How electricity works in Uganda.

Uganda electricity market 2026: ERA quarterly tariffs, UETCL single buyer, UEDCL distribution, prepaid meters, net metering, licensing and hydro-led renewables.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Ugandan shilling (UGX) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Uganda energy at a glance.

Key figures for households in Uganda. Each one links to its source on the full overview below.

  • Electricity price.

    919.7 UGX per kWh for households, including taxes. Figures for Jul–Sep 2026.

  • Household use.

    483 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    99% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Uganda.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Uganda below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Uganda requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Uganda.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Uganda, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Uganda, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Uganda.

Full overview

The energy market in Uganda, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Uganda runs an unbundled but state-led electricity system under the Electricity Act, Cap. 157 (the 1999 Act as amended in 2022). The Electricity Regulatory Authority (ERA) licenses every part of the chain and sets end-user tariffs every quarter. Generators, including the state-owned Uganda Electricity Generation Company (UEGCL) and independent power producers, sell to the Uganda Electricity Transmission Company (UETCL), which is the bulk buyer, the owner of the high-voltage grid and the licensed system operator. Since 1 April 2025, when Umeme Limited’s 20-year distribution concession ended, the state-owned Uganda Electricity Distribution Company (UEDCL) has distributed and sold power to almost every grid customer.

The grid is almost entirely renewable. Hydro plants on the Nile, led by Karuma (600 MW), Bujagali (250 MW), Kiira and Nalubaale (380 MW together) and Isimba (183 MW), produced 88% of electricity in 2024, sugar-cane bagasse 9% and solar 1.8%. Installed capacity reached 2,118.6 MW in September 2026, comfortably above a peak demand of 1,345 MW, and Uganda exports surplus power to Kenya, Rwanda, Tanzania and the Democratic Republic of Congo.

Access is the defining challenge. The 2024 census found that only 25.3% of households lit their homes with grid or mini-grid electricity and 28.1% with solar, and 2.75 million customers were connected to the grid at the end of 2025. Households pay a regulated domestic tariff (UGX 779.4/kWh plus 18% VAT in July–September 2026) with a lifeline rate for low users and a discounted cooking band. Rooftop systems can export under the Electricity (Net Metering) Regulations 2024 for kWh credits, while new grid-connected solar and wind licences have been paused since October 2025 pending a grid stability study.

Energy snapshot.

Headline figures for electricity in Uganda. Each shows its data year and links to its source.

  • Population45,905,417 peopleSource 1May 2024 census
  • Households10,698,913 householdsSource 1May 2024 census
  • Average household size4.2 people/householdSource 1May 2024 census
  • Electricity use per household483 kWh/yrSource 72024
  • Household price (UGX)919.7 UGX/kWhSource 2Jul–Sep 2026
  • Household price (EUR)0.209 EUR/kWhSource 6Jul–Sep 2026
  • Renewable electricity share99%Source 72024
  • Solar capacity0.108 GWSource 8September 2026
  • Wind capacity0 GWSource 8September 2026
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Yes
Home equipment in grid services
No
Regulator
Electricity Regulatory Authority (ERA)
System operator
Uganda Electricity Transmission Company Limited (UETCL), licensed system operator and bulk supplier
Distribution networks
One dominant state distributor, UEDCL, which took over Umeme’s concession on 1 April 2025; small licensed distributors (WENRECO in West Nile, Kalangala Infrastructure Services) and mini-grid operators serve isolated areas
Currency
Ugandan shilling (UGX)
Voltage and frequency
240 V single-phase / 415 V three-phase, 50 Hz

Electricity prices in Uganda.

Household price (UGX)
919.7 UGX/kWh (Jul–Sep 2026)Source 2Derived: ERA-approved domestic energy rate of UGX 779.4/kWh (units 16–80 and above 150) plus 18% VAT. Excludes the monthly service charge (UGX 3,360) and the cheaper lifeline (first 15 kWh) and cooking (81–150 kWh) bands. ERA published the October–December 2026 schedule on 1 October 2026; its domestic rates could not be verified from the regulator’s document, so the Q3 rate is used.
Household price (EUR)
0.209 EUR/kWh (Jul–Sep 2026)Source 6UGX 919.7 converted at UGX 4,398.9 per euro: the Bank of Uganda mid-rate of UGX 3,777.81 per US dollar on 29 May 2026 (the rate ERA used for the Q3 2026 tariff) multiplied by the ECB reference rate of USD 1.1644 per euro on the same date.
Typical annual electricity bill
376,585 UGX/yr (Jul–Sep 2026 tariffs)Source 2Derived illustration for a lifeline-eligible household using 40 kWh a month (close to the 483 kWh a year average per domestic account): 15 kWh × UGX 250 + 25 kWh × UGX 779.4 + UGX 3,360 service charge = UGX 26,595, plus 18% VAT = UGX 31,382 a month, × 12. No official average bill is published.

Household price trend (UGX per kWh).Source 4

756.2787.8819.4Q4 2023Q3 2026
Uganda household electricity price, UGX per kWh
Q4 2023805 UGX/kWh
Q1 2024797.3 UGX/kWh
Q2 2024819.4 UGX/kWh
Q3 2024803 UGX/kWh
Q4 2024796.4 UGX/kWh
Q1 2025775.7 UGX/kWh
Q2 2025756.2 UGX/kWh
Q3 2025756.2 UGX/kWh
Q4 2025756.2 UGX/kWh
Q1 2026756.2 UGX/kWh
Q2 2026756.2 UGX/kWh
Q3 2026779.4 UGX/kWh

How tariffs are set

ERA sets base tariffs once a year and then adjusts them every quarter using an automatic tariff adjustment formula driven by the shilling–dollar exchange rate (most power purchase agreements are in US dollars), core consumer price inflation, the international oil price and the generation mix. For July–September 2026 the parameters were UGX 3,777.81 per dollar (Bank of Uganda, 29 May 2026), a core CPI of 140.52 and an oil price of US$114.55 a barrel, which lifted the domestic rate from UGX 756.2 to 779.4/kWh after five unchanged quarters.

What a household pays

A domestic bill has an energy charge in bands (lifeline, standard, cooking band, standard again), a fixed monthly service charge of UGX 3,360 that prepaid customers pay with their first purchase of the month, and 18% VAT on every transaction. Because of the bands, the average price per kWh depends strongly on consumption: a lifeline customer using 15 kWh pays far less per unit than one using 60 kWh, while a household using 150 kWh benefits from the cooking discount on 70 of those units.

