Countries

Energy in Nigeria, explained.

How electricity works in Nigeria: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Nigeria: Not yet available.Olmack is not offered in Nigeria yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Nigeria.

Nigeria electricity market 2026: NERC Band A–E tariffs, 11 DisCos, state regulators under the Electricity Act 2023, NISO, metering, net billing and licensing.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Nigerian naira (NGN) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Nigeria energy at a glance.

Key figures for households in Nigeria. Each one links to its source on the full overview below.

  • Electricity price.

    209.5 NGN per kWh for households, including taxes. Figures for 2026.

  • Renewable share.

    26% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Nigeria.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Nigeria below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Nigeria requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Nigeria.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Nigeria, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Nigeria, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Nigeria.

Full overview

The energy market in Nigeria, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Nigeria has a privatised but heavily regulated electricity sector. Generation and distribution are largely in private hands: 11 regional distribution companies (DisCos) buy power through the Nigerian Bulk Electricity Trading company (NBET) from gas-fired and hydro plants, and the state-owned Transmission Company of Nigeria (TCN) carries it over the national grid. Since April 2025 the grid has been dispatched by a separate Nigerian Independent System Operator (NISO).

The Electricity Act 2023, together with a constitutional amendment in March 2023, allows each state to regulate its own intrastate electricity market. By the end of March 2026 the federal regulator, NERC, had transferred oversight to 16 states, including Lagos, Enugu, Oyo and Ogun, and in August 2026 the government said 17 states had set up their own regulatory commissions. Rules, tariffs and licences can therefore differ depending on where a household lives.

Household tariffs follow a service-based “Band A–E” system in which customers pay according to the hours of supply their feeder delivers. Band A customers (at least 20 hours a day) pay ₦209.50/kWh in NERC-regulated areas, while Bands B–E remain frozen at much lower subsidised rates. About 61.5% of the 12.6 million active customer accounts were metered in June 2026, and Net Billing Regulations issued in June 2026 let solar systems of 50 kWp to 1.5 MWp export surplus power for bill credits.

Energy snapshot.

Headline figures for electricity in Nigeria. Each shows its data year and links to its source.

  • Population237,527,782 peopleSource 82025
  • Households52,800,000 householdsSource 112025
  • Average household size4.5 people/householdSource 112023–24
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (NGN)209.5 NGN/kWhSource 22026
  • Household price (EUR)0.139 EUR/kWhSource 72026
  • Renewable electricity share26%Source 122023
  • Solar capacity0.197 GWSource 122024
  • Wind capacity0 GWSource 122024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Nigerian Electricity Regulatory Commission (NERC) for national and interstate activity; State Electricity Regulatory Commissions for intrastate markets in states that have taken over regulation
System operator
Nigerian Independent System Operator (NISO)
Distribution networks
11 privatised regional DisCos (plus Aba Power in part of Abia State), with state-level successor companies forming where states regulate their own markets
Currency
Nigerian naira (NGN)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Nigeria.

Household price (NGN)
209.5 NGN/kWh (2026)Source 2Band A (at least 20 hours of supply a day) non-maximum-demand tariff in NERC-regulated areas, unchanged since July 2024; NERC confirms end-user tariffs remained frozen at July 2024 rates through 2026. Excludes 7.5% VAT. Bands B–E pay between ₦31.24 and ₦62.48/kWh (Ikeja Electric schedule); state regulators can set different rates, for example ₦160/kWh for Band A in Enugu State from August 2025.
Household price (EUR)
0.139 EUR/kWh (2026)Source 7Converted from ₦209.50/kWh (Band A, excluding VAT) at the Central Bank of Nigeria central rate of ₦1,511.06 per euro on 24 September 2026.
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (NGN per kWh).Source 2

206.8215.9225Apr 2024May 2024Jul 2024Jul 2025Q1 2026
Nigeria household electricity price, NGN per kWh
Apr 2024225 NGN/kWh
May 2024206.8 NGN/kWh
Jul 2024209.5 NGN/kWh
Jul 2025209.5 NGN/kWh
Q1 2026209.5 NGN/kWh

Nigeria’s retail tariffs are set by NERC through the Multi-Year Tariff Order (MYTO), updated each month by supplementary orders for each DisCo. Each order calculates a “cost-reflective” tariff from inflation, the naira–dollar exchange rate, gas prices and available generation, and then sets the “allowed” tariffs customers actually pay. In June 2025, for example, NERC calculated a weighted average cost-reflective tariff of ₦185.9/kWh for Ikeja Electric against an allowed average of ₦114.7/kWh; the government pays the difference as a subsidy.

The Band A–E system

Since April 2024 tariffs have been linked to the quality of supply. Every 11 kV and 33 kV feeder is classified by the average hours of supply it delivers, and customers on that feeder pay the matching band rate. Band A customers had their subsidy removed in April 2024, when the rate rose to ₦225/kWh; it was cut to ₦206.80 in May 2024 and then set at ₦209.50 from July 2024. Bands B–E have stayed at the rates payable since December 2022. DisCos must publish daily supply hours for Band A feeders, and a feeder that repeatedly fails to deliver must be downgraded and its customers compensated.

A frozen tariff and a growing subsidy

Under a federal policy directive, end-user tariffs have been frozen at July 2024 levels; NERC applied the freeze in every monthly order in 2026. In the first quarter of 2026 the government’s subsidy obligation was ₦358.32 billion, about 52% of what generators invoiced. On 21 September 2026 the Minister of Power, Joseph Tegbe, said there was no immediate plan to raise tariffs.

