Energy in Gabon, explained.

How electricity works in Gabon: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Gabon: Not yet available.Olmack is not offered in Gabon yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Gabon.

Gabon electricity market 2026: SEEG monopoly supply, regulated national tariffs, Edan prepaid meters, hydro and gas generation and near-universal urban access.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Central African CFA franc (XAF) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Gabon energy at a glance.

Key figures for households in Gabon. Each one links to its source on the full overview below.

  • Electricity price.

    136.86 XAF per kWh for households, including taxes. Figures for Schedule valid from 1 January 2020.

  • Renewable share.

    38% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Gabon.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Gabon below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Gabon requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Gabon.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Gabon, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Gabon, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Gabon.

Full overview

The energy market in Gabon, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Electricity in Gabon is supplied by the Société d’Energie et d’Eau du Gabon (SEEG), a combined water and power utility founded in 1950 that produces, transmits, distributes and sells electricity across its service area. From 1997 SEEG was run under a 20-year concession by the Générale des Eaux group (later Veolia); the government terminated that concession in 2018. Policy is set by the ministry responsible for energy and water resources, and a sector regulator, ARSEE, was established in 2010.

Gabon is a mainly urban country: the World Bank estimates that 92% of its 2.6 million people live in towns, and 95.1% of the population had access to electricity in 2024 — 99% in urban areas but only 51.3% in rural areas. Supply is organised around several separate grids rather than one national network, with the largest systems around Libreville and Franceville and isolated diesel or hybrid plants in smaller towns.

Generation is split between hydropower and fossil fuels. IRENA records 2,398 GWh generated in 2023, 38% from hydro and 62% from fossil-fuelled plants, from roughly 0.7 GW of installed capacity. Since February 2025 a 20 kV cross-border line from Equatorial Guinea has supplied the northern town of Bitam, and the utility is working through a three-year emergency investment plan for 2025–2028.

Energy snapshot.

Headline figures for electricity in Gabon. Each shows its data year and links to its source.

  • Population2,593,130 peopleSource 12025
  • Households665,000 householdsSource 172025 (derived)
  • Average household size3.9 people/householdSource 172019
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (XAF)136.9 XAF/kWhSource 3Schedule valid from 1 January 2020
  • Household price (EUR)0.209 EUR/kWhSource 18Schedule valid from 1 January 2020
  • Renewable electricity share38%Source 22023
  • Solar capacityNot identified from a reliable public source.
  • Wind capacity0 GWSource 22023
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
ARSEE (Agence de Régulation, water and electricity regulator)
System operator
SEEG — operates generation, transmission and dispatch on each of the separate grids
Distribution networks
A single national utility, SEEG, distributes and sells electricity on all public grids
Currency
Central African CFA franc (XAF)
Voltage and frequency
240/410 V low-voltage supply (SEEG); frequency not verified from an official source

Electricity prices in Gabon.

Household price (XAF)
136.9 XAF/kWh (Schedule valid from 1 January 2020)Source 3All-in (TTC) price for a single-phase 6 kW domestic subscription: SEEG energy price 117.36 F/kWh plus 5.93 F/kWh special contribution, 7% municipal levy, 1% solidarity contribution and 10% VAT. Other bands: 55.02 (social 1 kW), 88.91 (social 2 kW), 122.96 (3 kW), 142.47 (9 kW) and 147.14 F/kWh (12 kW). This is the latest schedule SEEG publishes; the World Bank reports a tariff freeze since 2018.
Household price (EUR)
0.209 EUR/kWh (Schedule valid from 1 January 2020)Source 18Converted from XAF 136.86/kWh at the fixed parity of €1 = 655.957 CFA francs (Banque de France, accessed 10 October 2026).
Typical annual electricity bill
Not identified from a reliable public source.

Electricity prices in Gabon are set nationally and are the same in every town served by SEEG, even though the country is supplied by several unconnected grids with different generation costs. SEEG’s published schedule, valid from 1 January 2020, is still the latest posted on its website; according to the World Bank, tariffs have been frozen since 2018.

