How electricity works in Liechtenstein.
Liechtenstein electricity 2026: LKW tariffs and network prices, Swiss control area, 33-character metering point number, smart meters, solar feed-in pay and subsidies.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Swiss franc (CHF) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Liechtenstein energy at a glance.
Key figures for households in Liechtenstein. Each one links to its source on the full overview below.
Electricity price.
0.265 CHF per kWh for households, including taxes. Figures for 2026.
Renewable share.
66.9% of electricity from renewable sources. Figures for 2025 disclosure.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Liechtenstein.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Liechtenstein below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Liechtenstein requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Liechtenstein.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Liechtenstein, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Liechtenstein, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Liechtenstein.
The energy market in Liechtenstein, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Liechtenstein is a small Alpine principality whose electricity system is run almost entirely by one public company, Liechtensteinische Kraftwerke (LKW). LKW owns and operates the whole distribution network, runs the country’s hydro plants and is the main retail supplier. The country has no transmission system operator of its own: its 110 kV network is tied into the Swiss and Austrian grids and it belongs to the Swiss control area run by Swissgrid.
Under the Electricity Market Act (EMG) every customer can choose their supplier, and network prices are approved by the independent Commission for Energy Market Supervision (EMK). Liechtenstein follows EU energy law through the European Economic Area, but the 2019 Clean Energy Package electricity directive has not yet been incorporated into the EEA Agreement, so rules on energy communities, aggregators and active customers seen in EU countries do not yet apply.
Domestic generation covered about 35% of national electricity demand in 2024, up from 26% in 2020, driven by very rapid rooftop solar growth: installed PV capacity reached 77.1 MWp at the end of 2024, about 1,885 watts per inhabitant. The rest is imported from Switzerland and Austria. LKW’s 2025 supplier mix was 66.9% renewable.
Energy snapshot.
Headline figures for electricity in Liechtenstein. Each shows its data year and links to its source.
- Population41,024 peopleSource 202025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (CHF)0.265 CHF/kWhSource 22026
- Household price (EUR)0.284 EUR/kWhSource 212026
- Renewable electricity share66.9%Source 52025 disclosure
- Solar capacity0.077 GWSource 15end 2024
- Wind capacity0 GWSource 52025
- Energy storage capacity0.013 GWSource 152024
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Unknown
- Regulator
- Kommission für Energiemarktaufsicht (EMK)
- System operator
- Swissgrid AG (Liechtenstein is part of the Swiss control area)
- Distribution networks
- One distribution system operator for the whole country: Liechtensteinische Kraftwerke (LKW)
- Currency
- Swiss franc (CHF)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Liechtenstein.
- Household price (CHF)
- 0.265 CHF/kWh (2026)Source 2Derived by this profile from LKW’s published 2026 prices for a household using 4,500 kWh a year with no solar: LKWclassic flat energy price 10.70 Rp/kWh (lkw-tariffs), network usage 7.90 Rp (summer) and 9.70 Rp (winter) averaged on an assumed even split, Swissgrid system services 0.27 Rp, Swissgrid electricity reserve 0.41 Rp, EEG support levy 1.50 Rp, smart-meter metering charge CHF 7.00/month and base charge CHF 3.50/month, plus 8.1% VAT (mwstg). Equals CHF 1,101.60 a year before VAT.
- Household price (EUR)
- 0.284 EUR/kWh (2026)Source 21Converted from CHF 0.2646/kWh at the ECB reference rate of 9 October 2026 (EUR 1 = CHF 0.9313).
- Typical annual electricity bill
- 1,191 CHF/yr (2026)Source 2Derived: 4,500 kWh on LKWclassic flat rate with LKW 2026 network prices, levies and fixed charges, including 8.1% VAT. See the price note for the breakdown.
A Liechtenstein household bill has two parts. The energy part is set by the supplier, which for almost all households is LKW. The network part is set by LKW as the regulated network operator and approved by the EMK. It includes a monthly metering charge, a base charge and a seasonal per-kWh charge, plus two Swiss control-area charges passed through from Swissgrid (system services and the winter electricity reserve) and the statutory support levy under the Energy Efficiency Act (EEG). VAT is added at 8.1%, the same rate as Switzerland.
Network tariff groups
Since 2025 LKW has split low-voltage customers into two groups. Group 1 covers customers using up to 10,000 kWh a year with no feed-in. They pay CHF 7.00 a month for metering, CHF 3.50 a month base charge, 7.90 Rp/kWh in summer and 9.70 Rp/kWh in winter (2026, excluding VAT). Group 2 covers larger users and every customer with a generator or feed-in, including homes with rooftop solar. Instead of the base charge they pay a demand charge of CHF 2.75 per kW, based on the highest 15-minute average demand in the month, with lower per-kWh rates (7.10 Rp summer, 9.20 Rp winter) and a 2.10 Rp/kWh surcharge on winter evenings from 17:00 to 22:00. LKW says the demand charge rewards spreading out loads, for example charging an electric car at 11 kW instead of 22 kW.
