Countries

Energy in Kuwait, explained.

How electricity works in Kuwait: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Kuwait: Not yet available.Olmack is not offered in Kuwait yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Kuwait.

Kuwait electricity 2026: MEW monopoly, 2–5 fils/kWh tariffs, 17.5 GW peak, oil and gas generation, Shagaya solar tenders, smart meters, GCC grid and licensing.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Kuwaiti dinar (1 KWD = 1,000 fils) (KWD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Kuwait energy at a glance.

Key figures for households in Kuwait. Each one links to its source on the full overview below.

  • Electricity price.

    0.005 KWD per kWh for households, including taxes. Figures for 2017–2026.

  • Renewable share.

    0.2% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? No. Details are in the export section below.

Before you start

Four things to check in Kuwait.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Kuwait below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Kuwait requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Kuwait.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Kuwait, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Kuwait, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Kuwait.

Full overview

The energy market in Kuwait, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page21 sections

Kuwait's electricity system is run almost entirely by one government department. The Ministry of Electricity, Water and Renewable Energy (MEW) owns and operates most of the country's power and desalination stations, the transmission and distribution networks, and is the only retail supplier, billing every home and business for electricity and water. There is no separate energy regulator, no competitive retail market and no wholesale exchange. New large plants are procured as public–private partnerships through the Kuwait Authority for Partnership Projects (KAPP), with MEW as the sole buyer.

Household electricity is among the cheapest in the world. Under the tariff law approved in 2016, Kuwaiti citizens continue to pay the historic 2 fils/kWh for one home, while apartments rented by expatriates (the "investment" sector) were moved to a higher tariff from August 2017, reported at 5 fils/kWh, with 10 and 15 fils blocks for heavy use. At the Central Bank of Kuwait rate of 8 October 2026 even the 5 fils rate is under EUR 0.015/kWh.

Generation is almost all oil- and gas-fired: renewables supplied about 0.2% of the 88 TWh generated in 2023. Installed capacity was 19.4 GW in mid-2025 against a summer peak of 17.5 GW, and the system is stretched in the hottest months, when air conditioning dominates demand. The government targets 15% renewable electricity by 2030 and is tendering the first large Al Dibdibah–Shagaya solar plants alongside new gas-fired capacity at Az-Zour North. There is no scheme yet that lets households export rooftop solar to the grid.

Energy snapshot.

Headline figures for electricity in Kuwait. Each shows its data year and links to its source.

  • Population4,881,254 peopleSource 191 Jan 2025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (KWD)0.005 KWD/kWhSource 82017–2026
  • Household price (EUR)0.015 EUR/kWhSource 232026
  • Renewable electricity share0.2%Source 12023
  • Solar capacity0.102 GWSource 12024
  • Wind capacity0.012 GWSource 12024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter share45%Source 15Jan 2026
Market structure
Vertically integrated
Homes can export to the grid
No
Home equipment in grid services
No
Regulator
No independent regulator; MEW sets technical rules and applies tariffs fixed by law
System operator
Ministry of Electricity, Water and Renewable Energy (MEW)
Distribution networks
Single national distribution network owned and operated by MEW; no regional DSOs
Currency
Kuwaiti dinar (1 KWD = 1,000 fils) (KWD)
Voltage and frequency
240 V / 50 Hz

Electricity prices in Kuwait.

Household price (KWD)
0.005 KWD/kWh (2017–2026)Source 8Investment-sector (rented apartment) tariff applied from 22 August 2017, as reported by Kuwait Times. The 2016 law set 5 fils for the first 1,000 kWh a month, 10 fils for 1,000–2,000 kWh and 15 fils above 2,000 kWh for expatriate apartments. Kuwaiti citizens pay the old rate of 2 fils/kWh (KWD 0.002) for one home.
Household price (EUR)
0.015 EUR/kWh (2026)Source 23Converted from KWD 0.005/kWh at the Central Bank of Kuwait rate of 8 October 2026 (EUR 1 = 345.251 fils, i.e. KWD 0.345251). The 2 fils citizen rate equals about EUR 0.0058/kWh.
Typical annual electricity bill
Not identified from a reliable public source.

