How electricity works in Kazakhstan.
Kazakhstan electricity market 2026: single-buyer wholesale model, KEGOC as system operator, regional grid companies as suppliers, block household tariffs and net consumers up to 200 kW.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Kazakhstani tenge (KZT) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Kazakhstan energy at a glance.
Key figures for households in Kazakhstan. Each one links to its source on the full overview below.
Electricity price.
37.92 KZT per kWh for households, including taxes. Figures for from 12 Sep 2026.
Household use.
2,548 kWh a year for a typical household. Figures for 2022.
Renewable share.
14.5% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Kazakhstan.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Kazakhstan below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Kazakhstan requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Kazakhstan.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Kazakhstan, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Kazakhstan, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Kazakhstan.
The energy market in Kazakhstan, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Kazakhstan has a large, coal-dominated power system that serves a sparsely populated country of about 20.6 million people. In 2025 it generated 123.7 TWh, according to Ember. Coal supplied 54.3% of it and gas 29.4%. Hydro supplied 8.5%, wind 4.7% and solar 1.7%. The Bureau of National Statistics puts the renewable share at 14.5% including large hydro, or 7.0% excluding it. Consumption reached a record 124.6 TWh in 2025, and on 18 December 2025 demand peaked at 17,724 MW, above the 16,684 MW that domestic plants could generate at that moment. The shortfall was covered by imports, mainly from Russia.
Since 1 July 2023 the wholesale market has run on a single-buyer model. Generators sell their planned output to the Settlement and Financial Centre for Renewable Energy Support (RFC), which acts as the single buyer, and KOREM runs centralised trading and settles the real-time balancing market. KEGOC owns the national grid (220 kV and above) and is the system operator. Regional grid companies own the lower-voltage networks. Since 1 January 2025 they have also supplied retail customers, through 21 licensed transmission companies with supply licences.
Network tariffs and retail price caps are regulated by the Committee for Regulation of Natural Monopolies (KREM) of the Ministry of National Economy. Household prices vary by region and supplier. In Almaty they rise in three blocks according to monthly use per registered resident. Under the renewables law, a household or business with its own renewable plant of up to 200 kW can become a “net consumer” and sell surplus power to its supply company under a standard contract.
Energy snapshot.
Headline figures for electricity in Kazakhstan. Each shows its data year and links to its source.
- Population20,618,796 peopleSource 11 Sep 2026
- Households5,611,253 householdsSource 32021 census
- Average household size3.41 peopleSource 32021 census
- Electricity use per household2,547.5 kWh/yrSource 42022
- Household price (KZT)37.9 KZT/kWhSource 15from 12 Sep 2026
- Household price (EUR)0.076 EUR/kWhSource 20from 12 Sep 2026
- Renewable electricity share14.5%Source 52025
- Solar capacity1.23 GWSource 212025
- Wind capacity1.83 GWSource 212025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Committee for Regulation of Natural Monopolies (KREM), Ministry of National Economy; the Ministry of Energy sets market rules
- System operator
- KEGOC (Kazakhstan Electricity Grid Operating Company)
- Distribution networks
- Regional grid companies and other transmission companies (energy-transmitting organisations); since 2025, 21 of them also hold supply licences and sell to retail customers in their areas.
- Currency
- Kazakhstani tenge (KZT)
- Voltage and frequency
- 220/380 V, 50 Hz (0.4 kV low-voltage distribution)
Electricity prices in Kazakhstan.
- Household price (KZT)
- 37.9 KZT/kWh (from 12 Sep 2026)Source 15Almaty city and Almaty region, group 1 (household) average tariff including 16% VAT (32.69 KZT excluding VAT). Households can instead choose the block tariff: 34.28, 45.51 or 56.89 KZT/kWh including VAT. Tariffs differ between regions and suppliers.
- Household price (EUR)
- 0.076 EUR/kWh (from 12 Sep 2026)Source 20Converted from 37.92 KZT/kWh at the National Bank of Kazakhstan official rate of 502.05 KZT per EUR on 9 October 2026.
- Typical annual electricity bill
- 96,601 KZT/yr (2026)Source 15Derived: 2,547.5 kWh (2022 national average household use) at the Almaty household average tariff of 37.92 KZT/kWh from 12 September 2026. That is roughly EUR 192 at 502.05 KZT/EUR. Bills in other regions differ.
Household price trend (KZT per kWh).Source 16
| Jun 2026 | 35.37 KZT/kWh |
|---|---|
| Sep 2026 | 37.92 KZT/kWh |
Retail electricity prices in Kazakhstan are regulated, not set by competition. Each supply company sells to customers in its own area at prices built up from the cost of power bought from the single buyer plus regulated network charges. Those charges include KEGOC’s fee for use of the national grid, the regional grid company’s distribution tariff and the capacity charge. KREM, the natural-monopoly regulator in the Ministry of National Economy, approves the network tariffs and caps the retail price. The result is that tariffs differ from region to region.
Almaty shows how quickly prices are rising. From 5 June 2026 the household average tariff of the local supplier, AZhK Energosbyt, rose to 35.37 KZT/kWh including VAT, after increases in network charges. These included KEGOC’s grid-use fee (2.892 to 3.216 KZT/kWh from May 2026), the regional distribution tariff of Alatau Zharyk Company (13.65 to 15.42 KZT/kWh excluding VAT from April 2026) and the capacity-readiness charge collected by RFC. From 12 September 2026 the household rate rose again, to 37.92 KZT/kWh. AZhK’s approved distribution tariff keeps rising each year until 2030, when it reaches 17.28 KZT/kWh excluding VAT.
