How electricity works in Ghana.
Ghana electricity market 2026: PURC tariffs, ECG and NEDCo, GRIDCo, prepaid meters, net metering, Energy Commission licensing, renewables and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Ghanaian cedi (GHS) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Ghana energy at a glance.
Key figures for households in Ghana. Each one links to its source on the full overview below.
Electricity price.
2.038 GHS per kWh for households, including taxes. Figures for Oct–Dec 2026.
Renewable share.
36% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Ghana.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Ghana below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Ghana requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Ghana.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Ghana, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Ghana, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Ghana.
The energy market in Ghana, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Ghana has a state-led electricity sector with a single national transmission company, GRIDCo, and distribution dominated by two publicly owned utilities: the Electricity Company of Ghana (ECG) in the south and the Northern Electricity Distribution Company (NEDCo) in the north. Generation comes from the state-owned Volta River Authority (VRA), the Bui Power Authority and independent power producers. Two regulators share oversight: the Public Utilities Regulatory Commission (PURC) sets tariffs and service standards, and the Energy Commission issues licences and technical rules.
Household tariffs are set by PURC and reviewed every quarter against the cedi–dollar exchange rate, inflation, the price of natural gas and the hydro/thermal generation mix. After a 3.49% rise on 1 July 2026, PURC announced a 0% adjustment for October–December 2026, so residential customers using up to 300 kWh a month pay 203.7509 pesewas (GH¢2.0375) per kWh, with a cheaper lifeline band for very low consumption.
The power system is mainly thermal (gas-fired) with large hydro from Akosombo, Kpong and Bui; solar remains a small share. Most households buy electricity on prepaid meters, and ECG is replacing older meters with smart prepaid meters. A net metering code and an online net-metering application portal exist, while the government is preparing private sector participation in ECG from early 2027.
Energy snapshot.
Headline figures for electricity in Ghana. Each shows its data year and links to its source.
- Population30,800,000 peopleSource 72021
- Households8,345,414 householdsSource 72021
- Average household size3.6 people/householdSource 72021
- Electricity use per householdNot identified from a reliable public source.
- Household price (GHS)2.038 GHS/kWhSource 1Oct–Dec 2026
- Household price (EUR)0.153 EUR/kWhSource 6Oct–Dec 2026
- Renewable electricity share36%Source 92023
- Solar capacity0.188 GWSource 92024
- Wind capacity0 GWSource 92024
- Energy storage capacity0.054 GWhSource 332026
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- Public Utilities Regulatory Commission (tariffs) and Energy Commission (licensing and technical regulation)
- System operator
- Ghana Grid Company (GRIDCo)
- Distribution networks
- Two state-owned utilities — ECG (southern regions) and NEDCo (northern regions) — plus the private Enclave Power Company in industrial free zones
- Currency
- Ghanaian cedi (GHS)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Ghana.
- Household price (GHS)
- 2.038 GHS/kWh (Oct–Dec 2026)Source 1PURC residential energy charge for the 0–300 kWh band (203.7509 pesewas/kWh), set from 1 July 2026 and kept unchanged for Q4 2026. Excludes the monthly service charge and statutory levies.
- Household price (EUR)
- 0.153 EUR/kWh (Oct–Dec 2026)Source 6Converted from GH¢2.037509/kWh at the Bank of Ghana interbank mid rate of GH¢13.2785 per euro on 30 September 2026. Energy charge only.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (GHS per kWh).Source 1
| Q1 2026 | 2.0021 GHS/kWh |
|---|---|
| Q2 2026 | 1.9688 GHS/kWh |
| Q3 2026 | 2.0375 GHS/kWh |
| Q4 2026 | 2.0375 GHS/kWh |
PURC regulates electricity tariffs and adjusts them quarterly. Each quarter it reviews four variables — the cedi–US dollar exchange rate, domestic inflation, the weighted cost of natural gas, and the expected split between hydro and thermal generation — and announces the change shortly before the quarter begins. For Q4 2026 it applied an exchange rate of GH¢11.5646 to the dollar (a 3.04% depreciation), inflation of 4.97% and a gas price of US$7.8379/MMBtu, and concluded that no tariff change was needed.
Recent changes
Residential prices fell in April 2026 (the 0–300 kWh band dropped from 200.21 to 196.88 pesewas/kWh) and then rose 3.49% from 1 July 2026 to 203.7509 pesewas/kWh. The lifeline band, designed for very small consumers, moved from 86.90 to 89.9315 pesewas/kWh in July. Non-residential customers pay 183.9549 pesewas/kWh up to 300 kWh and 224.0395 pesewas/kWh above that; high-voltage special load customers pay 188.4762 pesewas/kWh.
What appears on a bill
The energy charge is only part of what a household pays. ECG and NEDCo also apply a monthly service charge and statutory levies for public street lighting and the national electrification scheme, which on prepaid meters are deducted from the first purchase of the month. The rates of these items were not confirmed from a current official source and are therefore not included in the price above.
