How electricity works in Taiwan.
Taiwan electricity market 2026: Taipower tariffs and summer rates, the 11-digit 電號 customer number, AMI smart meters, solar feed-in tariffs, storage and licensing.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in New Taiwan dollar (TWD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Taiwan energy at a glance.
Key figures for households in Taiwan. Each one links to its source on the full overview below.
Electricity price.
2.28 TWD per kWh for households, including taxes. Figures for 2025 usage at tariffs in force since 1 Oct 2025.
Household use.
4,136 kWh a year for a typical household. Figures for 2025.
Renewable share.
12.4% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Taiwan.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Taiwan below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Taiwan requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Taiwan.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Taiwan, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Taiwan, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Taiwan.
The energy market in Taiwan, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Taiwan’s power sector is dominated by one state company. Taiwan Power Company (Taipower), 98.25% government-owned, owns the whole transmission and distribution grid, dispatches the system, is the public retailer for every home and business, and owns most large power stations. In 2025 Taipower’s own plants produced 174.7 TWh gross, about 60% of national generation; the rest came from independent power producers, cogeneration plants and more than 14 GW of privately owned solar and wind, almost all of it sold to Taipower. The 2017 Electricity Act opened generation and renewable-electricity retail to private companies, but the planned break-up of Taipower was cancelled by the Executive Yuan in May 2024.
Retail tariffs are set by the Ministry of Economic Affairs (MOEA) on the advice of an Electricity Price Review Committee that meets in March and September. Household prices are an inclining-block tariff with higher summer rates. They rose in October 2025 and were then frozen for April and October 2026, leaving the national average price at NT$3.7823/kWh. Based on Taipower’s 2025 averages, a typical household used about 4,140 kWh a year and paid about NT$2.28/kWh.
The grid is an island with no international interconnectors. Fossil fuels supplied 86.5% of 2025 generation, mainly LNG (48.7%) and coal (36.2%), and renewables 12.4%, according to Ember. Nuclear generation ended when Maanshan unit 2 shut down on 17 May 2025, though a restart application is now under review. Solar has grown to about 15.5 GW, most of it on rooftops, and offshore wind to more than 4.5 GW. Small renewable systems sell their output to Taipower at a 20-year feed-in tariff, and about 2 GW of batteries take part in Taipower’s ancillary-services trading platform.
Energy snapshot.
Headline figures for electricity in Taiwan. Each shows its data year and links to its source.
- Population23,243,565 peopleSource 7end June 2026
- Households9,908,298 householdsSource 7end June 2026
- Average household size2.35 people/householdSource 7end June 2026
- Electricity use per household4,136 kWh/yrSource 62025
- Household price (TWD)2.28 TWD/kWhSource 62025 usage at tariffs in force since 1 Oct 2025
- Household price (EUR)0.063 EUR/kWhSource 112025–2026
- Renewable electricity share12.4%Source 92025
- Solar capacity15.5 GWSource 9end 2025
- Wind capacity4.52 GWSource 9end 2025
- Energy storage capacity2.01 GWSource 20March 2026
- Smart-meter share27%Source 12end 2025
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Ministry of Economic Affairs (MOEA), through its Energy Administration as the electricity regulatory agency, with tariffs reviewed by the Electricity Price Review Committee
- System operator
- Taipower, as the sole transmission and distribution enterprise, runs national dispatch and the ancillary-services trading platform
- Distribution networks
- Taipower owns and operates the entire distribution network nationwide (444,649 circuit-km), administered through regional district offices; there are no private DSOs
- Currency
- New Taiwan dollar (TWD)
- Voltage and frequency
- 110 V / 60 Hz (single-phase 110/220 V three-wire supply to homes); 220/380 V three-phase
Electricity prices in Taiwan.
- Household price (TWD)
- 2.28 TWD/kWh (2025 usage at tariffs in force since 1 Oct 2025)Source 6Derived: Taipower’s average residential bills of NT$638 a month (non-summer) and NT$1,084 a month (summer) give NT$9,440 a year for 4,136 kWh, or NT$2.282/kWh. The figures match the tariff: 308 kWh at non-summer rates costs NT$638.48 and 418 kWh at summer rates NT$1,083.50. Taipower’s tariffs include 5% business tax and there are no separate levies on the bill. The tariff was frozen for April and October 2026.
- Household price (EUR)
- 0.063 EUR/kWh (2025–2026)Source 11Converted from NT$2.282/kWh at NT$36.15 per EUR, the mid-point of Bank of Taiwan’s spot buying (35.95) and selling (36.35) rates in its final quotation on 30 September 2026. The ECB does not publish a TWD reference rate.
- Typical annual electricity bill
- 9,440 TWD/yr (2025)Source 6Derived from Taipower’s 2025 averages: NT$638 a month for eight non-summer months and NT$1,084 a month for four summer months. Of the NT$446 summer increase, Taipower attributes about NT$326 to higher use (mainly air conditioning) and NT$120 to the higher summer rates.
Taiwanese electricity prices are set administratively. Under Article 49 of the Electricity Act, the MOEA sets a formula for tariffs, and the Electricity Price Review Committee meets each March and September to decide whether rates change on 1 April or 1 October. Tariffs include 5% business tax; there are no separate network, renewable or environmental levies on a household bill. Network costs, renewable feed-in costs and Taipower’s fuel costs are all recovered through the energy rates, and there is one national tariff with no regional variation.
The inclining-block structure keeps the first blocks cheap: Taipower says the first three blocks have long been priced below the cost of supply. A household using 308 kWh a month outside summer paid an average of about NT$2.07/kWh in 2025, while every kWh above 1,000 kWh in summer costs NT$8.86. Summer pricing, applied to homes from 1 June to 30 September, raises the second and higher blocks; in 2025 average residential use rose from 308 to 418 kWh a month in summer.
Recent decisions
From 1 October 2025 the average tariff rose by 0.71%. Residential rates went up NT$0.1/kWh for use up to 700 kWh a month, NT$0.2 for 701–1,000 kWh and NT$0.4 above 1,000 kWh, which the government estimated would add NT$6.4 billion a year to Taipower’s revenue. At its meetings in March and on 18 September 2026 the committee froze tariffs, keeping the national average at NT$3.7823/kWh, even though higher fuel costs would have justified a 12.83% increase. It asked the government to seek NT$71.1 billion of budget support for Taipower and deferred any further decision to a third meeting in December 2026, which will also review transmission and distribution charges.
