Countries

Energy in Uzbekistan, explained.

How electricity works in Uzbekistan: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Uzbekistan: Not yet available.Olmack is not offered in Uzbekistan yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Uzbekistan.

Uzbekistan electricity market 2026: block household tariffs from 650 som/kWh, one national DSO (REPN), smart-meter prepayment, solar surplus sales and energy-market reform.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Uzbek som (UZS) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Uzbekistan energy at a glance.

Key figures for households in Uzbekistan. Each one links to its source on the full overview below.

  • Electricity price.

    650 UZS per kWh for households, including taxes. Figures for from 1 Jun 2026.

  • Household use.

    2,271 kWh a year for a typical household. Figures for 2025.

  • Renewable share.

    19.4% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Uzbekistan.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Uzbekistan below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Uzbekistan requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Uzbekistan.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Uzbekistan, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Uzbekistan, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Uzbekistan.

Full overview

The energy market in Uzbekistan, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Uzbekistan has the largest power system in Central Asia. It is still mostly gas-fired, but solar and wind are being added very quickly. In 2025 the country generated 86.7 TWh, according to Ember. Gas supplied 72.3% of it, coal 6.6% and other fossil fuels 1.7%. Solar supplied 7.5%, hydro 7.3% and wind 4.6%. Renewables therefore made up about 19% of generation, up from about 11% in 2023. Installed solar capacity rose from 3.19 GW to 5.93 GW during 2025, and wind from 0.5 GW to 1.65 GW.

The sector is state-owned and is being reorganised under the Law "On Electric Power Industry" (ZRU-939 of 7 August 2024). JSC National Electric Grid of Uzbekistan runs the transmission network and dispatch. JSC Uzenergosotish acts as the central purchaser: it buys power from state and private plants and handles cross-border trade. JSC Regional Electric Networks (REPN) owns the 0.4–110 kV distribution network and sells electricity to every household. Tariffs are still set by the government. A new Agency for the Development and Regulation of the Energy Market licenses market participants and is due to take over tariff approval from 2028.

Households pay rising block tariffs set per month. From 1 June 2026 the rate is 650 som/kWh for the first 200 kWh, rising to 2,200 som/kWh above 10,000 kWh. Nearly all customers have electronic meters linked to REPN’s automated metering system (ASKUE), and households on that system prepay. Since 2023, people and businesses with solar, wind or biogas plants of up to 1 MW have been able to sell their surplus to REPN.

Energy snapshot.

Headline figures for electricity in Uzbekistan. Each shows its data year and links to its source.

  • Population38,236,700 peopleSource 81 Jan 2026
  • Households7,650,000 householdsSource 102025–26
  • Average household size5 peopleSource 102025
  • Electricity use per household2,271 kWh/yrSource 122025
  • Household price (UZS)650 UZS/kWhSource 1from 1 Jun 2026
  • Household price (EUR)0.049 EUR/kWhSource 4from 1 Jun 2026
  • Renewable electricity share19.4%Source 52025
  • Solar capacity5.93 GWSource 52025
  • Wind capacity1.65 GWSource 52025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter share96.3%Source 21 Jan 2025
Market structure
Single buyer
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Agency for the Development and Regulation of the Energy Market (licensing and market rules); retail tariffs are set by the government until the Agency takes over in 2028
System operator
JSC National Electric Grid of Uzbekistan
Distribution networks
One national DSO and retailer, JSC Regional Electric Networks (REPN). It works through 12 regional branches, two regional network companies (Bukhara and Fergana) and 211 district and city enterprises.
Currency
Uzbek som (UZS)
Voltage and frequency
220/380 V, 50 Hz (0.4 kV low-voltage distribution network)

Electricity prices in Uzbekistan.

Household price (UZS)
650 UZS/kWh (from 1 Jun 2026)Source 1First block (0–200 kWh a month) of the household tariff, and the flat rate for homes with electric stoves. Higher blocks: 900 (201–500 kWh), 1,100 (501–1,000), 1,600 (1,001–5,000), 1,900 (5,001–10,000) and 2,200 som/kWh above 10,000 kWh.
Household price (EUR)
0.049 EUR/kWh (from 1 Jun 2026)Source 4Converted from 650 UZS/kWh at the Central Bank of Uzbekistan rate of 13,240.91 UZS per EUR on 9 October 2026.
Typical annual electricity bill
1,476,000 UZS/yr (2026)Source 1Derived: about 2,271 kWh a year (about 189 kWh a month, all in the first block) at 650 som/kWh. That is roughly EUR 111 at 13,240.91 UZS/EUR.

Household price trend (UZS per kWh).Source 3

450550650Apr 2025May 2025Jun 2026
Uzbekistan household electricity price, UZS per kWh
Apr 2025450 UZS/kWh
May 2025600 UZS/kWh
Jun 2026650 UZS/kWh

Household electricity prices in Uzbekistan are set by government resolution, not by a market. REPN applies them and publishes them in its online calculator. Cabinet of Ministers Resolution No. 194 of 31 March 2025 brought in a rising block structure from 1 May 2025. The social-norm block (up to 200 kWh a month) rose from 450 to 600 som/kWh. A new 800-som block covered 201–500 kWh, followed by 1,000 som for 501–1,000 kWh and 1,500 som above that. REPN’s FAQ said annual indexation of no more than 10% was planned from 2026. On 1 June 2026 every block went up again: the first block to 650 som, and new top blocks of 1,900 and 2,200 som/kWh were added for very heavy users.

