How electricity works in Moldova.
Moldova electricity market 2026: ANRE-regulated household prices, Moldelectrica, two DSOs, NLC supply-point codes, net billing for prosumers, licensing and smart meters.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Moldovan leu (MDL) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Moldova energy at a glance.
Key figures for households in Moldova. Each one links to its source on the full overview below.
Electricity price.
3.56 MDL per kWh for households, including taxes. Figures for from 1 Apr 2026.
Household use.
1,751 kWh a year for a typical household. Figures for 2025.
Renewable share.
26.3% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Moldova.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Moldova below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Moldova requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Moldova.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Moldova, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Moldova, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Moldova.
The energy market in Moldova, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Moldova is a small, import-dependent electricity system that has changed quickly since it synchronised with the continental European grid (ENTSO-E) together with Ukraine in March 2022. Until the end of 2024 most of the right bank’s power came from the gas-fired Moldovan thermal power plant (MGRES) in the Transnistrian region. Since 1 January 2025 none has been bought from it, and supply has come mainly from imports through Romania, the domestic market and fast-growing local solar and wind.
Households are almost all supplied by one of two universal-service suppliers at prices set by the regulator, the National Agency for Energy Regulation (ANRE). From April 2026 the single-rate price for low-voltage customers is 3.56 lei/kWh with Premier Energy (centre and south) and 3.95 lei/kWh with FEE Nord (north). Households currently pay no VAT on electricity, but the Government has proposed a 20% rate above the first 100 kWh a month from 2027.
Rooftop and utility solar is the main growth story. Renewable capacity, including prosumer systems, reached 982.8 MW at the end of 2025, up 69% in a year. Solar and wind supplied 26.3% of final electricity consumption. A day-ahead and intraday market run by OPEM opened in December 2025, and balancing and system-services markets were launched in September 2025. Unless stated otherwise, the figures here cover the territory controlled by the constitutional authorities and exclude the Transnistrian region.
Energy snapshot.
Headline figures for electricity in Moldova. Each shows its data year and links to its source.
- Population2,365,600 peopleSource 21 Jan 2026 (provisional)
- Households1,095,000 householdsSource 32024
- Average household size2.2 people/householdSource 32024
- Electricity use per household1,751 kWh/yrSource 112025
- Household price (MDL)3.56 MDL/kWhSource 8from 1 Apr 2026
- Household price (EUR)0.177 EUR/kWhSource 12from 1 Apr 2026
- Renewable electricity share26.3%Source 112025
- Solar capacity0.719 GWSource 11end 2025
- Wind capacity0.24 GWSource 11end 2025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter share3.1%Source 17Nov 2025
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- National Agency for Energy Regulation (ANRE)
- System operator
- Î.S. Moldelectrica (state-owned TSO)
- Distribution networks
- Two licensed DSOs: Premier Energy Distribution (centre and south, 66% of consumption points) and state-owned RED Nord (north, 34%)
- Currency
- Moldovan leu (MDL)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Moldova.
- Household price (MDL)
- 3.56 MDL/kWh (from 1 Apr 2026)Source 8Premier Energy regulated single-rate price for low-voltage (0.4 kV) customers, ANRE Decision 222/2026 of 31 March 2026. Households pay 0% VAT on electricity, so this is the full price per kWh. In the north, FEE Nord charges 3.95 lei/kWh (Decision 224/2026). Eurostat’s average for 2,500–4,999 kWh a year was 3.8725 lei/kWh in the second half of 2025.
- Household price (EUR)
- 0.177 EUR/kWh (from 1 Apr 2026)Source 12Converted from 3.56 MDL/kWh at the National Bank of Moldova official rate of 20.1263 MDL per EUR on 1 October 2026. The FEE Nord price converts to 0.1963 EUR/kWh. Eurostat’s own EUR figure for 2025-S2 is 0.1967 EUR/kWh.
- Typical annual electricity bill
- 6,234 MDL/yr (2025–2026)Source 8Derived: average household consumption of about 1,751 kWh (2025) multiplied by the Premier Energy single-rate price of 3.56 lei/kWh from April 2026. Roughly EUR 310 at 20.1263 MDL/EUR. It is an indication, not an official typical bill.
Household price trend (MDL per kWh).Source 7
| 2019-S1 | 1.8555 MDL/kWh |
|---|---|
| 2019-S2 | 1.9897 MDL/kWh |
| 2020-S1 | 2.0786 MDL/kWh |
| 2020-S2 | 1.9886 MDL/kWh |
| 2021-S1 | 1.8113 MDL/kWh |
| 2021-S2 | 1.8271 MDL/kWh |
| 2022-S1 | 2.3682 MDL/kWh |
| 2022-S2 | 4.4001 MDL/kWh |
| 2023-S1 | 3.574 MDL/kWh |
| 2023-S2 | 2.8511 MDL/kWh |
| 2024-S1 | 2.61 MDL/kWh |
| 2024-S2 | 2.6204 MDL/kWh |
| 2025-S1 | 4.2031 MDL/kWh |
| 2025-S2 | 3.8725 MDL/kWh |
How the household price is built
ANRE sets one regulated price per supplier and voltage level that already includes energy, transmission, distribution and the supplier’s margin. For 2026 it assumed an average purchase price of 2.62 lei/kWh for Premier Energy and 2.54 lei/kWh for FEE Nord, based on Energocom’s contracts, regional exchange prices and bilateral deals with local producers. Network tariffs approved in March 2026 are 24.5 bani/kWh for Moldelectrica’s transmission service and, at low voltage, 69.2 bani/kWh for Premier Energy Distribution and 113.7 bani/kWh for RED Nord. The higher northern distribution tariff largely explains why FEE Nord’s price is about 0.39 lei/kWh above Premier Energy’s.
Taxes and support
Electricity for households is currently zero-rated for VAT (natural gas carries 8%). In August 2026 the Government proposed, as part of its 2027 tax package, to exempt the first 100 kWh a month and apply the standard 20% rate above that. Parliament had not adopted this when this profile was researched. Low-income households can register for winter energy compensation through the Ministry of Labour and Social Protection’s compensatii.gov.md platform. For the November 2025–March 2026 season the compensation ranged from 500 to 1,000 lei.
