Energy in Cameroon, explained.

How electricity works in Cameroon: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Cameroon: Not yet available.Olmack is not offered in Cameroon yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Cameroon.

Cameroon electricity market 2026: ARSEL tariffs frozen since 2012, SOCADEL (ex-Eneo), SONATREL, prepaid meters, hydro-led mix, licensing and reforms.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Central African CFA franc (XAF) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Cameroon energy at a glance.

Key figures for households in Cameroon. Each one links to its source on the full overview below.

  • Electricity price.

    50 XAF per kWh for households, including taxes. Figures for 2026.

  • Renewable share.

    77% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Cameroon.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Cameroon below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Cameroon requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Cameroon.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Cameroon, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Cameroon, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Cameroon.

Full overview

The energy market in Cameroon, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Cameroon’s power sector was reformed under Law 2011/022 of 14 December 2011 governing the electricity sector. Generation is shared between the main public-service utility, the water-storage company EDC and three independent power producers (Dibamba Power Development Company, Kribi Power Development Company and Nachtigal Hydro Power Company). Transmission and system operation were separated in 2018 and are run by the state-owned Société Nationale de Transport de l’Électricité (SONATREL). The Agence de Régulation du Secteur de l’Électricité (ARSEL) regulates tariffs, processes licence applications and monitors operators on behalf of the state.

Distribution and retail sales were run by Eneo Cameroon, a private concession holder, from 2014. After the state took back Eneo’s activities, a presidential decree of 4 May 2026 converted the company into a publicly owned company, the Société Camerounaise d’Électricité (SOCADEL), with share capital of 43.9 billion FCFA. SOCADEL collects revenue from customers and passes it on to producers and the transmission company.

The system is dominated by hydropower: renewables, almost all of it hydro, supplied about 77% of electricity generated in 2023. Household prices are set by an ARSEL tariff grid that has not changed since 1 June 2012. The first block of up to 110 kWh a month costs 50 FCFA/kWh and is exempt from VAT. Since November 2024 the same grid has applied to prepaid customers. There is no net-metering or feed-in scheme for households yet, but the national Energy Compact commits to piloting one.

Energy snapshot.

Headline figures for electricity in Cameroon. Each shows its data year and links to its source.

  • Population29,879,337 peopleSource 272025
  • HouseholdsNot identified from a reliable public source.
  • Average household size5 people/householdSource 332018
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (XAF)50 XAF/kWhSource 22026
  • Household price (EUR)0.076 EUR/kWhSource 342026
  • Renewable electricity share77%Source 12023
  • Solar capacity0.063 GWSource 12024
  • Wind capacity0 GWSource 12024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
Agence de Régulation du Secteur de l’Électricité (ARSEL)
System operator
SONATREL (Société Nationale de Transport de l’Électricité), transmission owner and grid operator
Distribution networks
A single public distributor and retailer, SOCADEL (formerly Eneo Cameroon), for the whole national grid; small isolated systems and rural mini-grids under separate titles
Currency
Central African CFA franc (XAF)
Voltage and frequency
220 V / 50 Hz

Electricity prices in Cameroon.

Household price (XAF)
50 XAF/kWh (2026)Source 2Price for the first residential block (up to 110 kWh a month) under ARSEL Decision 0096/ARSEL/DG/DCEC/SDCT of 28 May 2012, still in force in 2026. Consumption up to 110 kWh a month is not subject to VAT (Law 98/009 of 1 July 1998). Higher blocks cost 79, 94 and 99 FCFA/kWh before VAT.
Household price (EUR)
0.076 EUR/kWh (2026)Source 34Converted from 50 FCFA/kWh at the fixed parity of 655.957 FCFA per euro (BEAC, unchanged since 1 January 1999; checked 9 October 2026). First residential block, VAT-exempt.
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (XAF per kWh).Source 2

5050.55020122016202020242026
Cameroon household electricity price, XAF per kWh
201250 XAF/kWh
201650 XAF/kWh
202050 XAF/kWh
202450 XAF/kWh
202650 XAF/kWh

Retail electricity prices in Cameroon are set by ARSEL. The residential grid has been frozen since June 2012. The national Energy Compact names this freeze as one cause of the sector’s structural financial imbalance. The state covers part of the gap through a tariff compensation paid to the distributor: ARSEL put total compensation at 68.59 billion FCFA in 2024. The average tariff for medium- and low-voltage customers combined was 81.58 FCFA/kWh.

Rising block tariff

Households pay by monthly consumption block. The first 110 kWh is the social block at 50 FCFA/kWh. Under Law 98/009 of 1 July 1998, consumption of 110 kWh a month or less is not subject to VAT. Customers using more pay 79 FCFA/kWh and higher block prices, plus VAT. Public lighting has its own rate of 66 FCFA/kWh.

