Countries

Energy in Guam, explained.

How electricity works in Guam: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Guam: Not yet available.Olmack is not offered in Guam yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Guam.

Guam electricity 2026: Guam Power Authority, PUC-approved rates and the LEAC fuel charge (28.27¢/kWh from Oct 2026), net metering with batteries, solar growth.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in US dollar (USD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Guam energy at a glance.

Key figures for households in Guam. Each one links to its source on the full overview below.

  • Electricity price.

    0.35 USD per kWh for households, including taxes. Figures for 2024.

  • Household use.

    12,003 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    9% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Guam.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Guam below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Guam requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Guam.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Guam, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Guam, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Guam.

Full overview

The energy market in Guam, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Guam, an unincorporated US territory in the western Pacific, has a single isolated island grid owned and run by the Guam Power Authority (GPA). GPA is a public corporation of the Government of Guam, created by the Guam Power Authority Act of 1968. It generates, transmits, distributes and sells electricity to about 54,000 customers, and is governed by the Consolidated Commission on Utilities (CCU), a board of five elected commissioners. Its rates, and any procurement that affects rates, are approved by the Guam Public Utilities Commission (PUC).

Almost all electricity is still made from imported petroleum. According to EIA, fossil fuels produced 91% of Guam’s electricity in 2024 and renewables 9%, mainly from the 25 MW Dandan and 60 MW Mangilao solar farms. The 198 MW Ukudu combined-cycle plant, which can burn ultra-low sulphur diesel or liquefied natural gas, came online on 25 December 2025 and is replacing the older oil units at Cabras. The US Navy is GPA’s largest single customer.

Households paid an average of 35.0 US cents per kWh in 2024 (EIA), more than double the US average. A large part of the bill is the Levelized Energy Adjustment Clause (LEAC), a fuel charge reset by the PUC. After falling to 13.58¢/kWh in January 2026, the residential LEAC rose to 19.42¢ in July and 28.27¢ from 1 October 2026 as fuel costs climbed. Homes with solar can join GPA’s net metering programme, but new systems connected since June 2020 must include at least one hour of battery storage. Guam law sets targets of 50% renewable electricity sales by 2035 and 100% by 2045.

Energy snapshot.

Headline figures for electricity in Guam. Each shows its data year and links to its source.

  • Population153,836 peopleSource 221 April 2020 (census)
  • HouseholdsNot identified from a reliable public source.
  • Average household size3.44 people/householdSource 242020
  • Electricity use per household12,003 kWh/yrSource 22024
  • Household price (USD)0.35 USD/kWhSource 22024
  • Household price (EUR)0.312 EUR/kWhSource 262024
  • Renewable electricity share9%Source 12024
  • Solar capacity0.085 GWSource 12025
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacity0.04 GWSource 112021
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Guam Public Utilities Commission (PUC)
System operator
Guam Power Authority (GPA)
Distribution networks
GPA owns and operates all transmission and distribution on the island; there are no other network companies
Currency
US dollar (USD)
Voltage and frequency
120/240 V / 60 Hz

Electricity prices in Guam.

Household price (USD)
0.35 USD/kWh (2024)Source 2EIA average residential revenue per kWh (USD 192.5 million ÷ 549,816 MWh), including the LEAC fuel charge. Prices have risen since: the residential LEAC alone was 28.2708¢/kWh from 1 October 2026, against 13.5840¢ in January 2026 (GPA).
Household price (EUR)
0.312 EUR/kWh (2024)Source 26Converted from USD 0.3501/kWh at the ECB reference rate of USD 1.1206 per euro on 9 October 2026.
Typical annual electricity bill
4,203 USD/yr (2024)Source 2Derived: residential revenue of USD 192,509,000 divided by 45,808 residential customers (EIA Table 12.6), about USD 350 a month. The figure reflects the high average consumption of about 1,000 kWh a month.

