Countries

Energy in Romania, explained.

How electricity works in Romania: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Romania: Not yet available.Olmack is not offered in Romania yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Romania.

Romania electricity market 2026: ANRE, Transelectrica, eight DSO areas, POD codes, prosumer compensation under Law 160/2026, licensing, storage and flexibility.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Romanian leu (RON) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Romania energy at a glance.

Key figures for households in Romania. Each one links to its source on the full overview below.

  • Electricity price.

    1.477 RON per kWh for households, including taxes. Figures for 2025-H2.

  • Household use.

    1,838 kWh a year for a typical household. Figures for 2024.

  • Renewable share.

    45.2% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Romania.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Romania below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Romania requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Romania.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Romania, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Romania, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Romania.

Full overview

The energy market in Romania, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Romania has a fully liberalised electricity market. Households have been able to choose their supplier since 2021, and the state-controlled wholesale and retail price caps introduced during the 2022 energy crisis ended on 1 July 2025. The regulator, the National Energy Regulatory Authority (ANRE), sets network tariffs and licenses market participants; Transelectrica owns the transmission grid and dispatches the system; and four distribution companies operate the low-voltage network across eight historical concession areas.

The end of the cap pushed household prices up sharply. Eurostat puts the average household price at 1.4767 lei/kWh (€0.2907/kWh) including taxes in the second half of 2025, up from 0.8987 lei/kWh in the first half, which took Romania from one of the cheapest EU markets to roughly the EU average in euro terms. Low-income households receive a 50 lei monthly energy voucher, currently extended to 31 December 2026.

Generation is mixed: hydro, nuclear (Cernavodă), gas, coal, wind and a fast-growing solar fleet. Romania had 359,378 prosumers with 4,019 MW of installed capacity at 30 June 2026, and 127,084 of them had batteries. A new prosumer law, Law 160/2026, entered into force on 26 July 2026 and moves compensation from a 24-month carry-forward to monthly settlement. Grid-scale storage reached 989 MW by 1 August 2026.

Energy snapshot.

Headline figures for electricity in Romania. Each shows its data year and links to its source.

Market structure
Fully liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Autoritatea Națională de Reglementare în domeniul Energiei (ANRE)
System operator
Transelectrica (CNTEE Transelectrica SA), through the National Energy Dispatcher (DEN)
Distribution networks
Eight regional concession areas run by four DSO groups: Rețele Electrice (PPC), Distribuție Energie Electrică România (Electrica), Delgaz Grid (E.ON) and Distribuție Energie Oltenia (Macquarie)
Currency
Romanian leu (RON)
Voltage and frequency
230 V / 50 Hz

Electricity prices in Romania.

Household price (RON)
1.477 RON/kWh (2025-H2)Source 1Eurostat average household price, all consumption bands, all taxes and levies included. Band DC (2,500–4,999 kWh/yr) was 1.4696 lei/kWh. First full half-year after the price cap ended on 1 July 2025.
Household price (EUR)
0.291 EUR/kWh (2025-H2)Source 1Eurostat’s own euro series (nrg_pc_204, currency EUR), so no separate conversion has been applied. EU-27 average for the same period: €0.2942/kWh.
Typical annual electricity bill
2,714 RON/yr (2025-H2 prices, 2024 consumption)Source 1Derived: average household consumption of 1,838 kWh (2024) multiplied by Eurostat’s average all-in price of 1.4767 lei/kWh for the second half of 2025. Romanian household bills have no separate standing charge for most suppliers, so the per-kWh figure covers most of the bill.

Household price trend (RON per kWh).Source 1

0.7961.2391.6822021-H22025-H2
Romania household electricity price, RON per kWh
2021-H20.7959 RON/kWh
2022-H11.1476 RON/kWh
2022-H21.682 RON/kWh
2023-H10.8883 RON/kWh
2023-H20.8835 RON/kWh
2024-H10.8826 RON/kWh
2024-H20.8697 RON/kWh
2025-H10.8987 RON/kWh
2025-H21.4767 RON/kWh

What is in the price

A Romanian household bill combines the supplier’s energy price with regulated charges that ANRE sets: distribution, transmission (injection and extraction), system services, the high-efficiency cogeneration contribution, green certificates for older renewable plants, excise duty, and VAT. VAT rose from 19% to 21% on 1 August 2025, a two-point rise that increased a typical Bucharest kWh price from 1.036 to 1.059 lei for customers whose energy price did not change.

Network tariffs by area

Distribution tariffs differ by DSO because each concession has its own cost base and approved revenue. From 1 January 2026 the low-voltage distribution tariff is 317.4 lei/MWh at Rețele Electrice (Muntenia Sud, Banat, Dobrogea), 355 lei/MWh at Distribuție Energie Electrică România (Muntenia Nord, Transilvania Nord and Sud), around 388 lei/MWh at Delgaz Grid (Moldova) and around 333 lei/MWh at Distribuție Energie Oltenia, the only area where it fell. Transelectrica’s extraction tariff rose to 36.45 lei/MWh and its injection tariff to 3.63 lei/MWh.

End of the price cap

Government Emergency Ordinance 27/2022 capped household prices from April 2022 at between 0.68 and 1.30 lei/kWh depending on consumption, with the difference reimbursed to suppliers. The scheme ended on 1 July 2025, and Eurostat recorded a 58.6% rise in household prices between the second half of 2024 and the second half of 2025, the largest in the EU. Measured in purchasing power, Romanian electricity was the most expensive in the EU in the second half of 2025.

Support for vulnerable households

Under Emergency Ordinance 35/2025, single people with a net income of up to 1,940 lei a month and families with up to 1,784 lei per member receive a 50 lei monthly electricity voucher. The scheme started on 1 July 2025, was due to end on 31 March 2026 and has been extended to 31 December 2026 for existing beneficiaries.

Shopping around

Prices vary widely between suppliers. ANRE runs an online comparator of standard offers, and households can switch through suppliers or ANRE’s national supplier-switching platform. In late 2025 the gap between the cheapest offers and universal service in Bucharest was about 0.3–0.6 lei/kWh (universal service 1.67 lei/kWh against competitive offers of 1.07–1.38 lei/kWh).

Tariff types.

