How electricity works in Kenya.
Kenya electricity market 2026: EPRA tariffs, Kenya Power, KETRACO, prepaid meter numbers, net metering, licensing, geothermal-led renewables and open access.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Kenyan shilling (KES) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Kenya energy at a glance.
Key figures for households in Kenya. Each one links to its source on the full overview below.
Electricity price.
28.82 KES per kWh for households, including taxes. Figures for Oct 2025.
Household use.
382 kWh a year for a typical household. Figures for FY2024/25.
Renewable share.
81.1% of electricity from renewable sources. Figures for FY2025/26 (July 2025–June 2026).
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Kenya.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Kenya below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Kenya requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Kenya.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Kenya, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Kenya, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Kenya.
The energy market in Kenya, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Kenya runs a state-led, single-buyer electricity system under the Energy Act 2019. The Energy and Petroleum Regulatory Authority (EPRA) sets tariffs and issues licences; the state generator KenGen and independent power producers sell power to Kenya Power (KPLC); the Kenya Electricity Transmission Company (KETRACO) owns most of the high-voltage grid and is the designated system operator; and Kenya Power owns the distribution network, meters every customer and is in practice the only retailer to households.
The power supply is one of the most renewable in the world. In the year to June 2026 geothermal provided 40.9% of the energy fed into the grid, hydro 22.7% and wind 12.3%, and imports (mostly from Ethiopia over a 500 kV HVDC line) another 12.2%. EPRA reports that renewables made up 81.1% of electricity generated. Installed capacity reached 3,987 MW and peak demand a record 2,514 MW on 29 June 2026.
Households pay a regulated tariff in three consumption bands plus monthly fuel, foreign-exchange and inflation charges, VAT and levies. Most of the 10.4 million connected customers use prepaid token meters. Small renewable systems can export under the Net-Metering Regulations 2024 for a credit worth half of each exported unit, and the Open Access Regulations gazetted in May 2026 begin to let very large consumers buy directly from generators. A proposed tariff increase for 2026–2029 was withdrawn in June 2026, so base tariffs are frozen at 2025/26 levels.
Energy snapshot.
Headline figures for electricity in Kenya. Each shows its data year and links to its source.
- Population57,532,493 peopleSource 112025
- Households12,143,913 householdsSource 92019 census
- Average household size3.9 people/householdSource 92019 census
- Electricity use per household382 kWh/yrSource 16FY2024/25
- Household price (KES)28.8 KES/kWhSource 7Oct 2025
- Household price (EUR)0.191 EUR/kWhSource 8Oct 2025
- Renewable electricity share81.1%Source 1FY2025/26 (July 2025–June 2026)
- Solar capacity0.587 GWSource 130 June 2026
- Wind capacity0.436 GWSource 130 June 2026
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Energy and Petroleum Regulatory Authority (EPRA)
- System operator
- KETRACO (designated system operator under section 138 of the Energy Act 2019)
- Distribution networks
- One national distributor: Kenya Power (KPLC) owns and operates the 334,157 km distribution network and serves almost all customers; REREC builds rural extensions that Kenya Power operates, and a few small distribution licensees serve private sites
- Currency
- Kenyan shilling (KES)
- Voltage and frequency
- 240 V single-phase / 415 V three-phase, 50 Hz
Electricity prices in Kenya.
- Household price (KES)
- 28.8 KES/kWh (Oct 2025)Source 7All-in price including base tariff, pass-through charges, levies and 16% VAT: Business Daily reported that a household using 200 kWh paid KES 5,764.15 for the month (5,764.15 ÷ 200 = 28.82). Base tariffs have been frozen since; the fuel, forex and inflation charges for August 2026 (KES 5.17/kWh) were about KES 0.5 lower than in October 2025 (KES 5.67/kWh), so the current all-in figure is slightly lower. No more recent official all-in figure was identified.
- Household price (EUR)
- 0.191 EUR/kWh (Oct 2025)Source 8KES 28.82 converted at the Central Bank of Kenya rate of KES 150.79 per euro (10 September 2026).
- Typical annual electricity bill
- 9,963 KES/yr (2025)Source 7Derived: national average household electricity spend of KES 830.27 a month reported by Business Daily (November 2025), × 12. Rural homes averaged KES 217 a month.
Household price trend (KES per kWh).Source 1
| Jul 2025 | 23.82 KES/kWh |
|---|---|
| Aug 2025 | 23.24 KES/kWh |
| Sep 2025 | 23.43 KES/kWh |
| Oct 2025 | 24.25 KES/kWh |
| Nov 2025 | 23.79 KES/kWh |
| Dec 2025 | 23.12 KES/kWh |
| Jan 2026 | 24.09 KES/kWh |
| Feb 2026 | 23.35 KES/kWh |
| Mar 2026 | 23.9 KES/kWh |
| Apr 2026 | 23.75 KES/kWh |
| May 2026 | 23.21 KES/kWh |
| Jun 2026 | 22.94 KES/kWh |
| Jul 2026 | 23.75 KES/kWh |
| Aug 2026 | 23.75 KES/kWh |
How a Kenyan electricity bill is built
The bill has three layers. First is the EPRA-approved base energy charge, set for a multi-year Tariff Control Period: the fourth period (2022/23 to 2025/26) took effect on 1 April 2023, and the 2025/26 domestic rates are KES 12.14, 16.50 and 18.57 per kWh for the 0–30, 30–100 and over-100 kWh bands. Second are monthly pass-through charges that EPRA gazettes for fuel used in thermal plants, foreign-exchange movements on dollar-denominated power contracts, inflation (reviewed every six months) and the Water Resources Authority levy on hydro output. Third are statutory charges: the EPRA levy of 3 cents per kWh, the Rural Electrification Programme levy of 5% of the energy charge and 16% VAT.
Pass-through charges are significant. Across July 2025 to June 2026 the fuel energy cost ranged from KES 2.99 to 3.81 per kWh and the forex adjustment from KES 0.68 to 1.79, and they together add roughly KES 4.5–5.7 to every unit. Because they are set monthly, a household’s unit cost moves every month even when base tariffs are frozen.
Tariff freeze in 2026
Kenya Power applied on 31 March 2026 for a fifth Tariff Control Period (2026/27 to 2028/29) that would have raised tariffs from July 2026. EPRA announced in June 2026 that the application had been withdrawn after consultations within government, cancelled the public hearings and confirmed that current retail tariffs remain in force until reviewed under the Energy Act. Only the base tariff is frozen; the monthly pass-through charges continue.
Regional differences and cost pressures
There is one national tariff schedule, so the price per kWh does not vary by region. System losses were 21.38% in 2025/26 against an allowed 16.5%; the cost of losses above the benchmark is borne by Kenya Power rather than passed to customers. Reliability is a recurring issue: EPRA reports an average SAIDI of 13.16 hours and 3.91 interruptions per customer per month in 2025/26, well above its targets.