Household price trend (USD per kWh).Source 2

0.1890.2850.3820142024
Guam household electricity price, USD per kWh
20140.2731 USD/kWh
20150.2286 USD/kWh
20160.1891 USD/kWh
20170.2 USD/kWh
20180.2376 USD/kWh
20190.2499 USD/kWh
20200.2111 USD/kWh
20210.2008 USD/kWh
20220.3006 USD/kWh
20230.3803 USD/kWh
20240.3501 USD/kWh

How rates are set

GPA does not set its own prices. It petitions the PUC, which reviews filings with the help of its consultant (Marianas Consulting Group) and an administrative law judge before issuing an order. Base rates cover GPA’s non-fuel costs and were last changed from 1 January 2026. The LEAC covers fuel plus fuel-related costs such as dock fees, storage tank rental, demurrage, hedging, trucking and testing. GPA says all LEAC expenses are publicly declared and audited by the PUC.

What drives the price

Because Guam burns imported diesel and fuel oil, the LEAC moves with world oil prices. In 2025 GPA cut the LEAC twice and again from January 2026, helped by the start of the more efficient Ukudu plant, which GPA expects to save more than 900,000 barrels of fuel a year. Fuel prices then rose: the PUC approved increases from July 2026 and, by order of 17 September 2026, from October 2026 (docket 26-13). On the residential factors alone, the October increase adds about USD 89 a month to a 1,000 kWh bill compared with July (derived: 1,000 × (28.2708¢ − 19.4150¢)). In 2026 the CCU also approved up to USD 32.5 million of financing for fuel purchases.

Comparison and trends

EIA’s residential average fell from 27.3¢/kWh in 2014 to 18.9¢ in 2016 with low oil prices, then rose to 38.0¢ in 2023 before easing to 35.0¢ in 2024. Guam’s price is consistently more than double the US average of about 16¢. Average residential use is high, at about 12,000 kWh a year, because air conditioning runs all year in the tropical climate.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesHouseholds are billed under GPA’s Schedule R (Residential Service); Schedule D covers condominium or apartment services. Base (non-fuel) rates are set by the PUC; the latest base rate decision (docket 25-14, 22 December 2025) took effect on 1 January 2026. GPA said the base rate change and a simultaneous LEAC cut together added about USD 8 a month to a 1,000 kWh residential bill.
VariableYesThe LEAC (Schedule Z) passes fuel and fuel-handling costs through to customers and is reset by the PUC, normally every six months. The residential (secondary distribution) factor was 15.5495¢/kWh from 1 August 2025, 13.5840¢ from 1 January 2026, 19.4150¢ from 1 July 2026 and 28.2708¢ from 1 October 2026. Customers taking supply at 13.8 kV, 34.5 kV or 115 kV pay slightly lower factors.
Time-of-useNoGPA publishes no residential time-of-use tariff. Its “Beat the Peak” campaign asks customers to shift use away from the 5–11 pm peak voluntarily.
DynamicNoThere is no wholesale market and no tariff linked to market prices.
OtherYesSchedule C (Net Metering) for customers with their own renewable generation, under which GPA pays for surplus power. Systems connected after 1 June 2020 must include battery storage.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
12,003 kWh/yr (2024)Source 2Derived: residential sales of 549,816 MWh divided by 45,808 residential customers (EIA Electric Power Annual, Table 12.6). Electricity from rooftop solar used on site is not included.
Average daily use per household
32.9 kWh/day (2024)Source 2Derived from 12,003 kWh a year per residential customer, grid supply only.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
10,195 kWh/person/yr (retail sales, all sectors) (2024 sales / 2020 population)Source 2Derived: 1,568,289 MWh of retail sales in 2024 divided by the 2020 census population of 153,836. Sales include supply to US Navy facilities, while the census population is civilian-weighted, so the figure overstates civilian use.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Households used 550 GWh of grid electricity in 2024, 35% of GPA’s sales. EIA reports that commercial customers took 33%, the US Navy 21% and the Government of Guam 11%. Average residential use, about 1,000 kWh a month, is roughly double that of many mainland US states because air conditioning, refrigeration and water heating run all year in a hot and humid climate. GPA uses 1,000 kWh a month as its typical residential bill.

