Countries

Energy in Myanmar, explained.

How electricity works in Myanmar: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Myanmar: Not yet available.Olmack is not offered in Myanmar yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Myanmar.

Myanmar electricity 2026: MOEE block tariffs from 50 kyat/kWh, YESC, MESC and ESE distribution, meter and account numbers, digital smart meters and power shortages.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Myanmar kyat (MMK) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Myanmar energy at a glance.

Key figures for households in Myanmar. Each one links to its source on the full overview below.

  • Electricity price.

    100 MMK per kWh for households, including taxes. Figures for 2026.

  • Renewable share.

    47.9% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Myanmar.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Myanmar below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Myanmar requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Myanmar.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Myanmar, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Myanmar, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Myanmar.

Full overview

The energy market in Myanmar, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page21 sections

Myanmar’s power sector is run almost entirely by the state through the Ministry of Electricity and Energy (MOEE). Its Electric Power Generation Enterprise (EPGE) operates state power stations and buys power from private and joint-venture plants, the Department of Power Transmission and System Control (DPTSC) runs the national grid, and three state distributors sell electricity to consumers: the Yangon Electricity Supply Corporation (YESC), the Mandalay Electricity Supply Corporation (MESC) and the Electricity Supply Enterprise (ESE) for the rest of the country. Households cannot choose their supplier.

Retail tariffs are set by the ministry with the agreement of the Union Government under the Electricity Law 2014. Households pay a rising-block tariff of 50 kyat per kWh for the first 50 units a month, rising to 300 kyat above 200 units. A notification issued in February 2026 left these rates unchanged and introduced a flat 900 kyat/kWh tariff for businesses that take a dedicated, uninterrupted 24-hour supply.

Generation is split roughly evenly between hydropower and natural gas, with a small share of coal, biomass and solar. Supply is well below demand: in December 2024 the ministry said that damage to 230 kV and 132 kV lines, natural disasters and reduced gas supply meant it could generate only about 2,400 MW against an average need of 4,400 MW, about 55% of requirements, so scheduled power cuts are common. About 80% of the population had access to electricity in 2024, and the 2024 census found that 20% of enumerated households relied on solar for lighting.

Energy snapshot.

Headline figures for electricity in Myanmar. Each shows its data year and links to its source.

  • Population51,316,756 peopleSource 172024 (30 September)
  • Households7,772,076 householdsSource 172024
  • Average household size3.8 people/householdSource 172024
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (MMK)100 MMK/kWhSource 12026
  • Household price (EUR)0.042 EUR/kWhSource 192026
  • Renewable electricity share47.9%Source 202024
  • Solar capacity0.22 GWSource 202024
  • Wind capacity0 GWSource 202024
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Ministry of Electricity and Energy (MOEE); no independent regulator was identified as operating
System operator
Department of Power Transmission and System Control (DPTSC), MOEE
Distribution networks
Three state distributors: YESC (Yangon Region), MESC (Mandalay Region) and the Electricity Supply Enterprise (ESE) for Nay Pyi Taw and all other states and regions; some off-grid systems are licensed by state and region governments.
Currency
Myanmar kyat (MMK)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in Myanmar.

Household price (MMK)
100 MMK/kWh (2026)Source 1Residential energy charge for 51–100 kWh a month. The household tariff runs from 50 kyat (1–50 kWh) to 300 kyat (above 200 kWh). Confirmed unchanged by MOEE Notification 89/2026, effective 1 February 2026.
Household price (EUR)
0.042 EUR/kWh (2026)Source 19Converted from 100 kyat/kWh at the Central Bank of Myanmar reference rate for 9 October 2026 (2,356.83 kyat per euro). Market exchange rates have differed from the official reference rate, so the euro value is indicative.
Typical annual electricity bill
Not identified from a reliable public source.

The Electricity Law 2014 gives the Ministry of Electricity and Energy the power to set electricity tariffs and service charges, with the agreement of the Union Government, and allows rates to differ by area. State and region governments set tariffs for the small off-grid systems they license. In practice there is one national schedule for grid customers.

