Energy in Hong Kong, explained.

How electricity works in Hong Kong: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Hong Kong: Not yet available.Olmack is not offered in Hong Kong yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Hong Kong.

Hong Kong electricity 2026: CLP Power and HK Electric under the Scheme of Control, Feed-in Tariff for solar to 2033, account-based supply points, licensing and grid rules.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Hong Kong dollar (HKD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Hong Kong energy at a glance.

Key figures for households in Hong Kong. Each one links to its source on the full overview below.

  • Electricity price.

    1.375 HKD per kWh for households, including taxes. Figures for March 2026.

  • Household use.

    4,580 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    1% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Hong Kong.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Hong Kong below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Hong Kong requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Hong Kong.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Hong Kong, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Hong Kong, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Hong Kong.

Full overview

The energy market in Hong Kong, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Hong Kong’s electricity is supplied by two investor-owned, vertically integrated companies. CLP Power Hong Kong serves Kowloon and the New Territories, including Lantau and most outlying islands, and HK Electric serves Hong Kong Island, Ap Lei Chau and Lamma. Each company generates (or buys) its own power, owns its own transmission and distribution network, reads its own meters and bills its own customers. There is no wholesale market and no retail choice.

Neither company holds a licence in the UK sense. Both are regulated through Scheme of Control Agreements (SCAs) with the government, now overseen by the Environment and Ecology Bureau (EEB). The current agreements run from 1 October 2018 (CLP) and 1 January 2019 (HK Electric) to 31 December 2033, and allow a permitted return of 8% on average net fixed assets. The government approves the companies’ development plans and projected basic tariff levels, and says it may change the regulatory framework after 2033.

The fuel mix for 2025 was 55% natural gas, 28% nuclear and renewable energy and 17% coal (sent-out basis). Most of the non-fossil share is nuclear power imported by CLP from the Daya Bay station in Guangdong; locally generated renewable electricity is around 1% of local generation. Since October 2018 a Feed-in Tariff has paid households and businesses for all the electricity their solar or wind systems generate, at rates fixed until the end of 2033. The Electrical and Mechanical Services Department (EMSD) regulates electrical safety and registers electrical workers, contractors and generating facilities.

Energy snapshot.

Headline figures for electricity in Hong Kong. Each shows its data year and links to its source.

  • Population7,498,900 peopleSource 12025
  • Households2,763,000 householdsSource 32024
  • Average household size2.6 peopleSource 32024
  • Electricity use per household4,580 kWh/yrSource 42024
  • Household price (HKD)1.375 HKD/kWhSource 6March 2026
  • Household price (EUR)0.157 EUR/kWhSource 7March 2026
  • Renewable electricity share1%Source 82023
  • Solar capacity0.333 GWSource 82024
  • Wind capacity0.001 GWSource 82024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Yes
Home equipment in grid services
Restricted
Regulator
Environment and Ecology Bureau (economic regulation via the Scheme of Control Agreements); EMSD (electrical safety)
System operator
CLP Power Hong Kong and The Hongkong Electric Company, each operating its own system
Distribution networks
Two integrated utilities, each owning transmission and distribution in its own area (CLP: Kowloon and New Territories; HK Electric: Hong Kong Island, Ap Lei Chau and Lamma)
Currency
Hong Kong dollar (HKD)
Voltage and frequency
220 V single-phase / 380 V three-phase, 50 Hz

Electricity prices in Hong Kong.

Household price (HKD)
1.375 HKD/kWh (March 2026)Source 6Residential price reported by GlobalPetrolPrices.com, which states it includes power, distribution, transmission and all taxes and fees. This is a market-research figure: the tariff pages of CLP Power and HK Electric could not be accessed for verification, and the two companies charge different, block-based rates. There is no VAT/GST on electricity in Hong Kong.
Household price (EUR)
0.157 EUR/kWh (March 2026)Source 7Converted from HKD 1.375/kWh at the ECB reference rate of 1 EUR = 8.7722 HKD on 7 October 2026.
Typical annual electricity bill
6,298 HKD/yr (2024 use, March 2026 price)Source 6Derived: 4,580 kWh a year (see consumption per household) × HKD 1.375/kWh = about HKD 6,298. Actual bills depend on which company supplies the home and on the block tariff reached.