Residential sales have moved with prices and the economy: they rose from 458 GWh in 2014 to 604 GWh in 2021, fell to 495 GWh in 2023, the year Typhoon Mawar struck in May, and recovered to 550 GWh in 2024. The evening peak between 5 pm and 11 pm, when solar output has stopped and air conditioners are running, is the hardest period for the system; in July 2026 GPA issued a schedule of potential rotating outages.

Housing and households.

Dwellings
51,555 dwellings (2020)Source 23Total housing units, up 2.0% from 50,567 in 2010.
Owner-occupied
52 % of occupied homes (2020)Source 24Up from 50.3% in 2010. Military housing was not covered in 2020.
Private rented
48 % of occupied homes (2020)Source 24Derived as 100% minus the 52.0% homeownership rate, so it covers all renter-occupied homes, including any public housing.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
94.2 % of population (2025)Source 25

Just over half of civilian households own their home. Households are large by US standards, averaging 3.44 people in 2020, which helps explain the high consumption per account. The population is concentrated in the north and centre of the island, in Dededo, Yigo, Tamuning and Mangilao.

Tenure matters for rooftop solar: GPA requires proof of ownership (title or deed), or a lease plus a letter of authorisation, to open an electricity account. Renters therefore need the owner’s involvement for any change to the connection, including net metering.

How the grid works in Guam.

  1. TransmissionGuam Power Authority (GPA)
  2. DistributionGPA owns and operates all transmission and distribution on the island; there are no other network companies
  3. MeteringGPA
  4. Supply1 or more retail suppliers

Physical system

Guam is a single island grid of about 54,000 customers. Generation has been dominated by oil-fired units such as those at Cabras and Piti, plus combustion turbines and diesel engines. The 198 MW Ukudu combined-cycle plant, supplied under an energy conversion agreement between GPA and Korea Electric Power Corporation (KEPCO), came online on 25 December 2025; EIA expects the last two Cabras units to be retired by 2026. Renewable supply comes from the Dandan (25 MW) and Mangilao (60 MW) solar farms, and a 40 MW battery system commissioned in March 2021 helps manage solar variability.

Reliability

Reserves have been tight, and Typhoon Mawar (May 2023) delayed the start of Ukudu (EIA). In 2023–2024 GPA added temporary capacity: repaired units, rented diesel generators, a 16 MWh battery and an interruptible load programme of about 16 MW with large customers. GPA issued a potential rotating outage schedule in July 2026. The US Department of Energy has selected GPA for a USD 21.2 million grid modernisation project to strengthen transmission in northern Guam.

Commercial flow

There is no wholesale market. GPA buys power from independent producers under PUC-approved contracts, including the solar farms and Ukudu, and recovers fuel costs through the LEAC. All customers pay GPA directly.

Who does what.

Who does what.
RoleOrganisationWhat it does
RegulatorGuam Public Utilities Commission (PUC)Approves GPA’s base rates, the LEAC fuel charge and rate-impacting procurements such as renewable energy and storage contracts. It also regulates Guam Waterworks Authority, Guam Solid Waste Authority, the Port Authority and telecommunications.
MinistryConsolidated Commission on Utilities (CCU)Five elected commissioners who govern GPA; for example, the CCU approved up to USD 32.5 million of fuel financing in 2026.
MinistryGuam Energy Office (GEO)Government of Guam energy office running LIHEAP bill assistance, weatherisation, the State Energy Program and the federal Home Energy Rebates.
System operatorGuam Power Authority (GPA)Vertically integrated public utility that dispatches all generation from its Power System Control Center using SCADA. EIA puts GPA’s generation capacity at 354 MW, more than 85 MW of it renewable.
DSOGPAOwns 1,839 miles of transmission and distribution lines and 29 substations. Customers can take supply at secondary (distribution) level or at 13.8 kV, 34.5 kV or 115 kV.
SupplierGPAThe only retail supplier, with 53,559 customers in 2024 (45,808 residential), including the US Navy under a long-term contract extended for ten years in July 2022.
MeteringGPAInstalls and reads all meters and runs the MyEnergyGuam consumption portal; AMI deployment is under way.

