How electricity works in Sierra Leone.
Sierra Leone electricity market 2026: EDSA prepaid supply, EWRC regulation, hydro-led generation, low access rates and the MCC-funded grid reform programme.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Sierra Leonean leone (SLE) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Sierra Leone energy at a glance.
Key figures for households in Sierra Leone. Each one links to its source on the full overview below.
Electricity price.
4.986 SLE per kWh for households, including taxes. Figures for March 2026.
Renewable share.
80% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Sierra Leone.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Sierra Leone below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Sierra Leone requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Sierra Leone.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Sierra Leone, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Sierra Leone, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Sierra Leone.
The energy market in Sierra Leone, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page21 sections
Grid electricity in Sierra Leone reaches homes through the Electricity Distribution and Supply Authority (EDSA), a state body that describes itself as mainly responsible for the supply, distribution and retail sale of electricity across the country. Generation and high-voltage transmission are the responsibility of the Electricity Generation and Transmission Company (EGTC), the sector is regulated by the Electricity and Water Regulatory Commission (EWRC), and policy is set by the Ministry of Energy.
The system is very small. IRENA records 322 GWh of electricity generated in 2023 and installed capacity of roughly 0.3 GW in 2024. Most of that output is renewable: hydropower supplied 228 GWh, about 71% of generation, with solar at 7% and bioenergy at 3%, while fossil-fuelled plants supplied the remaining fifth. The largest hydro plant, Bumbuna, has two 25 MW generating units.
Access is the defining challenge. According to the World Bank, 39.2% of the population had access to electricity in 2024: 56.4% in towns but only 24.9% in rural areas. A US$480 million compact with the Millennium Challenge Corporation, signed in September 2024, is financing a new transmission backbone, distribution upgrades and new connections, and a power-sector reform programme supporting the regulator and the ministry.
Energy snapshot.
Headline figures for electricity in Sierra Leone. Each shows its data year and links to its source.
- Population8,819,794 peopleSource 12025
- Households1,772,600 householdsSource 32021
- Average household size4.25 people/householdSource 32021
- Electricity use per householdNot identified from a reliable public source.
- Household price (SLE)4.986 SLE/kWhSource 5March 2026
- Household price (EUR)0.195 EUR/kWhSource 4March 2026
- Renewable electricity share80%Source 22023
- Solar capacityNot identified from a reliable public source.
- Wind capacity0 GWSource 22023
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- Electricity and Water Regulatory Commission (EWRC)
- System operator
- Electricity Generation and Transmission Company (EGTC) — state generation and transmission
- Distribution networks
- A single national distributor and retailer, EDSA (Electricity Distribution and Supply Authority)
- Currency
- Sierra Leonean leone (SLE)
- Voltage and frequency
- Not verified from an official source
Electricity prices in Sierra Leone.
- Household price (SLE)
- 4.986 SLE/kWh (March 2026)Source 5Household price of SLL 4,986/kWh (old leones; equal to SLE 4.986 after the 2022 redenomination at 1,000:1) reported by GlobalPetrolPrices, which cites EDSA and the EWRC and states that it includes power, network costs, taxes and fees. The EWRC’s own tariff schedule could not be accessed (website unreachable), so this is a secondary-source figure.
- Household price (EUR)
- 0.195 EUR/kWh (March 2026)Source 4Converted from SLE 4.986/kWh at the Bank of Sierra Leone reference rate of SLE 25.6303 per euro on 9 October 2026.
- Typical annual electricity bill
- Not identified from a reliable public source.
Electricity prices in Sierra Leone are regulated. The EWRC approves the tariffs that EDSA charges, and there is no retail competition on the national grid. The regulator’s website, which carries the approved tariff schedules, could not be reached for this profile, so the band structure and fixed charges are not reproduced here.
GlobalPetrolPrices, which cites EDSA and the EWRC as sources, reports a household price of SLL 4,986 per kWh in March 2026 — SLE 4.986 in the redenominated currency, or about US$0.25 — including taxes and fees. At the Bank of Sierra Leone reference rate on 9 October 2026 this is roughly €0.19/kWh.
