Countries

Energy in Liberia, explained.

How electricity works in Liberia: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Liberia: Not yet available.Olmack is not offered in Liberia yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Liberia.

Liberia electricity market 2026: LEC tariffs in US dollars, LERC regulation, Mount Coffee hydro plus CLSG imports, new embedded-generation net billing and smart-meter pilot.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Liberian dollar (LRD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Liberia energy at a glance.

Key figures for households in Liberia. Each one links to its source on the full overview below.

  • Electricity price.

    0.22 USD per kWh for households, including taxes. Figures for 2026 (effective 1 January 2026).

  • Renewable share.

    53.6% of electricity from renewable sources. Figures for Q2 2026 (April–June).

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Liberia.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Liberia below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Liberia requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Liberia.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Liberia, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Liberia, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Liberia.

Full overview

The energy market in Liberia, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Grid electricity in Liberia is supplied by the Liberia Electricity Corporation (LEC), the state utility responsible for generation, transmission, distribution and retail. The sector has been regulated since the 2015 Electricity Law by the Liberia Electricity Regulatory Commission (LERC), which sets LEC’s tariffs, licenses other operators such as mini-grid “micro utilities”, and issues the technical codes. Outside the LEC grid, the Rural and Renewable Energy Agency (RREA) co-implements off-grid electrification, including solar home systems and mini-grid pilots.

The grid is small but growing quickly. In the second quarter of 2026 LEC put 172.6 GWh into its network and met a record peak of 123.5 MW. Supply comes from four sources: the Mount Coffee hydropower plant (back to its full 88 MW in May 2026), imports over the regional CLSG interconnector from Côte d’Ivoire and Guinea, the Bushrod thermal plant in Monrovia, and a 20 MWp solar plant at Mount Coffee commissioned in March 2026. Imports are the swing source: they supplied 56% of LEC’s energy in the dry first quarter of 2026 and 36.9% in the wetter second quarter.

Access remains low. The World Bank estimates that 34.9% of Liberians had electricity in 2024 — 55.5% in urban areas but only 9.2% in rural areas. Tariffs are set and paid in US dollars: from 1 January 2026 households pay US$0.22 per kWh plus a monthly fixed charge. In June 2026 new Embedded Generation Regulations gave customers a legal right to connect rooftop solar and other small generators and be credited for exports under net billing.

Energy snapshot.

Headline figures for electricity in Liberia. Each shows its data year and links to its source.

  • Population5,731,206 peopleSource 12025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (LRD)0.22 USD/kWhSource 32026 (effective 1 January 2026)
  • Household price (EUR)0.196 EUR/kWhSource 142026
  • Renewable electricity share53.6 % of grid supplySource 9Q2 2026 (April–June)
  • Solar capacity0.018 GWSource 92026
  • Wind capacity0 GWSource 22024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Liberia Electricity Regulatory Commission (LERC)
System operator
Liberia Electricity Corporation (LEC) — designated transmission system operator and national grid company
Distribution networks
LEC distributes and retails on the national grid; licensed micro utilities run isolated mini-grids elsewhere
Currency
Liberian dollar (LRD)
Voltage and frequency
50 Hz (nominal low-voltage level not verified from an accessible official source)

Electricity prices in Liberia.

Household price (LRD)
0.22 USD/kWh (2026 (effective 1 January 2026))Source 3LERC-approved energy charge for residential prepaid and postpaid LEC customers, plus a monthly fixed charge of US$2.00 (prepaid) or US$3.79 (postpaid). Tariffs are denominated in US dollars, not Liberian dollars. The decision does not state whether Goods and Services Tax is included; LEC’s published 2022 tariff page stated that its rates then included GST.
Household price (EUR)
0.196 EUR/kWh (2026)Source 14Converted from US$0.22/kWh at the ECB euro reference rate of US$1.1206 per euro on 9 October 2026. Energy charge only; excludes the monthly fixed charge.
Typical annual electricity bill
Not identified from a reliable public source.

Liberia’s electricity tariffs are set in US dollars. LERC’s decision of 12 December 2025 on LEC’s tariff application fixed new end-user tariffs from 1 January 2026 for LEC’s licensed areas in Montserrado, Margibi, Grand Cape Mount, Grand Bassa, Bomi and Rivercess counties. The energy charge is designed to recover LEC’s full revenue requirement — operating costs, depreciation and a return on capital — while the fixed charge funds network reinforcement and quality-of-service improvements approved by LERC.