Prepaid alignment

When Eneo introduced prepayment, it applied provisional prepaid rates that differed from the 2012 grid. ARSEL found that this had brought in 4.65 billion FCFA too much in 2024, and deducted the sum from Eneo’s maximum allowed revenue. In October 2024 ARSEL ordered the two systems to be aligned. From 1 November 2024, prepaid and postpaid households pay the same 2012 prices, and each prepaid customer is placed in a block according to their average consumption.

Connection and deposit costs

A new household pays a connection charge and a consumption deposit (avance sur consommation), refundable when the contract ends. Excluding tax, Eneo’s published charges are 29,559 FCFA for a low-cost single-phase installation and 47,934 FCFA for a first-class single-phase installation. Deposits are 5,300 FCFA for a 5 A supply and 9,290 FCFA for 10 A. Extra cable and poles cost more.

Outlook

The Energy Compact commits the government to finalising a tariff model, then drafting and validating a tariff policy by the end of 2027. It also aims to cut the tariff compensation by 6% a year and to bill medium-voltage customers at cost of service from 2026.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesResidential low-voltage grid from 1 June 2012 (ARSEL Decision 0096 of 28 May 2012): 50 FCFA/kWh up to 110 kWh a month; 79 FCFA/kWh for 111–400 kWh; 94 FCFA/kWh for 401–800 kWh; 99 FCFA/kWh for 801–2,000 kWh. Meter and circuit-breaker maintenance and renewal charges were abolished.
PrepaymentYesPrepaid customers have paid the same 2012 grid since 1 November 2024. Each prepaid customer is placed in a tariff category based on average consumption over the previous six months. The minimum purchase is 1,000 FCFA, which buys 20 kWh in the 50 FCFA band.
Time-of-useNoNo time-of-use tariff is offered to households. Medium-voltage customers have separate ARSEL tariff tables with a capacity charge.
DynamicNoThere is no wholesale-linked or dynamic retail tariff.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
202 kWh/person/yr (2024)Source 30World Bank electric power consumption per capita (202.3 kWh), all sectors.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
0.8 % of homes (2018)Source 33Households cooking mainly with electricity. Wood (61.9%) and LPG/natural gas/biogas (25.8%) dominate.

Average electricity use is low. The World Bank puts consumption per person at about 202 kWh a year in 2024, all sectors. In the 2018 Demographic and Health Survey, 62.2% of households had electricity. Electric cooking was almost absent (0.8%), and 61.9% of households cooked mainly with wood.

Access has grown since then. World Bank data show 72% of the population with access in 2024: 95.6% in towns but 42.7% in rural areas. The Energy Compact gives 74% for 2025 and aims for universal access by 2030, connecting about 8 million more people.

Demand is constrained by supply and network problems more than by appliance ownership. In January 2026 the minister described a water deficit of 3 billion m³ and saturated transmission on the Edéa–Douala axis. The Compact plans for demand growth of about 6% a year and notes significant unmet (latent) demand. No reliable national figures were identified for air-conditioner ownership, electric vehicles or heat pumps.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
55.7 % of population (2025)Source 29

About 55.7% of Cameroonians lived in towns and cities in 2025, according to World Bank estimates. Douala and Yaoundé are the largest load centres on the southern grid. The average household had 5.0 members in the 2018 Demographic and Health Survey.

Housing data matter for metering because supply contracts are personal. A household that moves must end its contract, have its meter read and removed, and take out a new subscription at the new address. For a subscription on an existing connection, the distributor asks for a hand-drawn site plan, ID and, where the previous occupant left unpaid bills, a lease registered with the tax office.

When a new customer connects to a network extension paid for by an earlier customer, they must pay that customer a share of its cost (the “participation” or consequential right). The amount falls by 20% for each year since the extension was paid for, reaching zero after five years.

How the grid works in Cameroon.

  1. TransmissionSociété Nationale de Transport de l’Électricité (SONATREL)
  2. DistributionA single public distributor and retailer, SOCADEL (formerly Eneo Cameroon), for the whole national grid; small isolated systems and rural mini-grids under separate titles
  3. MeteringSOCADEL
  4. Supply1 or more retail suppliers

ARSEL put installed capacity at 1,994 MW in 2024: 1,409.69 MW hydro, 563.36 MW thermal, 15 MW solar and 6.36 MW solar–thermal hybrids. The largest plants on the southern grid are Nachtigal (420 MW), Song Loulou (384 MW), Edéa (276 MW), Memve’ele (210.8 MW) and the Kribi gas plant (216 MW). The Energy Compact gives 2,011 MW for 2025. The three independent power producers account for 722.97 MW, about 36% of capacity.

Two separate grids

The Southern Interconnected Grid (RIS) covers seven regions, including the Centre, Littoral and West, and carries most demand. It was joined to the former Eastern grid on 19 November 2022. In 2024 ARSEL listed 1,921 km of 225 kV and 1,097 km of 90 kV lines on the RIS. The Northern Interconnected Grid (RIN) serves Adamaoua, North and Far North from the 72 MW Lagdo dam, thermal plants and the 15 MW Guider solar plant over 338 km of 110 kV and about 200 km of 90 kV lines. ARSEL expected Lagdo to cover 71% of RIN demand in 2025, with 15% from thermal plants and 14% from solar. Isolated diesel and hybrid plants supply towns off both grids.