Taxes and regional differences

VAT at 7.5% has been applied to electricity bills since February 2020. Where a state has taken over regulation, its commission sets tariffs for the intrastate market. Enugu State’s regulator cut the Band A rate in its area to ₦160/kWh from 1 August 2025, so two households on Band A feeders in different states can pay different prices.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesService-based tariff (SBT) set by NERC in a Multi-Year Tariff Order with monthly supplementary orders. Price depends on the hours of supply guaranteed on the customer’s feeder: Band A at least 20 hours a day, Band B 16, Band C 12, Band D 8 and Band E 4. Ikeja Electric non-maximum-demand rates: Band A ₦209.50, Band B ₦62.48, Band C ₦45.80, Bands D and E ₦31.24 per kWh.
OtherYesLifeline tariff (class R1) for customers using no more than 50 kWh a month, ₦4.00/kWh in the Ikeja Electric schedule.
PrepaymentYesMetered households mostly use STS prepaid meters and buy 20-digit credit tokens from the DisCo, banks, apps or vendors. The band tariff applies; prepayment is a payment method, not a separate price.
Time-of-useNoNo residential time-of-use or dynamic tariff exists. Time-of-use metering is required only for exporters under the 2026 Net Billing Regulations.

Household prices compared with neighbouring countries (EUR per kWh).

  • Ghana€0.153
  • Nigeria€0.139

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
164 kWh/person/yr (2023)Source 12Derived: total electricity generation of 37,402 GWh (IRENA, 2023) divided by the World Bank 2023 population of 227.9 million. All sectors; excludes self-generation from private generators.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Grid electricity use per person in Nigeria is very low because supply is constrained, not because demand is small. In the first quarter of 2026 the 28 grid-connected power plants had an average available capacity of only 4,458 MW for a country of more than 230 million people, and the grid delivered 8,883 GWh over the quarter. Many households and businesses rely on petrol or diesel generators and, increasingly, on solar systems with batteries to cover the hours when the grid is off.

Access is also incomplete. The World Bank puts access to electricity at 62.5% of the population in 2024, and the 2023–24 Demographic and Health Survey found that 51% of the household population had access to electricity. Typical household uses are lighting, fans, refrigeration, television and phone charging, with air conditioning concentrated among better-off urban customers, who are more likely to be on Band A feeders.

No reliable national figures were identified for air-conditioner ownership, electric cooking or electric vehicles.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
63.8 % of population (2025)Source 9

Nigeria has not conducted a population and housing census since 2006, so there are no current official figures on the number of dwellings, tenure or dwelling types. The 2023–24 Nigeria Demographic and Health Survey reports an average household size of 4.5 people, and 19% of households are headed by women.

Housing arrangements matter for electricity metering. Where premises have no meter, the account is billed on an estimate capped by NERC for its feeder each month. Meters can be supplied by the DisCo, by a NERC-permitted Meter Asset Provider, through federal programmes or under vendor-financed arrangements, and NERC has issued orders on reimbursing customers who pay for meters themselves.

How the grid works in Nigeria.

  1. TransmissionTransmission Company of Nigeria (TCN), Nigerian Independent System Operator (NISO)
  2. Distribution11 privatised regional DisCos (plus Aba Power in part of Abia State), with state-level successor companies forming where states regulate their own markets
  3. MeteringMeter Asset Providers (MAPs) and Meter Service Providers (MSPs), Nigerian Electricity Management Services Agency (NEMSA)
  4. Supply11 or more retail suppliers

Electricity in Nigeria is generated mainly by gas-fired power stations and five large hydro plants. In the first quarter of 2026 there were 28 grid-connected plants (five hydro, two steam, 19 open-cycle and two combined-cycle gas turbine), but on average only 32.7% of their installed capacity was available because of gas supply shortages, breakdowns and low river flows. IRENA records 14.5 GW of installed capacity in 2024, while NERC reports an average available capacity of 4,458 MW in Q1 2026.

TCN carries power over the national grid to the DisCos’ bulk supply points and to a few international customers: the utilities of Benin (SBEE), Niger (NIGELEC) and Togo (CEET) buy power from Nigerian generators. In Q1 2026, 7.96% of the energy sent out by generators was lost in transmission. The grid remains fragile: generation fell to about 1,132 MW during a partial collapse on 23 August 2026.

Commercial flow

NBET buys power from generators and invoices the DisCos. Because retail tariffs are below cost, each DisCo pays only a “DisCo Remittance Obligation” covering what allowed tariffs can recover, and NBET bills the rest to the federal government. DisCos must also pay the market operator for transmission and administration. Losses and non-payment are high: the aggregate technical, commercial and collection loss across the DisCos was 37.44% in Q1 2026, against a regulatory target of 16.92%.

