How electricity works in Gambia.
Gambia electricity market 2026: NAWEC as sole utility, PURA tariffs, OMVG imports from Senegal, 23 MW Jambur solar, Cash Power prepaid meters and net metering plans.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Gambian dalasi (GMD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Gambia energy at a glance.
Key figures for households in Gambia. Each one links to its source on the full overview below.
Electricity price.
13.85 GMD per kWh for households, including taxes. Figures for 2023.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Gambia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Gambia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Gambia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Gambia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Gambia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Gambia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Gambia.
The energy market in Gambia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
The Gambia’s public electricity service is run by the National Water and Electricity Company (NAWEC), a government-owned limited company established in 1996 that also supplies water and sewerage. NAWEC generates, transmits, distributes and sells electricity across the country and had more than 355,000 electricity customer accounts in 2026. The sector is regulated by the Public Utilities Regulatory Authority (PURA), which licenses operators and approves tariffs under the Electricity Act 2005 and the Renewable Energy Act 2013. Policy sits with the Ministry of Petroleum, Energy and Mines.
Supply has long depended on heavy and light fuel oil plants at Kotu, Brikama and provincial stations, plus a licensed floating power ship operated by Karpower. Since the 225 kV line of the Gambia River Basin Development Organisation (OMVG) reached Soma and Brikama, the country can also import up to 150 MW from the regional grid; NAWEC buys from Senegal’s SENELEC under a 50 MW agreement signed in 2022.
Renewables are a recent addition. The 23 MWp Jambur solar plant with 8 MWh of batteries, inaugurated in March 2024, is the first utility-scale solar plant, and a larger solar-plus-storage park at Soma is being tendered. Electricity output supplied by NAWEC rose from 285 GWh in 2017 to 825 GWh in 2025, but demand peaks still outrun supply: in August 2026 NAWEC announced evening load shedding when demand reached 140 MW.
Energy snapshot.
Headline figures for electricity in Gambia. Each shows its data year and links to its source.
- Population2,822,093 peopleSource 212025
- Households297,581 householdsSource 132024
- Average household size8 people/householdSource 132024
- Electricity use per householdNot identified from a reliable public source.
- Household price (GMD)13.9 GMD/kWhSource 12023
- Household price (EUR)0.166 EUR/kWhSource 222023
- Renewable electricity shareNot identified from a reliable public source.
- Solar capacity0.023 GWSource 152024
- Wind capacityNot identified from a reliable public source.
- Energy storage capacity0.008 GWhSource 152024
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- Public Utilities Regulatory Authority (PURA)
- System operator
- NAWEC
- Distribution networks
- NAWEC is the sole national distributor; off-grid private wire networks up to 200 kW may operate under the Renewable Energy Act
- Currency
- Gambian dalasi (GMD)
- Voltage and frequency
- Not confirmed from an official source (single-phase and three-phase four-wire low-voltage service connections)
Electricity prices in Gambia.
- Household price (GMD)
- 13.9 GMD/kWh (2023)Source 1PURA-approved domestic tariff for the first band (0–300 kWh) on credit meters, and the flat domestic rate on prepaid (Cash Power) meters, in force since 10 April 2023. Higher bands on credit meters cost 14.06–15.46 GMD/kWh. VAT treatment and any fixed charges are not stated on the published tariff schedule.
- Household price (EUR)
- 0.166 EUR/kWh (2023)Source 22Converted from 13.85 GMD/kWh at 83.4704 GMD per euro (market reference rate updated 10 October 2026). The Central Bank of The Gambia website could not be reached to confirm its official rate.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (GMD per kWh).Source 1
| 2014 | 10.14 GMD/kWh |
|---|---|
| 2023 | 13.85 GMD/kWh |
Electricity tariffs in The Gambia are set by PURA on application from NAWEC, following cost-of-service studies and public consultation. One national schedule applies everywhere NAWEC supplies, with separate rates for credit and prepaid meters and for each customer class.