Commercial flow

The distributor buys power from the IPPs and EDC, adds its own generation, pays SONATREL’s transmission tariff and sells to customers at ARSEL tariffs. At the time of renationalisation, monthly revenue was about 30 billion FCFA against costs of 42–44 billion FCFA, a deficit of about 13 billion FCFA a month. By October 2026 monthly collections had risen to 32 billion FCFA, but bills from NHPC, Globeleq and SONATREL were still not being paid in full.

Losses and reliability

ARSEL measured transmission efficiency at 95% and distribution efficiency at only 71.52% in 2024, which means large technical and commercial losses. Outages and load shedding remain common. The government blames low rainfall, congested transmission towards Douala and an ageing network with about 1.5 million wooden poles, of which 50,000 are being replaced with concrete. A 400 kV Nyom 2–Nkolkoumou–Béon line (1,500 MW transfer capacity), part of a second corridor to carry Nachtigal’s output towards Douala, had a completion deadline of November 2026.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistère de l’Eau et de l’Énergie (MINEE)Sets energy policy, grants concessions and licences after ARSEL has examined the application, and drives the 2026 restructuring of the distributor and the Energy Compact reforms.
RegulatorAgence de Régulation du Secteur de l’Électricité (ARSEL)Sets tariffs and the maximum allowed revenue of SONATREL and the distributor, processes applications for concessions, licences, authorisations and declarations, issues authorisations and receives declarations directly, and monitors quality of service and fraud cases.
TSOSociété Nationale de Transport de l’Électricité (SONATREL)Public company created by Decree 2015/0455, holding a 99-year concession from 2019 for transmission and transmission-grid management (GRT). Runs the 225 kV, 110 kV and 90 kV networks and dispatch on the southern and northern interconnected grids. Its maximum allowed revenue in 2024 was 49.3 billion FCFA, about 7.13 FCFA/kWh.
DSOSOCADEL (Société Camerounaise d’Électricité, formerly Eneo Cameroon)Publicly owned company formed by decrees of 4 May 2026 from Eneo. It distributes and sells electricity nationwide, owns thermal and older hydro plants, and collects all customer revenue before paying producers and SONATREL. ARSEL counted 2,191,195 low-voltage customers in 2024.
SupplierSOCADELSole retailer for households, which cannot choose another supplier. Licences for sales at very high, high and medium voltage exist for large customers.
MeteringSOCADELOwns, installs and reads all customer meters, including prepaid meters, which remain its property. There is no independent meter operator.

Compared with the UK system.

Compared with the UK system.
UK conceptCameroon equivalentHow it works
DNOSOCADEL (formerly Eneo)One company owns and runs the low- and medium-voltage distribution network for the whole national grid, connects customers, meters, bills and collects payment. Network and retail are not separated.
National Grid/NESOSONATRELSONATREL combines transmission ownership and system operation (GRT) under one concession. The country is split into a Southern Interconnected Grid (RIS) and a Northern Interconnected Grid (RIN), which a 515 km, 225 kV line due in 2028 is planned to join.
MPANContract (subscriber) number / prepaid meter numberThere is no national supply-point number. Postpaid customers are identified by the distributor’s contract number, which starts with 20, and each bill has its own reference number. Prepaid customers buy credit using the meter number. Both exist only in the distributor’s own customer system.
MPRNNo equivalentThere is no piped household gas network. Households that cook with gas use bottled LPG.
Meter operatorSOCADELThe distributor supplies and owns both postpaid and prepaid meters. Customers cannot appoint their own meter operator.
SupplierSOCADEL (no choice)Households buy from the single distributor at ARSEL’s regulated tariff. Only high- and medium-voltage sales are open to other licence holders.
Smart-meter infrastructureSTS prepaid vending plus a first communicating-meter programmeInstead of a national smart-metering data network, the distributor runs a prepaid STS token system sold through mobile money. A World Bank-backed reform programme delivered its first 16,000 communicating meters in September 2026, starting with state-owned premises.

How a supply point is identified.