Because the average home uses about 189 kWh a month, a typical household stays in the cheapest block. At 650 som/kWh that is roughly 1.48 million som a year, or about EUR 111. Prices are very low by international standards, at about EUR 0.05/kWh. The block design is meant to protect basic consumption while charging large users, such as homes with electric heating, much higher rates.

Businesses are in tariff group II, and large connections of 750 kVA or more are in group I, which pays time-of-day rates. Under the 2024 Electric Power Industry Law, cross-subsidies are to be phased out. Under Decree UP-202 of 22 September 2026, tariff applications will go through a digital platform of the Interagency Tariff Commission from 1 July 2027. The energy-market regulator will approve regulated tariffs from 2028.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesHousehold block tariff from 1 June 2026, based on monthly use: 650 som/kWh for 0–200 kWh, 900 for 201–500, 1,100 for 501–1,000, 1,600 for 1,001–5,000, 1,900 for 5,001–10,000 and 2,200 above 10,000 kWh. Homes with electric stoves pay a flat 650 som/kWh.
PrepaymentYesUnder the Rules for the Use of Electricity and Natural Gas, customers whose meters are on ASKUE are supplied up to the amount they have prepaid. A household on ASKUE that falls into debt is disconnected remotely by software. Other households must settle the previous month’s bill by the 10th.
Time-of-useLimitedOnly tariff group I (connections of 750 kVA and above) pays a time-of-day tariff. Peak hours (06:00–09:00 and 17:00–22:00) cost 1.5 times the base rate, night hours (22:00–06:00) cost the base rate divided by 1.5, and daytime (09:00–17:00) is at the base rate. Households (group III) have no time-of-use option.
DynamicNoNo dynamic or spot-linked retail tariffs. The competitive wholesale and retail markets set out in the 2023–2030 Concept are not yet operating.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
2,271 kWh/yr (2025)Source 12Derived: 17,797.7 million kWh supplied to the housing sector in 2025 (Statistics Agency) divided by 7,837,140 household customers (REPN, 1 January 2025). This works out at about 189 kWh a month.
Average daily use per household
6.2 kWh/day (2025)Source 12Derived from 2,271 kWh a year per household customer.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,697.9 kWh/person/yr (2025)Source 13Consumption by all customers per head of population, across all sectors. The World Bank gives 2,097 kWh for 2024 on a broader basis.
Heat pumps
Not identified from a reliable public source.
Air conditioning
67 air conditioners per 100 households (2025)Source 11Up from 47 per 100 households in 2023 and 19 in 2010. This counts units, not the share of homes that have one.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

The Statistics Agency reports 17.8 TWh supplied to the housing sector in 2025, slightly less than in 2023 and 2024 (18.1 and 18.0 TWh), after fast growth from 14.8 TWh in 2021. Spread across about 7.8 million household accounts, that is about 2,270 kWh per home a year. Homes are large, averaging five people, so use per person is modest.

Cooling is the fastest-growing household load. The number of air conditioners per 100 households rose from 47 in 2023 to 67 in 2025, so summer evening peaks are a growing concern for the grid. Most homes heat and cook with natural gas. Homes with electric stoves have their own flat tariff, but no national figure for the share of homes cooking or heating with electricity was found.

Total electricity supply was 87.2 TWh in 2025 (Statistics Agency), and Ember puts demand at 89.6 TWh. Industry, including large state mining and metals companies, uses far more than households. The government targets energy savings every year: Decree UP-70 of 29 April 2026 aims to save 4.3 billion kWh of electricity in 2026.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
50.9 % of population (1 Jan 2026)Source 9Derived: urban permanent population of 19,471.7 thousand out of 38,236.7 thousand.

Just over half of Uzbekistan’s 38.2 million people live in towns and cities. Elsewhere, people mostly live in detached single-storey houses with yards, grouped into mahallas (neighbourhood communities). Cities, especially Tashkent, have Soviet-era and modern apartment blocks. The 2023 Solar House programme was aimed at private houses. Since May 2023, new multi-storey buildings have had to put solar panels on at least half of the free roof area, and the developer must connect them to the grid before the building can be accepted.

No reliable recent national breakdown of tenure or dwelling type was found, so those figures are left blank. A national population census is being prepared for 2026, and the Ministry of Energy has a section on it.

How the grid works in Uzbekistan.