Compared with the UK system.

Compared with the UK system.
UK conceptGuam equivalentHow it works
DNOGuam Power AuthorityThere is one network company for the whole island. GPA owns and operates every line and substation as well as most generation.
National Grid/NESOGPA Power System Control CenterThere is no separate transmission or system operator. GPA balances the isolated island grid itself from its control centre. Guam has no interconnection with any other system.
MPANGPA account numberThere is no standard supply-point number or central register. A connection is identified by the customer’s GPA account number, which is used for billing, payment (PayGPA) and registration on MyEnergyGuam, together with the meter at the premises.
MPRNNoneThere is no piped natural gas network, so no gas supply-point identifier exists. Liquefied natural gas for the Ukudu plant is still at the planning stage.
Meter operatorGPAGPA owns, installs and reads meters, including those used for net metering. There is no competitive metering market.
SupplierGPA (no choice)There is no retail competition. Every customer buys from GPA at PUC-approved rates.
Smart-meter infrastructureGPA AMI and MyEnergyGuamUnlike the UK’s national DCC network, metering communications are a GPA system, partly funded by a USD 16.7 million federal Smart Grid Initiative grant. Customers see daily kWh, projected usage and alerts on MyEnergyGuam; GPA publishes no coverage figure.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?GPA account number (Account No.)
Who issues it?Guam Power Authority (GPA)
FormatNot published. GPA does not publish the structure of its account or meter numbers.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the GPA bill and in the PayGPA online payment account. The meter number is on the meter at the premises.
Electronic accessCustomers register on MyEnergyGuam with their account number and the amount of their last bill to see daily kWh, projected usage and set alerts. Bills can be paid online through PayGPA.
Third-party accessNo public data-access framework. GPA offers a “Release of Utility Information” form for authorising disclosure of account information; solar installers work from the customer’s bill and authorisation.
Who keeps the registerGPA customer information and billing system
Register scopeNational

Guam has no territory-wide supply-point identifier like the UK MPAN. Every connection is an account in GPA’s own billing system, the only one on the island. The account number identifies the customer relationship and the meter identifies the physical connection. GPA does not publish the format of either, so no example is given here.

To start residential service, the applicant completes GPA’s application and provides government-issued photo ID, proof of ownership (title or deed) or a lease with a letter of authorisation, and contact details. Applications can be made at GPA’s customer service offices or by email. The application fee is USD 25, and same-day connection may be available for USD 9. New customers either pay a security deposit or build credit through twelve consecutive months of prompt payment. Deposits depend on the number of bedrooms and whether the home has air conditioning, from USD 125 (one bedroom, no air conditioning) to USD 500 (four bedrooms with air conditioning), and earn 1.24% interest a year.

Because the account belongs to the person, not the building, a new occupant opens a new account when moving in. GPA does not publish whether the account number or meter number is reused at the same address.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingUnknown
How exported electricity is paidNet metering under Schedule C: GPA credits customers for surplus power from customer-sited solar, wind and other renewable systems. The detailed crediting formula is set in the Schedule C tariff, which could not be read for this profile.
Is a battery required?Yes. EIA reports that net-metered systems connected after 1 June 2020 must include energy storage batteries with at least one hour of storage capacity.
Is net metering under review?Yes. GPA petitioned the PUC to review net metering on 14 November 2023 (docket 24-03). The docket list showed no order as of October 2026.
What size limits and technical standards apply?They are set out in GPA’s Net Metering Program Interconnection Policy and Schedule C, which could not be read for this profile. Check the current versions on GPA’s Forms and Permits page.

Connecting a home system.