200123456 (fictional contract number; the length is for illustration only)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Contract number (numéro de contrat) / prepaid meter number (N° de contrat)
Who issues it?The distributor (SOCADEL, formerly Eneo) issues a contract number when a customer subscribes. Prepaid meter numbers come with the STS meter and are registered by the distributor when it installs the meter.
FormatPostpaid contract numbers begin with “20”. Each bill has its own reference, made up of a policy number followed by the year and month (shown by Eneo as XXXXXX14XX). Prepaid meters follow the Standard Transfer Specification (STS). The meter number appears on the customer interface unit (code 804) and is used to buy 20-digit tokens. The full length of contract and meter numbers is not published.
LengthNot published (contract numbers start with 20; prepaid tokens are 20 digits)
Stays with the property when you switch supplier?No
Where to find itUnder the customer’s name on the bill (“Contract No.”). The bill reference is in the top right-hand corner. Prepaid customers can show their meter number by typing 804 on the in-home customer interface unit.
Electronic accessBills can be paid and prepaid tokens bought through MTN Mobile Money, Orange Money, Smobilpay agents, banks and the MyEasyLight online agency, using the contract number, bill reference or meter number. Tokens arrive by SMS.
Third-party accessAnyone who knows a contract number or meter number can pay a bill or buy credit for it. There is no regulated framework giving third parties access to consumption data.
Who keeps the registerThe distributor’s customer and prepaid vending systems. There is no independent central registry.
Register scopeNational

Cameroon has no utility-independent supply-point identifier like an MPAN. Because one company distributes and sells electricity across the whole national grid, a connection is identified only by that company’s own customer records: the contract number for postpaid customers and the meter number for prepaid customers.

Contract numbers and bill references

A postpaid customer receives a contract (subscriber) number when they subscribe. It is printed under their name on each bill, and payment guidance says it starts with 20. Each bill also carries a reference number, made up of the policy number plus the year and month. Mobile-money services accept either. A fictional contract number would look like 200123456; the real length is not published.

Prepaid meters

Prepaid meters work with a separate customer interface unit (CIU), a keypad display that must stay plugged in so it can communicate with the meter. Customers buy tokens with mobile money by entering the meter number, then type the 20-digit code into the CIU. Short codes show the meter number (804), the remaining credit (801) and total energy used (800). Code 811 releases a 10 kWh emergency credit. The meters use the STS standard. Older Hexing and Inhemeter meters installed between 2017 and 2021 needed key-change tokens before the STS token-identifier rollover on 24 November 2024.

Does it stay with the property?

No. The contract belongs to the person, not the premises. Moving house means ending the contract, which suspends supply and removes the meter, and then subscribing again at the new address. Customers can ask for their consumption deposit back when the contract ends, after any unpaid amounts have been deducted. Meters remain the distributor’s property.

Getting a new connection

An applicant applies at a sales point or agency, or online, with a site plan, ID and a completed request form. A quote must be issued within 5 days and is valid for 90 days. Low-voltage connection work must be done within 5 working days in towns and 15 in rural areas. On an existing connection, the meter must be fitted within 3 working days (urban) or 5 (rural) after the deposit is paid.

Who keeps the register

There is no national registry independent of the distributor. Because households cannot switch supplier, no switching register is needed. The 2026 restructuring moved Eneo’s customer base to SOCADEL without changing how customers are identified.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?No
Net meteringNo
Net billingNo
How exported electricity is paidNone for households. No regulated surplus purchase, net-metering or feed-in tariff exists for small self-producers.
Can households export solar power?Not under any current scheme. The national Energy Compact lists, as a planned action, a pilot programme for urban residential solar that includes putting in place a net-metering or feed-in-tariff policy.
What law applies?Law 2011/022 of 14 December 2011 governing the electricity sector and its implementing Decree 2012/2806 of 24 September 2012. The Compact provides for revising this law and adopting a dedicated renewable energy law, with drafting in 2026 and adoption in 2027.
Do small systems need permission?ARSEL’s title categories start at self-production above 100 kW (declaration). No title is listed for smaller self-production installations.
Which grid connection rules apply?Connections to the transmission network follow the Transmission Grid Connection Code adopted by MINEE order 000013 of 13 June 2019. Low-voltage connections follow the distributor’s service regulations, approved by ministerial order in 2009.

Connecting a home system.

  1. Small rooftop systems are normally installed behind the meter for self-consumption, often with batteries, as there is no route to sell surplus to the grid.
  2. Self-production above 100 kW and below 1 MW must be declared to ARSEL (fee 25,000 FCFA; decision within 60 days of a complete file).
  3. Self-production above 1 MW needs an ARSEL authorisation (fees of 1–5 million FCFA, depending on capacity).
  4. Selling power to the grid as a producer requires a production licence (granted by the minister after ARSEL has examined the application) and a power purchase agreement with the single buyer.

Cameroon has no arrangement that pays households for electricity they export. Residential and commercial solar is installed for self-consumption and backup, often with batteries because outages are frequent.

Larger self-producers are regulated by size. Installations above 100 kW and below 1 MW need a declaration to ARSEL, and those above 1 MW need an authorisation. ARSEL’s 2024 report lists self-production applications from industrial groups, including hybrid thermal–solar plants. Selling electricity to the grid is an independent-production activity that needs a licence and a contract with the single buyer.