The 2026 tariff notification

Notification 89/2026, issued on 27 February 2026 and effective from 1 February 2026, kept the residential and non-residential block rates unchanged. It added a third category: industrial zones and special economic zones that receive electricity over a direct line from LNG-fired power stations pay a flat 900 kyat/kWh and in return are exempt from load shedding, apart from line faults and system breakdowns. Other industrial and commercial users can request the same 24-hour supply at 900 kyat/kWh.

Household tariffs are low by regional standards when converted at the official exchange rate, and the rising blocks protect small users: the first 50 kWh a month cost 50 kyat each. The main constraint for households is not price but availability, as generation has fallen well short of demand and power is rationed through scheduled cuts.

Connection charges

New household connections carry one-off fees. Under the ministry’s published schedule for conventional meters, a rural 5/30 A manually read meter costs 45,000 kyat in total, a small-town 5/30 A meter read by hand-held unit 75,000 kyat and a city 10/60 A meter 90,000 kyat, covering the meter fee, deposit, wiring, connection, supervision and registration. Digital smart meters ordered online since August 2026 cost 250,000 kyat for a household meter and 1,000,000 to 1,460,000 kyat for 10–30 kW household power meters.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesResidential (“household use”) category, which covers homes, household power meters, bulk residential supplies and religious buildings with no commercial activity: 1–50 kWh 50 kyat; 51–100 kWh 100 kyat; 101–200 kWh 150 kyat; 201 kWh and above 300 kyat per kWh per month. Unchanged by Notification 89/2026.
RegulatedYesNon-residential category (industry, commerce, government offices, state enterprises, street lighting, NGOs, embassies and international organisations): 1–5,000 kWh 250 kyat; 5,001–20,000 kWh 400 kyat; above 20,000 kWh 500 kyat per kWh. Load shedding may apply when generation or network capacity is short.
OtherLimitedUninterrupted 24-hour supply over a dedicated line at a flat 900 kyat/kWh, introduced in February 2026 for industrial zones and special economic zones supplied from LNG-fired plants. Businesses outside those zones can apply to the ministry for the same arrangement. Not offered to households.
Time-of-useNoNo time-of-use tariff for households was identified in the official tariff schedule.
DynamicNoThere is no wholesale market or retail competition; all consumer prices are fixed in the ministry’s tariff schedule.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
296 kWh/person/yr (2024)Source 22All sectors (World Bank, 296.3 kWh; 371.0 kWh in 2023). Ember gives demand of 0.40 MWh per person in 2024.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
55 % of homes (2024)Source 18Enumerated households cooking mainly with electricity: urban 83%, rural 38%. Firewood 39%.

Electricity use in Myanmar is low and constrained by supply. Ember records national demand of 21.92 TWh in 2024, about 0.40 MWh per person, and the World Bank puts consumption at 296 kWh per person. The ministry said in December 2024 that demand was growing by about 9% a year and averaged 4,400 MW, while only about 2,400 MW could be generated.

Where the grid reaches, electricity is used heavily for cooking. In the 2024 census, 55% of enumerated households cooked mainly with electricity (83% in towns, 38% in rural areas) and 39% with firewood. Grid electricity was the main source of lighting for 66% of households (91% urban, 52% rural), while 20% relied on solar, mostly in rural areas.

The highest output recorded on the MOEE website is 3,338.5 MW, reached on 16 October 2022, with 67,534.7 MWh generated that day. On 8 October 2026 total generation was 70,851 MWh.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
85% (2024)Source 18Enumerated households owning their home: rural 94%, urban 69%.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
31 % of population (2024)Source 17Including the estimated population of unenumerated areas. Yangon Region is 68% urban.

Most Myanmar households own their homes: 85% in the 2024 census, rising to 94% in rural areas. Renting is concentrated in towns, where 23% of households rent and apartments make up about a fifth of homes, mainly in Yangon. Rural homes are mostly wooden or bamboo houses with corrugated metal roofs.

Ownership matters for an electricity connection, because a household meter application must include proof of ownership of the property as well as the applicant’s national registration card and household list. Tenants generally use the owner’s meter.

The census could not be carried out everywhere. About 19.1 million of the 51.3 million people were estimated rather than counted, so housing and amenity figures describe enumerated areas, which are more likely to be urban and grid-connected.

How the grid works in Myanmar.