Trend
Eurostat data show household prices of about 1.8–2.1 lei/kWh until 2021. They doubled during the 2022 gas crisis, eased in 2023–2024, then rose again in 2025 when MGRES stopped supplying the right bank and power had to be imported at market prices. ANRE cut prices in August 2025 (to 3.59 lei at Premier Energy and 4.00 lei at FEE Nord) and again slightly from April 2026. Average supply prices of the two universal suppliers were 340 and 373 bani/kWh in 2025, excluding VAT.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Universal service from Premier Energy (Premier Energy Distribution area) or FEE Nord (RED Nord area) at ANRE-approved prices. From April 2026 the low-voltage single rate is 3.56 lei/kWh (Premier Energy) and 3.95 lei/kWh (FEE Nord). VAT on household electricity is 0%. |
| Time-of-use | Yes | Optional day/night pricing for customers with a suitable meter. Day runs 07:00–23:00 and night 23:00–07:00. In 2026 Premier Energy charges 3.75 and 2.94 lei/kWh and FEE Nord 4.11 and 3.43 lei/kWh. ANRE based the night discount on Energocom’s actual spot purchase prices in those hours. |
| Variable | Limited | Any customer may leave universal service for a supplier selling at negotiated prices. In 2025 the three active free-market suppliers (M. Energy Trading, Navitas Energy and ML Energy Group) together held about 2.2% of retail supply. Licensed eligible consumers took 91.4 GWh, most of it non-household. |
| Dynamic | No | No commercial household tariff linked to hourly prices was identified. A sandbox pilot offering hourly dynamic prices through a virtual power plant platform was endorsed by the Ministry of Energy’s sandbox commission in January 2026 and awaits a Government decision. |
| Other | Yes | Prosumer contracts under net billing: exported energy is credited in money at the average day-ahead closing price for the billing period and set against the cost of imported energy. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 1,751 kWh/yr (2025)Source 11Derived: 1,917.5 GWh supplied to household consumers in 2025 (ANRE) divided by about 1.095 million households (see households). It is a national average, not a metered median.
- Average daily use per household
- 4.8 kWh/day (2025)Source 11Derived: about 1,751 kWh a year divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 811 kWh/person/yr (residential) (2025)Source 11Derived: 1,917.5 GWh of household consumption divided by the 1 January 2026 provisional population of 2,365,600. The NBS energy balance gives 6,677 TJ (about 1,855 GWh) of residential electricity use in 2024.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 12.3 % of households (2024)Source 323.2% of urban and 4.2% of rural households.
- Electric vehicles
- 9,849 battery-electric cars registered (cumulative) (2018–2025)Source 27Battery-electric vehicles registered since 2018 (7,768 by individuals). A further 77,985 hybrids were registered over the same period.
- Electric cooking
- Not identified from a reliable public source.
Household electricity use is low by European standards, at roughly 1,750 kWh per household a year, because heating and cooking rely mainly on gas, wood and district heat. In 2024 the Household Budget Survey found that 14.7% of households had central (district) heating, 26.7% their own heating system and 58.6% a stove or similar. In rural areas the stove share was 87.2%. Household demand is nonetheless rising: supplies to households grew from 1,613.7 GWh in 2023 to 1,917.5 GWh in 2025 and now make up 44.5% of final consumption, split almost evenly between towns (1,001 GWh) and villages (917 GWh).
Air conditioning is still uncommon outside Chișinău and other towns. Electric vehicles are a small but fast-growing load: registrations of electric and hybrid cars reached a record 30,567 in 2025. The national electric-mobility programme aims for 25% of the fleet to be electric or plug-in hybrid by 2030.
Housing and households.
- Dwellings
- 1,365,300 dwellings (1 Jan 2026)Source 5Registered housing stock, occupied and unoccupied; 54.8% in rural areas. The 2024 census counted 1,123,202 residential buildings.
- Owner-occupied
- 95.2 % of households (2024)Source 3Dwellings in private ownership (89.8% urban, 99.2% rural).
- Private rented
- 4.8 % of households (2024)Source 3Rented dwellings (10.1% urban, 0.8% rural).
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 67.9 % of households (2024)Source 3Households living in an individual house (97.3% in rural areas). 1.9% live in other dwelling types.
- Apartments and flats
- 30.2 % of households (2024)Source 368.7% of urban households live in flats.
- Urban population
- 46.4 % of population (8 Apr 2024 (census))Source 1
Moldova is mostly rural and has very high home ownership, mostly without mortgages. According to the 2024 census, 97.7% of residential buildings are individual houses, and there are only 9,776 apartment blocks, concentrated in Chișinău, Bălți and other towns. Most rural houses date from 1946–1960. Asbestos-cement sheeting is the most common roofing material in every region, which matters for anyone fitting rooftop solar.
For a detached house, a prosumer installation is a matter between the owner, the DSO and the supplier. In blocks of flats, Law 10/2016 lets residents organised under the condominium law share the output of a common installation, including for common areas. Fewer than one household in three lives in a flat, so most residential solar potential is on individual houses.
How the grid works in Moldova.
- TransmissionÎ.S. Moldelectrica
- DistributionTwo licensed DSOs: Premier Energy Distribution (centre and south, 66% of consumption points) and state-owned RED Nord (north, 34%)
- MeteringDSOs (metering is a network activity)
- Supply4 or more retail suppliers
Physically, electricity reaches the right bank over Moldelectrica’s 400 kV line from Isaccea (Romania) to Vulcănești, four 110 kV links with Romania and several 330 kV lines with Ukraine. Many of the 330 kV lines run through the MGRES substation in the Transnistrian region. The new 157 km, 400 kV Vulcănești–Chișinău line (630 MVA) bypasses that node. It was energised in July 2026 and scheduled for commercial operation at the end of August 2026. A 400 kV Bălți–Suceava line is planned for about 2028. The DSOs then deliver power at 35–110 kV, 6–10 kV and 0.4 kV over about 57,000 km of lines.