The price history chart shows the domestic over-100 kWh base rate plus that month’s fuel, forex, inflation and water-levy charges, before VAT and levies (derived from EPRA and gazette figures). It therefore sits below the all-in price in the snapshot.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Domestic (DC) tariff set by EPRA in three bands for 2025/26: KES 12.14/kWh for 0–30 kWh a month (lifeline), KES 16.50 for 30–100 kWh and KES 18.57 above 100 kWh, with no fixed demand charge. These base rates remain in force after the 2026–2029 tariff application was withdrawn. |
| Variable | Yes | Monthly pass-through charges are added to every kWh: fuel energy cost, foreign exchange fluctuation adjustment, a semi-annual inflation adjustment and the Water Resources Authority levy. For August 2026 meter readings these were KES 3.51, 1.1777, 0.48 and 0.015 per kWh. |
| Prepayment | Yes | Most households use STS prepaid meters and buy 20-digit tokens through M-Pesa Paybill 888880, the *977# USSD menu or the MyPower app. The same domestic tariff applies; postpaid customers pay their bill through Paybill 888888. |
| Time-of-use | Limited | A 50% off-peak discount on the base energy rate (22:00–06:00 on weekdays, longer windows at weekends and public holidays) is available to commercial and industrial customers, small commercial customers using over 100 kWh a month and e-mobility customers once consumption thresholds are met. It is not offered to domestic customers. |
| Other | Limited | E-mobility (EM) tariff for charging premises at KES 16.00/kWh for 200–15,000 kWh a month; EPRA removed the 15,000 kWh cap from 1 July 2026. |
| Dynamic | No | No dynamic or wholesale-linked retail tariff exists for households. |
Household prices compared with neighbouring countries (EUR per kWh).
- Uganda€0.209
- Kenya€0.191
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 382 kWh/yr (FY2024/25)Source 16Derived: domestic consumption of 3,640.32 GWh (EPRA Statistics Report 2025) divided by 9,538,120 domestic customer accounts (Kenya Power Integrated Annual Report 2025, Table 21). This is per account, not per household, and is pulled down by the large number of low-use lifeline accounts.
- Average daily use per household
- 1.05 kWh/day (FY2024/25)Source 16Derived: 382 kWh a year per domestic account ÷ 365. An average across all domestic accounts, including many very low-use lifeline connections.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 195 kWh/person/yr (all sectors) (2024)Source 14World Bank electric power consumption per capita (195.3 kWh).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 6,442 registered electric vehicles (June 2025)Source 2EPRA, citing about 300 charging points (Electric Mobility Association of Kenya). By June 2026, 543 customers were on the e-mobility tariff, consuming 12.25 GWh in the year.
- Electric cooking
- 0.9 % of households (2019 census)Source 10Main cooking fuel, conventional households: firewood 55.1%, LPG 23.9%, charcoal 11.6%, paraffin 7.8%, electricity 0.9%.
Kenya’s household electricity use is low by international standards but rising quickly. Domestic customers consumed 4,327 GWh in the year to June 2026, up 18.9% on the previous year, and their share of national consumption rose to 34.8%. Large commercial and industrial users took 47.6%, small businesses 16.2%, street lighting 1.4% and e-mobility 0.1%. Nairobi region alone accounts for 43.9% of national consumption.
Average use per domestic account was about 382 kWh a year in 2024/25. That figure is low because millions of connections made under rural electrification and the Last Mile Connectivity Project power only lighting, phone charging and a television. At the 2019 census 40.7% of households had a working television and 8.8% a refrigerator; in rural areas only 2.4% had a fridge.
Cooking is the large untapped load: under 1% of households cooked mainly with electricity in 2019, against 55.1% on firewood. Electric water heating is affected by the Energy (Solar Water Heating) Regulations 2025, which promote solar water heaters.
Electric mobility is still small but growing fast. Registered EVs reached 6,442 in June 2025, and e-mobility tariff consumption more than doubled in 2025/26.
Housing and households.
- Dwellings
- 12,043,016 conventional households (2019 census)Source 10The census counts households in conventional housing rather than dwellings; no separate dwelling stock figure was identified.
- Owner-occupied
- 61.3 % of conventional households (2019 census)Source 1086.6% in rural areas but only 21.3% in urban areas.
- Private rented
- 36.6 % of conventional households (2019 census)Source 10Derived: 4,660,027 households rent or are provided housing (38.7%); of these 88.5% rent from an individual and 6.0% from a private company (4,402,212 households, 36.6% of all conventional households).
- Social or public housing
- 1.8 % of conventional households (2019 census)Source 10Derived: households renting from national government (107,462), county government (64,836) or a parastatal (47,904) = 220,202, or 1.8% of conventional households. Much of this is employer-provided housing rather than social housing in the UK sense.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 32.2 % of population (2025)Source 12
Kenya is mostly rural: in 2019, 7.43 million of the 12.14 million households lived in rural areas and 4.71 million in urban areas, and the World Bank puts the urban share of the population at 32.2% in 2025. Tenure differs sharply between the two. In rural Kenya 86.6% of households own their home, typically a house on family land; in towns 78.7% rent, almost always from an individual landlord.
This shapes how energy decisions are made. Urban tenants in multi-unit rental blocks rarely control the roof or the meter installation, while rural owner-occupiers often do, which is one reason solar home systems spread widely before grid connections did. At the 2019 census 50.4% of households used mains electricity as their main lighting source (88.4% urban, 26.3% rural) and 19.3% used solar (29.9% in rural areas).
Electricity access has kept rising since. The World Bank reports 77% of the population had access in 2024 (98.1% urban, 67.1% rural), and Kenya Power had 10.43 million grid customers by June 2026.
How the grid works in Kenya.
- TransmissionKenya Electricity Transmission Company (KETRACO), KETRACO (designated system operator)
- DistributionOne national distributor: Kenya Power (KPLC) owns and operates the 334,157 km distribution network and serves almost all customers; REREC builds rural extensions that Kenya Power operates, and a few small distribution licensees serve private sites
- MeteringKenya Power
- Supply1 or more retail suppliers
Physical flow
Most power comes from the Rift Valley: geothermal plants at Olkaria and Menengai (1,013.7 MW installed), hydro (872.6 MW), the Lake Turkana wind farm and other wind and solar plants, plus thermal plants used mainly at the evening peak. Power travels over 10,100 km of transmission lines: 3,951 km at 132 kV, 1,958 km at 220 kV, 2,910 km at 400 kV and 1,282 km of 500 kV HVDC from Ethiopia. Kenya Power then steps it down through 66 kV (1,515 km, mostly around Nairobi), 33 kV (42,771 km) and 11 kV (46,629 km) to 243,242 km of low-voltage lines. Every domestic customer is supplied at low voltage, normally 240 V single-phase or 415 V three-phase.
Kenya is interconnected with Ethiopia, Uganda and Tanzania. In 2025/26 it imported 1,913.66 GWh: 1,577.66 GWh from Ethiopian Electric Power over the HVDC line, 322.06 GWh from Uganda, 6.53 GWh from Tanzania and 7.4 GWh supplied to the border town of Moyale. The Kenya–Tanzania 400 kV interconnector was energised in December 2024, and the next phase of the Ethiopian contract raises imports to 400 MW.
Commercial flow
Kenya Power is the single buyer. It holds power purchase agreements, approved by EPRA, with KenGen (57.5% of energy generated in 2025/26) and independent producers such as Lake Turkana Wind Power (9.4%) and Ormat’s Orpower 4 geothermal plant (6.6%), plus import contracts. It recovers these costs through the base tariff and the monthly fuel and forex pass-throughs. Because baseload geothermal cannot easily be turned down, 403.9 GWh of energy was curtailed in 2025/26, mostly as geothermal steam venting between midnight and 05:00.