Households pay less than businesses. In Almaty, non-household customers pay 50.03 KZT/kWh against 37.92 for households. KEGOC’s 2025 wholesale market review says most supply companies serving households buy from the single buyer at a supported price of about 13 KZT/kWh. That price has hardly changed since January 2024, while the single buyer’s cost was 22.71 KZT/kWh in August 2025. These supply companies took a record 64% of the single buyer’s sales in 2025, so the support is a growing cost to the market.
At about 0.08 EUR/kWh, Almaty household electricity is cheap by European standards but no longer among the cheapest in the region. A household using the 2022 national average of about 2,550 kWh would pay roughly 97,000 KZT (about EUR 190) a year at the Almaty average rate.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Almaty city and region, from 12 September 2026: group 1 (households) 37.92 KZT/kWh including VAT; group 2 (non-household use) 50.03; group 3 (state-budget bodies) 50.38; group 4 (special economic zones, producers of socially important food and some others) 45.59. Each supplier’s prices sit under a regulated retail price cap. |
| Other | Yes | Block tariff based on monthly use per registered resident (Almaty city, from 12 September 2026): level 1 at 34.28 KZT/kWh up to 90 kWh, level 2 at 45.51 KZT for 90–160 kWh and level 3 at 56.89 KZT above 160 kWh. Homes with electric stoves, homes without central hot water and formerly gas-supplied homes get thresholds of 115 and 190 kWh. In Almaty region the thresholds are lower (70/130 kWh, or 80/150 kWh with electric stoves). The household chooses this plan by application, using egov.kz records of how many people are registered at the address. |
| Time-of-use | No | Many new electronic meters can record two tariff zones (T1/T2), but the Almaty supplier says households have been billed on total consumption since 1 March 2018. No household time-of-day tariff is published in its current tariff schedule. |
| Dynamic | No | No retail tariffs linked to wholesale or spot prices. Wholesale volumes are bought day-ahead by the single buyer at regulated and auction prices. |
Household prices compared with neighbouring countries (EUR per kWh).
- Kazakhstan€0.076
- China€0.065
- Russia€0.062
- Uzbekistan€0.049
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 2,547.5 kWh/yr (2022)Source 4Average annual household electricity use from the Bureau of National Statistics household energy survey: 2,442 kWh in urban areas and 2,784 kWh in rural areas.
- Average daily use per household
- 6.98 kWh/day (2022)Source 4Derived from 2,547.5 kWh a year per household.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 6,050 kWh/person/yr (2025)Source 6Total electricity demand per person across all sectors (6.05 MWh). Industry, not households, accounts for most of it.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- 41.6 % of households (2022)Source 4Share of households using electricity for cooking (46.6% urban, 30.4% rural). Respondents could name more than one fuel; 37.2% use natural gas and 35.0% bottled LPG.
Kazakh households used about 14.3 TWh of electricity in 2022, according to the Bureau of National Statistics household energy survey, or about 2,550 kWh per household. Rural homes used more than urban ones (2,784 against 2,442 kWh). This reflects larger houses and more use of electricity for water heating and supplementary heating where there is no district heating or gas.
Electricity is rarely the main source of space heating. Of the 43% of households with their own heating system (rather than district heating), only 1.1% use electricity as the main fuel. Coal, gas or a mix are far more common. Electricity is, however, used by 88% of households that have supplementary heaters, and by 64% of households with a main water heater. About 42% of households cook with electricity, often alongside gas or bottled LPG.
Total consumption is dominated by industry: mining, metals and oil and gas. KEGOC reports national consumption of 124.6 TWh in 2025, up 3.8% on 2024. Demand grew fastest in the western (oil and gas) zone (+13.2%) and the southern zone (+8.0%). The Ministry of Energy’s forecast balance expects consumption to reach 150.7 TWh in 2030.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 81.4 % of households (2021 census)Source 3Derived: households living in premises owned by the respondent or another household member (2,820,347 + 1,744,910) out of 5,611,253.
- Private rented
- 12.7 % of households (2021 census)Source 3Derived: 714,431 households renting, for payment, premises owned by another private individual.
- Social or public housing
- 0.9 % of households (2021 census)Source 3Derived: 49,509 households living in state-owned premises.
- Houses
- 43.4 % of households (2021 census)Source 3Derived: 2,434,000 households living in single-family (individual) houses.
- Apartments and flats
- 54.8 % of households (2021 census)Source 3Derived: 3,072,696 households living in apartment buildings, including 352,276 in two-flat houses.
- Urban population
- 64.1 % of population (1 Jul 2026)Source 2Derived: urban population of 13,190,585 out of 20,590,589.
Most Kazakh households own their home. In the 2021 census about 81% lived in premises owned by a household member, about 13% rented from a private landlord and under 1% lived in state-owned housing.
Housing splits between apartment blocks (55% of households, mostly in towns and cities) and individual houses (43%, dominant in villages). In the countryside 1.4 million households live in individual houses. This matters for small-scale solar. Blocks of flats are managed through condominiums and service bodies (KSK/PKSK), and in new blocks the internal electricity network often belongs to the developer or the service body. Individual houses are connected directly to the regional grid company.
About 64% of the population lives in towns and cities.
How the grid works in Kazakhstan.
- TransmissionKEGOC (Kazakhstan Electricity Grid Operating Company)
- DistributionRegional grid companies and other transmission companies (energy-transmitting organisations); since 2025, 21 of them also hold supply licences and sell to retail customers in their areas.