  1. Design the system to GPA’s Net Metering Program Interconnection Policy, including battery storage of at least one hour for any system connected after 1 June 2020.
  2. Use a contractor licensed by the Guam Contractors Licensing Board and obtain the required building and electrical permits.
  3. Apply to GPA for net metering and interconnection, quoting the GPA account; proof of ownership or the owner’s authorisation is required for the account.
  4. After installation and inspection, GPA approves the interconnection and sets up net metering billing under Schedule C.

Households can export, but the 2020 battery requirement means new systems are designed to store midday solar output and use it in the evening peak rather than simply export it. This responds to the same problem GPA’s “Beat the Peak” campaign addresses: demand is highest between 5 pm and 11 pm, after solar output has fallen away.

Net metering has been offered for many years, and GPA has asked the PUC to review it. Any change will be decided in docket 24-03, so the terms for new systems may change.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use (rooftop solar)No generation licence. Installation by a contractor licensed by the Guam Contractors Licensing Board, with building and electrical permits. Parallel operation needs GPA interconnection approval.Contractors Licensing Board; GPAContractor licensing is governed by 21 GCA Chapter 70.
Export electricity to the gridNet metering application and interconnection approval from GPA under Schedule C; battery of at least one hour required for systems connected after 1 June 2020.GPA (tariff approved by the PUC)Terms under PUC review in docket 24-03.
Store electricity (home battery)No licence. Batteries are part of the net-metered installation and are covered by the interconnection approval and permits.GPA; permitting authoritiesRequired, not optional, for new net-metered systems.
Generate and sell electricity at utility scale (IPP)Contract with GPA won through a GPA procurement and approved by the CCU and the PUC; Schedule I applies to independent power producer service.GPA; CCU; PUCRecent PUC approvals include Phase IV renewable awards of 192 MW, 60 MW, 62 MW and 18.4 MW.
Supply electricity to consumersNot open to competition: GPA is the only retail supplier.Government of Guam (GPA Act of 1968)
Aggregate, trade or provide balancing and grid servicesNo market or licence category exists. Services are procured by GPA under contract, for example the interruptible load programme with large customers and storage procurements approved by the PUC.GPA; PUCPUC approved an energy storage procurement in August 2025 (docket 25-15).
Operate a virtual power plant or remotely control customer assetsNo specific regime. Any such arrangement would be a GPA programme approved through the CCU and PUC.GPA; PUCNo residential VPP programme was identified.

Because GPA is a vertically integrated public monopoly, “licensing” on Guam is mostly about contracts and approvals rather than licences. Anyone wanting to sell power at scale must win a GPA procurement and have the contract approved by the CCU and the PUC. Small customer systems need contractor licensing, permits and GPA interconnection approval, but no generation licence.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Interruptible load (large customers)RestrictedNot publishedNoGPA. GPA uses an interruptible load programme of about 16 MW with large customers to manage capacity shortfalls.
Utility storage procurementRestricted—NoGPA (approved by the PUC). Storage is procured by GPA as utility assets or contracts; the PUC approved an energy storage system procurement in August 2025.

There is no wholesale, balancing or flexibility market on Guam. Flexibility comes from GPA’s own batteries and generators, and from an interruptible load arrangement with large customers. Households take part only voluntarily, through the Beat the Peak campaign, and through the batteries now required with net-metered solar, which GPA does not dispatch.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Beat the PeakVoluntary campaign asking households to shift use away from 5–11 pm; no payments.
Energy SenseGPA rebates for efficient air conditioners and washers/dryers, funded through demand-side programmes.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutAMI deployment under way; no coverage figure published
Reading intervalNot published (customers see daily kWh)
OwnerGPA
FundingUSD 16.7 million federal Smart Grid Initiative grant (FY2010–2014)
Customer portalMyEnergyGuam (daily kWh, projected usage, alerts)
Data hubNone; data held in GPA’s systems

Metering is entirely GPA’s responsibility. GPA used federal smart grid funding in 2010–2014 and describes AMI deployment as under way. Customers who register on MyEnergyGuam with their account number can track daily consumption and set usage alerts. GPA has not published the number of smart meters, the reading interval or any third-party data access arrangement.