One national tariff

There is one tariff schedule for UEDCL customers nationwide, so prices do not vary by region. Separate tariffs are approved for the small distributors such as WENRECO and Kalangala Infrastructure Services. Distribution losses were 18.1% in 2025, up from 16.7% in 2024, and ERA sets annual loss targets for each distributor (Umeme’s target for 2024 was 13.24% against actual losses of 16.0%).

Price trend

The chart shows the standard domestic energy rate (units 16–80 and above 150) in each quarter, before VAT and the service charge. Tariffs fell from a peak of UGX 819.4 in April–June 2024 to UGX 756.2 when UEDCL took over distribution in April 2025, and rose again in July 2026 as the oil price and inflation increased.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesDomestic tariff (code 10.1, single-phase 240 V) approved by ERA each quarter. For July–September 2026: UGX 779.4/kWh for units 16–80 and above 150 in a month, up from UGX 756.2, which had applied from April 2025 to June 2026. Prices exclude 18% VAT.
OtherYesLifeline tariff: the first 15 kWh each month cost UGX 250/kWh for domestic customers whose rolling average consumption over the previous six months does not exceed 100 kWh. Unused lifeline units are forfeited at the end of the month.
OtherYes“Cooking tariff”: all domestic customers pay UGX 412/kWh for units 81–150 in a month, a declining block designed to encourage electric cooking. Consumption above 150 kWh returns to the standard rate.
PrepaymentYesMost households use prepaid meters. Tokens, sold since April 2025 as “UEDCL Light” (previously Umeme “Yaka”), are bought by mobile money (MTN, Airtel), banks, agents or the UEDCL Light app; the same domestic tariff and monthly service charge apply.
Time-of-useLimitedPeak (18:00–23:00), shoulder (05:00–18:00) and off-peak (23:00–05:00) energy rates apply to commercial, industrial and large service customers. In Q3 2026 commercial customers paid UGX 666.5, 562.1 and 429.7/kWh. Domestic customers have no time-of-use option.
DynamicNoNo dynamic or wholesale-linked retail tariff exists.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
483 kWh/yr (2024)Source 7Derived: domestic customers took 23.2% of the 4,846 GWh sold by distributors in 2024 (ERA statistics), about 1,124 GWh, divided by 2,327,898 domestic customers at the end of 2024 (ERA ESI Performance Report 2024, Table 7). This is per domestic account, not per household, and is pulled down by many very low-use rural connections.
Average daily use per household
1.32 kWh/day (2024)Source 7Derived: 483 kWh a year per domestic account ÷ 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
218 kWh/person/yr (all sectors) (2024)Source 7Baseline cited by ERA from the Fourth National Development Plan (NDP IV), which targets 1,090 kWh by 2029/30. The World Bank series gives 95.3 kWh for 2023.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
1.7 % of households that cook (May 2024 census)Source 1Main cooking fuel: wood 64.5%, charcoal 28.2%, electricity 1.7%, LPG 1.1%, biogas 1.1%, kerosene 0.8%.

Household electricity use in Uganda is very low. Domestic customers took 23.3% of the 5,430 GWh sold by distributors in 2025, while large and extra-large industrial customers took more than half. Per domestic account, use was about 483 kWh a year in 2024, and research on UEDCL’s pre-2025 rural and peri-urban networks found a median of only 20.6 kWh a month between 2019 and 2023, with many prepaid customers buying electricity in fewer than seven months of the year.

Most connected homes use electricity for lighting, phone charging, radio and television; only 14.1% of households owned a television in 2024. Cooking is the main untapped load: 92.7% of households that cook use wood or charcoal and 1.7% use electricity. The cooking band (UGX 412/kWh for units 81–150 a month) and ERA’s “Charcoal-to-Power” campaign, including a pilot institutional cooking tariff at Mulago National Hospital, aim to change this.

Demand is nevertheless growing fast from a low base. Distribution sales rose 12% in 2025 and the number of grid customers 11%, driven by free and subsidised connections under the World Bank-funded Electricity Access Scale-up Project.

Housing and households.

Dwellings
10,698,913 households (May 2024 census)Source 1The census counts households by dwelling characteristics; no separate dwelling-stock figure was identified.
Owner-occupied
65.8 % of households (May 2024 census)Source 177.2% in rural areas, 49.0% in urban areas and 15.3% in Kampala.
Private rented
24.8 % of households (May 2024 census)Source 1All rented dwellings (the published table combines private and public renting); 41.7% in urban areas and 70.0% in Kampala. A further 8.3% live rent-free.
Social or public housing
Not identified from a reliable public source.
Houses
42.8 % of households (May 2024 census)Source 1Derived: detached houses 18.7% plus semi-detached houses 24.1%. Other dwelling types: huts 20.5%, tenements (muzigo, rows of single rooms) 19.6%, rooms in a main house 10.0%, other 7.1%.
Apartments and flats
Not identified from a reliable public source.
Urban population
31.9 % of population (2025)Source 46World Bank estimate. The 2024 census classified 40.6% of households as urban (4.35 million of 10.70 million).

Two thirds of Ugandan households own their home, typically a house on family or customary land in a rural area. Renting is concentrated in towns: 41.7% of urban households rent, and in Kampala 70.0% do, many in tenements known as muzigo, single-room units in a row with shared facilities. Huts are still the main dwelling for 20.5% of households, and 79.0% in Karamoja.

These patterns shape how electricity is used. Rural owner-occupiers control their roofs and have adopted solar home systems on a large scale: in 2024, 28.1% of all households used solar as their main source of lighting, more than the 25.3% who used grid or mini-grid electricity. Urban tenants in muzigo blocks often share a landlord’s meter or sub-meter and rarely control the installation.

Electricity access has risen quickly but remains far from universal. The census found 53.4% of households had electricity from the grid or solar, and the World Bank estimates 55.3% of the population had access in 2024 (78.3% urban, 44.8% rural). The government’s target is 70% access by 2030.

How the grid works in Uganda.

  1. TransmissionUganda Electricity Transmission Company Limited (UETCL), UETCL (system operator licence)
  2. DistributionOne dominant state distributor, UEDCL, which took over Umeme’s concession on 1 April 2025; small licensed distributors (WENRECO in West Nile, Kalangala Infrastructure Services) and mini-grid operators serve isolated areas
  3. MeteringUEDCL
  4. Supply2 or more retail suppliers

Physical flow

Most electricity is generated on the Victoria Nile between Jinja and Karuma: the large hydro plants (1,500 MW in total) supplied 77.7% of UETCL’s purchases in 2025 and small hydro plants, mostly in western Uganda, a further 12.7%. Sugar factories at Kakira, Kinyara and elsewhere run bagasse cogeneration plants (188 MW), and two thermal plants at Tororo and Namanve (92 MW on the grid) supply about 1% of generation. Power moves over 5,383 km of transmission lines (3,740 km at 132 kV, 1,002 km at 220 kV, 606 km at 400 kV) to substations where UEDCL takes it at 33 kV and 11 kV. The distribution network reached 96,263 km at the end of 2025, 60% of it low voltage, and households are supplied at 240 V single-phase.