The bill for a domestic customer is built from the SEEG energy price plus several levies. For the general tariff these are a special contribution of 5.93 F/kWh, a 7% municipal levy, a 1% special solidarity contribution (not charged on the social bands or 3 kW) and VAT at 10%. A typical 6 kW single-phase household therefore pays 136.86 F/kWh all-in, about €0.21 at the fixed euro parity. Service fees such as disconnection or meter replacement carry VAT at 18%.

Social tariff

Households with a 1 kW or 2 kW subscription pay the social rate — 52.40 and 84.68 F/kWh before VAT — up to 120 and 240 kWh a month. New social connections can also be paid with a 25% deposit and the balance in 3, 6 or 12 interest-free monthly instalments, against 50% upfront for a standard connection.

Cost recovery

The World Bank reports that SEEG recorded a net loss of US$21.6 million in 2022, attributing it to declining operational performance, chronic under-investment and the tariff freeze. Its shareholders approved the delayed 2019–2023 accounts in December 2025.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesA single national low-voltage tariff schedule applies across Gabon. Single-phase domestic customers choose a subscribed power of 3, 6, 9 or 12 kW (up to 15 kW), and the price per kWh rises with the subscribed power: from 122.96 F/kWh all-in at 3 kW to 147.14 F/kWh at 12 kW. There is no monthly fixed charge for these bands.
OtherYesSocial tariff: 1 kW (S1) and 2 kW (S2) subscriptions priced at 55.02 and 88.91 F/kWh all-in, with consumption limits of 120 and 240 kWh a month respectively. The special 5.93 F/kWh contribution and the solidarity contribution do not apply.
PrepaymentYesSEEG offers Edan prepaid meters. Prepaid customers are not subject to meter readings; changes to subscribed power are applied by the agency in the credit management system and loaded into the meter by code.
Time-of-useLimitedPeak and off-peak energy prices exist only for medium- and high-voltage customers. Three-phase low-voltage customers above 18 kW pay a fixed charge per kW plus an energy price that depends on annual hours of use, but no time-of-day tariff for households was identified.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
Not identified from a reliable public source.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
1.7 % of homes (2019)Source 17Households cooking mainly with electricity, Demographic and Health Survey.

Most Gabonese homes are connected: the Demographic and Health Survey found 92.7% of households had electricity in 2019, and the World Bank puts access at 95.1% of the population in 2024. The gap is rural — 51.3% access outside towns against 99% in urban areas.

Electricity is used mainly for lighting, appliances and cooling; only 1.7% of households cook mainly with electricity (2019). The social tariff’s monthly limits of 120 and 240 kWh give an idea of what SEEG treats as modest household use.

Supply quality varies by grid. The Bongolo hydro plant, which supplies towns in the south such as Lambaréné, Mouila and Tchibanga, was flooded in November 2023 and only began returning to service in May 2026 after about 11 billion CFA francs of rehabilitation.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
92.1 % of population (2025)Source 1World Bank estimate.

Gabon is one of the most urbanised countries in Africa: the World Bank estimates that 92% of the population lives in urban areas, concentrated in Libreville and its surroundings, Port-Gentil and Franceville. Average household size was 3.9 people in the 2019 Demographic and Health Survey.

Detailed housing tables — tenure, dwelling type and dwelling counts — could not be accessed from the Direction Générale de la Statistique, so those figures are left blank.

How the grid works in Gabon.

  1. TransmissionSociété d’Energie et d’Eau du Gabon (SEEG)
  2. DistributionA single national utility, SEEG, distributes and sells electricity on all public grids
  3. MeteringSEEG
  4. Supply1 or more retail suppliers

Physical flow

IRENA records 2,398 GWh generated in 2023: 1,486 GWh from fossil fuels (62%), 912 GWh from hydropower (38%) and 1 GWh from solar. SEEG operates five hydro plants — Kinguélé, Tchimbélé, Poubara, Bongolo and Médouneu — and thermal plants running on diesel and gas. The Société de Patrimoine manages the Alenakiri and Cap Lopez thermal power stations and sells their output to SEEG.

The World Bank describes a system of four non-interconnected grids, plus isolated localities supplied by SEEG’s off-grid plants. Power is distributed at 30, 20 or 5.5 kV and delivered to homes at 240/410 V. Since 25 February 2025 a 20 kV line from Ebebiyin in Equatorial Guinea has supplied Bitam, raised from 2 MW to 5 MW in February 2026 with a contractual ceiling of 8 MW.