Market reform
The Energy (Electricity Market, Bulk Supply and Open Access) Regulations 2026 (Legal Notice 79, 8 May 2026) create a wholesale and retail market framework. The system operator registers participants and runs an online market portal for bilateral, spot and forward trades; generators may sell in bulk to eligible consumers; and networks must grant open access for a wheeling charge. In the current transitional phase participation is voluntary, but all trades must be disclosed to the system operator.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy and Petroleum | Sets energy policy, makes regulations under the Energy Act 2019 (such as the Net-Metering Regulations 2024 and the Open Access Regulations 2026) and oversees the state energy companies. |
| Regulator | Energy and Petroleum Regulatory Authority (EPRA) | Licenses generation, transmission, distribution, retail supply and cross-border trade; approves tariffs, monthly pass-through charges and power purchase agreements; licenses electrical workers, contractors and solar PV technicians and firms; designates the system operator; and resolves consumer complaints. |
| TSO | Kenya Electricity Transmission Company (KETRACO) | State transmission company that owns 6,399 km of the 10,100 km high-voltage network, including the 1,282 km 500 kV HVDC link to Ethiopia and the 400 kV lines. Kenya Power is the second licensed transmission utility and owns the remaining 3,702 km of older lines. |
| System operator | KETRACO (designated system operator) | EPRA gazetted KETRACO as system operator in December 2021 and removed the role from Kenya Power in January 2022, because combining dispatch with the single-buyer role was seen as a conflict of interest. The national control centre was located on Juja Road in Nairobi (2022); a new main control centre at Embakasi and a backup at Suswa are being built by GE Vernova and L&T. Under the 2026 Open Access Regulations the system operator also runs the electricity market portal. |
| DSO | The Kenya Power and Lighting Company Plc (Kenya Power, KPLC) | Listed company, 50.1% owned by the government. Operates the national distribution network at 66, 33 and 11 kV and low voltage, connects customers, owns and reads meters, sells prepaid tokens and bills. It is also the single buyer of bulk power from KenGen, IPPs and imports, and holds the export and import licence. |
| Supplier | Kenya Power (sole household retailer) | Supplies all 10.43 million grid-connected customers. EPRA has licensed a handful of other distribution and retail supply companies (for example for captive solar supply to factories), but households cannot choose a supplier. |
| Metering | Kenya Power | Under section 154 of the Energy Act the retailer supplies and fixes meters, which must be of a type approved by the Kenya Bureau of Standards (KEBS). Prepaid meters follow the international STS token standard. |
| Ministry | Rural Electrification and Renewable Energy Corporation (REREC) | State agency that builds rural grid extensions and off-grid stations, funded partly by the 5% Rural Electrification Programme levy. Completed networks are operated by Kenya Power, which runs 46.24 MW of off-grid stations, mostly diesel. |
Compared with the UK system.
| UK concept | Kenya equivalent | How it works |
|---|---|---|
| DNO | Kenya Power (KPLC) | There are no regional network companies. Kenya Power owns the low- and medium-voltage network across the whole country, organises it into commercial regions (Nairobi, Coast, North Eastern, Central Rift, Mt Kenya, West Kenya, North Rift, South Nyanza) and handles connections, faults (call 97771) and meter reading everywhere. |
| National Grid/NESO | KETRACO (transmission owner and system operator) | KETRACO combines most of the roles of the GB transmission owner and NESO: it builds and owns the 132–500 kV grid and is the designated system operator. Unlike Great Britain there is no balancing market; dispatch follows contracted power purchase agreements, with Kenya Power as the single buyer. |
| MPAN | Meter number (prepaid) or account number (postpaid) | There is no separate national supply-point number. Kenya Power identifies a prepaid connection by the meter’s STS meter number (11 or 13 digits) and a postpaid connection by its account number; these are what you quote to pay, to apply for net metering or to report a fault. |
| MPRN | No equivalent | Kenya has no piped gas network for homes, so there is no gas supply-point identifier. Households cook with LPG cylinders, firewood or charcoal. |
| Meter operator | Kenya Power | The retailer supplies, seals and reads the meter; customers cannot appoint a meter operator. A customer may provide a check meter, and net-metering customers pay for the bidirectional smart meter their system needs. |
| Supplier | Kenya Power (no switching for households) | There is no retail competition for households. From May 2026, eligible consumers with at least 1 MVA of load on the distribution network (10 MVA on transmission) can buy in bulk from a generator or another retailer and pay wheeling charges to use the networks. |
| Smart-meter infrastructure | STS prepaid meters; Kenya Power smart and AMR meters for larger users | There is no DCC-style national data hub. Household prepaid meters receive encrypted 20-digit tokens typed on a keypad and do not report readings. Kenya Power’s own head-end systems collect data from smart meters fitted to industrial, SME and public-lighting customers. |
How a supply point is identified.
04123456784 (fictional 11-digit STS meter number: manufacturer code 04, serial 12345678, check digit 4)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Meter number (prepaid) / account number (postpaid) (Meter No. / Account No.) |
| Who issues it? | Prepaid meter numbers are assigned by the meter manufacturer under the STS standard and registered by Kenya Power when the meter is installed; postpaid account numbers are created by Kenya Power when a supply contract is opened |
| Format | Prepaid: the STS meter number (Decoder Reference Number), made up of a manufacturer code, an 8-digit serial number and a final Luhn check digit. Postpaid: a numeric Kenya Power account number printed on the bill; its internal structure is not published. |
| Length | Prepaid meter number: 11 digits (2-digit manufacturer code) or 13 digits (4-digit manufacturer code). Postpaid account number: not publicly specified. |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed on the front of the prepaid meter or its keypad unit, and quoted in every token SMS. Postpaid customers find the account number on the paper or e-bill. Kenya Power’s contact centre (97771) can help identify it. |
| Electronic access | Customers use the number to buy tokens or pay bills by M-Pesa (Paybill 888880 for prepaid, 888888 for postpaid), through the *977# USSD menu, the MyPower app or the self-service portal (selfservice.kplc.co.ke), which requires registration with name, ID or passport number and phone or email. Recent tokens can be retrieved through these channels. |
| Third-party access | There is no public look-up and no third-party data access scheme. Installers and others get the number from the customer; the net-metering application form (Form 001) asks for the existing electricity account number, the customer’s KRA PIN and the land reference (LR) or plot number. |
| Who keeps the register | Kenya Power’s customer information and billing systems. EPRA receives aggregate statistics but does not keep a public register of supply points. |
| Register scope | National |
What identifies a connection
Kenya has no regulator-issued supply-point number equivalent to the MPAN. A connection is identified by whatever Kenya Power bills against. For the large majority of households, who are on prepaid metering, that is the meter number: it is what you enter as the “account number” when you pay through M-Pesa Paybill 888880, and every token is cryptographically tied to it. For postpaid customers (mostly businesses and older domestic connections) it is the account number on the bill, paid through Paybill 888888. New-connection fees go through a third Paybill, 888899.
How the prepaid meter number is structured
Prepaid meters in Kenya use the Standard Transfer Specification (IEC 62055-41). The STS meter number, technically the Decoder Reference Number, is globally unique: a manufacturer code, then an 8-digit serial number set by the manufacturer, then a check digit calculated with the Luhn formula. It is 11 digits long for meters with a 2-digit manufacturer code and 13 digits for the newer 4-digit codes. After payment Kenya Power’s vending system generates a 20-digit token that only that meter can decrypt.
In 2024 Kenya Power ran its “Update Token Meter Yako” campaign to move all 7.4 million STS prepaid meters to a new token identifier range before the old one expired. Customers received a reset code and an update code by SMS and keyed them into the meter by the end of August 2024; meters not updated stopped accepting tokens.