  1. TransmissionJSC National Electric Grid of Uzbekistan
  2. DistributionOne national DSO and retailer, JSC Regional Electric Networks (REPN). It works through 12 regional branches, two regional network companies (Bukhara and Fergana) and 211 district and city enterprises.
  3. MeteringREPN Center for Automation of Electric Energy Sales
  4. Supply1 or more retail suppliers

Physical flow

Large thermal plants (mostly gas-fired, with some coal), hydropower plants and a growing fleet of utility-scale solar and wind farms feed the trunk network of National Electric Grid of Uzbekistan. Power then passes through REPN’s 110/35/10/6 kV substations and 97,003 transformer points into 157,404 km of 0.4 kV lines to homes. Uzbekistan’s system also connects to those of neighbouring Central Asian countries, and the TSO manages parallel operation with them.

Commercial flow

Most money goes through one channel. Generators, including private IPPs under long-term PPAs, sell to the central purchaser, Uzenergosotish. It sells to REPN and to large consumers at tariffs set by the government. REPN bills households and businesses under standard supply contracts. The Concept for the phased transition to wholesale and retail markets in 2023–2030 (Decree UP-166, amended by UP-152 in 2025) plans a move to an online trading platform with free prices. Each stage starts only once the previous stage’s conditions are fully met.

Getting connected

A new customer applies for technical conditions (TU) through a public services centre or the my.gov.uz single portal. REPN or its regional branch issues them. In Tashkent, the Ministry of Energy must agree TUs for 500 kW and above. Supply designs must be agreed with Uzenergoinspeksiya. The customer pays for work on its own installation, and connection is not allowed without an ASKUE-compatible meter.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy of the Republic of UzbekistanSets state energy policy, plans the sector, oversees technical regulation and runs renewable development. Under UP-202 (2026) it no longer issues individual permits to energy companies and customers.
RegulatorAgency for the Development and Regulation of the Energy MarketCreated by Decree UP-166 (2023) and named as the Energy Market Regulator in Law ZRU-939. It licenses market participants, writes market rules, decides who counts as a large consumer, approves allowed network losses and settles disputes. From 2028 it will approve regulated tariffs and handle consumer protection.
RegulatorInspection for Control over the Use of Electricity, Oil Products and Gas (Uzenergoinspeksiya)The state body that inspects safety and technical compliance. It agrees supply designs for new connections and checks that customer installations are ready to be energised.
TSOJSC National Electric Grid of UzbekistanHas operated the trunk network (35 kV and above, as defined in the law) in full since 1 July 2024. It also handles real-time dispatch of the unified power system and parallel operation with neighbouring systems.
SettlementJSC Uzenergosotish (central purchaser)Buys electricity from producers, including private IPPs under power purchase agreements transferred to it on 1 January 2025. It sells to REPN and to large consumers at set tariffs and runs export and import contracts. Under Article 64 of ZRU-939 it acts as market operator until a competitive wholesale market exists.
DSOJSC Regional Electric Networks (REPN, Hududiy elektr tarmoqlari)The single distribution company and default supplier. It runs 293,162 km of 0.4–110 kV lines, 1,839 substations and 97,003 transformer points, and served 8.3 million customers on 1 January 2025.
MeteringREPN Center for Automation of Electric Energy SalesA REPN branch. REPN as a whole runs the automated metering (ASKUE) and billing systems, and meters must be compatible with the central AMI system (CAS) set up in each region.
SupplierJSC Thermal Power Plants and JSC UzbekhydroenergoThe state generators of thermal and hydro power. Large private solar, wind and gas plants under PPAs make up the rest of the generation fleet.

Compared with the UK system.

Compared with the UK system.
UK conceptUzbekistan equivalentHow it works
DNOREPN district/city power supply enterpriseOne national company, JSC Regional Electric Networks, owns and runs all 0.4–110 kV distribution through 211 district and city enterprises. Unlike GB’s 14 licensed areas, there is no regional competition or separate ownership.
National Grid/NESOJSC National Electric Grid of UzbekistanCombines ownership of the transmission network with real-time dispatch, much as National Grid did before NESO was split off. Commercial buying and trading sit separately with Uzenergosotish.
MPANPersonal account (shaxsiy hisob / litsevoy schet)There is no published national meter-point number. Each connection is identified by a personal account in REPN’s billing system, linked to the supply contract and the ASKUE meter. When a property is sold, REPN re-registers the account using cadastre data.
MPRNGas personal account with the gas supplierGas has its own account with the gas supply company and its own remote-read metering system (ASKUG), separate from electricity.
Meter operatorREPN (PTES)The network company buys, installs, registers, verifies and seals household meters at its own cost, and must fit them within a week of a request. Customers may have their meter verified by the Uzstandart agency.
SupplierREPN as designated supplierHouseholds cannot choose a supplier. The 2024 law creates suppliers, a designated (default) supplier and authorised consumers who may switch, but retail competition depends on market rules that are not yet in force.
Smart-meter infrastructureASKUE / CAS (central AMI system)Instead of a national communications provider like DCC, each region has a central AMI system run by REPN. Meters connect through modems, concentrators and SIM cards, allowing remote reading, prepayment and remote disconnection.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?Personal account number (shaxsiy hisob raqami / litsevoy schet)
Who issues it?JSC Regional Electric Networks, through the district or city power supply enterprise serving the property
FormatA numeric account number in REPN’s national billing system, linked to the customer’s supply contract and ASKUE meter. REPN does not publish its structure or length.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the electricity supply contract and REPN payment documents, and in the REPN personal cabinet (cabinet.het.uz). People can also look up their personal subscriber number on the my.gov.uz single portal using their passport or ID card and personal identification number (PINFL).
Electronic accessYes. REPN’s personal cabinet offers payments, SMS payment notices and spending tracking. Account and meter status are sent in real time to the government’s inter-agency data exchange.
Third-party accessNo open third-party or supplier access regime was identified. Data is shared with government systems, such as the Tax Committee’s Soliq app for solar subsidy payments and the inter-agency electronic exchange.
Who keeps the registerREPN billing system (the “Elektrhisob” programme, integrated with the customs and tax systems in 2023)
Register scopeNational