- MeteringNot identified from a reliable public source.
- Supply1 or more retail suppliers
Physical flow
Power is generated mainly by large coal plants in the north (Ekibastuz GRES-1 and GRES-2, Eurasian Group plants), city combined heat and power plants, hydro plants on the Irtysh and in the south, and a growing number of wind and solar farms. It flows over KEGOC’s national grid, which links the regions with each other and with Russia, Kyrgyzstan and Uzbekistan. Regional grid companies take it down to 0.4 kV for homes. Installed capacity was 26,807 MW on 1 January 2026, but only 22,844 MW was available, because of ageing plant, water limits on hydro and other constraints. The north has a surplus and the south a deficit, which the north–south transit lines cover.
Commercial flow
Since July 2023, almost all planned generation has been sold day-ahead to the single buyer (RFC). The order of purchase is: renewable plants with long-term contracts, CHP plants, plants with capacity-market contracts, and finally whatever is bought on KOREM’s centralised trading platform. Imports fill any remaining gap. The single buyer sells to wholesale buyers, including supply companies and large consumers. All wholesale market entities must take part in the real-time balancing market, where KOREM settles imbalances. Companies inside the same corporate group may still trade directly under bilateral contracts.
Getting connected
Large users and generators that connect to the national grid apply to KEGOC for technical conditions. Homes and small businesses connect to the regional grid company. In Almaty, the supply contract for a flat in an existing block is treated as concluded from the moment the building is first energised. Owners of individual houses sign the contract with the grid company. Wholesale market entities must be on the system operator’s list and sign contracts with KEGOC for grid use, balancing and (for generators) technical dispatch.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy of the Republic of Kazakhstan | The authorised body for the power sector. It writes the wholesale, retail and balancing market rules and the standard supply contracts, approves the forecast balances, sets ceiling auction prices for renewables and approves the rules and standard contract for net consumers. |
| Regulator | Committee for Regulation of Natural Monopolies (KREM), Ministry of National Economy | Regulates natural monopolies and socially important markets. Its national committee and regional departments approve transmission and distribution tariffs, such as KEGOC’s grid fees and AZhK’s tariffs for 2026–2030, and oversee retail price caps. |
| System operator | KEGOC (Kazakhstan Electricity Grid Operating Company) | The national company that owns and runs the national grid (27,917 km of lines and 83 substations, in nine regional branches). It dispatches the unified power system, runs parallel operation with Russia and Central Asia, balances the system in real time, provides system services and buys ancillary services. |
| Settlement | RFC – Settlement and Financial Centre for Renewable Energy Support (single buyer) | Named single buyer of electricity by Ministry of Energy order on 6 June 2023. It buys planned output from generators, signs long-term contracts with renewable auction winners, runs the capacity market and sells to wholesale buyers. |
| Exchange | KOREM – Kazakhstan Electricity and Power Market Operator | Runs centralised day-ahead trading between generators and the single buyer, acts as settlement centre for the real-time balancing market and organises the auctions for renewable and hydro projects. |
| DSO | Regional grid companies (e.g. JSC Alatau Zharyk Company, Almaty) | Regional grid companies own the 220/110/35/10(6)/0.4 kV networks in their regions. Smaller transmission companies run local networks, including the railway company’s. AZhK, part of Samruk-Energo, serves Almaty city and Almaty region. |
| Supplier | Licensed supply companies (e.g. AZhK Energosbyt branch) | Since 1 January 2025, retail supply has been carried out by grid companies holding a supply licence (21 of them). AZhK’s Energosbyt branch supplies more than 3.5 million residents and 38,000 businesses in Almaty and Almaty region. |
Compared with the UK system.
| UK concept | Kazakhstan equivalent | How it works |
|---|---|---|
| DNO | Regional grid company (REC) / energy-transmitting organisation | Each region has a regional grid company that owns and runs the network down to 0.4 kV, for example Alatau Zharyk Company in Almaty. Smaller transmission companies run local or industrial networks. As in GB, these are regulated monopolies. Unlike GB, the larger ones also supply customers. |
| National Grid/NESO | KEGOC | KEGOC combines ownership of the national grid (mainly 220–1,150 kV) with system operation, dispatch and balancing, as National Grid did before NESO was split off. It also runs the balancing-market IT platform that the single buyer and KOREM use. |
| MPAN | Personal account (лицевой счёт) | There is no national meter-point number. Each connection is a personal account in the local supply company’s billing system, tied to the meter’s serial number. When a home is sold, the new owner must re-register the account within 10 working days. |
| MPRN | Gas personal account with the gas distributor | Gas is billed separately on its own account. In 2022, only 39% of households had a gas meter, compared with almost all for electricity. |
| Meter operator | Supply/grid company metering service | There is no competitive meter-operator market. The local grid and supply companies install, register and read meters. In Almaty many homes now have electronic Saiman meters made in Kazakhstan, with power-line (PLC) communication. |
| Supplier | Licensed supply company for the area | In practice each household is supplied by the licensed supply company for its area (since 2025 usually the regional grid company) under a standard supply contract. Household switching is not a working option. |
| Smart-meter infrastructure | Company-level automated metering (ASKUE) | There is no national smart-meter data system like DCC. Automated meter reading is run separately by each grid company. KEGOC runs its own commercial metering system (ASKUE) for the wholesale market. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Personal account number (лицевой счёт / дербес шот) |
| Who issues it? | The licensed supply company for the area, e.g. the AZhK Energosbyt branch in Almaty, or the service body (KSK/PKSK) where a new block’s network is still on its books |
| Format | A numeric account number in the supply company’s billing system, linked to the address, the owner and the meter’s serial (identification) number. Each supply company sets its own format, and none was found published. |
| Length | Not published (varies by supply company) |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | On the monthly bill and in the supplier’s online personal account. The meter’s own identification number is shown on the meter’s face and display and in its passport. |
| Electronic access | Yes. Suppliers run online personal accounts and e-bills, and in Almaty a change of owner can be filed online with a digital signature (EDS via NCLayer). Residents registered at an address are confirmed through the egov.kz portal. |
| Third-party access | No regime giving third parties or competing suppliers access to account or meter data was found. |
| Who keeps the register | Billing system of each supply company; there is no national meter-point register |
| Register scope | Per DSO |
Kazakhstan has no standard national code for a supply point like the British MPAN or the European EAN. A household connection is identified by its personal account (лицевой счёт) with the licensed supply company for its area, together with the serial number of the meter at the address. Since 2025 the supply company is usually the regional grid company or its supply branch. The account and meter number appear on the bill and are what the customer quotes when paying or reporting readings. Formats vary by company and are not published, so no example is given here.