Decentralisation to the states

A constitutional amendment on 17 March 2023 and the Electricity Act 2023 allow states to make laws for, and regulate, electricity generation, transmission and distribution within their borders. NERC transfers oversight state by state, and the DisCo serving that state sets up a subsidiary licensed by the state regulator. In Lagos, for example, regulation passed to the Lagos State Electricity Regulatory Commission from 21 December 2024, and Eko and Ikeja Electric created Lagos subsidiaries. NERC keeps responsibility for the national grid, interstate trade and states that have not taken over regulation.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryFederal Ministry of PowerSets federal power policy, oversees the state-owned TCN and NBET, and coordinates the metering and subsidy policy, including the tariff freeze.
RegulatorNigerian Electricity Regulatory Commission (NERC)Federal regulator under the Electricity Act 2023: licences generation, transmission, system operation, distribution and trading; sets tariffs through the MYTO; regulates interstate and national-grid activity and the intrastate markets of states that have not set up their own regulators.
RegulatorState Electricity Regulatory Commissions (e.g. LASERC in Lagos, EERC in Enugu)Regulate intrastate electricity markets after NERC transfers oversight. By 31 March 2026 transfers had been completed to Abia, Anambra, Bayelsa, Edo, Ekiti, Enugu, Imo, Gombe, Kogi, Lagos, Niger, Nasarawa, Ogun, Ondo, Oyo and Plateau.
TSOTransmission Company of Nigeria (TCN)State-owned transmission service provider that owns and maintains the high-voltage national grid. It held the system operator licence until that role moved to NISO.
System operatorNigerian Independent System Operator (NISO)Created under the Electricity Act 2023 and inaugurated on 8 April 2025. Handles real-time dispatch and balancing, generation and transmission scheduling, procurement of ancillary services and administration of the wholesale market (market operator).
SettlementNigerian Bulk Electricity Trading Plc (NBET)State-owned bulk trader that buys power from generators under power purchase agreements and invoices the DisCos. The subsidised portion of generation costs is billed to the Federal Ministry of Finance.
DSODistribution companies (DisCos)Eleven privatised regional companies — Abuja, Benin, Eko, Enugu, Ibadan, Ikeja, Jos, Kaduna, Kano, Port Harcourt and Yola — own the local networks, connect, meter and bill customers. In states with their own regulators they operate through state-licensed subsidiaries.
MeteringMeter Asset Providers (MAPs) and Meter Service Providers (MSPs)NERC-permitted companies that finance, supply, install and maintain meters on behalf of DisCos (MAPs), or that manufacture, import or install meters (MSPs). NERC issued 21 MAP permits and 12 MSP certifications in Q1 2026.
MeteringNigerian Electricity Management Services Agency (NEMSA)Federal technical safety agency that tests and certifies meters and electrical installations, certifies electrical contractors and inspects installations before they are energised.

Compared with the UK system.

Compared with the UK system.
UK conceptNigeria equivalentHow it works
DNODisCo (distribution company)Each of the 11 DisCos owns and runs the distribution network in its franchise area and is also the only retail supplier there. There is no split between network operator and supplier for households.
National Grid/NESOTCN (transmission) and NISO (system operator)TCN owns and maintains the transmission network; NISO, separated from TCN under the Electricity Act 2023, dispatches the system and operates the wholesale market.
MPANDisCo account number and STS meter numberThere is no national supply-point number. Each DisCo gives the connection an account number in its billing system and, where a prepaid meter is fitted, the 11- or 13-digit STS meter number identifies the premises for buying credit.
MPRNNo direct equivalentNo piped residential gas supply-point system was identified; households typically use LPG cylinders, so there is no MPRN-type register.
Meter operatorDisCo, Meter Asset Provider or Meter Service ProviderThe DisCo is responsible for metering, but meters can be financed and installed by NERC-permitted MAPs or supplied under government programmes. All meters must be tested and certified by NEMSA.
SupplierThe local DisCo (no switching)Households cannot choose their supplier. Only “eligible customers” consuming at least 2 MWh/h over a month can contract directly with generators.
Smart-meter infrastructureDisCo vending and head-end systemsThere is no national data and communications company. Each DisCo runs its own vending and meter-management systems, and its head-end systems record feeder supply hours used to enforce the band rules.

How a supply point is identified.

0101 98765432 0 — written 0101987654320 (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?DisCo customer account number / prepaid meter number (STS decoder reference number) (Account number / meter number)
Who issues it?The DisCo (or its state-licensed successor) creates the account number; the meter number is the STS decoder reference number allocated by the meter manufacturer and linked to the account when the meter is installed
FormatSTS prepaid meter number: manufacturer code (2 or 4 digits) + 8-digit serial number + 1 Luhn check digit. DisCo account-number formats vary by company and are not published as a national standard.
Length11 or 13 digits (STS meter number); account number length varies by DisCo
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itThe meter number is printed on the meter or its customer interface unit and on every token receipt; the account number appears on postpaid bills and in the DisCo’s customer records.
Electronic accessCustomers use the meter or account number to buy prepaid tokens and Key Change Tokens through DisCo websites, apps, USSD codes, banks and vendors, and to log complaints.
Third-party accessAnyone who knows a meter number can buy credit for it through authorised vending channels. No regulated scheme for third parties to access a customer’s consumption data was identified.
Who keeps the registerEach DisCo’s own customer database and vending system; NERC collects aggregated customer and metering data from the DisCos.
Register scopePer DSO

Nigeria has no national, supplier-independent identifier for a supply point. A residential connection is known by its DisCo account number and, for the majority of metered homes that use prepaid meters, by the number of the meter itself. Because a household can only buy from the DisCo serving its area, there is no central switching register of the kind that MPANs serve in Britain.

How the prepaid meter number works

Nigerian prepaid meters follow the Standard Transfer Specification (STS), an open standard (IEC 62055-41) that lets any authorised vending system generate an encrypted 20-digit token for a particular meter. The meter number is the STS decoder reference number: a 2-digit or 4-digit manufacturer code, an 8-digit serial number and a final check digit calculated with the Luhn formula, giving 11 or 13 digits. A fictional example with a 4-digit manufacturer code is 0101987654320. A real meter number should never be guessed: credit bought for the wrong number goes to someone else’s meter.

The 2024 key change

STS meters contain a cryptographic “token identifier” that expired worldwide on 24 November 2024. NERC directed DisCos to give every prepaid customer two 20-digit Key Change Tokens from 1 November 2023, which reset the meter so it could keep accepting credit. Customers obtained them by entering their meter number on DisCo websites, by USSD or with their next purchase.