Tariffs are the same nationally for each customer class, so a household in Tamale on the NEDCo network pays the same regulated rate as one in Accra on the ECG network.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Residential tariffs are set by PURC for all distribution utilities. From 1 July 2026 (unchanged for Q4 2026): lifeline 0–30 kWh at 89.9315 pesewas/kWh; 0–300 kWh at 203.7509 pesewas/kWh; above 300 kWh at 269.2235 pesewas/kWh. |
| Prepayment | Yes | Most households buy credit in advance for STS prepaid meters through ECG offices, vendors, the ECG PowerApp or USSD short code *226#. The same PURC tariff applies; prepayment is a payment method rather than a separate price. |
| Other | Yes | PURC sets a separate tariff for electric vehicle charging, 208.6329 pesewas/kWh from 1 July 2026. |
| Time-of-use | No | No residential time-of-use or dynamic tariff was identified in the PURC tariff schedule. |
Household prices compared with neighbouring countries (EUR per kWh).
- Ghana€0.153
- Nigeria€0.139
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- Not identified from a reliable public source.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Household electricity use in Ghana is shaped by the tariff bands. PURC’s lifeline band (0–30 kWh a month) covers very small consumers, and the 0–300 kWh band covers most ordinary homes; consumption above 300 kWh a month is charged at a higher rate. Typical uses are lighting, fans, refrigeration, televisions and phone charging, with air conditioning concentrated in higher-income urban homes. No reliable national figure for average household consumption, air-conditioner ownership or electric cooking was identified.
Electricity demand is growing quickly. GRIDCo recorded an all-time peak of about 4,300 MW in December 2025, and in July 2026 peak system demand was 3,968 MW, with demand 6.61% higher than in July 2025. ECG’s own peak demand was reported at about 2,700 MW in May 2026.
The Energy Commission is developing electric vehicle charging regulations, and PURC already publishes a dedicated EV charging tariff, but no official count of electric vehicles was identified.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 56.7 % of population (2021)Source 8
The 2021 Population and Housing Census enumerated 8,345,414 households with an average size of 3.6 people. The listing counted 10,661,421 structures, 80.2% of them fully completed. The urban share of the population rose from 50.9% in 2010 to 56.7% in 2021, with almost half of the increase in the Greater Accra and Ashanti regions.
Shared “compound” houses, in which several households rent rooms around a common yard, are common in Ghanaian towns, and this matters for metering: several households may sit behind one connection, or a landlord may apply to ECG for separate meters. Reliable published tenure and dwelling-type shares from the final census report were not confirmed, so those figures are left blank.
How the grid works in Ghana.
- TransmissionGhana Grid Company (GRIDCo), GRIDCo System Operations
- DistributionTwo state-owned utilities — ECG (southern regions) and NEDCo (northern regions) — plus the private Enclave Power Company in industrial free zones
- MeteringECG / NEDCo (as distribution utilities)
- Supply2 or more retail suppliers
Electricity is generated by the Volta River Authority (hydro at Akosombo and Kpong plus thermal plants), the Bui Power Authority (hydro, solar and batteries) and independent power producers, most of them gas-fired. IRENA records 5,894 MW of installed capacity in 2024, of which 4,114 MW was fossil-fuelled and 1,584 MW hydro.
GRIDCo carries the power over the National Interconnected Transmission System at up to 330 kV and delivers it to bulk supply points of ECG, NEDCo and Enclave Power, and to bulk customers such as mines and large factories. The 551 km 330 kV Kumasi–Bolgatanga line, completed in 2021, strengthened supply to the north and allows exports of 150 MW to Burkina Faso.
Commercial flow
Ghana works largely as a single-buyer system. ECG buys bulk power from VRA and independent producers and resells it to households at PURC tariffs. Bulk customers holding an Energy Commission permit can contract directly with generators through the wholesale market that GRIDCo operates. Payment arrears across this chain are a long-standing problem: uncollected revenue was reported at GH¢9.2 billion in 2025, and ECG’s total losses were about 26–27% in 2026.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy and Green Transition | Sets energy policy, oversees the state utilities, the net-metering programme and the planned private sector participation in ECG. |
| Regulator | Public Utilities Regulatory Commission (PURC) | Economic regulator: approves electricity tariffs (reviewed quarterly), quality-of-service standards and consumer complaints. |
| Regulator | Energy Commission | Technical regulator and licensing authority under the Energy Commission Act 1997 (Act 541): licences for wholesale supply, transmission and distribution, renewable energy service providers, bulk customer permits, the grid and net-metering codes, and certification of electricians. |
| TSO | Ghana Grid Company (GRIDCo) | Owns and operates the National Interconnected Transmission System (NITS); operational since 1 August 2008 when transmission assets transferred from VRA. |
| System operator | GRIDCo System Operations | Real-time dispatch and balancing of supply and demand, and operation of the Wholesale Electricity Market for generators and bulk customers. |
| DSO | Electricity Company of Ghana (ECG) | State-owned distributor and retailer for southern Ghana, organised in eight operational regions: Accra East, Accra West, Tema, Ashanti, Eastern, Western, Volta and Central. |
| DSO | Northern Electricity Distribution Company (NEDCo) | Distribution arm of the Volta River Authority, established in 1987 for the former Brong-Ahafo, Northern, Upper East and Upper West regions. |
| DSO | Enclave Power Company | Privately owned distributor serving over 80 manufacturing companies in the Tema Free Zones Enclave and nearby industrial areas. |
| Metering | ECG / NEDCo (as distribution utilities) | Each distribution utility owns, installs and reads its own meters; there is no separate competitive meter operator role. Meters are tested by the Ghana Standards Authority. |
| Settlement | GRIDCo Market Operations | Meters and bills bulk customers and wholesale transactions on the transmission system. |
Compared with the UK system.