Tariff types.
TariffAvailableDetail
FixedYesMost competitive offers are fixed-price contracts for 3, 12 or 24 months. In the ANRE comparator for Bucharest in November 2025 the cheapest all-in offers ranged from 1.07 to 1.38 lei/kWh at 200 kWh a month.
VariableYesSome suppliers publish standard offers with a variable price that can be changed with notice, usually linked to their purchasing costs.
RegulatedLimitedThere is no longer a regulated energy price. Households and small businesses may ask for universal service from a designated supplier at a published, non-discriminatory price; the network tariffs inside every bill remain regulated by ANRE.
DynamicLimitedSuppliers with more than 200,000 customers must offer a dynamic-price contract, following the hourly day-ahead price on OPCOM, to customers with a smart meter who ask for one. Offers must be sent within 5 working days and listed in the ANRE comparator. Take-up is small because only about a third of meters are smart.
Time-of-useLimitedDay/night offers exist but are not widespread. They need a multi-register or smart meter installed by the DSO.
OtherYesProsumer contracts. The supplier nets electricity exported against electricity consumed (quantitative compensation) or buys the surplus. From 26 July 2026 this is settled monthly under Law 160/2026.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,838 kWh/yr (2024)Source 8Derived: Eurostat final electricity consumption of households in 2024 (13,907 GWh) divided by 7,565,900 private households in 2024 (Eurostat lfst_hhnhtych).
Average daily use per household
5 kWh/day (2024)Source 8Derived: 1,838 kWh per household per year divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
729 kWh/person/yr (2024)Source 8Residential only. Derived: household electricity consumption of 13,907 GWh divided by the 1 January 2024 population of 19,067,576.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
49,594 battery-electric cars (31 Dec 2024)Source 44Registered fully electric passenger cars (DGPCI data), up 26% on a year earlier; 266,598 hybrids of all types were also registered. Transelectrica expected about 68,000 electric vehicles of all categories in 2026.
Electric cooking
Not identified from a reliable public source.

Romanian households use little electricity by EU standards: about 1,840 kWh a year on average, or roughly 5 kWh a day. Most homes heat with gas boilers, district heating in larger cities or firewood in rural areas, so electricity is used mainly for lighting, appliances and, increasingly, air conditioning in summer.

Household consumption was 13.9 TWh in 2024, about 30% of final electricity consumption of 45.8 TWh. National consumption has been flat: Transelectrica reported net internal consumption of 53.1 TWh in 2025, 0.8% lower than in 2024, with the sharp price increases of 2021–2022 and 2025 and rapid growth in rooftop self-consumption both holding down metered demand.

Rooftop solar now changes the national load curve. Transelectrica notes that the 3,450 MW of prosumer capacity connected by January 2026 creates a midday dip in grid demand and has pushed the morning peak below the evening peak. Electric vehicles remain a small load but are growing.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
93.2% (2025)Source 6Share of population living in owner-occupied homes (EU-SILC); 92.0% own outright with no mortgage, one of the highest rates in the EU.
Private rented
2.3% (2025)Source 6Share of population renting at market price.
Social or public housing
Not identified from a reliable public source.
Houses
63.8% (2025)Source 7Share of population living in houses; 62.5% in detached houses and 1.3% in semi-detached.
Apartments and flats
36% (2025)Source 7Share of population living in flats; 32.8% in buildings with ten or more dwellings.
Urban population
52.2 % of population (2025)Source 12

Almost all Romanians own their home, mostly without a mortgage, so the person paying the electricity bill usually also owns the roof. Nearly two-thirds of people live in detached houses, particularly in rural areas, which have plenty of roof space for solar panels.

About a third live in flats, mostly in large blocks from the 1960s–1980s in towns and cities. Rooftop solar on a block needs the owners’ association to agree and is much less common; each flat has its own supply point and meter, usually grouped in a meter cabinet on the stairwell or outside the building.

Rural homes are often on long low-voltage feeders, so a high share of single-phase rooftop systems in one village can cause voltage problems and delays to connections. DSOs check that inverters meet ANRE’s technical norm before they energise a prosumer installation.

How the grid works in Romania.

  1. TransmissionTranselectrica, National Energy Dispatcher (Dispecerul Energetic Național, DEN)
  2. DistributionEight regional concession areas run by four DSO groups: Rețele Electrice (PPC), Distribuție Energie Electrică România (Electrica), Delgaz Grid (E.ON) and Distribuție Energie Oltenia (Macquarie)
  3. MeteringDistribution system operators, ANRE POSF (Platforma Online de Schimbare a Furnizorului)
  4. Supply7 or more retail suppliers

Physical flow

Large power stations such as Hidroelectrica’s dams, Nuclearelectrica’s Cernavodă units, gas plants and wind and solar parks feed the 400/220 kV transmission network owned by Transelectrica. Transelectrica connects to the 110 kV, medium-voltage and 0.4 kV networks of the eight distribution areas, which serve households. Romania is synchronously connected to continental Europe, with interconnectors to Hungary, Serbia, Bulgaria, Ukraine and Moldova.

Commercial flow

Generators sell on OPCOM’s day-ahead and intraday markets or through bilateral contracts. Suppliers buy energy, sign contracts with households and pay the DSO and Transelectrica regulated tariffs, which they pass through on the bill. Every market participant either is, or delegates to, a balance responsible party (PRE) that pays for its deviations on the balancing market run by Transelectrica.