Does it stay with the property?

The meter and its number normally stay at the premises when an occupier moves out, and the DisCo updates the account details. When a meter is replaced, for example under a mass metering programme, the premises gets a new meter number. Some DisCos, such as Ikeja Electric, also ask customers to link their National Identification Number (NIN) to their meter account before buying tokens.

The band and feeder attached to a connection

Every connection is also assigned to a feeder, and the feeder’s band (A–E) determines the tariff. NERC’s monthly orders publish feeder-by-feeder lists of upgrades and downgrades, so a household’s price can change if its feeder’s supply hours change.

Getting a new connection or a meter

New customers apply to their DisCo for a connection. Metering is supplied in several ways: by the DisCo itself, by a NERC-permitted Meter Asset Provider, through government programmes such as the World Bank-funded Distribution Sector Recovery Programme (DISREP) and the Presidential Metering Initiative, or under vendor-financed arrangements; NERC has also issued an order on the reimbursement of meter costs paid by customers. In Q1 2026, 357,495 meters were installed: 129,224 under DISREP, 118,681 by MAPs, 97,992 under the Meter Acquisition Fund, 10,589 financed by DisCos and 1,009 by vendors.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringNo
Net billingYes
How exported electricity is paidNet billing (from June 2026): imports billed at the retail tariff, exports credited at a NERC-approved export tariff; credits carried forward against future bills, no cash payment
Can an ordinary household export rooftop solar?In practice, rarely. The Net Billing Regulations 2026 do not exclude residential customers, but the 50 kWp minimum means typical household systems fall outside the framework. The scheme targets factories, commercial buildings, hospitals, universities, hotels and large residential estates.
Which technologies qualify?Solar PV only for now; small wind and hydro may be added later once technical standards exist.
How are exports valued?Exports are credited using export tariff factors of 0.55 off-peak and 0.75 during the 6–9 p.m. peak, reviewed by NERC at least annually. The peak rate applies only to systems with a qualifying battery that can deliver 50% of the PV capacity for two hours; others are credited at the off-peak rate.
What happens to surplus credits?Credits are offset against future import charges and netted off on the anniversary of connection. No cash is paid unless NERC provides otherwise, and a bill cannot go negative. Credits can pass with the premises if the agreement is formally transferred.
Are there export limits?Aggregate prosumer exports on a network asset may not exceed 30% of its average load, and a customer’s approved export capacity is generally capped at 120% of its eligible load demand.
What meter is needed?A revenue-grade import/export or dual-register smart meter with time-of-use capability, provided by the DisCo after a connection charge. A NEMSA-certified bidirectional meter can be used for up to 12 months, during which all exports are credited at the off-peak rate.

Connecting a home system.

  1. Install a solar PV system of 50 kWp to 1.5 MWp connected to the DisCo network, using a NEMSA-certified electrical contractor.
  2. Apply to the DisCo with the prescribed form, proof of ownership or occupation of the premises, a certified single-line diagram and technical specifications.
  3. The DisCo carries out a technical feasibility assessment within 15 business days, checking the network’s hosting capacity.
  4. Sign a Net Billing Agreement with the DisCo (within 5 business days).
  5. NERC issues an electronic registration certificate (within 10 business days).
  6. The DisCo completes interconnection works within 30 business days (120 if major reinforcement is needed) and fits an import/export time-of-use meter; NEMSA inspects and certifies the installation before commissioning.

Until 2026 Nigeria had no general route for customers to be paid for surplus electricity: the Regulations on Embedded Generation 2012 allowed DisCos to buy from embedded generators under contract, but there was no net metering for self-consumers. The Net Billing Regulations 2026 (NERC-R-002-2026), released on 3 June 2026 under section 226 of the Electricity Act 2023 and developed with German and EU support, create a standard route for solar “prosumers” to export.

The scheme is net billing, not net metering: electricity taken from the DisCo is charged at the customer’s band tariff, while exports are measured separately and credited at a lower NERC-approved export rate. A higher export rate in the evening peak is designed to reward systems with batteries that can discharge when the grid is most stretched.

For most households, the practical choice is still self-consumption. Rooftop solar is widely installed with batteries and inverters as a backup for frequent outages, without a grid-export agreement. Mini-grids are regulated separately: the Mini-Grid Regulations 2026 allow isolated mini-grids up to 5 MW and interconnected mini-grids up to 10 MW, including an export tariff in the commercial agreement with the DisCo.