Uzbekistan has no standard meter-point code like the UK MPAN or the European EAN. Each household or business connection is a personal account in the billing system of JSC Regional Electric Networks. The account is created when the customer signs the standard supply contract with the local REPN enterprise, and it is tied to the meter installed at the connection. REPN does not publish the account number’s format or length, so no example is given here.

The account belongs to the customer, not to a market-wide register. The Rules for the Use of Electricity and Natural Gas (Cabinet Resolution No. 319 of 31 May 2024) state that, when a property changes hands, REPN re-registers the account to the new owner using cadastre records. The Cadastre Agency sends REPN the new owner’s details within three days of registering the sale. Non-household customers must sign a new contract and register the account in their own name within 30 days. Where a new personal subscriber number has to be created, REPN states it in the contract, and the customer can retrieve it through the my.gov.uz portal.

Because one company runs the network, metering, billing and household supply, the account works as the meter point, the customer number and the billing reference all at once. Prosumers selling surplus power use the same account. Under Cabinet Resolution No. 247 of 2023, export volumes are recorded in REPN’s billing system, and the monthly net export is sent online to the Tax Committee’s Soliq app to calculate the Solar House subsidy.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingYes
How exported electricity is paidMonthly netting in REPN billing, with surplus bought by REPN at 80% of the tariff group II (business) rate. Under the Solar House programme, households also receive a state subsidy of 1,000 som/kWh on their monthly net export.
Who can sell surplus power?Individuals and businesses with solar, wind or biogas plants of up to 1 MW installed mainly for their own use (Cabinet Resolution No. 247 of 14 June 2023).
What price is paid?REPN buys the surplus at 80% of the tariff for group II (non-household) customers, on a guaranteed basis for at least 10 years if the customer chooses.
How is a household’s monthly bill settled?Under the Solar House programme, if a household exports more than it imports in a month, it pays nothing for electricity that month. If it exports less, it pays only for the net import.
Is there a size limit or registration threshold?The surplus-sale scheme covers plants up to 1 MW. Renewable plants of 300 kW and above must be registered with the authorised state body before they can connect (Law ZRU-539, as amended in 2024). Generators under 5 MW do not need a generation licence.
Can I sell power to a neighbour instead of REPN?Yes, through the producer’s own network. Where the producer has no network, the power can be delivered over REPN’s grid if a transit fee is paid at the rate set by the Interagency Tariff Commission.

Connecting a home system.

  1. Install a solar, wind or biogas plant for own use (up to 1 MW for the surplus-sale scheme; Solar House covered household systems of up to 50 kW).
  2. For installations up to 20 kW, notify REPN through its online platform. No additional technical conditions are needed if the plant fits within the capacity already allowed in the existing TU.
  3. Send REPN an offer to sell surplus power with the plant’s technical specifications, a copy of the connection diagram, a monthly generation forecast for one year and a signed sale contract.
  4. REPN reviews the documents and signs the purchase contract within 10 working days.
  5. Producer and REPN install ASKUE-compatible metering for export and import.
  6. Each month, readings are exchanged and REPN pays for accepted surplus within 10 working days of the reconciliation statement. Households register in the Soliq app to receive the Solar House subsidy, which is paid by the 25th of the following month.

Uzbekistan has opened the grid to small generators in stages. Presidential Resolution PQ-44 of December 2021 guaranteed that REPN would buy surplus power from own-use solar, wind and biogas plants of up to 1 MW, at 80% of the business tariff. Presidential Resolution PP-57 of 16 February 2023 started the Solar House programme from 1 April 2023. It pays households a state subsidy of 1,000 som for every kWh of monthly net export, on top of netting their bill. Cabinet Resolution No. 247 of June 2023 set out the procedure and linked REPN’s billing system to the Tax Committee so the subsidy can be paid automatically to bank cards.