| UK concept | Ghana equivalent | How it works |
|---|---|---|
| DNO | Distribution utility (ECG, NEDCo, Enclave Power) | There is no separation between network owner and retail supplier. ECG and NEDCo own the local network, connect customers, install meters, bill and collect payment in their own areas. Enclave Power serves only industrial free zones. |
| National Grid/NESO | GRIDCo | GRIDCo combines the transmission owner, system operator and wholesale market operator roles in one state company. |
| MPAN | Meter number / ECG customer account | There is no national supply-point number. Prepaid customers are identified by the number of the STS meter installed at the premises, which is used to buy credit; postpaid customers have a utility account number on their bill. |
| MPRN | No direct equivalent | No piped household gas network or gas supply-point identifier was identified, so there is no MPRN-type number. |
| Meter operator | The distribution utility | ECG or NEDCo supplies, installs and replaces the meter; customers cannot appoint an independent meter operator. |
| Supplier | The distribution utility (no choice) | Households cannot switch supplier: whoever owns the local network sells the electricity at PURC-regulated tariffs. Only large bulk customers can buy directly from generators. |
| Smart-meter infrastructure | ECG smart prepaid meters and Meter Management System | Instead of a national data and communications company, each utility runs its own system. ECG’s smart prepaid meters communicate with its central servers and Meter Management System, can detect tampering and switch off remotely. |
How a supply point is identified.
04 12345678 3 — written 04123456783 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Prepaid meter number (STS meter number) / ECG customer account number (STS meter number) |
| Who issues it? | The meter manufacturer allocates the number under the STS standard; the distribution utility (ECG or NEDCo) links it to a customer record when it installs the meter |
| Format | For STS prepaid meters the meter number is the decoder reference number defined in IEC 62055-41: a 2-digit manufacturer code, an 8-digit manufacturer serial number and 1 check digit (11 digits). The standard also allows a 13-digit version with a 4-digit manufacturer code. Postpaid account number formats are not published. |
| Length | 11 digits (STS meter number); postpaid account number format not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed on the meter faceplate and on the customer interface unit, and on prepaid purchase receipts; postpaid customers find the account number on their ECG or NEDCo bill. |
| Electronic access | Customers buy prepaid credit and make service requests using the meter number in the ECG PowerApp, ECG’s web self-service platform or by USSD (*226#). |
| Third-party access | Anyone who knows a meter number can buy credit for it through vendors, mobile money or the PowerApp, including from abroad. There is no regulated data-access regime for third parties to read consumption data. |
| Who keeps the register | Each distribution utility’s own customer billing and Meter Management System (ECG, NEDCo, Enclave Power). |
| Register scope | Per DSO |
Ghana has no national, utility-independent supply-point identifier comparable to an MPAN. A household connection is identified in practice by the utility’s customer record and, for the large majority of homes on prepaid meters, by the number of the meter itself.
How the prepaid meter number works
ECG’s prepaid meters follow the Standard Transfer Specification (STS, IEC 62055-41), the open standard that lets any authorised vending point generate an encrypted credit token for a particular meter. Under the standard each meter has a unique decoder reference number: a manufacturer code, an eight-digit serial number and a check digit, giving 11 digits in the common form. Because ECG’s smart prepaid meters are STS-compatible, customers can buy credit from any vendor in any ECG region using just this number.
A fictional example would be 04123456783: manufacturer code 04, serial 12345678 and check digit 3. Real numbers must never be guessed — buying credit for the wrong meter credits someone else’s account.
Does it stay with the property?
The number belongs to the physical meter, not to the customer. When an occupier moves out, the meter and its number stay at the premises and the utility updates the customer record. When a meter is replaced — as is happening across ECG’s network under its smart prepaid meter programme — the premises receives a new number, and ECG transfers any remaining credit to the new meter. This is why the identifier is neither permanently tied to the property nor to the person.
Getting a new connection
Applications for a new service connection, a separate meter or additional load are made through the ECG PowerApp or self-service platform. The applicant uploads an Installation Completion Certificate signed by a licensed electrician (the wiring must comply with the Electrical Wiring Regulations 2011, L.I. 2008), identification and a site plan. ECG inspects the site, issues a quotation, and connects and meters the premises once it has been paid. Since February 2024 ECG has handled these requests digitally.