Electricity prices in Kuwait are set by law, not by a regulator or a market. MEW bills consumption per kilowatt-hour on a single combined electricity and water account for each premises. For more than 50 years, until 2016, all users paid 2 fils/kWh.

The 2016 reform

In April 2016 the National Assembly approved a law raising electricity and water charges for apartment buildings occupied by expatriates, commercial and industrial users, agriculture and government offices, phased in between 12 and 21 months after publication. Citizens were exempted for one home, which is why the households most Kuwaitis live in still pay 2 fils/kWh. The investment-sector tariff took effect on 22 August 2017 and the government-sector tariff on 22 November 2017. In August 2023 the government said there would be no return to the old prices for the sectors that had been moved.

What this means for bills

Even at 5 fils/kWh, a flat using 1,000 kWh a month pays KWD 5, or roughly EUR 14 at the October 2026 exchange rate. Because the tariff is far below the cost of oil- and gas-fired generation, the state carries most of the cost of supply, and the low price weakens the incentive for households to save energy or invest in rooftop solar. MEW relies on awareness campaigns, appliance and air-conditioning codes and, from 2026, smart-meter data to encourage efficiency.

Because the tariff depends on who occupies the property rather than on a competitive offer, there are no regional price differences and no supplier switching.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesKuwaiti citizens: 2 fils/kWh for one home (villa or apartment). A citizen who owns more than one home pays the newer tariffs on the others.
RegulatedYesInvestment sector (apartments occupied by expatriates): introduced on 22 August 2017 and reported at 5 fils/kWh. The 2016 law provides 5 fils for 0–1,000 kWh a month, 10 fils for 1,000–2,000 kWh and 15 fils above 2,000 kWh.
RegulatedYesCommercial premises: 25 fils/kWh flat under the 2016 law, applied from 2017. Government buildings moved from 2 to 25 fils/kWh on 22 November 2017.
Time-of-useNoNo time-of-use, dynamic or off-peak tariff is offered to households.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
16,626 kWh/person/yr (2024)Source 21World Bank indicator of electric power consumption per capita, all sectors.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Kuwait has one of the highest electricity uses per person in the world, about 16,600 kWh a year across all sectors. Most of it goes on cooling: summer temperatures above 45 °C, large detached family homes and very low tariffs mean air-conditioning runs most of the year.

Kuwait's 2019 National Communication to the UN climate convention, as reported by Kuwait Times, put residential buildings at around 64% of electricity consumption, and air conditioning at nearly 70% of national peak demand. A 2025 modelling study found that air conditioning accounts for around 67% of residential electricity use and 72% of household peak demand, and projected cooling demand to grow by about 2.9% a year to 2040.

This makes demand strongly seasonal. On 5 June 2025 the minimum system load was about 9.4 GW, while the peak eleven days later reached 17.5 GW.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
100 % of population (2025)Source 20

Kuwait is effectively a city-state: the World Bank classes 100% of its population as urban. Housing splits along nationality lines. The tariff law distinguishes citizens’ homes, typically villas in private-housing areas, from "investment" apartment buildings rented mainly by the expatriate majority. A current official breakdown of dwellings by type and tenure was not identified.

This split shapes the electricity system. The tariff law treats private housing and investment buildings differently, villa roofs are the main space for any future household solar, and tenants in apartment blocks have little control over the building or its supply.

How the grid works in Kuwait.

  1. TransmissionMEW (national control), GCC Interconnection Authority (GCCIA)
  2. DistributionSingle national distribution network owned and operated by MEW; no regional DSOs
  3. MeteringNot identified from a reliable public source.
  4. Supply1 or more retail suppliers

Kuwait's power system is a single state-run chain. MEW's stations burn natural gas, crude oil, heavy fuel oil and gas oil; in June 2025 alone they consumed about 58.1 million MSCF (thousand standard cubic feet) of natural gas, 3.4 million barrels of heavy oil, 0.8 million barrels of crude oil and 68,000 barrels of gas oil. Power flows through MEW's transmission and distribution networks to customers, and MEW bills them directly.