Price level
For a household using 4,500 kWh a year on LKWclassic, 2026 published prices work out at about CHF 1,191 a year including VAT, or about 26.5 Rp/kWh all-in. The energy price is roughly half of this; the rest is network charges, levies and VAT. Because Liechtenstein is in the Swiss control area and LKW buys most of its electricity on the Swiss and wider European market, retail prices follow Swiss wholesale prices. The variable and dynamic products pass these prices through more directly.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Fixed | Yes | LKWclassic fixes the energy price for the whole calendar year. From 1 January 2026 it is 10.70 Rp/kWh as a single rate, or 11.26 Rp/kWh high rate and 10.55 Rp/kWh low rate. The low rate applies daily from 20:00 to 07:00 and from Saturday 13:00 to Monday 07:00. |
| Variable | Yes | LKWflex is reset every month. In October 2026 it was 17.451 Rp/kWh (savings), 19.196 Rp/kWh (standard) and 22.686 Rp/kWh (peak), plus a 1.70 Rp/kWh processing fee. |
| Dynamic | Yes | LKWfree follows hourly EPEX Spot Switzerland day-ahead prices plus a 1.40 Rp/kWh processing fee. |
| Time-of-use | Yes | Network usage is charged at a higher winter rate (October–March) than summer rate (April–September). For tariff group 2 (over 10,000 kWh or with a generator) there is a 2.10 Rp/kWh winter peak surcharge from 17:00 to 22:00 and a monthly demand charge of CHF 2.75 per kW. |
| Other | Yes | Green add-ons can be combined with any LKW product: LiStrom natur (+1.00 Rp/kWh) or LiStrom natur plus (+5.00 Rp/kWh). |
Household prices compared with neighbouring countries (EUR per kWh).
- Germany€0.37
- Austria€0.327
- Switzerland€0.292
- Liechtenstein€0.284
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 8,896 kWh/person/yr (2025)Source 4All sectors. Derived by dividing LKW’s 2025 net grid load (364,949 MWh) by the 2025 population (41,024, wb-pop). It excludes PV self-consumption and reflects Liechtenstein’s large industrial base.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 7.2 % of passenger cars (2024)Source 15Share of the car fleet that is electric, with hybrids counted at 20%. About 23% of new cars registered in 2024 were fully electric and 40% hybrid.
- Electric cooking
- Not identified from a reliable public source.
Liechtenstein used 364,949 MWh of electricity from the public grid in 2025, according to LKW. Electricity use per person is high by European standards because a large share goes to industry.
National grid sales and peak demand have stayed broadly flat for about 15 years even as heat pumps and electric cars have spread. The government’s energy monitoring report puts this down to efficiency gains and to the growing amount of rooftop solar power used on site, which is not measured. In 2024 electricity use including PV self-consumption rose 2.1%, while sales from the grid rose only 0.5%.
Heating is moving away from fossil fuels, but slowly. In 2024 there were still 8,001 oil and gas heating systems, about 70% of all heating systems recorded in the buildings and dwellings statistics. District heating using waste heat from the Buchs waste incinerator across the Rhine in Switzerland is expanding quickly in Schaan, Vaduz and Bendern.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- Not identified from a reliable public source.
Current housing tenure and dwelling-type figures from the Office of Statistics (Amt für Statistik) could not be verified for this profile. The population of 41,024 (2025) lives in eleven municipalities in the Rhine valley and on the slopes above it, served by more than 12,000 network connections.
Under LKW’s network rules the network user can be the owner or the tenant of a home. For multi-occupancy buildings, shared supplies such as stair lighting and laundry rooms are billed to the owners. Where tenants change often, LKW can make the owner or managing agent the network user. This matters for rented flats with solar: the building owner normally holds the grid connection.
How the grid works in Liechtenstein.
- TransmissionSwissgrid AG
- DistributionOne distribution system operator for the whole country: Liechtensteinische Kraftwerke (LKW)
- MeteringLiechtensteinische Kraftwerke (LKW)
- Supply1 or more retail suppliers
Physical network
Liechtenstein’s distribution grid connects to the Swiss and Austrian transmission systems at 110 kV (network level 3). Four 110 kV lines run to Switzerland and one to Austria. Cross-border capacity on the Switzerland–Liechtenstein–Austria line is managed within the Swiss–Austrian border capacity. LKW transforms this down at four substations to its 10 kV medium-voltage network (about 270 km) and then, through more than 300 transformer stations and 1,625 distribution cabinets, to the 400 V low-voltage network (about 1,100 km) that serves homes.
Commercial flow
Because the country belongs to the Swiss control area, all generators and consumers must sit in a Swissgrid balance group. Suppliers buy power on the Swiss and European wholesale markets or from their own plants. LKW’s own output covered 63,271 MWh of a 364,949 MWh national load in 2025, and it bought in the remaining 312,621 MWh. Customers pay one supplier for energy, while LKW bills network usage, Swissgrid pass-through charges and the EEG levy as network operator.