Taipower’s finances
Because tariffs have lagged fuel costs since 2022, Taipower’s accumulated losses exceeded NT$410 billion by July 2025. At the end of 2025 its liabilities were NT$2.69 trillion, 90.9% of total assets. Tariff decisions therefore remain political and are often balanced against government capital injections and subsidies.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | The default for homes is Taipower’s residential non-time-of-use tariff, a six-block inclining tariff in force since 1 October 2025. Per kWh, summer (1 June–30 September) / non-summer: up to 120 kWh NT$1.78 / 1.78; 121–330 kWh 2.55 / 2.26; 331–500 kWh 3.80 / 3.13; 501–700 kWh 5.14 / 4.24; 701–1,000 kWh 6.44 / 5.27; over 1,000 kWh 8.86 / 7.03. Most homes are read and billed every two months, so the block limits are doubled. There is no standing charge. |
| Time-of-use | Yes | Any household can opt for the simple time-of-use tariff (簡易型時間電價), which needs a suitable meter. Two-period version: NT$75 a month basic charge; weekday peak NT$5.16/kWh in summer (09:00–24:00) and NT$4.93 out of summer (06:00–11:00 and 14:00–24:00); off-peak NT$2.06 (summer) and NT$1.99 (non-summer), including all day at weekends and on designated off-peak days. A three-period version has a summer peak of NT$7.13 (16:00–22:00). Use above 2,000 kWh a month adds NT$1.04/kWh. |
| Dynamic | No | There is no wholesale spot market and no household tariff linked to wholesale prices. Taipower buys from independent producers under long-term contracts and regulated feed-in tariffs. |
| Other | Limited | Green electricity can be bought from licensed renewable-energy retailers (including Taipower’s own renewable retail arm) through wheeling or direct supply with renewable energy certificates, but this market is aimed at companies; in 2025 Taipower’s renewable retail business had just 250 customers. |
Household prices compared with neighbouring countries (EUR per kWh).
- Philippines€0.208
- Japan€0.169
- South Korea€0.125
- Taiwan€0.063
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,136 kWh/yr (2025)Source 6Derived from Taipower’s 2025 averages for residential customers: 308 kWh a month in the eight non-summer months and 418 kWh a month in the four summer months (308 × 8 + 418 × 4).
- Average daily use per household
- 11.3 kWh/day (2025)Source 6Derived: 4,136 kWh a year divided by 365. About 10.1 kWh a day outside summer and 13.7 kWh a day in summer.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 12,500 kWh/person/yr (2025)Source 9Total electricity demand across all sectors per person (Ember: 12.50 MWh). Taipower’s “power” (industrial and large commercial) tariff classes took 167.0 TWh of its 238.4 TWh retail sales in 2025, and the lighting class (homes and small businesses) 71.4 TWh.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 97.5 % of homes (2024)Source 26Air-conditioner ownership per 100 households in the 2024 Survey of Family Income and Expenditure (DGBAS).
- Electric vehicles
- 137,272 electric passenger cars registered (March 2026)Source 28Registered electric passenger cars, 1.83% of the passenger-car fleet. Taiwan also has a large electric-scooter fleet, not counted here.
- Electric cooking
- Not identified from a reliable public source.
Taiwan is an industrial economy, and households account for a modest share of electricity. Taipower’s 2025 retail sales were 238.4 TWh to 15.57 million customer accounts, and 70% went to the “power” tariff classes used by industry and large commercial premises. Semiconductor manufacturing is driving demand growth: total generation reached 288.9 TWh in 2025, 31.4 TWh more than the government had planned for.
Household demand is driven by cooling. Almost every home has air conditioning, and Taipower’s data show average residential use rising by nearly 40% in the summer months. Electric vehicles are a small but rising load, with 137,000 electric cars registered in March 2026.
Housing and households.
- Dwellings
- 9,477,000 dwellings (H2 2025)Source 27Derived and approximate: the Ministry of the Interior counted 894,582 low-use dwellings (based on electricity use) in the second half of 2025, 9.44% of taxable residential units, which implies about 9.48 million units. The ratio is published to two decimals, so the total is approximate.
- Owner-occupied
- 84.4% (2024)Source 26Households living in a home they own (2024 Survey of Family Income and Expenditure). Including homes owned by direct relatives the share is about 90%.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- Not identified from a reliable public source.
Home ownership in Taiwan is high, at 84.4% of households in 2024, and the average home is about 131 m². Two building types matter for energy. In the cities, most people live in apartment blocks managed under the Condominium Administration Act, where each flat usually has its own Taipower account and meter but the roof is common property. Elsewhere, many families live in narrow multi-storey terraced townhouses (透天厝) with their own flat roofs, which is where household rooftop solar is easiest.
Putting solar on the roof of an apartment block needs the agreement of the owners’ meeting and, in practice, a management committee, and the system is normally connected under a separate account. Tenants generally pay their own bills on the landlord’s account; Taipower offers a tenant query service so that renters can check the bills for the address they lease. The large number of low-use dwellings, identified through low electricity use, is a sign of second homes and investment property.
How the grid works in Taiwan.
- TransmissionTaiwan Power Company (Taipower) – transmission, Taipower dispatch
- DistributionTaipower owns and operates the entire distribution network nationwide (444,649 circuit-km), administered through regional district offices; there are no private DSOs
- MeteringTaipower, Taipower customer system and e-bill service
- Supply1 or more retail suppliers
Most large power stations are on the west coast, from coal and LNG plants at Taichung, Linkou, Talin and Hsinta to the LNG terminal and gas plant at Tatan. Taipower’s backbone runs at 345 kV north to south, with 161 kV and 69 kV lines below it, and power is delivered to homes at 110/220 V. Demand in the north exceeds local supply: at the 2025 peak, northern Taiwan’s demand of 15,595 MW was 1,421 MW more than its local supply, so power flows north from central and southern Taiwan. Outlying islands such as Kinmen and Matsu are supplied by their own local power stations.