  1. TransmissionDepartment of Power Transmission and System Control (DPTSC)
  2. DistributionThree state distributors: YESC (Yangon Region), MESC (Mandalay Region) and the Electricity Supply Enterprise (ESE) for Nay Pyi Taw and all other states and regions; some off-grid systems are licensed by state and region governments.
  3. MeteringNot identified from a reliable public source.
  4. Supply3 or more retail suppliers

Physically, electricity flows from hydropower dams, mainly in the north and east, and gas-fired plants near Yangon and the coast, through DPTSC’s 230 kV and 132 kV national grid to 66 kV and 33 kV sub-transmission networks run by the distributors, and then at 11 kV and 400/230 V to consumers. MESC alone operated about 269 miles of 66 kV, 1,418 miles of 33 kV, 1,917 miles of 11 kV and 2,145 miles of 400 V lines.

Commercially the system is a state single buyer. EPGE generates power and buys from private and joint-venture plants, DPTSC transmits it and the three distributors sell it at the tariff set by the ministry. In December 2024 MOEE reported 7,272 MW of installed capacity at the plants supplying the grid, but said that only about 4,000 MW could be produced at full output and that actual generation averaged around 2,400 MW, because lines had been destroyed, plants damaged by natural disasters and gas allocations reduced. The ministry is pursuing LNG-fired plants as a short-term response and hydro, solar and wind in the longer term.

Losses are significant. MESC reported distribution losses of 13.6% for Mandalay Region in August 2019, and in 2026 the ministry has prosecuted large industrial users for electricity theft and is replacing meters more than 20 years old.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Electricity and Energy (MOEE)Sets policy, tariffs (with Union Government agreement) and technical standards, issues permits for large power projects, and owns the state generation, transmission and distribution bodies. The Department of Electric Power Planning (DEPP) handles sector planning.
RegulatorElectricity Supervisory Commission (provided for in the Electricity Law 2014)The Electricity Law 2014 provides for a five- or seven-member commission to supervise the sector, with optional sub-commissions in states and regions. No evidence was found that it operates as an independent regulator; regulatory functions sit with the ministry.
TSODepartment of Power Transmission and System Control (DPTSC)Owns and operates the national grid at 230 kV, 132 kV and 66 kV and dispatches generation through the national control centre.
SupplierElectric Power Generation Enterprise (EPGE)Runs state hydro and gas-fired plants and buys the output of independent and joint-venture power producers, acting as the single buyer for the grid.
DSOYangon Electricity Supply Corporation (YESC)Distributes and sells electricity in Yangon Region, the largest load centre.
DSOMandalay Electricity Supply Corporation (MESC)Formed on 1 April 2015; distributes an average of about 460 MW in Mandalay Region over 66 kV, 33 kV, 11 kV and 400 V networks.
DSOElectricity Supply Enterprise (ESE)Distributes electricity in Nay Pyi Taw and all other states and regions through township electricity offices, which take meter applications, connect customers and bill them.

Compared with the UK system.

Compared with the UK system.
UK conceptMyanmar equivalentHow it works
DNOYESC, MESC or ESE township electricity officeThe township office of the state distributor owns the local network, checks that a premises is within reach of a 230/400 V line, installs the meter, reads it and bills the customer. Network and retail are not separated.
National Grid/NESODPTSCA ministry department owns the transmission grid and dispatches power stations. There is no balancing market; shortfalls are managed through scheduled load shedding.
MPANMeter number plus ledger account number (and a computer code)A connection is recorded in the township office’s consumer ledger under a meter number and an account number. The Mandalay distributor’s online bill check asks for the meter number and a computer, bar or CNP code. There is no national supply-point number or central register.
MPRNNo equivalentThere is no piped gas network for homes. Households cook mainly with electricity or firewood.
Meter operatorThe state distributorMeters are supplied, installed and read by YESC, MESC or ESE. New digital smart meters are leased from the state rather than owned by the customer. There are no independent meter operators.
SupplierYESC, MESC or ESEEach area has one state supplier selling at the national tariff. Households cannot switch.
Smart-meter infrastructureMOEE smart-meter system (developing)In August 2026 MOEE said it was moving towards a smart-meter system and building a digital platform, monitored from control centres, through which customers with analogue meters can submit their own readings. There is no national data hub comparable to the DCC.

How a supply point is identified.