Solar on the grid
Rapid rooftop solar growth is changing network flows. In 2024 Liechtenstein exported power to Switzerland for the first time in its recent history, though only 0.3% of national sales, because solar output at times exceeded national demand. Maximum PV feed-in (35.7 MW) already exceeds the lowest Sunday midday load (25.6 MW). LKW is responding with more low-voltage cabling, smart-grid analysis software, demand charges and dynamic tariffs.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry for Home Affairs, Economy and Sport | Responsible for energy policy together with the Ministry for Infrastructure and Education. The government sets the EEG support levy by ordinance and reports annually to parliament on the Energy Strategy 2030. |
| Regulator | Kommission für Energiemarktaufsicht (EMK) | Independent five-member commission set up under the EMG. It approves network connection and network usage prices and LKW’s technical operating rules (TBB), designates network operators, settles disputes and monitors the electricity and gas markets. |
| TSO | Swissgrid AG | Swiss transmission system operator. Liechtenstein has no transmission grid of its own and belongs to the Swiss control area, so Swissgrid’s balance-group, balancing-energy and system-services rules apply. Its system-service and reserve charges appear on Liechtenstein bills. |
| DSO | Liechtensteinische Kraftwerke (LKW) | Public company and the only distribution network operator. It runs about 270 km of 10 kV lines, around 1,100 km of 400 V lines, more than 300 transformer stations and four substations (Balzers, Eschen, Schaan, Triesen), with over 12,000 connections. |
| Supplier | Liechtensteinische Kraftwerke (LKW) | Main retail supplier and owner of four hydro plants and eight drinking-water power plants. Customers may switch to another supplier. LKW provides fallback supply to any customer left without a supply contract. |
| Metering | Liechtensteinische Kraftwerke (LKW) | Supplies, installs, owns and reads all meters as network operator and is rolling out Landis+Gyr smart meters across the country. |
| Settlement | Swissgrid balance groups | Every producer and consumer connected to LKW’s grid must belong to a balance group in the Swiss control area. Suppliers that want to sell in Liechtenstein register a balance-group contract with Swissgrid. |
| Exchange | EPEX Spot (Swiss market) | Swiss day-ahead prices are the reference for LKW’s dynamic tariff and for the market-based payment to solar owners for the power they feed in. |
Compared with the UK system.
| UK concept | Liechtenstein equivalent | How it works |
|---|---|---|
| DNO | LKW (Netzbetreiberin) | One national distribution network operator instead of regional DNOs. LKW is designated under the EMG and its network prices are approved by the EMK. Unlike a GB DNO, LKW is also the main supplier and generator. |
| National Grid/NESO | Swissgrid | Liechtenstein uses the Swiss transmission operator. Swissgrid balances the Swiss control area, which includes Liechtenstein, and its tariffs are passed through on LKW bills. Four 110 kV lines link to Switzerland and one to Austria. |
| MPAN | Messpunkt-Nr. (metering point number) | A 33-character identifier beginning “LI”, printed on the network operator’s bill and needed to switch supplier. It is issued and held by LKW for every metering point in the country. |
| MPRN | Gas metering point (LKW / gas network) | Gas has a separate market law (GMG) and its own metering points. This profile covers electricity only. |
| Meter operator | LKW | There is no competitive metering market. LKW supplies, owns and maintains all meters and charges a regulated monthly metering fee, CHF 7.00 for a direct-connected smart meter in 2026. |
| Supplier | Stromlieferant | All customers may choose their supplier. LKW is the incumbent, and an incoming supplier can handle the switch using a power of attorney from the customer. Households are entitled to basic supply (Grundversorgung) under the EMG. |
| Smart-meter infrastructure | LKW smart meters and Energieportal | There is no central DCC-style hub. LKW reads its Landis+Gyr meters over powerline or mobile networks and gives customers their data through the Energieportal and a local customer interface on the meter. |
How a supply point is identified.
LI00 0001 0000 0000 0000 0000 0047 1826 3
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Messpunkt-Nummer (metering point number) (Messpunkt-Nr.) |
| Who issues it? | Liechtensteinische Kraftwerke (LKW) as network operator |
| Format | Country code “LI” followed by 31 numeric characters, printed in groups of four. On LKW’s supplier-switch form the first 24 characters are pre-printed as LI00 0001 0000 0000 0000 0000 and the customer fills in the remaining nine characters for their own metering point. |
| Length | 33 characters |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the network operator’s (LKW’s) electricity bill. LKW’s switching form says to copy the metering point number as shown on that bill. |
| Electronic access | Customers with a smart meter can view their consumption data in LKW’s Energieportal (energieportal.li). The meter also has a standardised local customer interface that outputs readings every 10 seconds. |
| Third-party access | A new supplier can act for the customer under a signed power of attorney (Vollmacht) that gives the metering point number and the property. The EMG requires the regulator to ensure customers can access their consumption data in a standard format. |
| Who keeps the register | Liechtensteinische Kraftwerke (LKW), the only network operator, keeps the register of metering points and connection objects. |
| Register scope | National |
Every electricity connection point in Liechtenstein has a metering point number (Messpunkt-Nummer). LKW assigns it as the national network operator. It is 33 characters long and begins with the country code “LI”. On LKW’s supplier-switch form most of the number is pre-printed (LI00 0001 0000 0000 0000 0000), which shows that every Liechtenstein metering point shares this prefix. The customer adds the last nine characters from their bill. The fictional example above shows the full format.
The number identifies the metering point, not the customer. The switching form asks for the property supplied (“Bezugsobjekt”) together with the metering point number, and LKW makes the property owner responsible for unused or vacant connections. However, LKW’s published documents do not say explicitly whether the number stays the same when occupants change, so this is left unconfirmed here.