The 2026 schedule cut the household energy charge to US$0.22/kWh. The tariff LEC published from 1 January 2022 was US$0.264/kWh for households, with monthly fixed charges of US$2.728 (prepaid) and US$4.917 (postpaid); LEC stated that those rates included a US$0.01/kWh regulatory surcharge and GST at 13% on energy and 10% on fixed charges. The 2026 decision does not say whether GST is included, so the two schedules are not directly comparable.

Levies and connection charges

LEC’s approved revenue requirement includes a 3.5% regulatory levy on total monthly revenue, remitted to LERC. New connections cost US$70 for a single-phase supply and US$340 for a three-phase supply.

Cost recovery

LEC is not yet financially self-sustaining. In Q2 2026 its energy revenue was US$21.48 million against direct costs of US$27.23 million, and the government budgeted a US$50 million subsidy for FY2026, including US$20 million to settle energy trade debts to the Ivorian and Guinean suppliers and the CLSG transmission company. LEC billed energy at an average of about US$0.21/kWh in the quarter.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesLERC sets LEC’s end-user tariffs. From 1 January 2026 the energy charge is US$0.22/kWh for residential and non-residential customers, with monthly fixed charges of US$2.00 (residential prepaid), US$3.79 (residential postpaid), US$8.48 (non-residential prepaid) and US$12.00 (non-residential postpaid). Medium-voltage customers pay US$0.20/kWh plus US$42.40 a month.
PrepaymentYesMost LEC sales are prepaid: prepaid meter sales supplied 80% of LEC’s energy revenue in Q2 2026. Residential prepaid customers pay a lower fixed charge (US$2.00) than postpaid customers (US$3.79). Credit is sold through Libango vending locations, bank branches and an online portal.
OtherYesSocial tariff: US$0.13/kWh with no fixed charge, set by LERC for eligible low-use customers.
Time-of-useNoNo time-of-use tariff is in force. The Embedded Generation Regulations 2026 say utilities should move prosumers to time-of-use tariffs within 12 months of the regulations being published, where technically and economically feasible.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
Not identified from a reliable public source.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Most Liberians are not connected to the grid. The World Bank estimates electricity access at 34.9% of the population in 2024: 55.5% in towns and 9.2% in rural areas. LEC had 385,145 registered customers in June 2026, but only 167,671 (43.5%) were billed that month; LEC reports roughly 220,000 registered customers going unbilled in an average month because of metering, vending and data problems.

Bioenergy dominates final energy use. IRENA reports that renewables made up about 92% of total final energy consumption in 2022, almost all of it firewood and charcoal used by households, while access to clean cooking is around 1%.

Supply has been rationed in dry seasons. LEC’s Q2 2026 report records supply-driven load shedding in April and May 2026, and expects annual peak demand of 150–155 MW, above what its firm generation can meet unaided in the dry season.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
56.1 % of population (2025)Source 1World Bank estimate.

Just over half of Liberia’s population lives in urban areas, according to World Bank estimates, concentrated in Greater Monrovia in Montserrado County, which is also where most of LEC’s network lies.

The 2022 Liberia Population and Housing Census, run by the Liberia Institute of Statistics and Geo-Information Services (LISGIS), counted 5,250,187 people and collected data on housing conditions, including availability of electricity. Its housing-tenure and dwelling-type tables were not accessible for this profile, so those figures are left blank.

How the grid works in Liberia.

  1. TransmissionLiberia Electricity Corporation (LEC), LEC
  2. DistributionLEC distributes and retails on the national grid; licensed micro utilities run isolated mini-grids elsewhere
  3. MeteringLEC
  4. Supply1 or more retail suppliers

Physical flow

In Q2 2026 LEC supplied 172,607 MWh to its grid: 87,272 MWh from Mount Coffee hydro (50.6%), 63,736 MWh imported over the CLSG line from Côte d’Ivoire and Guinea (36.9%), 16,395 MWh from the Bushrod thermal plant (9.5%) and 5,232 MWh from Mount Coffee solar (3.0%). Mount Coffee’s output swings with the seasons — river inflows rose from about 81 to 438 cubic metres per second between April and June 2026 — so imports and heavy-fuel-oil generation fill the gap in the dry season.

Power is carried on a 66 kV transmission network (about 378 km) linking the generation sites with 13 primary substations around Greater Monrovia and corridors to Margibi and Bomi, then distributed at 22 kV and 33 kV. Network losses are high: in Q2 2026 transmission losses were 3.9% of generation, distribution technical losses 13.6% and commercial losses 21.1%, leaving 61.4% of energy billed.