Operating pressures in 2026

In July 2026 Cernavodă Unit 1 was taken out of service and drought reduced Danube flows and hydro output. During the heatwave the Ministry of Energy convened the Energy Command, and DEN balanced the system with imports, storage and new solar. Winter is still the main peak season: demand reached 8,954 MW (hourly average) on 12 February 2025.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy (Ministerul Energiei)Sets energy policy and drafts primary legislation (Electricity Law 123/2012), runs the contracts-for-difference auctions and coordinates crisis measures such as the Energy Command during the summer 2026 heatwave.
RegulatorANRELicenses generation, storage, supply, trading and aggregation; approves transmission and distribution tariffs; writes connection, metering and prosumer rules; runs the offer comparator and the national supplier-switching platform (POSF).
TSOTranselectricaState-controlled owner and operator of the 400/220 kV transmission network and cross-border interconnections, about 4,000 MW of import/export capacity in summer 2026.
System operatorNational Energy Dispatcher (Dispecerul Energetic Național, DEN)Transelectrica’s control centre. Balances the system in real time, runs the balancing market, qualifies balancing service providers and publishes seasonal operating studies.
DSORețele Electrice Muntenia, Banat and DobrogeaThree concession companies owned by the PPC group (formerly Enel) covering Bucharest–Ilfov–Giurgiu and the south (Muntenia Sud), western Romania (Banat) and the Black Sea coast (Dobrogea).
DSODistribuție Energie Electrică România (DEER)Electrica group DSO for three areas, Muntenia Nord, Transilvania Nord and Transilvania Sud, covering 18 counties.
DSODelgaz GridE.ON group DSO for the Moldova region in the north-east. It also distributes gas.
DSODistribuție Energie OlteniaDSO for Oltenia in the south-west, formerly owned by CEZ and now owned by Macquarie through Evryo.
MeteringDistribution system operatorsEach DSO owns, installs and reads the meters in its area, runs its own smart-metering programme to ANRE’s calendar, and supplies meter data to suppliers.
Data hub / registryANRE POSF (Platforma Online de Schimbare a Furnizorului)National supplier-switching platform operated by ANRE. It links suppliers and network operators and holds consumption-point and contract metadata. It is not a meter-data hub; interval data stays with each DSO.
ExchangeOPCOMElectricity and gas market operator: day-ahead market (PZU), intraday market and bilateral contract platforms. The PZU price is the reference for dynamic tariffs and for valuing some prosumer surplus.
SupplierLicensed suppliers (furnizori)Dozens of competing suppliers hold the customer contract and bill network charges on to the customer. Designated last-resort suppliers (FUI) provide universal service.

Compared with the UK system.

Compared with the UK system.
UK conceptRomania equivalentHow it works
DNOOperator de distribuție concesionar (OD)Four DSO groups hold concessions for eight fixed regions, like UK licence areas. They own the network and the meters, connect customers and prosumers, and issue the technical connection permit (ATR) and connection certificate. Small local distributors also exist, but almost all households are in one of the eight areas.
National Grid/NESOTranselectrica and its dispatch centre (DEN)Transelectrica combines what NESO and National Grid Electricity Transmission do in Great Britain. It owns the transmission network and dispatches and balances the system through DEN.
MPANCod POD (cod unic de identificare a locului de consum)Each consumption point has a POD code issued by its DSO. The format depends on the DSO, from a 10-character code beginning EMO at Delgaz Grid to an 18-digit code beginning 594 at DEER. Unlike the MPAN, it has no common national structure carrying profile or loss information.
MPRNGas consumption-point code from the gas DSOGas points have separate identifiers issued by the gas distribution operator. Some companies, such as Delgaz Grid, distribute both electricity and gas, but the two codes remain separate.
Meter operatorThe DSOThere is no competitive meter-operator market. Metering at distribution level is a regulated DSO activity: the DSO owns and installs the meter, replaces it with a bidirectional meter when a prosumer connects, and reads it.
SupplierFurnizor (ANRE-licensed supplier)As in Great Britain, the supplier holds the contract and bills network charges. Households can also choose universal service from a designated supplier. Since the cap ended in July 2025 there is no Ofgem-style default price cap.
Smart-meter infrastructureSisteme de măsurare inteligentă (SMI) run by each DSONo DCC equivalent. Each DSO buys, installs and runs its own smart meters and head-end systems to a rollout calendar approved by ANRE, and data moves from the DSO to suppliers through DSO platforms.

How a supply point is identified.

594053000123456789 (fictional, DEER-style 18-digit format)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Cod POD (cod unic de identificare a locului de consum) (POD)
Who issues it?The distribution operator of the area where the consumption point is connected
FormatSet by each DSO. Rețele Electrice (Muntenia, Banat, Dobrogea): alphanumeric, starts with “RO”. Delgaz Grid: alphanumeric, starts with “EMO”. Distribuție Energie Electrică România: numeric, starts with “594”. Distribuție Energie Oltenia: numeric, starts with “594”.
Length15 characters (Rețele Electrice), 10 (Delgaz Grid), 18 digits (DEER), 26 digits (Distribuție Energie Oltenia)
Stays with the property when you switch supplier?Yes
Where to find itIn the consumption-point section of every electricity bill (usually page two) with the point’s name, address and voltage level, and on the technical connection permit (ATR) and connection certificate issued by the DSO.
Electronic accessThrough the customer account on the DSO’s portal (where smart-meter data is available) and on supplier invoices and apps. ANRE’s POSF platform uses the POD to route supplier changes.
Third-party accessThe current supplier receives metering data from the DSO, for example Rețele Electrice provides daily smart-meter data and load curves to suppliers through a dedicated platform. A new supplier gets access when the customer switches. Other parties, such as installers or aggregators, need the customer’s authorisation.
Who keeps the registerEach DSO keeps the register of consumption points and meters in its area. ANRE’s POSF holds consumption-point and contract metadata for supplier switching.
Register scopePer DSO

What the POD identifies

POD stands for point of delivery. It is the point where the network operator’s assets end and the customer’s installation begins, where electricity is delivered and metered. The DSO assigns the code when the point is first connected, and it stays tied to that physical point. When a house is sold or a tenant changes, the contract holder changes but the POD does not. It also does not change when the meter is replaced, for example with a smart or bidirectional meter.

Why the format varies

Romania has no single national format. Each of the four DSO groups kept its own numbering when the concessions were set up and privatised. The two 594-prefixed formats use the GS1 prefix for Romania, while the RO… and EMO… codes are internal formats. Anyone handling customers in several regions needs to know which DSO a code belongs to.

When households need it

Households quote the POD when they switch supplier, report a meter reading or outage, request a power increase, or connect solar panels as a prosumer. Supplier switching is free and is handled by the new supplier, which uses the POD to identify the point through ANRE’s POSF platform. EU rules require the technical switch to be completed within 24 hours by 2026.