Moving home and changes of occupier
The meter and its number are physically fixed at the premises and stay there unless Kenya Power replaces the meter, in which case the number changes. The customer account, however, is held in a named person’s name. Tenants frequently share or inherit a landlord’s meter, so the name on the account may not be the occupier’s. The Net-Metering Regulations allow a net-metering agreement and its unused credits to be assigned to a new owner or occupier using Form 002, which shows that rights attach to the customer contract rather than to the meter.
Data caveat
Kenya Power does not publish the structure of its postpaid account numbers, and real STS manufacturer codes are allocated by the STS Association. The example above is fictional and only illustrates the length and check-digit format.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Net metering in kWh: each exported unit earns a credit worth 50% of a unit, offset against imports in the monthly bill; surplus credit is carried forward and forfeited at the end of the licensee’s financial year |
| How large can a system be? | The regulations cover renewable systems under 1 MW. Domestic customers may install up to 4 kW on a single-phase supply and 10 kW on a three-phase supply. Commercial and industrial customers may install up to 1 MW, capped at their maximum demand over the previous 12 months. |
| Is there a national cap? | Yes. Aggregate net-metered capacity is limited to 100 MW for the first five years from commencement in June 2024, shared between licensees in proportion to their load. EPRA reviews the cap when it is reached and at least every five years. Kenya Power may also set local limits based on network studies, which must be published on its website. |
| What is an exported unit worth? | A credit of 50% of the exported unit, set against imported energy at the retail tariff. Credits roll over month to month but are forfeited at the end of Kenya Power’s financial year (30 June) and on termination of the agreement. There is no payment for capacity, reactive power or other grid support, and bills may not be estimated. |
| Which technologies qualify? | Renewable energy generators only, as defined in the Energy Act 2019. Battery storage is not a generator in its own right but may sit behind the meter. |
| What meter and safety equipment are required? | A smart bidirectional meter with two-way communication that records peak supply in different periods and supports time-of-use metering, of a KEBS-approved type. A clearly labelled, lockable, visibly open manual disconnect switch accessible to Kenya Power is required unless the inverter automatically disconnects on loss of grid supply, carries a manufacturer’s warranty to that effect and is installed and tested by an authorised person. |
| Can I generate without net metering? | Yes. Section 117 of the Energy Act allows generation for own use up to 1 MW without any authorisation, so self-consumption systems that do not export need no generation licence. Installation must still be done by EPRA-licensed solar and electrical practitioners, and connecting a system to export without a net-metering agreement is an offence. |
| Can households sell to neighbours or to the market? | No. Selling electricity to third parties requires a generation and retail licence. The 2026 Open Access Regulations open bulk purchase only to eligible consumers of at least 1 MVA. |
Connecting a home system.
- Use an installer licensed by EPRA (a solar PV contractor holding a C1 licence, employing a T3 technician for grid-connected and hybrid systems). Installation, interconnection and maintenance must be done by an authorised person to the Kenya Electricity Distribution Grid Code and Kenya Standards.
- Apply to Kenya Power (the licensee) on Form 001, giving the existing electricity account number, KRA PIN, plot or LR number, peak demand and the planned generator capacity. Systems over 10 kW need a feasibility study report by a registered engineer.
- Kenya Power examines the application against the feasibility study and power-flow studies and must give a decision within 60 days, with conditions or reasons for rejection.
- If approved, sign the five-year renewable net-metering agreement, pay the EPRA-approved deposit and fees, and file a copy of the agreement with EPRA within 30 days.
- Install and commission the bidirectional smart meter within six months of signing (or the application lapses), at the customer’s cost, giving Kenya Power 14 days’ notice so it can witness testing and commissioning.
- Kenya Power adds the customer to its public net-metering register and credits exported kWh in each monthly bill.
Section 162 of the Energy Act 2019 obliges every distribution licensee or retailer to offer net metering to consumers with renewable generators of up to 1 MW. The detailed rules came only with the Energy (Net-Metering) Regulations 2024 (Legal Notice 104, Kenya Gazette Supplement 121, 18 June 2024). They describe net metering as giving consumers “energy storage on the grid”, but at a 50% exchange rate: two exported units offset one imported unit.
For households the scheme is narrow. Single-phase homes, which are most of Kenya’s domestic connections, are capped at 4 kW, and the customer pays for the smart meter and interconnection. Most residential and commercial solar in Kenya is therefore designed for self-consumption, often with batteries, rather than export. EPRA’s figures show the scale of this behind-the-meter market: captive solar PV owned by commercial and industrial consumers reached 373.3 MW in June 2026, up 24% in a year.
Carbon credits from net-metered systems belong to the consumer unless another law says otherwise. Disputes go to EPRA under the Energy (Complaints and Disputes Resolution) Regulations, with appeal to the Energy and Petroleum Tribunal.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | EPRA generation licence required, except generation for own use of up to 1 MW, which needs no authorisation | EPRA | Energy Act 2019, s117. Operating without a licence is an offence (fine of at least KES 1 million or at least a year in prison). EPRA granted 11 generation licences in 2025/26, many for captive solar supplying factories. A 2023 amendment bill proposed cutting the own-use threshold to 500 kW; enactment was not confirmed. |
| Store electricity | No separate storage licence; behind-the-meter batteries need no authorisation, grid-scale storage is licensed as part of a generation project | EPRA | The Energy Act 2019 has no storage-specific licence category. New variable renewable PPAs are now required to include appropriately sized battery storage. |
| Export to the grid (small systems) | Net-metering agreement with Kenya Power; renewable systems under 1 MW (domestic 4 kW single-phase / 10 kW three-phase) | Kenya Power (agreement), EPRA (regulations, fees, disputes) | Energy (Net-Metering) Regulations 2024. Aggregate cap of 100 MW for the first five years. |
| Sell electricity to consumers (retail supply) | EPRA retail supply licence | EPRA | A retail licence covers procuring energy, metering, selling, billing and collecting revenue (s145). Several captive solar developers hold retail licences to sell to the sites they supply. |
| Distribute electricity | EPRA distribution licence | EPRA | Kenya Power is the national distributor; a few distribution and supply licences cover private networks and mini-grids. |
| Bulk purchase / wholesale trading | Eligible consumers of at least 1 MVA (distribution) or 10 MVA (transmission) may buy in bulk from a generation licensee; each bulk supply contract needs EPRA approval | EPRA; system operator (market registration) | Open Access Regulations 2026. Market participants register with the system operator; in the transitional phase participation is voluntary but trades must be disclosed. |
| Import and export across borders | EPRA export and import licence | EPRA | Kenya Power holds licence EPRA/PUL/XI/0001. Trade is coordinated with neighbouring system operators and the Eastern Africa Power Pool. |
| Balancing and ancillary services | Provided under the Grid Code and contracts with the system operator; tariffs approved by EPRA | System operator (KETRACO), EPRA | All grid-connected licensees other than retail suppliers must provide ancillary services. No route for small or aggregated assets is defined. |
| Aggregation and virtual power plants | No licence category or framework exists | EPRA | The Energy Act and the 2026 market regulations do not mention aggregators. Any aggregated sale to third parties would need generation and retail licences. |
| Remote control of customer assets | Not specifically regulated | — | No rules on third-party remote control of household devices were identified. Kenya Power may disconnect a net-metered system that breaches the Grid Code after 24 hours’ notice, or immediately for safety. |
| Install solar PV systems | EPRA solar PV licence: technician classes T1 (single module/battery DC up to 100 Wp), T2 (up to 300 Wp, may include an inverter), T3 (grid-connected and hybrid); firm classes C1 (design and install, with a T3), V1 (sell and install, with a T2), V2 (manufacture or import, with a T2) | EPRA (licensing); NITA (training accreditation) | Energy (Solar Photovoltaic Systems) Regulations 2012. In 2025/26 EPRA issued 244 C1, 197 V1, 248 V2, 248 T3 and 35 T2 licences. |
| Electrical installation work | EPRA electrical worker and contractor licences by class: C2 (single-phase, buildings up to two storeys), C1, B (any building height up to medium voltage), A2 (lifts, escalators, generators), A1 | EPRA | At June 2026 there were 8,792 licensed electrical workers and 4,750 licensed electrical contractors. |
Licensing rests on section 117 of the Energy Act 2019: anyone generating, exporting, importing, transmitting, distributing or retailing electricity needs an EPRA licence, with a single exemption for generating for one’s own use up to 1 MW. That exemption is why rooftop and ground-mounted solar for self-consumption, the main form of distributed generation in Kenya, can be built without a generation licence. Exporting is different: it requires a net-metering agreement for small systems or a generation licence and PPA for larger ones.