Hong Kong electricity prices are set by the two power companies under the Scheme of Control rather than by a market. The bill has two main parts: a basic tariff that recovers the companies’ capital and operating costs and their permitted 8% return on average net fixed assets, and a fuel cost adjustment that passes through fuel costs, including the gas, coal and imported nuclear power. Domestic tariffs rise in blocks, so heavier users pay more per kWh. There is no VAT or GST on electricity.

Prices differ between the two areas because the companies have different generation fleets and costs. CLP Power’s customers benefit from imported Daya Bay nuclear power and natural gas piped from the Mainland; HK Electric relies on its own Lamma Power Station. Neither company has an exclusive franchise in law, but in practice each home can only be supplied by the company whose network serves it.

Government relief

The government’s Electricity Charges Relief Scheme paid each eligible residential account up to HKD 1,200 over 24 months (HKD 50 a month) from January 2024 to December 2025. The scheme has ended, but unused relief can still be set against bills until 31 December 2026.

Data caveat

Both companies publish their current tariffs on their own websites, but these pages could not be accessed for this profile. The headline price is therefore a market-research average and should be checked against the CLP Power or HK Electric tariff tables for a specific home.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesEach company has one domestic tariff for its area. Under the Scheme of Control, the government approves projected basic tariff levels in each company’s development plan and the EEB examines annual tariff adjustments. Domestic tariffs are block (tiered) tariffs, with a separately shown fuel cost adjustment that passes through changes in fuel prices.
FixedNoThere is no retail competition, so households cannot choose a fixed-price contract from a rival supplier.
DynamicNoNo wholesale market exists, so no wholesale-linked household tariff is available.
OtherYesRenewable Energy Certificates (RECs) have been sold by the power companies since 1 January 2019. Each certificate represents units of electricity from local renewable sources and lets a customer pay extra to support renewable generation.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
4,580 kWh/yr (2024)Source 4Derived: domestic electricity consumption in 2024 of 45,557.24 TJ (C&SD table 915-91202) = 12,654.8 GWh, divided by 2,763,000 domestic households (Housing in Figures 2025) = about 4,580 kWh per household.
Average daily use per household
12.5 kWh/day (2024)Source 4Derived: 4,580 kWh a year ÷ 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
6,091 kWh/person/yr (2025)Source 4All sectors. Derived: total local electricity consumption in 2025 of 164,433.33 TJ (45,676 GWh) ÷ 7,498,900 people.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Households used 45,557 TJ (about 12,655 GWh) of electricity in 2024 and 44,471 TJ (about 12,353 GWh) in 2025, roughly 27% of local consumption. Commercial buildings account for most of the rest: the government notes that buildings as a whole consume about 90% of Hong Kong’s electricity.

Homes are small flats in high-rise blocks, so use per household is moderate despite a hot, humid climate in which air-conditioning drives summer demand. Cooking and water heating are commonly served by town gas or LPG: Hong Kong has 2.3 million gas customers, which limits the share of electricity used for cooking. The Mandatory Energy Efficiency Labelling Scheme, now in its fourth phase, covers 11 types of household electrical and gas appliances that account for about 80% of residential energy use.

Housing and households.

Dwellings
3,047,000 flats (March 2025)Source 3Stock of flats: 871,000 public rental, 457,000 subsidised sale and 1,719,000 private.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
30% (2024)Source 3Share of domestic households living in public rental housing. A further 15.4% live in subsidised sale flats, 53.8% in private housing and 0.8% in temporary housing.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
100 % of population (2025)Source 2

Almost all Hong Kong households live in flats in multi-storey buildings. In 2024, 45.4% of domestic households lived in public housing (30.0% in public rental flats and 15.4% in subsidised sale flats) and 53.8% in private housing. The Housing Authority, Housing Society and Housing Bureau manage the public stock.