Commercial flow

LEC buys imported power from the Ivorian and Guinean utilities, generates the rest itself and sells to all grid customers at LERC-regulated tariffs. The regulations allow for independent generators and LEC is negotiating a solar independent power producer project, but there is no wholesale market or retail competition in operation.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Mines and EnergySets national energy policy. Government subsidy to LEC is channelled through the Ministry of Finance and Development Planning.
RegulatorLiberia Electricity Regulatory Commission (LERC)Independent regulator created under the 2015 Electricity Law. Approves tariffs, licenses generation, transmission, distribution, import/export, trading and micro utilities, issues self-supply permits, certifies electricians and contractors, and publishes the Grid Code, Distribution Code and Embedded Generation Regulations.
TSOLiberia Electricity Corporation (LEC)Designated under section 9.3 of the Electricity Law as transmission system operator and national grid company. Operates about 378 km of 66 kV lines and 13 primary substations, and is building a SCADA/EMS and National Load Dispatch Center.
System operatorLECAs TSO, LEC is responsible under the licensing regulations for generation scheduling and dispatch, ancillary services, international transmission coordination and administering any wholesale market and settlement.
DSOLECRuns the national distribution network: 42 medium-voltage feeders at 22 kV and 33 kV, about 1,086 km of MV line, 3,164 distribution transformers and about 2,332 km of low-voltage network (Q2 2026).
DSOLicensed micro utilities (mini-grid operators)Operators of isolated or off-grid systems up to 10 MW or 20,000 customers, licensed by LERC under separate Micro Utility Licensing Regulations. LERC has issued tariff decisions for operators such as Jungle Energy Power and ENERGICITY (Starlight).
SupplierLECSole retail supplier on the national grid, selling at LERC-approved tariffs.
MeteringLECInstalls, maintains and tests customer meters; runs prepaid vending. A smart-metering pilot of 100,000 meters is being delivered by the contractor Senapt.

Compared with the UK system.

Compared with the UK system.
UK conceptLiberia equivalentHow it works
DNOLEC (and micro utilities off-grid)There are no regional network companies on the main grid: LEC owns and operates the distribution network as well as generation and transmission. A distribution licence covers networks of 33 kV and below; isolated mini-grids are run by LERC-licensed micro utilities.
National Grid/NESOLEC as TSO; WAPP / TRANSCO CLSG for the regional lineLEC is both the transmission owner and system operator for the 66 kV national grid. The 225 kV CLSG interconnector links Liberia with Côte d’Ivoire, Sierra Leone and Guinea within the West African Power Pool; cross-border transmission charges on it are set by the ECOWAS regional regulator (ERERA).
MPANLEC customer account and meter numberA connection is identified by the LEC customer account created when the application is approved and the meter LEC installs. Prepaid customers buy credit against their meter. LEC does not publish a standard number format.
MPRNNo equivalentThere is no piped natural-gas supply to homes and so no gas supply-point register.
Meter operatorLECLEC supplies and maintains meters. For prosumers, the Embedded Generation Regulations allow the bi-directional meter to be procured, installed and maintained by the utility or a duly authorised third party.
SupplierLECNo retail competition on the grid. The licensing regulations provide for a retail trading licence, but all grid customers buy from LEC.
Smart-meter infrastructurePrepaid metering; smart-meter pilot from 2026Most customers use prepaid meters. A 100,000-meter smart-metering pilot with associated vending systems began field deployment in the Paynesville distribution area from August 2026. There is no national data hub; meter data management sits with LEC.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?LEC customer account and meter number
Who issues it?Liberia Electricity Corporation, when a connection application is approved and a meter installed
FormatNot published. LEC does not document the structure of its account or meter numbers on its website.
LengthNot verified
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the LEC meter, prepaid vending receipts and postpaid bills, and in the My LEC Online customer portal.
Electronic accessApplications are made online (applicants track them by email) and customers can manage accounts and pay through the My LEC Online portal (portal.lecliberia.com).
Third-party accessNo framework for third-party access to metering or customer data was identified. The Embedded Generation Regulations let a legally mandated representative apply on a prosumer’s behalf.
Who keeps the registerLEC’s customer and commercial management systems (being migrated to SAP S/4HANA, go-live targeted August 2027)
Register scopeNational

In Liberia a grid connection is identified by the customer account LEC opens and the meter it installs. New customers apply online: LEC asks for an email address, which is used to track the application, proof of ownership of the premises, and a personal identity document or tax identification number. Once approved, the customer pays the LERC-approved connection charge — US$70 for single-phase or US$340 for three-phase — and LEC installs a prepaid or postpaid meter.