Other numbers on the bill

Suppliers also give each customer a customer code and a contract number. These identify the commercial relationship, not the physical point, and change if the household changes supplier. The meter has its own serial number, also printed on the bill.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingLimited
How exported electricity is paidQuantitative (kWh-for-kWh) compensation of the energy component by the supplier, settled monthly from July 2026; installations up to 400 kW can request it. Some larger and non-household prosumers are instead paid for surplus at the OPCOM day-ahead weighted average price.
Is there a size limit?Prosumer status applies up to 400 kW per consumption point under the Electricity Law as amended. Law 160/2026 lets installations up to 400 kW request quantitative compensation, and installations up to 900 kW are exempt from paying for their imbalances.
How is exported energy credited?One kWh exported offsets one kWh imported for the energy part of the price. Network tariffs, system services, green certificates, cogeneration contribution, excise duty and VAT are not offset and are billed on the electricity actually imported. From 26 July 2026 this is settled monthly; the earlier 24-month carry-forward of surplus has gone.
Until when is quantitative compensation guaranteed?Reporting on Law 160/2026 indicates that quantitative compensation stays available for installations up to 200 kW until 31 December 2030, after which surplus is expected to be valued financially. ANRE’s implementing methodology was in public consultation from 20 August 2026, so check the final text.
Can the surplus be used elsewhere?Yes, under Law 160/2026: surplus from one consumption point can offset consumption at another point of the same prosumer if both have the same supplier and the same DSO. The surplus value can also be used towards gas bills with the same supplier once ANRE’s rules are in place.
Do household prosumers pay tax on the surplus?Revenue from surplus sold by individuals with small installations has been exempt from income tax and social contributions. Law 160/2026 raises the threshold below which prosumers need not issue invoices for energy delivered to the grid from 27 kW to 900 kW.
Can I add a battery?Yes. Storage is notified to the DSO with the generation installation and included in commissioning tests. Batteries funded by Casa Verde Baterii must charge only from the prosumer’s own solar surplus, not from the grid.

Connecting a home system.

  1. Choose an installer. Rooftop systems for self-consumption do not need a building permit under Law 50/1991 art. 11(1)(f), except in protected areas, and inverters must be on the DSO’s list of equipment compliant with ANRE Order 228/2018.
  2. Submit a connection notification and documents to the DSO, directly, through the supplier (for households) or online. For an existing consumption point the DSO checks the file within 2 working days.
  3. The DSO replaces the meter with a bidirectional meter within 5 working days of receiving a complete file, then notifies the prosumer that tests may start.
  4. Test the generation (and any storage) installation for up to 5 working days, then submit the commissioning acceptance report to the DSO.
  5. The DSO issues the connection certificate within 3 working days and energises the installation for good within 2 working days of the certificate.
  6. Sign or amend the supply contract so the supplier applies prosumer compensation from the first full month.
  7. For a new consumption and production point, the DSO first issues a technical connection permit (ATR) within 15 calendar days of a complete application, and a connection contract within 3 working days.

Romania’s prosumer scheme is one of the most generous in the EU. It has driven very fast growth, from about 110,000 prosumers with 1,442 MW at the end of 2023 to 359,378 with 4,019 MW at the end of June 2026. Because the energy component is netted kWh for kWh and network charges are not, a household’s savings depend on its supplier’s energy price and how much it consumes at the times it generates.

Law 160/2026, in force since 26 July 2026, keeps the quantitative model but makes it monthly, extends it to more types of prosumer and site, and simplifies invoicing. ANRE published draft implementing rules on 20 August 2026; the prosumers’ association APCE criticised parts of the draft, and some mechanisms are not expected to apply fully until 2027.

Connection rules for small prosumers are set by ANRE Order 19/2022. Adding panels to an existing home is a notification rather than a full application: the DSO swaps the meter and issues a connection certificate on short fixed deadlines. Delays happen mostly where local networks are saturated.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityANRE setup authorisation and generation licence for capacity injecting more than 1 MW; exempt below 1 MW total power and for self-consumption without injectionANRELicensing Regulation approved by ANRE Order 6/2025, in force 26 March 2025. Plants below 1 MW still need a DSO connection and must meet technical norms.
Store electricityStorage licence and setup authorisation above 1 MW, standalone or co-located; exempt below 1 MWANREStorage was given its own licence type under Order 6/2025. Household batteries behind a prosumer meter need no licence.
Export to the grid (household)No licence; prosumer status certified by the DSO through the connection certificate, up to 400 kW per consumption pointDSO (under ANRE Order 19/2022)Physical-person prosumers may sell surplus without registering a business or holding an ANRE authorisation.
Sell electricity (prosumer to supplier or neighbours)No licence up to 400 kW: prosumers can sell surplus to their supplier and, under Law 160/2026, to consumers connected at the plant’s busbarsANRE (methodology)Above 400 kW the plant is treated as an ordinary producer.
Supply electricity to end customersSupply licence (which also covers trading)ANRESuppliers must meet financial and balancing requirements and report to ANRE. Large suppliers have extra obligations, such as offering dynamic-price contracts.
Trade electricity (wholesale only)Trading licence, plus registration on OPCOM and balance responsibilityANRE; OPCOMHolders of a valid licence in another EU member state can be exempt under Order 6/2025.
Aggregate customers or assetsAggregation licence; aggregated groups must be technically qualified by Transelectrica before offering balancing servicesANRE; TranselectricaIndependent aggregation was introduced when Directive 2019/944 was transposed. The first demand-only aggregated group was activated on the balancing market on 1 September 2026.
Balancing and grid servicesBalancing service provider qualification by Transelectrica; minimum offer 1 MW for every reserve typeTranselectrica (DEN)Smaller assets must be pooled by an aggregator to reach 1 MW.
Virtual power plantNo separate VPP licence; operated under an aggregation (or supply) licence with qualified aggregated groupsANRE; TranselectricaA VPP that also trades energy needs balance responsibility and OPCOM registration.
Remote control of customer assetsNo specific licence; done under contract by the aggregator or supplier with the customer’s consentContractual; data-protection lawAssets taking part in balancing must meet Transelectrica’s telemetry and control requirements.
DistributionDistribution licence and concession; exemptions for closed distribution systems and small networks serving below 3 MWANREIndustrial parks and free zones may run exempt networks.

Romania licenses electricity activities under the Electricity and Gas Law 123/2012 and ANRE’s licensing regulation, replaced by Order 6/2025 in March 2025. The main threshold is 1 MW: generation and storage capacities under 1 MW, and self-consumption that does not inject into the grid, need no licence. That leaves almost all rooftop and small commercial solar outside licensing, administered through the DSO connection process instead.

Order 6/2025 sets out separate licences for generation, storage, supply, trading, aggregation, distribution, transmission and market operation. Aggregation is a licensed activity, and aggregated portfolios must pass Transelectrica’s technical qualification before they can offer reserves.