This matters for distributed energy. A flat owner normally has no exclusive roof, so rooftop solar needs the agreement of the building’s owners’ corporation or management, and output is shared or sold under the Feed-in Tariff rather than used inside one flat. Village houses in the New Territories (New Territories Exempted Houses) are the main low-rise exception, and the government has relaxed the rules for installing solar systems on their rooftops.

How the grid works in Hong Kong.

  1. TransmissionCLP Power Hong Kong Limited, The Hongkong Electric Company, Limited (HK Electric)
  2. DistributionTwo integrated utilities, each owning transmission and distribution in its own area (CLP: Kowloon and New Territories; HK Electric: Hong Kong Island, Ap Lei Chau and Lamma)
  3. MeteringNot identified from a reliable public source.
  4. Supply2 or more retail suppliers

Physically, electricity in Hong Kong comes from three places: CLP Power’s contracted stations in the New Territories (Black Point, Castle Peak and Penny’s Bay), HK Electric’s Lamma Power Station, and imports from Guangdong. CLP imports about 70% of the output of the Daya Bay nuclear station (two 984 MW reactors), plus another 10% until 2028, and can use up to half of the 1,200 MW Guangzhou Pumped Storage Power Station phase 1 for peak supply. In 2025 local production was 130,719 TJ and imports from the Mainland 45,653 TJ; there were no exports.

Natural gas reaches Black Point and Lamma through submarine pipelines from the Mainland and from an offshore LNG terminal east of the Soko Islands that the two companies maintain jointly. Coal makes up about one-fifth of the fuel mix, down from about half in 2015, and the government has pledged to stop using coal for daily generation by 2035.

Commercially the system is simple: there is no wholesale market, power exchange or balancing market. Each company plans and pays for its own generation and network under its SCA, recovers its costs and permitted return through tariffs, and bills its own customers. The SCAs state that they grant no exclusive rights or franchise areas and do not exclude newcomers, but no third-party supplier currently operates. Under the HK Electric SCA, the company is to cooperate with government studies of stronger interconnection with the Mainland and of third-party access to the grid, and the government will discuss market readiness and transition with the company before 1 January 2031.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryEnvironment and Ecology Bureau (EEB)Sets energy policy, signs and monitors the Scheme of Control Agreements, examines tariff adjustment proposals and development plans, and leads renewable energy policy.
RegulatorElectrical and Mechanical Services Department (EMSD)Enforces the Electricity Ordinance (Cap. 406): registers electrical workers, contractors and generating facilities, inspects installations and runs the HK RE NET renewable energy portal.
System operatorCLP Power Hong Kong LimitedOwns and operates transmission and distribution in Kowloon and the New Territories, buys power from Castle Peak Power Company’s stations (Black Point 3,850 MW, Castle Peak 3,058 MW, Penny’s Bay 300 MW, WENT landfill 14 MW) and from Daya Bay, and supplies and meters customers.
System operatorThe Hongkong Electric Company, Limited (HK Electric)Generates at Lamma Power Station (3,082 MW), owns and operates transmission and distribution on Hong Kong Island, Ap Lei Chau and Lamma, and supplies and meters customers.
DSOCLP Power and HK Electric distribution networksThere are no separate distribution companies: each integrated utility runs the low-voltage network in its own area and processes grid-connection requests from renewable energy systems.

Compared with the UK system.