Currency
Prices are still sometimes quoted in old leones (SLL), where 1,000 SLL equal 1 new leone (SLE); EDSA’s website, for example, lists meter prices with the SLL label. Check which unit a quoted price uses.
Cost recovery and reform
The MCC compact includes a US$50.5 million Power Sector Reform Project intended to improve the financial sustainability of the electricity sector and implement the government’s Power Sector Reform Roadmap, with support for the EWRC and the Ministry of Energy.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Prepayment | Yes | Prepaid meters are EDSA’s main metering option for households; credit is bought through payment aggregators or at designated banks. EDSA lists single-phase and three-phase prepaid meters for new connections. |
| Regulated | Yes | Retail tariffs are approved by the EWRC and charged nationally by EDSA. The current approved schedule could not be read because the EWRC website was unreachable; a secondary source puts the household price at about SLE 4.99/kWh including taxes in March 2026. |
| Other | Yes | Postpaid metering is available; EDSA lists a postpaid meter alongside its prepaid options, with bills payable at designated banks. |
| Time-of-use | No | No time-of-use tariff for households was identified. |
Household prices compared with neighbouring countries (EUR per kWh).
- Liberia€0.196
- Sierra Leone€0.195
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- Not identified from a reliable public source.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Household electricity use is low because so many homes are unconnected. The World Bank estimates that 39.2% of the population had access to electricity in 2024 — 56.4% in urban areas and 24.9% in rural areas. The MCC, using its own figures, states that about 30% of the population has access and fewer than 5% of people in rural areas.
Cooking relies almost entirely on traditional bioenergy: IRENA puts access to clean cooking at about 1% of the population, and bioenergy makes up around 98% of renewable energy consumption. Total electricity generation was equivalent to only around 40 kWh per person in 2023.
Voltage quality is a recurring problem. The MCC notes that unreliable and fluctuating voltage often damages household and business appliances such as refrigerators.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 45.9 % of population (2025)Source 1World Bank estimate.
Just under half of Sierra Leone’s population lives in towns, according to World Bank estimates, with the Freetown area in the Western region the main urban centre. The Western region also has the smallest households, averaging 3.92 people in the 2021 census, against 4.68 in the Eastern region.
Statistics Sierra Leone’s 2021 Mid-Term Population and Housing Census was the country’s first digital census. Its preliminary report gives population and household size; detailed housing tenure and dwelling-type tables were not identified, so those figures are left blank.
How the grid works in Sierra Leone.
- TransmissionElectricity Generation and Transmission Company (EGTC)
- DistributionA single national distributor and retailer, EDSA (Electricity Distribution and Supply Authority)
- MeteringEDSA
- Supply1 or more retail suppliers
Physical flow
Sierra Leone generated 322 GWh in 2023 according to IRENA, of which 228 GWh came from hydropower, 63 GWh from fossil fuels, 22 GWh from solar and 10 GWh from bioenergy. Hydro is the backbone of supply: the Bumbuna dam has two 25 MW units. Hydro plants ran at about 43% of capacity in 2023, while fossil-fuelled plants ran at only about 5%.
Power moves from EGTC’s plants over the transmission network to EDSA’s distribution system. The MCC Transmission Backbone Project (US$226.7 million) is designed to remove bottlenecks with a new transmission corridor and centralised control, and the Distribution and Access Project (US$123.6 million) upgrades the distribution network, adds dispatch centres and funds new connections.