Who keeps the register
There is no central registry. ECG, NEDCo and Enclave Power each maintain their own customer and meter databases; ECG has introduced a new Meter Management System alongside its smart prepaid meters. Because there is no supplier switching, there is no national register of the kind needed to move customers between suppliers.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Net metering: electricity exported is credited against electricity bought from the distribution utility, tracked over an annual period |
| Is there a legal basis for exporting from rooftop solar? | Yes. The Renewable Energy (Amendment) Act 2020 (Act 1045) amended the Renewable Energy Act 2011 (Act 832) to create a net-metering scheme, and the Energy Commission has issued a Net Metering Code for connecting renewable generators to the distribution network. |
| Is there a size limit? | The original 2015 net-metering code limited the scheme to renewable systems of up to 200 kW. Any different limit in the 2023 code was not confirmed. |
| Am I paid for surplus electricity? | Net metering is designed on the assumption that exports do not exceed purchases over an annual tracking period; surplus is a credit against later consumption rather than a cash payment. |
| How widely available is it? | Limited. Uptake has been driven by a donor-funded programme for up to 12,000 net-metered systems, and in May 2026 the ministry described a national net-metering framework as still being prepared. |
Connecting a home system.
- Have the system designed and installed by an Energy Commission-licensed renewable energy service provider, with wiring by a certified electrician.
- Apply for a net meter through the national net-metering web portal launched in December 2025 (or through the distribution utility).
- The distribution utility (ECG, NEDCo or Enclave Power) reviews the application against the Energy Commission Net Metering Code and inspects the installation.
- The utility installs a smart bi-directional net meter and the customer becomes a “customer-generator”.
- Exports are credited against later consumption under the net-metering billing rules.
Households in Ghana can, in principle, export rooftop solar electricity to the grid under net metering. The legal basis is the Renewable Energy Act 2011 as amended in 2020, and the technical rules are set out in the Energy Commission’s Net Metering Code for connecting renewable generating systems to the distribution network. Customers on the scheme are called customer-generators.
Under the code, the electricity a system sends to the distribution utility’s network is credited and set against electricity the customer buys. The 2015 version of the code applied to systems up to 200 kW and assumed that exports would not exceed purchases over a year.
In practice, access is still limited. Large-scale rollout is tied to the Ghana Solar PV-based Net Metering Project, funded by the African Development Bank, the Climate Investment Funds, Switzerland’s SECO and the government under the Scaling-up Renewable Energy Programme, which aims to install up to 12,000 roof-mounted net-metered systems for public facilities, SMEs and households. A web portal for applying for smart net meters was launched in December 2025, and in May 2026 the ministry said a national net-metering framework was being prepared.
Most rooftop solar in Ghana is installed for self-consumption, often with batteries as backup during outages, rather than for export.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for the grid (utility-scale) | Wholesale electricity supply licence in stages: provisional licence, then siting and construction permits, then an operational licence | Energy Commission | Applies to grid-connected solar and wind plants. A moratorium on new power purchase agreements imposed in 2020 was lifted in April 2023. |
| Generate for own use on a household roof | No separate generation licence identified for household self-consumption; grid-connected export requires approval under the Net Metering Code | Energy Commission (code) / distribution utility (connection) | The installer must hold a renewable energy service provider licence and wiring must be done by a certified electrician. |
| Install and maintain solar or other renewable systems | Licence required for any commercial activity in the renewable energy industry, including installation and maintenance | Energy Commission (Renewable Energy Act 2011, Act 832) | Carrying on a commercial renewable energy activity without a licence is an offence under Act 832. |
| Electrical wiring of premises | Certification as a Certified Electrical Wiring Professional | Energy Commission (Electrical Wiring Regulations 2011, L.I. 2008) | ECG requires an Installation Completion Certificate signed by a licensed electrician before connecting a new service. |
| Export to the grid | Net-metering approval and a net meter from the distribution utility; no licence for small customer-generators | Distribution utility under the Energy Commission Net Metering Code | Credits offset consumption; no cash export tariff identified. |
| Sell electricity to a third party (embedded generation, PPA or lease) | Provider needs project registration, a provisional wholesale electricity supply licence and an operational licence; the buyer needs a bulk customer permit | Energy Commission | Bulk customer eligibility: at least 1 million kWh a year, or at least 500 kVA consistently for three consecutive months. Ordinary households cannot buy from third parties. |
| Distribute and retail electricity | Distribution and sale licence; tariffs approved by PURC | Energy Commission (licence) / PURC (tariffs) | Held by ECG, NEDCo and Enclave Power. There is no separate retail supply licence for households. |
| Store electricity | No storage-specific licence or exemption regime identified | Energy Commission | Grid-scale batteries so far have been developed by state entities (Bui Power Authority) and the government announced a 200 MW battery procurement in March 2026. |
| Wholesale trading and market participation | Wholesale supply licence (generators) or bulk customer permit (buyers), plus GRIDCo connection and market registration | Energy Commission / GRIDCo | GRIDCo operates the Wholesale Electricity Market and NITS access. |
| Cross-border trade | No specific licence route for private parties identified | Ministry / GRIDCo / West African Power Pool arrangements | Exports to neighbouring countries are carried over GRIDCo interconnectors. |
| Balancing, grid services, aggregation, VPP and remote control of assets | No framework identified | — | There is no published route for aggregators or distributed assets to provide balancing or ancillary services. |
Licensing in Ghana is concentrated in the Energy Commission. Utility-scale generators follow a staged wholesale supply licence process, and anyone carrying out a commercial renewable energy activity — from importing panels to installing and maintaining systems — must hold a licence under the Renewable Energy Act 2011.