Compared with the UK system.
UK conceptHong Kong equivalentHow it works
DNOCLP Power or HK ElectricThe same company that generates and supplies also owns the distribution network. Which one serves a home depends on location: Hong Kong Island, Ap Lei Chau and Lamma (HK Electric) or Kowloon, the New Territories and most other islands (CLP Power).
National Grid/NESOTwo separate company systemsThere is no independent system operator. Each company dispatches its own generation and runs its own transmission system. The two systems are joined by a 720 MVA cross-harbour link for emergency support and reserve sharing, and CLP’s system is also connected to the Guangdong grid.
MPANElectricity account numberThere is no standard supply-point number. A connection is identified by the account number the power company issues to the customer, together with the premises address and meter number in the company’s records.
MPRNTowngas account numberPiped town gas is supplied by The Hong Kong and China Gas Company under its own account system, separate from electricity.
Meter operatorThe power companyMeters are provided, owned and read by CLP Power or HK Electric. There is no competitive metering market.
SupplierThe power companyNo retail competition: households buy from the company whose network serves them, on the government-monitored domestic tariff.
Smart-meter infrastructureCompany-owned smart meters and systemsEach company installs smart meters and runs its own communications and data systems. There is no central data hub like the DCC.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Electricity account number (CLP Power or HK Electric)
Who issues it?CLP Power Hong Kong Limited or The Hongkong Electric Company, depending on the area
FormatA numeric account number issued by the power company when a customer opens an account. The two companies use their own numbering, and the structure is not published on public pages accessed for this profile.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itPrinted on the electricity bill and shown in each company’s online account and mobile app.
Electronic accessAccount holders view bills and consumption through the company’s own online account services. Smart-meter data is held by the company that installed the meter.
Third-party accessNo regulated route for third parties (such as switching suppliers or aggregators) to access meter data was identified. With no retail competition, there is no switching process that would need one.
Who keeps the registerEach company keeps its own customer, premises and meter records. There is no shared or government-run supply-point register.
Register scopePer DSO

Hong Kong has no equivalent of the UK MPAN: no territory-wide code identifies a supply point independent of the customer. Instead, each of the two power companies keeps its own records linking an address, a meter and a customer account. A household moving into a flat applies to the company that serves that address to open an account, and the company allocates an account number which then appears on every bill.

Because each address can only be served by one company, the account number, together with the premises address and the meter number, is enough to identify the connection in practice. Whether the account number itself survives a change of occupier is a matter for each company’s procedures and was not confirmed from an accessible official page for this profile.

A solar or wind system registered for the Feed-in Tariff is handled through the same company. Under the gross Feed-in Tariff, the company meters all the electricity the system generates separately from the electricity the household consumes, and pays the Feed-in Tariff on the generated units.

Format and example

Neither company publishes the structure of its account numbers on the pages accessed for this profile, so no example in a confirmed format is given. Records are kept separately by CLP Power and HK Electric; there is no national register.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingNo
How exported electricity is paidGross Feed-in Tariff, fixed by system size and paid for every kWh generated: HKD 4/kWh up to 10 kW, HKD 3/kWh above 10 kW to 200 kW, HKD 2.5/kWh above 200 kW to 1 MW; available for the project life until the end of 2033
Who can join the Feed-in Tariff?Any non-government body or individual who is a customer of the relevant power company and installs a distributed renewable energy system of up to 1 MW.
Is it net metering?No. It is a gross scheme: the Feed-in Tariff is paid on all electricity the system generates, and the customer pays the normal tariff for all electricity consumed.
Is there a size limit?The Feed-in Tariff and the EMSD Technical Guidelines cover systems up to 1,000 kW. Systems above 200 kW are referred to the power company case by case, and as a general rule a site supplied by more than one 1,500 kVA transformer may connect up to 200 kW of renewable systems per transformer.
What protection is required?An anti-islanding function that disconnects the system when the grid is de-energised, synchronisation checks on the connecting breaker, and compliance with the Code of Practice for the Electricity (Wiring) Regulations (including Codes 26P(2) and 26P(3)) and the power company’s Supply Rules.
Is Feed-in Tariff income taxed?Participants are exempt from profits tax and from business registration requirements in respect of Feed-in Tariff payments (Exemption from Profits Tax (Feed-in Tariff Scheme) Order, 2020).

Connecting a home system.