The account belongs to the property, and the name on it is changed when ownership changes. According to the Almaty supplier, someone who buys a flat must re-register the account in their own name within 10 working days of registering ownership, as the Rules for the Use of Electricity require. They do this online with a digital signature or at a customer office, showing ID and proof of ownership. To use the block tariff, the household also provides an egov.kz extract showing how many people are registered at the address, because block thresholds are set per resident.
In newly built blocks the internal network often stays on the developer’s or service body’s books for a time. Residents then pay that body, which in turn holds the account with the supplier. Each grid company’s own billing and automated metering systems are the only register. There is no central data hub, and the wholesale market uses KEGOC’s commercial metering system rather than household-level data.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Unknown |
| Net billing | Yes |
| How exported electricity is paid | Surplus is sold to the supply company under the Ministry of Energy’s standard sale contract for net consumers (Order No. 350 of 30 September 2024), following the purchase rules of Order No. 309 of 2016. The price was not identified in the sources read. |
| Who can export? | A “net consumer”: an individual or company that meets all or part of its own needs from a small-scale renewable plant it owns, connected to the distribution network and with separate metering of imports and exports (Article 1, renewables law). |
| What is the size limit? | Since 1 July 2024 a small-scale plant is defined as one with a total installed capacity of up to 200 kW. The Ministry of Energy’s 2023 guidance still used a 100 kW limit. |
| Who buys the surplus? | The supply company serving the customer, under the standard sale contract. Larger renewable plants instead sell to the single buyer (RFC) under contracts won at auction. |
| Who sets the connection rules? | The Ministry of Energy approves the rules for connecting and operating small-scale plants, the standard sale contract and the purchase procedure (Article 6 of the renewables law). |
Connecting a home system.
- Install a small-scale renewable plant (up to 200 kW in total, including combined installations) on property you own, connected to the distribution network.
- Fit separate metering of imports from and exports to the grid: a bidirectional meter with a valid verification certificate.
- At least 15 calendar days before connection, notify both the supply company and the grid company, attaching the plant’s technical specifications, the connection diagram and a month-by-month generation forecast for one year.
- Give the supply company your ID (or company documents), the meter’s passport and verification certificate, and your bank details.
- The supply company sends a signed draft sale contract within 5 working days. Once the contract is signed, the plant is connected to the grid company’s network.
Kazakhstan’s prosumer scheme is set out in the 2009 Law on Support for the Use of Renewable Energy Sources. A “net consumer” owns a small renewable plant connected to the distribution grid, uses its output on site and sells any surplus to its supply company. Amendments in force from 1 July 2024 introduced the term “small-scale plant” and raised the limit to 200 kW. The Ministry of Energy approved a new standard sale contract in September 2024 (amended July 2025). The purchase rules date from 2016 and were last amended in 2024.