States with their own regulators may adopt their own rules; the regulations as reported do not address how they apply in those states.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityNo licence for generation of up to 1 MW in aggregate at a site; generation licence (on-grid, off-grid or embedded) above thatNERC (national grid or interstate) or the state regulator (wholly intrastate)Licensed generators may be required to meet renewable energy obligations set by NERC. Major licences take up to six months to process.
Generate for own use (captive generation)Captive power generation permit for self-consumption above 1 MW; no permit at or below 1 MWNERC or state regulatorNERC issued seven captive generation permits totalling 40.82 MW in Q1 2026. Imported generating sets need a NERC clearance certificate.
Install a household rooftop solar systemNo generation licence; installation by a NEMSA-certified electrical contractor holding a valid competency certificateNEMSANEMSA’s 2026 rooftop solar safety guidelines require a load assessment, DC and AC isolators, surge protection and earthing of 2 ohms or less.
Export to the gridNet Billing Agreement with the DisCo and NERC registration certificate for solar systems of 50 kWp–1.5 MWp; no route identified for smaller systemsDisCo / NERC / NEMSA (inspection)Exports are credited against bills, not paid in cash.
Distribute electricity (including mini-grids)No licence for distribution of up to 100 kW at a site; mini-grid registration certificate below 100 kW distribution capacity, permit above 100 kW; distribution licence for larger networksNERC or state regulatorMini-Grid Regulations 2026 raised the maximum size to 5 MW (isolated) and 10 MW (interconnected).
Supply / sell electricity to third partiesDistribution or trading licence; households can only buy from their DisCo. Eligible customers (at least 2 MWh/h over a month) can contract directly with generators.NERC / state regulatorIndependent Electricity Distribution Networks hold their own licences; NERC issued one in Q1 2026.
Store electricityNo storage-specific licence or exemption regime identifiedNERCBatteries in a household solar system are treated as part of the installation; the Net Billing Regulations reward qualifying batteries with the peak export rate.
Wholesale trading and bulk purchaseTrading licenceNERCNBET is the licensed bulk trader. Wholesale market rules are administered by NISO as market operator.
Metering servicesMeter Asset Provider permit (financing, supply, installation, maintenance) or Meter Service Provider certification (manufacture, import, installation)NERC; meters certified by NEMSANERC issued 21 MAP permits and 12 MSP certifications in Q1 2026.
Balancing, grid services, aggregation, VPP and remote control of assetsNo framework identified for distributed assetsNISO (ancillary services) / NERCNISO procures ancillary services from grid-connected plants; no route for aggregated household assets was identified.

The Electricity Act 2023 replaced the Electric Power Sector Reform Act 2005 and keeps a simple de minimis rule: anyone may build and run a generating plant of up to 1 MW at a site, or a distribution network of up to 100 kW, without a licence. Above those thresholds, NERC issues licences for generation, transmission, system operation, distribution and trading, and permits for captive generation, mini-grids and metering.

Jurisdiction depends on location. An investor goes to the state regulator when the activity is wholly within one state, that state has its own regulatory authority and the project does not involve the national grid or interstate supply; otherwise NERC is the licensing authority.

For households the practical requirements concern safety rather than licensing: installers must be NEMSA-certified, installations are inspected before energisation, and exporting requires the formal net-billing process, which currently only larger systems can use.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale electricity marketNo—NoNISO (market operator) / NBET. Generators sell mainly to NBET under power purchase agreements; eligible customers and international buyers can contract bilaterally. No route for households or aggregated small assets.
Ancillary servicesNo—NoNISO. NISO procures and schedules ancillary services from grid-connected plants as part of system planning; no participation by distributed resources was identified.
Net billing peak export creditRestricted50 kWpNoDisCos / NERC. Not a flexibility market, but the higher 6–9 p.m. export factor for battery-backed systems is the only price signal rewarding distributed assets for evening delivery.

Nigeria has no flexibility, demand-response or aggregator market open to distributed energy resources. The system’s main problem is a shortage of supply rather than a need to procure flexibility: DisCos manage shortfalls through load shedding, and NISO allocates available generation between DisCos when output falls short.

Distributed resources affect the system mainly by reducing demand on the grid. Behind-the-meter solar and batteries, diesel and petrol generators and mini-grids supply a large share of actual consumption, but they are not dispatched or aggregated by the system operator.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutMass metering of unmetered customers under DISREP, the Presidential Metering Initiative and MAPs; 61.51% of active customers metered in June 2026
Reading intervalNot published
Active customers (June 2026)12,589,486
Metered customers (June 2026)7,743,839 (61.51%)
Highest DisCo metering ratesEko 88.70%, Ikeja 87.91%, Abuja 81.38%
Lowest DisCo metering ratesJos 35.42%, Yola 36.20%
Dominant meter typeSTS prepaid (11/13-digit meter number, 20-digit tokens)
Meter certificationNEMSA
DISREP fundingUS$500 million (World Bank)

Metering in Nigeria is about closing a basic gap rather than upgrading existing meters. Nearly two in five active customers are still unmetered and are billed on estimates, which NERC caps each month feeder by feeder. Metering rates differ sharply between DisCos: above 80% for Eko, Ikeja and Abuja, but around 35% for Jos and Yola in June 2026.

Meters are installed through several channels. The World Bank-funded Distribution Sector Recovery Programme (US$500 million) had deployed 668,000 of 1,033,000 meters delivered under Phase 1 by August 2026; the Presidential Metering Initiative, coordinated by the Bureau of Public Enterprises, aims to meter all registered customers; and Meter Asset Providers finance and install meters for DisCos. Installations rose to 203,521 newly metered customers in June 2026 alone.

Nigeria’s prepaid meters use the STS standard. DisCos’ head-end systems are used to monitor feeder supply hours for the band tariffs, but no national smart-meter specification, data hub or published smart-meter share was identified.

Renewable electricity.

Electricity generation mix (2023).

  • Fossil fuels (mainly gas): 73.9%
  • Hydro: 25.2%
  • Solar: 0.7%
  • Bioenergy: 0.2%
Source 12
Renewable electricity share
26% (2023)Source 12Share of electricity generation (hydro 25%, solar 1%). For grid-connected plants only, NERC reports hydro at 36.36% of generation in Q1 2026; the share swings with river flows and gas supply.
Home solar
Not identified from a reliable public source.
Solar added each year
0.015 GW (2024)Source 12
Hydro
2.861 GW (2024)Source 12
Solar PV
0.197 GW (2024)Source 12
Bioenergy
0.021 GW (2024)Source 12
Wind
0 GW (2024)Source 12
Fossil fuels
11.5 GW (2024)Source 12

Targets.