Businesses that generate their own power are also settled by monthly netting. The Rules for the Use of Electricity provide that, when a legal entity exports more than it uses, it can choose to be paid for the surplus in cash or to have it credited against next month’s consumption. Decree UP-202 of 22 September 2026 removed one paragraph of the business-netting provisions of PP-57, so prosumers should check the current consolidated text before relying on the details.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityLicence for grid-connected plants of 5 MW and above. Plants under 5 MW and off-grid generators are exempt.Agency for the Development and Regulation of the Energy MarketLicence sub-types by technology. The state duty is 30 times the base calculation amount (BRV), plus an annual fee.
Store electricityLicence for grid-connected storage. Exempt if off-grid, or if the storage is used for the owner’s own needs.Agency for the Development and Regulation of the Energy MarketSub-types: batteries, compressed air, gravity and other methods. The law also defines a separate "storage system operator" role.
Export to the grid (prosumer)No licence for own-use plants up to 1 MW. A purchase contract with REPN and ASKUE metering are required.REPN (contract); Ministry of Energy register for plants of 300 kW and aboveInstallations up to 20 kW are reported to REPN through its online platform.
Sell / supply electricity to consumersSupply licence required.Agency for the Development and Regulation of the Energy MarketREPN is the designated supplier to customers who cannot choose. Small renewable producers may sell to neighbours through their own local networks under contract.
Trade electricity / wholesaleTrading licence required, including for export and import.Agency for the Development and Regulation of the Energy MarketUntil competitive market rules are fully in place, Uzenergosotish buys and sells centrally as the licensed central purchaser.
Transmission and distributionSeparate transmission and distribution licences required.Agency for the Development and Regulation of the Energy MarketHeld by National Electric Grid of Uzbekistan and REPN. The law requires network activities to be independent of other activities.
Operate the marketMarket-operator licence required.Agency for the Development and Regulation of the Energy MarketArticle 64 of ZRU-939: the central purchaser does this until the wholesale market is fully set up.
Aggregate, VPP, balancing and grid servicesNo aggregator or VPP licence exists. Balancing is part of the system operator’s functions.—Neither the 2024 law nor licensing regulation No. 91 has a separate aggregation activity.
Remote control of customer assetsNo specific licence identified.—REPN itself can disconnect ASKUE-connected customers remotely for non-payment.

Article 48 of the Law "On Electric Power Industry" (ZRU-939 of 7 August 2024) lists eight licensed activities: market operator, generation, storage, transmission, central purchaser, distribution, supply and trading. The procedure is in Cabinet of Ministers Resolution No. 91 of 13 February 2025. Each sub-type needs its own licence.

The exemptions are what matter for distributed energy. Regulation No. 91 does not apply to generators that are not connected to the unified power system, to off-grid storage, to generators of less than 5 MW, or to storage equipment used for the owner’s own needs. Rooftop solar, small commercial plants and home batteries therefore need no licence. They are handled through REPN connection and purchase contracts, and renewable plants of 300 kW and above must be registered.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale energy (central purchaser)Restricted—NoJSC Uzenergosotish. Prices and volumes are set by contract and tariff. Small producers sell to REPN, not to the central purchaser.
Competitive wholesale and retail marketsDeveloping—UnknownMarket operator (central purchaser in the interim). Planned under the 2023–2030 Concept and Law ZRU-939, with daily trading on an online platform at free prices. Market rules are still being phased in.
Balancing and system servicesNo—NoJSC National Electric Grid of Uzbekistan. The system operator balances the system with dispatchable state plants. No open procurement for distributed resources was identified.

Uzbekistan has no flexibility or demand-response market for small assets. The 2024 law defines balancing and system services, but these are carried out by the system operator with large plants. Neither the law nor the licensing regulation has an aggregator or VPP role.

The main demand-side tools are tariffs. Group I customers (750 kVA and above) pay 1.5 times the base rate at peak and a reduced rate at night. Households face rising monthly blocks that discourage heavy use. Large grid batteries are being built under state investment resolutions to support the solar and wind fleet, and these are where most new flexibility is coming from.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNear-universal electronic metering on REPN’s ASKUE system
Reading intervalNot published
Electronic meters installed8,041,081 (1 Jan 2025)
Connected to billing (ASKUE)7,995,762
Installed during 2024400,190
Total customers8,301,831 (7,837,140 households)
Who pays for household metersREPN (developers pay in new apartment blocks)

Uzbekistan has one of the most complete smart-meter rollouts in the region. By 1 January 2025, REPN had installed 8,041,081 electronic meters, and 7,995,762 of them were connected to its billing system. That covers about 96% of all customer accounts. The Rules for the Use of Electricity require every customer to have a meter compatible with ASKUE and with the central AMI system (CAS) in each region. No new connection is allowed without one.

The system makes prepayment the default for connected customers. Electricity is supplied up to the amount prepaid, and households in debt are cut off remotely by software. REPN has also reported cooperation with Kazakhstan’s grid company KEGOC on rolling out an ASKUE system there.

Renewable electricity.

Electricity generation mix (2025).

  • Gas: 72.3%
  • Coal: 6.6%
  • Other fossil: 1.7%
  • Solar: 7.5%
  • Hydro: 7.3%
  • Wind: 4.6%
Source 5
Renewable electricity share
19.4% (2025)Source 5Share of generation: solar 7.50%, hydro 7.27% and wind 4.61%. Net imports were 2.93 TWh, about 3% of the 89.6 TWh demand, so the generation share is used.
Home solar
Not identified from a reliable public source.
Solar added each year
2.74 GW (2025)Source 5Derived: 5.93 GW at the end of 2025 minus 3.19 GW at the end of 2024.
Solar PV
5.93 GW (2025)Source 5
Wind
1.65 GW (2025)Source 5
Hydro
2.44 GW (2025)Source 5
Gas
14.5 GW (2025)Source 5
Coal
2.39 GW (2025)Source 5

Targets.