The procedure is mainly a notification, not a permit. The customer notifies the supply and grid companies, provides technical data and a bidirectional meter, and signs a sale contract that the supply company must offer within five working days. The full purchase rules and the article of the law on payment were not publicly accessible, so the price paid for surplus is not stated here. Prospective net consumers should ask their supply company for the current contract terms.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (wholesale) | To sell on the wholesale market a generator must be on the system operator’s list of wholesale market entities and sign contracts with KEGOC for grid use, balancing and technical dispatch. Planned output is sold to the single buyer. A separate generation licence was not confirmed in the sources read. | KEGOC (list of entities); Ministry of Energy (market rules) | Exception: power traded within a corporate group under bilateral contracts. Industrial complexes with their own plants are treated separately. |
| Generate from renewables (utility scale) | Long-term purchase contracts with the single buyer are awarded by auction. Fixed feed-in tariffs apply only to contracts signed before auctions were introduced. | KOREM (auction organiser); RFC (purchase contract); Ministry of Energy (ceiling prices, siting plan) | Winners must apply to RFC within 60 days to sign the purchase contract and must lodge financial guarantees. Auctions can include projects with storage. |
| Self-generate and export (prosumer) | No licence. Small-scale renewable plants up to 200 kW: notification to the supply and grid companies, separate metering and a standard sale contract. | Supply company; grid company; Ministry of Energy rules | Larger self-generation is treated as a wholesale-market generator. |
| Store electricity | No storage-specific licensing regime was identified. The renewables law defines an “electricity storage system”, and pumped-storage projects are procured by auction under the electricity law. | Ministry of Energy | A draft law on alternative energy proposes returning storage investment through single-buyer capacity contracts or through price arbitrage on the wholesale and balancing markets. |
| Supply electricity to retail customers | Licence to buy electricity for supply. Since 1 January 2025 supply is carried out by grid companies holding this licence. | Licensing under the Ministry of Energy; prices capped under KREM regulation | System-services contracts are required for supply volumes of at least 1 MW average daily (base) load. |
| Wholesale trading | Only through the single buyer and KOREM’s centralised trading. Participants must be on the system operator’s list of wholesale market entities. | KEGOC; RFC; KOREM | |
| Balancing | All wholesale market entities must take part in the real-time balancing market. A balance provider can take financial responsibility for other entities’ imbalances. | KEGOC (physical balancing); KOREM (settlement centre) | Price caps apply to balancing energy and negative imbalances. |
| Grid services (ancillary services) | The system operator buys ancillary services (regulating reserves, active and reactive power control, black start) from wholesale market entities. | KEGOC | Small distributed assets are not wholesale market entities and cannot take part directly. |
| Aggregation / VPP / remote control of assets | No aggregator or VPP role is defined in the sources read. The balance-provider role is the closest to aggregation. | Ministry of Energy (market rules) | Household assets cannot currently be pooled for market participation. |
| Transmission and distribution | Regulated natural-monopoly activity: tariffs, tariff estimates and investment programmes are approved by KREM. | KREM (Ministry of National Economy) | Companies must hold annual public hearings on how they have met their approved tariff estimates and investment programmes. |
Kazakhstan’s market licensing is built around the single buyer. Generators do not choose their buyers. They sell planned output to RFC in a fixed order of priority, and anyone trading on the wholesale market must be on KEGOC’s list of wholesale market entities and hold the related grid, balancing and dispatch contracts. Renewable projects compete in auctions run by KOREM and sign long-term contracts with RFC.
At household level no licence is needed to generate. A net consumer with a plant of up to 200 kW only has to notify the supply and grid companies and sign a standard contract. Supply to end customers needs a licence, and since 2025 it has been held by grid companies. Grid tariffs and retail price caps go through KREM, which publishes approval orders and requires public hearings.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Real-time balancing market | Restricted | — | Limited | KEGOC / KOREM (settlement centre). Settles hourly imbalances between planned and actual output and use for all wholesale market entities. KEGOC activates price bids from a ranked list. Balance providers can carry other entities’ imbalances. |
| System and ancillary services | Restricted | — | No | KEGOC. KEGOC buys regulating reserves, active and reactive power control and black start from wholesale market entities. It also has frequency-control arrangements with neighbouring systems. |
| Capacity market | Restricted | — | No | RFC (single buyer). Pays generators to keep capacity available. The charge for capacity readiness rose to 1,560,850 KZT per MW a month from 1 January 2026. New flexible generation and pumped storage are procured by tender or auction. |
| Demand response / local flexibility | No | — | No | No household or distribution-level flexibility market or demand-response scheme was identified. |
Flexibility in Kazakhstan is provided almost entirely by large plants and imports. The system has a structural capacity shortage at peak: on 18 December 2025 the shortfall was 831 MW, covered from Russia. Hydro plants on the Irtysh help follow the load. KEGOC buys ancillary services from wholesale market entities and settles deviations with neighbouring systems under bilateral agreements.
Distributed assets have no route into these markets. Taking part requires wholesale-market status, contracts with KEGOC and, for system services, at least 1 MW of average load. The balance-provider role lets one entity take on others’ imbalances, but there is no aggregator or VPP category for small assets. Storage is at an early stage. KEGOC is preparing a 3.45 MW / 7.72 MWh battery pilot, and a draft law would let storage earn revenue through capacity contracts or wholesale arbitrage.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| KOREM centralised trading | Electronic platform for day-ahead centralised trading with the single buyer and for renewable and hydro auctions. |
| Balancing market system (KEGOC) | Hardware and software system run by KEGOC, with single-buyer and balancing-settlement modules, used by all wholesale market entities. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national programme; grid companies are installing electronic and PLC-enabled meters in their own areas |
| Reading interval | Not specified nationally; households are billed monthly on total consumption |
| Households with an electricity meter (2022) | 99.98% |
| Electricity meters in households (2022) | 5.62 million |
| Typical new meters (Almaty) | Saiman ORMAN CO-E711 (single-phase) and DALA CA4-E720 (three-phase), with PLC |
| Billing basis | Total kWh since 1 March 2018 |
Nearly every Kazakh home has an electricity meter: 99.98% of households in the 2022 survey, about 5.6 million meters in total. There is no national smart-meter mandate, rollout target or central data system. Metering is the job of each grid and supply company, and automated meter reading (ASKUE) is built up company by company.
In Almaty and Almaty region, many residents are getting electronic meters made in Kazakhstan by Saiman. These meters can communicate over power lines (PLC) and record two tariff zones. The supplier still bills on total consumption and asks customers to submit readings from the TOTAL register, so the meters’ time-of-use features are not used for household tariffs. No reliable national figure for the share of remotely read meters was found.
Renewable electricity.
Electricity generation mix (2025).