The 2023 increase
NAWEC applied for a tariff revision in October 2022. PURA approved it, and new rates took effect on 10 April 2023: the first domestic band rose from 10.14 to 13.85 GMD/kWh (about 37%). NAWEC described it as the first real increase since 2015, citing rising fuel and production costs. No later revision had been published by October 2026.
What drives costs
Most domestic generation burns imported heavy and light fuel oil, which makes the cost of supply sensitive to oil prices and the exchange rate. Imports over the OMVG network and new solar capacity are intended to lower the average cost of supply.
Prepaid and postpaid
Credit-meter customers are billed in rising blocks, so heavy users pay more per kWh. Prepaid customers pay the flat class rate, which for households equals the lowest credit-meter band.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Uniform national tariffs approved by PURA and applied by NAWEC. Domestic credit (postpaid) meters pay rising blocks: 13.85 GMD/kWh for 0–300 kWh, 14.06 for 301–600 kWh, 14.43 for 601–1,000 kWh and 15.46 above 1,000 kWh (from 10 April 2023). |
| Prepayment | Yes | Cash Power prepaid meters pay a flat rate per customer class; the domestic prepaid rate is 13.85 GMD/kWh. Credit is bought as a token from NAWEC outlets, vendors, bank ATMs and mobile services such as QCell’s QPower. |
| Other | Yes | Non-domestic flat rates: commercial 14.90, hotels and industries 15.90, agriculture 13.89, and area councils and central government 16.20 GMD/kWh. |
| Time-of-use | No | No time-of-use tariff appears in the published schedule. |
Household prices compared with neighbouring countries (EUR per kWh).
- Gambia€0.166
- Senegal€0.128
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 292 kWh/person/yr (2025)Source 4Derived: 824,905 MWh of electricity output reported by NAWEC for 2025 divided by the World Bank 2025 population estimate (2,822,093). All sectors, before network losses.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Access to electricity reached 69% of the population in 2024, according to the World Bank: 85.6% in urban areas and 39.2% in rural areas. NAWEC reports that it has electrified more than 719 communities through grid extension and solar mini-grids.
Electricity output supplied by NAWEC grew every year from 285,028 MWh in 2017 to 824,905 MWh in 2025, an 18.5% increase in 2025 alone, and NAWEC projects 904,146 MWh for 2026.
Demand is highest in hot weather. In August 2026 NAWEC attributed a peak of 140 MW to extreme heat and, with imports constrained, introduced load shedding mainly between 8 pm and 4 am.
No reliable national figures were identified for household consumption, air-conditioner ownership, electric cooking or electric vehicles.
Housing and households.
- Dwellings
- 502,832 residential buildings (2024)Source 13Buildings or structures used for residential purposes (91.8% of 547,528 structures). Many Gambian households live in compounds, so buildings do not equal dwellings or households.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 65 % of population (2025)Source 21World Bank estimate.
The 2024 census counted 297,581 households with an average of 8.0 people. Brikama local government area alone has 147,611 households (49.6% of the total) and Kanifing 61,586, so the greater Banjul area dominates electricity demand.
The census counted 547,528 buildings and structures, 502,832 of them residential. By building, 63.3% were residential owner-occupied, 8.2% let to tenants only and 3.4% shared between owners and tenants; 9.8% were vacant. Household-level tenure figures were not in the preliminary report.
How the grid works in Gambia.
- TransmissionNational Water and Electricity Company (NAWEC), OMVG
- DistributionNAWEC is the sole national distributor; off-grid private wire networks up to 200 kW may operate under the Renewable Energy Act
- MeteringNot identified from a reliable public source.
- Supply1 or more retail suppliers
Physical flow
Domestic generation comes from NAWEC’s fuel-oil plants at Kotu and Brikama in the greater Banjul area and smaller provincial stations, the Karpower floating plant (about 30 MW under a short-term contract, according to PURA) and the 23 MWp Jambur solar plant with 8 MWh of batteries. The EIB put national installed capacity at 98 MW when Jambur was inaugurated in March 2024.