Commercially, Energocom buys imports and supply-security volumes as central supplier and sells them to Premier Energy and FEE Nord. These suppliers also buy from local producers and pay transmission and distribution tariffs on behalf of their customers. Local generation supplied 1,841.4 GWh in 2025, against 4,304.8 GWh of final consumption. Gas-fired combined heat and power plants in Chișinău (Termoelectrica) and Bălți (CET-Nord) supplied 38.3% of domestic output. Network losses and technological consumption were about 10.3% of energy entering the system.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy | Sets energy policy and runs renewable auctions (including the 2025–2026 wind-plus-storage round). It also leads the smart-meter pilot, the energy regulatory sandbox and the 2026–2030 digital transformation programme. |
| Regulator | National Agency for Energy Regulation (ANRE) | Licenses all electricity activities, approves regulated supply prices and network tariffs, and adopts the connection, metering, market and balancing rules. It also keeps the register of renewable prosumers. |
| TSO | Î.S. Moldelectrica | State-owned transmission and system operator (400/330/110 kV). It runs the balancing and system-services markets launched in 2025 and acts as Local Issuing Office 64 for EIC codes. |
| DSO | Premier Energy Distribution | Privately owned DSO for Chișinău and the centre and south, covering about 70% of the territory. It served 955,630 consumption points in 2025. |
| DSO | RED Nord | State-owned DSO for the north, including Bălți. It served 491,156 consumption points in 2025. |
| Supplier | Premier Energy and FEE Nord (universal-service and last-resort suppliers) | Each supplies households in one DSO area at ANRE-regulated prices, and each is the counterparty for prosumer contracts in its area. Together they held about 97.8% of retail supply in 2025. |
| Supplier | Energocom | State-owned central electricity supplier (Government Decision 885/2017). It buys imports and supply-security volumes and sells them to the universal suppliers. It is also the offtaker for renewable auction contracts. |
| Exchange | OPEM (Operatorul Pieței de Energie M) | Licensed market operator and a subsidiary of Romania’s OPCOM. It launched the day-ahead market on 10 December 2025 and the intraday market on 17 December 2025, and is the designated operator for future coupling with EU markets. |
| Metering | DSOs (metering is a network activity) | Each DSO owns, reads and maintains the meters in its area under ANRE’s Regulation on metering for commercial purposes (Decision 74/2022). Prosumers buy their own bidirectional meter, which must be compatible with the DSO’s remote-reading system. |
Compared with the UK system.
| UK concept | Moldova equivalent | How it works |
|---|---|---|
| DNO | Operatorul sistemului de distribuție (OSD) | Two licensed DSOs cover the right bank: Premier Energy Distribution (centre and south) and RED Nord (north). The boundary is geographic, so the address decides the DSO. On the left bank a separate, unlicensed operator serves the Transnistrian region. |
| National Grid / NESO | Î.S. Moldelectrica | A single state enterprise owns the transmission network and operates the system, including real-time balancing. Since 2025 it also runs the balancing energy and system-services markets. |
| MPAN | NLC (număr loc consum, consumption-place number) | Households are identified on the bill by a consumption-place number issued in the supplier/DSO billing system of each area. It is not a national, structured code like the MPAN. A national register of consumption places (RNLC) is planned under the Government’s energy digitalisation programme. |
| MPRN | Gas consumption place with the gas distribution company | Gas points are administered separately by the gas distribution companies and supplied by Energocom at regulated prices. There is no link to the electricity code. |
| Meter operator | DSO (no competitive metering) | Meters belong to and are read by the DSO. Households cannot appoint a meter operator. A prosumer must buy and fit a bidirectional meter that the DSO can parameterise and read remotely. |
| Supplier | Furnizorul serviciului universal (universal-service supplier) | Almost every home buys from Premier Energy or FEE Nord at regulated prices. Switching to a negotiated-price supplier is legally open but rare. Law 164/2025 requires the technical switch to take no more than 24 hours by the end of 2026. |
| Smart-meter infrastructure (DCC / SMETS2) | DSO head-end systems (pilot) | There is no central data company. The pilot meters send 15-minute and hourly data to a head-end system supplied through UNDP, with DSO-run meter-data management. A national energy management platform and RNLC register are planned. |
How a supply point is identified.
NLC 4718263; SV 4718263015 (fictional, Premier Energy style)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Număr loc consum (consumption-place number) (NLC) |
| Who issues it? | The supplier/DSO billing system for the area. In the centre and south this is the Premier Energy system, inherited from Red Union Fenosa. The format used by FEE Nord and RED Nord in the north was not identified. |
| Format | A numeric code identifying the consumption place in the billing database. In the Premier Energy area it was described as seven digits. Each bill also carries a variable symbol (Simbol Variabil, SV) used for payment: the seven NLC digits followed by a three-digit invoice sequence number. A separate contract number and the meter serial number are also printed on the bill. |
| Length | 7 digits in the Premier Energy area (SV payment reference: 10 digits). Not standardised nationally. |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the paper or electronic electricity bill. In the Premier Energy layout the NLC is in the top left-hand box with the customer’s name, address and contract number, highlighted on a yellow background. The SV is shown under the billing dates. |
| Electronic access | Customers quote the NLC to the supplier’s call centre and online services to identify their account. Bills can be paid anywhere in the country, online or at banks and post offices, using the SV. Smart-meter pilot data (15-minute and hourly) is collected by the DSO’s head-end system. No national consumer data portal exists yet. |
| Third-party access | A new supplier needs the customer’s consumption-place details to arrange a switch with the DSO. Prosumer connection permits and contracts refer to the same consumption place. ANRE’s register of renewable prosumers holds the address, plant type, capacity, contracted power and energy flows for each prosumer, and ANRE must publish aggregated data quarterly. |
| Who keeps the register | Each DSO keeps its own register of consumption places and meters, linked to the suppliers’ billing systems. Moldelectrica, as EIC Local Issuing Office 64, allocates Z-type codes to metering points and W-type codes to consumers and generators taking part in the wholesale market, not to ordinary homes. A national register of consumption places (RNLC) is planned but not yet in place. |
| Register scope | Per DSO |
Moldova has no national, structured supply-point number. A household is known by its consumption place (loc de consum), the point where its installation is connected and metered. The universal supplier’s billing system identifies it by the NLC. A Red Union Fenosa (now Premier Energy) explanation of its bill describes the NLC as an individual seven-digit code. The SV payment reference is built from those seven digits plus a three-digit invoice number, so it changes every month while the NLC does not. The company calls the NLC an individual code of the customer, so whether a new occupant keeps the same number is not stated in the sources found.