Uganda is interconnected with Kenya, Tanzania, Rwanda and the Democratic Republic of Congo, and exported 478.1 GWh in 2024, 7.6% of UETCL’s sales; imports were only 49.9 GWh. New interconnectors are planned with Tanzania (220 kV from Masaka, targeted for 2029) and South Sudan, financed by the African Development Bank.

Commercial flow

UETCL is the bulk supplier: it buys from UEGCL (which operates Karuma, Isimba, Nalubaale and Kiira), from independent producers such as Bujagali Energy and from small hydro, solar and bagasse plants on feed-in or negotiated tariffs, then sells to distributors at ERA-approved bulk supply tariffs with peak, shoulder and off-peak rates. UETCL bought 7,845 GWh and sold 7,573 GWh in 2025. Distributors recover their costs through ERA’s end-user tariffs.

Reform

The Electricity (Amendment) Act 2022 ended UETCL’s legal monopoly as single buyer: generators may now sell directly to distributors or to eligible bulk consumers, transmission is open to private investment, and the feed-in tariff ceiling rose from 20 MW to 50 MW. In practice the single-buyer model still dominates, and the end of the Umeme and Eskom concessions has returned distribution and the oldest hydro plants to state companies.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy and Mineral Development (MEMD)Sets energy policy (Energy Policy 2023, Energy Transition Plan), issues policy directions on new generation, and since the government rationalised its agencies has absorbed the former Rural Electrification Agency, so it now runs rural electrification and the Electricity Access Scale-up Project.
RegulatorElectricity Regulatory Authority (ERA)Licenses generation, transmission, system operation, bulk supply, distribution, sale and cross-border trade; approves base and quarterly end-user tariffs and feed-in tariffs; makes regulations such as the Net Metering Regulations 2024; issues electrical installation permits; and handles complaints not resolved by distributors.
TSOUganda Electricity Transmission Company Limited (UETCL)State-owned owner of the 5,383 km high-voltage network (132, 220 and 400 kV). It holds the transmission, system operator, bulk supply and export/import licences, signs power purchase agreements with generators and sells bulk power to distributors.
System operatorUETCL (system operator licence)Schedules and dispatches power plants, manages cross-border flows and carries out the technical studies that set the grid’s variable renewable energy limit (cut from 250 MW to 200 MW in October 2025).
DSOUganda Electricity Distribution Company Limited (UEDCL)State-owned national distributor since 1 April 2025, when the government took back the network operated by Umeme Limited from 2005 to 2025. It runs three regions, 15 territories and 98 service centres, connects customers, owns and reads meters, sells prepaid “Light” tokens and processes net-metering applications.
DSOWENRECO, Kalangala Infrastructure Services and mini-grid operatorsWest Nile Rural Electrification Company serves the West Nile region and Kalangala Infrastructure Services the Kalangala islands under separate ERA licences and tariffs. Licensed mini-grids served 37,507 domestic customers at the end of 2024.
SupplierUEDCL (retail supply)Distribution and retail sale are combined: each distributor is the only supplier in its area. Since the 2022 amendment, consumers with an average demand of at least 1,500 kVA may buy part of their power in bulk directly from generators.
MeteringUEDCLThe distributor supplies, installs and owns meters. Meters must comply with the Weights and Measures (Electricity Meters) Rules 2015 and are verified by the Uganda National Bureau of Standards (UNBS).

Compared with the UK system.

Compared with the UK system.
UK conceptUganda equivalentHow it works
DNOUEDCL (plus WENRECO and KIS in isolated areas)One state company owns and operates the 11 kV, 33 kV and low-voltage network across almost all of Uganda, organised into three regions and 15 service territories. Unlike Great Britain’s regional DNOs, it is also the retail supplier and meter operator.
National Grid/NESOUETCLUETCL combines the roles of transmission owner, system operator and single bulk buyer. It contracts generation through power purchase agreements and dispatches plants centrally; there is no balancing market.
MPANMeter number (prepaid) or account number (postpaid)There is no regulator-issued supply-point number. A prepaid connection is identified by the STS meter number used to buy tokens; a postpaid connection by the UEDCL account number on the bill.
MPRNNo equivalentUganda has no piped gas network for homes. Households cook mainly with firewood and charcoal; LPG is sold in cylinders.
Meter operatorUEDCLThe distributor supplies and maintains the meter; customers cannot appoint their own meter operator. Net-metering customers pay for the bidirectional meter but the distributor installs it and is responsible for it.
SupplierUEDCL (no switching)Households cannot choose a supplier. Only eligible bulk consumers (average demand of at least 1,500 kVA) may buy directly from a generator, and if grid-connected only up to 30% of their energy.
Smart-meter infrastructureSTS prepaid “Light” meters; AMR for large usersThere is no DCC-style national data hub. Household prepaid meters accept 20-digit tokens and do not report readings; UEDCL reads large power users’ meters remotely through its automated meter reading system.

How a supply point is identified.

07123456782 (fictional 11-digit STS meter number: manufacturer code 07, serial 12345678, check digit 2)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Meter number (prepaid) / account number (postpaid) (Meter No. / Account No.)
Who issues it?Prepaid meter numbers are assigned by the meter manufacturer under the STS standard and registered by the distributor (UEDCL) when the meter is installed; postpaid account numbers are created by UEDCL when a supply contract is opened
FormatPrepaid: the STS meter number (decoder reference number), a manufacturer code followed by a serial number and a final check digit. Postpaid: a numeric UEDCL account number printed on the bill; its structure is not published.
LengthSTS meter numbers are 11 digits (2-digit manufacturer code) or 13 digits (4-digit code) under the STS standard; UEDCL does not publish the lengths in use. Postpaid account number length is not published.
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itPrinted on the customer interface unit (the keypad inside the home) and on the meter itself, which is often mounted on the pole outside, and quoted on every token receipt and SMS. Postpaid customers find the account number on their paper, SMS or e-mail bill.
Electronic accessCustomers enter the meter number to buy “UEDCL Light” tokens by MTN or Airtel mobile money (for example Airtel *185# > Pay Bill > UEDCL Light), at banks and agents or in the UEDCL Light app, which also shows token status. Postpaid customers can get their bill by sending “BILL <account number>” to 8185 or register for e-billing; new connections are applied for online at selfservice.uedcl.co.ug.
Third-party accessThere is no public look-up and no consumer data-sharing scheme. Installers obtain the meter or account number from the customer; a net-metering notice and application to the distributor identify the prosumer and the connection point.
Who keeps the registerUEDCL’s customer information, billing and prepaid vending systems (inherited from Umeme in April 2025). ERA receives aggregate statistics but keeps no public register of supply points.
Register scopePer DSO

What identifies a connection

Uganda has no MPAN-style supply-point number issued by the regulator or a central registry. A connection is identified by whatever the distributor bills against. Most households are on prepaid metering, so the meter number is the identifier: it is what a customer types into a mobile-money menu to buy electricity, and every token generated is cryptographically tied to that meter. Postpaid customers, mostly businesses and large users, are identified by their UEDCL account number.