Because LKW is the only network operator, there is one register for the whole country. There is no separate data hub or registration service. LKW handles metering point data, meter reading and the network side of supplier switches, and the incoming supplier’s balance-group arrangements are handled under Swissgrid rules for the Swiss control area.
Switching supplier
A customer who wants to switch, or to return to LKW, signs a power of attorney that lets the new supplier cancel the existing supply contract and arrange the change. LKW’s form lists the customer’s name and address, the property supplied, the metering point number and the current supplier. Moving home is reported to LKW on a separate form, and changes of ownership or tenancy must be notified under the network rules.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Market-based: LKW pays for each kWh fed in at Swiss spot prices in 15-minute intervals (never below zero since 2025), with a government-set minimum of 6 Rp/kWh if the annual average for the reference installation falls below that. Plants commissioned before 2023 keep a fixed feed-in tariff unless they switch once to the market model. |
| Is there a network charge for exporting? | No. LKW charges no network usage fees on electricity fed into its grid from PV systems. However, customers with a generator are placed in network tariff group 2, which has a monthly demand charge on electricity they draw from the grid. |
| What happens when spot prices are negative? | Since an amendment to the Energy Efficiency Ordinance (EEV) on 1 January 2025, the market-based price used for feed-in payments is at least zero, so solar owners do not pay to export during negative-price hours. |
| Who keeps the green certificates? | When LKW takes the electricity, it also takes the right to use its ecological value (guarantees of origin). |
| Which technical rules apply? | LKW’s technical operating rules (TBB 2026, approved by the EMK) apply. They refer to STI Directive No. 220 on generating plants, Swiss rule SNR 460712 for stationary storage, the D-A-CH-CZ rules on network disturbances, EN 50160 and EN 61000-3-2/-3-3. |
| Do I need a balance group to export? | Every generator must be in a Swiss control-area balance group. A generator without an offtake contract may not feed in. For small solar systems this is covered by LKW’s statutory offtake of the electricity. |
Connecting a home system.
- Plan the system with a licensed electrical installer and obtain any building permit required. The Energiefachstelle lists the building permit among the subsidy application documents.
- Submit LKW’s connection request for generating plants (Anschlussgesuch für Energieerzeugungsanlagen) and, for a home battery, the separate request for energy storage systems (ESS).
- Install to the Swiss low-voltage installation standard (NIN) and LKW’s technical connection conditions. The installer must hold a trade licence and an installation licence under the Low-Voltage Installation Ordinance (NIV).
- The installer submits a declaration of conformity under the NIV. LKW may carry out a spot-check inspection.
- LKW fits or configures the meter that records feed-in in 15-minute intervals. The connection moves to network tariff group 2.
- Apply to the Energiefachstelle for the state PV subsidy and, separately, to the municipality for any local top-up.
- LKW pays for the electricity fed in monthly or quarterly at the market-based price.
Households can export solar power and are paid for it, but there is no net metering. Since 1 January 2023 new installations have been paid a market-based price: LKW values each 15 minutes of feed-in at the Swiss spot price. If the average annual market price for the reference installation falls below the statutory minimum of 6 Rp/kWh, the minimum applies. Since 2025, negative prices are no longer counted, so the market-based price cannot go below zero. Installations commissioned up to 31 December 2022 keep the earlier fixed tariff, but owners may switch once to the market model.
In practice the value of solar is increasingly in using it on site. The government’s monitoring report estimates that about 40% of PV output is now used where it is generated, and the share is rising. Homes with solar pay LKW’s group 2 network tariff, which has a demand charge and a winter-evening surcharge. Self-consumption, home batteries and load shifting therefore affect bills more than in many neighbouring markets.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | No electricity-market licence identified; building and electrical permits needed under special laws | Building and electrical safety authorities; LKW for grid connection | EMG Art. 4 makes building generating plants subject to approval under the relevant special laws (building and electricity legislation). Rooftop PV needs a connection request to LKW. |
| Store electricity | No market licence identified; grid connection request required for storage operated in parallel with the grid | LKW | LKW has a separate connection request form for energy storage systems (ESS). Swiss rule SNR 460712 is referenced for stationary storage. |
| Export to the grid | Connection approval from LKW plus balance-group coverage; no licence for household systems | LKW; Swissgrid balance-group rules | Feed-in without an offtake contract or balance group is prohibited under the TBB. Household solar is covered by LKW’s offtake under the EEG. |
| Supply / sell to end customers | No separate supply licence identified in the EMG; supplier must be in a Swissgrid balance group | EMK (market supervision); Swissgrid (balance group contract) | The EMK refers suppliers interested in selling in Liechtenstein to Swissgrid’s balance-group registration documents. Suppliers must meet the EMG consumer-protection duties. |
| Aggregate / virtual power plant | No specific legal framework or licence identified | Not applicable | The EMG does not yet include the Clean Energy Package provisions on aggregators, active customers or energy communities, because Directive (EU) 2019/944 is not yet part of the EEA Agreement. |
| Wholesale trading | No explicit licence in the EMG; trading takes place through Swiss control-area balance groups | Swissgrid | Cross-border rules follow the Swiss control area. Liechtenstein implements EU Regulation 714/2009 through the EEA. |
| Balancing and grid services | Swissgrid rules for the Swiss control area apply; no Liechtenstein-specific scheme identified | Swissgrid | The participation conditions for Liechtenstein-connected units were not verified for this profile. |
| Operate a distribution network | Designation by the regulator | EMK | EMG Art. 26(1)(5) empowers the EMK to designate transmission and distribution network operators. LKW is the network operator and is also governed by its own law (LKWG, 2009). |
| Electrical installation work (e.g. PV, batteries) | Trade licence plus installation licence under the NIV | Office of Economic Affairs (trade licence); installation licence under the NIV (application form published by LKW) | Work must follow the Swiss NIN standard and LKW’s TAB. A declaration of conformity is required, followed by spot-check inspections under NIV Art. 28. |
| Remote control of customer assets | No specific licence identified | Not applicable | Under the TBB, LKW as network operator may limit power or switch off appliances during peak periods to optimise network loading (EMV Art. 3). |
Licensing in Liechtenstein is light because the market is small and dominated by one public company. The EMG does not set up separate licences for supply or trading like those in the UK. Instead, market access depends on joining the Swiss control area through a Swissgrid balance group, while network operation depends on designation by the EMK. Generating plants need approval under building and electrical law, and every grid-connected generator or battery needs a connection request to LKW.