Installed capacity on 30 June 2025 was 19,377 MW: 8,290 MW of steam units, 7,910 MW of gas turbines, 3,107 MW of combined-cycle units and 70 MW at the Shagaya renewable park. Available capacity on the 2025 peak day was 16,750 MW, below the 17,520 MW peak recorded after GCC exchanges, and MEW reports peak load both before and after those exchanges.

Stress on the system

Summer peaks have hovered around 17.5–17.6 GW for three years: 17,640 MW in 2024, 17,610 MW in 2025 and 17,540 MW in 2026, with MEW crediting energy conservation for keeping the peak down despite new loads. In March 2026 seven overhead transmission lines were knocked out by falling debris from air-defence interceptions during the regional conflict, causing partial outages.

Relief is expected from the Az-Zour North 2 and 3 plant (about 2,700 MW plus desalination), for which the power and water purchase agreement was due to be signed in February 2026 with a three-year build, and from the first large solar plants at Al Dibdibah–Shagaya.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Electricity, Water and Renewable Energy (MEW)Owns and operates most generation and desalination plants, the transmission and distribution networks and all metering, and is the sole supplier and buyer of electricity.
System operatorMEW (national control)Dispatches the stations at Shuwaikh, Shuaiba, Doha East and West, Az-Zour South and North, Sabiya and the Shagaya renewable park, and manages exchanges with the GCC grid. MEW's statistics department publishes daily loads, capacity and generation.
DSOMEWBuilds and operates the distribution network and handles new connections, meter installation and removal, and faults (hotline 152).
SupplierMEWBills electricity and water on one account per premises, with payment through the MEW portal, KNET and the government Sahel app.
MinistryKuwait Authority for Partnership Projects (KAPP)Procures independent water and power plants and large solar plants as public–private partnerships under Law 116/2014 and Law 39/2010, with MEW as offtaker.
TSOGCC Interconnection Authority (GCCIA)Owns the 400 kV regional grid linking the six GCC states. Kuwait connects at the Al Wafrah (400 kV) and Al-Zour (275 kV) substations; Al Wafrah is also the connection point for the link to Iraq.

Compared with the UK system.

Compared with the UK system.
UK conceptKuwait equivalentHow it works
DNOMEWThere are no regional distribution companies. MEW owns every substation and cable down to the customer and handles connections and faults itself.
National Grid/NESOMEW national controlTransmission ownership, system operation, planning and most generation all sit inside the same ministry. External links to the GCC grid are owned by GCCIA, a regional company.
MPANMEW electricity account / meter registrationEach premises ("facility") has an MEW electricity and water account to which its meters are registered. The account is used for bills, payments and service requests. MEW does not publish a standard format, and it is an internal utility reference, not a national metering identifier.
MPRNNone (water meter on the same MEW account)There is no residential mains gas network. The second meter on an MEW account is normally the water meter, billed alongside electricity.
Meter operatorMEWMEW supplies, installs, registers and removes all electricity and water meters and charges the customer for meter installation. There is no competitive metering market.
SupplierMEWCustomers cannot choose a supplier. The price depends on the category of premises and, for homes, on whether the occupant is a Kuwaiti citizen.
Smart-meter infrastructureMEW smart-meter projectThere is no separate data company like the DCC. MEW is replacing meters with smart meters that send readings directly to the ministry, with real-time data for customers through apps or in-home displays; the project was about 45% complete in January 2026.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?MEW electricity account (facility account)
Who issues it?Ministry of Electricity, Water and Renewable Energy (MEW)
FormatUtility account reference attached to a premises (facility) and its registered electricity and water meters. MEW does not publish the structure.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the MEW bill, together with the meter reading, units consumed, tariff and any balance carried forward, and in the MEW online services and the Sahel app.
Electronic accessCustomers can look up and pay bills for one facility or all their facilities through the MEW portal, the MEW quick-payment site and the government Sahel app, and request instalments or update customer data online.
Third-party accessNo published framework for third parties (suppliers, aggregators, installers) to access meter or consumption data.
Who keeps the registerMEW customer and meter registration system (new-customer meter registration, addition and removal of meters).
Register scopeNational