Township: Chanayethazan; account no. 12/3456; meter no. 2408715; computer code 0712345 (fictional and illustrative — exact formats are not published)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Meter number (မီတာအမှတ်) and ledger account number (ငွေစာရင်းအမှတ်), with a computer code on the bill
Who issues it?The township electricity office of YESC, MESC or ESE that installs the meter
FormatNot publicly standardised. The township office records each new connection in its consumer ledger (Electricity Form 43) with a meter number and an account number, and issues a meter-reading card (Form 76). Bills also show a computer account number; MESC’s online bill check accepts the meter number together with a computer code, bar code or CNP code.
LengthNot publicly documented; varies by distributor and township office.
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itPrinted on the monthly electricity bill and the meter-reading card; the meter number is also on the meter itself.
Electronic accessBills can be checked online (MESC by meter number and computer code; MOEE e-bill pages for other areas) and paid through banks and mobile wallets such as AYA, KBZ, CB, Yoma, OK $ and Mytel Pay.
Third-party accessNo framework for third-party access to meter or consumption data was identified. Banks and wallets use the identifiers only to fetch and pay bills.
Who keeps the registerEach township electricity office keeps its own consumer ledger and meter register; YESC, MESC and ESE run their own billing systems.
Register scopePer DSO

In Myanmar a home’s electricity connection is identified locally, not by a national code. The applicant applies to the township electricity engineer of the distributor for a household meter, with a copy of their national registration card, the household list and proof of ownership of the property, and promises that internal wiring will be done only by holders of an electrical competency certificate.

How a connection is recorded

The township office first checks the documents and whether the site is within 300 feet of a 230 V or 400 V line with spare transformer capacity. Once the fees are paid, the office registers the new consumer in its common register, issues the meter from stores and records it in the meter register book and bin card, installs it and connects supply up to the outgoing breaker. The finance section then opens a meter-reading card and an entry in the consumer ledger, writing the meter number and account number on the deposit receipt, and starts meter reading and billing.

Online applications and smart meters

Since 15 August 2026 new applicants can request a digital smart meter through the ministry’s website instead of visiting the office, and the meter is leased from the state. In the first two weeks 9,686 people applied; 2,482 applications were returned as incomplete, 7,204 were being processed and 1,331 meters had been installed, the first within 27 hours of application.

Because there is no retail competition, there is no switching process or national register of supply points. Whether an account is transferred when a property is sold is handled by the local office; no published transfer rule was identified.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringUnknown
Net billingUnknown
How exported electricity is paidNot identified. MOEE published an announcement on buying electricity from rooftop solar in January 2023, but the terms were not found on an official web page.
Is there a net-metering scheme for households?No published net-metering or net-billing rules were identified on the ministry’s or distributors’ websites.
Who decides whether power can be sold to the grid?The Ministry of Electricity and Energy. Under the Electricity Law 2014 a permit holder wishing to sell electricity to the national grid must apply to the ministry.
Does a household need permission for a solar system that does not export?No specific rule for small self-consumption systems was identified. Off-grid solar home systems are widespread, especially in rural areas.

Connecting a home system.

  1. Contact the township office of YESC, MESC or ESE about grid connection of a solar system.
  2. Generators that want to sell to the national grid must apply to the Ministry of Electricity and Energy, which may approve or refuse (Electricity Law 2014, section 14).
  3. Plants and lines connected to the grid must meet the ministry’s technical standards (section 39).

Myanmar has no established export scheme for household generators. In January 2023 MOEE published a video announcement on buying electricity from rooftop solar, which the Mandalay distributor links from its website, but the tariff, size limits and procedure could not be confirmed from an official written source. Anyone planning a grid-connected system should ask the local distributor directly.