  • Generate an extra 4.3 billion kWh of electricity from large solar and wind plants in 2026, saving 1.3 billion m³ of gas (Decree UP-70, 29 April 2026).
  • Install 270 MW of small solar PV plants in mahallas classed as "difficult" in 2026 (UP-70).
  • Solar panels on at least 50% of the free roof area of new multi-storey buildings (PP-57, from 1 May 2023).

Uzbekistan has moved from almost no solar to a large fleet in about four years. Statistics Agency data show solar output rising from 0.05 TWh in 2021 to 0.62 TWh in 2023 and 3.97 TWh in 2024. Ember puts solar at 6.5 TWh in 2025 and wind at 4.0 TWh, as wind capacity more than tripled during the year. Large solar and wind plants are developed as investment projects approved by individual presidential or government resolutions, and private plants sell under power purchase agreements now held by Uzenergosotish.

Hydro (2.44 GW) is the older renewable source and varies with water availability: its share fell from about 10% in 2024 to 7.3% in 2025. Small-scale solar is supported through the Solar House programme, tax exemptions, rooftop rules for new buildings and programmes for state buildings. Since 2024 the renewables law has also provided for "green energy" certificates, and income from selling them is exempt from profit tax.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage in Uzbekistan is mainly being built at grid scale. From late 2023 the government approved a series of standalone battery projects, mostly 100–150 MW with two hours of storage, close to demand centres in the Fergana Valley and Tashkent region. Some large solar plants were also approved with batteries attached. The 2024 law made electricity storage a licensed activity with its own "storage system operator" role. Licensing regulation No. 91 exempts off-grid storage and storage used for the owner’s own needs.

For homes and small businesses, PP-57 gives a tax incentive. The standard three-year property and land tax exemption for renewable installations of up to 100 kW is extended to ten years if the system includes storage of at least 25% of the solar capacity.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
JSC Regional Electric Networks (Hududiy elektr tarmoqlari)Supplies all 8,301,831 retail customers (1 Jan 2025); 64.8 billion kWh delivered in 2024NoLimitedNoYes

There is no retail choice for households. REPN is the network owner, meter operator and designated supplier. The 2024 law sets up a retail market with licensed suppliers and "authorised consumers" who can switch, but this depends on retail market rules being adopted under the 2023–2030 Concept. Large consumers can already buy from the central purchaser, Uzenergosotish.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of EnergyGovernmentEnergy policy, planning and technical regulationLeads renewable policy and sector reform, and oversees the state energy companies.
Agency for the Development and Regulation of the Energy MarketRegulatorLicensing, market rules, future tariff approvalLicenses generation of 5 MW and above, storage, supply and trading, and will approve regulated tariffs from 2028.
UzenergoinspeksiyaRegulatorState energy inspectionAgrees supply designs and inspects electrical installations before they are energised.
JSC National Electric Grid of UzbekistanTransmissionTSO and system operatorRuns the trunk network and dispatch of the unified power system.
JSC UzenergosotishMarketCentral purchaser, export and importCounterparty to IPP power purchase agreements and the interim market operator.
JSC Regional Electric NetworksDistributionNational DSO, meter operator and supplierConnects customers, runs ASKUE and buys prosumer surplus.
JSC UzbekhydroenergoRenewable EnergyState hydropower generatorRuns the national hydro fleet.
Statistics Agency under the PresidentGovernmentOfficial statisticsPublishes electricity production, supply and household data series.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
MeteringASKUE-compatible meters (central AMI system, CAS) with metrological verificationCabinet of Ministers Resolution No. 319 (Rules for the Use of Electricity and Natural Gas)Required for every connection and for prosumer export metering.
Meter verificationState metrological verificationUzstandart agencyHouseholds may have meters verified themselves. REPN removes, refits, seals and registers the meter free of charge.
Installation designRules for the Construction of Electrical Installations (PUE)Referenced in Resolution No. 319Meters, instrument transformers and ASKUE equipment must meet the PUE. Designs are agreed with Uzenergoinspeksiya.
Grid connection of renewablesRegulation on connecting renewable producers to the unified power systemLaw ZRU-539 on Renewable Energy SourcesUnauthorised connection is prohibited. Plants of 300 kW and above must be registered first. The owner pays for network reinforcement needed for the connection.
Solar equipment importsConformity with established national standardsPresidential Resolution PP-57Authorities were told to stop imports of panels that do not meet the required standard.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Technical conditions (TU) for a new connectionYesNationalIssued by REPN through public services centres or my.gov.uz. Additional TUs are not needed for a renewable plant within the capacity already allowed.
Notification of small renewable installationYesNationalPlants up to 20 kW are reported to REPN through its online platform.
Registration of renewable plantLimitedNationalOnly plants of 300 kW and above must be registered with the authorised body before connection.
Generation licenceLimitedNationalOnly for grid-connected plants of 5 MW and above.
Surplus purchase contract with REPNYesNationalSigned within 10 working days of a complete application.
Design approval by UzenergoinspeksiyaLimitedNationalNeeded for supply projects for buildings and new loads, as set out in Resolution No. 319.