Practitioner licensing is stricter than in many countries. Only EPRA-licensed solar technicians and firms may design and install solar PV, and only licensed electrical workers and contractors may carry out electrical installation work. Licences are graded by system size and complexity, so grid-tied and hybrid systems with inverters require a T3 technician working for a C1 contractor.
Draft Energy (Electric Power Undertaking Licensing) Regulations were published for consultation in 2024 and would replace the older licensing rules once made. There is no licence category for aggregators, virtual power plants or standalone storage operators.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Ancillary services (frequency control, network control, black start) | Restricted | — | No | KETRACO (system operator). Defined in the Kenya National Transmission Grid Code: primary response within 10 seconds sustained for a further 20 seconds, secondary response via automatic generation control, tertiary reserve and demand control. Provided by licensed generators under ancillary services agreements; tariffs are approved by EPRA. Kenya Power plans to procure battery storage for ancillary services. |
| Bilateral, spot and forward electricity market | Restricted | 1 MVA on distribution / 10 MVA on transmission (eligible consumers) | No | System operator market portal. Created by the Open Access Regulations 2026. Open to licensees and eligible consumers; participation is voluntary in the transitional phase and wheeling arrangements are still being put in place. |
| Demand control and load shedding | No | — | No | KETRACO / Kenya Power. The Grid Code treats automatic under-frequency load shedding and emergency manual load shedding as demand-control ancillary services; there is no paid demand-response programme for customers. |
| Time-of-use off-peak tariff | Restricted | — | No | Kenya Power / EPRA. Not a market but the main demand-shifting tool: a 50% off-peak discount for C&I, larger small commercial and e-mobility customers. 267.6 GWh was consumed under it in 2025/26, saving users KES 1.88 billion. |
| Eastern Africa Power Pool day-ahead market | Developing | — | No | EAPP. Kenya Power is preparing for cross-border trading through the planned EAPP day-ahead market; access is for national utilities and licensed traders. |
Kenya has no flexibility market for distributed energy resources and no legal framework for aggregation. System flexibility comes from hydro reservoirs, thermal peaking plants and imports, managed centrally by the system operator. The main flexibility problem is the opposite of many European systems: inflexible geothermal baseload and wind contracts cause surplus energy at night, which is curtailed or vented.
Change is coming from two directions. The 2026 market regulations set out ancillary service contracts and a market portal, though only for licensees and very large consumers. And storage is entering through generation contracts: Kenya Power states that new variable renewable PPAs must include appropriately sized batteries and that it intends to procure battery-based ancillary services. Households take part in demand management only indirectly, through the domestic tariff bands; the off-peak tariff is not offered to them.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Eastern Africa Power Pool | Regional power pool coordinating interconnected system operators; Kenya’s Grid Code links ancillary service obligations to EAPP security standards. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No household smart-meter rollout; prepaid STS token meters dominate, with smart meters retrofitted to larger customers |
| Reading interval | Not published for households; STS prepaid meters do not transmit readings |
| Prepaid STS meters | 7.4 million (2024 token update campaign) |
| Smart meters retrofitted | 304,903 by June 2025 (industrial, SME and public lighting) |
| Token format | 20-digit STS token, keyed into the meter |
| Net-metering meter | Bidirectional smart meter with two-way communication and TOU capability, paid by the customer |
| Meter type approval | Kenya Bureau of Standards (Energy Act s154) |
| Meter reading | Optical character recognition and geofencing piloted in Nairobi for postpaid meters |
Prepaid token metering is the norm for Kenyan households. Prepaid meters use the Standard Transfer Specification: they are not connected to any network, and the only communication is the 20-digit token the customer types in. This gives Kenya Power payment up front but no consumption data from households. The 2024 key change, when all 7.4 million STS meters had to be reset and updated with SMS codes, illustrates how the system is administered: entirely through the vending platform and the customer’s keypad.
Smart metering is aimed at the customers where revenue is concentrated. Under its loss-reduction “Gigawatt Project” Kenya Power retrofitted more than 304,000 smart meters to industrial, SME and public-lighting customers by June 2025, converted older automated meter reading (AMR) installations to smart meters to restore two-way visibility, and added feeder and transformer meters for energy accounting. Commercial losses fell from 6.28% to 4.36% of energy.
There is no national data hub, data access code or consumer data portability scheme. Consumption data sits in Kenya Power’s billing and head-end systems and reaches customers through bills, the MyPower app and the self-service portal.
Renewable electricity.
Electricity generation mix (FY2025/26 (July 2025–June 2026)).
- Geothermal: 40.9%
- Hydro: 22.7%
- Wind: 12.3%
- Imports (mainly Ethiopian hydro): 12.2%
- Thermal: 8.3%
- Solar: 3%
- Off-grid stations: 0.6%
- Renewable electricity share
- 81.1% (FY2025/26 (July 2025–June 2026))Source 1EPRA: renewables accounted for 81.13% of electrical energy generated (80.48% the year before). Measured against all electricity supplied, domestic renewables were 79.46% and imports (largely Ethiopian hydro) a further 12.19%, giving 91.65% renewable supply.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 72.8 MW (FY2025/26)Source 1Captive solar PV rose from 300.5 MW to 373.3 MW; grid-connected solar capacity was unchanged.
- Geothermal
- 1,013.7 MW (30 June 2026)Source 1Including 70 MW added at Menengai in 2025/26 (Kaishan and Globeleq, 35 MW each).
- Hydro
- 872.6 MW (30 June 2026)Source 1
- Solar PV
- 587.5 MW (30 June 2026)Source 1210.25 MW grid-connected, 373.30 MW captive, 3.90 MW off-grid.
- Wind
- 436.1 MW (30 June 2026)Source 1
- Bioenergy
- 163.8 MW (30 June 2026)Source 1Almost all captive (sugar and industrial plants).
- Thermal
- 630.2 MW (30 June 2026)Source 1
Targets.
- Transition to 100% renewable electricity generation by 2030 (government long-term objective cited by EPRA).
- Second Nationally Determined Contribution: 35% reduction in greenhouse gas emissions by 2035 against business as usual.
- Universal electricity access by 2030 through grid extension and mini-grids.