The OMVG 225 kV line from Kaolack in Senegal via Soma to Brikama gives an import capacity of 150 MW.
Commercial flow
NAWEC is the single buyer. It buys from Karpower, imports from SENELEC under a five-year 50 MW agreement signed in 2022 (initially 30 MW on a take-and-pay basis), and resells with its own output at regulated tariffs. Under the Renewable Energy Act, NAWEC as the “Responsible Network Utility” would also pay any feed-in tariff for renewable electricity delivered into the grid.
Reliability
Supply has repeatedly fallen short at peak times. NAWEC introduced evening load shedding in August 2026, citing record demand, constrained imports and a fault at a large generating unit on the import side.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Petroleum, Energy and Mines (MOPEM) | Sets energy policy, recommends renewable targets, keeps the registry of renewable energy facilities and coordinates permitting under the Renewable Energy Act 2013. |
| Regulator | Public Utilities Regulatory Authority (PURA) | Licenses generation, transmission, dispatch and distribution under the Electricity Act 2005, approves tariffs, handles consumer complaints, manages the Renewable Energy Fund and is responsible for feed-in tariff rules. |
| TSO | National Water and Electricity Company (NAWEC) | Owns and operates the national 33 kV and higher network, dispatches its own plants, the Karpower power ship, the Jambur solar plant and imports. |
| TSO | OMVG | The Gambia River Basin Development Organisation owns the regional 225 kV interconnection with substations at Soma and Brikama, through which The Gambia imports electricity from the regional grid. |
| DSO | National Water and Electricity Company (NAWEC) | Sole distribution network operator, including provincial networks around Basse, Farafenni, Soma and Bansang. |
| Supplier | National Water and Electricity Company (NAWEC) | Sole supplier to households, at PURA-approved tariffs, with prepaid (Cash Power) and postpaid meters. |
Compared with the UK system.
| UK concept | Gambia equivalent | How it works |
|---|---|---|
| DNO | NAWEC | There are no regional network companies. NAWEC owns and runs every distribution network in the country. Off-grid renewable “private wire” networks of up to 200 kW may supply villages at no more than the national tariff. |
| National Grid/NESO | NAWEC (and OMVG for the 225 kV interconnection) | NAWEC operates the transmission system and dispatches generation. The Electricity Act 2005 provides for separate transmission and dispatch licences, but no independent system operator has been created. |
| MPAN | Cash Power meter number / NAWEC account number | Prepaid customers are identified by the number of their Cash Power meter, which is used to buy credit tokens; postpaid customers by their NAWEC account. Both are issued by NAWEC and held in its own systems. There is no national meter-point register. |
| MPRN | No equivalent | The Gambia has no piped natural gas network for households. |
| Meter operator | NAWEC | NAWEC buys, installs and maintains all meters. The Electricity Act 2005 gives PURA powers over metering and metering equipment. |
| Supplier | NAWEC | There is no retail competition. Households buy from NAWEC at tariffs approved by PURA. |
| Smart-meter infrastructure | Cash Power token meters; smart AMI prepayment meters being introduced | Most households use keypad prepaid meters topped up with numeric tokens. In 2023 NAWEC tendered 30,000 single-phase smart AMI meters and three-phase smart AMI prepayment meters under an African Development Bank-funded project. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Cash Power meter number (prepaid) / NAWEC customer account (postpaid) |
| Who issues it? | National Water and Electricity Company (NAWEC) when a connection is made |
| Format | Prepaid: the number of the Cash Power meter, used to register the meter with vending services and buy tokens. Postpaid: NAWEC account number shown on the bill. Neither format is published by NAWEC. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | The meter number is on the prepaid meter and on token receipts; the account number is on NAWEC bills and in the online customer portal. |
| Electronic access | NAWEC runs an online customer portal for bills and account management. Prepaid credit can be bought through mobile services (for example QCell’s QPower by USSD or SMS), bank ATMs and diaspora top-up services using the meter number. |
| Third-party access | No framework for third-party access to metering or consumption data was identified. Anyone who knows a meter number can buy credit for it; QPower lets one mobile line register up to five meters. |
| Who keeps the register | NAWEC customer and prepaid vending systems |
| Register scope | National |
A household electricity connection in The Gambia is identified by references issued by NAWEC, the only supplier. For prepaid supply, which is now the norm for households, the key identifier is the Cash Power meter number. Credit is bought against that number and delivered as a numeric token that the customer types into the meter.