Renewable electricity.

Electricity generation mix (2024).

  • Oil (fuel oil and diesel): 91%
  • Renewables (mainly solar): 9%
Source 1
Renewable electricity share
9% (2024)Source 1Share of electricity generation (EIA: fossil fuels 91%, renewables the remainder). Guam has no electricity imports, so the shares of generation and consumption are the same. Rooftop solar used on site is not counted.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Utility-scale solar (Dandan, Mangilao)
85 MW (2025)Source 125 MW Dandan (2015) and 60 MW Mangilao (2022).
Customer-sited solar
Not identified from a reliable public source.
Battery storage (GPA)
40 MW (2021)Source 11

Targets.

  • Renewable Portfolio Standard (2019 update): 50% of electricity sales from renewables by 2035 and 100% by 2045 (EIA).
  • GPA Clean Energy Master Plan: 50% of electricity from renewable or non-greenhouse-gas sources by 2030 and 100% by 2040, plus a 37% cut in hazardous air pollutant and greenhouse gas emissions by 2030.

Renewables supplied about 9% of generation in 2024, from the 25 MW Dandan and 60 MW Mangilao solar farms. GPA is buying much more through phased renewable procurements. The 132 MW Yona solar project with battery storage is under construction for completion in 2028 (EIA), and the PUC approved further Phase IV awards in 2025–2026: 192 MW to a KEPCO-EWP-Samsung/Core Tech group (docket 24-25), 60 MW to PRG CTI Tanguisson (26-02), 62 MW to SunEnergy 1-4 (26-14) and 18.4 MW to four PRU companies (25-16). Not every project is completed: GPA cancelled a 40 MW solar project in March 2025.

The legal targets count solar, wind, biomass, wave and ocean thermal energy. GPA’s own master plan sets earlier dates than the law and also links renewable growth to a target of halving the LEAC fuel charge.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
40 MW (2021)Source 11GPA’s first battery energy storage system, commissioned March 2021. GPA also lists a 16 MWh battery in use since February 2024 as part of its emergency capacity measures.

Storage is central to Guam’s plans because solar output collapses just before the 5–11 pm peak. GPA runs its own batteries, new solar contracts are being bought with storage, and households adding solar must also install a battery. No residential storage total is published.

Storage projects.

  • GPA battery energy storage system: 40 MW, commissioned March 2021 to manage solar intermittency.
  • Yona Solar Power Project: 132 MW solar with battery storage, under construction for 2028 (EIA).
  • GPA energy storage procurement (PUC docket 25-15): Procurement approved by PUC order of 28 August 2025.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Guam Power Authority (GPA)100% (sole utility; 53,559 customers in 2024)NoNoNoYes

GPA is the only electricity supplier on Guam. Customers cannot choose a supplier or a green tariff; the renewable share rises only as GPA adds renewable contracts.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Guam Power AuthorityDistributionVertically integrated public utilityGenerates, transmits, distributes and sells all grid electricity and runs net metering.
Guam Public Utilities CommissionRegulatorUtility regulatorSets GPA base rates and the LEAC and approves power and storage procurements; its docket list is the public record of rate changes.
Guam Energy OfficeGovernmentGovernment energy officeRuns bill assistance, weatherisation and the federal Home Energy Rebates.
Guam Contractors Licensing BoardGovernmentContractor licensingLicenses the contractors who install solar and battery systems and publishes the contractors list.
US Energy Information AdministrationGovernmentFederal energy statisticsPublishes Guam’s electricity sales, prices and territory energy profile.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (net metering)GPA Net Metering Program Interconnection PolicyGPASets the technical and procedural conditions for connecting customer generation; the document could not be read for this profile.
Storage with net meteringMinimum one hour of battery storage for systems connected after 1 June 2020GPAReported by EIA.
Distribution constructionGPA underground distribution standards and work-order procedure (SP-100)GPACovers handholes, transformer pads and conduit; GPA must inspect 48 hours before concrete is poured.
Installer licensing21 GCA Chapter 70 (contractor licensing)Guam Contractors Licensing BoardInstallers must hold a Guam contractor licence.