- Coal: 54.3%
- Gas: 29.4%
- Other fossil: 1.5%
- Hydro: 8.5%
- Wind: 4.7%
- Solar: 1.7%
- Renewable electricity share
- 14.5% (2025)Source 5Share of total electricity production, including large hydro (14.48%). Excluding large hydro the share was 7.02%. Net imports were about 2% of demand (Ember: 2.41 TWh of 126.1 TWh), so the generation share is used.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Wind
- 1.83 GW (2025)Source 21
- Solar PV
- 1.23 GW (2025)Source 21
- Hydro (total)
- 2.85 GW (2025)Source 6RFC lists 167.3 MW of small hydro under renewable support; the rest is large hydro.
- Biogas
- 0.001 GW (2025)Source 211.067 MW.
- All renewable plants under RFC support
- 3.24 GW (2025)Source 213,236.7 MW, excluding large hydro.
Targets.
- The Ministry of Energy’s forecast balance (2026–2032) expects renewable output to rise from 9.9 TWh in 2026 to 25.1 TWh in 2030.
- Renewable capacity is procured through auctions organised by KOREM. Auction rounds for solar, wind and small hydro are scheduled for the second half of 2026.
Renewables (excluding large hydro) have grown from 0.6% of production in 2015 to 7.0% in 2025, according to the Bureau of National Statistics. In 2025 wind produced 5.2 TWh, solar 2.3 TWh and small hydro 1.2 TWh. Including large hydro, the renewable share was 14.5%. Coal still provides more than half of all electricity, mostly from the Ekibastuz basin.
Growth came first from fixed feed-in tariffs set by government decree in 2014. Since 2018 it has come from auctions. Winners sign long-term contracts with RFC, the single buyer, which gives renewable output first place in the daily purchase order. Fixed tariffs and auction prices are indexed every year. KEGOC says 13 renewable plants totalling 707.7 MW were commissioned in 2025, and the government’s forecast balance expects renewable output to more than double by 2030.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Battery storage in Kazakhstan is still at the pilot stage. KEGOC’s first battery, 3.45 MW / 7.72 MWh at the Kokshe 220 kV substation, is meant to produce recommendations for changing the technical and legal rules on storage. Since 2024 the renewables law has defined an electricity storage system and has allowed renewable auctions to include projects with storage. The electricity law provides separate auctions and capacity tariffs for new pumped-storage plants.
KEGOC’s 2025 market review describes a draft law on alternative energy that would give storage two ways to recover its investment: a capacity-market contract with the single buyer won at auction, or arbitrage between prices on the wholesale and balancing markets. No route for home batteries was identified beyond self-consumption alongside a net-consumer plant.
Storage projects.
- KEGOC battery storage pilot (Kokshe substation): Agreed on 4 December 2023 between KEGOC, China Power International and the Renewable Energy Association of Kazakhstan: a 3.45 MW / 7.72 MWh battery near the 220 kV Kokshe substation to study how storage can help integrate renewables.
- Renewable auctions with storage: The renewables law allows auctions for new renewable plants “including those equipped with electricity storage systems”.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Alatau Zharyk Company – Energosbyt branch (Almaty) | More than 3.5 million residents and 38,000 businesses in Almaty and Almaty region | No | No | No | Yes |
Kazakhstan has no competitive household supply market. Since 1 January 2025 each area is supplied by the grid company that holds a supply licence there, 21 in all. Before this, separate supply companies (some regulated, some not) handled sales. The unregulated suppliers handed their customers to regulated ones between April and December 2024. In Almaty and Almaty region the supplier is the Energosbyt branch of Alatau Zharyk Company, part of the state-owned Samruk-Energo group. Under the renewables law, supply companies are the buyers of net consumers’ surplus.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy of the Republic of Kazakhstan | Government | Energy policy, market rules, renewables support | Approves market rules, forecast balances, auction ceiling prices and the rules and standard contract for net consumers. |
| Committee for Regulation of Natural Monopolies (KREM) | Regulator | Tariff regulator, Ministry of National Economy | Approves grid tariffs and oversees regulated retail prices. |
| KEGOC | Transmission | National grid company and system operator | Runs the national grid, dispatch and balancing, and publishes annual wholesale market reviews. |
| RFC – Settlement and Financial Centre for Renewable Energy Support | Market | Single buyer of electricity | Buys planned generation, holds renewable purchase contracts and runs the capacity market. |
| KOREM | Market | Market operator and balancing settlement centre | Runs centralised trading and renewable auctions, and settles the balancing market. |
| Alatau Zharyk Company (AZhK) | Distribution | Regional grid company for Almaty and Almaty region | The largest urban network, with published tariffs and tariff paths to 2030. |
| Kazakhstan Electricity Association (KEA) | Renewable Energy | Industry association | Brings together more than 100 of the country’s largest energy companies. |
| QazaqGreen | Renewable Energy | Information portal on green energy | Covers renewable energy projects and policy in Kazakhstan. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Small-scale renewable connection | Rules for connecting small-scale renewable plants to the grid and operating them | Ministry of Energy (under Art. 6 of the renewables law) | Apply to plants up to 200 kW owned by net consumers. |
| Prosumer contract | Standard contract for buying electricity from net consumers (Order No. 350, 30 Sep 2024) | Ministry of Energy | Amended July 2025; used together with the 2016 purchase rules (Order No. 309). |
| Metering | GOST R 52322-2005 / GOST 31819.21-2012 (static active-energy meters) | Interstate (CIS) standards | Cited by the Almaty supplier for the Saiman meters installed in homes. Meters need metrological verification. |
| Supply contract | Standard supply contract for household and non-household consumers | Ministry of Energy | For flats in blocks, deemed concluded on first connection. |
| Installer accreditation | Not identified | — | No solar-specific installer certification scheme was found in the sources read. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Notification to supply and grid companies (net consumer) | Yes | National | At least 15 calendar days before connection, with technical specifications, connection diagram and a 12-month generation forecast. |
| Bidirectional meter with verification certificate | Yes | National | Separate metering of imports and exports is part of the legal definition of a net consumer. |
| Sale contract with supply company | Yes | National | Standard contract; the supply company must send a signed draft within 5 working days. |
| Technical conditions for a new or upgraded connection | Yes | Mixed | Issued by the grid company that owns the network (KEGOC for the national grid, the regional grid company for distribution). |
| Planning/building permission for rooftop solar | Unknown | Local | No national rule specific to rooftop solar was found. |
For a small rooftop or ground-mounted system the paperwork is mainly a matter of notifying and signing contracts with the supply and grid companies. In blocks of flats the building network may belong to a condominium or developer, so their agreement is also needed in practice. Large plants need technical conditions from KEGOC or the regional grid company and, to receive long-term support, an auction win.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Sale of surplus by net consumers | Active | Export payment | Owners of renewable plants up to 200 kW can sell surplus to their supply company under a standard contract. The purchase price was not identified in the sources read. | — |
| Renewable energy auctions (single-buyer purchase contracts) | Active | Auction / long-term purchase contract | Winners of KOREM auctions sign long-term contracts with RFC, and their output is bought first. Auction prices are indexed every year. | — |
| Fixed feed-in tariffs (Government Decree No. 645, 2014) | Closed | Feed-in tariff | Paid only under contracts signed with RFC before auctions were introduced; still indexed for those plants but closed to new projects. | 2014 – 2018 (new contracts) |
Data and connectivity.