The main gap compared with EU member states is the Clean Energy Package. Directive (EU) 2019/944 is still under scrutiny for incorporation into the EEA Agreement, so Liechtenstein law does not yet define aggregators, active customers, citizen energy communities or the right to a dynamic price contract. In practice LKW already offers a dynamic tariff.
Flexibility and grid services.
Aggregation of home equipment: Unknown
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Swiss control-area balancing and system services | Unknown | — | Unknown | Swissgrid. Liechtenstein is part of the Swiss control area, so Swissgrid’s balancing markets are the relevant ones. This profile could not verify whether small assets connected in Liechtenstein can take part, or on what terms. |
| Dynamic retail pricing | Yes | — | No | LKW. Households can choose LKWfree, priced hourly at EPEX Spot Switzerland plus a fee, to shift consumption into cheap hours. |
| Network demand charge | Yes | — | No | LKW. The CHF 2.75/kW monthly demand charge and the winter-evening surcharge in network tariff group 2 reward lower peaks, but they are tariff signals rather than a flexibility market. |
Liechtenstein has no local flexibility market of its own. Balancing is handled within the Swiss control area by Swissgrid, and LKW works within that framework. The government’s 2025 monitoring report sets out an “incentive and storage strategy” in three steps: shift demand first (from 2025), store more from about 2030, and convert surplus power (power-to-heat, power-to-X, seasonal storage) from about 2035. It names hot-water storage, heat pumps and electric boilers in heat networks, and price-led charging of electric cars and home batteries as the main levers.
For households, the practical tools today are price signals: LKW’s dynamic and monthly-variable tariffs, and the demand-based network tariff for homes with solar. The report notes that old ripple-control receivers only let the network operator switch loads off and are not suited to price-based flexibility, and that home energy management systems are needed to respond to dynamic prices.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| LKW Energieportal | Customer portal for smart-meter consumption data, the basis for responding to tariff signals. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Country-wide exchange under way: Unterland from Q3–Q4 2026, finishing in Triesenberg in Q3–Q4 2031 |
| Reading interval | 15 minutes (billing); 10-second readings through the customer interface |
| Responsible party | LKW as network operator |
| Meter make | Landis+Gyr AG (Switzerland) only |
| Communications | Powerline communication or mobile network, chosen on site |
| Cost of exchange | Free of charge |
| Monthly metering charge (2026) | CHF 7.00 direct-connected; CHF 21.60 CT-connected (excl. VAT) |
| Customer access | LKW Energieportal and local customer interface |
| Legal basis | EU Directives 2012/27 and 2019/944 cited by LKW via the EEA; EMG Art. 13a |
LKW is replacing all electricity meters with Landis+Gyr smart meters. After pilot projects, the systematic exchange is moving region by region: the Unterland starts in the third or fourth quarter of 2026, and the last area, Triesenberg, is scheduled for the third or fourth quarter of 2031. The exchange is free. Meters send data to LKW over the power cables (PLC) or the mobile network, depending on the location.
Smart meters record consumption in 15-minute intervals, which LKW uses for the demand charge and for valuing solar feed-in. The meter display updates every 15 seconds, and a standard customer interface outputs readings every 10 seconds for home energy management systems. Data protection follows the GDPR and Liechtenstein’s Data Protection Act. LKW has not published how many meters have been changed so far.
Renewable electricity.
Electricity generation mix (2025 (LKW supply mix disclosure)).
- Hydro: 48.7%
- Nuclear: 32.5%
- Solar: 12.5%
- Wind: 5.7%
- Natural gas (CHP): 0.5%
- Renewable electricity share
- 66.9% (2025 disclosure)Source 5Liechtenstein is a net importer, so this is the renewable share of LKW’s supplied electricity (Stromkennzeichnung 2025), not of domestic generation. Electricity produced in Liechtenstein made up 32.3% of the supplied mix (31.76% renewable plus 0.54% gas CHP). Domestic production covered about 35% of national demand in 2024 (monitoring).