Kuwait has no standardised national metering point number comparable to an MPAN or an EAN code. Because MEW is the only network operator and supplier, it identifies supply internally: each premises is set up as a facility with an MEW account, and electricity and water meters are registered to it through the "meter registration (new customer)" and "addition/removal of meters" services.

A new connection is requested from MEW, which charges supply, deposit and meter installation fees set out in its published price lists, and the account is opened in the name of the property holder or tenant. When a tenant changes, the account details are updated with MEW rather than switched between suppliers.

MEW does not publish the length or structure of its account or meter numbers, so no example format is given here. In practice the bill, the MEW portal and the Sahel app are the places where a customer finds the reference needed for payments, complaints and service requests.

With the smart-meter rollout, readings are sent directly to MEW instead of being estimated or read on site, but the meter data stays within MEW; there is no central data hub open to other market participants because there are none.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?No
Net meteringNo
Net billingNo
How exported electricity is paidNone for households. Utility-scale renewable plants sell all output to MEW under long-term purchase agreements procured by KAPP.
Can households sell excess solar power to MEW?No scheme is in force. Kuwait Times reported in June 2026 that the government is exploring policies to let homeowners install panels and sell surplus power to the state.
Have homes installed rooftop solar?Yes, on a pilot basis: a rooftop programme launched by the Kuwait Institute for Scientific Research (KISR) in 2015 installed systems on around 160 homes.
How do large renewable plants get paid?Through 30-year power purchase agreements with MEW as the buyer, as in the 500 MW Al Dibdibah–Shagaya Phase III Zone 2 tender.

Connecting a home system.

  1. No application route for exporting household solar power to the grid has been published by MEW.
  2. Utility-scale plants are procured by KAPP through prequalification and competitive bidding, then sign a purchase agreement with MEW.
  3. Plants are built at sites allocated by the state (for example the Shagaya Renewable Energy Park) and connected by MEW.

Kuwait does not have net metering, net billing or a feed-in tariff for small generators. With household tariffs of 2–5 fils/kWh, rooftop solar for self-consumption saves very little on a bill, and there is no published technical route for exporting to the MEW network.

Distributed solar so far consists of pilots and public buildings: the KISR rooftop programme, and solar installations at cooperative society car parks in Adailiya and Zahra designed to meet about 10% of each cooperative’s electricity demand.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (utility scale)Only through a state procurement: a public–private partnership tendered by KAPP or a project under Law 39/2010, with a purchase agreement signed with MEW. No open licensing regime for merchant generators.KAPP / MEWLaw 39/2010 provides for Kuwaiti shareholding companies to build and operate power and desalination plants; Law 116/2014 is the general PPP law.
Generate for own use (rooftop solar)No published licensing or connection scheme for household generation; any connection to the MEW network requires MEW approval.MEWPilot systems were installed under a KISR programme.
Store electricityNo specific framework for battery storage.MEWBehind-the-meter batteries are not regulated separately.
Export to the gridNot available to households.MEWUtility-scale plants export under PPAs.
Supply / sell electricity to customersReserved to MEW; no supply licence exists.MEWTariffs are set by law.
Aggregate, trade, wholesale, balancing, VPPNot possible: there is no wholesale, balancing or flexibility market.MEWRegional trading takes place between national utilities through GCCIA.
Remote control of customer assetsNo framework for third-party demand response or remote control.MEWMEW runs public conservation campaigns instead.
Electrical design and installation workMEW accreditation of electrical engineers, engineering offices and air-conditioning companies.MEWMEW publishes accreditation requirements and a list of approved companies on its investor portal.