- Fixed broadband
- 15.3 fixed subscriptions per 100 people (2024)Source 26
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Internet use is high: 93.4% of people used the internet in 2024, according to the World Bank. Fixed broadband is less common, at 15.3 subscriptions per 100 people, so mobile networks and power-line communication matter for remote meter reading. In Almaty the new household meters use PLC over the low-voltage network. No national figures for 4G or 5G population coverage were verified.
Grid conditions.
- National peak demand
- 17.7 GW (18 Dec 2025)Source 9All-time peak of 17,724 MW at 17:55. Generation peaked at 16,684 MW and the 831 MW deficit was imported.
- Annual electricity demand
- 124.6 TWh (2025)Source 9124,606.5 million kWh, up 3.8% on 2024. Ember reports 126.1 TWh.
- Generation capacity
- 26.8 GW (1 Jan 2026)Source 7Installed capacity of 26,807.0 MW, of which 22,844.2 MW was available.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Kazakhstan’s grid has three zones. The northern zone (75.5 TWh of consumption in 2025) holds the large coal plants and has a surplus. The southern zone (30.6 TWh), including Almaty, is in deficit. The western zone (18.4 TWh), centred on oil and gas, is only partly linked to the rest. The Ministry of Energy’s forecast balance shows a 12.8 TWh deficit in the south in 2026, met by north–south transfers and imports. New plants are expected to turn the national position into a surplus from 2027.
The system operates in parallel with Russia and, under a 1999 agreement, with the Central Asian systems of Kyrgyzstan, Tajikistan and Uzbekistan. KEGOC manages unplanned flows and frequency support through bilateral contracts. Available capacity is typically 15–20% below installed capacity because of ageing equipment and hydro water limits, so peak demand has exceeded domestic generation for most years since 1990.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Single-buyer wholesale market and real-time balancing market | Current | 1 Jul 2023 | Planned output is sold to RFC as single buyer. KOREM settles the balancing market and KEGOC runs physical balancing. |
| Small-scale renewable plants up to 200 kW | Current | 1 Jul 2024 | Amendments to the renewables law defined small-scale plants and raised the net-consumer threshold to 200 kW. A new standard contract followed in September 2024. |
| Retail supply transferred to licensed grid companies | Current | 1 Jan 2025 | All supply functions passed to grid companies holding supply licences (21 companies), after unregulated suppliers left the market in 2024. |
| Household tariff increases in Almaty | Current | 5 Jun 2026 and 12 Sep 2026 | The household average tariff rose to 35.37 and then 37.92 KZT/kWh (incl. VAT) as grid, capacity and wholesale costs increased. |
| Annual increases in AZhK distribution tariff to 2030 | Upcoming | 2027–2030 | Approved path: 15.48 KZT/kWh in 2027, 16.21 in 2028, 16.58 in 2029 and 17.28 in 2030 (excluding VAT). |
| Draft law on alternative energy: storage investment return | Upcoming | Draft – date not set | Would let storage projects earn revenue through auctioned capacity contracts with the single buyer or through wholesale and balancing-market arbitrage. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | A net-consumer scheme exists for plants up to 200 kW, but no statistics on residential uptake were found. RFC’s register lists 1.23 GW of solar, almost all in utility-scale plants. |
| Distributed energy market | Low | Generation is dominated by large coal and gas plants (85% fossil in 2025). Distributed generation has no route to the wholesale or flexibility markets. |
| Grid flexibility market | Low | The balancing and ancillary-services markets are open only to wholesale market entities (with a 1 MW threshold for system-services contracts). There is no aggregator role and no demand-response scheme. |
| Energy storage adoption | Low | No operating grid batteries were reported. The first KEGOC pilot is 3.45 MW / 7.72 MWh, and storage revenue rules are still in draft. |
| Renewable growth environment | Medium | Renewables excluding large hydro rose from 0.6% (2015) to 7.0% (2025) of production. 707.7 MW was commissioned in 2025, and renewable output is forecast to reach 25.1 TWh by 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 27 sources
- Demographic statistics – population of the Republic of Kazakhstan. Bureau of National Statistics, Agency for Strategic Planning and Reforms, 2026. accessed 9 October 2026.