  1. Contact the power company serving the premises (CLP Power or HK Electric) at the design stage, so it can advise on grid connection before the design is finalised.
  2. Obtain any building, land-lease and owners’ consents needed for the structure (for example, from the owners’ corporation of a multi-storey building).
  3. Apply to the power company for the Feed-in Tariff and agree the connection arrangements and terms.
  4. Have a registered electrical contractor install the system; a registered electrical worker inspects, tests and certifies it (Form WR1) before it is energised.
  5. Register the system with EMSD as a generating facility where required, before grid connection.
  6. Agree the commissioning date and witnessed tests with the power company; Feed-in Tariff payments then start.

Households and businesses can connect solar or wind systems to the grid and be paid for their output. The Feed-in Tariff was introduced with the current Scheme of Control Agreements: CLP Power began on 1 October 2018 and HK Electric on 1 January 2019. Rates are set by system size and, once approved, a system is paid for its project life until the end of 2033.

Between 2018 and 2024 the two companies approved more than 26,000 applications, for systems expected to generate nearly 420 million kWh a year. The cost of the scheme is recovered from all customers through tariffs, and customers can also buy Renewable Energy Certificates to support it.

Technical requirements are set out in EMSD’s Technical Guidelines on Grid Connection of Renewable Energy Power Systems (2021 edition). The owner and the power company agree the final design, the connection terms and any extra equipment the company needs, which the owner may have to pay for.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityNo generation licence. Generating facilities must be registered with EMSD under the Electricity Ordinance unless they form part of a fixed installation that already needs a periodic test certificate (Form WR2)EMSDRooftop solar systems are classed as generating facilities. Registration must be made before grid connection.
Store electricityNo storage-specific licence identified; battery installations are electrical installations subject to the Electricity Ordinance and the Code of PracticeEMSDWork must be done by registered electrical contractors and workers.
Export to the gridAgreement with the power company and, for the Feed-in Tariff, an approved application; systems up to 1 MW eligibleCLP Power or HK ElectricConnection terms are agreed case by case for systems over 200 kW.
Sell or supply electricity to customersNo retail supply licensing regime; the two incumbents supply under Scheme of Control Agreements with the governmentEnvironment and Ecology BureauThe SCAs do not grant exclusive franchises, but no third-party supplier operates and no access regime for third parties is in force.
Aggregate, trade, wholesale or provide balancingNot applicable: there is no wholesale, balancing or flexibility market—Demand response is run by the power companies themselves.
Carry out electrical installation workRegistration as a registered electrical worker (section 30) and registered electrical contractor (section 33) under the Electricity OrdinanceEMSDA registered worker must inspect, test and certify a new installation (Form WR1) before it is energised; the contractor endorses the certificate.
Remote control of assets / VPPNo specific licensing framework identified—Any participation would be through a power company programme.

Licensing in Hong Kong is about electrical safety rather than market access. The Electricity Ordinance (Cap. 406), enforced by EMSD, requires electrical work to be carried out by registered contractors and workers and requires generating facilities to be registered. There is no separate licence to generate, supply or trade electricity, because the market is organised through the two Scheme of Control Agreements rather than through licences.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Utility demand response programmesRestricted—NoCLP Power / HK Electric. The SCAs include a Demand Response Incentive that rewards each company for the demand reduction it achieves. Programmes are run by the companies with their own customers; there is no open market for third-party aggregators.

Hong Kong has no wholesale, balancing, capacity or ancillary-services market, so distributed energy resources cannot sell flexibility services in the way they can in Europe. Demand-side flexibility exists only through the companies’ own demand response and energy-saving programmes, which the SCAs reward through financial incentives. Third-party grid access is the subject of a government study, but no access regime is in force.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutCompany-led smart meter installation by CLP Power and HK Electric; no published penetration figure accessed
Reading intervalNot identified from an accessible official source
Owner of metersCLP Power or HK Electric
Central data hubNone
Regulatory frameworkCompany development plans under the Scheme of Control

Smart meters in Hong Kong are installed and owned by the two power companies as part of their own investment programmes, which the government reviews through the Scheme of Control development plans. There is no separate metering regulation, competitive metering market or central data platform. Customers see their data through their power company’s online account services.