Kuwait has no electricity licensing regime in the European sense, because there is no independent regulator and no market to license entry into. Private capital enters the sector only through state-run procurements: KAPP tenders the project, a project company is formed, and MEW buys the output under a long-term agreement.

Below that level, the main permissions are technical. Engineers and contractors who design or install electrical and air-conditioning systems must be accredited by MEW, and connections, meters and changes to a supply are handled through MEW services.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale / balancing marketNo—NoMEW. MEW dispatches its own stations and contracted plants centrally; there is no market in which distributed assets could bid.
GCC regional exchangesNo—NoGCCIA. Power exchanges and reserve sharing take place between national utilities over the GCCIA grid, not with individual customers.

There is no route for households or businesses to sell flexibility in Kuwait. Peak management relies on MEW’s own reserve, GCC imports, public appeals to save energy at peak times and, when needed, planned cuts. Smart meters will give MEW better data on consumption, but no demand-response product has been announced.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutNational smart electricity meter replacement by MEW, about 45% complete in January 2026, targeted for completion by end-2026
Reading intervalNot published
Responsible bodyMEW (customer service sector)
ProgressAbout 45% of the project completed (Jan 2026)
TargetCompletion by the end of 2026
Customer featuresReal-time consumption through mobile apps or in-home displays; no estimated readings

MEW is replacing electricity meters across the country with smart meters that record actual consumption and transmit it directly to the ministry, ending estimated bills. MEW said in January 2026 that about 45% of the project had been completed and that it aimed to finish by the end of 2026, and that households would be able to follow their use in real time and could cut bills by up to 10%.

Because MEW is both network operator and supplier, it owns the meters, the communications and the data.

Renewable electricity.

Electricity generation mix (2023).

  • Fossil (natural gas and oil): 99.8%
  • Solar: 0.1%
  • Wind: 0.1%
Source 1
Renewable electricity share
0.2% (2023)Source 1Derived arithmetically from IRENA: 114 GWh solar plus 57 GWh wind out of 88,017 GWh total generation in 2023 (0.19%). The Ember dataset republished by Our World in Data attributes a larger wind output to Kuwait, which is inconsistent with the 12 MW of wind capacity reported by IRENA and MEW.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Solar (PV and CSP)
0.102 GW (2024)Source 1
Wind
0.012 GW (2024)Source 1
Fossil fuels
20.2 GW (2024)Source 1

Targets.

  • 15% of electricity from renewable sources by 2030
  • Shagaya Renewable Energy Park planned at 4,500 MW
  • Carbon neutrality pledge for 2060

Kuwait generates almost all of its electricity from oil and gas. IRENA puts renewable output at 171 GWh out of 88,017 GWh in 2023. Data from Ember, republished by Our World in Data, show natural gas supplying about 62% and oil about 36% of generation in 2024, an unusually large role for oil in power generation.

The existing renewable capacity is mainly the first phase of the Shagaya Renewable Energy Park, developed with KISR: 50 MW of concentrated solar power and 20 MW of wind and PV units combined (five wind turbines and six PV units, as listed by MEW). Kuwait Times reported in 2026 that the pilot wind turbines produced 20% more than projected.

Al Dibdibah–Shagaya Phase III

The next step is the Al Dibdibah–Shagaya Phase III programme, tendered by KAPP with MEW and KISR. Zone 1 (1,100 MW) had a bid deadline of 15 January 2026 and Zone 2 (500 MW PV) of 16 February 2026, both as independent power projects with 30-year purchase agreements with MEW. The government expects these projects online around 2028–29.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

No grid-scale battery storage was identified in operation. Storage has not featured as a separate procurement in the published tenders, and there is no framework for behind-the-meter batteries to export or provide services.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Ministry of Electricity, Water and Renewable Energy (MEW)100% (sole supplier)NoNoNoNo