Flexibility and grid services.

Aggregation of home equipment: Yes

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency containment reserve (FCR)Restricted1 MWYesTranselectrica. Procured by Transelectrica from qualified units, which can include generation, storage and aggregated groups.
Automatic frequency restoration reserve (aFRR)Restricted1 MWYesTranselectrica. Secondary regulation under automatic control from DEN. Transelectrica integrated its first battery storage installation into the balancing platform for this service in 2023.
Manual frequency restoration reserve (mFRR) and balancing energyDeveloping1 MWYesTranselectrica. Open to generation, storage and demand. On 1 September 2026 a demand-only aggregated group was activated for the first time, with one site providing 3 MW by cutting consumption for 30 minutes.
Day-ahead and intraday energy marketsYes—YesOPCOM. Assets can be traded through a supplier, trader or aggregator. Hourly PZU prices are the basis for dynamic household contracts.
Local DSO flexibilityNo—UnknownNo DSO flexibility markets were identified; DSOs manage congestion through connection conditions and network investment.

Romania’s balancing market is technology-neutral, but every offer must be at least 1 MW, so households and small businesses can take part only through an aggregator. The legal framework for independent aggregators and active customers came with the transposition of Directive 2019/944, and in 2026 aggregation moved from paper to practice with the first demand-only group activated on 1 September 2026.

Grid-scale batteries are the fastest-growing source of flexibility: 663 MW of storage was connected between January and July 2026, taking available storage to 989 MW. The roughly 127,000 household batteries installed with rooftop solar are not yet aggregated at scale; under Casa Verde Baterii, funded batteries must charge only from the household’s own solar.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Transelectrica balancing market platformQualification of balancing service providers and aggregated groups, and reserve and balancing energy offers.
OPCOMDay-ahead, intraday and bilateral electricity markets.
FlexumersAggregator behind the first demand-only aggregated group activated on the balancing market in September 2026.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutDSO-led rollout to an ANRE calendar; about 35% of consumption points had smart meters in March 2026
Reading intervalNot set nationally; depends on the DSO’s smart-metering system and meter generation
Smart meters installedAbout 3.5 million of roughly 10 million points (March 2026)
Range between DSOsFrom about 69% to 14% coverage
Largest programmeRețele Electrice: about 2 million smart meters targeted by end of 2025
Who installsThe DSO, free of charge, to ANRE’s calendar
Data to suppliersThrough DSO platforms; no national meter-data hub

Smart metering in Romania is the job of the DSOs, not suppliers. Each DSO proposes an annual installation programme, ANRE approves it as part of a national calendar, and the cost is recovered through distribution tariffs. Progress is uneven: in March 2026 the ANRE president described smart meters as an “absolute priority” for operators, with one DSO near 69% coverage and another at 14%.

Rețele Electrice (Muntenia Sud, Banat, Dobrogea) has the most advanced programme. It had almost 1.7 million smart meters at the end of 2024, aimed for about 2 million by the end of 2025, and gives suppliers daily meter data and load curves through a dedicated platform.

Low smart-meter coverage limits dynamic tariffs, time-of-use offers and demand response for households. ANRE has said it wants suppliers to warn customers when their consumption approaches 80% of their contracted amount, which depends on wider smart-meter coverage.

Renewable electricity.

Electricity generation mix (2024).

  • Hydro: 26%
  • Nuclear: 20.4%
  • Gas: 17.2%
  • Coal: 14.9%
  • Wind: 11.9%
  • Solar: 6.4%
  • Oil: 1.1%
  • Bioenergy: 0.9%
  • Other (incl. pumped storage): 1.2%
Source 9
Renewable electricity share
45.2% (2024)Source 9Derived from Eurostat gross electricity production: hydro excluding pumped storage, wind, solar and bioenergy (24,124 GWh) as a share of 53,376 GWh. On the EU renewable-directive (SHARES) consumption basis the renewable share of electricity was 49.9% in 2025 (Eurostat nrg_ind_ren).
Home solar
2.07 GW (30 Jun 2026)Source 19Installed capacity of 324,535 individual (physical-person) prosumers, ANRE data.
Solar added each year
1.33 GW (Jan–Jul 2026)Source 18Grid-connected solar plants only (Transelectrica). Prosumer capacity grew by a further ~565 MW between 1 January (3,454 MW) and 30 June 2026 (4,019 MW).
Hydro
6.69 GW (1 Jan 2026)Source 13878 units, ANRE licence data.
Solar (licensed plants)
3.09 GW (1 Jan 2026)Source 13895 licensed solar plants. 1,331 MW of new solar was connected between January and July 2026.
Prosumers (mostly rooftop solar)
4.02 GW (30 Jun 2026)Source 19359,378 prosumers: 2,067 MW individuals and 1,952 MW legal entities.
Wind
3.14 GW (1 Jan 2026)Source 13
Nuclear
1.41 GW (1 Jan 2026)Source 13Two CANDU units at Cernavodă; Unit 1 was withdrawn from service in July 2026.
Biomass / biogas / other
0.14 GW (1 Jan 2026)Source 13

Targets.

  • 38.3% renewable share of gross final energy consumption by 2030 (updated National Energy and Climate Plan)
  • Installed capacity of 31.3 GW by 2030, about 76% renewable (updated NECP)
  • Climate neutrality before 2045 and an 85% cut in net greenhouse-gas emissions by 2030 against 1990 (updated NECP)
  • Coal phase-out from power generation by 2032

Romania has a relatively low-carbon power mix because of large hydro and nuclear. In 2024 hydro produced about a quarter of electricity and Cernavodă a fifth, with gas and lignite/coal together just under a third. Wind has been flat at about 3.1 GW for years, while solar has grown fast, first through the prosumer boom and now through large ground-mounted plants.

Contracts for difference are now the main support for large renewables. The second CfD auction in 2025 awarded 2,751 MW, 1.49 GW of solar at an average of about €40/MWh and 1.26 GW of wind at about €74/MWh, bringing the two rounds to 4.2 GW. Older plants still receive green certificates, which are funded through a charge on every bill.

Hydro output depends heavily on rainfall: the 2026 drought cut hydro generation and, together with low Danube flows affecting Cernavodă cooling, made Romania more reliant on imports and on new solar and storage during the summer.