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 16.9 MWp (2024)Source 15Up from 15.2 MWp in 2023 and 9.7 MWp in 2022; the strategy target is at least 5 MWp a year.
- Solar PV
- 77.1 MWp (end 2024)Source 15
- Wind
- 0 MW (2025)Source 5No wind turbines in Liechtenstein; wind in the supply mix comes from LKW stakes abroad.
- Hydro
- Not identified from a reliable public source.
- Pumped storage (Samina)
- 10.8 MW pumping (2024)Source 152 × 5.4 MW pumps, about 90 MWh usable per cycle.
Targets.
- Energy Strategy 2030: 30% of final energy from renewables and waste heat by 2030 (31.7% reached in 2024).
- Energy Strategy 2030: 20% lower final energy demand than in 2008 by 2030 (−17.4% in 2024).
- Greenhouse gas emissions 55% below 1990 by 2030 and 68% by 2035; net zero for energy-related emissions by 2050 under the Emissions Trading Act.
- At least 5 MWp of new PV a year; the energy portal cites an extra 50 MWp of PV by 2030.
Domestic electricity in Liechtenstein comes from LKW’s hydro plants (including drinking-water turbines) and a fast-growing fleet of rooftop solar systems. A small amount comes from gas and biogas combined heat and power. In 2024 domestic production covered about 35% of national electricity demand, compared with 26% in 2020, helped by a record hydro year and a 26.4% rise in PV output. LKW also owns stakes in hydro and wind plants abroad, which appear in its supply mix.
LKW’s 2025 supply mix disclosure shows 66.94% renewable electricity: 48.74% hydro, 12.47% solar and 5.73% wind, with 32.52% nuclear and 0.54% gas CHP. The domestic part of this mix was 31.76% renewable (19.29% hydro and 12.47% solar).
Solar is the main growth area. Capacity has more than tripled since 2016, from 21.9 MWp to 77.1 MWp at the end of 2024, and PV supplied 14.2% of national electricity use in 2024. Wind is the next priority: an LKW study found up to eleven sites with more than 110 GWh a year of potential, and in November 2024 the government ordered a strategic environmental assessment so that wind zones can be added to the national structure plan. A proposal to make PV mandatory on buildings was rejected in 2023.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 90 MWh per cycle (2024)Source 15Samina pumped-storage plant, in pumping operation since 2015, 2 × 5.4 MW. Its full capacity is only available from September to March, when natural inflow is low.
Storage in Liechtenstein means mainly the Samina pumped-storage plant, plus a growing but still small number of batteries, about 2 MW and 3.5 MWh in 2024. The government expects storage, including pumped hydro, bidirectional electric cars and home batteries, to play a bigger role from around 2030, once load shifting has been used as far as possible.
Home batteries connected in parallel with the grid need LKW’s connection request for energy storage systems and must meet Swiss rule SNR 460712. No dedicated state battery subsidy was identified on the Energiefachstelle pages consulted.
Storage projects.
- Samina pumped-storage plant: LKW plant with 2 × 5.4 MW pumping capacity and about 90 MWh per cycle, used mainly for day/night shifting. Pumping energy fell to 4 MWh in 2024 from 887 MWh in 2023 because of high natural inflow and small price spreads.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Liechtensteinische Kraftwerke (LKW) | — | Yes | Yes | Yes | Yes |
LKW is the incumbent supplier and supplies most Liechtenstein customers. Customers are legally free to buy from another supplier registered in the Swiss control area, and LKW publishes a power-of-attorney form for customers switching to it. Market shares and a list of other active suppliers were not published on the regulator’s or LKW’s pages consulted.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Energiefachstelle Liechtenstein (Office of Economic Affairs) | Government | National energy office within the Amt für Volkswirtschaft | Runs state energy subsidies (PV, heating, insulation), the Energy Strategy 2030 monitoring and energy advice. |
| Kommission für Energiemarktaufsicht (EMK) | Regulator | Electricity and gas market regulator | Approves network prices and technical rules and supervises the electricity market. |
| Swissgrid AG | Transmission | Transmission system operator for the Swiss control area | Balances the control area that includes Liechtenstein and handles balance-group contracts. |
| Liechtensteinische Kraftwerke (LKW) | Distribution | Sole network operator, main supplier and generator | Handles grid connections, metering, smart meters, solar feed-in payments and installation inspections. |
| LKW Energieportal | Metering | Customer data portal | Where households view smart-meter consumption data. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection rules | LKW Technische Betriebliche Bestimmungen (TBB) 2026 | LKW, approved by EMK | Approved 4 December 2025, in force 1 January 2026. Covers network use, connection, metering and the technical connection conditions (TAB). |
| Generating plants | STI Directive No. 220 (version 0621) | Starkstrominspektorat (STI) | Requirements for generating plants, referenced in the TBB. |
| Stationary storage | SNR 460712:2018-07 | Swiss rule (SNR) | Swiss rule for stationary electrical storage systems, referenced in the TBB. |
| Low-voltage installations | NIN SN 411000:2025 | Swiss standard | Swiss low-voltage installation standard applied under the Liechtenstein NIV. |
| Voltage quality | SN EN 50160:2010 | CENELEC | Characteristics of the supply voltage. |
| Harmonics and flicker | EN 61000-3-2 (2023), EN 61000-3-3 (2023); D-A-CH-CZ technical rules for network disturbances (2007) | CENELEC; VSE/VEÖ/VDN/CSRES | Limits on disturbances caused by appliances and generators. |
| Connection request | Technical connection request (TAG) VSE 2023 | VSE (Swiss electricity association) form used by LKW | Used together with LKW’s connection forms for generators and storage. |
| Installer qualification | NIV installation licence and declaration of conformity | Liechtenstein Low-Voltage Installation Ordinance (LGBl. 2007 No. 220) | Installers need a trade licence and an installation licence. LKW’s installation inspection carries out spot checks. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Grid connection request to LKW (generator) | Yes | National | Connection request for generating plants operated in parallel with the grid, plus the technical connection request (TAG). |