  • NDC 3.0 (submitted 22 September 2025): 50% renewable electricity generation by 2030
  • NDC 3.0: emissions 29.3% below 2018 levels by 2030 and 32.2% by 2035 (conditional on international support)
  • Net zero emissions by 2060
  • DARES: new or improved access for 16.2 million people and 465 MW of renewable capacity by December 2028

Hydropower from five large grid-connected plants is Nigeria’s main renewable source, supplying about a quarter of electricity in 2023 according to IRENA. Its share of grid generation varies through the year: NERC reports 36.36% in Q1 2026, but hydro availability fell 28.8% that quarter as reservoir levels dropped.

Grid-connected solar is still small: IRENA counts 197 MW in 2024, with only 15 MW added that year. Most solar is distributed and off-grid — rooftop systems with batteries, solar home systems and mini-grids — and is poorly captured in capacity statistics.

The main support programme is the World Bank’s US$750 million Distributed Access through Renewable Energy Scale-up (DARES), run by the Rural Electrification Agency. By June 2026 it had reached 5.3 million people and supported 1.046 million solar home systems, but only 41.25 MW of its 465 MW renewable capacity target had been delivered.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Energy storage in Nigeria is overwhelmingly behind the meter. Households and businesses pair inverters and batteries with solar panels, or use them alone to store grid power for outages. NEMSA’s 2026 rooftop solar guidelines require lithium batteries to have dedicated battery management and temperature control and to be placed in ventilated areas away from living spaces.

The Net Billing Regulations 2026 are the first regulatory instrument to give batteries an explicit value: battery-backed solar systems qualify for a higher export credit during the evening peak. No storage-specific licensing regime or grid-scale battery programme was identified.

Storage projects.

  • Mini-grids with battery storage: Solar mini-grids supported by REA programmes such as DARES serve communities off the grid; NERC issued six mini-grid permits (0.75 MW) in Q1 2026.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Ibadan Electricity Distribution Plc (IBEDC)2,501,809 active customers (Mar 2026), the largest DisCo by customersNoNoNoLimited
Enugu Electricity Distribution Plc (EEDC)1,652,808 active customers (Mar 2026)NoNoNoLimited
Abuja Electricity Distribution Plc (AEDC)1,371,518 active customers (Mar 2026)NoNoNoLimited
Ikeja Electric Plc1,337,621 active customers (Mar 2026)NoNoNoLimited
Benin Electricity Distribution Plc (BEDC)1,098,270 active customers (Mar 2026)NoNoNoLimited
Port Harcourt Electricity Distribution Plc (PHED)1,077,117 active customers (Mar 2026)NoNoNoLimited
Jos Electricity Distribution Plc (JED)822,309 active customers (Mar 2026)NoNoNoLimited
Kano Electricity Distribution Plc (KEDCO)799,094 active customers (Mar 2026)NoNoNoLimited
Eko Electricity Distribution Plc (EKEDC)666,679 active customers (Mar 2026)NoNoNoLimited
Kaduna Electricity Distribution Plc (KAEDCO)548,043 active customers (Mar 2026)NoNoNoLimited
Yola Electricity Distribution Plc (YEDC)511,580 active customers (Mar 2026)NoNoNoLimited

Households cannot choose their supplier: each DisCo is the sole retailer in its franchise area and sells at regulated band tariffs. Export is “Limited” for every DisCo because the Net Billing Regulations 2026 apply only to solar systems of at least 50 kWp. No DisCo offers renewable, time-of-use or dynamic tariffs for households.

The structure is changing as states take over regulation. Where a state regulator is in place, the DisCo serving that state operates through a state-licensed subsidiary — for example, Eko and Ikeja Electric’s Lagos subsidiaries under LASERC. Aba Power, an integrated generation and distribution company in Abia State, is a separate franchise outside the 11 DisCos.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Federal Ministry of PowerGovernmentFederal power policySets subsidy and tariff policy and oversees TCN, NBET and the metering programmes.
Nigerian Electricity Regulatory Commission (NERC)RegulatorFederal electricity regulatorPublishes tariff orders, quarterly sector reports and the net-billing, mini-grid and metering regulations.
Transmission Company of Nigeria (TCN)TransmissionTransmission service providerOwns and maintains the national high-voltage grid.
Nigerian Independent System Operator (NISO)MarketSystem and market operatorDispatches the grid, schedules generation and administers the wholesale market.
Nigerian Bulk Electricity Trading Plc (NBET)MarketBulk electricity traderBuys power from generators and invoices the DisCos.
Nigerian Electricity Management Services Agency (NEMSA)MeteringTechnical safety, inspection and certificationCertifies meters, electrical contractors and installations, and issued the rooftop solar safety guidelines.
Rural Electrification Agency (REA)Renewable EnergyOff-grid and rural electrification agencyImplements the DARES programme for mini-grids and solar home systems.
Renewable Energy Association of Nigeria (REAN)Renewable EnergyRenewable energy industry association (launched 2016)Represents private renewable energy companies in dealings with regulators.
Standards Organisation of Nigeria (SON)GovernmentNational standards bodySets and enforces product standards, including for imported electrical and solar equipment.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid export (net billing)Net Billing Regulations 2026 (NERC-R-002-2026)NERCSolar PV of 50 kWp–1.5 MWp; hosting limit of 30% of a network asset’s average load; revenue-grade time-of-use import/export meter.
Rooftop solar installation safetyNEMSA safety guidelines for rooftop solar PV systems (2026)NEMSACertified contractors only; DC and AC isolators, surge protection, earthing of 2 ohms or less, 0.13 m ventilation gap under panels, battery management for lithium batteries.
Installer competencyNEMSA competency certificate for electrical contractorsNEMSAContractors must carry a valid certificate during installation; installations are not energised until inspected and certified.
Prepaid meteringStandard Transfer Specification (IEC 62055-41)STS Association / IEC11- or 13-digit meter numbers and 20-digit encrypted tokens; key change tokens issued in 2023–24.
MetersMeter Asset Provider and Meter Service Provider frameworks; NEMSA meter certificationNERC / NEMSAMeters must be supplied by permitted MAPs or certified MSPs and tested by NEMSA.
Mini-gridsMini-Grid Regulations 2026 (NERC-R-001-2026)NERCUp to 5 MW isolated or 10 MW interconnected; permits above 100 kW distribution capacity; grid-arrival compensation rules.
Embedded generationRegulations on Embedded Generation 2012NERCFramework for generators connected directly to a DisCo network selling to that DisCo.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Generation licence for a household systemNoMixedNot required for generation up to 1 MW at a site under the Electricity Act 2023.
Certified installer and NEMSA inspectionYesNationalRooftop solar must be installed by a NEMSA-certified electrical contractor; installations are inspected and certified before energisation.
DisCo approval to exportLimitedMixedNeeded only for net billing (50 kWp–1.5 MWp): DisCo feasibility study, Net Billing Agreement and NERC registration certificate.
Mini-grid permit or registrationLimitedMixedRequired for mini-grid developers: registration below 100 kW distribution capacity, permit above, issued by NERC or the relevant state regulator.
Captive generation permitLimitedMixedRequired only for self-consumption generation above 1 MW.