Kenya’s electricity has been predominantly renewable for years because of geothermal energy from the Rift Valley, which runs around the clock and supplied 6,420 GWh in 2025/26. Hydro is the second pillar but varies with rainfall, and the Lake Turkana wind farm supplies about a tenth of national energy on its own. Thermal plants, 8.3% of supply, are used mainly for peaks and dry years and are the main driver of the fuel pass-through charge. The grid emission factor was 0.053 tCO2/MWh in 2025/26.
Growth in renewable capacity has slowed in the grid-connected segment: total installed capacity rose only 3.8% in 2025/26, and almost all new grid capacity was the 70 MW of geothermal at Menengai. Rising demand has increasingly been met by imports from Ethiopia, whose share of supply rose from 10.6% to 12.2%.
The fastest-growing segment is behind-the-meter solar. Captive solar owned by factories, farms and commercial buildings grew 24% in a year to 373 MW, far more than the 210 MW of grid-connected solar farms. EPRA also approved several solar supply agreements between developers and industrial users during the year, including one hybrid solar and battery project.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage in Kenya is at an early stage on the grid and largely invisible behind the meter. There is no storage licence category, no storage-specific tariff and no published register of installed batteries. The demand is clear, however: frequent outages (an average of nearly four interruptions per customer per month in 2025/26) push businesses and better-off households to pair solar with batteries, and night-time curtailment of geothermal and wind shows the value of shifting energy at system level.
Policy is moving storage into planning rather than markets. Kenya Power’s planning prioritises flexible capacity such as batteries and pumped storage for integrating variable renewables, requires batteries in new variable renewable PPAs, and intends to buy ancillary services from batteries. KenGen has commissioned a small battery and is preparing a utility-scale system.
Storage projects.
- KenGen headquarters BESS (1.16 MWh): KenGen’s 2034 strategy targets 500 MWh of storage over the next decade.
- KenGen grid-scale BESS (planned, 100 MW / 200 MWh): Reported as a planned 200 MWh project whose first 100 MW phase is to be financed by the World Bank; no commissioning date has been published.
- Storage in new renewable PPAs: Kenya Power states that new PPAs for variable renewable plants must include appropriately sized battery storage, and plans battery-based ancillary services and solar-battery hybrids at four off-grid diesel stations.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Kenya Power (KPLC) | All 10.43 million grid customers (June 2026); 9.54 million domestic accounts (June 2025) | No | Limited | No | Limited |
Kenya Power is the only electricity retailer for households. In June 2025 it had 7.54 million customers on its own schemes and 2.51 million on rural electrification (REP) schemes, of which 7.29 million were in the lowest domestic band (DC1, up to 30 kWh a month). Customers cannot switch supplier and there are no green or time-of-use tariffs for homes.
EPRA has licensed several private companies to retail power to specific large sites, typically factories supplied by an on-site or nearby solar plant under a supply agreement approved by the regulator; 2025/26 licences included BE Africa C&I, Empower Projects Kenya, Jinye Company and Hydrobox Kenya. These do not serve households.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy and Petroleum | Government | Energy policy and regulations | Makes the regulations under the Energy Act 2019, including net metering and open access. |
| Energy and Petroleum Regulatory Authority (EPRA) | Regulator | Economic and technical regulator | Sets tariffs and pass-through charges, licenses utilities, installers and electricians, and publishes the annual energy statistics. |
| Kenya Electricity Transmission Company (KETRACO) | Transmission | Transmission owner and system operator | Builds the high-voltage grid and dispatches the system; runs the market portal under the 2026 regulations. |
| Kenya Power (KPLC) | Distribution | National distributor, single buyer and retailer | Connects customers, owns meters, processes net-metering applications and bills every customer. |
| Kenya Electricity Generating Company (KenGen) | Renewable Energy | State-owned generator | Produced 57.5% of electricity in 2025/26 from geothermal, hydro, wind and thermal plants; developing battery storage. |
| Geothermal Development Company (GDC) | Renewable Energy | State geothermal steam developer | Drills and supplies steam for geothermal plants such as those at Menengai. |
| Rural Electrification and Renewable Energy Corporation (REREC) | Government | Rural electrification and renewable energy agency | Builds rural grid extensions and off-grid stations with Kenya Power under programmes such as Last Mile Connectivity. |
| Kenya Bureau of Standards (KEBS) | Metering | National standards body | Approves meter types and publishes the Kenya Standards (KS IEC) for solar modules, inverters and batteries. |
| Kenya Renewable Energy Association (KEREA) | Solar | Renewable energy industry association | Represents solar and renewable energy companies and helped develop the national solar PV technician curriculum. |
| Africa Minigrid Developers Association (AMDA) | Renewable Energy | Mini-grid industry association | Association of private mini-grid developers serving off-grid communities in Kenya and across Africa. |
| Eastern Africa Power Pool (EAPP) | Market | Regional power pool | Coordinates cross-border trade and security standards with Ethiopia, Uganda, Tanzania and other members. |
| Consumers Federation of Kenya (COFEK) | Consumer | Consumer organisation | Consumer rights organisation active on utility tariffs and service issues. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (distribution) | Kenya Electricity Grid Code – Kenya National Distribution Grid Code | EPRA | Net-metered systems must be installed and operated to the Distribution Grid Code, the relevant Kenya Standards and EPRA guidelines; Kenya Power can disconnect systems that breach it. |
| Grid connection (transmission) | Kenya National Transmission Grid Code (KNTGC), May 2022 | EPRA | Covers connection, a renewable power plant chapter, operations and ancillary services, aligned with Eastern Africa Power Pool rules. |
| Inverters | KS IEC 62109-1 / KS IEC 62109-2; KS IEC 62894 | KEBS (adopting IEC) | Safety of PV power converters and inverters; inverter data sheet and nameplate. |
| Anti-islanding and utility interface | KS IEC 62116; KS IEC 61727 | KEBS (adopting IEC) | Islanding-prevention test for grid-connected inverters and utility interface characteristics. The net-metering rules require a lockable manual disconnect unless the system disconnects automatically on loss of grid. |
| PV modules | KS IEC 61215; KS IEC 61730-1 / -2 | KEBS (adopting IEC) | Design qualification and safety qualification of PV modules. |
| Batteries | KS IEC 61427-2; KS 1709 series; KS IEC 62509 | KEBS | Batteries for on-grid renewable storage, batteries for PV systems and charge controllers. |
| System design and installation | KS 1673-1 (solar PV power systems: design, installation, operation) | KEBS | Kenyan standard for PV system design and installation practice. |
| Installer accreditation | Energy (Solar Photovoltaic Systems) Regulations 2012 – licence classes T1–T3, C1, V1, V2 | EPRA | Only licensed technicians may design and install solar PV; training is accredited by the National Industrial Training Authority (NITA). |
| Electrical installation | EPRA electrical worker and contractor licences (classes A1, A2, B, C1, C2) | EPRA | Required for all electrical installation work under the Energy Act 2019. |
| Prepaid metering | IEC 62055-41 Standard Transfer Specification (STS); KEBS type approval | IEC / STS Association; KEBS | Defines the meter number and 20-digit token system used by Kenya Power prepaid meters. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Generation licence | Limited | National | Not needed for own-use generation up to 1 MW; required above that or for any sale to third parties. |
| Net-metering agreement (to export) | Yes | National | Form 001 to Kenya Power, decision within 60 days, five-year agreement filed with EPRA; feasibility study by an engineer above 10 kW. |
| Licensed installer | Yes | National | Solar PV work must be done by EPRA-licensed solar technicians and firms, and electrical work by licensed electrical workers and contractors. |
| New grid connection | Yes | National | Applied for through Kenya Power (online, app or office) and paid through Paybill 888899; Last Mile Connectivity households pay a KES 15,000 contribution through their token purchases. |
| Planning or building approval for rooftop solar | Unknown | Local | Building approvals are handled by county governments; no national rule specific to rooftop solar was identified. |
For a household, the practical permissions are a licensed installer and, if the system will export, a net-metering agreement with Kenya Power. Systems used only for self-consumption need no generation licence below 1 MW, but connecting any system so that it can export without an agreement is an offence under the net-metering regulations.