Because LEC is the only distributor and supplier on the national grid, its customer database is in practice the national register of supply points. It held 389,065 accounts including inactive ones at the end of June 2026, of which 385,145 were registered customers. LEC’s field survey of its network recorded about 48,587 delivery points across seven distribution zones. LEC does not publish the format or length of its account or meter numbers, so no example is shown here.

Prepaid customers buy credit for their meter at Libango vending locations, at Ecobank and LBDI bank branches, or online. LEC’s commercial systems are being replaced: an SAP S/4HANA programme started in May 2026, and the smart-metering pilot includes new vending systems.

Whether an account stays with a property when the occupant changes is not stated in the sources consulted. For prosumers the rule is explicit: if premises with an embedded generator are sold, the new owner must sign a new connection agreement with the utility and any accumulated export credits are forfeited.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingYes
How exported electricity is paidNet billing: exports are credited at an export tariff based on the utility’s avoided cost, approved by LERC; credits offset energy purchases only, with no cash payment.
What size of system can be connected?Up to the lower of the customer’s main supply breaker rating converted to kW, or 1,000 kW, subject to feeder hosting-capacity limits set by the utility.
Which technologies qualify?Solar, wind, hydro, geothermal and biomass, with or without storage. All customers may install embedded generators subject to the applicable rules.
How are exports paid for?Under net billing. Exports are valued at an export tariff based on the utility’s avoided cost and credited in the monthly billing period against energy purchases only — not against fixed or demand charges and never as cash. Surplus credit rolls over but not beyond the utility’s financial year.
What meter is needed?A bi-directional meter with separate import and export registers, complying with the Electricity Metering Code. Reversing spinning-disc meters are not allowed.
Can a third party own the system?Yes. Systems owned by someone other than the customer are allowed, but the customer is treated as the prosumer and signs the connection agreement.
Is an export tariff published?Not yet identified. The regulations require the utility to submit an avoided-cost methodology and LERC to approve prosumer tariffs annually; no approved export rate was found as of October 2026.

Connecting a home system.

  1. Have the system designed and installed to the Grid Code, the utility’s requirements and the nominated interconnection standard, using a LERC-certified electrician.
  2. Apply to the distribution utility with applicant details, proposed capacity, technology, estimated import/export/generation, anti-islanding arrangements and plant data.
  3. Pay application, connection, bi-directional meter and any study fees; systems up to 500 kW follow simplified connection criteria, larger ones need network impact studies.
  4. Receive the utility’s decision — within 30 days under the simplified criteria, or 60–90 days where studies are needed.
  5. Sign the Embedded Generation (EG) Connection Agreement covering connection and billing.
  6. Complete commissioning, including a physical test of the anti-islanding response, and receive written approval to connect.
  7. Register with LERC where required under the licensing regulations (self-supply facilities of 10 kW and above).

Liberia’s Embedded Generation Regulations 2026 (LERC-REG-010 2026), in force from 24 June 2026 and gazetted on 28 July 2026, give customers open and non-discriminatory access to the distribution grid for generators of up to 1 MW located on their premises and used mainly for self-consumption. Systems up to 500 kW use simplified connection criteria; those between 500 kW and 1,000 kW need detailed network impact studies.

The regulations choose net billing rather than net metering: imported energy is charged at the normal tariff and exported energy is credited at a separate export tariff based on the utility’s avoided cost, which may also reflect line-loss and environmental savings. Credits cannot be cashed out and lapse at the end of the utility’s financial year or when the premises are sold.