Energy storage.

Home batteries
127,084 prosumers with batteries (30 Jun 2026)Source 19123,231 individuals and 3,853 legal entities. Battery capacity (kWh) is not published.
Grid-scale storage
989 MW (1 Aug 2026)Source 18Standalone and co-located storage available in the system, Transelectrica. 663 MW was connected in January–July 2026, and Transelectrica expected about 1,000 MW more by the end of 2026.

Storage is growing fast at both ends of the system. Grid-scale batteries went from 494 MW at the start of 2026 to 989 MW by August, many of them co-located with new solar parks, and batteries are now qualified for balancing services. At household level more than a third of prosumers have a battery, encouraged by earlier Casa Verde rounds that funded panels plus storage and by the end of the price cap.

Batteries above 1 MW need an ANRE storage licence. Behind-the-meter household batteries are notified to the DSO with the solar installation. DEER has published an operating procedure on exempting stored energy from network tariffs.

Storage projects.

  • Casa Verde Baterii (AFM): A 400 million lei grant programme for batteries at existing household prosumers, with a target of at least 400 MWh of storage.
  • Transelectrica substation PV and storage (PNRR): 11.25 MW of solar and 19.10 MWh / 5 MW of storage at 29 transmission substations for their own consumption and back-up, off-grid by design.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Electrica Furnizare—UnknownUnknownYesYes
Hidroelectrica—UnknownUnknownYesYes
PPC Energie—UnknownUnknownYesYes
E.ON Energie România—UnknownUnknownYesYes
Engie România—UnknownUnknownUnknownYes
Premier Energy—UnknownUnknownUnknownYes
Nova Power & Gas—UnknownUnknownUnknownYes

The household market is led by the former incumbent suppliers in each region, Electrica Furnizare, PPC Energie (formerly Enel) and E.ON Energie România, plus Hidroelectrica, which has won hundreds of thousands of households since entering retail. Independent suppliers such as Nova Power & Gas, Premier Energy and Engie compete on price. In ANRE’s September 2024 report on the whole retail market, Electrica Furnizare had a 15.1% share and Hidroelectrica 13.0%; household-only shares are not published in the same way.

Prosumers settle compensation with the supplier of their consumption point, and suppliers with more than 200,000 customers must offer dynamic-price contracts on request. Whether a supplier is cheap for a prosumer depends on its energy price, because quantitative compensation offsets the energy component only.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of EnergyGovernmentEnergy policy, legislation and CfD auctionsDrafts electricity and prosumer legislation, runs the contracts-for-difference scheme and chairs the Energy Command in crises.
Environment Fund Administration (AFM)GovernmentGrant programmesRuns the Casa Verde programmes, including Casa Verde Fotovoltaice and the 2026 Casa Verde Baterii scheme.
ANRERegulatorEnergy regulatorLicensing, tariffs, connection and prosumer rules, prosumer statistics, the offer comparator and the POSF switching platform.
TranselectricaTransmissionTSO and system operatorBalancing market, BSP and aggregator qualification, seasonal adequacy studies and data on new capacity.
Rețele Electrice RomâniaDistributionDSO for Muntenia Sud, Banat and DobrogeaConnections, prosumer notifications and the largest smart-meter programme.
Distribuție Energie Electrică RomâniaDistributionDSO for Muntenia Nord and Transilvania Nord/SudPublishes the step-by-step prosumer connection guide under ANRE Order 19/2022.
Delgaz GridDistributionDSO for Moldova (north-east)Online prosumer platform and prosumer guide.
Distribuție Energie OlteniaDistributionDSO for Oltenia (south-west)Connections and metering in Oltenia.
OPCOMMarketElectricity and gas market operatorDay-ahead (PZU) and intraday prices that underpin dynamic tariffs and some prosumer surplus valuations.
Asociația Prosumatorilor și a Comunităților de Energie (APCE)ConsumerProsumer and energy community associationRepresents household prosumers in consultations on Law 160/2026 rules and Casa Verde Baterii.
Romanian Wind Energy Association (RWEA)Renewable EnergyWind and renewables industry associationIndustry voice on CfD auctions, grid access and offshore wind.
Romanian Photovoltaic Industry Association (RPIA)SolarSolar industry associationIndustry body for utility and rooftop solar.
FlexumersFlexibilityDemand-response aggregatorOperated the first demand-only aggregated group activated on Romania’s balancing market (September 2026).

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Prosumer grid connection (technical)ANRE Order 228/2018 – technical norm for prosumers injecting active powerANRETechnical conditions for generation at prosumer sites up to 400 kW per consumption point. DSOs must publish lists of compliant inverters and generator modules.
Prosumer connection procedureANRE Order 19/2022ANRESteps and deadlines for new and existing consumption points, including meter replacement within 5 working days and a connection certificate within 3 working days.
Generator requirements (EU network code)Regulation (EU) 2016/631 (RfG) and ANRE notification procedure (Order 51/2019)European Commission / ANREOperational notification and compliance testing for power-generating modules, applied with Order 228/2018 for small installations.
InvertersDSO-published lists of inverters compliant with Order 228/2018DSOsInstallers should check the list of the relevant DSO before buying equipment.
Installer accreditationANRE-authorised electricians and ANRE-certified installation companiesANREElectrical installation work must be designed and carried out by ANRE-authorised people and companies. Casa Verde programmes also require AFM-validated installers.
Building permitLaw 50/1991, art. 11(1)(f)ParliamentRooftop PV for self-consumption is exempt from a building permit if it does not change the load-bearing structure. Since Law 166/2023 this also covers ground-mounted panels for self-consumption.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Building permit for rooftop solarNoNationalExempt under Law 50/1991 art. 11(1)(f) when the load-bearing structure is not altered; prior notification to the local authority applies.
Heritage or protected-area approvalLimitedLocalIn historic or protected areas, the planning department or Ministry of Culture may need to approve the work.
DSO connection and prosumer certificationYesRegionalNotification (existing site) or connection request (new site) to the local DSO, followed by a bidirectional meter and connection certificate.
ANRE licenceNoNationalNot needed below 1 MW; prosumers up to 400 kW sell surplus without a licence.
Owners’ association consent (apartment blocks)YesLocalInstalling on a shared roof or facade needs the owners’ association to agree.
Building permit for large ground-mounted systemsLimitedLocalNeeded for ground-mounted systems that are not for self-consumption, or on land away from the dwelling, and for large structures with foundations.