The 2025 Energy Compact commits the government to a pilot programme for urban residential solar. The pilot covers system standards, a net-metering or feed-in-tariff policy, financing incentives and demonstration sites. No scheme had been adopted by October 2026.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (independent producer selling to the grid)Licence (commercial regime). Hydro plants on the public domain need a concession; hydro up to 5 MW, including rural electrification, needs an authorisation.Minister of Water and Energy, after ARSEL has examined the applicationLicence fee 50 million FCFA; concession 100 million FCFA. ARSEL has 60 days to examine the file and the minister then has 30 days; if the minister does not decide, the application is deemed approved.
Self-generation (autoproduction)Declaration above 100 kW and below 1 MW; authorisation above 1 MW. No title is listed below 100 kW.ARSELDeclaration fee 25,000 FCFA; authorisation fees 1–5 million FCFA, depending on capacity. 60-day decision period.
Store energyWater storage for electricity generation is a concession activity, held by EDC on the Sanaga basin. No specific title for battery storage was identified.MINEE / ARSELStorage is not a separate licensed activity in ARSEL’s title categories.
Export / sell surplus to the gridNo surplus-sale framework for self-producers. Sales to the grid require producer status.MINEE / ARSELA net-metering or feed-in-tariff pilot is planned under the Energy Compact.
Supply / sell to final customersLicence for sales at very high, high and medium voltage. Low-voltage retail is part of the public distribution title.Minister, after ARSEL has examined the applicationARSEL’s register lists Eneo, DPDC, KPDC and Nachtigal Hydro Power Company as sales licence holders.
Distribute electricityConcession for public distribution. Authorisation for direct distribution up to 100 kW.Minister (concession); ARSEL (authorisation)Eneo held the distribution title from 2001 (20 years plus a 10-year renewal); the activity passed to SOCADEL in 2026.
Transmission and grid managementConcessionMINEESONATREL holds both concessions for 99 years from 2019.
Import / export electricityLicenceMinister, after ARSEL has examined the applicationNo cross-border interconnection was in service in 2024.
Wholesale tradingNo wholesale market. Producers sell under bilateral contracts to the single buyer.ARSELAn Electricity Market Code was adopted by MINEE order 000014 of 13 June 2019.
Aggregate, VPP, balancing, grid services or remote control of assetsNo framework identifiedSONATREL / ARSELBalancing and reserves are provided by large plants dispatched by SONATREL.

Law 2011/022 sorts electricity activities into four legal regimes. Concessions cover hydro on the public domain, water storage, transmission and public distribution. Licences cover independent production, sales at high and medium voltage, and imports and exports. Authorisations cover self-production above 1 MW, hydro up to 5 MW and direct distribution up to 100 kW. Declarations cover self-production between 100 kW and 1 MW. Private lines built entirely on private land need no title.

Applications go to ARSEL with the documents and fees set by MINEE order 00000193 of 28 April 2014. ARSEL decides on declarations and authorisations itself. For licences and concessions, it sends a non-objection to the minister, who decides. ARSEL’s 2024 report lists ten applications, including hydro projects of 300 MW (Minkouma) and 95 MW (Mungo Fall), hydro–solar hybrids, industrial self-production plants and solar mini-grids in the Far North and East.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency and reserve servicesNo—NoSONATREL. SONATREL dispatches large hydro and thermal plants. There is no market or tender for ancillary services open to distributed assets.
Demand responseNo—NoShortages are handled by load shedding. No paid demand-response programme for households or businesses was identified.

Cameroon has no wholesale or flexibility market. The 2019 Electricity Market Code sets rules for relations between producers, the transmission company and the distributor. In practice, generation is bought under bilateral contracts and dispatched centrally by SONATREL.

The sector’s priorities are adding supply, strengthening transmission and recovering revenue, not flexibility services. The Energy Compact mentions introducing storage to stabilise the grid as a transmission-segment challenge. The government has also announced a 200 MW emergency solar programme to add capacity quickly.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutPrepaid STS meters for about 37% of low-voltage customers (2024). A communicating-meter programme began in September 2026, starting with state-owned premises.
Reading intervalNot published
Low-voltage customers (2024)2,191,195
Prepaid customers (2024)820,233
Communicating meters received (Sept 2026)16,000 (first batch)
Installation targets by 30 Dec 202610,000 state premises; 30,000 new household connections
Meter ownershipDistributor (SOCADEL)

Cameroon’s metering modernisation has relied on prepayment. Eneo deployed STS prepaid meters under amendment No. 3 to its concession agreement, which committed it to modernising the distribution network and metering. Customers moved to prepayment voluntarily when converting from postpaid, and new connections could also be prepaid. ARSEL counted 820,233 prepaid customers in 2024. The Compact plans to convert 600,000 of the 1,334,908 postpaid customers to prepayment.

Prepaid meters reduce unpaid bills but have not ended fraud. ARSEL found that 53% of irregularities recorded in 2024 involved prepaid meters. ARSEL and the distributor also worked on eligibility criteria for communicating meters for low-voltage customers.