Permissions are centralised and handled largely online. One national DSO issues technical conditions and contracts, and REPN’s billing system is linked to the tax and customs systems. Decree UP-202 of 2026 also ends the Ministry of Energy’s practice of issuing individual permits to energy companies and customers.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Guaranteed purchase of surplus renewable powerActiveExport paymentREPN buys surplus power from own-use solar, wind and biogas plants of up to 1 MW at 80% of the group II tariff, for at least 10 years if the customer chooses.Since 2021 (PQ-44); procedure from June 2023
Solar House (Quyoshli xonadon) subsidyActiveFeed-in subsidy and net meteringA state subsidy of 1,000 som per kWh of monthly net export from household solar, paid through the Soliq app. The subsidy is not taxable income. Bills are netted monthly. This is the status in the current consolidated text of PP-57.From 1 April 2023
Tax exemptions for renewable installationsActiveTax reliefFor installations up to 100 kW: three years’ exemption from property and land tax (and profit tax on grid sales for companies), or ten years with storage of at least 25% of PV capacity. For individuals, it applies once per property for systems over 1 kW and is capped at 2× BRV a year (property tax) and 1× BRV a year (land tax).Current wording from 10 January 2024 (PP-13)
Green energy certificatesActiveCertificate schemeElectronic certificates confirming renewable generation. Income from selling them is exempt from profit tax.Since February 2024 (ZRU-906)

Data and connectivity.

Fixed broadband
34.7 fixed subscriptions per 100 people (2024)Source 16
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Smart meters connect to REPN’s regional central AMI systems through communication modules, antennas, modems, SIM cards and concentrators, so mobile networks are the main channel. The Statistics Agency’s household survey found only 3.7% of households with fixed wired broadband in 2024, so home internet is mostly mobile. That matters for app-based monitoring of solar and battery systems.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
89.6 TWh (2025)Source 5
Generation capacity
26.9 GW (2025)Source 5Derived: sum of Ember capacity by fuel (gas 14.49, solar 5.93, hydro 2.44, coal 2.39, wind 1.65 GW). IRENA reported 21.18 GW at the end of 2024.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Demand is growing quickly. Ember puts it at 84.4 TWh in 2024 and 89.6 TWh in 2025, and Uzbekistan imported about 2.9 TWh net in both years. REPN delivered 64.8 billion kWh through its networks in 2024. It also reported rebuilding 29,496 km of lines and 10,221 transformer points, and building 21 new substations, during the year. Fast growth in solar and wind is why the government is backing grid batteries and why Decree UP-202 (2026) calls for a long-term supply concept to 2050, with storage and nuclear power as options.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Law "On Electric Power Industry" (ZRU-939)CurrentIn force from November 2024Sets up the market roles (system operator, market operator, central purchaser, TSO, DSO, suppliers, traders, storage operators), eight licensed activities and the phasing-out of cross-subsidies.
Licensing regulation No. 91Current13 February 2025Licensing procedure, with exemptions for plants under 5 MW, off-grid assets and own-use storage.
Household tariff increaseCurrent1 June 2026All blocks raised, with the first block going from 600 to 650 som/kWh, and new top blocks of 1,900 and 2,200 som/kWh added.
Decree UP-202 on fuel and energy sector reformCurrent22 September 2026Ends individual ministry permits, moves the Inspection to a preventive model and sets out the regulator’s new functions. It also sets up annual demand forecasts, a three-year strategic plan and a three-year investment plan, and bans projects outside the investment plan.
Digital platform of the Interagency Tariff CommissionUpcoming1 July 2027Tariff applications, calculations and decisions move onto one digital platform (UP-202).
Regulator takes over tariff approval and consumer protectionUpcoming2028The Agency for the Development and Regulation of the Energy Market will approve regulated electricity and gas tariffs and handle consumer complaints.
Transition to competitive wholesale and retail marketsUpcomingBy 2030Phased under the 2023–2030 Concept (UP-166, amended by UP-152 in 2025), with free-price trading on an online platform. Each stage starts only when the previous stage’s conditions are met.
Concept for energy supply to 2050UpcomingEnd of 2026Draft to go to the Cabinet of Ministers and then be published, covering renewables, storage and nuclear (UP-202).