Renewable electricity.

Electricity generation mix (2025).

  • Natural gas: 55%
  • Nuclear and renewables (mainly imported nuclear): 28%
  • Coal: 17%
Source 9
Renewable electricity share
1% (2023)Source 8Share of local generation (362 GWh of 36,170 GWh in 2023, IRENA). Hong Kong is a net importer: imports from the Mainland were 45,653 TJ in 2025, about 26% of local production plus imports (C&SD, derived). These imports are mainly Daya Bay nuclear power. The government’s fuel mix reports nuclear and renewables together (28% in 2025) and does not publish a separate renewable share of consumption.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Solar PV
333 MW (2024)Source 8
Bioenergy
58 MW (2024)Source 8
Wind
1 MW (2024)Source 8
Hydro
1 MW (2024)Source 8

Targets.

  • Increase renewable energy to 7.5–10% of the fuel mix for electricity generation by 2035, and further to 15% subsequently
  • Increase zero-carbon energy to about 60–70% of the fuel mix before 2035
  • Cease using coal for daily electricity generation by 2035
  • Net-zero electricity generation and carbon neutrality before 2050 (Climate Action Plan 2050)

Hong Kong’s renewable resources are limited by its size and density. Local renewable generation was 362 GWh in 2023 out of 36,170 GWh (about 1%), mostly solar (210 GWh) and bioenergy from landfill gas and waste (150 GWh). The fuel mix is dominated by natural gas, coal and imported nuclear power.

Solar has grown since the Feed-in Tariff started, from small amounts to 333 MW by 2024. The government has installed small systems on its own premises (more than HKD 2.2 billion approved for about 260 projects), piloted solar at restored landfills, and funded about 700 10 kW systems at schools and welfare organisations under the Solar Harvest scheme, which ended in March 2024. Waste-to-energy plants such as O·Park1 and O·Park2 export surplus electricity to the grid.

Because local potential is limited, the government’s strategy also relies on regional cooperation and joint ventures to bring zero-carbon electricity from outside Hong Kong.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Energy storage is at an early stage within Hong Kong itself. The main storage resource available to the system is pumped storage in Guangdong under CLP’s contract. There is no storage-specific support scheme or market, and home batteries are treated as ordinary electrical installations under the Electricity Ordinance.

Storage projects.

  • Guangzhou Pumped Storage Power Station (Conghua), phase 1: CLP Power can use up to half of the 1,200 MW capacity, storing off-peak electricity from its stations and Daya Bay and generating hydroelectricity for Hong Kong’s peak demand.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
CLP Power Hong Kong LimitedSole supplier in Kowloon, the New Territories, Lantau and most outlying islandsYesUnknownNoYes
The Hongkong Electric Company, Limited (HK Electric)Sole supplier on Hong Kong Island, Ap Lei Chau and LammaYesUnknownNoYes