Commercially, Taiwan works as a single-buyer system. Independent power producers sell coal and gas power to Taipower under long-term contracts (7.85 GW of contracted capacity in 2025). Renewable generators sell at feed-in tariffs or through corporate power purchase agreements, delivered by wheeling over Taipower’s grid or direct supply. Taipower then resells to customers at regulated tariffs. There is no energy spot market. The main competitive market is Taipower’s trading platform for ancillary services and demand response.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Economic Affairs (MOEA) – Energy Administration | The MOEA is the competent authority under the Electricity Act. Its Energy Administration (formerly the Bureau of Energy) sets energy policy, approves tariffs on the Electricity Price Review Committee’s advice, issues electricity business licences, sets the annual renewable feed-in tariffs and recognises renewable installations of 2,000 kW and above. |
| Regulator | Electricity regulatory agency (MOEA) | Article 3 of the Electricity Act requires the MOEA to designate an electricity regulatory agency to supervise electricity enterprises, approve licences, manage the electricity market, forecast supply and demand, publish carbon emission factors and mediate disputes. These functions sit within the MOEA rather than in an independent regulator. Local governments recognise renewable systems below 2,000 kW. |
| TSO | Taiwan Power Company (Taipower) – transmission | Taipower is the only licensed transmission and distribution enterprise. At the end of 2025 it ran 4,151.8 circuit-km of 345 kV extra-high-voltage lines, 14,630 circuit-km of primary and secondary transmission lines and 37 extra-high-voltage substations. Transmission losses were 1.19% in 2025. |
| System operator | Taipower dispatch | Under Article 8 of the Electricity Act the transmission and distribution enterprise dispatches the system and must give priority to connecting and dispatching renewables. Taipower’s dispatch centre balanced a 2025 peak load of 40,752 MW. It runs the trading platform for frequency regulation, reserves and demand response. |
| DSO | Taipower – distribution | Owns and operates the distribution network nationwide: 444,649 circuit-km of lines and 1.59 million distribution transformers at the end of 2025, with distribution losses of 2%. Its regional district offices (區營業處) handle new connections, meter changes and all renewable grid-connection reviews. |
| Supplier | Taipower – public retail | Taipower is the only public retailer (公用售電業) and supplies 15.57 million customer accounts at regulated tariffs. Licensed renewable-energy retailers may sell green electricity to customers through wheeling or direct supply, almost entirely to companies. |
| Metering | Taipower | Owns, installs and reads all revenue meters, including AMI smart meters and the separate generation meters fitted to solar systems that sell to it. There is no competitive metering. |
| Data hub / registry | Taipower customer system and e-bill service | Taipower keeps the single national register of customer numbers (電號), supply addresses and meters. Customers see bills and, where AMI is installed, interval data on its e-bill website and the Taiwan Power app. |
| Flexibility market | Taipower trading platform (電力交易平台) | Launched in 2021. Qualified traders, now licensed as specified electricity suppliers, sell frequency regulation (dReg, E-dReg), reserves and demand response to Taipower from batteries, generators and flexible loads. At the end of March 2026, 2,223.3 MW of resources from 108 private companies were integrated. |
Compared with the UK system.
| UK concept | Taiwan equivalent | How it works |
|---|---|---|
| DNO | Taipower (one national distribution business) | There are no regional network companies. Taipower owns the whole distribution network, run through regional district offices, and is also the transmission owner, system operator and main retailer. It is not legally unbundled, and plans to split it into separate companies were dropped in 2024. |
| National Grid / NESO | Taipower (transmission and dispatch) | Taipower owns the transmission network and also dispatches the system, so there is no separate system operator. Taiwan has no interconnectors with other countries. |
| MPAN | Taipower customer number (電號) | An 11-digit number that Taipower gives each supply account at an address. It appears on every bill and is used for payment, enquiries and changes of name. Because Taipower is the only retailer for households, it is not used for switching. See the supply-point section. |
| MPRN | Town-gas company customer number | Piped natural gas is supplied by regional town-gas companies, each with its own account numbers. Many homes use bottled LPG instead. There is no national gas supply-point register. |
| Meter operator | Taipower | Taipower owns and maintains every meter. Households cannot appoint a meter operator. Solar systems selling to Taipower have their own generation meter, also owned by Taipower. |
| Supplier | Taipower (public retailer) | Households cannot change supplier for their ordinary supply, and tariffs are set nationally. Renewable-energy retailers can sell certified green electricity, but in practice to companies, which keep their Taipower connection and pay network and standby charges. |
| Smart-meter infrastructure (DCC / SMETS2) | Taipower AMI | Taipower runs a single AMI system of meters, communications and head-end, with meter data held in its own meter data management system. It had installed 4.1 million low-voltage smart meters by the end of 2025. There is no separate data-communications company. |
How a supply point is identified.
07123456789 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Taipower customer number (電號) |
| Who issues it? | Taiwan Power Company (Taipower) |
| Format | An 11-digit numeric account number assigned by Taipower to each supply account (用電場所) under contract. Taipower does not publish what the individual digits mean. It is separate from the serial number printed on the meter. |
| Length | 11 digits |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Printed in the top-left corner of the Taipower bill or payment notice, and shown in the Taiwan Power app and the e-bill website. Customers can also obtain it from Taipower’s 1911 customer service line. |
| Electronic access | Account holders registered for the e-bill service or the Taiwan Power app can link one or more customer numbers, view and pay bills and, where an AMI meter is installed, see the previous day’s consumption in 15-minute intervals. Tenants can use a dedicated tenant query service by entering the 11-digit customer number; it covers residential accounts on the non-time-of-use or simple time-of-use tariffs, and access ends 60 days after the lease ends. |
| Third-party access | There is no switching gateway, because Taipower is the only household retailer. Installers need the customer number, the account holder’s authorisation and building documents to apply to Taipower for a solar grid-connection review. No general consumer-consented data-sharing scheme (like open energy data) for third parties was identified. |
| Who keeps the register | Taipower’s national customer information system, covering every supply account, address, tariff and meter. |
| Register scope | National |
The Taipower customer number identifies a supply contract at a particular place. When a home is sold or let, the account normally stays with the address: the new occupant applies to Taipower for a change of name (過戶) and takes over the existing number, while the outgoing account holder settles the final bill. If the meter is replaced, the meter has a new serial number but the customer number does not change. A new supply, for example in a new building, gets a new customer number.