Larger projects add EPRA licensing, an approved power purchase or supply agreement and, for transmission-connected plants, Grid Code compliance studies with the system operator.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering | Active | Net metering | Renewable systems under 1 MW (domestic 4 kW single-phase, 10 kW three-phase) receive a credit of 50% of each exported unit against imports; credits roll over within Kenya Power’s financial year. Capped at 100 MW nationally for the first five years. | From 18 June 2024 |
| Last Mile Connectivity Project | Active | Connection subsidy | Subsidised grid connections for households near transformers for a contribution of KES 15,000, with no upfront payment: half of each token purchase is deducted until it is repaid. The government targets 1.18 million connections over two years from October 2025 (Phase VI covers 150,001 connections in 45 counties). | Phase VI announced October 2025 |
| Off-peak time-of-use discount | Active | Tariff discount | 50% off the base energy charge during off-peak hours for commercial and industrial, larger small commercial and e-mobility customers. Not available to domestic customers. | Since December 2017 (C&I); April 2023 (SC and e-mobility) |
| E-mobility tariff | Active | Special tariff | KES 16.00/kWh base rate for EV charging premises, with the 15,000 kWh monthly cap removed from 1 July 2026. | Since 2023 |
Data and connectivity.
- Fixed broadband
- 2.84 million fixed internet subscriptions (June 2026)Source 33Communications Authority data: up 32.4% in a year; fibre 1.57 million. Fixed connections reach only a minority of the 12 million+ households.
- 4G coverage
- 97.3 % population coverage (April–June 2025)Source 32
- 5G coverage
- 30 % population coverage (April–June 2025)Source 321.9 million 5G subscriptions by March 2026.
Mobile networks are the backbone of the electricity customer relationship in Kenya. Prepaid tokens are bought by M-Pesa and delivered by SMS, *977# works on any phone, and 4G covered 97.3% of the population by mid-2025. That makes mobile-connected devices, rather than fixed broadband, the realistic communication channel for smart meters, inverters and battery systems.
Fixed broadband is growing quickly but from a low base: 2.84 million fixed internet subscriptions in June 2026, more than half of them fibre and concentrated in Nairobi and other towns. At the 2019 census only 22.6% of people aged three and over used the internet; the World Bank estimated 35% of the population were internet users in 2024.
Grid conditions.
- National peak demand
- 2.514 GW (29 June 2026)Source 12,514.28 MW, up 8.55% on 2024/25; EPRA expects about 2,700 MW in the coming year.
- Annual electricity demand
- 15.7 TWh (FY2025/26)Source 1Energy delivered to the grid including imports (15,692.81 GWh). Electricity sold to customers was 12.44 TWh; system losses were 21.38%.
- Generation capacity
- 3.263 GW (30 June 2026)Source 1Grid-connected installed capacity including 200 MW of contracted imports (effective capacity 3,082 MW). Including captive (676.6 MW) and off-grid (47.6 MW) plants, total installed capacity was 3,987.2 MW.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- 403.9 GWh (FY2025/26)Source 1392.36 GWh geothermal (steam venting, mostly 00:00–05:00) and 11.58 GWh wind; down from 668.70 GWh in 2024/25.
Kenya’s grid is constrained less by capacity than by reliability and by the shape of demand. Peak demand occurs between 19:00 and 21:00, when solar is absent and thermal plants and imports are needed, while at night baseload geothermal exceeds demand and is curtailed. The 2025/26 reduction in curtailment came from higher night-time demand and more imports being absorbed.
The distribution network is long and thin: 334,157 km of lines for 10.4 million customers, extended rapidly by rural electrification. Reliability indicators all missed EPRA targets in 2025/26 (CAIDI 3.23 hours per interruption against a 1.36-hour benchmark), and losses remain above the allowed level.
Transmission works under way include the Nanyuki–Isiolo, Nanyuki–Rumuruti, Narok–Bomet and Rabai–Kilifi 132 kV lines. In 2025/26 the 442 km Isinya–Mariakani section of the Isinya–Rabai line was energised at 400 kV, and EPRA approved a public-private partnership with Africa50 and Power Grid India to deliver new transmission projects.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Energy (Electricity Market, Bulk Supply and Open Access) Regulations 2026 | Current | 8 May 2026 | Legal Notice 79 of 2026. Creates wholesale and retail market segments, a system-operator market portal, bilateral/spot/forward trading, ancillary service contracts and open access with wheeling charges for eligible consumers of at least 1 MVA (distribution) or 10 MVA (transmission). Voluntary in the transitional phase; wheeling arrangements are being operationalised. |
| Tariff review for 2026/27–2028/29 withdrawn; base tariffs frozen | Current | June 2026 | Kenya Power’s application of 31 March 2026 was withdrawn and public hearings cancelled. 2025/26 base tariffs remain in force; monthly pass-through charges continue. |
| E-mobility tariff cap removed | Current | 1 July 2026 | EPRA removed the 15,000 kWh monthly cap on the e-mobility tariff and is developing e-mobility regulations. |
| Finance Act 2026: VAT on solar batteries | Current | 1 July 2026 | KPMG’s summary of the enacted Finance Act 2026 lists solar batteries and electric bicycles as moving from zero-rated to standard-rated VAT from 1 July 2026, although earlier press reports said the parliamentary committee had recommended keeping zero-rating. Buyers should confirm the current treatment with the Kenya Revenue Authority. |
| Energy (Net-Metering) Regulations 2024 | Current | 18 June 2024 | Legal Notice 104 of 2024: net metering for renewable systems under 1 MW with a 50% export credit and a 100 MW national cap for five years. |
| New National System Control Centre | Upcoming | About 2028 | KETRACO’s new main control centre at Embakasi and emergency centre at Suswa, with advanced energy management and wide-area monitoring systems, built by GE Vernova and L&T with French and EU financing over about three years from 2025. |
| Higher electricity imports from Ethiopia | Upcoming | 2026/27 | The next phase of the power purchase agreement with Ethiopian Electric Power raises imports to 400 MW over the 500 kV HVDC link. |
| Energy (Electric Power Undertaking Licensing) Regulations | Upcoming | Draft published 2024; not yet in force | Draft regulations to update licensing procedures for electricity undertakings under the Energy Act 2019. |
| Proposed lower threshold for own-use generation | Upcoming | Proposed 2023; enactment not confirmed | A Statute Law (Miscellaneous Amendments) Bill 2023 proposed cutting the licence exemption for own-use generation from 1 MW to 500 kW. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official residential capacity figure; domestic net metering is capped at 4 kW single-phase/10 kW three-phase with a 50% export credit, and the census found solar as main lighting source mainly in off-grid rural homes. |
| Distributed energy market | Medium | Captive (on-site) generation was 676.6 MW, 17% of installed capacity, at June 2026; captive solar grew 24% in a year to 373.3 MW (EPRA). |
| Grid flexibility market | Low | No flexibility or demand-response market and no aggregation framework; the 2026 market regulations open trading only to licensees and consumers of at least 1 MVA. |
| Energy storage adoption | Low | No national storage statistic; largest disclosed grid battery is 1.16 MWh (KenGen, 2025), with a 100 MW/200 MWh system only planned. |
| Renewable growth environment | Medium | Renewables already supply about 80% of generation, but grid capacity grew only 3.8% in 2025/26 (mainly 70 MW geothermal) while captive solar grew strongly. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 34 sources
- Energy & Petroleum Statistics Report for the year ended 30th June 2026. Energy and Petroleum Regulatory Authority (EPRA), 2026. accessed 1 October 2026.