Mobile and banking channels rely on the same number. On QCell’s QPower service, for example, the customer first links a meter number to the mobile line (up to five meters), then buys an amount by USSD or SMS and receives the token by text message. Postpaid customers are identified by their NAWEC account and receive bills in rising consumption bands.
There is no national data hub or meter-point register of the European type; records sit in NAWEC’s customer and vending systems. NAWEC does not publish the length or structure of meter or account numbers, or whether the account changes when occupants change, so no example is given here.
Smart AMI meters bought under the Gambia Electricity System Reinforcement and Expansion Project will add remote communication, but NAWEC has not published how identifiers or data access will change.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Feed-in tariff provided for by law but no published rules or rate; larger renewable projects sell to NAWEC under negotiated power purchase agreements. |
| Can households sell surplus solar power to NAWEC? | Not yet in practice. A feed-in tariff and net-metering scheme was validated by the Ministry in June 2022, and in March 2026 PURA, NAWEC, the Ministry, the World Bank and Sustainable Energy Africa met to review the status of net-metering implementation. No operating scheme or published rate was identified. |
| What does the Renewable Energy Act say about feed-in tariffs? | PURA must make Feed-in Tariff Rules setting eligibility, standard contracts and a fixed tariff per technology for at least fifteen years, with priority connection and purchase, a national capacity cap and no retrospective changes. Electricity generated outside The Gambia is not eligible. |
| Who pays for grid connection? | For projects outside the feed-in tariff, connection costs are shared as for other new grid developments approved by PURA. If NAWEC considers the required work excessive, the developer may carry it out at its own expense. PURA arbitrates disputes. |
| Are there rules on installers? | Installers must be trained and certified where relevant, and give a quality guarantee of at least six months. PURA is to keep a register of qualified installers. |
Connecting a home system.
- Register the renewable installation with the Ministry for inclusion in the national registry, and tell NAWEC its location, capacity and expected grid injection (Renewable Energy Act 2013, section 18).
- NAWEC, as Responsible Network Utility, assesses whether the grid can safely accept the connection and whether any grid development needed is excessive.
- Generation for sale to the grid requires a generation licence from PURA; generation solely for on-site consumption does not.
- Where no feed-in tariff applies, sell to NAWEC at a negotiated rate no higher than the alternative cost of generation as assessed by PURA.
The legal basis for selling renewable electricity to the grid has existed since the Renewable Energy Act 2013, but the implementing rules have been slow to arrive. The Ministry validated a feed-in tariff and net-metering scheme in June 2022 after delays dating back to 2013. In March 2026 PURA hosted a review of net-metering implementation under a World Bank-supported distributed generation support programme, which indicates that the scheme was still not fully operational.