Commercial flow
EDSA buys bulk power and resells it to all grid customers at regulated tariffs, so the sector works as a single-buyer system. There is no wholesale market or retail competition.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy | Sets energy policy and co-implements donor-funded access projects with EDSA, including the World Bank’s Enhancing Sierra Leone Energy Access Project. Leads the Power Sector Reform Roadmap supported by the MCC compact. |
| Regulator | Electricity and Water Regulatory Commission (EWRC) | Regulates the electricity and water sectors, including tariffs and licensing. Receives institutional support under the MCC Power Sector Reform Project. |
| TSO | Electricity Generation and Transmission Company (EGTC) | State company responsible for generation and the high-voltage transmission system. The MCC Transmission Backbone Project adds a new transmission corridor and a national dispatch centre with SCADA upgrades. |
| DSO | Electricity Distribution and Supply Authority (EDSA) | Mainly responsible for the supply, distribution and retail sale of electricity nationwide. Implements the World Bank Enhancing Sierra Leone Energy Access Project (US$50 million, approved January 2021), whose objective is to increase access and improve EDSA’s operational performance. |
| Supplier | EDSA | Sole retail supplier on the national grid, selling at EWRC-approved tariffs. |
| Metering | EDSA | Provides, installs and maintains customer meters — prepaid single-phase and three-phase, and postpaid — and is expanding prepaid metering. |
Compared with the UK system.
| UK concept | Sierra Leone equivalent | How it works |
|---|---|---|
| DNO | EDSA | One authority runs distribution for the whole country, so there are no regional network areas. EDSA builds and operates the medium- and low-voltage networks and connects customers. |
| National Grid/NESO | EGTC | The Electricity Generation and Transmission Company owns state generation and the transmission network. A national dispatch centre with SCADA is being built under the MCC compact. |
| MPAN | EDSA meter number / customer account | A connection is identified by the meter EDSA installs and the customer account linked to it. Prepaid customers quote the meter number when buying credit through aggregators. No public specification of the number format was identified. |
| MPRN | No equivalent identified | There is no piped natural-gas distribution to households and no gas supply-point register. |
| Meter operator | EDSA | The distributor supplies, installs and maintains meters; there is no separate metering market. |
| Supplier | EDSA | There is no retail competition. All grid customers buy from EDSA at EWRC-approved prices. |
| Smart-meter infrastructure | Prepaid metering, with early AMI procurement | Most households use prepaid meters credited with purchased tokens. EDSA has begun procuring AMI (advanced metering infrastructure) prepayment meters, starting with 3,000 three-phase units tendered in January 2025. There is no national smart-meter data hub. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | EDSA meter number and customer account |
| Who issues it? | EDSA, when a meter is installed for a new connection |
| Format | Not published. EDSA does not document the structure of its meter or account numbers on its website. |
| Length | Not verified |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the meter itself and on EDSA receipts, prepaid token slips or postpaid bills. |
| Electronic access | EDSA’s website lists e-services and a customer login but was marked as under construction when accessed; credit is bought electronically through aggregators. |
| Third-party access | No framework for third-party access to metering or customer data was identified. |
| Who keeps the register | EDSA’s customer and metering records |
| Register scope | National |
In Sierra Leone a residential connection is identified by the meter that EDSA installs and the customer account attached to it. A customer who wants supply submits EDSA’s application forms with supporting documents, and EDSA then provides, installs and maintains a meter that records the electricity supplied. EDSA lists three meter options: a single-phase prepaid meter, a three-phase prepaid meter and a postpaid meter.
For prepaid customers the meter number is the working identifier: credit is bought through payment aggregators such as mobile-money services, and the resulting token is entered into the meter. Postpaid customers pay bills at designated banks. EDSA runs a One Stop Shop at its head office at 53 Siaka Stevens Street, Freetown, and a toll-free line (672).
Because EDSA is the only distributor and supplier, its customer database is in practice the national register of supply points. EDSA does not publish the format or length of its meter or account numbers, so no example is shown here, and whether an account stays with the property when the occupant changes is not documented in the sources consulted.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Unknown |
| Net metering | Unknown |
| Net billing | Unknown |
| How exported electricity is paid | Not identified. No published net-metering, net-billing or feed-in arrangement for household systems was found in accessible official sources. |
| Can households sell solar power to the grid? | No household export or net-metering scheme was identified in accessible official sources. The EWRC website, where such rules would be published, could not be reached. |
Connecting a home system.
