates: US dollar (USD). European Central Bank, 2026. accessed 7 October 2026.
  13. Share of electricity generated by renewables: Colombia (Ember). Our World in Data, 2025. accessed 7 October 2026.
  14. Share of electricity production by source: Colombia (Ember). Our World in Data, 2025. accessed 7 October 2026.
  15. Installed solar capacity: Colombia (IRENA). Our World in Data, 2025. accessed 7 October 2026.
  16. Installed wind capacity: Colombia (IRENA). Our World in Data, 2025. accessed 7 October 2026.
  17. Per capita electricity demand: Colombia (Ember). Our World in Data, 2025. accessed 7 October 2026.
  18. Electricity demand: Colombia (Ember). Our World in Data, 2025. accessed 7 October 2026.
  19. La demanda de energía eléctrica del SIN creció 2,62% en 2025 frente al año pasado (XM data). La República, 2026. accessed 7 October 2026.
  20. Colombia deploys 333 MW of PV in 2025. pv magazine, 2026. accessed 7 October 2026.
  21. En 2025 la generación de energía solar superó al carbón (UPME data). Radio Nacional de Colombia, 2026. accessed 7 October 2026.
  22. Colombia pasó del 2% al 13,87% en generación de energía con renovables en tres años. Portafolio, 2025. accessed 7 October 2026.
  23. Colombia generó un récord de energía (XM data, August 2026). El Colombiano, 2026. accessed 7 October 2026.
  24. Ember Current: May 2026 newsletter. Ember, 2026. accessed 7 October 2026.
  25. Resolución CREG 174 de 2021: autogeneración a pequeña escala y generación distribuida. CREG, 2021. accessed 7 October 2026.
  26. Concepto CREG 3018 de 2026: liquidación de excedentes de AGPE. CREG, 2026. accessed 7 October 2026.
  27. Concepto CREG 4607 de 2026: generación distribuida, autogeneración colectiva y remota. CREG, 2026. accessed 7 October 2026.
  28. Resolución CREG 101 001 de 2022: infraestructura de medición avanzada (AMI). CREG, 2022. accessed 7 October 2026.
  29. Circular CREG 129 de 2025: estudios sobre implementación de AMI. CREG, 2025. accessed 7 October 2026.
  30. CREG presenta propuesta para el uso de tecnologías inteligentes dentro de la prestación del servicio domiciliario. El Heraldo, 2025. accessed 7 October 2026.
  31. Medidores inteligentes de energía: así se implementarán en Colombia. Valora Analitik, 2023. accessed 7 October 2026.
  32. Cerca de $9 billones invertirán los distribuidores de energía para contadores inteligentes. La FM. accessed 7 October 2026.
  33. Circular CREG 050 de 2009 (definition of NIU). CREG, 2009. accessed 7 October 2026.
  34. Enel Colombia rediseñó la factura de energía. Enel Colombia, 2026. accessed 7 October 2026.
  35. Pasos para pagar la factura de la luz de manera virtual. Alcaldía de Bogotá, 2025. accessed 7 October 2026.
  36. Menos consumo, más beneficios: nuevo programa de ahorro de energía (CREG Resolución 101 120 de 2026). Enel Colombia, 2026. accessed 7 October 2026.
  37. Resolución CREG 131 de 1998: usuarios no regulados. CREG, 1998. accessed 7 October 2026.
  38. Concepto Superservicios 46 de 2026: cambio de comercializador. Superservicios (CREG normative database), 2026. accessed 7 October 2026.
  39. Resolución CREG 078 de 2005 (XM assumes CND, ASIC and LAC functions). CREG, 2005. accessed 7 October 2026.
  40. Superservicios reitera plan para estabilizar a Air-e y garantizar el servicio en el Caribe. La República, 2026. accessed 7 October 2026.
  41. Subasta de energía limpia con baterías de almacenamiento (July 2026). El Colombiano, 2026. accessed 7 October 2026.
  42. Diez empresas compiten en subasta de almacenamiento. Portafolio. accessed 7 October 2026.
  43. Colombia analiza reactivar exportación de electricidad a Ecuador. El Oriente, 2026. accessed 7 October 2026.
  44. Ecuador vende energía eléctrica por millones de dólares a Colombia y Perú. The Logistics World, 2026. accessed 7 October 2026.
  45. Colombia y Panamá definen hoja de ruta para comenzar la interconexión eléctrica en 2026. La Estrella de Panamá, 2026. accessed 7 October 2026.
  46. Panamá y Colombia actualizan proyecto de interconexión eléctrica. Prensa Latina, 2025. accessed 7 October 2026.
  47. Resolución 40117 de 2024: Reglamento Técnico de Instalaciones Eléctricas (RETIE). Ministerio de Minas y Energía (DIAN normograma), 2024. accessed 7 October 2026.
  48. Resolución 40304 de 2025: ampliación de los periodos de transición del RETIE. Ministerio de Minas y Energía (DIAN normograma), 2025. accessed 7 October 2026.
  49. Resolución UPME 400 de 2026: ventana de solicitudes para certificados de incentivos tributarios Ley 1715. Accounter, 2026. accessed 7 October 2026.
  50. Gobierno reglamenta Colombia Solar: hogares de estratos 1, 2 y 3 podrán generar su propia energía y reducir subsidios. Ministerio de Minas y Energía, 2026. accessed 7 October 2026.
  51. Colombia supera los 24.000 techos solares y acelera la democratización de la energía limpia. Ministerio de Minas y Energía, 2026. accessed 7 October 2026.
  52. Resolución CREG 101 054 de 2024: programa transitorio de participación activa de la demanda. CREG, 2024. accessed 7 October 2026.
  53. Resolución CREG 101 084 de 2025: mecanismo transitorio de respuesta de la demanda. CREG, 2025. accessed 7 October 2026.
  54. Proyecto de Resolución CREG 701 115 de 2026: programa permanente de participación de la demanda. CREG, 2026. accessed 7 October 2026.
  55. Celsia: energía para hogares y empresas. Celsia. accessed 7 October 2026.
  56. Urban population (% of total population): Colombia. World Bank, 2025. accessed 7 October 2026.
  57. Fixed broadband subscriptions (per 100 people): Colombia. World Bank, 2024. accessed 7 October 2026.
  58. Access to electricity (% of population): Colombia. World Bank, 2024. accessed 7 October 2026.

Questions about energy in Colombia.