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionHighLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumThe Solar House subsidy, guaranteed surplus purchase and tax exemptions have been in place since 2023, and installations up to 20 kW only need to be notified. No official figure for installed household solar capacity was found.
Distributed energy marketMediumOwn-use plants up to 1 MW can sell surplus, plants under 5 MW need no licence, and rooftop PV is required on new multi-storey buildings. The 2026 programme adds 270 MW of small PV in mahallas.
Grid flexibility marketLowSingle-buyer model with no aggregator or VPP role and no open balancing or demand-response markets. Competitive markets are planned by 2030.
Energy storage adoptionMediumMany grid batteries of 100–300 MW (200–600 MWh) have been approved by resolution, and storage is a licensed activity under the 2024 law. Operating capacity has not been officially published.
Renewable growth environmentHighSolar capacity rose from 3.19 GW to 5.93 GW and wind from 0.5 GW to 1.65 GW in 2025, and the renewable share of generation went from about 11% (2023) to 19.4% (2025).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 28 sources
  1. Electricity consumption calculator for houses/apartments (household tariffs until and from 1 June 2026). JSC Regional Electric Networks, 2026. accessed 9 October 2026.
  2. General information — JSC "Regional Electric Networks" (customers, networks, meters as of 1 January 2025). JSC Regional Electric Networks, 2025. accessed 9 October 2026.
  3. Frequently asked questions (tariffs under Cabinet Resolution No. 194 of 31 March 2025). JSC Regional Electric Networks, 2025. accessed 9 October 2026.
  4. Official exchange rate of the euro, 09.10.2026. Central Bank of the Republic of Uzbekistan, 2026. accessed 9 October 2026.
  5. Yearly electricity data — full release (Uzbekistan rows: generation, capacity, demand, imports). Ember, 2026. accessed 9 October 2026.
  6. Uzbekistan — country electricity profile. Ember, 2026. accessed 9 October 2026.
  7. Energy Profile: Uzbekistan (renewable capacity 2024, generation 2023). IRENA, 2025. accessed 9 October 2026.
  8. Permanent population — total (open data, sdmx 246). Statistics Agency under the President of the Republic of Uzbekistan, 2026. accessed 9 October 2026.
  9. Permanent population — urban (open data, sdmx 248). Statistics Agency under the President of the Republic of Uzbekistan, 2026. accessed 9 October 2026.
  10. Information on the average composition of households (by region). Statistics Agency under the President of the Republic of Uzbekistan, 2026. accessed 9 October 2026.
  11. Number of air conditioners per 100 households. Statistics Agency under the President of the Republic of Uzbekistan, 2026. accessed 9 October 2026.
  12. Volume of electricity supply in housing sector. Statistics Agency under the President of the Republic of Uzbekistan, 2026. accessed 9 October 2026.
  13. Volume of electricity consumption by subscribers per capita. Statistics Agency under the President of the Republic of Uzbekistan, 2026. accessed 9 October 2026.
  14. Volume of electricity produced by solar power plants. Statistics Agency under the President of the Republic of Uzbekistan, 2025. accessed 9 October 2026.
  15. Share of households with fixed (wired) broadband Internet access. Statistics Agency under the President of the Republic of Uzbekistan, 2025. accessed 9 October 2026.
  16. Fixed broadband subscriptions (per 100 people) — Uzbekistan. World Bank, 2024. accessed 9 October 2026.
  17. Law of the Republic of Uzbekistan No. ZRU-939 "On Electric Power Industry" (7 August 2024). LexUz — National Database of Legislation, 2024. accessed 9 October 2026.
  18. Regulation on licensing of activities in the electric power sector (Cabinet Resolution No. 91, 13 February 2025). LexUz — National Database of Legislation, 2025. accessed 9 October 2026.
  19. Law No. ZRU-539 "On the Use of Renewable Energy Sources" (as amended). LexUz — National Database of Legislation, 2024. accessed 9 October 2026.
  20. Law No. ZRU-906 amending legislation on renewable energy (green energy certificates). LexUz — National Database of Legislation, 2024. accessed 9 October 2026.
  21. Cabinet Resolution No. 247 of 14 June 2023 on the procedure for selling surplus electricity from renewable sources. LexUz — National Database of Legislation, 2023. accessed 9 October 2026.
  22. Presidential Resolution PP-57 of 16 February 2023 on accelerating renewable energy and energy-saving technologies (consolidated). LexUz — National Database of Legislation, 2026. accessed 9 October 2026.
  23. Decree UP-166 of 28 September 2023 on the next stage of energy sector reform (consolidated). LexUz — National Database of Legislation, 2026. accessed 9 October 2026.
  24. Decree UP-152 of 29 August 2025 amending the Concept of transition to wholesale and retail electricity markets 2023–2030. LexUz — National Database of Legislation, 2025. accessed 9 October 2026.
  25. Rules for the Use of Electricity and Natural Gas (Cabinet Resolution No. 319, 31 May 2024, consolidated). LexUz — National Database of Legislation, 2026. accessed 9 October 2026.
  26. Decree UP-70 of 29 April 2026 on energy efficiency and rational use of energy resources in 2026. LexUz — National Database of Legislation, 2026. accessed 9 October 2026.
  27. Decree UP-202 of 22 September 2026 on further development of the fuel and energy sector. LexUz — National Database of Legislation, 2026. accessed 9 October 2026.
  28. Resolution on the investment project for a 150 MW (300 MWh) energy storage system in Zangiota district. LexUz — National Database of Legislation, 2025. accessed 9 October 2026.

Questions about energy in Uzbekistan.

Talk to us about Olmack in Uzbekistan.Tell us about your home, housing portfolio or school estate in Uzbekistan. We'll explain what is possible there now.