Permissions for household solar are light: no building permit for most rooftop systems, no licence, and a DSO connection process with short fixed deadlines. The main practical constraints are network capacity in rural areas, DSO inverter lists and, for flats, getting the owners’ association to agree.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Casa Verde BateriiScheduledGrantUp to 75% of the cost of a home battery, capped at 15,000 lei including VAT and 1,250 lei/kWh, for existing household prosumers. Minimum 12 kWh, at least 5,000 cycles, charging only from the household’s own solar. Applicants are ranked by an automated score on own contribution and capacity. Budget of 400 million lei. The guide was signed on 11 September 2026; session dates had not been announced.From late 2026 (sessions to be announced)
Casa Verde FotovoltaiceClosedGrantGrants of up to 30,000 lei for household solar with storage. The last completed session (27 September–8 October 2024) funded about 66,000 households. The programme was suspended in July 2025, and in 2026 AFM moved to the batteries-only scheme.2019–2024 sessions
Prosumer quantitative compensationActiveNet meteringkWh-for-kWh netting of the energy component, settled monthly since Law 160/2026 came into force on 26 July 2026. Available up to 400 kW; reported to be guaranteed for installations up to 200 kW until 31 December 2030.Until at least 31 Dec 2030
Energy voucher for vulnerable consumersActiveBill support50 lei a month towards electricity bills for low-income single people (up to 1,940 lei net a month) and families (up to 1,784 lei per member).1 Jul 2025 – 31 Dec 2026
Contracts for difference (CfD)ActiveCfDTwo-sided contracts for utility-scale wind and solar. Two rounds have awarded 4.2 GW, including 2,751 MW in the second round in 2025.—
Reduced VAT on solar panels and heat pumpsClosedVAT reliefThe reduced rate on supplying and installing solar panels, solar thermal panels and heat pumps ended on 1 August 2025. These are now taxed at the standard 21% rate.Ended 1 Aug 2025

Data and connectivity.

Fixed broadband
96.3 % of households (FTTP coverage) (2025)Source 43Fibre-to-the-premises coverage; fixed very-high-capacity network coverage 96.5%. 95.5% of households had internet access in 2025 (Eurostat).
4G coverage
Not identified from a reliable public source.
5G coverage
59.3 % of households (basic 5G coverage) (2025)Source 43Still well below the EU average of 96.8%.

Romania has one of the best fixed networks in the EU, with fibre to the premises covering about 96% of households, but it trails on 5G, at about 59% coverage in 2025 against an EU average of 97%. In practice most connected inverters, batteries and home-energy apps use the home Wi-Fi or fibre connection.

Smart meters are read remotely by each DSO through its own head-end system. Communication technologies and data formats differ between DSOs, and there is no national smart-meter communications provider.

Grid conditions.

National peak demand
8.954 GW (12 Feb 2025)Source 14Highest hourly-average consumption of winter 2024–2025, morning peak. Summer peaks reached 8,127 MW (hourly) in June 2025.
Annual electricity demand
53.1 TWh (2025)Source 15Net internal consumption, preliminary (2024: 53.5 TWh). Net internal production was 49.3 TWh, and net imports were 3.72 TWh.
Generation capacity
19.2 GW (1 Jan 2026)Source 13Installed capacity in ANRE licences (2,090 units). Excludes 3,454 MW of prosumers and 494 MW of storage.
Interconnection
4 GW (July 2026)Source 16Approximate cross-border exchange capacity for import/export stated by Transelectrica.
Curtailment
Not identified from a reliable public source.

Romania was a net importer in 2025, by 3.72 TWh, as coal plants closed and new solar came online. Imports are needed mainly in winter evenings and in dry or low-wind periods, while sunny middle-of-the-day hours increasingly produce surpluses for export.