How it is used
The NLC, contract number and address identify the customer in every dealing with the supplier. The DSO handles connection requests, connection permits (aviz de racordare) and meter changes for the same consumption place. For a prosumer, the DSO’s permit records the connection point (substation, feeder and 0.4 kV board), the approved plant capacity, the individual capacity cap under Government Decision 599/2025 and the contracted power of the consumption place.
Where it is heading
In October 2025 the Government approved its 2026–2030 Programme for the digital transformation of the energy sector. It includes a national energy management platform and a national register of consumption places (RNLC) covering all consumers. The legal framework for these was still being analysed in mid-2026. Moldelectrica already issues EIC codes to market participants and metering points used in wholesale settlement.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Net billing: exports are credited in money at the average day-ahead closing price for the billing period (until the day-ahead market is liquid, at the supplier’s average purchase price excluding central-supplier volumes). The credit is set against the cost of imports. Any credit left after 12 months is paid to the prosumer’s bank account on request. |
| Is net metering still available? | Only for existing contracts. Law 331/2023 (in force 8 December 2023) replaced net metering with net billing for new prosumers. Universal suppliers signed net-metering contracts until 31 December 2023, and the mechanism applies until 31 December 2027. At the end of 2025, 5,032 customers with 114.8 MW were still on it. |
| How many prosumers use net billing? | 3,553 customers with 85.4 MW at the end of 2025, up from 1,306 a year earlier. They exported 42.9 GWh in 2025. |
| What happens if the system is bigger than the individual cap? | It can still be connected up to the approved capacity, but suppliers pay only for exports proportional to the share of capacity within the cap. In one 2025 Premier Energy Distribution permit, for example, a 29.76 kW plant had a cap of 22.98 kW. |
| Do prosumers pay for imbalances? | No. Prosumers (and net-metering customers) belong to their supplier’s balancing group and are exempt from financial responsibility for imbalances. |
| Can flats or off-site plants take part? | Yes. Residents of a block organised under the condominium law (Law 187/2022) can share output from a common installation. A prosumer may also own a plant away from the consumption place if both are on the same DSO network, the plant serves only that prosumer and both have hourly metering. |
| Can the DSO limit exports? | Yes. The DSO may limit total plant capacity or export volumes in certain areas or periods because of technical network constraints. ANRE monitors these cases and settles disputes. In 2025 Premier Energy Distribution refused 909 of 2,338 generator connection requests and RED Nord 215 of 599. |
Connecting a home system.
- Check eligibility. The system must use renewable sources, be connected behind the household’s own consumption place, not exceed its contracted power or 200 kW, and stay within the individual capacity cap of Government Decision 599/2025 (up to 10 kW, or a level based on consumption or contracted power).
- Apply to the DSO (Premier Energy Distribution or RED Nord) for a connection permit (aviz de racordare) for the generating plant. The regulatory deadline is 30 days. The permit sets the connection point, approved capacity, protection, power-factor and metering requirements.
- Design and install the system as the permit requires. This includes protections that disconnect the plant when grid supply is lost, and a bidirectional meter recording hourly or interval imports and exports that complies with ANRE Decision 74/2022, bought by the prosumer and compatible with the DSO’s remote-reading system.
- The DSO inspects, seals the meter and connects the plant, and notifies ANRE so the prosumer is entered in the register of renewable prosumers.
- Sign a prosumer contract with the supplier: Premier Energy or FEE Nord under the net-billing scheme, or a negotiated-price supplier on agreed terms.
- Each month the bill nets the value of exported and imported energy in a prosumer account. A positive balance rolls forward for up to 12 months and can then be paid out.
Moldova moved from net metering to net billing at the end of 2023 to bring prosumer remuneration closer to market value. Under net billing a kWh exported at midday is worth the average day-ahead price, while a kWh imported is charged at the full regulated retail price, including network costs. That makes self-consumption and storage more valuable than export. Law 10/2016 explicitly gives prosumers the right to install batteries without paying network charges twice on stored energy that stays in the home, including in an electric vehicle.
Prosumer growth has been fast but uneven. Prosumers and net-metering customers delivered about 20% of all solar electricity fed into the grid in 2025. At the same time, high refusal rates for generator connection permits show local network limits on weak rural lines. From 2025 ANRE also requires a performance guarantee of 1,000 lei per kW for plants above 200 kW, to stop speculative permit applications from blocking capacity.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (conventional) | Generation licence from ANRE under Law 164/2025 on electricity. No small-plant exemption threshold was identified in the sources reviewed. | ANRE | Four generation licence holders at the end of 2025 (including Termoelectrica, CET-Nord and the Costești hydro plant). |
| Generate electricity from renewables | Licence for producing electricity from renewable sources (Law 10/2016, Article 21). It can be obtained before construction and is withdrawn if the plant is not built within 4 years. Prosumers within the 200 kW ceiling act as final consumers and do not hold a generation licence. | ANRE | Large plants seeking support compete in Government auctions for “eligible producer” status. Connection permits for plants above 200 kW need a 1,000 lei/kW guarantee. |
| Store energy | New licensed activity introduced by Law 164/2025 (in force 19 August 2025). Prosumers may store their own renewable output without a licence. | ANRE | Storage co-located with renewable plants is also being procured through the wind-plus-battery auction (at least 0.25 MWh per MW). |
| Export surplus from a home | No licence. A connection permit from the DSO, a bidirectional meter and a prosumer contract with the supplier are needed. Capacity may not exceed contracted power, the Government individual cap or 200 kW. | DSO / supplier (ANRE register) | For a non-household prosumer, generation must not be its main commercial or professional activity. |
| Supply electricity to final customers | Electricity supply licence. | ANRE | 78 supply licence holders at the end of 2025 (17 issued that year), but only five actually supplied final customers in 2025. |
| Trade electricity (wholesale) | Electricity trading licence, a new activity under Law 164/2025, plus registration in ANRE’s Register of wholesale energy market participants (in force for electricity since 27 July 2024). | ANRE | 12 trading licences issued in 2025. Day-ahead and intraday trading also requires registration with OPEM. |
| Aggregate (demand or distributed generation) | Aggregation licence, a new activity under Law 164/2025. | ANRE | Three aggregation licences existed at the end of 2025. |
| Balancing services / grid services | Qualification of reserve-providing units or groups by Moldelectrica under the balancing terms and conditions approved by ANRE in 2025, plus registration as, or with, a balance-responsible party. | Moldelectrica / ANRE | No qualified reserve providers existed when the markets opened, so ANRE imposed a temporary public-service obligation on Moldelectrica to buy balancing capacity by non-market means (Decision 561/2025). |
| Virtual power plant / remote control of assets | No specific VPP licence. Commercial aggregation needs an aggregation licence. New models can be tested in the energy regulatory sandbox (Law 252/2024) with temporary derogations approved by Government decision. | ANRE / Ministry of Energy (sandbox) | A VPP pilot with hourly dynamic prices and prosumer aggregation was endorsed by the sandbox commission in January 2026. |
| Distribute or transmit electricity | Distribution or transmission licence; regulated monopoly. | ANRE | Premier Energy Distribution’s licence was extended for 25 years in 2025. Moldelectrica holds the transmission and dispatch licences. |
Law 164/2025 on electricity replaced Law 107/2016 on 19 August 2025 and transposes the EU Clean Energy Package via the Energy Community. It added three new licensed activities (storage, aggregation and trading) and rules for citizen energy communities, which universal suppliers must buy surplus from. It also requires the technical process of switching supplier to take no more than 24 hours by the end of 2026. ANRE issues licences through the SIA GEAP electronic permits system.