Commercial flow

SEEG generates most of its own power and buys from the Société de Patrimoine’s thermal plants and the cross-border link, then sells to all grid customers at nationally uniform regulated prices. There is no wholesale market or retail competition.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Hydraulic ResourcesSets policy for electricity and water and oversees structural investment. Co-implements the World Bank’s Access to Basic Services and Performance Improvement Project (PASBAP).
RegulatorARSEE (Agence de Régulation, water and electricity regulator)Sector regulator established in 2010. The World Bank has described its effective role as limited relative to its legal mandate. Its website could not be reached for this profile.
TSOSociété d’Energie et d’Eau du Gabon (SEEG)Responsible for operating, maintaining and replacing generation, transmission and distribution infrastructure in its service area. Runs high-voltage networks around Libreville (90 kV and above) and Franceville (63 kV) and dispatches each grid.
DSOSEEGDistributes at 30 kV, 20 kV or 5.5 kV and supplies customers at low voltage. In 2016 it reported 316,168 electricity subscriptions, 5,123 km of network and 57 localities served.
SupplierSEEGSole retail supplier on public grids, selling at a single national tariff schedule.
MeteringSEEGInstalls and replaces meters (single-phase and three-phase, conventional and Edan prepaid) and reads conventional meters for monthly billing.

Compared with the UK system.

Compared with the UK system.
UK conceptGabon equivalentHow it works
DNOSEEGThere are no regional network companies. SEEG builds, owns or operates and maintains the medium- and low-voltage networks in every town it serves and connects new customers.
National Grid/NESOSEEG (on each separate grid)Gabon has no single national transmission grid. SEEG operates several unconnected systems — the largest around Libreville and Franceville — and balances generation and demand on each.
MPANSEEG subscription (abonnement) and meter numberA connection is identified by the subscription contract SEEG opens and the meter it installs. No public specification of the number format was identified.
MPRNNo equivalent identifiedNo piped natural-gas distribution to households and no gas supply-point register were identified.
Meter operatorSEEGThe utility supplies, installs, checks and replaces meters; there is no separate metering market.
SupplierSEEGThere is no retail competition. All grid customers buy from SEEG under the national tariff schedule.
Smart-meter infrastructureEdan prepaid metersSEEG’s Edan prepaid meters are credited with codes and configured remotely through the agency’s credit management system. There is no national smart-meter data hub.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?SEEG subscription (abonnement) and meter number
Who issues it?SEEG, when the subscription contract is signed and the meter installed
FormatNot published. SEEG does not document the structure of its contract, customer or meter numbers on its website.
LengthNot verified
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the meter and on SEEG’s monthly bills, which show the account details and consumption period; prepaid customers use the Edan meter details.
Electronic accessSEEG runs an online agency (webagence) for customers; the identifier it uses to log in is not documented on the public pages.
Third-party accessNo framework for third-party access to metering or customer data was identified.
Who keeps the registerSEEG’s customer and metering records
Register scopeNational

In Gabon a household connection is administered entirely by SEEG. To apply, a customer goes to an SEEG agency with a copy of an identity document and the number of the nearest electricity pole. The premises must first be prepared: an earth connection, a fuse box or circuit breaker, wiring ready to be connected after the meter and a finished wall where the meter will go. A power assessment is carried out at the agency.

SEEG then prepares an estimate covering cable, trenching and fittings within 15 working days; it is valid for two months but may change because tariffs and connection prices are revised quarterly. Supply is switched on within 15 working days of signing the contract and paying. The subscription specifies the subscribed power (for example 3, 6, 9 or 12 kW single-phase), which determines the tariff band.

Each connection is then identified by its subscription and meter. Conventional customers receive a monthly bill on a fixed date and have 15 days to pay. Customers with an Edan prepaid meter are not read; when they change subscribed power, the agency updates the credit management system and a code loads the new setting into the meter.