How prepaid meters work

Ugandan prepaid meters follow the international Standard Transfer Specification (STS). The meter is often split into a metering and control unit fixed on the pole or outside wall and a customer interface unit inside the home, where the 20-digit token is keyed in. When the STS token identifier expired worldwide on 24 November 2024, the distributors sent key-change tokens to every prepaid meter; by the deadline 2.2 million customers (95.5% of Umeme and UEDCL meters) had updated their meters, and meters not updated stopped accepting new tokens.

Changes of operator and occupier

When UEDCL took over from Umeme on 1 April 2025, meter numbers did not change: the “Yaka” brand became “UEDCL Light” and customers continued to buy tokens with the same number. The meter stays physically at the premises and its number changes only if the meter is replaced. The account, however, is in a named person’s name, and tenants frequently buy tokens for a meter registered to the landlord. A new connection requires a copy of the national ID, a digital wiring certificate from an ERA-licensed wireman and, where the line crosses other land, wayleave consent.

Data caveat

UEDCL does not publish the structure of its account numbers or the STS manufacturer codes in use. The example above is fictional and illustrates only the STS length and check-digit format.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingNo
How exported electricity is paidNet metering in kWh: exported energy is discounted by 20%, netted against imports each month at the retail tariff, and any surplus is carried forward as kWh credit indefinitely; no cash payment
How large can a system be?Below 500 kW (0.5 MW) for every customer category, and no larger than the customer’s maximum load demand in the previous 12 months (or the maximum allowed demand where demand is not metered). Generation on a commercial scale under net metering is prohibited.
Is there a national cap?Yes. Aggregate net-metering capacity is limited to 5% of system peak demand, reviewed annually by ERA. Each distributor also sets limits for its area based on equipment ratings and network stability studies.
What is an exported unit worth?Every exported kWh is reduced by a 20% discount factor, which the regulations say covers non-collection, losses, network capacity costs and “virtual storage” on the grid. The rest offsets imported kWh at the retail energy rate. Credits never offset the fixed service charge, cannot be paid out in cash and roll over from month to month.
Which technologies qualify?All renewable technologies: solar, wind, hydro, geothermal, biomass, biogas, biofuel and fuel cells.
What meter and safety equipment are required?A bidirectional, two-way-communicating net meter that records import, export and peak demand in different periods and supports time-of-use metering, verified by UNBS and paid for by the applicant. A visible, lockable manual disconnect switch is required unless the inverter shuts down automatically on loss of grid supply, is warranted to do so and has been inspected and tested by the distributor.
Are the detailed guidelines in force?ERA consulted on draft Net Metering Guidelines with the Ministry, UEDCL and industry on 21 August 2025 to put the regulations into practice. Applicants should confirm current procedures and fees with UEDCL.
Can households sell to neighbours?No. Interconnection does not authorise the prosumer to use the network to supply anyone other than the distributor, and selling electricity to third parties requires ERA licences.

Connecting a home system.

  1. Have the system designed and installed to the Primary Grid Code and relevant standards, with the electrical installation done by an electrician holding an ERA installation permit.
  2. Notify the distributor (UEDCL) of the intention to develop a net-metering system, giving the location, renewable source, capacity, technical specifications and timeline.
  3. The distributor assesses line capacity, the aggregate net-metering limit and the customer’s maximum demand, and issues a no-objection to carry out an interconnection feasibility study.
  4. Commission a qualified contractor, at the prosumer’s cost, to carry out the feasibility study (system description, voltage, current, fault level and power-factor impact).
  5. Apply to the distributor on the form in the Second Schedule of the regulations, submit the study and pay the net-metering fees. The distributor must decide within 60 days, approving, approving with conditions or rejecting with reasons.
  6. Sign a net-metering agreement (up to 10 years, renewable for 10). The distributor sends it to ERA within seven working days for a no-objection.
  7. Pay the interconnection costs. The distributor installs the bidirectional meter and connects the system within 30 days of payment. Decisions can be appealed to ERA within 30 days.

The Electricity (Net Metering) Regulations 2024 (S.I. No. 14 of 2024, gazetted on 2 April 2024) are Uganda’s first rules allowing consumers to export surplus renewable electricity. They define a prosumer as any residential, commercial or industrial customer generating on its side of the meter from a renewable source with a capacity not exceeding 0.5 MW, and they require every distribution licence application to include a net-metering plan for all customer categories.

The scheme is designed for self-consumption. Systems are capped at the customer’s own maximum demand, exports earn only kWh credits worth 80% of their volume, and the prosumer pays for the feasibility study, the bidirectional meter and any network work. For most households, especially the many with single-phase supply and low consumption, the economics of a grid-tied system therefore rest on reducing purchases rather than on export.