The utility must publish its permitting process, application forms and connection agreement, keep a register of prosumers (including generation and storage capacity and GIS location) and report it to LERC twice a year. Because these procedures and the export tariff were still being put in place in late 2026, export is classed here as limited in practice.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for sale (grid-connected)Generation licence from LERC; applications go through public notice and, where required, a public hearingLERCAmended Electricity Licensing Regulations 2026 (in force 24 June 2026). Composite licences are not granted; each activity needs its own licence.
Generate for own use (self-supply)Below 10 kW: outside the licensing regulations. 10–100 kW: exempt from licensing but must register with LERC and obtain an Authorization. Above 100 kW: Self-Supply Permit. Above 2 MW: full licence procedure unless waivedLERCThe exemption does not apply where the self-supplier retails electricity (micro utility licence needed) or injects into a distribution network.
Export surplus to the gridEG Connection Agreement with the distribution utility under the Embedded Generation Regulations 2026 (up to 1 MW); self-suppliers of 10 kW and above who inject need a LERC permit or authorizationDistribution utility (LEC); LERCPaid under net billing at an avoided-cost export tariff approved by LERC.
Store electricityNo separate storage licence categoryLERCEmbedded generators may include storage, which is recorded in the utility’s prosumer register.
Transmit electricityTransmission licence (66 kV and above)LERCLEC is the TSO and national grid company under section 9.3 of the Electricity Law. Cross-border WAPP transmission priced by ERERA is outside the regulations.
Distribute electricityDistribution licence (33 kV and below)LERCLEC on the national grid.
Run a mini-grid / sell to customers off-gridMicro utility licence or permit for isolated or off-grid systems up to 10 MW or 20,000 customersLERCGoverned by the Amended Micro Utility Licensing Regulations 2026 and the Mini Grid Code; LERC approves micro utility tariffs.
Supply / retail tradingTrading licenceLERCA retail trading licensee must contract with a supplier or distributor for energy and network use and publish a customer charter. No competing retailer operates on the grid.
Import or export electricity across bordersImport and export licenceLERCLicensees must show financial and technical capacity.
System operation, balancing and ancillary servicesTSO licenceLERCHeld by LEC, which is responsible for dispatch, procurement of ancillary services and administration of any wholesale market and settlement.
Aggregation, VPP, remote control of assetsNo regime identified—Not addressed in the regulations consulted; there is no market in which these services are traded.
Electrical installation workCertification of electrical professionals and contractorsLERCProsumer installations must be carried out by an electrician certified under these regulations; LERC runs a searchable register.

Under the Amended Electricity Licensing Regulations 2026, anyone carrying out a regulated activity — generation, transmission, distribution, import and export, trade or transmission system operation — must register with LERC and then hold a licence, permit or authorization. LERC keeps a public register of licences and permits.

Small self-generation is lightly regulated. Systems under 10 kW fall outside the licensing regulations; systems of 10–100 kW need registration and an authorization; larger self-supply needs a permit, and above 2 MW the full licensing procedure applies. Once a self-supplier injects power into a distribution network, the exemptions fall away and the embedded-generation connection rules apply.

Mini-grids are licensed separately as micro utilities. LERC also certifies electricians and electrical contractors, and the embedded-generation rules require prosumer installations to be done by a certified electrician.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Energy, balancing and ancillary servicesNo—NoLEC (TSO). LEC dispatches its own plants and imports. The regulations make the TSO responsible for ancillary services and any wholesale market, but no market open to distributed resources was identified.

Liberia has no wholesale electricity market and no flexibility or demand-response market for distributed resources. The licensing regulations task LEC, as TSO, with procuring ancillary services and administering a future wholesale market, under system and market operation rules approved by LERC.

The groundwork is still being laid: a LESSAP-financed SCADA/EMS and National Load Dispatch Center was about 75% complete at the end of June 2026. The Embedded Generation Regulations also allow the utility to disconnect embedded generators that threaten the network, with 48 hours’ notice except in emergencies.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutPrepaid metering dominates; a 100,000-meter smart-metering pilot began field deployment in Paynesville from August 2026
Reading intervalNot published
Meter ownerLEC
Smart-meter pilot100,000 meters (Senapt, Pilot Project 1)
First deploymentPaynesville distribution area, from mid-August 2026
Other procurementAbout 25,000 prepaid meters under LESSAP II (bids submitted June 2026)
Prosumer meterBi-directional, separate import and export registers
Smart-meter shareNot published

LEC’s main metering tool is the prepaid meter: prepaid sales supplied 80% of energy revenue in Q2 2026, and LEC is moving government accounts to prepayment. In the quarter it installed 4,559 new-connection meters and 4,345 replacements.

Smart metering is central to LEC’s loss-reduction programme. The Senapt pilot covers 100,000 smart meters with vending systems and customer service interfaces; about 15,500 customers had been surveyed by 20 June 2026, factory acceptance testing was complete, and a shipment of about 15,000 meters was due at the Freeport by 23 July 2026, with field deployment planned from mid-August in Paynesville, an area with heavily overloaded feeders.

Renewable electricity.

Electricity generation mix (2023 (domestic generation, excluding imports)).