Because SEEG is the only distributor and supplier, its customer database is in practice the national register of supply points. A change of account holder is handled at an agency with an authorisation form, a current identity document and a zero balance on the account. SEEG does not publish the format or length of its account or meter numbers, so no example is shown here.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Unknown
Net meteringNo
Net billingNo
How exported electricity is paidNot identified. SEEG’s published tariff schedule contains no export, net-metering or feed-in tariff for small producers.
Can households sell solar power to the grid?No household export, net-metering or feed-in arrangement appears in SEEG’s tariff schedule or customer information, and the regulator’s website could not be reached.

Connecting a home system.

  1. No published procedure for connecting and exporting from a household solar system was identified; contact SEEG and ARSEE.

Accessible official sources describe no scheme that lets households export surplus solar power to SEEG’s grids or be credited for it. Solar produced only 1 GWh in 2023 according to IRENA, although 11 MW of solar capacity was added in 2024.

Rooftop solar in homes is therefore used for self-consumption, typically behind the SEEG meter or as back-up. Anyone planning a grid-tied system should confirm current requirements with SEEG and ARSEE.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for sale to the gridAuthorisation from the State; thresholds and exemptions not verifiedMinistry of Energy and Hydraulic Resources; ARSEEThe Société de Patrimoine’s thermal plants sell to SEEG. Regulatory texts could not be accessed.
Generate for own use (rooftop solar)No published threshold or exemption identifiedARSEE; SEEG (if grid-connected)Confirm requirements with the regulator.
Export / sell surplus to the gridNo household export regime identifiedARSEE; SEEGNo net-metering or feed-in tariff in the published schedule.
Transmit and dispatch electricityCarried out by SEEG on each gridGovernment of Gabon; ARSEEThe Veolia concession was terminated by the government in 2018.
Distribute and supply on public gridsCarried out by SEEGGovernment of Gabon; ARSEENo retail competition; single national tariff.
Cross-border importOperating agreement between utilitiesSEEG and SEGESA (Equatorial Guinea)Network operating agreement signed 20 March 2025 for the Ebebiyin–Bitam link.
Store electricityNo specific storage licensing regime identified—Not addressed in the sources consulted.
Aggregate, trade, wholesale, balancing, grid services, VPP, remote control of assetsNo regime identified—There is no organised wholesale or flexibility market in which these activities exist.

ARSEE has regulated the water and electricity sectors since 2010, but its rules and licensing texts could not be accessed for this profile, so licence thresholds and exemptions for small generators are not stated here.

In practice the sector is run by state bodies: SEEG for generation, transmission, distribution and supply; the Société de Patrimoine for certain thermal plants whose output it sells to SEEG; and the Conseil National de l’Eau et de l’Electricité for public lighting and similar public services. There are no licences for supply competition, aggregation, trading or flexibility services because those markets do not exist.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Energy, balancing and ancillary servicesNo—NoSEEG. Each grid is balanced by SEEG. No market for distributed resources, demand response or aggregation was identified.

Gabon has no wholesale electricity market and no flexibility or demand-response market open to distributed resources. The only demand-side signal in the tariff is for larger customers, whose energy price depends on annual hours of use and, at medium and high voltage, on peak or off-peak periods.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo national smart-meter programme; SEEG runs Edan prepaid meters alongside conventional monthly-billed meters
Reading intervalNot published
Meter supplySEEG
Prepaid systemEdan prepaid meters
Conventional billingMonthly, payable within 15 days
Meter replacement after fraud (single-phase)34,178 F CFA before VAT (2020 schedule)
Smart-meter shareNot published

SEEG offers two metering arrangements: conventional meters read for a monthly bill, and Edan prepaid meters that customers credit in advance. Edan meters are configured through a credit management system — a change in subscribed power is sent to the meter as a code — but SEEG publishes no figures on how many are installed or whether they communicate remotely.

Renewable electricity.

Electricity generation mix (2023).

  • Fossil fuels: 62%
  • Hydro: 38%
Source 2
Renewable electricity share
38% (2023)Source 2Share of generation: 913 GWh renewable (912 GWh hydro, 1 GWh solar) out of 2,398 GWh (IRENA). Imports are negligible.
Home solar
Not identified from a reliable public source.
Solar added each year
11 MW (2024)Source 2
Total installed (all sources)
0.7 GW (2024)Source 2Rounded value shown in IRENA’s capacity chart; renewables about 47% of capacity, 96% of which is hydro.
Solar (net additions in 2024)
11 MW (2024)Source 2
Wind
0 MW (2024)Source 2

Targets.