Households are deliberately kept outside licensing. A renewable prosumer stays a final consumer, sells surplus only to its own supplier and is exempt from imbalance responsibility. Below the 200 kW ceiling, the practical gatekeepers are the DSO connection permit and the Government’s individual capacity cap, not ANRE licensing.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Day-ahead and intraday markets (OPEM) | Yes | — | Limited | OPEM. Opened in December 2025 for registered participants. Volumes are growing: a record 4,487.6 MWh, about 40% of daily consumption, was traded for 22 August 2026 at an average 2,427.08 MDL/MWh (about 120 EUR/MWh). Coupling with EU markets is targeted for 2028. |
| Balancing energy market | Developing | — | Limited | Moldelectrica. Launched on 22 September 2025 under ANRE Decision 276/2025. Prices for balancing energy are capped in relation to day-ahead prices (Decision 528/2025). |
| System services market (aFRR, mFRR, replacement reserves) | Developing | — | Limited | Moldelectrica. Only test transactions took place after launch because no units had qualified. Moldelectrica was given a temporary obligation to tender balancing capacity outside the market. ANRE’s 2025 balancing rules explicitly allow consumption sites, aggregators and storage to take part. |
| DSO local flexibility | No | — | No | No DSO flexibility market was identified. DSOs manage prosumer congestion by limiting connection capacity or exports. |
Moldova’s organised markets are only months old. Until December 2025 almost all electricity was traded bilaterally or through Energocom. The day-ahead market now gives a reference price, which net billing will use once it is liquid. The balancing and system-services markets exist in law, but in their first year Moldelectrica had to buy reserves outside the market.
Distributed assets have a legal route into these markets, through aggregation licences and the 2025 balancing terms that admit demand, aggregated units and storage. In practice, participation by household assets had not started by mid-2026. The most concrete household-level step is the sandbox VPP pilot combining dynamic prices with prosumer aggregation.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| OPEM day-ahead and intraday platform | Short-term power exchange operated with OPCOM support. |
| Energy regulatory sandbox | Ministry of Energy framework for testing innovations such as VPPs, V2G charging (Government Decision 830/2025) and real-time low-voltage monitoring. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Pilot stage: 44,520 smart meters installed by November 2025; target of 500,000 (at least 40% of households) by 2030 |
| Reading interval | 15 minutes and hourly (pilot meters) |
| Installed (Nov 2025) | 44,520 meters in both DSO areas |
| Next phase | 65,000 more meters delivered by end-2026, installed from Q1 2027 (about 100,000, ≈7% of consumers) |
| 2030 target | 500,000 meters, at least 40% of household consumers, including 100,000 vulnerable households |
| Funding | Pilot financed by the Government of Italy through UNDP Moldova |
| Data system | Head-end system supplied via UNDP; SIMS meter-data management for remote reading and loss detection |
| Prosumer meters | Bidirectional, hourly or interval, bought by the prosumer, compatible with DSO remote reading (ANRE Decision 74/2022) |
Moldova has no mass smart-meter roll-out yet. The Ministry of Energy launched a pilot in June 2023. About 3,000 test meters were installed in Bălți and Chișinău in 2024, and 44,520 had been installed across both distribution areas by November 2025. They report 15-minute and hourly data to a central head-end system and are meant to support differentiated tariffs and analysis of consumption.
The Programme for the digital transformation of the energy sector 2026–2030, approved on 8 October 2025, aims for 500,000 smart meters covering at least 40% of household consumers, prioritising vulnerable families and urban areas. It also aims to cut network losses to 10%. Under Law 10/2016, where a DSO cost-benefit analysis approved by ANRE supports smart metering, prosumers must fit a remotely readable smart bidirectional meter at their own expense.
Renewable electricity.
Electricity generation mix (2025).
- Natural gas (CHP): 38.4%
- Solar: 37.4%
- Wind: 19.6%
- Hydro: 3.7%
- Biogas: 0.9%
- Renewable electricity share
- 26.3% (2025)Source 11Derived share of final electricity consumption: 1,134 GWh of renewable generation out of 4,304.8 GWh consumed. Used instead of the generation share because most consumption is imported: of domestic generation alone (1,841.4 GWh), 61.6% was renewable (solar 37.4%, wind 19.6%, hydro 3.7%, biogas 0.9%).
- Home solar
- 200.2 MW (end 2025)Source 11Derived: 114.8 MW under net metering (5,032 customers) plus 85.4 MW under net billing (3,553 customers). It covers household and non-household prosumers; no household-only split was published.
- Solar added each year
- 318.4 MW (2025)Source 11Derived: 719.2 MW at the end of 2025 minus 400.8 MW at the end of 2024.
- Solar PV (incl. prosumers)
- 719.2 MW (end 2025)Source 11
- Onshore wind
- 239.7 MW (end 2025)Source 11
- Hydro (right bank)
- 16.7 MW (end 2025)Source 11
- Biogas
- 7.2 MW (end 2025)Source 11
Targets.
- Draft Energy Strategy 2050 (public consultation from September 2025): 85% of domestic electricity production from zero-carbon sources by 2050.