Solar is widely used off the grid. In the 2024 census 20% of enumerated households, and 30% of rural households, used solar as their main source of lighting.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (large, above 30 MW)Permit from the Ministry of Electricity and Energy with Union Government agreementMOEEThe Electricity Law 2014 defines large electricity businesses as above 30 MW; these are administered by the Union.
Generate electricity (medium 10–30 MW, small up to 10 MW)Permit from the state or region government for plants not connected to the national gridState or region government (or self-administered zone/division leading body)Grid-connected projects require coordination with MOEE; self-administered areas license supply to their own towns and villages.
Sell electricity to the national gridApplication to and approval by MOEEMOEESection 14 of the Electricity Law 2014; the ministry may approve or refuse.
Transmission and system operationReserved to the stateMOEE (DPTSC)The ministry manages demand and system control under the grid code.
Distribute and supply to consumersState distributors on the grid; permits from MOEE or state/region governments for other distributionMOEE; state and region governments for off-grid systemsThere is no retail competition on the national grid.
Store electricityNo specific licensing rule identifiedMOEEStorage is not separately defined in the Electricity Law 2014.
Aggregate, trade or provide balancing and grid servicesNot provided forMOEEThere is no wholesale, balancing or flexibility market and no aggregator licence.
Electrical installation workElectrical competency certificateChief Inspector under MOEEThe Chief Inspector issues competency, equipment-quality and electrical-safety certificates and registration certificates for generation and distribution businesses; meter applicants must use certificated wiremen.
Import, manufacture or sell electrical equipmentPermit and compliance with standards issued under the Electricity LawMOEEChapter 6 of the Electricity Law 2014.

The Electricity Law 2014 (Union Parliament Law No. 44 of 27 October 2014) sorts electricity businesses by size: small up to 10 MW, medium above 10 MW up to 30 MW, and large above 30 MW. Large projects and anything forming part of the Union’s grid are permitted by the Ministry of Electricity and Energy with the agreement of the Union Government. State and region governments permit medium and small generation and distribution that is not connected to the national grid, and self-administered zones and divisions license electricity businesses for their own towns and villages.

Implementing rules were issued in 2015 (Notification 198/2015) and amended in 2022 (Notification 123/2022). The law also sets up an inspection regime under a Chief Inspector, who issues competency certificates for electricians, equipment and safety certificates, and registration certificates for generation and distribution businesses.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale, balancing and ancillary servicesNo—NoDPTSC. There is no electricity market. DPTSC dispatches state and contracted plants, and shortages are managed through load shedding.
24-hour dedicated supply (industrial and commercial)Restricted—NoMOEE. Not a flexibility market: large users can pay 900 kyat/kWh for supply exempt from load shedding over a dedicated line.

Myanmar has no market through which distributed assets could sell flexibility, and no demand-response programme for households was identified. The system’s main problem is a shortage of generation and damaged transmission, which the ministry manages with scheduled power cuts. The February 2026 tariff created a premium category for uninterrupted supply rather than paying users to reduce demand.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutEarly stage: digital smart meters issued to new applicants via the MOEE website since 15 August 2026
Reading intervalNot published
Online applications opened15 August 2026
Applications in first two weeks9,686 (7,204 complete, 1,331 meters installed)
Household smart meter fee250,000 kyat
Household power meter fees10 kW 1,000,000; 20 kW 1,230,000; 30 kW 1,460,000 kyat
OwnershipLeased from the state
Conventional meter readingManual or hand-held unit (HHU)

Most Myanmar homes have conventional meters read monthly by distributor staff, either manually or with hand-held units. In August 2026 the ministry began offering digital smart meters to new applicants through its website, leased from the state, with the aim of speeding up connections and cutting out intermediaries. It is also replacing meters more than 20 years old and those performing poorly to reduce losses.

For customers who still have analogue or non-communicating meters, the ministry said it was building a digital system through which they can read their own meters and pay, monitored from control centres, with trials due shortly. No reading interval, communication technology or data-access rules for the new meters have been published.

Renewable electricity.

Electricity generation mix (2024).

  • Hydro: 46.1%
  • Gas: 46.1%
  • Coal: 5.5%
  • Bioenergy: 1.2%
  • Solar: 0.6%
  • Other fossil: 0.6%
Source 20
Renewable electricity share
47.9% (2024)Source 20Share of domestic generation: hydro 46.06%, bioenergy 1.24%, solar 0.55%. Net imports were small (0.21 TWh against 21.92 TWh of demand).
Home solar
Not identified from a reliable public source.
Solar added each year
0.04 GW (2024)Source 20Derived from Ember capacity: 0.22 GW in 2024 against 0.18 GW in 2023.
Hydro
3.27 GW (2024)Source 20
Gas
2.44 GW (2024)Source 20
Solar
0.22 GW (2024)Source 20
Coal
0.19 GW (2024)Source 20
Bioenergy
0.06 GW (2024)Source 20

Targets.