Each supplier is the only option in its area. “Renewable tariff” here means the Renewable Energy Certificates both companies sell; “export tariff” means the Feed-in Tariff.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Environment and Ecology BureauGovernmentEnergy policy and Scheme of Control monitoringSigns and monitors the SCAs, reviews tariffs and sets renewable energy targets.
Electrical and Mechanical Services Department (EMSD)RegulatorElectrical safety regulatorRegisters electrical workers, contractors and generating facilities, and publishes grid-connection guidance.
HK RE NET (EMSD)Renewable EnergyRenewable energy information portalFeed-in Tariff information, technical guidelines, PV guidance notes and the Solar Irradiation Map.
CLP Power Hong KongDistributionIntegrated utility (Kowloon and New Territories)Grid connection, Feed-in Tariff applications and supply in its area.
HK ElectricDistributionIntegrated utility (Hong Kong Island and Lamma)Grid connection, Feed-in Tariff applications and supply in its area.
Census and Statistics DepartmentGovernmentOfficial statisticsPublishes Hong Kong Energy Statistics, including consumption by user type and imports.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Wiring and installationCode of Practice for the Electricity (Wiring) RegulationsEMSDMandatory basis for design and installation; Codes 26P(2) and 26P(3) apply to renewable systems.
Grid connectionTechnical Guidelines on Grid Connection of Renewable Energy Power Systems (2021 edition)EMSDCovers systems up to 1,000 kW; additional requirements above 200 kW. Also the power companies’ Supply Rules.
Anti-islandingIEC 62116; IEC 61727 (reference standards)IEC (listed by EMSD)Anti-islanding function required; tripping time as specified by the power company.
InvertersIEC 62109IEC (listed by EMSD)Safety of power converters for PV systems.
PV modulesIEC 61215; IEC 61730IEC (listed by EMSD)Design qualification and safety of PV modules.
Interconnection referencesIEEE 1547 series; ENA EREC G98IEEE; Energy Networks Association (UK)Listed by EMSD as overseas references where local rules do not cover a detail.
Installer registrationRegistered electrical worker / registered electrical contractor (Electricity Ordinance ss. 30 and 33)EMSDMandatory for electrical work; Form WR1 certificate before energising.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Power company agreementYesNationalConnection arrangements, terms and commissioning tests are agreed with CLP Power or HK Electric before the system is connected.
EMSD generating facility registrationLimitedNationalRequired before grid connection unless the system is part of a fixed installation already needing a periodic test certificate (Form WR2).
Electrical certification (Form WR1)YesNationalA registered electrical worker inspects, tests and certifies the installation before it is energised.
Building owners’ consentLimitedLocalIn multi-storey buildings the roof is usually common property, so the owners’ corporation or management must agree.
Village house rooftop systemsLimitedNationalThe government has relaxed the requirements for solar systems on the rooftops of New Territories Exempted Houses.

Most of the administrative work for a rooftop system sits with the power company and EMSD. Structural and building requirements depend on the size and type of installation and the building; EMSD publishes Guidance Notes for Solar Photovoltaic System Installation (2024) and a safety pamphlet covering both structural and electrical safety.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Feed-in Tariff (FiT)ActiveFeed-in tariffGross payment for all electricity generated by renewable systems up to 1 MW: HKD 4/kWh (≤10 kW), HKD 3/kWh (>10–200 kW), HKD 2.5/kWh (>200 kW–1 MW), for the project life until the end of 2033.Oct 2018 (CLP) / Jan 2019 (HK Electric) – Dec 2033
Profits tax exemption for Feed-in Tariff incomeActiveTax reliefExempts participants from profits tax and business registration in respect of Feed-in Tariff participation and payments.—
Electricity Charges Relief SchemeClosedBill creditHKD 50 a month (up to HKD 1,200) per residential account; ended in December 2025, with unused relief usable until 31 December 2026.Jan 2024 – Dec 2025
Solar HarvestClosedGrant (installation)Government-funded 10 kW solar systems for eligible schools and welfare organisations; concluded in March 2024.—

Data and connectivity.