Apartment buildings
In most Taiwanese apartment blocks each flat has its own Taipower meter and customer number, so households deal directly with Taipower rather than through the building’s management. Common areas such as lifts, pumps and corridor lighting have a separate account in the name of the management committee. A rooftop solar system on a shared roof is normally registered on its own account, so that it can be metered and paid separately.
Solar and other generation
When a home sells solar power to Taipower, Taipower installs a separate generation meter and signs a power purchase contract with the system owner for that system. Under full sale (全額躉售), all output goes through the generation meter and is paid at the feed-in tariff, while the home keeps buying its own electricity on its existing customer number. Under self-consumption with surplus sale (自發自用、餘電躉售), only the exported surplus is bought by Taipower. There is no net metering.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Regulated 20-year feed-in tariff paid by Taipower, fixed at the rate for the year in which the system’s registration is approved (provided it is built within the deadline). 2026 rooftop solar rates: NT$5.6279/kWh below 10 kW, NT$5.3819 for 10–20 kW, NT$4.2505 for 20–50 kW, falling to NT$3.6236 at 500 kW and above, plus small bonuses for high-efficiency modules and remote or indigenous areas. Owners can sell all output or only their surplus, or sell through a renewable-energy retailer under a power purchase agreement instead. |
| Is there net metering? | No. Taiwan uses feed-in tariffs. Most small systems have historically sold all their output to Taipower: in 2025 Taipower bought 10.07 TWh from 10.14 GW of solar owned by non-generation businesses, almost their entire output. The MOEA now encourages self-consumption with surplus sale, using an automatic transfer switch. |
| How long is the feed-in contract? | Twenty years. The rate is set by the MOEA each January for the year. The 2026 rates were announced on 2 January 2026 and left solar unchanged from late 2025, citing environmental and typhoon-resilience requirements. |
| What sizes count as a generation business? | Small rooftop systems are usually “third-type” installations owned by households or companies that are not electricity businesses. Systems of 2,000 kW and above need MOEA recognition, and generation businesses need an electricity business licence. Self-use generators may normally sell no more than 20% of their capacity, but renewable systems may sell all their output. |
| Which voltage do small systems connect at? | Taipower’s technical guidelines for connecting renewable systems allow systems below 100 kW to connect to the low-voltage network (single-phase 110/220 V or three-phase 220/380 V). Larger systems connect at high voltage (11.4 or 22.8 kV) or higher, and Taipower may require reinforcement, for which grid-connection extra rates are added to the tariff. |
| Can grid connection be refused or delayed? | Yes. Taipower’s review can find that the local feeder has no spare capacity, in which case reinforcement must be scheduled or paid for. Grid connection scheduling is one of the main causes of delay for solar projects. |
Connecting a home system.
- Choose an installer and check the roof and structure. On an apartment block, obtain the owners’ meeting or management committee agreement; on a rented home, the landlord’s consent.
- The installer applies to Taipower’s district office for a grid-connection review (併聯審查), which checks the capacity of the local feeder and sets the connection point and voltage.
- Apply to the local (city or county) government for consent and recordation (同意備案) of the system. Systems below 2,000 kW are handled by local governments; 2,000 kW and above by the MOEA.
- Confirm whether the structure needs building approval. Many rooftop systems can use a building-permit exemption if a structural engineer or architect certifies it.
- Sign a power purchase contract (購售電契約) with Taipower, then install the system with certified modules and inverters.
- Taipower inspects the connection, fits the generation meter and starts parallel operation; the local government then issues equipment registration (設備登記), and feed-in payments begin.
Taiwan built its solar market on a generous gross feed-in tariff. A household or small business installs panels, and Taipower buys the electricity for 20 years at a fixed rate that is well above the price of the electricity the home buys. Because the feed-in rate (NT$5.63/kWh for systems below 10 kW in 2026) is more than twice the average household price, most small systems have sold all their output rather than using it themselves.
Policy is now moving towards self-consumption and resilience. In 2026 the MOEA’s household rooftop programme raised its grant from NT$3,000 to NT$20,000 per kW for households that install an automatic transfer switch and use their own solar, selling only the surplus. From 1 August 2026, new, extended or renovated buildings with a floor area of 1,000 m² or more must install 1 kW of solar per 20 m² of building area.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Electricity business licence for generation businesses (valid 20 years, renewable for 10 years at a time). Renewable systems below 2,000 kW need only local-government consent, recordation and equipment registration; systems of 2,000 kW and above need MOEA recognition. Self-use generators of 2,000 kW and above need central approval, smaller ones a municipal or county permit. | MOEA; local governments below 2,000 kW | Self-use renewable systems below 500 kW are exempt from the requirement to employ a chief technician. |
| Store electricity | Grid-connected storage that trades on Taipower’s platform falls under the specified electricity supplier category added to the Electricity Act in May 2025. The registration rules drafted in July 2025 set a two-stage licence (consent, then licence after completion), a local briefing for systems above 20 MW and project verification (VPC) before licensing. | MOEA (Energy Administration); Taipower for connection | Storage behind a customer’s meter that does not trade needs no electricity business licence, but must meet electrical safety and connection rules. |
| Export surplus power | No licence for small renewable systems: local-government recordation and registration, a Taipower grid-connection review and a power purchase contract. | Local government; Taipower | Paid at the MOEA’s annual feed-in tariff for 20 years, or sold through a renewable-energy retailer. |
| Sell / supply electricity to consumers | Licence as a renewable-energy retailer (再生能源售電業) for selling green electricity. Public retail of conventional electricity is reserved to Taipower. | MOEA | Renewable generators may also supply customers directly over their own lines or by wheeling over Taipower’s grid, with approval. |
| Aggregate distributed resources (VPP) | To sell aggregated resources to Taipower, an aggregator must be a qualified trader on the trading platform, now licensed as a specified electricity supplier. Demand-response-only aggregators have a one-stage licence. | MOEA; Taipower (trader qualification and testing) | Traders can use their own resources or resources of customers they represent; they must show technical capability, resource integration and financial standing. |
| Demand response | No licence for customers joining Taipower’s own demand-response programmes; aggregators selling demand response on the trading platform need specified electricity supplier status. | Taipower; MOEA | In 2025 Taipower contracted 3,663 MW of load reduction and achieved 1,167 MW on the 3 July evening peak. |
| Trade on the wholesale market | There is no wholesale energy market to trade on. Generators sell to Taipower under contract or feed-in tariff, or to customers through renewable retail and corporate PPAs. | MOEA | Corporate PPAs have replaced the feed-in tariff for offshore wind, which was dropped from the 2026 tariff schedule. |
| Balancing and grid services | Qualification as a trader on Taipower’s platform, testing of each resource and, since 2025, a specified electricity supplier licence. | Taipower; MOEA | Products include dynamic regulation reserve (dReg), energy-shifting regulation reserve (E-dReg), spinning and supplemental reserves and demand bidding. |
| Remote control of customer assets | No specific licence. Control is exercised by the trader under its platform contract, and the equipment must meet Taipower’s communication and cybersecurity requirements. | Taipower | Inverters for grid-connected solar must have passed the BSMI’s cybersecurity tests for inverters and monitoring units to keep their voluntary product certification. |
| Operate transmission and distribution networks | Reserved to the single state-owned transmission and distribution enterprise (Taipower). | MOEA | Article 71-1 of the Electricity Act, added in January 2026, sets prison terms of 1–7 years for endangering major generation, control systems or submarine cables. |
Taiwan’s licensing follows the 2017 Electricity Act and the Renewable Energy Development Act (last amended June 2025). The main categories are generation businesses, the single transmission and distribution enterprise, the public retailer, renewable-energy retailers and, since May 2025, specified electricity suppliers, which provide demand response, storage or other services through Taipower’s trading platform. Small renewable systems owned by households and companies are not electricity businesses: they are recognised and registered by local governments and sell to Taipower under contract.