Under the Electricity Sector Reform Programme, financed by the World Bank, MINEE began receiving 16,000 communicating meters in Douala on 23 September 2026. They go first to state premises to control public consumption. The next phase, for new household connections, was due to be announced in October 2026. The targets are at least 10,000 public meters and 30,000 household meters installed by 30 December 2026. Communicating meters at medium-to-low-voltage substations, to measure energy flows and losses, are planned for 2025–2030.

Renewable electricity.

Electricity generation mix (2023).

  • Hydro: 75.4%
  • Fossil fuels (gas and oil): 22.9%
  • Solar: 1.7%
Source 1
Renewable electricity share
77% (2023)Source 1Share of electricity generation: 5,349 GWh renewable out of 6,942 GWh (hydro 5,233 GWh, solar 117 GWh). Cameroon has no cross-border electricity interconnection in service, so generation is equivalent to supply.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro
0.814 GW (2024)Source 1
Solar
0.063 GW (2024)Source 1
Wind
0 GW (2024)Source 1
Fossil fuels
0.703 GW (2024)Source 1

Targets.

  • Energy Compact: raise non-hydro renewables to 10% of the electricity mix by 2030.
  • Energy Compact: reach 3,000 MW of installed capacity by 2030 (2,011 MW in 2025).
  • Universal electricity access by 2030 (74% in 2025), including mini-grids and standalone solar.
  • Hybridise the six isolated thermal power stations with solar and small hydro by 2030.

Hydro is the backbone of Cameroon’s electricity. In 2023 it produced 5,233 GWh, about 75% of generation, according to IRENA. ARSEL put hydro capacity at 1,409.69 MW in 2024; IRENA’s 2024 statistics show a lower figure of 814 MW. Nachtigal (420 MW) produces about 2,970 GWh a year, almost 30% of the southern grid’s output. Hydrology is a growing risk: in 2026 the government cited a water deficit of 3 billion m³ and said Nachtigal cannot always run at full power.

Solar is small but growing. Grid-connected plants include the 15 MW Scatec plant at Guider in the north and solar–diesel hybrids in the East and South. The state has built 350 decentralised solar mini-plants, and the 2023–2024 project pipeline includes hydro–solar hybrids. In 2026 the government announced a 200 MW emergency solar programme. There is no wind generation.

The STAR-C solar training centre, set up with the International Solar Alliance, runs free courses for photovoltaic installers on mini-grids and rooftop systems. A rooftop-systems session was scheduled for 12–16 October 2026.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Energy storage in Cameroon means water storage, not batteries. Water storage is a separately regulated concession activity, with its own ARSEL tariff work with EDC. No battery energy storage system on the grid was identified. The Energy Compact lists introducing storage to stabilise transmission networks as a challenge, without setting a target.

Storage projects.

  • Sanaga regulating reservoirs: Four reservoirs (Lom Pangar, Bamendjin, Mbakaou and Mapé) with 13,300 hm³ of capacity regulate river flow for the downstream Song Loulou, Edéa and Nachtigal plants. EDC holds the water-storage concession.
  • Lagdo reservoir: A multi-year reservoir of 6,300 hm³ behind the 72 MW Lagdo dam on the Bénoué, which supplies most of the northern grid.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
SOCADEL (formerly Eneo Cameroon)Sole low-voltage supplier on the national gridNoNoNoNo

Households have no choice of supplier. Eneo Cameroon served all low-voltage customers on the interconnected grids until the state took back its activities. In May 2026 it was converted into the publicly owned SOCADEL, whose first management team was installed on 5 May 2026. Customer-facing services, including bill payment, prepaid tokens and the online agency, were still run through the Eneo website and channels in October 2026.

Large customers at high and medium voltage can in principle buy from other sales licence holders. ARSEL’s register lists DPDC, KPDC and Nachtigal Hydro Power Company as holders of sales licences.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministère de l’Eau et de l’Énergie (MINEE)GovernmentEnergy ministrySets policy, grants concessions and licences, and publishes the Energy Compact and reform news.
Agence de Régulation du Secteur de l’Électricité (ARSEL)RegulatorElectricity regulatorPublishes tariff grids, title procedures, the register of title holders and annual activity reports.
SOCADEL (Eneo Cameroon customer services)DistributionPublic distributor and retailerHandles connections, subscriptions, prepaid meters and billing for all grid-connected households.
Agence des Normes et de la Qualité (ANOR)GovernmentNational standards bodyResponsible under the Energy Compact for proposing national standards for solar equipment.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Transmission grid connectionTransmission Grid Connection Code (MINEE order 000013 of 13 June 2019)MINEETechnical rules for connecting to the SONATREL network.
Market rulesElectricity Market Code (MINEE order 000014 of 13 June 2019)MINEEGoverns commercial relations between sector operators.
Low-voltage supplyPublic distribution service regulations (MINEE order 00000013 of 26 January 2009)MINEEApproved for AES SONEL, which later became Eneo. Sets connection, metering and billing rules for customers.
Prepaid meteringStandard Transfer Specification (STS), edition 2 keysSTS Association / IECPrepaid meters had to comply with STS edition 2 by 24 November 2024.
Solar equipmentNational solar equipment standards (in preparation)ANORThe Compact plans a technical reference for solar equipment by December 2026, with some specifications becoming mandatory by the end of 2027.
Installer accreditationNo mandatory installer accreditation identifiedMINEE (STAR-C training centre)MINEE’s STAR-C centre runs voluntary five-day courses for PV installers.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Small self-consumption solar (up to 100 kW)NoNationalNo title is listed in ARSEL’s title categories below the 100 kW declaration threshold.
Self-production declaration (100 kW–1 MW)YesNationalFiled with ARSEL; fee 25,000 FCFA; 60-day period.
Self-production authorisation (above 1 MW)YesNationalIssued by ARSEL; fees 1–5 million FCFA.
Grid connection or new supplyYesNationalApplication to the distributor with a site plan and ID; quote within 5 days, connection within 5 (urban) or 15 (rural) working days.
Environmental and social impact studyLimitedNationalRequired for categories of operation listed in order 00001/MINEPDED of 8 February 2016, generally larger projects.