- No published procedure for connecting and exporting from a household solar system was identified; contact EDSA and the EWRC.
Accessible official sources do not describe any scheme that lets households export surplus solar power to EDSA’s grid or be credited for it. Solar contributes about 7% of domestic generation (22 GWh in 2023, IRENA), mainly from larger plants rather than rooftop systems.
Given low grid access and unreliable supply, solar in homes is typically used for self-consumption, often off-grid. Anyone planning a grid-tied system should confirm current requirements with EDSA and the EWRC.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for sale to the grid | Licence from the sector regulator; thresholds and exemptions not verified | EWRC | Regulatory texts could not be accessed (EWRC website unreachable). |
| Generate for own use (rooftop solar) | No published threshold or exemption identified | EWRC; EDSA (if grid-connected) | Confirm requirements with the regulator. |
| Export / sell surplus to the grid | No household export regime identified | EWRC; EDSA | No net-metering or feed-in tariff found. |
| Transmit electricity | Carried out by the state company EGTC | Government of Sierra Leone; EWRC | Transmission expansion financed under the MCC compact. |
| Distribute and supply on the national grid | Carried out by the state authority EDSA | Government of Sierra Leone; EWRC | No retail competition. |
| Store electricity | No specific storage licensing regime identified | — | Not addressed in the sources consulted. |
| Aggregate, trade, wholesale, balancing, grid services, VPP, remote control of assets | No regime identified | — | There is no organised wholesale or flexibility market in which these activities exist. |
The electricity sector is regulated by the EWRC, which oversees tariffs and licensing. Its legal texts and licensing rules could not be accessed for this profile, so licence thresholds and exemptions for small generators are not stated here.
In practice the grid is operated by two state bodies: EGTC for generation and transmission, and EDSA for distribution and retail supply. There are no licences for supply competition, aggregation, trading or flexibility services because those markets do not exist.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Energy, balancing and ancillary services | No | — | No | EGTC / EDSA. Supply is balanced by the state companies. No market for distributed resources, demand response or aggregation was identified. |
Sierra Leone has no wholesale electricity market and no flexibility or demand-response market open to distributed resources. The priority is basic grid capacity: the MCC compact is financing SCADA, a national dispatch centre and distribution dispatch centres, which are prerequisites for any future active network management.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter programme; prepaid metering dominates and EDSA has begun procuring AMI prepayment meters |
| Reading interval | Not published |
| Meter supply | EDSA (provides, installs, maintains) |
| Meter types | Single-phase prepaid, three-phase prepaid, postpaid |
| AMI procurement | 3,000 three-phase AMI prepayment meters (tender, January 2025) |
| Prepaid top-up | Payment aggregators and banks |
| Smart-meter share | Not published |
EDSA states that it provides, installs and maintains the meters that measure electricity supplied to customers, and that expanding prepaid metering is part of its mission. Customers top up through payment aggregators or pay at designated banks.
A tender for the supply of 3,000 three-phase AMI prepayment meters, published in January 2025, indicates the start of communicating prepayment meters for larger customers. No official data were identified on the share of communicating meters or reading intervals.
Renewable electricity.
Electricity generation mix (2023 (domestic generation)).
- Hydro: 71%
- Fossil fuels: 20%
- Solar: 7%
- Bioenergy: 3%
- Renewable electricity share
- 80% (2023)Source 2Share of domestic generation: 259 GWh of renewable output (hydro 228, solar 22, bioenergy 10) out of 322 GWh (IRENA). Electricity imported from neighbouring countries is not included, and no reliable figure for imports was identified.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0 MW (2024)Source 2IRENA records no net renewable capacity change in 2024 (0.3 MW in 2023, 5.3 MW in 2022).
- Total installed (all sources)
- 0.3 GW (2024)Source 2Rounded value shown in IRENA’s capacity chart; renewables about 45% of capacity.