Because Taipower is the only buyer of grid services, its platform rules decide who can take part. Traders must pass qualification and performance tests. The 2025 storage rules responded to rapid growth in battery projects and to safety concerns, adding licensing, local briefings for large sites and certification requirements.
Flexibility and grid services.
Aggregation of home equipment: Yes
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Dynamic regulation reserve (dReg) | Yes | — | Yes | Taipower. Fast frequency regulation provided mainly by batteries, bought day-ahead on the trading platform. Taipower’s 2025 storage target of 500 MW of dReg was met. |
| Energy-shifting regulation reserve (E-dReg) | Yes | — | Yes | Taipower. Introduced in July 2022: batteries provide frequency regulation and also shift energy into the evening peak after sunset. The 500 MW target for 2025 was met, and applications far exceeded it. |
| Spinning and supplemental reserves | Yes | — | Yes | Taipower. Reserve products open to generators, storage and flexible loads that pass Taipower’s tests. |
| Demand response (Taipower programmes and demand bidding) | Yes | — | Yes | Taipower. Business customers take part directly or through aggregators. In 2025, 4,335 customer applications were received in the peak month, 3,663 MW was contracted and 1,167 MW was delivered on 3 July. Ordinary households do not take part in the trading platform. |
Taiwan has built a fast-growing flexibility market without a wholesale energy market. Taipower buys frequency regulation, reserves and demand response through its trading platform, which it set up in 2021 to support rising solar output and to cover the steep fall in solar output each evening. Batteries are the main resource: 1,847 MW of battery capacity was qualified by March 2026, more than the 1,000 MW target for 2025. During the 3 April 2024 earthquake, storage on the platform delivered 510 MW within moments to support system frequency.
Households are not yet part of this market. Their tariffs give no real-time price signal beyond the optional time-of-use tariff, smart-meter coverage is about a quarter of low-voltage customers, and aggregators focus on large batteries and industrial loads. The 2026 household rooftop programme, which promotes transfer switches and self-consumption, is aimed at resilience rather than market participation.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Taipower trading platform (電力交易平台) | Taipower’s market for ancillary services and demand response. At the end of March 2026 it had more than 2,730 MW of registered applications and 2,223.3 MW integrated from 108 private companies. |
| Taipower e-bill service and Taiwan Power app | Customer access to bills and AMI interval data. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | 4.1 million low-voltage AMI meters by end 2025 (about 27% of lighting-class customers); 6 million planned by 2030 |
| Reading interval | 15 minutes (AMI interval data); most homes are billed every two months |
| Owner and operator | Taipower (no competitive metering) |
| Coverage | 3 million meters in June 2024; 4,107,409 at the end of 2025. |
| Target | 6 million low-voltage smart meters by 2030. |
| Architecture | Meters, communications and a control centre feeding Taipower’s meter data management system (MDMS). Newer meters separate the communication module from the metering unit, so the communications technology can be changed later. |
| Customer access | Previous-day usage in 15-minute intervals in the Taiwan Power app and on the e-bill website. |
| Third-party data | No general consent-based data-sharing scheme was identified. |
Taipower’s AMI programme is being extended to low-voltage homes and shops in phases. Coverage is still partial: the 4.1 million meters installed by the end of 2025 compare with 15.2 million lighting-class customer accounts. Taipower plans 6 million by 2030, so most households will still have conventional meters, read manually every two months, until well into the 2030s.
Where an AMI meter is installed, the household can see 15-minute data from the previous day and receive usage comparisons and alerts. Interval data also make the time-of-use tariffs practical. A new meter is also needed for solar sale and for time-of-use tariffs, fitted by Taipower.
Renewable electricity.
Electricity generation mix (2025).
- Gas: 48.7%
- Coal: 36.2%
- Solar: 5.6%
- Wind: 4.2%
- Hydro: 1.9%
- Other fossil: 1.6%
- Nuclear: 1.1%
- Bioenergy: 0.7%
- Renewable electricity share
- 12.4% (2025)Source 9Share of 288.88 TWh total generation: solar 5.59%, wind 4.15%, hydro 1.91%, bioenergy 0.73% (Ember yearly electricity data). Up from 10.92% in 2024. Official statements put the 2025 renewable share at about 13%, well short of the long-standing 20% goal for 2025, because demand grew faster than forecast.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 1.19 GW (2025)Source 9Derived: Ember installed capacity of 15.47 GW at the end of 2025 minus 14.28 GW at the end of 2024.