  • Hydro: 59%
  • Fossil fuels: 40%
  • Solar: 1%
Source 2
Renewable electricity share
53.6 % of grid supply (Q2 2026 (April–June))Source 9Derived: Mount Coffee hydro (50.6%) plus Mount Coffee solar (3.0%) as a share of the 172,607 MWh LEC supplied to its grid in Q2 2026. Imports over the CLSG line (36.9%) are not counted as renewable because their generation mix is not reported. This is a wet-season quarter; in the dry first quarter imports supplied 56% of energy. On a domestic-generation basis IRENA reports renewables at 60% of the 593 GWh generated in 2023.
Home solar
Not identified from a reliable public source.
Solar added each year
17.8 MWac (2026)Source 9Mount Coffee Solar PV Plant commissioned 24 March 2026; distributed additions not included.
Hydro (Mount Coffee)
88 MW (2026)Source 9All four units in service from late May 2026 after Unit 1 was restored.
Solar PV (Mount Coffee plant)
17.8 MWac (2026)Source 920 MWp; commissioned 24 March 2026.
Thermal (Bushrod and other LEC units)
40 MW (2026)Source 9Approximate value given by LEC (“~40 MW thermal”).
Wind
0 MW (2024)Source 2

Targets.

  • LEC Strategic Plan 2025–2030: expand generation capacity from 107 MW to 200 MW and reach more than 600,000 connections by 2030.
  • No current, officially published national renewable electricity target could be verified from accessible government sources.

Hydropower is Liberia’s main domestic source. IRENA reports that of 593 GWh generated in 2023, 349 GWh (59%) came from hydro and 239 GWh (40%) from fossil fuels, with solar at 4 GWh. Those figures exclude imports, which are a large part of supply.

Capacity has grown sharply in 2026. The 20 MWp Mount Coffee solar plant was commissioned in March, and Mount Coffee hydro returned to its full 88 MW in May. LEC reports an installed fleet of about 146 MW at the end of June 2026.

More is planned under the World Bank-financed RESPITE programme: a further 10 MWp of solar at Mount Coffee with a battery, a Mount Coffee hydropower extension of about 42 MW (four Kaplan units), and preparation of Saint Paul River 2, estimated at 250 MW plus about 50 MWp of solar potential. A proposed solar public-private partnership of 23.75 MWp with a 5 MW / 10 MWh battery was paused in mid-2026 pending a procurement-law decision.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

No operational grid-scale battery storage was identified on the LEC system as of mid-2026. Storage appears in two planned solar projects and is explicitly allowed alongside embedded generators, whose storage capacity must be recorded in the utility’s prosumer register.

Storage projects.

  • Mount Coffee solar extension with BESS (RESPITE): Additional 10 MWp of solar with a 12 MWh / 6 MW battery energy storage system, financed by RESPITE additional financing of US$57 million approved in February 2026 (programme closing December 2028).
  • Proposed solar PPP with battery: 23.75 MWp solar (about 18 MW AC) with a 5 MW / 10 MWh battery; paused at an executive decision point in Q2 2026.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Liberia Electricity Corporation (LEC)Sole supplier on the national gridNoNoNoLimited

LEC is the only electricity supplier for customers on the national grid, at LERC-approved US-dollar tariffs. Off the main grid, licensed micro utilities sell electricity from mini-grids at tariffs approved by LERC.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Liberia Electricity Regulatory Commission (LERC)RegulatorElectricity regulatorSets tariffs, issues licences and technical codes, and certifies electricians.
Liberia Electricity Corporation (LEC)DistributionNational utility, TSO, distributor and supplierConnects customers, installs meters and handles embedded-generation connections on the national grid.
Rural and Renewable Energy Agency (RREA)Renewable EnergyRural and off-grid electrification agencyCo-implements LESSAP Phase 2 off-grid work, including solar home systems and private mini-grid pilots.
West African Power Pool (WAPP)TransmissionRegional power poolRegional framework for the CLSG interconnection that carries Liberia’s imports.
Central Bank of LiberiaGovernmentCentral bankPublishes Liberian dollar exchange rates against the US dollar, in which tariffs are set.
Liberia Institute of Statistics and Geo-Information Services (LISGIS)GovernmentNational statistics officeRuns the population and housing census.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Embedded generation connectionEmbedded Generation Regulations 2026 (LERC-REG-010 2026)LERCSets size limits, the application process, anti-islanding requirements, bi-directional metering and net billing; requires compliance with a utility-nominated interconnection standard.
Distribution networkElectricity Distribution Code of Liberia (June 2022)LERCSystem frequency 50 Hz; harmonic and flicker limits by reference to IEC 61000 series and IEEE 519; includes connection rules for embedded generation and net-metered generators.
Transmission gridElectricity Grid Code of LiberiaLERCCovers planning, connection, operating, scheduling and dispatch, and metering codes.
Mini-gridsAmended Mini Grid Code of Liberia 2026LERCTechnical rules for micro utility networks.
Solar productsSolar Energy Products Technical RegulationsLERCTechnical regulation for solar products; content not reviewed in detail.
WiringLiberia Electrical Wiring Code; Electrical Wiring RegulationsLERCApplies to customer electrical installations.
Installer accreditationCertification and Licensing of Electrical Professionals and Contractors RegulationsLERCLERC certifies electricians and contractors and publishes a searchable register; required for prosumer installations.
Service qualityCustomer Service and Quality of Supply RegulationsLERCSets supply-quality and customer-service standards for licensees.