- Hydro (Bumbuna, two units)
- 50 MWSource 11Single plant (two 25 MW units), not the national hydro total.
- Wind
- 0 MW (2024)Source 2
Targets.
- No current, officially published renewable electricity target could be verified from accessible government sources.
Hydropower dominates Sierra Leone’s electricity. In 2023 it produced 228 GWh of the 322 GWh generated (71%), according to IRENA, making renewables about 80% of domestic generation.
Solar produced 22 GWh in 2023 (7%) and bioenergy 10 GWh (3%). IRENA’s 2024 breakdown of renewable capacity is about 53% hydro, 29% bioenergy and 18% solar. Capacity growth has been slow: IRENA records renewable additions of 8.1 MW in 2021, 5.3 MW in 2022, 0.3 MW in 2023 and none in 2024.
Across total energy supply rather than electricity, renewables were 74% in 2022, but almost all of this is traditional bioenergy — firewood and charcoal — used for cooking.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
No official statistics on battery storage were identified, and accessible sources contain no specific licensing or market rules for storage.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Electricity Distribution and Supply Authority (EDSA) | Sole supplier on the national grid | No | No | No | No |
EDSA is the only electricity supplier for customers on the national grid. It serves domestic, commercial and industrial consumers at EWRC-approved tariffs, mostly through prepaid meters.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Electricity and Water Regulatory Commission (EWRC) | Regulator | Electricity and water regulator | Approves tariffs and regulates licensees in the electricity sector. |
| Electricity Distribution and Supply Authority (EDSA) | Distribution | National distributor and supplier | Connects customers, installs meters and sells electricity nationwide. |
| Electricity Generation and Transmission Company (EGTC) | Transmission | State generation and transmission company | Operates state power plants and the high-voltage grid that the MCC Transmission Backbone Project is expanding. |
| Ministry of Energy | Government | Energy ministry | Sets energy policy and leads the Power Sector Reform Roadmap. |
| Statistics Sierra Leone (Stats SL) | Government | National statistics office | Publishes census data on population and households. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (inverter / interconnection technical rules) | No published grid code for small generators identified | — | Not found in accessible official sources. |
| Prepayment metering | Not verified | EDSA | EDSA procures prepaid and AMI prepayment meters; the specification standard was not verified. |
| Installer accreditation | No national scheme identified | — | No certification scheme for solar installers was verified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| EDSA connection application | Yes | National | Completed EDSA forms with supporting documents; EDSA then installs a prepaid or postpaid meter. |
| Regulator approval for grid-connected generation | Unknown | National | Rules for small generators could not be verified. |
| Planning permission | Unknown | Local | No national rule on planning consent for rooftop solar was identified. |
For a household the administrative relationship is with EDSA, which handles applications, meter installation and payments. Requirements for connecting private generation to the grid were not identified in accessible official sources.
Data and connectivity.
- Fixed broadband
- 25.1 % of population using the internet (2024)Source 1Share of individuals using the internet (ITU via World Bank), not fixed-broadband coverage.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
About a quarter of the population used the internet in 2024, according to World Bank data.
Payment aggregators and banks are the channels for buying prepaid electricity credit. No information was identified on the communication technologies used by EDSA’s AMI meters.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- Not identified from a reliable public source.
- Generation capacity
- 0.3 GW (2024)Source 2Rounded value shown in IRENA’s installed-capacity chart.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The grid is small and constrained. Thermal plants ran at only about 5% of capacity in 2023 while hydro ran at about 43% (IRENA), reflecting fuel costs and seasonal water availability. Unreliable and fluctuating voltage damages appliances, according to the MCC.