For households, the practical requirements are about who does the work rather than the household itself: the installer must be licensed, the wiring must be done by an electrician certified under L.I. 2008, and export requires net-metering approval from the distribution utility. In 2026 the Energy Commission introduced an Integrated Certification and Apprenticeship Platform (iCAP) and planned to synchronise electrician certification with ECG’s systems.
Retail competition does not exist for homes. Only bulk customers — consuming at least 1 GWh a year or 500 kVA — may buy electricity from a supplier other than their distribution utility.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale Electricity Market | No | — | No | GRIDCo. Open to licensed generators and permitted bulk customers. No route for households or aggregated small assets was identified. |
| Ancillary services and reserves | Unknown | — | Unknown | GRIDCo. GRIDCo dispatches the system and balances supply and demand, but no published market for third-party ancillary services was identified. |
Ghana does not have flexibility or demand-response markets open to distributed energy resources. Balancing is done centrally by GRIDCo using mainly hydro and thermal plants, and the wholesale market is limited to licensed generators and bulk customers.
The system’s challenges are adequacy and fuel supply rather than flexibility procurement: PURC noted in July 2026 the need to closely monitor generation availability and fuel supply. Battery storage is entering through state projects at Bui and the planned 200 MW national procurement rather than through market mechanisms.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | ECG is replacing older postpaid and prepaid meters with smart prepaid meters under its Loss Reduction Programme |
| Reading interval | Not published |
| Dominant meter type | STS prepaid |
| Smart meter models (ECG/Brainsfield) | BY100C single-phase, BY300C three-phase |
| Credit purchase | ECG PowerApp, *226#, vendors, mobile money |
| Meter accuracy testing | Ghana Standards Authority |
| ECG target (2024) | 800,000 smart prepaid meters |
Smart metering in Ghana is led by the distribution utilities rather than by a national programme with data standards. In December 2024 ECG and Brainsfield Ltd launched smart prepaid meters intended to replace all existing postpaid and prepaid meters for domestic and commercial customers, beginning in Kumasi. The meters communicate in real time with ECG’s central servers, show consumption and credit on a customer interface unit, detect tampering and can disable supply.
Pilots followed in districts such as Suame and Ahenema Kokoben in 2025, and mass meter replacement has taken place in parts of the Tema region. ECG said in 2024 that it aimed to secure 800,000 smart prepaid meters. No published national penetration figure was identified.
Billing complaints following meter replacement led ECG in March 2026 to ask the Ghana Standards Authority to test randomly selected meters in the laboratory and the field; ECG says every meter is tested and certified by the GSA before installation.
Renewable electricity.
Electricity generation mix (2023).
- Fossil (gas and oil): 64%
- Hydro: 35%
- Solar: 1%
- Renewable electricity share
- 36% (2023)Source 9Share of electricity generation (hydro 35%, solar 1%). PURC projects hydro at 24.25% of generation for Q4 2026, so the share varies strongly with hydrology.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Hydro
- 1.584 GW (2024)Source 9
- Solar
- 0.188 GW (2024)Source 9
- Bioenergy
- 0.008 GW (2024)Source 9
- Wind
- 0 GW (2024)Source 9
- Fossil fuels
- 4.114 GW (2024)Source 9
Targets.
- Net zero emissions by 2060 under the Energy Transition and Investment Plan (brought forward from 2070 in the National Energy Transition Framework).
- 10% renewable energy integration by 2030 (cited by the Ministry of Energy and Green Transition in October 2025).
- Up to 12,000 net-metered rooftop solar systems under the Scaling-up Renewable Energy Programme.
- About 4,000 rooftop solar systems totalling 137 MW under the National Clean Energy Programme.
Ghana’s renewable electricity comes overwhelmingly from large hydro. In 2023 IRENA recorded 23,401 GWh of generation, of which 8,193 GWh was hydro and 259 GWh solar, giving a renewable share of 36%. The hydro share depends heavily on rainfall in the Volta basin: PURC’s tariff assumptions for Q4 2026 put hydro at 24.25% and thermal at 75.75%, and its July 2026 fact sheet reported thermal plants supplying 74.33% of generation.
Solar capacity reached 188 MW in 2024. The largest public solar site is the Bui Power Authority’s hydro-solar hybrid, with 100 MWp of land-based solar and 5 MWp of floating solar, and further plants in northern Ghana. Wind generation had not started by 2024.