In the meantime most rooftop solar operates behind the meter. Larger projects sell under power purchase agreements: the planned Soma solar park, for example, is being procured as an independent power producer selling to NAWEC for 25 years.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Generation licence from PURA; not required for generation solely for consumption at the site of the generating facility | PURA | Electricity Act 2005, section 5. Renewable projects must also register with the Ministry’s renewable energy registry. |
| Self-generate (including rooftop solar) | No licence for on-site consumption only | PURA; Ministry registry for renewable installations | Developers of renewable systems should register them and inform NAWEC of location and capacity (Renewable Energy Act, section 18). |
| Export surplus to the grid | Generation licence and agreement with NAWEC; feed-in tariff rules not yet in operation | PURA; NAWEC | Net metering was validated in 2022 and remained under implementation in 2026. |
| Store electricity | No specific storage licensing regime identified | — | Neither the Electricity Act nor the Renewable Energy Act addresses storage separately. |
| Transmit electricity | Transmission licence (33 kV and above) | PURA | NAWEC operates the national grid; OMVG owns the 225 kV interconnection. |
| Dispatch (system operation) | Dispatch licence | PURA | Provided for in the Electricity Act 2005; performed by NAWEC. |
| Distribute electricity | Distribution licence for a defined territory; not required within a single premises or for non-commercial sub-metering within a single building | PURA | Off-grid renewable private wire networks up to 200 kW may charge up to the national tariff; larger ones or higher tariffs need PURA approval. |
| Sell / supply electricity to end users | Distribution licence with PURA-approved tariffs | PURA | NAWEC is the only grid supplier. |
| Import or export electricity | Through licensed transmission at grid receiving or delivery points | PURA; Ministry | Imports from SENELEC are bought by NAWEC under a power purchase agreement. |
| Aggregate, trade, balancing, grid services, VPP, remote control of assets | No regime identified | — | There is no wholesale or flexibility market in which these activities exist. |
The Electricity Act 2005 replaced earlier legislation with a licensing system run by PURA, created by the Public Utilities Regulatory Authority Act 2001. It defines four licences: generation, transmission, dispatch and distribution. Applicants must show competence, financial strength and the ability to meet service obligations, and licences specify the service, territory, duration and conditions.
In practice the sector remains vertically integrated: NAWEC holds all network and supply functions, while Karpower is the licensed independent power producer named by PURA. The Act’s aim of a privately operated, competitive sector has not been realised.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Energy, balancing and ancillary services | No | — | No | NAWEC. NAWEC balances the system with its own thermal plants, the Karpower ship, Jambur solar and batteries, and imports. No market for distributed resources, demand response or aggregation was identified. |
The Gambia has no wholesale electricity market or flexibility market. When supply falls short, NAWEC uses scheduled load shedding.
The OMVG 225 kV interconnection links the Gambian grid to the regional network; imports are bought by NAWEC under bilateral agreements rather than through a market.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Prepaid Cash Power meters dominate; smart AMI prepayment meters being procured |
| Reading interval | Not published |
| Meter ownership | NAWEC |
| Payment modes | Prepaid (Cash Power) and postpaid |
| Smart meters tendered | 30,000 single-phase AMI meters plus three-phase AMI prepayment meters (Oct 2023) |
| Smart-meter share | Not published |
Prepaid meters were introduced on a large scale from around 2011, when NAWEC procured 60,000 Cash Power meters. Credit can now be bought from NAWEC offices and vendors, bank ATMs, mobile services and diaspora top-up services.
In October 2023 NAWEC invited bids for 30,000 single-phase smart AMI energy meters and three-phase four-wire smart AMI prepayment meters, with service connection materials, under the Gambia Electricity System Reinforcement and Expansion Project. NAWEC describes a smart-meter rollout as under way but does not publish installation numbers or reading intervals.
Renewable electricity.
Electricity generation mix (2023 (domestic generation, excluding imports)).
- Oil (fuel oil): 98.9%
- Solar: 0.6%
- Wind: 0.4%
- Renewable electricity share
- Not identified from a reliable public source.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 23 MW (2024)Source 14IRENA’s net solar capacity added in 2024, corresponding to the Jambur plant.
- Solar PV (Jambur)
- 23 MWp (2024)Source 15
- Battery storage (Jambur)
- 8 MWh (2024)Source 15
- Import capacity (OMVG interconnection)
- 150 MW (2022)Source 6
Targets.