Permissions.

Permissions.
PermissionRequiredLevelDetail
LEC connection applicationYesNationalOnline application with email, proof of premises ownership and ID or tax number; connection charge US$70 (single-phase) or US$340 (three-phase).
Utility approval for embedded generationYesNationalApplication, EG Connection Agreement, commissioning and written approval to connect; decision within 30 days (simplified) or 60–90 days (with studies).
LERC registration / authorization for self-supplyLimitedNationalBelow 10 kW: not covered. 10–100 kW: registration and authorization. Above 100 kW: self-supply permit.
Certified electricianYesNationalProsumer installations must be carried out by an electrician certified by LERC.
Planning permissionUnknownLocalNo national rule on planning consent for rooftop solar was identified.

For a household, the main administrative relationships are with LEC, which handles connections, meters and embedded-generation approvals, and with LERC, which sets the rules, certifies installers and registers larger self-generation. The Embedded Generation Regulations require the utility to publish its permitting documents, but those documents had not been identified on LEC’s website as of October 2026.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Embedded generation net billingActiveNet billingIn force from 24 June 2026: prosumers up to 1 MW can export surplus electricity and receive bill credits at an avoided-cost export tariff approved by LERC. Credits offset energy charges only and expire at the end of the utility’s financial year. No approved export rate had been identified as of October 2026.From 24 June 2026
Social tariffActiveReduced tariffLERC-approved social tariff of US$0.13/kWh with no fixed charge, against US$0.22/kWh plus a fixed charge for standard residential customers.From 1 January 2026

Data and connectivity.

Fixed broadband
32.2 % of population using the internet (2024)Source 1Share of individuals using the internet (ITU via World Bank), not fixed-broadband coverage.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

About a third of Liberians used the internet in 2024, according to World Bank data.

LEC’s own telecoms are being built out alongside the SCADA system: telecom commissioning was 31.7% complete (13 of 41 jobs) in June 2026. The communications technology used by the smart-meter pilot was not stated in the sources consulted. Prepaid credit is sold through vending agents, banks and an online portal.

Grid conditions.

National peak demand
0.124 GW (16 June 2026)Source 9Highest peak yet served without capacity-driven load shedding. LEC forecasts an annual peak of 150–155 MW.
Annual electricity demand
Not identified from a reliable public source.
Generation capacity
0.146 GW (June 2026)Source 9LEC installed fleet: 88 MW hydro, 17.79 MWac solar and about 40 MW thermal.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Liberia’s grid depends on imports in the dry season and on Mount Coffee hydro in the wet season. In Q1 2026 imports supplied 56% of LEC’s energy; in Q2, as river flows rose, hydro took over and imports fell to 36.9%. Supply-driven load shedding occurred in April and May 2026.