Distributed solar is being promoted through donor-backed net metering and through the National Clean Energy Programme launched in October 2025 with Switzerland’s KliK Foundation under Article 6 of the Paris Agreement. The ministry has said it is updating the Renewable Energy Master Plan for 2026–2030.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 54 MWh (2026)Source 33Bui Power Authority only (30 MWh installed plus 24 MWh of a 50 MWh upgrade operational).
Grid-scale storage in Ghana is at an early stage and led by the state. The Bui Power Authority operates the main battery system, linked to its solar and hydro plants, and the government has announced a competitive procurement of 200 MW of batteries to help meet the evening peak.
Household batteries are mostly used as backup alongside solar during outages. There are no specific rules or incentives for home storage, and no official installed figure.
Storage projects.
- Bui hydro-solar hybrid battery system: 30 MWh installed alongside Bui’s solar plants, with a 50 MWh expansion of which 24 MWh was operating and the rest due by Q2 2026.
- National 200 MW battery procurement: Announced to Parliament in March 2026 by the Minister for Energy and Green Transition to supply the grid during night-time peak hours; to be procured by competitive bidding. Locations, duration and timetable not yet published.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Electricity Company of Ghana (ECG) | — | No | No | No | Limited |
| Northern Electricity Distribution Company (NEDCo) | — | No | No | No | Limited |
Households do not choose their electricity supplier. ECG serves its eight southern regions, NEDCo serves the north, and both sell at the same PURC tariffs. Enclave Power Company supplies only industrial tenants in free zones.
The government is preparing private sector participation in ECG. Cabinet approved private participation in April 2025, initially for billing and revenue collection, and options under study include a single concession for the whole business, multiple regional leases, and service franchises for the low-voltage network. A transaction adviser’s report was due in the first week of October 2026, with participation expected to start in early 2027. The government has said this is not a sale of ECG.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy and Green Transition | Government | Energy policy and sector oversight | Leads the net-metering programme, battery procurement and ECG reform. |
| Public Utilities Regulatory Commission | Regulator | Tariff and service-quality regulator | Publishes quarterly tariff decisions and utility performance fact sheets. |
| Energy Commission | Regulator | Licensing and technical regulator | Issues licences, the grid and net-metering codes, and certifies electricians. |
| Ghana Grid Company (GRIDCo) | Transmission | Transmission owner, system and market operator | Operates the national grid, dispatch and the wholesale market. |
| Electricity Company of Ghana | Distribution | Distribution and retail, southern Ghana | Connects, meters and bills most Ghanaian households. |
| Northern Electricity Distribution Company | Distribution | Distribution and retail, northern Ghana | Serves the northern regions as part of VRA. |
| Bui Power Authority | Renewable Energy | State hydro, solar and storage developer | Operates the Bui hydro-solar hybrid and the largest battery system. |
| Association of Ghana Solar Industries (AGSI) | Solar | Solar industry association (founded 2006) | Represents solar companies in consultations with state agencies. |
| Ghana Standards Authority | Metering | National standards and meter testing | Tests and certifies electricity meters before installation. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Transmission connection | National Electricity Grid Code (2009) | Energy Commission | Rules for developing, operating and using the National Interconnected Transmission System. |
| Distributed generation connection | Net Metering Code for Connecting Renewable Energy Generating Systems to the Distribution Network | Energy Commission | Technical connection conditions for renewable systems on the low-voltage network. |
| Installation wiring | Electrical Wiring Regulations 2011 (L.I. 2008) | Energy Commission | Only Certified Electrical Wiring Professionals may carry out indoor wiring. |
| Prepaid metering | Standard Transfer Specification (IEC 62055-41) | IEC / STS Association | Defines prepaid tokens and the meter number structure used by ECG meters. |
| Installer accreditation | Renewable energy service provider licence (Act 832) | Energy Commission | Required for commercial installation and maintenance of renewable systems. |
| Meter accuracy | Testing and certification before installation | Ghana Standards Authority | ECG states every meter is GSA-tested before installation. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Distribution utility approval for export | Yes | National | Grid-connected systems that export need net-metering approval and a net meter from ECG, NEDCo or Enclave Power. |
| Licensed installer | Yes | National | Commercial installers must hold an Energy Commission renewable energy service provider licence. |
| Certified electrician | Yes | National | Wiring must be done by a Certified Electrical Wiring Professional under L.I. 2008. |
| Planning or building permit | Unknown | Local | No national rule specific to rooftop solar was identified; building permits are issued by metropolitan, municipal and district assemblies. |
| Bulk customer permit (third-party supply) | Limited | National | Only needed where a large customer buys from a supplier other than its distribution utility. |
For a household rooftop system the main approvals are technical and come from the distribution utility under the Energy Commission’s Net Metering Code, with the installer and electrician holding the relevant Energy Commission licence or certificate. A system used only for self-consumption behind the meter still needs certified wiring.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Ghana Solar PV-based Net Metering Project (SREP) | Active | Net metering | Programme to deploy up to 12,000 roof-mounted net-metered solar systems for public facilities, SMEs and households, funded by the African Development Bank, Climate Investment Funds, SECO and the government. A web portal to apply for smart net meters launched in December 2025. | — |
| National Clean Energy Programme | Active | Carbon-credit-financed rooftop solar | US$200 million programme launched in October 2025 by the ministry, the EPA and Switzerland’s KliK Foundation under Article 6 of the Paris Agreement, for about 4,000 rooftop solar systems totalling 137 MW for homes, small businesses and industry. | Launched October 2025 |
| Residential lifeline tariff | Active | Social tariff | Reduced PURC rate of 89.9315 pesewas/kWh for residential consumption of 0–30 kWh a month (from 1 July 2026). | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Ghana’s smart prepaid meters communicate with the utility’s central servers, and customers interact with them mainly by mobile phone: credit is bought through the ECG PowerApp, mobile money or the *226# USSD code.