- Digital transformation programme 2026–2030: increase grid capacity to integrate renewables from 150 MW to 600 MW by 2030.
- Government Decision 599/2025 sets renewable capacity limits and maximum quotas valid until 31 December 2030. No new fixed-tariff quotas were allocated for solar and wind.
Renewable generation fed into the grid rose from 0.4 TWh in 2023 to 1.13 TWh in 2025, with solar alone going from 78 GWh to 549 GWh (excluding prosumers). Growth came from three routes. Merchant and bilateral solar parks grew rapidly. Prosumers added around 200 MW. Government auctions awarded large “eligible producer” status at fixed prices for 105 MW of wind and 60 MW of solar in 2025, with 15-year contracts with Energocom. These solar plants began delivering in August 2025.
Because renewables are mostly solar, they are concentrated at midday. The rest of domestic output comes from the gas-fired CHP plants in Chișinău and Bălți and the Costești hydro plant on the Prut. The large Dubăsari hydro plant and MGRES are on the left bank and outside these figures. A second auction round for up to 170 MW of onshore wind, requiring at least 0.25 MWh of storage per MW, received bids by 31 March 2026, and technical bids were opened on 18 June 2026.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is at an early stage but is now written into the rules. Law 164/2025 created a storage licence, Law 10/2016 protects prosumer batteries from double network charging, and the 2025 balancing rules admit storage as a reserve provider. The country’s first large battery came online in 2026. Further grid-scale projects linked to the CET-Nord site in Bălți and the wind auction are in procurement. With a shortage of balancing capacity and fast solar growth, batteries are the main candidate to fill the gap.
Storage projects.
- Rădeni solar-plus-storage: 60 MWh battery co-located with a 50 MW solar farm, privately financed and commissioned in May 2026. It is the country’s largest solar plant and battery.
- Wind-plus-storage auction 2025–2026: Government auction for up to 170 MW of onshore wind with an obligation of at least 0.25 MWh of storage per MW. Bids were submitted by 31 March 2026 and evaluation continued in mid-2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Premier Energy | 74.28% of retail electricity supply (2025) | No | Yes | No | Yes |
| Furnizarea Energiei Electrice Nord (FEE Nord) | 23.56% of retail electricity supply (2025) | No | Yes | No | Yes |
| M. Energy Trading | 1.42% of retail supply (2025) | Unknown | Unknown | Unknown | Unknown |
| Navitas Energy | 0.62% of retail supply (2025) | Unknown | Unknown | Unknown | Unknown |
Retail supply is highly concentrated: ANRE measured a Herfindahl–Hirschman index of 6,033 in the household segment in 2025. Premier Energy and FEE Nord each serve one DSO area as universal-service and last-resort supplier. The other active suppliers sell at negotiated prices, mainly to businesses. ML Energy Group held 0.12%. Upstream, state-owned Energocom acts as central supplier, buying imports and supply-security volumes for the universal suppliers.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy | Government | Energy policy, renewable auctions, smart-meter pilot, regulatory sandbox | Publishes auction documents, infrastructure progress reports and the energy strategy. |
| National Agency for Energy Regulation (ANRE) | Regulator | Licensing, tariffs, connection, metering and market rules | Source of regulated prices in force, the licence register and annual market reports. |
| Î.S. Moldelectrica | Transmission | TSO and system operator; balancing and system-services markets; EIC issuing office | Publishes the ten-year network development plan and runs the balancing market. |
| Premier Energy Distribution | Distribution | DSO for the centre and south | Issues connection permits for homes and prosumers in most of the country. |
| RED Nord | Distribution | State-owned DSO for the north | Connection permits and metering in the northern districts. |
| OPEM | Market | Electricity market operator (day-ahead and intraday) | Publishes day-ahead prices used as the reference for prosumer net billing. |
| Energocom | Market | State central electricity supplier and renewable auction offtaker | Buys imported and contracted electricity for the regulated market. |
| National Centre for Sustainable Energy (CNED) | Renewable Energy | Public support institution for renewables and efficiency; runs Casa Verde/FEERM grants | Administers household grants for insulation, heat pumps and solar with batteries. |
| Energy Community Secretariat | Government | International body overseeing transposition of EU energy law | Moldova’s market reforms follow its Energy Community commitments. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Regulation on connection to electricity networks and transmission/distribution services (ANRE Decision 168/2019) | ANRE | Sets connection permit procedures and deadlines (10 days for consumers, 30 days for generating plants) and the simplified procedure for small renewable plants. |
| Metering | Regulation on metering electricity for commercial purposes (ANRE Decision 74/2022) | ANRE | Prosumer meters must be bidirectional, at least class 1 for active energy, metrologically verified under Law 19/2016, store at least 45 days of data and be configurable and readable by the DSO. |
| Power quality | SM EN 50160 | National Standardisation Institute (adopted EN) | Distortion, unbalance and flicker from PV plants must stay within EN 50160 limits (stated in DSO connection permits). |
| Inverter behaviour / anti-islanding | Law 10/2016 Article 39¹ and DSO connection permit conditions | Parliament / DSO | Automatic disconnection on loss of grid supply; continuous operation at 0.9–1.1 Un and within grid-code frequency limits; ride-through of voltage dips; reactive power adjustable between 0.95 capacitive and 0.95 inductive. |
| Electrical installation | NAIE (rules for electrical installations); NCM G.02.02:2018 (lightning protection) | National technical regulations | Referenced in DSO permits for surge protection, residual-current protection and lightning protection. |
| Grid codes | Electricity network codes and guidelines transposing the EU Electricity Integration Package | ANRE | Transposition of the five network codes and guidelines (including balancing) was completed in November 2025. |
| Installer accreditation | No national PV installer certification scheme identified | — | Casa Verde requires a qualified specialist to prepare the technical report before works are funded. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| DSO connection permit (aviz de racordare) | Yes | National | Issued by Premier Energy Distribution or RED Nord within 30 days for generating plants. Sample permits are valid for two years. |
| Individual capacity cap | Yes | National | Government Decision 599/2025 (in force 19 September 2025): up to 10 kW, or a cap derived from consumption or contracted power. Exports above the cap share are not remunerated. |
| Prosumer contract with supplier | Yes | National | Needed to be paid for exports under net billing. |
| Bidirectional meter | Yes | National | Bought by the prosumer to ANRE Decision 74/2022 specifications and installed in an outdoor metering cabinet accessible to the DSO. |
| ANRE licence | No | National | Not needed for prosumers up to 200 kW and within contracted power. |
| Building permit | Limited | Local | Governed by Law 163/2010 on authorising construction works. No explicit national exemption for rooftop PV was confirmed in the sources reviewed, so owners should check with the local public authority (primăria). |