Permissions.

Permissions.
PermissionRequiredLevelDetail
GPA interconnection and net metering approvalYesNationalRequired for any system operating in parallel with the grid.
Licensed contractorYesNationalInstallation by a contractor licensed by the Contractors Licensing Board.
Building and electrical permitsYesNationalTerritorial permits and inspection before GPA approves the connection.
Owner authorisation (tenants)LimitedNationalGPA accounts require proof of ownership or a lease with the owner’s authorisation.

Guam is a single jurisdiction, so permits, contractor licensing and grid connection are all handled at territory level. There is no separate municipal planning layer for typical rooftop systems identified in the sources reviewed.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net metering (Schedule C)ActiveNet meteringGPA credits surplus power from customer renewable systems; batteries required for systems connected since 1 June 2020. Under PUC review (docket 24-03).—
GPA Energy Sense rebatesActiveRebateUSD 100–800 for qualifying efficient air conditioners, plus rebates for washers and dryers, bought from approved vendors with the old unit recycled.—
Home Energy Rebates (HOMES and HEEHR)ScheduledGrantFederally funded rebates of up to USD 8,000 (HOMES) and USD 14,000 (HEEHR), income-based. Solar panels are not eligible. GEO expects to open the programmes in 2027.Expected 2027
Weatherization Assistance Program and LIHEAPActiveGrantFree energy-saving upgrades and energy bill assistance for eligible low-income households, run by the Guam Energy Office.—

Data and connectivity.

Fixed broadband
85.9 % of households (2020)Source 24Households with a broadband internet subscription; 95.0% had at least one computer.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Most households have broadband, which supports app-based monitoring of solar and batteries. Metering data travels over GPA’s own AMI system, and customers access it through the MyEnergyGuam web portal. No national smart-home or demand-response protocol has been adopted.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
1.568 TWh (2024)Source 2Retail sales to all customers (1,568,289 MWh); generation is higher because of losses and plant use.
Generation capacity
0.354 GW (2025–2026)Source 1GPA total, of which more than 85 MW renewable (EIA, updated May 2026).
Interconnection
0 GWSource 1Guam’s grid is an isolated island system owned by GPA with no links to other islands.
Curtailment
Not identified from a reliable public source.