MEW is the only electricity supplier in Kuwait. It bills all categories of customer, from private homes to industry, under tariffs fixed by law, and collects payment through its own portal, KNET and the Sahel app.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Electricity, Water and Renewable Energy (MEW)GovernmentGeneration, grid, supply, metering and technical rulesRuns the whole electricity chain and publishes monthly and annual statistics.
Kuwait Authority for Partnership Projects (KAPP)GovernmentPPP procurement of power, water and solar plantsTenders Az-Zour North, Al Dibdibah–Shagaya and other IWPP/IPP projects.
Kuwait Institute for Scientific Research (KISR)Renewable EnergyRenewable energy research and Shagaya park developmentDeveloped the Shagaya pilot plants and the residential rooftop pilot.
GCC Interconnection Authority (GCCIA)TransmissionRegional 400 kV interconnectorConnects Kuwait with the other GCC grids and, via Al Wafrah, is building a link to southern Iraq.
Central Statistical Bureau (CSB)GovernmentNational statisticsPopulation estimates and household surveys.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Electrical installationsMEW regulations R-1 and S-1MEWPublished in MEW’s references and guidebooks library; MEW also issues specifications for cables, transformers, breakers and fuses.
Air conditioningMEW R-6 (2018) air-conditioning codeMEWEfficiency requirements for the largest end use.
Solar water heatingWater Heating Systems Code for BuildingsMEWBuilding code for water heating systems.
Installer accreditationMEW accreditation of electrical engineers and AC companiesMEWRequirements and application forms published on the MEW investor portal.
Grid connection of small generators / invertersNo published code identifiedMEWNo public grid-connection standard for rooftop PV inverters was found.

Permissions.

Permissions.
PermissionRequiredLevelDetail
New electricity connectionYesNationalRequested from MEW, which charges supply, deposit and meter installation fees.
Electrical design by accredited engineerYesNationalElectrical work is designed and certified by MEW-accredited engineers or offices.
Grid-connected rooftop solarLimitedNationalNo general scheme; pilots have been run with KISR and public bodies.
Large generation projectYesNationalThrough KAPP procurement and an MEW purchase agreement.

All electricity permissions run through national bodies. There is no separate municipal planning route specific to solar panels identified in published sources; the binding constraint is MEW’s approval for any connection to its network.

Data and connectivity.

Fixed broadband
1 fixed subscriptions per 100 people (2023)Source 22
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband penetration is very low, at about one subscription per 100 people in 2023 (World Bank), so home connectivity depends largely on mobile networks. MEW has not published which communications technology its smart meters use.

Grid conditions.