- 50% renewable energy by 2030 (as cited by the EIB at the Jambur inauguration, March 2024)
Until 2024 almost all domestic electricity came from fuel oil: IRENA records 475 GWh of generation in 2023, of which only 3 GWh was solar and 2 GWh wind. The 23 MWp Jambur solar plant in Kombo South, inaugurated on 25 March 2024 with 8 MWh of batteries, changed that. The EIB said it would supply about one-fifth of national electricity at full output and serve the equivalent of 18,500 households. It was financed with €65 million from the EIB, €40 million from the EU and €36 million from the World Bank under the Gambia Electricity Restoration and Modernisation Project.
The next large project is a solar park at Soma in the Lower River Region, next to the OMVG substation. NAWEC launched a tender in October 2024 for a 50 MW first phase with battery storage, scalable to 150 MW, to be built and run by an independent producer for 25 years under a World Bank-backed public-private partnership.
Imports over the OMVG network are expected to include hydropower from the Kaleta and Sambangalou dams in future, according to NAWEC, which would raise the renewable share of consumption.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 8 MWh (2024)Source 15Battery at the Jambur solar plant.
Grid battery storage is limited to the 8 MWh system at Jambur. The Soma solar park tender includes battery storage, but its size had not been confirmed in the sources consulted.
No licensing or market rules specific to storage were identified.
Storage projects.
- Jambur solar plant: 23 MWp solar with 8 MWh of battery storage, inaugurated March 2024 and operated for NAWEC.
- Soma solar park: Phase I of 50 MW solar with battery storage tendered by NAWEC in October 2024, scalable to 150 MW.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| National Water and Electricity Company (NAWEC) | Sole supplier (355,000+ electricity customer accounts, 2026) | No | No | No | No |
NAWEC is the only supplier for grid-connected customers. Off-grid renewable private wire networks up to 200 kW may supply communities at no more than the national tariff under the Renewable Energy Act.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Public Utilities Regulatory Authority (PURA) | Regulator | Multi-sector utilities regulator | Licenses electricity operators, approves tariffs, manages the Renewable Energy Fund and is responsible for feed-in tariff and net-metering rules. |
| National Water and Electricity Company (NAWEC) | Distribution | National electricity and water utility | Runs generation, transmission, distribution and supply, and publishes tariffs and output data. |
| Ministry of Petroleum, Energy and Mines (MOPEM) | Government | Energy ministry | Sets policy and targets, keeps the renewable energy registry and validated the feed-in tariff and net-metering scheme. |
| Organisation pour la Mise en Valeur du fleuve Gambie (OMVG) | Transmission | Regional river basin organisation | Owns the 225 kV interconnection and the Soma and Brikama substations through which The Gambia imports electricity. |
| PURA Consumer Affairs | Consumer | Complaints handling | Receives consumer complaints about utility services. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection of renewables | Renewable Energy Act 2013, sections 3 and 11–12 | National Assembly; NAWEC as Responsible Network Utility | NAWEC determines the safety and technical capability of the grid to accept each renewable connection. No published grid code for small generators was identified. |
| Equipment | Internationally recognised performance and safety standards | PURA | PURA may require importers of renewable energy systems to show compliance with internationally recognised standards (Renewable Energy Act, section 3). |
| Installer accreditation | Renewable Energy Act 2013, section 17 | PURA | Installers must be appropriately trained and certified where relevant, and give at least a six-month installation guarantee. PURA is to keep a register of qualified installers. |
| Metering | Electricity Act 2005, section 9 | PURA | Covers metering and metering equipment of licensees. |
| Inverters, anti-islanding | None identified | — | No national technical standard for small grid-connected inverters was identified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Registration in the renewable energy registry | Yes | National | Developers of renewable systems must register facilities with the Ministry and inform NAWEC of location, capacity and expected grid injection. |
| Generation licence | Limited | National | Needed to sell to the grid; not needed for generation solely for on-site consumption. |
| NAWEC technical approval | Yes | National | NAWEC assesses whether the grid can safely accept a renewable connection. |
| Planning permission | Unknown | Local | No national rule on planning consent for rooftop solar was identified. The Renewable Energy Act requires the Ministry to simplify and publish permitting procedures, with decisions within 60 days of a complete application. |
The Renewable Energy Act 2013 commits the government to streamlined permitting for renewable projects: agencies must acknowledge applications within ten business days and decide complete applications within sixty days unless otherwise agreed, with simpler processes for low-impact developments.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Renewable Energy Act fiscal incentives | Active | Import duty, VAT and corporate tax relief | Registered renewable projects certified by the Ministry are exempt from import tax, VAT and retail tax for fifteen years from commissioning, and from corporate tax for fifteen years subject to five-yearly performance reviews. Eligible renewable equipment is exempt from import duty. Current customs practice was not verified. | From 2013 |
| Feed-in tariff and net metering | Scheduled | Feed-in tariff / net metering | Provided for by the Renewable Energy Act 2013 and validated by the Ministry in June 2022; implementation was still being reviewed by PURA, NAWEC and partners in March 2026. No published rate was identified. | — |
Data and connectivity.