  • No current, officially published renewable electricity target could be verified from accessible government sources.

Hydropower is Gabon’s main renewable source. In 2023 it produced 912 GWh of the 2,398 GWh generated (38%), according to IRENA, with the rest from gas- and oil-fired plants. The hydro share has fallen since 2018 as thermal output grew; in 2019 IRENA records 103 MW of fossil and 147 MW of renewable capacity added.

Solar is just beginning: 11 MW was added in 2024. At village scale, a World Bank project completed five hybrid solar–diesel mini-grids (0.35 MW in total) serving 307 households, and the follow-on PASBAP project plans hybrid solar–thermal plants in 21 villages across all nine provinces.

Across total energy supply, renewables were 51% in 2022, but 93% of that is bioenergy (mainly wood) rather than electricity.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

No official statistics on battery storage were identified, and accessible sources contain no specific licensing or market rules for storage. Batteries are used in hybrid solar–diesel mini-grids serving isolated villages, but capacities were not published.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Société d’Energie et d’Eau du Gabon (SEEG)Sole supplier on public gridsNoLimitedNoNo

SEEG is the only electricity supplier for customers on Gabon’s public grids. It sells to domestic, commercial and industrial customers under one national schedule, with peak and off-peak pricing only for medium- and high-voltage customers.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Société d’Energie et d’Eau du Gabon (SEEG)DistributionNational water and electricity utilityGenerates, transmits, distributes and sells electricity, and connects and meters customers.
ARSEE (Agence de Régulation, water and electricity regulator)RegulatorWater and electricity regulatorSector regulator established in 2010.
Ministry of Energy and Hydraulic ResourcesGovernmentEnergy and water ministrySets policy and oversees structural investment in power and water.
Société de PatrimoineGovernmentState asset-holding company for the sectorManages the Alenakiri and Cap Lopez thermal power plants and sells their output to SEEG.
Direction Générale de la StatistiqueGovernmentNational statistics officePublishes national statistics including census and price data.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Domestic installation before connectionSEEG connection prerequisitesSEEGEarthing, a fuse box or circuit breaker and wiring ready for connection after the meter are required before SEEG connects a home.
Grid connection (inverter / interconnection technical rules)No published grid code for small generators identified—Not found in accessible official sources.
Installer accreditationNo national scheme identified—No certification scheme for solar installers was verified.

Permissions.

Permissions.
PermissionRequiredLevelDetail
SEEG connection application and estimateYesNationalIdentity document and nearest pole number at an SEEG agency; estimate within 15 working days, connection within 15 working days of payment.
Regulator approval for grid-connected generationUnknownNationalRules for small generators could not be verified.
Planning permissionUnknownLocalNo national rule on planning consent for rooftop solar was identified.

For a household the administrative relationship is with SEEG, which handles applications, estimates, connection, metering and billing. Requirements for connecting private generation to SEEG’s grids were not identified in accessible official sources.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Social electricity tariffActiveSocial tariffReduced price per kWh for 1 kW and 2 kW subscriptions (55.02 and 88.91 F/kWh all-in) up to 120 and 240 kWh a month, and connection payable with a 25% deposit and interest-free instalments.—

Data and connectivity.

Fixed broadband
68.7 % of population using the internet (2024)Source 1Share of individuals using the internet (ITU via World Bank), not fixed-broadband coverage.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

About two-thirds of the population used the internet in 2024, according to World Bank data. No information was identified on the communication technology used by SEEG’s Edan prepaid meters.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
Not identified from a reliable public source.
Generation capacity
0.7 GW (2024)Source 2Rounded value shown in IRENA’s installed-capacity chart.
Interconnection
0.008 GW (2026)Source 10Contractual ceiling of 8 MW on the 20 kV Ebebiyin (Equatorial Guinea) – Bitam line; 5 MW delivered from February 2026.
Curtailment
Not identified from a reliable public source.

Gabon’s grid is fragmented: the World Bank describes four non-interconnected networks, with the remaining localities supplied by isolated SEEG plants. IRENA estimates that thermal plants ran at 44% of capacity in 2023, hydro at 33% and solar at 16%.