Guam must meet all demand, including the evening air-conditioning peak, from generation on the island. Reserve margins have been tight since the loss of Cabras units and the delayed Ukudu plant, leading to emergency capacity purchases, an interruptible load programme and, in July 2026, a potential rotating outage schedule. Ukudu’s arrival in December 2025, the retirement of Cabras and several hundred megawatts of contracted solar and storage are reshaping the system.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
LEAC increase to 28.2708¢/kWhCurrent1 October 2026PUC order of 17 September 2026 (docket 26-13) raised the residential fuel charge from 19.4150¢ for October 2026 to January 2027, after an increase from 13.5840¢ in July 2026.
New base ratesCurrent1 January 2026PUC rate decision of 22 December 2025 (docket 25-14) changed GPA’s base rates alongside a LEAC reduction.
Ukudu power plant in serviceCurrent25 December 2025198 MW combined-cycle plant able to burn ultra-low sulphur diesel or LNG; GPA expects fuel savings of more than 900,000 barrels a year.
Net metering reviewUpcomingPending (petition filed 14 November 2023)PUC docket 24-03 will decide whether and how net metering terms change.
Yona solar and storage projectUpcoming2028132 MW solar with battery storage under construction (EIA).
Home Energy Rebates launchUpcoming2027Guam Energy Office expects to open HOMES and HEEHR rebates to the public.
LNG terminal for UkuduUpcomingNot scheduledGPA has requested federal funding for an estimated USD 210 million LNG terminal at Tanguisson, Dededo (EIA); a Phase I LNG study was filed with the PUC in July 2025.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costHighLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useHighLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumNet metering is available and widely used enough for GPA to require batteries from June 2020 and seek a PUC review (docket 24-03), but no installed-capacity total is published.
Distributed energy marketMediumEvery net-metered system connected since June 2020 must include at least one hour of battery storage; no totals are published.
Grid flexibility marketLowNo wholesale, balancing or flexibility market; only a GPA interruptible load arrangement (~16 MW) with large customers.
Energy storage adoptionMedium40 MW utility battery since 2021, a 16 MWh battery added in 2024, a PUC-approved storage procurement (2025) and mandatory batteries for new net-metered solar.
Renewable growth environmentMediumRenewables were 9% of generation in 2024, but 132 MW of solar with storage is under construction and Phase IV awards totalling more than 300 MW were approved in 2025–2026.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 26 sources
  1. Guam Territory Energy Profile: overview. US Energy Information Administration, 2026. accessed 10 October 2026.
  2. Electric Power Annual, Table 12.6 Guam by sector, 2014 through 2024. US Energy Information Administration, 2025. accessed 10 October 2026.
  3. Levelized Energy Adjustment Clause (LEAC). Guam Power Authority, 2026. accessed 10 October 2026.
  4. Rate adjustment (January 2026). Guam Power Authority, 2026. accessed 10 October 2026.
  5. Rates: power and service rate schedules. Guam Power Authority, 2026. accessed 10 October 2026.
  6. Start, stop and move services. Guam Power Authority, 2026. accessed 10 October 2026.
  7. Track my energy consumption (MyEnergyGuam). Guam Power Authority, 2026. accessed 10 October 2026.
  8. About us. Guam Power Authority, 2024. accessed 10 October 2026.
  9. Clean Energy Master Plan. Guam Power Authority. accessed 10 October 2026.
  10. Projects, forecasts and studies. Guam Power Authority. accessed 10 October 2026.
  11. Highlights and significant events. Guam Power Authority. accessed 10 October 2026.
  12. Brighter Days Ahead: generation capacity initiatives. Guam Power Authority, 2024. accessed 10 October 2026.
  13. Beat the Peak. Guam Power Authority, 2026. accessed 10 October 2026.
  14. Residential forms and permits. Guam Power Authority. accessed 10 October 2026.
  15. News and media. Guam Power Authority, 2026. accessed 10 October 2026.
  16. Energy Sense rebates: air conditioning. Guam Power Authority. accessed 10 October 2026.
  17. Dockets: Power (Guam Power Authority). Guam Public Utilities Commission, 2026. accessed 10 October 2026.
  18. Guam Public Utilities Commission. Guam Public Utilities Commission. accessed 10 October 2026.
  19. Home Energy Rebates. Guam Energy Office, 2026. accessed 10 October 2026.
  20. Guam Energy Office programmes. Guam Energy Office. accessed 10 October 2026.
  21. Guam Contractors Licensing Board. Government of Guam. accessed 10 October 2026.
  22. 2020 Census of Guam, Table 1: Population of Guam, 2010 and 2020. US Census Bureau, 2021. accessed 10 October 2026.
  23. 2020 Census of Guam, Table 3: Housing units, 2010 and 2020. US Census Bureau, 2021. accessed 10 October 2026.
  24. Census Bureau releases 2020 Island Areas Census data for Guam. US Census Bureau, 2022. accessed 10 October 2026.
  25. Urban population (% of total population), Guam. World Bank, 2025. accessed 10 October 2026.
  26. ECB euro reference exchange rate: US dollar. European Central Bank, 2026. accessed 10 October 2026.

Questions about energy in Guam.

Talk to us about Olmack in Guam.Tell us about your home, housing portfolio or school estate in Guam. We'll explain what is possible there now.