- Fixed broadband
- 49.5 % of population using the internet (2024)Source 21Share of individuals using the internet (ITU via World Bank), not fixed-broadband coverage.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
About half the population used the internet in 2024, according to the World Bank.
Mobile networks are already part of electricity retail: prepaid credit is sold by USSD and SMS (for example QCell’s QPower), with tokens delivered by text message. The communication technology for NAWEC’s new smart AMI meters was not published.
Grid conditions.
- National peak demand
- 0.14 GW (2026)Source 16Peak demand of 140 MW reported by NAWEC in August 2026.
- Annual electricity demand
- 0.825 TWh (2025)Source 4Electricity output supplied by NAWEC (824,905 MWh), including imports and purchases. Projected 904,146 MWh in 2026.
- Generation capacity
- 0.098 GW (2024)Source 15National installed capacity cited by the EIB at the Jambur inauguration (March 2024). NAWEC states more than 100 MW in 2026.
- Interconnection
- 0.15 GW (2022)Source 6Import capacity of the OMVG Kaolack–Soma–Brikama 225 kV line. Contracted imports from SENELEC are 50 MW.
- Curtailment
- Not identified from a reliable public source.
Demand has grown faster than local generation. Output supplied by NAWEC almost tripled between 2017 and 2025, and imports over the OMVG line have become central to meeting peaks. When imports were constrained in August 2026, NAWEC had to shed load.
NAWEC’s priorities are upgrading and extending distribution networks to use the import capacity, adding solar with storage at Soma, and reducing losses through metering. The government’s target was universal access by 2025; World Bank data show 69% access in 2024.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| 2023 tariff increase | Current | 10 April 2023 | PURA-approved increases of about 37% for domestic electricity, the first real increase since 2015. |
| Net-metering implementation | Upcoming | Under implementation (review March 2026) | PURA, NAWEC, the Ministry, the World Bank and Sustainable Energy Africa reviewed the status of net metering under a distributed generation support programme. |
| Soma solar park | Upcoming | Tendered October 2024 | Phase I of 50 MW solar with battery storage, scalable to 150 MW, procured as an independent power producer selling to NAWEC for 25 years. |
| Smart metering | Upcoming | Procurement from October 2023 | 30,000 smart AMI meters tendered under the Gambia Electricity System Reinforcement and Expansion Project. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | — | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official residential solar statistics; net metering not yet operating, so rooftop systems run behind the meter. |
| Distributed energy market | Low | Distributed generation is limited to self-generation and off-grid systems; a feed-in framework exists in law but not in operation. |
| Grid flexibility market | Low | No wholesale or flexibility market; NAWEC is single buyer and system operator. |
| Energy storage adoption | Low | One 8 MWh grid battery at Jambur; Soma storage at tender stage. |
| Renewable growth environment | Medium | Renewables were about 1% of domestic generation in 2023, but 23 MWp of solar was added in 2024 against roughly 100 MW of total capacity and a 50–150 MW solar park is being procured. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 22 sources
- Service Tariffs. National Water and Electricity Company (NAWEC), 2023. accessed 10 October 2026.