Permitting is national. Households installing small solar systems for their own use do not need an electricity-sector title. The regime only starts at 100 kW of self-production, and there is no grid-export route to apply for. Larger projects go through ARSEL and, for production licences and concessions, the minister. Environmental and social studies are required for listed project categories.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Social electricity blockActiveRegulated tariffThe first 110 kWh a month is charged at 50 FCFA/kWh and is not subject to VAT.Since 1 June 2012
Tax and customs exemptions for renewable equipmentActiveVAT and customs reliefThe Energy Compact refers to the VAT exemption in the 2012 Finance Law and the customs-duty exemption in the 2024 Finance Law, and commits to extending these incentives for the life of the Compact. The exact list of eligible equipment is set by circular No. 02137 of 13 March 2024.—
Net-metering / feed-in tariff pilot for urban residential solarScheduledNet metering / feed-in tariffPlanned under the Energy Compact action agenda for 2026–2030, together with solar system standards and financing incentives. Not yet in force.2026–2030

Data and connectivity.

Fixed broadband
2.1 fixed subscriptions per 100 people (2022)Source 32
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband is rare, at about 2.1 subscriptions per 100 people in 2022, but mobile internet is widespread: 46% of people used the internet in 2024, according to the World Bank. Mobile money is the main channel for paying electricity bills and buying prepaid tokens, through MTN Mobile Money and Orange Money USSD menus, with tokens delivered by SMS.

Prepaid meters talk to their in-home interface units locally. Remote reading over cellular networks is only now being introduced with the first communicating meters for state premises and new household connections.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
6.96 TWh (2024)Source 16Total energy injected into the grids (6,959,393 MWh), not final consumption. Losses are significant: distribution efficiency was 71.52%.
Generation capacity
1.994 GW (2024)Source 16The Energy Compact gives 2,011 MW for 2025.
Interconnection
0 GW (2024)Source 18The Compact gives a 2024 baseline of zero cross-border transfer capacity and targets 1,000 MW by 2030. The Cameroon–Chad interconnection project (PIRECT) is under construction.
Curtailment
Not identified from a reliable public source.

The main constraints are transmission and finance, not lack of generation. Nachtigal’s output reaches Yaoundé, but the corridor towards Douala and its industrial area is saturated. The 400 kV and 225 kV lines and the Béon substation under construction in 2026 are meant to relieve it, and the RIS–RIN interconnection is planned for 2028.