| Performance guarantee | Limited | National | 1,000 lei per kW for connection permits above 200 kW only. |
For a household, the path is administrative rather than planning-led: DSO permit, installation to the permit’s technical conditions, meter and connection, then a supplier contract. The main practical constraints are the individual capacity cap and local network capacity. Many generator permit requests were refused in 2025, especially on weak rural feeders.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net billing for renewable prosumers | Active | Net billing | Exports credited in money at the average day-ahead price and offset against import costs; credit carried for 12 months and then paid out on request. For systems within the Government individual cap, up to 200 kW. | Since 1 January 2024 |
| Net metering (legacy contracts) | Closed | Net metering | Closed to new contracts on 31 December 2023. Existing contracts (5,032 customers, 114.8 MW) continue until 31 December 2027, with annual excess bought by 31 March at the supplier’s average purchase price. | Until 31 Dec 2027 for existing contracts |
| Casa Verde (FEERM) home energy grants | Scheduled | Grant | 50% of eligible costs up to 200,000 lei for individual houses: insulation, windows, heat pumps, or solar panels with batteries (solar and heat pumps only if the home is insulated or being insulated). The second call opened on 18 March 2026 for about 1,000 households (200 million lei). A further call was announced for autumn 2026. | Next call: autumn 2026 |
| Winter energy compensation for vulnerable households | Closed | Bill support | Means-tested compensation of 500–1,000 lei for the November 2025–March 2026 cold season, applied for through compensatii.gov.md. Arrangements for 2026–2027 had not been confirmed when this profile was researched. | Nov 2025 – Mar 2026 |
| Large eligible producer auctions | Active | Fixed-price contract (auction) | Government auctions award 15-year fixed-price contracts with Energocom. The 2025 round awarded 105 MW of wind and 60 MW of solar. The 2025–2026 round for up to 170 MW of wind with storage was being evaluated. | 2025–2026 round in evaluation |
Data and connectivity.
- Fixed broadband
- 74.1 % of households with internet (2024)Source 383.0% urban, 67.4% rural.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
The smart-meter pilot uses a central head-end system that collects 15-minute and hourly readings from DSO meters. Consumption places with more than 50 kW connected must have meters that link to the DSO’s automated metering system. Smaller household prosumer meters must be compatible with the DSO’s remote-reading system. The DSO permit for small prosumers does not require separate telecommunications equipment for the plant (Law 331/2023). Home internet access, at 74% of households, makes app-based monitoring of solar and batteries practical for most homes, though less so in villages.
Grid conditions.
- National peak demand
- 0.76 GW (winter 2023)Source 21Right-bank peak load (700 MW in summer 2023). Including the Transnistrian region (about 250 MW at winter peak), system peak exceeds 1,000 MW.
- Annual electricity demand
- 4.3 TWh (2025)Source 114,304.8 GWh delivered to final consumers on the right bank. Network losses and technological consumption added about 484 GWh.
- Generation capacity
- Not identified from a reliable public source.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The right-bank system is small (peak demand well under 1 GW) and has historically depended on MGRES and on transit through its substation. Since synchronising with ENTSO-E in 2022, Moldova has imported heavily from Romania, especially after MGRES supply stopped in January 2025, when imports rose by about 2,541 GWh. The new 400 kV Vulcănești–Chișinău line is the first of three projects to give direct, redundant links to Romania. Bălți–Suceava follows around 2028, and a Strășeni–Gutinaș line is in preparation.
Inside the country, the main constraint is ageing infrastructure. More than 83% of transmission lines and 80% of substations are over 30 years old. Weak low-voltage rural feeders limit how much rooftop solar can connect. Balancing capacity is also scarce, which is why the Government is pairing new wind with mandatory storage and buying reserves through a temporary public-service obligation.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Law 164/2025 on electricity | Current | 19 August 2025 | Replaced Law 107/2016. It introduces licences for storage, aggregation and trading, citizen energy communities and smart-metering provisions, and requires 24-hour technical switching by the end of 2026. |
| Day-ahead and intraday markets | Current | December 2025 | OPEM opened the day-ahead market on 10 December and the intraday market on 17 December 2025. Coupling with EU markets is targeted for 2028. |
| Balancing and system-services markets | Current | 22 September 2025 | Launched under ANRE Decision 276/2025. Moldelectrica has a temporary obligation to buy balancing capacity outside the market until enough providers qualify. |
| Individual capacity caps for prosumers | Current | 19 September 2025 | Government Decision 599/2025 replaced the earlier capacity quotas. Net billing is now limited per plant (up to 10 kW, or based on consumption or contracted power) rather than by a national quota. |
| Supplier switching within 24 hours | Upcoming | By end of 2026 | Legal deadline under Law 164/2025 for the technical switching process. |
| VAT on household electricity | Upcoming | 2027 (proposed) | The Government’s 2027 fiscal proposals (August 2026) would exempt the first 100 kWh a month and apply 20% VAT above that, replacing today’s 0%. Not yet adopted by Parliament. |
| End of legacy net metering | Upcoming | 31 December 2027 | Remaining net-metering contracts end. Holders can move to net billing. |
| Smart meters and national consumption-place register | Upcoming | 2026–2030 | 65,000 further pilot meters from 2027 and a 500,000-meter target by 2030, plus a national energy management platform and register of consumption places (RNLC). |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Low | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | About 8,600 prosumer contracts (5,032 net metering and 3,553 net billing) with 200 MW at the end of 2025, against 1.45 million consumption points. Penetration is under 1% of sites, though it is growing quickly. |
| Distributed energy market | Medium | Distribution-connected renewables delivered 995 GWh in 2025 (up 86%), and renewables met 26.3% of final consumption, mostly from distribution-connected solar and wind. |
| Grid flexibility market | Low | Balancing and system-services markets opened in 2025 but had no qualified reserve providers. Three aggregator licences exist; no DSO flexibility markets. |
| Energy storage adoption | Low | The first large battery (60 MWh at Rădeni) came online in 2026. There are no published statistics on home or grid storage. |
| Renewable growth environment | High | Renewable capacity rose 69% in 2025 to 982.8 MW, with solar up 1.8 times and wind up 1.5 times; renewable generation fed into the grid rose 77% (641 GWh to 1,134 GWh). |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 29 sources
- Final results of the 2024 Population and Housing Census: Geographical distribution of the population. National Bureau of Statistics of the Republic of Moldova, 2025. accessed 1 October 2026.