- Press release: tariff increase for electricity and water. National Water and Electricity Company (NAWEC), 2023. accessed 10 October 2026.
- About NAWEC. National Water and Electricity Company (NAWEC). accessed 10 October 2026.
- Electricity services. National Water and Electricity Company (NAWEC), 2026. accessed 10 October 2026.
- Electricity generation. National Water and Electricity Company (NAWEC). accessed 10 October 2026.
- NAWEC and SENELEC sign 50 MW power purchase agreement. National Water and Electricity Company (NAWEC), 2022. accessed 10 October 2026.
- Invitation for bids: supply of smart AMI energy meters (GESREP/GO/001). National Water and Electricity Company (NAWEC), 2023. accessed 10 October 2026.
- OMVG delegation visits The Gambia to assess regional power infrastructure. National Water and Electricity Company (NAWEC), 2026. accessed 10 October 2026.
- Electricity overview. Public Utilities Regulatory Authority (PURA). accessed 10 October 2026.
- PURA hosts stakeholders on distributed generation and net metering. Public Utilities Regulatory Authority (PURA), 2026. accessed 10 October 2026.
- Renewable Energy Act 2013. Republic of The Gambia (via PURA), 2013. accessed 10 October 2026.
- Electricity Act, 2005. National Assembly of The Gambia, 2005. accessed 10 October 2026.
- The Gambia 2024 Population and Housing Census: Preliminary Report. Gambia Bureau of Statistics (via UNFPA Gambia), 2024. accessed 10 October 2026.
- Energy Profile: Gambia. IRENA, 2025. accessed 10 October 2026.
- Gambia: strong international support for a new era of renewables with inauguration of historic 23 MWp solar plant. European Investment Bank, 2024. accessed 10 October 2026.
- NAWEC announces load shedding as power demand hits 140MW. The Point, 2026. accessed 10 October 2026.
- Petroleum ministry validates feed-in tariff and net metering scheme. The Point, 2022. accessed 10 October 2026.
- Gambia’s NAWEC seeking bidders for 50 MW solar power project. TaiyangNews, 2024. accessed 10 October 2026.
- QPower. QCell. accessed 10 October 2026.
- About NAWEC cashpower meters and customer care. The Point, 2011. accessed 10 October 2026.
- World Development Indicators: population, urban population, access to electricity, internet users — Gambia. World Bank, 2025. accessed 10 October 2026.
- EUR reference exchange rates (latest). ExchangeRate-API, 2026. accessed 10 October 2026.
Questions about energy in Gambia.
Tariffs are set by PURA and uniform nationwide. Since 10 April 2023 households pay 13.85 dalasi per kWh on prepaid meters and for the first 300 kWh on credit meters, rising to 15.46 dalasi above 1,000 kWh. That is about €0.17 per kWh.
The National Water and Electricity Company (NAWEC), owned by the government, is the only grid supplier. It had more than 355,000 electricity customer accounts in 2026.
The Public Utilities Regulatory Authority (PURA) licenses operators and approves tariffs under the Electricity Act 2005. The Ministry of Petroleum, Energy and Mines sets policy.
Not yet for households in practice. The Renewable Energy Act 2013 provides for a feed-in tariff and a net-metering scheme was validated in 2022, but PURA was still reviewing its implementation in March 2026.
There is none. Prepaid customers are identified by their Cash Power meter number, used to buy credit tokens; postpaid customers by their NAWEC account. NAWEC keeps these records; there is no national meter-point register.
Mostly from NAWEC’s fuel-oil power stations and the Karpower floating plant, imports from Senegal over the OMVG 225 kV line, and since 2024 the 23 MWp Jambur solar plant.
Demand at peak times can exceed available supply. In August 2026 demand reached 140 MW in extreme heat while imports were constrained, and NAWEC introduced evening load shedding.