Net metering is unaffected by ERA’s October 2025 pause on new grid-connected solar and wind licences, which applies to utility-scale projects; off-grid systems are also exempt.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityERA generation licence for plants of 0.5 MW and above; smaller plants do not need a full licence but must be registered with ERAERALarge projects go through a notice of intended application (Form A), publication in the Gazette and a newspaper, public comments, a permit to carry out studies and then a licence. New grid-connected solar and wind licences and permits have been paused since 29 October 2025 (Regulatory Notice No. 002 of 2025); hybrid and storage-integrated projects are prioritised.
Self-generation behind the meterNo licence for renewable systems below 0.5 MW used for own consumption; a net-metering agreement is needed to exportDistributor (UEDCL); ERAElectricity (Net Metering) Regulations 2024. Installation must be carried out by holders of ERA installation permits.
Store electricityNo separate storage licence category; grid-scale storage is licensed as part of a generation projectERAERA’s October 2025 notice gives priority to hybrid and storage-integrated projects; behind-the-meter batteries need no licence.
Export to the grid (small systems)Net-metering agreement with the distributor for renewable systems below 0.5 MW, capped at the customer’s maximum demandUEDCL (agreement); ERA (no-objection, appeals)Aggregate cap of 5% of system peak demand.
Sell electricity to consumersERA sale or distribution licence; generators may sell directly only to distributors, UETCL or eligible bulk consumersERAEligible bulk consumers have an average demand of at least 1,500 kVA. If connected to the national grid they may buy only 30% of their energy directly from an eligible seller; off-grid consumers may buy all of it.
Distribute electricityERA distribution licenceERAUEDCL holds the main national licence; WENRECO, Kalangala Infrastructure Services and mini-grid operators hold licences for isolated areas.
Transmit electricityERA transmission licenceERAUETCL holds the licence; the 2022 amendment opened transmission to private investment, and an independent power transmission framework is being developed.
Bulk supply / wholesale tradingERA bulk supplier licenceERAUETCL is the licensed bulk supplier and buys power under power purchase agreements. There is no wholesale market or exchange.
Import and export across bordersERA export and import licenceERAHeld by UETCL, which trades with neighbouring utilities under bilateral agreements.
System operation, balancing and grid servicesERA system operator licenceERA; UETCLUETCL holds the licence and procures reserves from contracted generators. No route exists for small or aggregated assets.
Aggregation, virtual power plants and remote control of assetsNo licence category or framework existsERANot addressed in the Electricity Act or regulations. Under the net-metering rules the distributor may disconnect a prosumer’s system at any time if it threatens the network.
Electrical installation work (including solar)ERA installation permit by class: D (domestic installations up to 240 V), C2 (up to 1 kV), C and C1 (up to 6.6 kV), B (up to 66 kV), A (all work including high voltage); company permits XL, XM, XHERA Installation Permits CommitteeElectricity (Installation Permits) Regulations 2025. Permits are valid for one to three years and are not transferable; class D costs UGX 35,000 a year. A digital wiring certificate from a permit holder is required for a new connection.

Every part of the electricity supply industry is licensed by ERA under the Electricity Act, Cap. 157: generation, transmission, bulk supply, system operation, distribution, sale, and export and import. The licensing route for larger plants is deliberately public, with a gazetted notice of intended application, a comment period and a permit to carry out feasibility studies before a full licence is granted.

For distributed generation, the key thresholds are 0.5 MW, below which plants are registered rather than licensed and may join net metering, and 1,500 kVA of average demand, above which a consumer may buy power in bulk from a generator. There is no specific regulation for battery storage, aggregators or virtual power plants.

Practitioner regulation is through ERA’s installation permits. Since 2025 the Electricity (Installation Permits) Regulations 2025 set the permit classes and require every individual working for a firm to hold their own permit, and ERA publishes a register of certified permit holders.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Reserves and frequency controlRestricted—NoUETCL (system operator). Provided by large hydro and thermal plants under their power purchase agreements and the Primary Grid Code. There is no ancillary services market and no route for distributed assets.
Bulk purchase by eligible consumersRestricted1,500 kVA average demandNoERA / eligible sellers. Bilateral purchase from generators, the bulk supplier or uncontracted generators, limited to 30% of a grid-connected consumer’s energy.
Time-of-use tariffsRestricted—NoERA / UEDCL. Peak, shoulder and off-peak energy charges for commercial and industrial customers, and a declining block tariff for large industrial customers that increase consumption (266 companies qualified). Not offered to households.
Eastern Africa Power Pool tradingDeveloping—NoEAPP. Regional trading among national utilities. UETCL trades bilaterally with Kenya, Rwanda, Tanzania and the DRC.

Uganda has no flexibility market for distributed energy resources and no legal framework for aggregation. System balancing is done centrally by UETCL, mainly with the large Nile hydro plants, whose output can be adjusted, and with thermal back-up.

Flexibility has become a planning issue because of variable renewables. In October 2025 ERA cut the grid’s firm absorption ceiling for solar and wind from 250 MW to 200 MW on the system operator’s advice, noted that about 239 MW was already licensed or permitted, and paused new licences pending a grid stability study that will assess storage, hybrid systems and smart-grid technologies. Households take part in demand management only through the tariff bands.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Eastern Africa Power Pool (EAPP)Regional power pool through which Uganda’s cross-border trade is coordinated.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNo household smart-meter rollout; STS prepaid token meters dominate, with automated meter reading for large power users
Reading intervalNot published for households; prepaid meters do not transmit readings
Prepaid STS metersAbout 2.3 million (2.2 million updated by the November 2024 key-change deadline, 95.5% of the total)
Token format20-digit STS token, keyed into the customer interface unit
Prepaid brand“UEDCL Light” since April 2025 (formerly Umeme “Yaka”)
Large power usersAutomated meter reading; customers can view consumption and load profiles online
Net-metering meterBidirectional, two-way communicating, time-of-use capable, paid for by the prosumer
Meter verificationUganda National Bureau of Standards (Weights and Measures (Electricity Meters) Rules 2015)
Local manufacturingHenley Energy meter factory, Kawempe (opened July 2025), 600,000–700,000 single-phase meters a year

Prepaid metering is the norm for Ugandan households and has been since Umeme introduced Yaka meters. The meters use the Standard Transfer Specification: they are not networked, and the only communication is the token that the customer enters. That gives the distributor payment in advance but almost no household consumption data, as the global STS key change of 2024 illustrated, when every meter had to be updated by hand with codes sent to customers.

Remote reading is used where revenue is concentrated: UEDCL’s automated meter reading system sends large power users’ billing data electronically. For new connections, about 270,000 prepaid meters were being tested and supplied in 2026 to UEDCL, WENRECO and KIS under the results-based financing arrangement of the Electricity Access Scale-up Project. There is no national data hub, data access code or consumer data portability scheme.

Renewable electricity.

Electricity generation mix (2024).