- Energy & Petroleum Statistics Report for the year ended 30th June 2025. Energy and Petroleum Regulatory Authority (EPRA), 2025. accessed 1 October 2026.
- Cancellation of public consultative forums following the withdrawal of the retail electricity tariff review application for the 5th Tariff Control Period (2026/27–2028/29). Energy and Petroleum Regulatory Authority (EPRA), 2026. accessed 1 October 2026.
- EPRA Announces New Fuel, Forex Charges for July Electricity Bills. Kenyans.co.ke, 2026. accessed 1 October 2026.
- EPRA Announces Ksh4.70 Per kWh in Electricity Charges for August. Kenyans.co.ke, 2026. accessed 1 October 2026.
- Explainer: 7 Taxes and Levies on KPLC Electricity Bill. Kenyans.co.ke, 2025. accessed 1 October 2026.
- MPs order regulator to increase power prices. Business Daily Africa, 2025. accessed 1 October 2026.
- Weekly Bulletin, 11 September 2026 (Table 1: Kenya Shilling exchange rates). Central Bank of Kenya, 2026. accessed 1 October 2026.
- 2019 Kenya Population and Housing Census, Volume I: Population by County and Sub-County. Kenya National Bureau of Statistics, 2019. accessed 1 October 2026.
- 2019 Kenya Population and Housing Census, Volume IV: Distribution of Population by Socio-Economic Characteristics (Tables 2.10, 2.11b, 2.18, 2.19, 2.33, 2.36). Kenya National Bureau of Statistics, 2019. accessed 1 October 2026.
- Population, total – Kenya (SP.POP.TOTL). World Bank, 2025. accessed 1 October 2026.
- Urban population (% of total population) – Kenya (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 1 October 2026.
- Access to electricity (% of population) – Kenya (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 1 October 2026.
- Electric power consumption (kWh per capita) – Kenya (EG.USE.ELEC.KH.PC). World Bank, 2024. accessed 1 October 2026.
- Individuals using the Internet (% of population) – Kenya (IT.NET.USER.ZS). World Bank, 2024. accessed 1 October 2026.
- Integrated Annual Report and Financial Statements for the year ended 30 June 2025. The Kenya Power and Lighting Company Plc, 2025. accessed 1 October 2026.
- Customer support (paybill numbers, *977#, self-service portal, tokens). Kenya Power, 2026. accessed 1 October 2026.
- How to Buy Tokens After KPLC Makes Changes on Paybill Numbers. Kenyans.co.ke. accessed 1 October 2026.
- What is a meter number?. STS Association. accessed 1 October 2026.
- Kenya Power rolls out free “Update Token Meter Yako” exercise targeting 7.4 million meters. Kenya Power newsroom, 2024. accessed 1 October 2026.
- The Energy (Net-Metering) Regulations, 2024 (Legal Notice No. 104). Kenya Gazette Supplement No. 121, via EPRA, 2024. accessed 1 October 2026.
- The Energy (Electricity Market, Bulk Supply and Open Access) Regulations, 2026 (Legal Notice No. 79). Kenya Gazette Supplement No. 115, via EPRA, 2026. accessed 1 October 2026.
- Energy Act, 2019 (Cap. 314). Kenya Law, 2019. accessed 1 October 2026.
- Regulatory Impact Assessment of the Energy (Solar Photovoltaic Systems) Regulations – Final Report. Energy and Petroleum Regulatory Authority (EPRA), 2019. accessed 1 October 2026.
- The Kenya Electricity Grid Code, Part 1: Kenya National Transmission Grid Code (May 2022). Energy and Petroleum Regulatory Authority (EPRA), 2022. accessed 1 October 2026.
- Power dispatch hub moved after Ketraco takes control. Nation (Nation Media Group), 2022. accessed 1 October 2026.
- GE Vernova, L&T to develop Kenya’s National System Control Centre. African Review, 2025. accessed 1 October 2026.
- How Kenya Power can use batteries to reduce electricity blackouts. HapaKenya, 2026. accessed 1 October 2026.
- Kenya: Tax measures in Finance Act 2026. KPMG TaxNewsFlash, 2026. accessed 1 October 2026.
- A reprieve for Kenya’s electric vehicles, but for how long?. Launch Base Africa, 2026. accessed 1 October 2026.
- Govt Plans to Connect One Million Kenyans to Power in Two Years. Kenyans.co.ke, 2025. accessed 1 October 2026.
- Kenya’s Digital Transformation Accelerates with Surge in Mobile and Broadband Growth. Telecom Review Africa (reporting Communications Authority of Kenya), 2025. accessed 1 October 2026.
- Kenya’s broadband market grows as fibre, wireless and satellite add more connections. TechTrends Kenya (reporting Communications Authority of Kenya), 2026. accessed 1 October 2026.
- EPRA tightens rules for own-use power generation. Nation (Nation Media Group), 2023. accessed 1 October 2026.
Questions about energy in Kenya.
Households pay an EPRA-regulated base rate of KES 12.14/kWh for the first 30 kWh a month, KES 16.50 for 30–100 kWh and KES 18.57 above 100 kWh, plus monthly fuel, forex and inflation charges (about KES 5.17/kWh in August 2026), levies and 16% VAT. A 200 kWh household paid about KES 28.8 per kWh all-in in late 2025, roughly €0.19.
Kenya Power (KPLC) supplies every grid-connected household and owns the distribution network and meters. It buys power from KenGen, independent producers and imports. KETRACO runs the transmission grid and the system, and EPRA regulates the sector. Households cannot switch supplier.
There is no separate supply-point number. Prepaid customers are identified by the meter number printed on the meter, an 11- or 13-digit STS number ending in a check digit, which is also the account number used to buy tokens on M-Pesa Paybill 888880. Postpaid customers use the account number on their bill.
Yes, through net metering with Kenya Power under the 2024 regulations. Domestic systems are limited to 4 kW on single-phase and 10 kW on three-phase supplies. Each exported unit earns a credit worth half a unit, carried forward but lost at the end of Kenya Power’s financial year. There is no cash payment.
You do not need a generation licence for your own use up to 1 MW, but the installation must be done by an EPRA-licensed solar technician and firm. Grid-connected and hybrid systems need a T3 technician, normally working for a C1-licensed contractor. Exporting requires a net-metering agreement.
About 81% of electricity generated in the year to June 2026 was renewable: geothermal 40.9%, hydro 22.7%, wind 12.3% and solar 3.0%, with a further 12.2% imported, mostly hydro from Ethiopia. Thermal plants supplied 8.3%.
Most homes have STS prepaid token meters, which accept 20-digit tokens but do not send readings. Kenya Power has fitted more than 304,000 smart meters, mainly to industrial, SME and street-lighting customers, and net-metering customers must install a bidirectional smart meter at their own cost.