- Population of the Republic of Kazakhstan by gender and type of locality (as of 1 July 2026). Bureau of National Statistics, 2026. accessed 9 October 2026.
- 2021 National Population Census – Housing characteristics of the population. Bureau of National Statistics, 2024. accessed 9 October 2026.
- Fuel and energy consumption in households of the Republic of Kazakhstan (2022). Bureau of National Statistics, 2023. accessed 9 October 2026.
- Data on renewable energy sources – share of RES in electricity production (2015–2025). Bureau of National Statistics, 2026. accessed 9 October 2026.
- Yearly electricity data (full release, long format). Ember, 2026. accessed 9 October 2026.
- Electricity sector of Kazakhstan: key facts. KEGOC, 2026. accessed 9 October 2026.
- KEGOC – key indicators (home page). KEGOC, 2026. accessed 9 October 2026.
- Analysis of the functioning of the wholesale electricity and capacity market for 2025. KEGOC, 2026. accessed 9 October 2026.
- Order approving forecast balances of electricity and capacity of the UES of Kazakhstan for 2026–2032. Ministry of Energy of the Republic of Kazakhstan (published by KEGOC), 2026. accessed 9 October 2026.
- Law No. 165-IV of 4 July 2009 “On support for the use of renewable energy sources” (as amended to 19.01.2026). PRG (Paragraph) legal information system, 2026. accessed 9 October 2026.
- Law No. 588-II of 9 July 2004 “On the electric power industry” (as amended to 07.09.2026). PRG (Paragraph) legal information system, 2026. accessed 9 October 2026.
- Algorithm for net consumers on the sale of electricity and connection to supply and grid companies. Ministry of Energy of the Republic of Kazakhstan (via PRG), 2023. accessed 9 October 2026.
- Order No. 350 of 30 September 2024 approving the standard contract for buying electricity from net consumers. Ministry of Energy of the Republic of Kazakhstan (via PRG), 2025. accessed 9 October 2026.
- Tariff plans from 12 September 2026 (Almaty city and Almaty region). Alatau Zharyk Company – Energosbyt branch, 2026. accessed 9 October 2026.
- Information for consumers on changes to electricity tariffs from 5 June 2026. Alatau Zharyk Company – Energosbyt branch, 2026. accessed 9 October 2026.
- Algorithm for connecting electricity (change of owner, new connections). Alatau Zharyk Company – Energosbyt branch, 2026. accessed 9 October 2026.
- Guide to taking meter readings. Alatau Zharyk Company – Energosbyt branch, 2026. accessed 9 October 2026.
- Tariffs – notice of change to electricity transmission tariffs 2026–2030. JSC Alatau Zharyk Company, 2026. accessed 9 October 2026.
- Official exchange rates on 09.10.2026. National Bank of Kazakhstan, 2026. accessed 9 October 2026.
- Renewable energy in Kazakhstan – installed capacity of renewable plants (2025). RFC – Settlement and Financial Centre for Renewable Energy Support, 2026. accessed 9 October 2026.
- Selection of renewable energy projects (auctions). RFC – Settlement and Financial Centre for Renewable Energy Support, 2026. accessed 9 October 2026.
- Prices and tariffs – fixed tariffs, auction prices, support tariff. RFC – Settlement and Financial Centre for Renewable Energy Support, 2026. accessed 9 October 2026.
- KOREM – centralised trading and balancing market settlement centre. JSC KOREM, 2026. accessed 9 October 2026.
- Committee for Regulation of Natural Monopolies of the Ministry of National Economy. Government of the Republic of Kazakhstan (gov.kz), 2026. accessed 9 October 2026.
- Fixed broadband subscriptions (per 100 people) – Kazakhstan. World Bank, 2024. accessed 9 October 2026.
- Individuals using the Internet (% of population) – Kazakhstan. World Bank, 2024. accessed 9 October 2026.
Questions about energy in Kazakhstan.
It depends on the region. In Almaty city and Almaty region, households pay an average of 37.92 KZT/kWh including VAT from 12 September 2026, or about EUR 0.076. Households can instead choose a block tariff of 34.28, 45.51 or 56.89 KZT/kWh, depending on monthly use per registered resident.
Yes. Under the renewables law, owners of renewable plants up to 200 kW connected to the distribution grid can register as “net consumers”. They notify their supply and grid companies, install a bidirectional meter and sign a standard sale contract with the supply company, which buys the surplus.
There is no national meter-point number. Each home is identified by its personal account (лицевой счёт) with the local supply company, linked to the meter’s serial number. The account stays with the property, and a new owner must re-register it within 10 working days.
KEGOC owns the national high-voltage grid and is the system operator. Regional grid companies, such as Alatau Zharyk Company in Almaty, run the local networks and since 2025 also supply households. RFC is the single buyer of wholesale power, and KOREM runs centralised trading and balancing settlement.
In 2025 renewables provided 14.5% of electricity production including large hydro, or 7.0% excluding it (Bureau of National Statistics). Coal provided about 54% and gas about 29% (Ember).
In practice, no. Households are supplied by the licensed supply company for their area, usually the regional grid company since 2025, at regulated prices.
Almost every home has a meter, and grid companies are installing electronic meters, some of which communicate over power lines. There is no national smart-meter programme or data hub, and households are billed monthly on total consumption.