  • Hydro: 88.1%
  • Bagasse: 9%
  • Solar: 1.8%
  • Thermal: 1%
  • Other (biomass): 0.2%
Source 7
Renewable electricity share
99% (2024)Source 7Derived from ERA generation data: 6,788.5 GWh generated, of which thermal plants produced 65.1 GWh (1.0%). ERA’s 2025 breakdown (hydro 89%, bagasse 8%, solar 2%, thermal 1%) gives the same result.
Home solar
Not identified from a reliable public source.
Solar added each year
20 MW (2026 (to September))Source 8The 20 MW Ituka solar plant; no utility solar capacity was added in 2025.
Large hydro
1,500.2 MW (September 2026)Source 8Karuma 600 MW, Bujagali 250 MW, Kiira 200 MW, Isimba 183 MW, Nalubaale 180 MW, Achwa 1 and 2 (87.2 MW).
Small hydro
221.5 MW (September 2026)Source 8Including 0.6 MW off-grid.
Bagasse cogeneration
188.2 MW (September 2026)Source 8Sugar factories supplying own use and the grid (Kakira 51.1 MW, SCOUL 26 MW, Mayuge 23 MW and others).
Solar PV
108.3 MW (September 2026)Source 8
Thermal
100 MW (September 2026)Source 8Jacobsen Namanve 50 MW, Electromax Tororo 42 MW and Electromax Arua 8 MW (off-grid).

Targets.

  • Energy Transition Plan (launched at COP28, December 2023): 52 GW of capacity by 2040 and net zero emissions from the energy sector by 2065.
  • Fourth National Development Plan (2025/26–2029/30): electricity access from 53.4% to 70% by 2030, clean cooking access from 25% to 50%, and consumption per person from 218 kWh to 1,090 kWh.
  • Electricity Access Scale-up Project: about 1.5 million household connections in five years from 2024.

Uganda’s electricity has been overwhelmingly renewable for decades because of the Nile. Capacity grew 54% between 2021 and 2025, mainly with the 600 MW Karuma and 183 MW Isimba stations, and generation rose 18% in 2025 to 8,021.8 GWh. Hydro supplied about 89% of generation in 2025, bagasse 8%, solar 2% and thermal 1%. Because hydro is so dominant, rainfall and Lake Victoria’s outflow matter more to supply security than fuel prices.

Grid-connected solar has grown slowly, from a handful of 10–20 MW plants built under the feed-in tariff and the GET FiT programme. ERA cut the REFiT for solar to US 5.1 cents/kWh in Phase VI and in 2025 concluded that the grid could absorb no more variable renewables without studies, rejecting about US$230 million of proposed solar projects, including a 100 MW plant with 250 MWh of batteries at Nakaseke, and pausing new licences.

The largest renewable growth is off-grid. Solar home systems light more Ugandan homes than the grid, and mini-grids and productive-use solar systems are expanding under government and donor programmes.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Storage on Uganda’s grid is at the planning stage. There is no storage licence category or tariff, and the large hydro reservoirs provide most of the system’s flexibility. The regulator’s October 2025 notice signals that future solar and wind projects are more likely to be approved if they include storage or are hybrids, which makes batteries a condition for further variable renewable growth rather than a separate market.

Behind the meter, batteries are widespread in off-grid solar home systems and in backup systems used by businesses, but they are not counted in official statistics.

Storage projects.

  • BESS pilot project (UNDP, Italy, CESI): A stakeholder workshop on 19 May 2026 began shaping Uganda’s first battery energy storage pilot, supported by UNDP and Italy’s Ministry of Environment and Energy Security; the tender is planned for the first quarter of 2027.
  • Nakaseke solar and storage (100 MWp / 250 MWh, not licensed): Authorised by a government policy direction in August 2025 but among the projects ERA declined in September 2025 because the variable renewable ceiling had been reached.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Uganda Electricity Distribution Company Limited (UEDCL)About 97% of grid customers; 2.75 million grid customers nationally in December 2025NoLimitedNoLimited
West Nile Rural Electrification Company (WENRECO)West Nile regionNoNoNoUnknown

Distribution and retail supply are combined in Uganda, so a household’s supplier is simply the distributor in its area. UEDCL took over Umeme’s customers, staff, service centres and assets on 1 April 2025 after the government paid a buy-out of about US$118 million; at the end of 2024 Umeme had served 89% of domestic grid customers and UEDCL’s own rural territories about 10%. Kalangala Infrastructure Services supplies the Kalangala islands and licensed mini-grid companies serve isolated villages.

There is no retail competition and no green or time-of-use tariff for households.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy and Mineral Development (MEMD)GovernmentEnergy policy and rural electrificationSets energy policy and the Energy Transition Plan, and runs rural electrification and the Electricity Access Scale-up Project.
Electricity Regulatory Authority (ERA)RegulatorElectricity regulatorLicenses all electricity activities, sets quarterly tariffs, issues installation permits and publishes sector statistics.
Uganda Electricity Transmission Company Limited (UETCL)TransmissionTransmission owner, system operator and bulk supplierBuys all grid generation, dispatches the system and trades across borders.
Uganda Electricity Distribution Company Limited (UEDCL)DistributionNational distributor and supplierConnects customers, owns meters, sells prepaid tokens and processes net-metering applications.
Uganda Electricity Generation Company Limited (UEGCL)Renewable EnergyState-owned generatorOperates Karuma, Isimba, Nalubaale and Kiira hydro stations and the Namanve thermal plant, the core of national supply.
Electricity Disputes TribunalConsumerSector disputes tribunalHears disputes between consumers, licensees and sector players, with the powers of the High Court.
Uganda National Bureau of Standards (UNBS)MeteringNational standards bodyVerifies electricity meters and publishes Uganda Standards for solar modules and off-grid products.
Uganda Solar Energy Association (USEA)SolarSolar industry associationRepresents solar companies and works with UNBS on product quality standards.
Eastern Africa Power Pool (EAPP)MarketRegional power poolCoordinates cross-border trade with Kenya, Tanzania, Rwanda and other members.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionElectricity (Primary Grid Code) Regulations 2003ERANet-metered systems must be designed and installed to the Primary Grid Code, and power quality must stay within its limits.
Net meteringElectricity (Net Metering) Regulations 2024, S.I. No. 14 of 2024ERACapacity limits, interconnection studies, parallel operation, disconnect switches and metering for prosumers below 0.5 MW.
Anti-islandingNet Metering Regulations 2024, reg. 7(4)–(5): lockable manual disconnect, waived for automatic shutdown on loss of gridERAThe waiver requires the system to be warranted by the manufacturer to disconnect and to be inspected and tested by the distributor.
MeteringWeights and Measures (Electricity Meters) Rules 2015; Electricity (Code of Quality of Service) Regulations 2020Government of Uganda / ERA; verification by UNBSApply to all net meters; prepaid meters follow the STS standard.
PV modulesUS IEC 61215-1:2016UNBS (adopting IEC)Design qualification and type approval of terrestrial PV modules.
Installer accreditationElectricity (Installation Permits) Regulations 2025 – permit classes A, B, C, C1, C2, D and company classesERA Installation Permits CommitteeOnly permit holders may carry out electrical installation work, including solar installations.
Prepaid meteringIEC 62055-41 Standard Transfer Specification (STS)IEC / STS AssociationDefines meter numbers and the 20-digit token system.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Generation licenceLimitedNationalRequired from 0.5 MW; smaller plants are registered with ERA. New grid-connected solar and wind licences are paused.
Net-metering agreement (to export)YesNationalNotice to UEDCL, feasibility study, application, decision within 60 days and an agreement sent to ERA for no-objection.
Licensed electricianYesNationalInstallation work must be done by a holder of an ERA installation permit; new connections need a digital wiring certificate.
New grid connectionYesNationalOnline application to UEDCL, inspection fee (UGX 23,600 for domestic customers) and connection charge. No-pole and one-pole single-phase connections are free under the Electricity Connections Policy; others can be financed or self-financed.
Planning or building approval for rooftop solarUnknownLocalBuilding control is a local government function; no national rule specific to rooftop solar was identified.