| Grid connection request to LKW (battery) | Yes | National | Separate connection request for energy storage systems (ESS). |
| Building permit | Limited | Mixed | EMG Art. 4 makes generating plants subject to approval under building law. The Energiefachstelle lists the building permit among PV subsidy documents. Exact exemptions for rooftop PV were not verified. |
| Licensed installer and declaration of conformity | Yes | National | Work by an installer with an NIV installation licence, with a declaration of conformity to LKW. |
| Subsidy application | Limited | Mixed | Only needed to claim support: a paper application to the Energiefachstelle and, where offered, to the municipality. |
For a household solar or battery system, the key approvals come from LKW as network operator. These are the connection request and, after installation, the installer’s declaration of conformity. Building-law approval is handled under the building legislation, and the national PV subsidy application asks for the building permit, technical data sheets, the grid connection approval and a land-registry plan.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| State PV investment subsidy | Active | Grant | CHF 500 per kWp on new-build roofs, CHF 650 per kWp on existing roofs and roof-independent systems, and CHF 750 per kWp for vertical (e.g. façade) systems, up to a maximum amount. Paper application to the Energiefachstelle. | — |
| Municipal PV top-ups | Active | Grant | Municipalities add their own support. In Schaan, for example, it matches the state contribution, though municipal caps are lower than the state cap. | — |
| Market-based feed-in payment with minimum price | Active | Export payment | For plants commissioned from 1 January 2023: 15-minute Swiss spot price, at least zero since 2025, with a 6 Rp/kWh minimum if the annual average for the reference installation is lower. | Since 1 January 2023 |
| Fixed feed-in tariff (pre-2023 plants) | Closed | Feed-in tariff | Closed to new plants. Installations commissioned up to 31 December 2022 keep it unless the owner switches once to the market model. | Plants commissioned up to 31 December 2022 |
| Renewable heating and building renovation subsidies | Active | Grant | State and municipal support for heat pumps and other sustainable heating, insulation of existing buildings and Minergie-P/A buildings. 307 renewable heating systems were subsidised in 2024. Current rates were not verified. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
LKW’s smart meters send data over powerline communication or the mobile network, chosen for each site. A standard customer interface on the meter lets home energy management systems read live data every 10 seconds. LKW also runs Liechtenstein’s fibre network and publishes separate technical conditions for fibre connections.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 0.365 TWh (2025)Source 4Net national grid load of 364,949 MWh; LKW’s own generation was 63,271 MWh and purchases 312,621 MWh.
- Generation capacity
- Not identified from a reliable public source.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
National load is small, a few tens of megawatts, and has been broadly stable for 15 years. The challenge now is midday solar surplus: in 2024 peak PV feed-in reached 35.7 MW against a minimum Sunday load of 25.6 MW, and the country exported small amounts of power to Switzerland for the first time. LKW is reinforcing the low-voltage network, laying a record length of low-voltage cable in 2024, and using demand charges and dynamic tariffs to encourage load shifting.
Security of supply relies on the Swiss and Austrian connections and the Swiss control area. Liechtenstein is part of OSTRAL, the Swiss organisation for electricity supply in emergencies, and customers pay the Swiss winter electricity reserve charge.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| New network operating rules (TBB 2026) | Current | 1 January 2026 | LKW’s technical operating rules, approved by the EMK on 4 December 2025, replace earlier versions and bind all connected customers. |
| Electricity Market Act amendment | Current | 1 January 2026 | The EMG was amended on 13 June 2025, with the consolidated version in force from 1 January 2026. |
| Demand-based network tariff | Current | 2025 | Customers using over 10,000 kWh a year or with feed-in pay a monthly kW demand charge based on their highest 15-minute load, plus a winter-evening surcharge. |
| Feed-in price floor at zero | Current | 1 January 2025 | An amendment to the Energy Efficiency Ordinance excludes negative spot prices from the market-based feed-in payment. |
| Country-wide smart meter exchange | Upcoming | Q3–Q4 2026 to Q3–Q4 2031 | Systematic meter replacement begins in the Unterland and finishes in Triesenberg. |
| Clean Energy Package (Directive 2019/944) in the EEA | Upcoming | Not yet scheduled | The directive is under scrutiny for incorporation into the EEA Agreement, with a draft Joint Committee Decision under consideration. Once incorporated, Liechtenstein will need rules on active customers, aggregators, energy communities and dynamic price contracts. |
| Wind energy zones | Upcoming | Planning from November 2024 | The government ordered a strategic environmental assessment to add wind suitability areas to the national structure plan, after which municipalities would designate energy zones. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | 77.1 MWp of PV at the end of 2024, about 1,885 W per inhabitant (about twice the Swiss level), supplying 14.2% of national electricity use. |
| Distributed energy market | High | Rooftop PV peak feed-in (35.7 MW) already exceeds minimum Sunday load (25.6 MW), and about 40% of PV output is used on site. |
| Grid flexibility market | Low | No national flexibility market or aggregator framework; balancing sits within the Swiss control area. Flexibility currently comes through LKW dynamic tariffs and demand charges. |
| Energy storage adoption | Low | Around 2 MW / 3.5 MWh of batteries nationally in 2024, plus the 10.8 MW Samina pumped-storage plant. |
| Renewable growth environment | High | PV additions of 16.9 MWp in 2024 and 15.2 MWp in 2023, more than three times the 5 MWp/yr strategy target; domestic production rose from 26% of demand in 2020 to about 35% in 2024. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 21 sources
- Stromtarife (LKWclassic, LKWflex, LKWfree). Liechtensteinische Kraftwerke, 2026. accessed 10 October 2026.