The network is fragile. On 13 June 2026 a disturbance on the CLSG grid tripped all four Mount Coffee units at once, and LEC identifies unresolved N-1 weaknesses on its 66 kV network, with a 132 kV upgrade as the reinforcement direction. Paynesville substation transformers ran at up to about 130% of rating. Transmission due-diligence work for a possible MCC Compact II was submitted in Q2 2026.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Embedded Generation Regulations 2026CurrentIn force 24 June 2026 (gazetted 28 July 2026)First framework for prosumers to connect generators of up to 1 MW to distribution networks and be credited for exports under avoided-cost net billing.
Amended Electricity and Micro Utility Licensing Regulations 2026CurrentIn force 24 June 2026 (gazetted July 2026)Updated licensing thresholds and procedures, including self-supply authorizations (10–100 kW) and permits (above 100 kW), and micro utility rules for mini-grids up to 10 MW or 20,000 customers.
New LEC end-user tariffsCurrent1 January 2026LERC decision of 12 December 2025: residential energy charge US$0.22/kWh, social tariff US$0.13/kWh, new connection charges of US$70 and US$340.
Time-of-use tariffs for prosumersUpcomingWithin 12 months of publication of the Embedded Generation Regulations (by mid-2027)The regulations direct utilities to move prosumers to time-of-use tariffs as the standard approach where technically and economically feasible.
Smart-metering pilot (100,000 meters)UpcomingField deployment from August 2026LEC’s revenue-protection programme: smart meters with vending systems, starting in the Paynesville distribution area.
RESPITE solar-plus-storage and hydro expansionUpcomingProgramme closing December 2028Additional 10 MWp solar with a 12 MWh / 6 MW battery at Mount Coffee, a ~42 MW Mount Coffee hydropower extension and preparation of Saint Paul River 2.
LESSAP Phase 2CurrentApproved 24 June 2024; closing 30 June 2029US$45 million World Bank project implemented by RREA and LEC to expand access and improve LEC’s performance, including distribution expansion, revenue protection, solar home systems and private mini-grid pilots.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo official residential solar statistics; the embedded-generation net-billing framework only came into force in June 2026 and no export tariff had been published.
Distributed energy marketLowGrid access is 34.9% (World Bank, 2024); distributed generation is now legally permitted up to 1 MW but no prosumer register data are published.
Grid flexibility marketLowNo wholesale or flexibility market; LEC is the sole supplier and its SCADA/National Load Dispatch Center was still under construction in 2026.
Energy storage adoptionLowNo operational grid-scale or reported residential battery storage; a 12 MWh battery is planned under RESPITE.
Renewable growth environmentMediumIn 2026 a 20 MWp solar plant was commissioned and 22 MW of hydro restored, with further hydro and solar-plus-storage projects financed (LEC Q2 2026 report).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 18 sources
  1. World Development Indicators: population, urban population, access to electricity, internet users — Liberia. World Bank, 2025. accessed 10 October 2026.
  2. Energy Profile: Liberia. IRENA, 2025. accessed 10 October 2026.
  3. Publication of Electricity Tariffs for the Liberia Electricity Corporation (LEC). Liberia Electricity Regulatory Commission, 2025. accessed 10 October 2026.
  4. Embedded Generation Regulations 2026 (LERC-REG-010 2026). Liberia Electricity Regulatory Commission, 2026. accessed 10 October 2026.
  5. Amended Electricity Licensing Regulations 2026 (LERC-Amended Reg.-001-2026). Liberia Electricity Regulatory Commission, 2026. accessed 10 October 2026.
  6. Technical regulations and codes. Liberia Electricity Regulatory Commission. accessed 10 October 2026.
  7. Electricity Distribution Code of Liberia (June 2022). Liberia Electricity Regulatory Commission, 2022. accessed 10 October 2026.
  8. Tariff decisions. Liberia Electricity Regulatory Commission. accessed 10 October 2026.
  9. LEC Second Quarter Report 2026 (quarter ended 30 June 2026). Liberia Electricity Corporation, 2026. accessed 10 October 2026.
  10. Current tariff (effective 1 January 2022). Liberia Electricity Corporation, 2022. accessed 10 October 2026.
  11. Get connected. Liberia Electricity Corporation. accessed 10 October 2026.
  12. Pay locations. Liberia Electricity Corporation. accessed 10 October 2026.
  13. Generation projects. Liberia Electricity Corporation. accessed 10 October 2026.
  14. ECB euro reference exchange rate: US dollar (USD). European Central Bank, 2026. accessed 10 October 2026.
  15. Central Bank of Liberia — exchange rates. Central Bank of Liberia, 2026. accessed 10 October 2026.
  16. 2022 Liberia Population and Housing Census — Policy Brief on Population size and composition. LISGIS / UNFPA Liberia, 2024. accessed 10 October 2026.
  17. World Bank projects in Liberia (electricity). World Bank. accessed 10 October 2026.
  18. Liberia Electricity Sector Strengthening and Access Project Phase 2 (P180498) — project record. World Bank, 2024. accessed 10 October 2026.

Questions about energy in Liberia.

Talk to us about Olmack in Liberia.Tell us about your home, housing portfolio or school estate in Liberia. We'll explain what is possible there now.