For a home solar system used for self-consumption, Nigeria requires no generation licence. The binding requirements are about safety and workmanship: NEMSA certifies the contractor and inspects the installation. No national planning-permission rule specific to rooftop solar was identified; building rules are set at state level.

Because regulatory powers are now split between NERC and the state commissions, developers of larger projects such as mini-grids or embedded generators must first establish which regulator has jurisdiction.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net billing for solar exportersActiveNet billing (export credit)Bill credits for exported solar electricity at NERC-approved export factors (0.55 off-peak, 0.75 peak with qualifying battery) for systems of 50 kWp–1.5 MWp.From June 2026
VAT exemption for renewable energy equipmentActiveVAT reliefSection 186(2) of the Nigeria Tax Act 2025 exempts renewable energy equipment from VAT (standard rate 7.5%), unless otherwise directed by the Minister of Finance. Electric vehicles and their parts are zero-rated.From 1 January 2026
Distributed Access through Renewable Energy Scale-up (DARES)ActiveGrants (performance-based) and financingUS$750 million World Bank programme run by the Rural Electrification Agency, supporting mini-grids and solar home systems with performance-based grants to developers.Dec 2023 – Dec 2028
Lifeline and Band B–E tariff subsidyActiveConsumer tariff subsidyFederal subsidy covering the gap between cost-reflective and allowed tariffs; Band B–E and lifeline rates frozen. ₦358.32 billion in Q1 2026.Ongoing

Data and connectivity.

Fixed broadband
56.1 % of population (May 2026)Source 30NCC broadband penetration (broadband subscriptions relative to population), not households.
4G coverage
54.3 % of mobile connections (May 2026)Source 31
5G coverage
4.49 % of mobile connections (May 2026)Source 31

Mobile networks are the main route for digital services in Nigeria: there were 189.68 million active mobile subscriptions and 122 million broadband subscriptions in May 2026. 4G accounted for 54.3% of mobile connections, while 5G, launched in 2022, had reached only 4.49%.

Electricity payments rely heavily on mobile channels: prepaid tokens and key change tokens are delivered by SMS, USSD codes and apps. No national smart-meter communications standard was identified; meter communication is specified by each DisCo or programme.

Grid conditions.

National peak demand
5.802 GW (2021)Source 24All-time peak generation transmitted on the national grid (1 March 2021), not true demand, which is suppressed by supply shortages. The 2025 peak was 5,713.6 MW on 2 March 2025.
Annual electricity demand
37.4 TWh (2023)Source 12Total electricity generation, used as a proxy for grid demand.
Generation capacity
14.5 GW (2024)Source 12Installed capacity. Average available grid capacity was only 4.458 GW in Q1 2026 (NERC).
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The Nigerian grid operates far below its installed capacity. In Q1 2026 average available generation was 4,458 MW, 17.5% lower than in the previous quarter, and the plant availability factor was just 32.7%. Gas supply shortfalls and low reservoir levels are recurring constraints, and the grid suffers periodic collapses, including a partial collapse on 23 August 2026.