Fixed broadband
100.7 % of households (June 2026)Source 18Household broadband penetration rate (OFCA). World Bank: 40.27 fixed broadband subscriptions per 100 people (2024).
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Hong Kong has near-universal fixed broadband and very high mobile penetration, so communications are not a constraint for smart meters, inverter monitoring or home energy management. Smart-meter communications are chosen and operated by each power company.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
45.7 TWh (2025)Source 4Derived: local electricity consumption of 164,433.33 TJ ÷ 3,600.
Generation capacity
11.6 GW (2024)Source 8Installed capacity within Hong Kong (11,183 MW non-renewable, 393 MW renewable). Excludes Daya Bay and Conghua capacity contracted outside Hong Kong.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Hong Kong consumed 45.7 TWh in 2025, met by 130,719 TJ (36.3 TWh) of local production and 45,653 TJ (12.7 TWh) of imports from the Mainland. Each company maintains enough capacity for its own area, with the cross-harbour link for emergency support. Because almost all renewable generation is small rooftop solar on a large, gas- and coal-based system, curtailment is not a reported issue.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Additional Daya Bay nuclear importsCurrentUntil 2028CLP imports a further 10% of Daya Bay’s output, on top of its usual 70%, until 2028.
Discussion of future regulatory frameworkUpcomingBefore 1 January 2031Under the HK Electric SCA, the government will discuss market readiness, potential changes to the regulatory framework and transition issues with the company before 2031.
Expiry of the Scheme of Control Agreements and Feed-in TariffUpcoming31 December 2033Both SCAs and Feed-in Tariff payments run to the end of 2033. The government may change the electricity supply regulatory framework after that date.
End of coal for daily generationUpcomingBy 2035Climate Action Plan 2050 commits to stop using coal for daily electricity generation, raise renewables to 7.5–10% and zero-carbon energy to about 60–70% of the fuel mix by 2035.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useMediumLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowMost households live in flats without their own roof; total solar capacity was 333 MW in 2024 across all customer types.
Distributed energy marketLowLocal renewable generation was about 1% of local generation in 2023 (IRENA).
Grid flexibility marketLowNo wholesale, balancing or flexibility market; demand response only through the two utilities.
Energy storage adoptionLowNo published battery storage capacity; main storage resource is contracted pumped storage in Guangdong.
Renewable growth environmentMediumSolar grew under the Feed-in Tariff (over 26,000 approvals by 2024) and the target is 7.5–10% renewables by 2035, from a base of about 1%.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 19 sources
  1. Population, total – Hong Kong SAR, China (SP.POP.TOTL). World Bank, 2025. accessed 9 October 2026.
  2. Urban population (% of total) – Hong Kong SAR, China. World Bank, 2025. accessed 9 October 2026.
  3. Housing in Figures 2025. Hong Kong Housing Authority, 2025. accessed 9 October 2026.
  4. Table 915-91202: Local consumption of electricity and gas by type of users. Census and Statistics Department, 2025. accessed 9 October 2026.
  5. Table 915-91203: Production, imports, exports and consumption of energy. Census and Statistics Department, 2025. accessed 9 October 2026.
  6. Hong Kong electricity prices. GlobalPetrolPrices.com, 2026. accessed 9 October 2026.
  7. Euro foreign exchange reference rates: Hong Kong dollar (HKD). European Central Bank, 2026. accessed 9 October 2026.
  8. Energy Profile: China, Hong Kong SAR. IRENA, 2025. accessed 9 October 2026.
  9. Energy Supplies. Environment and Ecology Bureau, 2025. accessed 9 October 2026.
  10. Promotion and Development of Renewable Energy. Environment and Ecology Bureau. accessed 9 October 2026.
  11. Scheme of Control Agreements. Environment and Ecology Bureau. accessed 9 October 2026.
  12. Scheme of Control Agreement – The Hongkong Electric Company and HK Electric Investments. Environment and Ecology Bureau, 2017. accessed 9 October 2026.
  13. Electricity Charges Relief Scheme. Environment and Ecology Bureau. accessed 9 October 2026.
  14. Feed-in Tariff – Introduction. EMSD (HK RE NET). accessed 9 October 2026.
  15. Technical Guidelines on Grid Connection of Renewable Energy Power Systems (2021 Edition). EMSD, 2021. accessed 9 October 2026.
  16. Electricity Safety. EMSD. accessed 9 October 2026.
  17. Hong Kong Yearbook 2024, Chapter 18: Environment and Ecology. Hong Kong SAR Government, 2024. accessed 9 October 2026.
  18. Key Communications Statistics. Office of the Communications Authority (OFCA), 2026. accessed 9 October 2026.
  19. Fixed broadband subscriptions (per 100 people) – Hong Kong SAR, China. World Bank, 2024. accessed 9 October 2026.

Questions about energy in Hong Kong.