- Solar PV
- 15.5 GW (2025)Source 9
- Wind (onshore and offshore)
- 4.52 GW (2025)Source 9
- Hydro (excluding pumped storage)
- 2.12 GW (2025)Source 9
- Bioenergy
- 0.08 GW (2025)Source 9
- Pumped-storage hydro
- 2.602 GW (2025)Source 8Mingtan (1,602 MW) and Taikuan II (1,000 MW), both owned by Taipower.
Targets.
- The long-standing goal of 20% renewable electricity by 2025 was missed; the 2025 share was about 12–13%.
- Mandatory solar on new, extended or renovated buildings of 1,000 m² or more from 1 August 2026, expected to add about 660 MW a year.
- Net-zero emissions by 2050 under the national net-zero pathway.
Taiwan’s electricity is still mostly fossil-fuelled. After the last nuclear unit closed in May 2025, LNG became the largest source (48.7% of 2025 generation), with coal at 36.2%. Coal’s share is falling as old units close, such as Hsinta unit 3 in October 2025, and as new gas units start up. Renewables rose to 12.4% in 2025, but demand from chip-making has grown faster than planned, so the share remains well below target.
Solar is the largest renewable source. About two-thirds of capacity is on rooftops, from factories and farm buildings to homes, and the rest is ground-mounted, on fish ponds or floating. Growth has slowed to about 1.2 GW a year because of land-use, environmental-assessment and grid-connection limits, and a typhoon in July 2025 damaged more than 135,000 panels, leading to tighter design rules. Offshore wind in the Taiwan Strait has passed 4.5 GW; new projects are now financed through corporate PPAs instead of the feed-in tariff.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 2.01 GW (March 2026)Source 20Derived: 1,847.4 MW of batteries qualified on Taipower’s trading platform plus 160 MW of Taipower-owned batteries. Pumped hydro (2.6 GW) is separate.
Grid-scale batteries have grown quickly since Taipower opened its trading platform in 2021, attracted by payments for frequency regulation and evening energy shifting. Taipower met its 2025 target of 1,000 MW, made up of 160 MW at its own sites and 840 MW bought through the platform, and private capacity has since more than doubled. Fire-safety concerns and the volume of applications led to the new licensing rules for storage in 2025.
Large new electricity users may soon have to install their own generation or storage. An amendment to the Energy Management Act passed on 21 August 2026 requires users setting up or expanding large contracts above a threshold, such as chip plants, to install self-generation or storage, with fines of NT$150,000–750,000 for non-compliance; the thresholds will be set in implementing rules.
Storage projects.
- Taipower’s own grid batteries: 160 MW at four sites: Tainan salt-field solar farm and Luyuan substation (20 MW each, 2022), Longtan substation (60 MW, 2023) and Dongshan substation (60 MW, 2024).
- Private batteries on the trading platform: 1,847.4 MW qualified by March 2026, providing dReg and E-dReg services; the 2025 target of 500 MW for each was met.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Taiwan Power Company (Taipower) | Sole public retailer: 15.57 million customer accounts and 238.4 TWh of sales in 2025 | Limited | Yes | No | Yes |
Every household buys its electricity from Taipower at the national regulated tariff. Taipower also buys households’ solar output under feed-in contracts. Private renewable-energy retailers sell certified green electricity under corporate PPAs, mostly to manufacturers and technology companies, while Taipower’s own renewable retail arm sold 632 GWh to 250 customers in 2025. For households, the only choice is between the standard and time-of-use tariffs.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Economic Affairs – Energy Administration | Government | Energy policy, tariffs, licensing, feed-in tariffs, renewable promotion | Sets the annual feed-in tariffs, runs the household rooftop solar programme, licenses electricity businesses and publishes energy statistics. |
| Taiwan Power Company (Taipower) | Transmission | Transmission, distribution, dispatch, public retail, metering | Handles every connection, grid-connection review, feed-in contract and smart meter, and publishes tariffs. |
| Taipower trading platform | Market | Ancillary services and demand-response market | The route by which batteries and aggregated loads earn revenue for grid services. |
| Bureau of Standards, Metrology and Inspection (BSMI) | Government | Product standards and certification | Publishes CNS standards and runs voluntary product certification for PV modules, inverters and storage power-conversion systems. |
| Nuclear Safety Commission | Government | Nuclear regulator | Reviewing Taipower’s applications to restart the Maanshan and Kuosheng nuclear plants. |
| National Renewable Energy Certification Center (T-REC) | Renewable Energy | Renewable energy certificates | Issues the renewable energy certificates that underpin green-electricity sales and corporate PPAs. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Taipower technical guidelines for connecting renewable generation systems (再生能源發電系統併聯技術要點) | Taipower | Define low voltage as up to 600 V and high voltage as above 600 V to 25 kV, set connection voltage by capacity (below 100 kW at low voltage), require protection against unintended islanding, and limit voltage fluctuation and fault current. Larger plants must provide real-time data, ride-through and frequency response. |
| Inverters | CNS 15382 (grid-connection functions); CNS 15426-1/-2 (safety); CNS 14674 or IEC 62920 (EMC) | BSMI | Tested under BSMI voluntary product certification (VPC). Inverters and monitoring units must also pass the BSMI cybersecurity test specification. A separate specification covers power-conversion systems for grid-connected storage. |
| PV modules | CNS standards for PV modules with BSMI voluntary product certification | BSMI | Certified modules are required for feed-in tariff projects; high-efficiency modules earn a small tariff bonus. |
| Energy storage | Project verification (VPC) of grid-connected storage sites | BSMI; MOEA | Required before a grid-connected storage operator receives its licence under the 2025 rules; sites above 20 MW also need a local briefing. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Local-government consent, recordation and equipment registration | Yes | Local | Renewable systems below 2,000 kW are recognised by the city or county government, which issues consent and recordation before building and equipment registration after completion. |
| Taipower grid-connection review | Yes | National | Every grid-connected system needs Taipower’s review of feeder capacity and connection arrangements, followed by an inspection before parallel operation. |
| Building permission | Limited | Local | Many rooftop systems can be exempt from a separate building permit for miscellaneous works if a structural engineer, civil engineer or architect certifies the design and structural safety. Larger or taller structures need a permit. |
| Owners’ meeting consent (apartments) | Limited | Local | Required where the roof is common property of a condominium building. |
| MOEA recognition | Limited | National | Only for renewable systems of 2,000 kW and above, and for electricity business licences. |
For a home, the main steps are local-government recordation and Taipower’s grid-connection review, with structural certification for the roof. Under the Renewable Energy Development Act, local governments recognise systems below 2,000 kW. Some cities, such as Taoyuan in May 2026, have published their own guidance for solar projects.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Renewable feed-in tariff (再生能源電能躉購費率) | Active | Feed-in tariff | 20-year fixed purchase by Taipower. 2026 rooftop solar rates: NT$5.6279/kWh (1–10 kW), 5.3819 (10–20 kW), 4.2505 (20–50 kW), 4.0459 (50–100 kW), 3.7152 (100–500 kW), 3.6236 (500 kW and above); ground-mounted 3.5037; floating 3.8948. Bonuses are available for high-efficiency modules (up to NT$0.3377/kWh for systems below 10 kW), remote and indigenous areas, module recycling and grid-connection costs. | 2026 rates (announced 2 January 2026) |
| Household Rooftop Solar Acceleration Programme (家戶屋頂設置太陽光電加速計畫) | Active | Grant | MOEA Energy Administration grant of NT$20,000 per kW (up from NT$3,000), up to NT$2 million per household, for residential rooftop systems that install an automatic transfer switch and use self-consumption with surplus sale to Taipower. Local governments such as Taitung offer additional grants that can be combined with it. | 2026; applications by 27 November 2026 |
Data and connectivity.