For a household, the practical permissions are a permitted electrician and, if the system will export, a net-metering agreement with UEDCL. A self-consumption system below 0.5 MW needs no generation licence.

Utility-scale projects face a longer process: an ERA notice of intended application, public consultation, a permit for studies, an environmental assessment, a licence and a power purchase agreement with UETCL. For solar and wind, that route is currently closed to new grid-connected projects pending the grid stability study.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net meteringActiveNet meteringRenewable systems below 0.5 MW, capped at the customer’s maximum demand, earn kWh credits for 80% of exported energy, carried forward indefinitely. Aggregate cap of 5% of system peak demand.Regulations gazetted 2 April 2024
Free connections (Electricity Access Scale-up Project)ActiveConnection subsidyNo-pole and one-pole single-phase connections are free; a hybrid-financed no-pole connection costs UGX 470,000. The World Bank-funded project (US$608 million) had delivered 235,906 connections, 420,000 off-grid solar systems and 3,981 productive-use solar systems by June 2026.From 2024 (five years)
Lifeline tariffActiveSocial tariffFirst 15 kWh a month at UGX 250/kWh for domestic customers averaging no more than 100 kWh a month over six months.—
Cooking tariffActiveTariff discountUGX 412/kWh for domestic units 81–150 in a month, against a standard rate of UGX 779.4 (Q3 2026).—
Renewable Energy Feed-in Tariff (REFiT) Phase VIActiveFeed-in tariffStandardised tariffs for renewable plants up to 50 MW selling to the grid; US 5.1 cents/kWh for solar PV. New solar and wind licences are currently paused.From January 2024
Energy rebate frameworkActiveConnection cost refundIndustrial customers above 500 kVA that build at least 500 m of network able to connect 10 further customers within a year are reimbursed through offsets against their energy bills.—

Data and connectivity.

Fixed broadband
19.7 million mobile internet subscriptions (June 2026)Source 50Uganda Communications Commission Q2 2026 data (49 million mobile subscriptions in total). No current fixed broadband figure was identified; the census found 16.6% of people in urban areas and 4.3% in rural areas used the internet.
4G coverage
93.3 % population coverage (MTN network) (June 2026)Source 51Coverage of the largest operator’s network; no national multi-operator figure was identified.
5G coverage
25.6 % population coverage (MTN network) (June 2026)Source 51

Mobile money is the backbone of the electricity customer relationship: prepaid tokens are bought through MTN and Airtel menus and delivered by SMS, and bills can be queried by text message. Mobile networks, rather than fixed broadband, are therefore the realistic communications channel for meters, inverters and battery monitoring.

Internet use is still low. The World Bank estimates 8.9% of the population used the internet in 2024, although mobile internet subscriptions grew 10% in the second quarter of 2026 alone, to 19.7 million.

Grid conditions.

National peak demand
1.345 GW (December 2025)Source 14Maximum demand including exports was 1,345.3 MW, up 20% on December 2024; demand within Uganda was 1,166.2 MW.
Annual electricity demand
8.02 TWh (2025)Source 10Energy generated by grid-connected plants (8,021.8 GWh), including electricity later exported. Distributors sold 5,430 GWh to customers.
Generation capacity
2.119 GW (September 2026)Source 8Total installed capacity registered by ERA (2,118.6 MW), including own-use and off-grid plants. Available firm capacity is lower, about 1,550 MW in early 2026 according to UETCL.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Since Karuma was completed Uganda has had more generation capacity than it can use at home: 2,119 MW installed against an in-country peak of about 1,166 MW in December 2025. The constraints are elsewhere: the reach and reliability of the distribution network, distribution losses of 18.1%, the capacity of the grid to absorb variable solar and wind, and limited cross-border transmission to export surplus hydro power.