Reliability problems are linked to ageing assets and under-investment. The Bongolo hydro plant was out of service for about three years after flooding in November 2023, and SEEG is implementing a three-year emergency plan for 2025–2028. The World Bank’s PASBAP project (US$150 million) is intended to extend about 633 km of medium- and low-voltage lines and reduce SEEG’s technical and commercial losses.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Emergency investment plan for energy and waterCurrent2025–2028Three-year emergency plan under the strategic investment plan to restore the power and water sector, announced by SEEG in April 2025.
Gabon – Equatorial Guinea interconnectionCurrentIn service 25 February 2025; 5 MW from 9 February 202620 kV link from Ebebiyin to Bitam with a contractual ceiling of 8 MW; later phases are planned to extend supply to Oyem, Medzeng and Médouneu.
Access to Basic Services and Performance Improvement Project (PASBAP)UpcomingWorld Bank financing documents from 2024US$150 million IBRD-financed project to increase access to electricity, water and sanitation, extend about 633 km of distribution lines, build hybrid solar–thermal plants in 21 villages and reduce SEEG’s losses.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo official residential solar statistics and no household export or net-metering scheme identified; solar was 1 GWh of 2,398 GWh generated in 2023 (IRENA).
Distributed energy marketLowNo published framework for distributed generation on SEEG’s grids; distributed renewables are limited to small village hybrid mini-grids.
Grid flexibility marketLowNo wholesale or flexibility market; SEEG is the sole operator and supplier on several unconnected grids.
Energy storage adoptionLowNo official statistics or regulatory framework for battery storage identified.
Renewable growth environmentLowIRENA records only 0.4 MW of renewable additions between 2020 and 2023 and 11 MW of solar in 2024; the renewable share of generation fell to 38% in 2023.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 18 sources
  1. World Development Indicators: population, urban population, access to electricity, internet users — Gabon. World Bank, 2025. accessed 10 October 2026.
  2. Energy Profile: Gabon. IRENA, 2025. accessed 10 October 2026.
  3. Tarifs des fournitures d’électricité BT et d’eau applicables sur l’ensemble du Gabon. SEEG, 2020. accessed 10 October 2026.
  4. Barème des prix de l’énergie électrique et de l’eau potable (valable à compter du 01/01/2020). SEEG, 2020. accessed 10 October 2026.
  5. Tarifs. SEEG. accessed 10 October 2026.
  6. FAQ. SEEG. accessed 10 October 2026.
  7. Gestion de l’électricité. SEEG. accessed 10 October 2026.
  8. Historique. SEEG. accessed 10 October 2026.
  9. Interconnexion électrique Gabon – Guinée Equatoriale : signature de la convention d’exploitation des réseaux électriques. SEEG, 2025. accessed 10 October 2026.
  10. Interconnexion électrique Guinée Equatoriale – Gabon : mise au point et démenti de la SEEG. SEEG, 2026. accessed 10 October 2026.
  11. Remise en service progressive de l’usine hydroélectrique de Bongolo. SEEG, 2026. accessed 10 October 2026.
  12. Plan Stratégique d’Investissement de relance du secteur de l’énergie et de l’eau potable. SEEG, 2025. accessed 10 October 2026.
  13. L’Assemblée Générale Ordinaire des Actionnaires approuve les comptes de 2019 à 2023. SEEG, 2026. accessed 10 October 2026.
  14. Implementation Completion and Results Report — Access to Basic Services in Rural Areas and Capacity Building Project (P144135). World Bank, 2024. accessed 10 October 2026.
  15. Access to Basic Services and Performance Improvement Project (P179643) — project record. World Bank. accessed 10 October 2026.
  16. Concept Environmental and Social Review Summary — Access to Basic Services and Performance Improvement Project (P179643). World Bank, 2023. accessed 10 October 2026.
  17. Gabon Demographic and Health Survey 2019–21: households with electricity, cooking with electricity, mean household size. The DHS Program (ICF), 2019. accessed 10 October 2026.
  18. Partenariats Afrique-France (zone franc). Banque de France. accessed 10 October 2026.

Questions about energy in Gabon.

Talk to us about Olmack in Gabon.Tell us about your home, housing portfolio or school estate in Gabon. We'll explain what is possible there now.