- Fixed broadband
- 96.1 % of households with internet access (2024)Source 26Households with an internet connection per 100 households (Survey of Family Income and Expenditure). Not limited to fixed broadband.
- 4G coverage
- 15,980,000 4G subscriptions (30 June 2026)Source 29NCC subscriber data; the first time 4G subscriptions fell below 16 million.
- 5G coverage
- 12,400,000 5G subscriptions (30 June 2026)Source 29NCC subscriber data. Derived share: about 44% of 4G and 5G subscriptions combined.
Taiwan has dense mobile coverage and near-universal household internet access. 5G subscriptions reached 12.4 million in mid-2026 and are expected to overtake 4G. Taipower’s AMI uses its own communication network feeding its meter data management system, and newer meters have a separate communication module so that the network technology can be updated. Inverters for grid-connected solar must pass BSMI cybersecurity tests, which affects monitoring and remote-control options for installers and aggregators.
Grid conditions.
- National peak demand
- 40.8 GW (2025)Source 8Taipower system peak load in 2025 (40,752.09 MW); average load was 29,499 MW. On 342 days the operating reserve margin was 10% or more and on 23 days between 6% and 10%.
- Annual electricity demand
- 288.9 TWh (2025)Source 9Ember electricity demand, equal to generation as there are no imports. Taipower’s retail sales were 238.4 TWh.
- Generation capacity
- 62.9 GW (2025)Source 9Derived: Ember fossil capacity (40.72 GW) plus clean capacity (22.19 GW). Taipower’s own plants made up 32.64 GW.
- Interconnection
- 0 GW (2025)Source 9Taiwan has no international interconnectors; Ember records zero net imports.
- Curtailment
- Not identified from a reliable public source.
Taiwan is an isolated grid with no links to other countries, so it must meet its own peak demand and absorb disturbances alone. Supply has been tight in recent summers, and the evening peak after sunset is now the critical period, which is why Taipower has bought so much battery capacity. Earthquakes and typhoons are frequent risks to the system.
The grid has a north–south imbalance: northern Taiwan, with Taipei and the Hsinchu technology cluster, had a 1.4 GW shortfall in local supply at the 2025 peak, and lines such as Xizhi–Minquan are bottlenecks in summer. Taipower’s grid-strengthening plan includes new transmission and substations for offshore wind.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Residential tariff increase | Current | 1 October 2025 | Average tariff +0.71%; residential +NT$0.1/kWh up to 700 kWh a month, +0.2 for 701–1,000 kWh, +0.4 above 1,000 kWh. |
| Electricity Act amendments | Current | May 2025 and 5 January 2026 | May 2025: new specified electricity supplier category for demand response and storage, and nuclear operating licences extendable by up to 20 years. January 2026: Article 71-1 penalties for endangering major generation, control systems and submarine cables. |
| Licensing of grid-connected storage and demand-response traders | Current | Rules drafted July 2025; existing operators to register by August 2026 | Two-stage licence for storage, local briefings above 20 MW and VPC verification before licensing; 108 existing operators (about 2.1 GW) to register within one year. |
| Mandatory solar on large buildings | Current | 1 August 2026 | New, extended or renovated buildings of 1,000 m² floor area or more must install 1 kW of solar per 20 m² of building area. |
| Tariff freeze | Current | 1 April and 1 October 2026 | Rates unchanged; national average NT$3.7823/kWh. The government is seeking NT$71.1 billion of budget support for Taipower. |
| Tariff and transmission/distribution charge review | Upcoming | December 2026 | A third Electricity Price Review Committee meeting will review transmission and distribution charges and reconsider the deferred tariff decision. |
| Self-generation or storage for large new electricity users | Upcoming | Passed 21 August 2026; implementing rules pending | Energy Management Act amendment requiring large new or expanded contract users to install self-generation or storage above thresholds to be set by the MOEA. |
| Possible restart of the Maanshan nuclear plant | Upcoming | Under review since March 2026 | Taipower applied to restart Maanshan and Kuosheng in March 2026. On 3 September 2026 the Nuclear Safety Commission said its technical review of Maanshan was complete, pending administrative procedures; inspections and other approvals would still be needed before operation, which the economics minister has said could be as early as 2028. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Low | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | About 10 GW of rooftop solar, much of it small systems selling at a 20-year feed-in tariff of up to NT$5.63/kWh, but many are on commercial, agricultural and industrial roofs; no separate household figure exists, and apartments limit home installations in cities. |
| Distributed energy market | Medium | Taipower bought 10.07 TWh in 2025 from 10.14 GW of solar owned by non-generation businesses, and 2.2 GW of distributed resources are integrated in its trading platform; households remain passive feed-in sellers. |
| Grid flexibility market | Medium | Taipower’s trading platform buys regulation, reserves and demand response from 108 private companies with 2,223 MW integrated, and aggregation is permitted, but there is no wholesale energy market and households cannot take part. |
| Energy storage adoption | Medium | About 2.0 GW of grid batteries (1,847 MW on the platform plus 160 MW Taipower-owned) by March 2026, against a 2025 target of 1,000 MW; residential storage is negligible. |
| Renewable growth environment | Medium | Renewable share rose from 10.9% (2024) to 12.4% (2025) with about 1.2 GW of solar added in 2025 and offshore wind above 4.5 GW, but the 20% target for 2025 was missed. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 30 sources
- 電價表 (Taipower detailed tariff schedule, rates effective 1 October 2025). Taiwan Power Company, 2025. accessed 1 October 2026.