- Demographic situation in 2025. National Bureau of Statistics of the Republic of Moldova, 2026. accessed 1 October 2026.
- Aspects of the standard of living of population, edition 2025 (Household Budget Survey 2024). National Bureau of Statistics of the Republic of Moldova, 2025. accessed 1 October 2026.
- Rezultatele finale ale RPL 2024: Caracteristici ale clădirilor rezidențiale și locuințelor. National Bureau of Statistics of the Republic of Moldova, 2026. accessed 1 October 2026.
- Housing stock as of January 1, 2026. National Bureau of Statistics of the Republic of Moldova, 2026. accessed 1 October 2026.
- Balanța energetică a Republicii Moldova, ediția 2025. National Bureau of Statistics of the Republic of Moldova, 2025. accessed 1 October 2026.
- Electricity prices for household consumers – bi-annual data (nrg_pc_204), Moldova, 2,500–4,999 kWh, all taxes. Eurostat, 2026. accessed 1 October 2026.
- Tarife în vigoare – energie electrică. ANRE, 2026. accessed 1 October 2026.
- Notă de argumentare privind aprobarea prețurilor reglementate pentru furnizarea energiei electrice de către Premier Energy în anul 2026. ANRE, 2026. accessed 1 October 2026.
- Notă de argumentare privind aprobarea prețurilor reglementate pentru furnizarea energiei electrice de către FEE Nord în anul 2026. ANRE, 2026. accessed 1 October 2026.
- Raportul de activitate al ANRE pentru anul 2025. ANRE, 2026. accessed 1 October 2026.
- Official exchange rates of the Moldovan leu, 1 October 2026. National Bank of Moldova, 2026. accessed 1 October 2026.
- TVA 20% pentru lumină și gaz: echitate sau jaf?. WatchDog.MD, 2026. accessed 1 October 2026.
- Guvernul Moldovei propune cote diferențiate de TVA pentru 2027. Logos Press, 2026. accessed 1 October 2026.
- Legea nr. 10/2016 privind promovarea utilizării energiei din surse regenerabile (consolidated text). Premier Energy (republished official text), 2024. accessed 1 October 2026.
- Aviz de racordare (prosumer PV connection permit) issued by Premier Energy Distribution, 2025. Premier Energy Distribution (via MTender), 2025. accessed 1 October 2026.
- Stadiul proiectelor/programelor de infrastructură ale Ministerului Energiei – actualizare 14.07.2026. Ministry of Energy of the Republic of Moldova, 2026. accessed 1 October 2026.
- Guvernul a aprobat Programul de transformare digitală a domeniului energetic pentru anii 2026–2030. Government of the Republic of Moldova, 2025. accessed 1 October 2026.
- Smart meters for renewable energy in the Edineț–Cupcini area. Ministry of Energy of the Republic of Moldova, 2025. accessed 1 October 2026.
- Distribution of EIC codes. Î.S. Moldelectrica. accessed 1 October 2026.
- Planul de dezvoltare a rețelei electrice de transport pe 10 ani (TYNDP 2025–2034). Î.S. Moldelectrica, 2025. accessed 1 October 2026.
- Explicăm conţinutul facturii pentru energia electrică consumată (Red Union Fenosa, now Premier Energy). Economist / Premier Energy, 2014. accessed 1 October 2026.
- OPEM și OPCOM anunță lansarea PZU și PPZ. OPCOM / OPEM, 2025. accessed 1 October 2026.
- Record de tranzacționare pe PZU operată de OPEM (21.08.2026). OPCOM / OPEM, 2026. accessed 1 October 2026.
- The 400-kV Vulcănești–Chișinău power line has been prepared for commercial operation. InfoMarket, 2026. accessed 1 October 2026.
- Moldova’s largest BESS, built by Huawei, now inaugurated and commissioned. ESS News, 2026. accessed 1 October 2026.
- More and more Moldovans choose electric, hybrid cars: 87,000 vehicles registered in recent years. Moldpres, 2026. accessed 1 October 2026.
- Moldova to launch new Casa Verde grant applications this autumn. Logos Press, 2026. accessed 1 October 2026.
- Energy Strategy 2050 presented for public consultation. Ministry of Energy of the Republic of Moldova, 2025. accessed 1 October 2026.
Questions about energy in Moldova.
From April 2026 households pay a regulated 3.56 lei/kWh with Premier Energy (centre and south) or 3.95 lei/kWh with FEE Nord (north), about €0.18–0.20/kWh. There is no VAT on household electricity at present. Optional day/night rates are cheaper between 23:00 and 07:00.
Almost all homes buy from the universal-service supplier for their area: Premier Energy where Premier Energy Distribution runs the network, and FEE Nord in the RED Nord area. Switching to a negotiated-price supplier is allowed but rare.
Yes. New prosumers use net billing: you get a DSO connection permit, fit a bidirectional meter and sign a prosumer contract with your supplier. Exports are credited at the average day-ahead price and offset against your bill, with any credit paid out after 12 months on request. Systems are limited to your contracted power, the Government individual cap and 200 kW.
There is no national supply-point number. Your bill shows a consumption-place number (NLC, seven digits in the Premier Energy area) together with a contract number, and each month’s bill has a variable symbol used for payment. A national register of consumption places is planned.
Not for new customers. It closed to new contracts at the end of 2023 and existing contracts run until 31 December 2027. New systems join the net-billing scheme instead.
Only in a pilot so far: about 44,500 were installed by November 2025 and about 65,000 more are due from 2027. The Government’s 2026–2030 digital programme targets 500,000 smart meters, covering at least 40% of households.
The Casa Verde programme run by CNED pays 50% of costs, up to 200,000 lei, for energy renovation of individual houses. This can include solar panels with batteries or heat pumps if the house is insulated. A new call was announced for autumn 2026.