Demand is growing fast, with peak demand including exports rising 20% in 2025, and ERA’s projections show the system needing far more capacity by 2040 if oil and gas, electric cooking and industrial demand grow as planned. Transmission works include the Uganda–Tanzania 220 kV interconnector, with construction expected in 2026/27 and operation in 2029, and the South Sudan interconnector.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
UEDCL takes over national distribution from UmemeCurrent1 April 2025End of Umeme’s 20-year concession. UEDCL now distributes and supplies almost all grid customers; Yaka prepaid tokens became “UEDCL Light”.
Pause on new grid-connected solar and wind licencesCurrent29 October 2025ERA Regulatory Notice No. 002 of 2025 cut the variable renewable ceiling from 250 MW to 200 MW and paused new licences and permits pending a grid stability study by the system operator. Hybrid and storage-integrated projects are prioritised; off-grid projects are unaffected.
Electricity (Installation Permits) Regulations 2025Current2025Updated permit classes and requirements for electrical installation work, including solar.
Quarterly tariff increaseCurrent1 July 2026Domestic standard rate rose from UGX 756.2 to 779.4/kWh after five unchanged quarters. ERA published the October–December 2026 schedule on 1 October 2026.
Net Metering GuidelinesUpcomingDraft consulted August 2025; adoption not confirmedOperational guidelines for the Net Metering Regulations 2024, prepared by ERA with the Ministry and UEDCL.
Grid stability study and new variable renewable thresholdsUpcomingPendingResults will set new limits for solar and wind and guidance on storage and hybrid projects.
Uganda–Tanzania 220 kV interconnectorUpcoming2029Construction expected to start in 2026/27 with commercial operation targeted for 2029.
First battery storage pilot tenderUpcomingQ1 2027UNDP-supported pilot battery energy storage project.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMedium28.1% of households (3.0 million) used solar as their main lighting source in the 2024 census, mostly off-grid; grid-tied rooftop export under net metering is new and capped at the customer’s own demand.
Distributed energy marketMediumMore households rely on off-grid solar than on the grid, 420,000 off-grid solar systems were delivered under the access project by June 2026, and 188 MW of bagasse cogeneration operates at sugar factories (ERA, UBOS).
Grid flexibility marketLowNo flexibility, ancillary services or demand-response market and no aggregation framework; balancing is done centrally by UETCL with hydro.
Energy storage adoptionLowNo grid-scale battery in operation; first pilot tender planned for 2027 and the only large proposal (250 MWh at Nakaseke) was not licensed.
Renewable growth environmentMediumInstalled capacity grew 54% between 2021 and 2025 (mainly hydro) and generation 18% in 2025, but new grid-connected solar and wind licences are paused.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 51 sources
  1. National Population and Housing Census 2024 – Final Report, Volume 1 (Main). Uganda Bureau of Statistics, 2024. accessed 1 October 2026.
  2. Schedule of end-user electricity tariffs to be charged by UEDCL for the third quarter (July to September) of 2026. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  3. Electricity retail tariffs for the third quarter (July to September) of 2026. Uganda Electricity Distribution Company Limited, 2026. accessed 1 October 2026.
  4. Tariff schedules (quarterly end-user tariff schedules, 2023–2026). Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  5. Understanding your electricity bill: how power tariffs for domestic consumers work. UG Business, 2025. accessed 1 October 2026.
  6. ECB euro reference exchange rate: US dollar (USD). European Central Bank, 2026. accessed 1 October 2026.
  7. Electricity Supply Industry Performance Report for the Year 2024. Electricity Regulatory Authority, 2025. accessed 1 October 2026.
  8. Installed generation capacity as at September 2026 (spreadsheet). Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  9. Installed capacity. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  10. Energy generated to the national grid. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  11. Customer growth. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  12. Energy sales by customer category. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  13. Energy purchases, sales and losses. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  14. Maximum demand. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  15. Distribution network length. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  16. Transmission network length. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  17. Transmission energy purchases and sales. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  18. Uganda’s electricity sector overview. Electricity Regulatory Authority, 2026. accessed 1 October 2026.
  19. Licensing procedure. Electricity Regulatory Authority. accessed 1 October 2026.
  20. Feed-in tariff (REFiT Phase VI). Electricity Regulatory Authority. accessed 1 October 2026.
  21. About installation permits. Electricity Regulatory Authority. accessed 1 October 2026.
  22. Installation permit fees. Electricity Regulatory Authority. accessed 1 October 2026.
  23. Notice on grid absorption capacity and interim licensing measures for solar and wind projects. Electricity Regulatory Authority, 2025. accessed 1 October 2026.
  24. The Electricity (Net Metering) Regulations, 2024 (S.I. No. 14 of 2024). Uganda Gazette, via Electricity Regulatory Authority, 2024. accessed 1 October 2026.
  25. Uganda progresses with net metering guidelines. GET.transform, 2025. accessed 1 October 2026.
  26. Customer Information Booklet 2026. Uganda Electricity Distribution Company Limited, 2026. accessed 1 October 2026.
  27. 2.2m customers have upgraded Yaka metres, says minister. Daily Monitor, 2024. accessed 1 October 2026.
  28. How UEDCL Light tokens work (formerly Umeme’s Yaka system explained). Nymynet, 2025. accessed 1 October 2026.
  29. 10 key things you should know about the UEDCL takeover from Umeme. Business Times Uganda, 2025. accessed 1 October 2026.
  30. What is a meter number?. STS Association. accessed 1 October 2026.
  31. Regulatory update – Ugandan Electricity Act. ENS, via Mondaq, 2025. accessed 1 October 2026.
  32. Distributed energy resources regulation market highlight: Uganda. CrossBoundary Energy. accessed 1 October 2026.
  33. Queries as ERA halts Shs790b solar projects. Daily Monitor, 2025. accessed 1 October 2026.
  34. Kenya targets more Ugandan electricity in 2027. Daily Monitor, 2026. accessed 1 October 2026.
  35. Rural Electrification Agency merger left Ministry Shs570 billion debt. Parliament of the Republic of Uganda, 2026. accessed 1 October 2026.
  36. Over 270,000 meters undergo testing as govt pushes 1 million new electricity connections. Daily Monitor, 2026. accessed 1 October 2026.
  37. Govt unveils Shs54b smart meter electricity factory. Daily Monitor, 2025. accessed 1 October 2026.
  38. CESI drives energy innovation in Uganda. CESI, 2026. accessed 1 October 2026.
  39. Uganda approves 250 MWh co-located BESS project led by Energy America-owned subsidiary. ESS News, 2025. accessed 1 October 2026.
  40. UETCL targets 2029 commissioning of 220 kV Uganda–Tanzania interconnection. Global Transmission Report, 2026. accessed 1 October 2026.
  41. Uganda launches energy transition plan at COP28. Eagle Online, 2023. accessed 1 October 2026.
  42. Karuma dam pushes UEGCL revenue gains up by 40 per cent. Daily Monitor, 2025. accessed 1 October 2026.
  43. Eskom Uganda hands over Nalubaale and Kiira power plants to Gov’t. Eagle Online, 2023. accessed 1 October 2026.
  44. Patterns, purchases and policy: understanding domestic electricity use in rural and peri-urban Uganda. Quantitative Social Science and Evaluation Lab, Columbia University, 2025. accessed 1 October 2026.
  45. US IEC 61215-1:2016 Terrestrial photovoltaic (PV) modules. Tradebarriers.org (notification of Uganda National Bureau of Standards), 2016. accessed 1 October 2026.
  46. Urban population (% of total population) – Uganda (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 1 October 2026.
  47. Access to electricity (% of population) – Uganda (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 1 October 2026.
  48. Electric power consumption (kWh per capita) – Uganda (EG.USE.ELEC.KH.PC). World Bank, 2023. accessed 1 October 2026.
  49. Individuals using the Internet (% of population) – Uganda (IT.NET.USER.ZS). World Bank, 2024. accessed 1 October 2026.
  50. Uganda’s mobile internet growth outpaces voice as TikTok overtakes WhatsApp. PC Tech Magazine (reporting Uganda Communications Commission data), 2026. accessed 1 October 2026.
  51. MTN Uganda profits rise as subscriber base grows. TimesLIVE, 2026. accessed 1 October 2026.

Questions about energy in Uganda.

Talk to us about Olmack in Uganda.Tell us about your home, housing portfolio or school estate in Uganda. We'll explain what is possible there now.