Unpaid bills along the payment chain, from the distributor to SONATREL and the producers, limit maintenance and investment. ARSEL’s 2024 report notes that SONATREL struggled to invest mainly because customers paid their bills irregularly.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Eneo converted into the publicly owned SOCADELCurrent2026-05-04Decrees 2026/163, 2026/164 and 2026/165 converted Energy of Cameroon (Eneo) into a publicly owned company, approved SOCADEL’s statutes and appointed its board. A 100-day review on 8 October 2026 reported monthly revenue up from 30 to 32 billion FCFA.
Prepaid tariffs aligned with the 2012 gridCurrent2024-11-01ARSEL required prepaid customers to be billed on the same 2012 block tariffs as postpaid customers.
Communicating meter deploymentUpcoming2026-12-30Target of at least 10,000 meters on state premises and 30,000 for new household connections under the World Bank-backed Electricity Sector Reform Programme.
Second Nachtigal evacuation corridor (400 kV)Upcoming2026-11Completion of the Nyom 2–Nkolkoumou–Béon 400 kV line (1,500 MW transfer capacity) and Béon substation, with related 225 kV links towards Douala.
Revision of the electricity law and a dedicated renewable energy lawUpcoming2027The Energy Compact plans to revise Law 2011/022, to draft a renewable energy law and its implementing texts in 2026, and to adopt them in 2027.
National tariff policyUpcoming2027A tariff policy based on customer type, including mini-grids, is due to be drafted and validated by the end of 2027, ending the long freeze in practice.
Southern–Northern grid interconnectionUpcoming2028A 515 km, 225 kV double-circuit line to join the RIS and RIN into a single national grid.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo export, net-metering or feed-in scheme; no residential solar statistics; total solar capacity of 63 MW in 2024 (IRENA).
Distributed energy marketLowDistributed generation is limited to self-production for own use and mini-grids; titles only start at 100 kW and there is no surplus purchase.
Grid flexibility marketLowSingle-buyer system with central dispatch by SONATREL; no wholesale, ancillary-service or demand-response market.
Energy storage adoptionLowNo grid-scale battery storage identified; storage consists of hydro reservoirs.
Renewable growth environmentMediumRenewables already supply about 77% of generation; the 420 MW Nachtigal plant was commissioned and a 200 MW emergency solar programme was announced, but the non-hydro share is small.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 34 sources
  1. Energy Profile: Cameroon. IRENA. accessed 9 October 2026.
  2. Tarifs basse tension (Décision n°0096/ARSEL/DG/DCEC/SDCT du 28 mai 2012). ARSEL, 2012. accessed 9 October 2026.
  3. Residential electricity rates. Eneo Cameroon. accessed 9 October 2026.
  4. Eneo Prepaid Guide (FAQ). Eneo Cameroon, 2024. accessed 9 October 2026.
  5. TID rollover of prepaid meters – FAQs. Eneo Cameroon, 2024. accessed 9 October 2026.
  6. Obtaining a connection. Eneo Cameroon. accessed 9 October 2026.
  7. Obtaining a subscription. Eneo Cameroon. accessed 9 October 2026.
  8. Moving house. Eneo Cameroon. accessed 9 October 2026.
  9. Cancelling my subscription. Eneo Cameroon. accessed 9 October 2026.
  10. Exercising my consequential rights (participation). Eneo Cameroon. accessed 9 October 2026.
  11. Pay your Eneo bills via MTN Mobile Money. Eneo Cameroon. accessed 9 October 2026.
  12. Payment via Orange Mobile Money. Eneo Cameroon. accessed 9 October 2026.
  13. Catégories de titres. ARSEL. accessed 9 October 2026.
  14. Procédures d’obtention des titres. ARSEL. accessed 9 October 2026.
  15. Titres du secteur. ARSEL. accessed 9 October 2026.
  16. Rapport d’activités 2024 de l’ARSEL. ARSEL, 2025. accessed 9 October 2026.
  17. Atelier Énergie GECAM 2026. ARSEL, 2026. accessed 9 October 2026.
  18. Compact énergétique de la République du Cameroun. MINEE, 2025. accessed 9 October 2026.
  19. Création de la SOCADEL : le Cameroun engage la transformation de son secteur électrique. MINEE, 2026. accessed 9 October 2026.
  20. Le MINEE installe la toute première équipe dirigeante de la SOCADEL. MINEE, 2026. accessed 9 October 2026.
  21. Évaluation des 100 premiers jours de la SOCADEL. MINEE, 2026. accessed 9 October 2026.
  22. Réforme du secteur électrique : le MINEE réceptionne 16 000 compteurs intelligents. MINEE, 2026. accessed 9 October 2026.
  23. Électricité : le MINEE et le FMI passent en revue les défis et les perspectives du secteur. MINEE, 2026. accessed 9 October 2026.
  24. Accès à l’électricité : la Banque mondiale salue les progrès du Cameroun. MINEE, 2026. accessed 9 October 2026.
  25. Électricité : le MINEE met la pression sur le deuxième corridor d’évacuation. MINEE, 2026. accessed 9 October 2026.
  26. Appel à candidature – formation des techniciens-installateurs des systèmes solaires photovoltaïques (STAR-C). MINEE, 2026. accessed 9 October 2026.
  27. Population, total – Cameroon. World Bank, 2025. accessed 9 October 2026.
  28. Access to electricity (% of population) – Cameroon. World Bank, 2024. accessed 9 October 2026.
  29. Urban population (% of total population) – Cameroon. World Bank, 2025. accessed 9 October 2026.
  30. Electric power consumption (kWh per capita) – Cameroon. World Bank, 2024. accessed 9 October 2026.
  31. Individuals using the Internet (% of population) – Cameroon. World Bank, 2024. accessed 9 October 2026.
  32. Fixed broadband subscriptions (per 100 people) – Cameroon. World Bank, 2022. accessed 9 October 2026.
  33. Cameroon DHS 2018 – household indicators (API). The DHS Program, 2018. accessed 9 October 2026.
  34. Histoire du franc CFA (1 EUR = 655,957 FCFA). Banque des États de l’Afrique Centrale (BEAC). accessed 9 October 2026.

Questions about energy in Cameroon.

Talk to us about Olmack in Cameroon.Tell us about your home, housing portfolio or school estate in Cameroon. We'll explain what is possible there now.