Grid capacity is a growing constraint. Many rural low-voltage networks were not designed for widespread rooftop export, and large solar and storage projects queue for transmission capacity. Transelectrica connected 2,514 MW of new generation and storage in January–July 2026 and expected about 2,000 MW more by the end of the year.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Prosumer Law 160/2026 and ANRE implementing rulesUpcomingLaw in force 26 Jul 2026; ANRE rules in consultation from 20 Aug 2026; some mechanisms 2027Monthly settlement in place of the 24-month carry-forward, compensation across several sites, use of surplus towards gas bills, and higher thresholds for invoicing (900 kW) and imbalance exemption (900 kW). ANRE’s draft methodology was being contested by the prosumers’ association.
Casa Verde Baterii sessionsUpcomingGuide signed 11 Sep 2026; sessions to be announced400 million lei for home batteries at existing prosumers, with automated scoring in place of first-come, first-served.
End of the household price capCurrent1 Jul 2025The GEO 27/2022 cap ended; households pay contract prices, with a 50 lei voucher for low-income households until 31 December 2026.
VAT increase to 21%Current1 Aug 2025The standard VAT rate, which applies to electricity bills, rose from 19% to 21%, and the reduced rate for solar panels and heat pumps ended.
New ANRE licensing regulationCurrent26 Mar 2025Order 6/2025 created separate storage and aggregation licences and kept the 1 MW exemption threshold.
Vulnerable-consumer voucher due to endUpcoming31 Dec 2026The 50 lei monthly voucher is currently legislated until the end of 2026.
Coal phase-outUpcoming2032Coal-fired generation is to be phased out by 2032 under Romania’s energy and climate plans and Recovery Plan commitments.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionMediumLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionHigh324,535 individual prosumers with 2,067 MW at 30 June 2026 (ANRE), out of about 7.6 million households.
Distributed energy marketHigh359,378 prosumers with 4,019 MW at 30 June 2026, more than the 3,094 MW of licensed solar parks at 1 January 2026.
Grid flexibility marketMediumAggregation is licensed and allowed on all reserve types with a 1 MW minimum; the first demand-only aggregated group was activated in September 2026; there are no DSO flexibility markets.
Energy storage adoptionHigh989 MW of grid storage at 1 August 2026, double the 494 MW of January, and 127,084 prosumers with batteries at 30 June 2026.
Renewable growth environmentHigh1,331 MW of solar and 496 MW of wind connected in January–July 2026, and 4.2 GW awarded in two CfD rounds.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 45 sources
  1. Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2026. accessed 1 October 2026.
  2. Electricity price statistics (Statistics Explained). Eurostat, 2026. accessed 1 October 2026.
  3. Population on 1 January (demo_pjan). Eurostat, 2025. accessed 1 October 2026.
  4. Private households by household composition (lfst_hhnhtych). Eurostat, 2025. accessed 1 October 2026.
  5. Average household size (lfst_hhantych). Eurostat, 2025. accessed 1 October 2026.
  6. Distribution of population by tenure status (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
  7. Distribution of population by dwelling type (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
  8. Supply, transformation and consumption of electricity (nrg_cb_e). Eurostat, 2024. accessed 1 October 2026.
  9. Gross and net production of electricity and derived heat by fuel (nrg_bal_peh). Eurostat, 2024. accessed 1 October 2026.
  10. Share of energy from renewable sources (nrg_ind_ren). Eurostat, 2025. accessed 1 October 2026.
  11. Level of internet access – households (isoc_ci_in_h). Eurostat, 2025. accessed 1 October 2026.
  12. Urban population (% of total population) – Romania. World Bank, 2025. accessed 1 October 2026.
  13. Planificarea operațională a funcționării SEN în vara 2026. Transelectrica – Dispecerul Energetic Național, 2026. accessed 1 October 2026.
  14. Planificarea operațională a funcționării SEN în iarna 2025–2026. Transelectrica – Dispecerul Energetic Național, 2025. accessed 1 October 2026.
  15. Raport curent – rezultate financiare preliminare T4 2025. Transelectrica, 2026. accessed 1 October 2026.
  16. Comunicat de presă, 30 iulie 2026 – Comandamentul Energetic. Transelectrica, 2026. accessed 1 October 2026.
  17. Comunicat de presă, 15 aprilie 2026 – PNRR fotovoltaice și stocare în stații. Transelectrica, 2026. accessed 1 October 2026.
  18. Transelectrica: 2.500 MW de noi capacităţi de producţie şi stocare conectați la reţea de la începutul anului. Economedia (Agerpres / Transelectrica data), 2026. accessed 1 October 2026.
  19. Câți prosumatori sunt racordați la rețelele electrice din România (date ANRE, 30 iunie 2026). StartupCafe (ANRE data), 2026. accessed 1 October 2026.
  20. Alerte la 80% consum de energie: ANRE pregătește un sistem RO-Alert pentru facturi. Financiarul.ro, 2026. accessed 1 October 2026.
  21. Comunicat Rețele Electrice – program smart meter 2025. Rețele Electrice România, 2025. accessed 1 October 2026.
  22. Întrebări frecvente furnizare energie electrică – codul POD pe zone de distribuție. Anchor Grup, 2025. accessed 1 October 2026.
  23. Ce este codul POD de pe factura de curent. Evenimentul Zilei, 2026. accessed 1 October 2026.
  24. ANRE a dezvoltat platforma online de schimbare a furnizorului de energie electrică şi de gaze naturale la nivel naţional. Economica.net, 2022. accessed 1 October 2026.
  25. Noi prețuri la energie electrică pentru toți clienții din România de la 1 ianuarie. Economica.net, 2025. accessed 1 October 2026.
  26. Nouă obligație pentru toți furnizorii mari de energie electrică, la cererea clientului. Economica.net, 2023. accessed 1 October 2026.
  27. Top 10 cele mai bune oferte la energie electrică din București la un consum mediu de 200 kWh lunar. Economedia, 2025. accessed 1 October 2026.
  28. Cu cât va crește factura de energie a clienților Hidroelectrica după majorarea TVA de la 1 august. Ziarul Profit, 2025. accessed 1 October 2026.
  29. Ai dat avans cu TVA 9% pentru casă sau panouri fotovoltaice? Pregătește banii pentru diferența de TVA. Newsweek România, 2025. accessed 1 October 2026.
  30. Tichetul de 50 de lei pentru plata energiei electrice se prelungește până la finalul lui 2026. Revista Biz, 2026. accessed 1 October 2026.
  31. Noi reguli pentru prosumatori (Legea 160/2026). Adevărul, 2026. accessed 1 October 2026.
  32. Prosumatori: de la 26 iulie 2026, un nou cadru legal. Fiscalitatea.ro, 2026. accessed 1 October 2026.
  33. Compensarea energiei pentru prosumatori se modifică: ce urmează până în 2030. Agerpres, 2026. accessed 1 October 2026.
  34. Prosumatorii amenință că dau ANRE în judecată. SpotMedia, 2026. accessed 1 October 2026.
  35. Racordarea locurilor de consum și de producere aparținând prosumatorilor conform Ord. ANRE nr. 19/2022. Distribuție Energie Electrică România, 2022. accessed 1 October 2026.
  36. New licensing regulation for the electricity sector (ANRE Order 6/2025). BPV Grigorescu Ștefănică, 2025. accessed 1 October 2026.
  37. Transelectrica: demand-only aggregated group activated in balancing market for the first time. The Diplomat Bucharest, 2026. accessed 1 October 2026.
  38. Ghidul Casa Verde Baterii semnat: 400 milioane lei pentru stocare. Economedia, 2026. accessed 1 October 2026.
  39. Programul Casa Verde 2026: ce verifică proprietarii înainte să depună dosarul. Agerpres, 2026. accessed 1 October 2026.
  40. Poți monta panouri solare fără autorizație? Ce prevede legea. Capital, 2025. accessed 1 October 2026.
  41. With EBRD support, Romania delivers second successful renewable energy auction. EBRD, 2025. accessed 1 October 2026.
  42. România își majorează ținta de energie regenerabilă la 38% din consum în anul 2030. HotNews, 2024. accessed 1 October 2026.
  43. Romania – 2026 Digital Decade country report (Council doc. 10476/26 ADD 24). European Commission / Council of the EU, 2026. accessed 1 October 2026.
  44. În România sunt înmatriculate 10,8 milioane de vehicule. Economica.net (DGPCI data), 2025. accessed 1 October 2026.
  45. Tarifele de transport și distribuție a energiei electrice cresc de la 1 ianuarie (2025). Economica.net, 2024. accessed 1 October 2026.

Questions about energy in Romania.

Talk to us about Olmack in Romania.Tell us about your home, housing portfolio or school estate in Romania. We'll explain what is possible there now.