  • National electrification by 2030, reaffirmed by MOEE in August 2026.
  • MOEE states that long-term demand growth will be met from domestic hydro, solar and wind resources, with LNG-fired plants as a short-term measure.

Hydropower and gas each produced about 46% of Myanmar’s electricity in 2024, according to Ember, with coal at 5.5% and bioenergy and solar together under 2%. Hydro output varies with the season, and gas-fired output has been limited by reduced gas allocations to power stations.

Grid-scale solar remains small at about 0.22 GW, and no wind capacity is recorded. Solar matters far more off the grid: in the 2024 census 30% of enumerated rural households used solar as their main source of lighting.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

No grid-scale battery projects were identified from official sources. Reservoir hydropower provides the system’s main storage. Frequent power cuts mean that households and businesses that can afford it use generators, inverters and batteries for backup, but no data on their numbers were found.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Yangon Electricity Supply Corporation (YESC)Sole supplier in Yangon RegionNoNoNoUnknown
Mandalay Electricity Supply Corporation (MESC)Sole supplier in Mandalay RegionNoNoNoUnknown
Electricity Supply Enterprise (ESE)Sole grid supplier in Nay Pyi Taw and other states and regionsNoNoNoUnknown

All three suppliers are state bodies under MOEE and charge the same national tariff. Smart meters are marked “Limited” because digital smart meters are being issued only to new online applicants since August 2026.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Electricity and Energy (MOEE)GovernmentPolicy, tariffs, permits, standards and state power utilitiesPublishes the tariff schedule, the Electricity Law and rules, meter application forms and daily generation figures.
Department of Power Transmission and System Control (DPTSC)TransmissionNational grid owner and system operatorRuns the 230 kV and 132 kV grid and dispatch.
Mandalay Electricity Supply Corporation (MESC)DistributionDistributor and supplier for Mandalay RegionOffers online bill checks, meter applications and network information for Mandalay.
Yangon Electricity Supply Corporation (YESC)DistributionDistributor and supplier for Yangon RegionServes the country’s largest city and load centre.
Electricity Supply Enterprise (ESE)DistributionDistributor for Nay Pyi Taw and the other states and regionsHandles meter applications and billing through township electricity offices.
Department of PopulationGovernmentNational census agencyPublishes the 2024 census figures on households, housing and energy use.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionMOEE grid code and technical standards (Electricity Law 2014, sections 37–40)Ministry of Electricity and EnergyPlants, lines and substations connecting to the grid must meet the ministry’s standards; the ministry’s decision on standards and test results is final.
Installer accreditationElectrical competency certificateChief Inspector (MOEE)Household wiring must be carried out by certificate holders, as applicants confirm on the meter application form.
Equipment and safetyEquipment quality and electrical safety certificatesChief Inspector (MOEE)Issued under chapter 7 of the Electricity Law 2014. No specific national inverter or anti-islanding standard was identified.
RulesElectricity Rules (Notification 198/2015, amended by 123/2022)Ministry of Electricity and EnergyImplementing rules under the Electricity Law 2014.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Household meter connectionYesLocalApplication to the township electricity office (or online since August 2026) with national registration card, household list and proof of property ownership; site must be within 300 feet of a 230/400 V line.
Selling power to the national gridYesNationalApplication to and approval by MOEE under section 14 of the Electricity Law 2014.
Off-grid generation and distribution up to 30 MWYesRegionalPermits from state or region governments, or self-administered zone and division bodies, for systems not connected to the national grid.
Electrical installation by a certificated electricianYesNationalCompetency certificates are issued under the Chief Inspector.

The main permission a household deals with is the meter connection itself, which is handled locally by the distributor’s township office. Permission to sell power to the grid is reserved to the ministry. No specific planning or building-permit rule for rooftop solar on homes was identified.

Data and connectivity.

Fixed broadband
2.87 fixed subscriptions per 100 people (2024)Source 23
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband is rare, at under three subscriptions per 100 people, and most internet use is over mobile networks. The 2024 census found that 83% of enumerated households had a phone and 57% had internet access at home. Bills are widely paid through mobile banking and wallets.

No communication standard or data platform for smart meters has been published; the ministry’s planned digital self-reading system relies on customers submitting readings online.

Grid conditions.