National peak demand
17.5 GW (2026)Source 1617,610 MW in 2025 and 17,640 MW in 2024. On 16 June 2025 MEW recorded 17,520 MW including GCC exchanges and 16,478 MW before them.
Annual electricity demand
Not identified from a reliable public source.
Generation capacity
19.4 GW (30 Jun 2025)Source 3Installed capacity; available capacity on the 2025 peak day was 16,750 MW.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The grid runs at its limit in summer. In 2026 MEW said that energy conservation helped keep the peak at 17,540 MW despite about 1,000 MW a year of new loads. A planned 400 kV double-circuit line of 295 km from GCCIA’s Al Wafrah substation to Al-Faw in southern Iraq is designed to supply about 500 MW to Iraq.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Tariff law for non-citizen housing, commercial and government usersCurrentIn force since 2017Investment apartments, commercial and government premises pay higher tariffs; citizens keep 2 fils/kWh for one home.
Smart electricity meter rollout completionUpcomingEnd of 2026MEW aims to finish replacing meters nationally, giving real-time consumption data.
Al Dibdibah–Shagaya Phase III solar (1,600 MW)UpcomingBids received 2026; operation expected around 2028–29Zone 1 (1,100 MW) and Zone 2 (500 MW) IPPs with 30-year PPAs with MEW.
Az-Zour North 2 and 3 IWPPUpcomingPPA due February 2026; about three years to buildAbout 2,700 MW of power and 120 million imperial gallons a day of desalination.
Household solar export policyUpcomingUnder studyThe government has said it is exploring allowing homeowners to sell surplus solar power to the state; no rules have been published.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionMediumLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo export or net-metering scheme; rooftop solar limited to a KISR pilot of around 160 homes.
Distributed energy marketLowGeneration is centralised in MEW and PPP plants; no framework for distributed generation or storage.
Grid flexibility marketLowNo wholesale, balancing or flexibility market; MEW dispatches centrally and only utilities trade over GCCIA.
Energy storage adoptionLowNo grid-scale battery storage identified and no storage framework.
Renewable growth environmentLowRenewables were about 0.2% of generation in 2023; 1.6 GW of solar is in procurement towards a 15% target for 2030.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 26 sources
  1. Energy Profile: Kuwait. IRENA, 2025. accessed 9 October 2026.
  2. Share of electricity production by source – Kuwait (Ember data). Our World in Data, 2024. accessed 9 October 2026.
  3. Monthly Statistics Book, June 2025. Ministry of Electricity, Water and Renewable Energy, 2025. accessed 9 October 2026.
  4. Customer services. Ministry of Electricity, Water and Renewable Energy. accessed 9 October 2026.
  5. References and guidebooks. Ministry of Electricity, Water and Renewable Energy. accessed 9 October 2026.
  6. MEWRE Investor Website – Statistics and accreditation. Ministry of Electricity, Water and Renewable Energy. accessed 9 October 2026.
  7. New tariffs to take effect after 15 months. Kuwait Times, 2016. accessed 9 October 2026.
  8. New electricity tariffs. Kuwait Times, 2017. accessed 9 October 2026.
  9. Govt vows no return to old energy prices. Kuwait Times, 2023. accessed 9 October 2026.
  10. Kuwait to raise power prices for first time in 50 years. Middle East Eye, 2016. accessed 9 October 2026.
  11. Kuwait MEW electricity and water bills 2026. Gulf Times Now, 2026. accessed 9 October 2026.
  12. Regional tensions renew focus on Kuwait's renewable energy push and power security. Kuwait Times, 2026. accessed 9 October 2026.
  13. Studies highlight the biggest drivers of Kuwait's electricity consumption. Kuwait Times, 2026. accessed 9 October 2026.
  14. Kuwait Launches Bidding For 500 MW Al Dibdibah–Shagaya Phase III Solar Project. SolarQuarter, 2025. accessed 9 October 2026.
  15. Kuwait to complete smart electricity meter installation nationwide. Arab Times, 2026. accessed 9 October 2026.
  16. Kuwait's summer power peak drops to 17,540 MW despite rising demand. Times Kuwait, 2026. accessed 9 October 2026.
  17. Al-Zour North Power plant project set to sign $1 billion deal Tuesday. Times Kuwait, 2026. accessed 9 October 2026.
  18. Kuwait says 7 overhead power lines out of service due to falling debris from interception operations. Anadolu Agency, 2026. accessed 9 October 2026.
  19. Population Estimates in Kuwait by Age, Nationality and Sex at 1-1-2025. Central Statistical Bureau, 2025. accessed 9 October 2026.
  20. Urban population (% of total population) – Kuwait. World Bank, 2025. accessed 9 October 2026.
  21. Electric power consumption (kWh per capita) – Kuwait. World Bank, 2024. accessed 9 October 2026.
  22. Fixed broadband subscriptions (per 100 people) – Kuwait. World Bank, 2023. accessed 9 October 2026.
  23. Exchange rates – EUR. Central Bank of Kuwait, 2026. accessed 9 October 2026.
  24. GCCIA existing network. GCC Interconnection Authority. accessed 9 October 2026.
  25. Projects under construction. GCC Interconnection Authority. accessed 9 October 2026.
  26. Legislation (Law 116/2014, Law 39/2010). Kuwait Authority for Partnership Projects. accessed 9 October 2026.

Questions about energy in Kuwait.

Talk to us about Olmack in Kuwait.Tell us about your home, housing portfolio or school estate in Kuwait. We'll explain what is possible there now.