- Netznutzungspreise 2026 – Kundengruppe 1. Liechtensteinische Kraftwerke, 2026. accessed 10 October 2026.
- Netznutzungspreise 2026 – Kundengruppe 2. Liechtensteinische Kraftwerke, 2026. accessed 10 October 2026.
- Zahlen & Fakten. Liechtensteinische Kraftwerke, 2025. accessed 10 October 2026.
- Energiequellen und Stromproduktion (Stromkennzeichnung 2025). Liechtensteinische Kraftwerke, 2025. accessed 10 October 2026.
- Solarstromvergütung. Liechtensteinische Kraftwerke, 2026. accessed 10 October 2026.
- Rollout Smart Meter. Liechtensteinische Kraftwerke, 2026. accessed 10 October 2026.
- Stromnetz in Liechtenstein. Liechtensteinische Kraftwerke. accessed 10 October 2026.
- FAQ Netznutzung. Liechtensteinische Kraftwerke. accessed 10 October 2026.
- Technische Betriebliche Bestimmungen (TBB), Stand 01.01.2026. Liechtensteinische Kraftwerke, 2026. accessed 10 October 2026.
- Vollmacht zum Wechsel meines/unseres Stromlieferanten. Liechtensteinische Kraftwerke. accessed 10 October 2026.
- Downloads (connection requests and forms). Liechtensteinische Kraftwerke. accessed 10 October 2026.
- Förderungen und Anträge – Photovoltaik. Energiefachstelle Liechtenstein. accessed 10 October 2026.
- Energiepolitik. Energiefachstelle Liechtenstein. accessed 10 October 2026.
- Bericht und Antrag Nr. 107/2025 betreffend den 5. Monitoringbericht zur Energiestrategie 2030 (Berichtsjahr 2024). Regierung des Fürstentums Liechtenstein, 2025. accessed 10 October 2026.
- Kommission für Energiemarktaufsicht (EMK). EMK Liechtenstein. accessed 10 October 2026.
- Elektrizitätsmarktgesetz (EMG), LR 730.3. gesetze.li (Government of Liechtenstein), 2026. accessed 10 October 2026.
- Mehrwertsteuergesetz (MWSTG), LR 641.20, Art. 25. gesetze.li (Government of Liechtenstein). accessed 10 October 2026.
- EEA-Lex: Directive (EU) 2019/944. EFTA. accessed 10 October 2026.
- Population, total – Liechtenstein (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
- Euro foreign exchange reference rates. European Central Bank, 2026-10-09. accessed 10 October 2026.
Questions about energy in Liechtenstein.
With LKW’s 2026 prices, a household using 4,500 kWh a year on the LKWclassic fixed-price product pays about CHF 1,191 a year including 8.1% VAT, or about 26.5 Rp per kWh all-in. The energy price is 10.70 Rp/kWh; the rest is network charges, Swissgrid charges, the EEG support levy, fixed metering and base charges, and VAT.
Liechtensteinische Kraftwerke (LKW) is the incumbent supplier and the only network operator. All customers may legally choose another supplier registered in the Swiss control area.
The metering point number (Messpunkt-Nummer). It is a 33-character code starting with “LI”, assigned by LKW and printed on the network bill. You need it to switch supplier.
Yes. LKW pays for electricity fed in at the Swiss spot price in 15-minute intervals, never below zero. If the annual average for the reference installation falls below 6 Rp/kWh, a 6 Rp/kWh minimum applies. There is no net metering, and no network fee is charged on feed-in.
Yes. The state pays CHF 500 per kWp on new-build roofs, CHF 650 per kWp on existing roofs and CHF 750 per kWp for façade systems, up to a cap. Many municipalities add their own top-up.
LKW operates the whole distribution network. There is no national transmission operator: Liechtenstein is part of the Swiss control area run by Swissgrid, with four 110 kV links to Switzerland and one to Austria.
Yes. LKW is installing Landis+Gyr smart meters free of charge. The country-wide exchange runs from Q3–Q4 2026 to 2031, and customers can see their data in LKW’s Energieportal.