Transmission losses were 7.96% in Q1 2026. When generation falls short, NISO allocates available power among DisCos, which then ration supply between feeders according to their bands — one reason Band A feeders sometimes miss their 20-hour commitment and customers become entitled to compensation.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Net Billing Regulations 2026CurrentJune 2026First general framework for exporting solar power (50 kWp–1.5 MWp) with export credits, time-of-use metering and a battery-linked peak export rate.
Mini-Grid Regulations 2026CurrentQ1 2026Raises mini-grid size limits to 5 MW (isolated) and 10 MW (interconnected) and revises interconnection, grid-arrival compensation and export tariff arrangements.
Transfer of regulation to the statesCurrent2024–2026NERC had transferred oversight to 16 states by March 2026 (Gombe from 7 January 2026); 17 states had established regulatory commissions by August 2026, with Akwa Ibom creating one in July 2026.
Nigeria Tax Act 2025Current1 January 2026Exempts renewable energy equipment from VAT and zero-rates electricity supplied by generators to the grid and by TCN to DisCos, and electric vehicles.
Tariff freeze and subsidyCurrentSince July 2024End-user tariffs held at July 2024 levels; on 21 September 2026 the Minister of Power said no increase was planned in the near term.
Amendments to the Electricity Act 2023UpcomingNot yet scheduledThe government said in August 2026 that it is working on amendments to fine-tune implementation of the Act.
Mass metering programmesUpcomingOngoing to 2026–2028DISREP and the Presidential Metering Initiative aim to meter all registered customers and end estimated billing.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumRooftop and home solar is widespread as outage backup and DARES had supported 1.046 million solar home systems by June 2026, but grid-connected solar is only 197 MW (IRENA 2024) and household export is not generally possible.
Distributed energy marketMediumLarge reliance on behind-the-meter generators, solar and mini-grids; regulated mini-grid and net-billing frameworks exist, but distributed assets are not integrated into system operation.
Grid flexibility marketLowNo demand-response, aggregation or flexibility market; ancillary services are procured by NISO from grid-connected plants only.
Energy storage adoptionLowNo grid-scale battery programme or official storage statistics; storage is mainly household inverter batteries and mini-grids.
Renewable growth environmentLowRenewable share of generation about 26% (IRENA 2023), almost entirely hydro; only 15 MW of solar added in 2024 and DARES had delivered 41.25 MW of its 465 MW target by June 2026.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 31 sources
  1. First Quarter 2026 Report. Nigerian Electricity Regulatory Commission, 2026. accessed 1 October 2026.
  2. Order NERC/2025/064 — July 2025 Supplementary Order to the MYTO for Ikeja Electric Plc. Nigerian Electricity Regulatory Commission, 2025. accessed 1 October 2026.
  3. Over 4m electricity customers remain unmetered – NERC. Economic Confidential (reporting NERC data), 2026. accessed 1 October 2026.
  4. Nigeria tariff freeze keeps power subsidy high, says NERC. The Rio Times, 2026. accessed 1 October 2026.
  5. Enugu electricity regulator slashes Band A tariff to ₦160/kWh. Techeconomy, 2025. accessed 1 October 2026.
  6. Nigeria: We’ll implement 7.5% VAT from Feb 1, AEDC tells customers. Africa Energy Portal, 2020. accessed 1 October 2026.
  7. CBN releases updated dollar, pound, euro exchange rates (24 September 2026). Legit.ng (reporting Central Bank of Nigeria), 2026. accessed 1 October 2026.
  8. Population, total — Nigeria. World Bank, 2025. accessed 1 October 2026.
  9. Urban population (% of total population) — Nigeria. World Bank, 2025. accessed 1 October 2026.
  10. Access to electricity (% of population) — Nigeria. World Bank, 2024. accessed 1 October 2026.
  11. Nigeria Demographic and Health Survey 2023–24: Key Findings. National Population Commission / DHS Program, 2024. accessed 1 October 2026.
  12. Energy Profile: Nigeria. IRENA, 2025. accessed 1 October 2026.
  13. NERC Net Billing Regulations 2026. DLA Piper Africa, 2026. accessed 1 October 2026.
  14. New Net Billing Regulation enables solar users to earn credits for excess electricity. GIZ, 2026. accessed 1 October 2026.
  15. The Electricity Act 2023 and the Constitutional Amendment Act 2023: implications for the power sector. Mondaq, 2023. accessed 1 October 2026.
  16. Powering Nigeria’s future: introducing the Electricity Act 2023. Afriwise, 2023. accessed 1 October 2026.
  17. Investor & Regulatory FAQs – Nigerian Electricity Sector. Nigerian Electricity Regulatory Commission. accessed 1 October 2026.
  18. Eligibility customers regime: the implementation of an open access electricity market in Nigeria. Mondaq, 2017. accessed 1 October 2026.
  19. NERC transfers electricity regulation in Lagos to new state commission. News Central, 2024. accessed 1 October 2026.
  20. Nigeria moves to close electricity metering gap. Voice of Nigeria, 2026. accessed 1 October 2026.
  21. How to get KCT for your prepaid meter. Techpoint Africa, 2023. accessed 1 October 2026.
  22. What is a meter number?. STS Association. accessed 1 October 2026.
  23. NEMSA issues safety guidelines for rooftop solar installations. TheNigeriaLawyer, 2026. accessed 1 October 2026.
  24. Nigeria records new power generation peak of 5,713.6MW. Ripples Nigeria (reporting TCN), 2025. accessed 1 October 2026.
  25. DisCos embark on load shedding as power grid suffers partial collapse, generation plunges to 1,132MW. AllAfrica (ThisDay), 2026. accessed 1 October 2026.
  26. Nigeria’s $750 million DARES project faces major energy access gap. fundsforNGOs News, 2026. accessed 1 October 2026.
  27. Examination of the Value Added Tax provisions under the Nigeria Tax Act, 2025. Mondaq, 2025. accessed 1 October 2026.
  28. Nigeria Tax Act, 2025 has been signed — highlights. EY, 2025. accessed 1 October 2026.
  29. Nigeria 2035 NDC. Climate Action Tracker, 2025. accessed 1 October 2026.
  30. Nigeria internet subscriptions rise to 157.4 million as broadband penetration hits 56.1% in May. Techeconomy (reporting NCC), 2026. accessed 1 October 2026.
  31. Nigeria: Telecom — 5G adoption remains low despite huge investments. AllAfrica (reporting NCC data), 2026. accessed 1 October 2026.

Questions about energy in Nigeria.

Talk to us about Olmack in Nigeria.Tell us about your home, housing portfolio or school estate in Nigeria. We'll explain what is possible there now.