Next-Gen InfraCo, a government-licensed wholesale operator, began commercial operation of a shared 4G/5G network in March 2026 after approval by the National Communications Authority, with an aim of 70% 5G population coverage by 2027.
Grid conditions.
- National peak demand
- 4.3 GW (Dec 2025)Source 13All-time peak of about 4,300 MW recorded by GRIDCo in December 2025.
- Annual electricity demand
- 23.4 TWh (2023)Source 9Total electricity generation (23,401 GWh), used as a proxy for annual demand including exports.
- Generation capacity
- 5.894 GW (2024)Source 9Installed capacity. The US government’s commercial guide gives 5,260 MW installed and 4,856 MW dependable (excluding embedded generation) at November 2024.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Ghana’s grid is interconnected with neighbouring systems within the West African Power Pool. To the north, a 225 kV line links Bolgatanga with Ouagadougou in Burkina Faso, and the 330 kV Kumasi–Bolgatanga line allows exports of 150 MW to Burkina Faso.
Reliability on the transmission network is generally high, but supply adequacy depends on gas supply to thermal plants and on hydrology. Distribution losses are a major issue: ECG’s total losses were about 26–27% in 2026, of which technical losses were 9.8%, and revenue collection has been uneven.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Tariffs unchanged for Q4 2026 | Current | 1 October 2026 | PURC announced on 24 September 2026 a 0% adjustment to electricity tariffs for October–December 2026, keeping the rates set on 1 July 2026. |
| Shared 4G/5G network goes live | Current | March 2026 | Next-Gen InfraCo began commercial operations after NCA approval. |
| Private sector participation in ECG | Upcoming | Early 2027 (expected) | Government is structuring concession-type arrangements for ECG (and NEDCo) rather than a sale. A transaction adviser’s report was due in the first week of October 2026. Trade unions oppose the plan. |
| National 200 MW battery storage procurement | Upcoming | Announced March 2026 | Competitive procurement of grid batteries to support the night-time peak; timetable not published. |
| National net-metering framework | Upcoming | In preparation (May 2026) | The ministry said a national framework allowing households and businesses to feed surplus rooftop solar to the grid was being prepared. |
| Electric vehicle charging regulations | Upcoming | In development (2026) | The Energy Commission is progressing regulations for EV charging. |
| Updated Renewable Energy Master Plan 2026–2030 | Upcoming | 2026 | The ministry is updating the master plan to guide renewable investment to 2030. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official residential capacity figure; net metering is still being scaled up through a 12,000-system donor programme and a portal launched in December 2025. |
| Distributed energy market | Low | Total solar capacity was 188 MW in 2024 (IRENA), mostly utility-scale; distributed generation is mainly behind-the-meter self-consumption. |
| Grid flexibility market | Low | No flexibility, demand-response or aggregation market identified; wholesale market limited to generators and bulk customers. |
| Energy storage adoption | Low | Tens of MWh of grid batteries (Bui Power Authority); a 200 MW national procurement only announced in March 2026. |
| Renewable growth environment | Low | Non-hydro renewables were about 1% of generation in 2023; growth in demand has been met largely by thermal generation. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 39 sources
- Electricity tariff rise by 3.49 per cent, water 0.85 per cent. Ghana News Agency (reporting PURC), 2026. accessed 1 October 2026.
- PURC keeps electricity and water tariffs unchanged for fourth quarter of 2026. MyJoyOnline (reporting PURC), 2026. accessed 1 October 2026.
- No increment in electricity, water tariffs for fourth quarter — PURC. Ghana News Agency, 2026. accessed 1 October 2026.
- PURC announces electricity, water tariff reductions. Ghana News Agency, 2026. accessed 1 October 2026.
- Ghana’s electricity generation continues to decline, recorded peak demand of 3,968MW in July 2026 – PURC. MyJoyOnline (reporting PURC fact sheet), 2026. accessed 1 October 2026.
- Daily interbank FX rates. Bank of Ghana, 2026. accessed 1 October 2026.
- Ghana’s population is 30.8 million (2021 PHC provisional results). Ghana News Agency (reporting Ghana Statistical Service), 2021. accessed 1 October 2026.
- Ghana’s urban population is 56.7 per cent. Ghana News Agency (reporting Ghana Statistical Service), 2021. accessed 1 October 2026.