- 調整後各類用戶電價表 (adjusted tariffs from 1 October 2025). Taiwan Power Company, 2025. accessed 1 October 2026.
- October 2026 electricity tariff frozen (Electricity Price Review Committee, 18 September 2026). Business Today, 2026. accessed 1 October 2026.
- 10月新電價全年挹注台電64億收入 累虧仍逾4100億. Central News Agency, 2025. accessed 1 October 2026.
- October 2025 electricity tariff adjustment. Formosa Weekly News, 2025. accessed 1 October 2026.
- 夏月電價6/1上路!月均電費增至1084元 (Taipower 2025 residential averages). ETtoday, 2026. accessed 1 October 2026.
- 民國115年6月戶口統計資料分析 (household registration statistics, June 2026). Ministry of the Interior, 2026. accessed 1 October 2026.
- 114年電業年報 (Taipower electricity business annual report 2025). Taiwan Power Company, 2026. accessed 1 October 2026.
- Yearly electricity data (full release, long format). Ember, 2026. accessed 1 October 2026.
- 綠電占比20%為何跳票?經濟部:去年經濟太強讓分母大增. United Daily News, 2026. accessed 1 October 2026.
- Historical exchange rates – EUR, 30 September 2026. Bank of Taiwan, 2026. accessed 1 October 2026.
- 台電拚 2030 年 600 萬具智慧電表. TechNews, 2026. accessed 1 October 2026.
- Taipower app adds AMI 15-minute usage data. iThome, 2020. accessed 1 October 2026.
- 住宅租屋電費查詢專區 (tenant bill query). Taiwan Power Company. accessed 1 October 2026.
- 115年度再生能源電能躉購費率及其計算公式 (2026 feed-in tariffs). Ministry of Economic Affairs, via Taiwan Power Company, 2026. accessed 1 October 2026.
- 2026 feed-in tariffs announced: solar unchanged, offshore wind removed. Commercial Times, 2026. accessed 1 October 2026.
- Electricity Act. Ministry of Justice – Laws & Regulations Database, 2026. accessed 1 October 2026.
- 再生能源發展條例 (Renewable Energy Development Act). Ministry of Justice – Laws & Regulations Database, 2025. accessed 1 October 2026.
- Nuclear Safety Commission completes technical review of Maanshan restart. Focus Taiwan (CNA), 2026. accessed 1 October 2026.
- DER Integration – Taipower Smart Grid. Taiwan Power Company, 2026. accessed 1 October 2026.
- Energy Administration previews licensing rules for specified electricity suppliers (storage and demand response). Commercial Times, 2025. accessed 1 October 2026.
- 立院三讀 新增用電設備應設自用發電或儲能 (Energy Management Act amendment). Central News Agency, 2026. accessed 1 October 2026.
- Taiwan introduces new solar rules for large buildings. pv magazine, 2026. accessed 1 October 2026.
- Household rooftop solar grant raised to NT$20,000 per kW. Commercial Times, 2026. accessed 1 October 2026.
- 台東推光電誘因再強化 可同時申請中央與地方雙補助. Central News Agency, 2026. accessed 1 October 2026.
- Housing and household equipment, 2024 Survey of Family Income and Expenditure. Executive Yuan (DGBAS), 2025. accessed 1 October 2026.
- Low-use housing statistics, second half of 2025. United Daily News (Economic Daily News), 2026. accessed 1 October 2026.
- Electric passenger car registrations reach 137,272. Commercial Times, 2026. accessed 1 October 2026.
- 5G subscriptions pass 12.4 million (NCC data, June 2026). NOWnews, 2026. accessed 1 October 2026.
- Executive Yuan cancels Taipower split. Commercial Times, 2024. accessed 1 October 2026.
Questions about energy in Taiwan.
Household prices are set by the government and charged by Taipower on an inclining-block tariff. Since 1 October 2025 the first 120 kWh a month costs NT$1.78/kWh, and higher blocks cost up to NT$8.86/kWh in summer. Based on Taipower’s 2025 averages, a typical home pays about NT$9,440 a year, or about NT$2.28/kWh (about €0.063). Prices include 5% business tax.
From 1 June to 30 September Taipower applies higher summer rates to all blocks above 120 kWh a month, and households use more electricity for air conditioning. In 2025 average residential use rose from 308 to 418 kWh a month and the average monthly bill from NT$638 to NT$1,084.
The Taipower customer number (電號), an 11-digit number printed in the top-left corner of the electricity bill. It identifies the supply account at an address, stays with the property when occupants change, and is held in Taipower’s national customer register.
Yes. Taipower buys solar electricity under a 20-year feed-in contract at the rate for the year the system is approved; in 2026 that is NT$5.6279/kWh for rooftop systems below 10 kW. You can sell all your output or only your surplus. There is no net metering.
Not for an ordinary home supply. Taipower is the only public retailer and tariffs are set nationally. Licensed renewable-energy retailers sell green electricity, but mainly to companies.
Partly. Taipower had installed 4.1 million low-voltage AMI smart meters by the end of 2025, about a quarter of its homes and small businesses, and plans 6 million by 2030. Households with one can see 15-minute usage in the Taiwan Power app.
Yes. The MOEA’s Household Rooftop Solar Acceleration Programme pays NT$20,000 per kW, up to NT$2 million, for homes that install an automatic transfer switch and use self-consumption with surplus sale, with applications due by 27 November 2026. Some local governments add their own grants.