Grid investment is concentrated in the MCC compact signed on 27 September 2024: US$226.7 million for a transmission backbone and national dispatch centre, US$123.6 million for distribution and access, and US$50.5 million for sector reform. The World Bank’s Enhancing Sierra Leone Energy Access Project (US$50 million plus US$13 million additional financing in 2023) had a closing date of 31 December 2025.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| MCC compact: transmission, distribution and sector reform | Upcoming | Signed 27 September 2024 | US$480 million programme: Transmission Backbone Project (US$226.7m), Distribution and Access Project (US$123.6m) and Power Sector Reform Project (US$50.5m) supporting the EWRC, the Ministry of Energy and the Power Sector Reform Roadmap. |
| AMI prepayment metering | Current | Tender January 2025 | EDSA procurement of 3,000 three-phase AMI prepayment meters, the first communicating prepayment meters identified. |
| Enhancing Sierra Leone Energy Access Project | Current | Approved January 2021; closing date 31 December 2025 | World Bank project implemented by EDSA and the Ministry of Energy to increase electricity access and improve EDSA’s operational performance. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official residential solar statistics and no household export or net-metering scheme identified; solar was 7% of generation in 2023 (IRENA). |
| Distributed energy market | Low | No published framework or data for distributed generation on the national grid; access is 39.2% (World Bank, 2024). |
| Grid flexibility market | Low | No wholesale or flexibility market; EDSA is the sole supplier and dispatch infrastructure is still being built under the MCC compact. |
| Energy storage adoption | Low | No official statistics or regulatory framework for battery storage identified. |
| Renewable growth environment | Low | IRENA records renewable capacity additions of 0.3 MW in 2023 and none in 2024, although renewables already supply about 80% of generation. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 11 sources
- World Development Indicators: population, urban population, access to electricity, internet users — Sierra Leone. World Bank, 2025. accessed 10 October 2026.
- Energy Profile: Sierra Leone. IRENA, 2025. accessed 10 October 2026.
- 2021 Mid-Term Population and Housing Census — Preliminary Report of the Final Results. Statistics Sierra Leone, 2022. accessed 10 October 2026.
- Bank of Sierra Leone Reference Rates as at 09-Oct-26. Bank of Sierra Leone, 2026. accessed 10 October 2026.
- Sierra Leone electricity prices. GlobalPetrolPrices.com, 2026. accessed 10 October 2026.
- Electricity Distribution and Supply Authority — home page. EDSA. accessed 10 October 2026.
- Tenders and documents. EDSA, 2025. accessed 10 October 2026.
- Sierra Leone Compact. Millennium Challenge Corporation, 2024. accessed 10 October 2026.
- Enhancing Sierra Leone Energy Access (P171059) — project record. World Bank, 2021. accessed 10 October 2026.
- World Bank projects in Sierra Leone (electricity). World Bank. accessed 10 October 2026.
- SL Completion of Bumbuna Hydroelectric project — IDA Guarantee (P086903) — project record. World Bank, 2005. accessed 10 October 2026.
Questions about energy in Sierra Leone.
Tariffs are regulated by the EWRC and charged nationally by EDSA. A secondary source citing EDSA and the EWRC puts the household price at about SLE 4.99 per kWh (around US$0.25) including taxes in March 2026.
The Electricity Distribution and Supply Authority (EDSA) is the only distributor and retail supplier on the national grid. Generation and transmission are handled by the state-owned EGTC, and the EWRC regulates the sector.
According to the World Bank, 39.2% of the population had access in 2024 — 56.4% in urban areas and 24.9% in rural areas.
Mostly hydropower. IRENA reports that of 322 GWh generated in 2023, 71% came from hydro, 20% from fossil fuels, 7% from solar and 3% from bioenergy. The Bumbuna hydro plant has two 25 MW units.
There is no standardised national supply-point number. A connection is identified by the meter EDSA installs and the customer account linked to it; prepaid customers quote their meter number when buying credit.
No household net-metering or feed-in scheme was identified in accessible official sources. Check current rules with EDSA and the EWRC before connecting a system to the grid.
One new leone (SLE) equals 1,000 old leones (SLL). Some electricity prices, including EDSA’s listed meter prices, are still labelled in old leones.