- Energy Profile: Ghana. IRENA, 2025. accessed 1 October 2026.
- Ghana Country Commercial Guide: Energy Sector. US International Trade Administration, 2025. accessed 1 October 2026.
- Overview. Ghana Grid Company. accessed 1 October 2026.
- System Operations. Ghana Grid Company. accessed 1 October 2026.
- Festive power demand hits record high; Energy Minister assures of stable supply. Citi Newsroom, 2025. accessed 1 October 2026.
- About ECG. Electricity Company of Ghana. accessed 1 October 2026.
- Get Electricity. Electricity Company of Ghana. accessed 1 October 2026.
- ECG rolls out digital application service. Graphic Online, 2024. accessed 1 October 2026.
- ECG introduces advanced smart prepaid meters. Ghanaian Times, 2025. accessed 1 October 2026.
- ECG and Brainsfield Ltd launch smart prepaid meter to curb power losses. Starr FM, 2024. accessed 1 October 2026.
- ECG assures public of meter accuracy amid billing concerns. Ghana News Agency, 2026. accessed 1 October 2026.
- Northern Electricity Distribution Company. NEDCo. accessed 1 October 2026.
- LMI Holdings Ltd (Enclave Power Company) project disclosure. International Finance Corporation. accessed 1 October 2026.
- IEC 62055-41: Standard transfer specification (SASO adoption). IEC / Saudi Standards, Metrology and Quality Organization, 2019. accessed 1 October 2026.
- Net-metering portal for clean energy access launched. Graphic Online, 2025. accessed 1 October 2026.
- Energy Commission Net Metering Code 2023. Energy Commission, 2023. accessed 1 October 2026.
- Net Metering Code (Ghana). IEA Policies Database, 2015. accessed 1 October 2026.
- Renewable Energy (Amendment) Act, 2020 (Act 1045). Parliament of Ghana (via ESMAP RISE), 2020. accessed 1 October 2026.
- Ghana to scale up solar, mini-grid projects nationwide. Ghana News Agency, 2026. accessed 1 October 2026.
- Ghana launches $200 million rooftop solar initiative under Paris Agreement. Ghana News Agency, 2025. accessed 1 October 2026.
- Distributed energy resources regulation market highlight: Ghana. CrossBoundary Energy, 2024. accessed 1 October 2026.
- It’s illegal to engage uncertified electrician for wiring – Energy Commission. Ghanaian Times, 2026. accessed 1 October 2026.
- ECG private sector participation to start by early 2027 – Finance ministry adviser. Graphic Online, 2026. accessed 1 October 2026.
- Transaction advisor’s report on ECG private sector participation due first week of October. Graphic Online, 2026. accessed 1 October 2026.
- Hydro Solar Hybrid. Bui Power Authority. accessed 1 October 2026.
- Ghana plans to procure 200 MW of battery storage. ESS News, 2026. accessed 1 October 2026.
- GRIDCo commissions 330kV Kumasi–Bolgatanga transmission line project. Agence Française de Développement. accessed 1 October 2026.
- Increasing access to stable, reliable and affordable energy for the citizens of ECOWAS. World Bank, 2021. accessed 1 October 2026.
- Ghana launches first 5G network with shared infrastructure model. MEA Tech Watch, 2026. accessed 1 October 2026.
- Ghana Energy Transition Plan. US International Trade Administration. accessed 1 October 2026.
- National Electricity Grid Code 2009. Energy Commission (via ESMAP RISE), 2009. accessed 1 October 2026.
Questions about energy in Ghana.
From 1 October to 31 December 2026, residential customers pay PURC-regulated energy charges of 89.9315 pesewas/kWh for the 0–30 kWh lifeline band, 203.7509 pesewas/kWh (about GH¢2.04, or €0.15) for 0–300 kWh, and 269.2235 pesewas/kWh above 300 kWh. A service charge and levies are added.
PURC reviews tariffs every quarter, based on the exchange rate, inflation, natural gas prices and the hydro/thermal generation mix. Tariffs rose 3.49% in July 2026 and were left unchanged for Q4 2026.
Yes, in a limited way. Under the Energy Commission’s Net Metering Code, power exported by a rooftop system is credited against electricity you buy from ECG or NEDCo. You apply for a net meter through the net-metering portal or your utility, and the system must be installed by a licensed provider. There is no cash feed-in payment for households.
There is none. Most homes are identified by the number of their STS prepaid meter, typically 11 digits, which is used to buy credit. Postpaid customers have an account number on their bill. Each utility keeps its own records.
No. Households are supplied by the distribution utility for their area — ECG in the south, NEDCo in the north. Only bulk customers using at least 1 GWh a year or 500 kVA can buy from other suppliers.
GRIDCo owns and operates the national transmission grid and the wholesale market. ECG, NEDCo and Enclave Power run the distribution networks. PURC sets tariffs and the Energy Commission issues licences.
Companies that install or maintain solar systems commercially need a licence from the Energy Commission under the Renewable Energy Act 2011, and wiring must be done by a Certified Electrical Wiring Professional.