National peak demand
3.34 GW (2022)Source 3Record generation peak of 3,338.5 MW on 16 October 2022. This is served load, not unconstrained demand: MOEE put average demand at 4,400 MW in December 2024.
Annual electricity demand
21.9 TWh (2024)Source 20
Generation capacity
7.27 GW (2024)Source 4Total installed capacity of plants supplying the MOEE system (7,272 MW), of which about 4,000 MW could be produced at full output; average generation was about 2,400 MW.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The grid is constrained by supply rather than surplus. MOEE said in December 2024 that about 1,408 MW of capacity could not be used because 230 kV and 132 kV lines had been destroyed, plants were damaged by natural disasters and gas allocations had fallen, leaving generation at about 55% of requirements. The ministry publishes daily generation figures on its website (70,851 MWh on 8 October 2026) and has issued notices to the public about system breakdowns.

Electricity access is uneven: the World Bank estimates that 80.4% of the population had access in 2024, and in the 2024 census grid electricity was the main lighting source for 91% of urban but only 52% of rural enumerated households.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Tariff Notification 89/2026 and 900 kyat 24-hour supply categoryCurrent1 February 2026Residential and non-residential block rates unchanged; new flat 900 kyat/kWh tariff for uninterrupted dedicated supply to industrial zones, special economic zones and businesses that request it.
Online applications for digital smart metersCurrent15 August 2026New household and business meters can be ordered through the MOEE website; the meters are digital smart meters leased from the state.
Digital self-reading and monitoring system for analogue metersUpcomingTrial announced August 2026MOEE said a system for customers with non-smart meters to read and pay, monitored from control centres, would be trialled shortly.
National electrification targetUpcoming2030MOEE has instructed state and regional offices to prepare for electrifying the whole country by 2030.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo grid-connected rooftop solar scheme with published terms; solar is mainly off-grid, used for lighting by 20% of enumerated households.
Distributed energy marketLowDistributed generation is mainly off-grid solar and diesel; no grid framework for distributed resources was identified.
Grid flexibility marketLowNo wholesale, balancing or demand-response market; shortages are handled by load shedding.
Energy storage adoptionLowNo grid-scale battery storage identified from official sources.
Renewable growth environmentLowEmber records renewable capacity of 3.51 GW in 2022 and 3.55 GW in 2024, with solar rising only from 0.18 GW to 0.22 GW.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 23 sources
  1. Electricity tariffs and charges (Notification 89/2026). Ministry of Electricity and Energy, 2026. accessed 9 October 2026.
  2. Total electricity generation on 8 October 2026. Ministry of Electricity and Energy, 2026. accessed 9 October 2026.
  3. Highest electricity generation recorded on 16 October 2022. Ministry of Electricity and Energy, 2022. accessed 9 October 2026.
  4. Notice on power lines and generation affected by attacks and natural disasters (21 December 2024). Ministry of Electricity and Energy / YESC, 2024. accessed 9 October 2026.
  5. Fees for applying for new digital smart meters via the website. Ministry of Electricity and Energy, 2026. accessed 9 October 2026.
  6. Progress of online applications for new digital smart meters. Ministry of Electricity and Energy, 2026. accessed 9 October 2026.
  7. Notice to electricity consumers on meter replacement and electricity theft (15 August 2026). Ministry of Electricity and Energy, 2026. accessed 9 October 2026.
  8. Deputy Minister inspects Shan State power facilities (30 August 2026). Ministry of Electricity and Energy, 2026. accessed 9 October 2026.
  9. Household meter application form and connection procedure. Ministry of Electricity and Energy. accessed 9 October 2026.
  10. Electricity Law 2014 (Union Parliament Law No. 44/2014). Ministry of Electricity and Energy, 2014. accessed 9 October 2026.
  11. Electricity Rules and amendments (Notifications 198/2015 and 123/2022). Ministry of Electricity and Energy. accessed 9 October 2026.
  12. E-Bill: online payment of electricity bills. Ministry of Electricity and Energy. accessed 9 October 2026.
  13. Announcement on buying electricity from rooftop solar (video). MOEE Myanmar (YouTube), 2023. accessed 9 October 2026.
  14. Check electricity consumption and charges. Mandalay Electricity Supply Corporation. accessed 9 October 2026.
  15. Electricity distribution information. Mandalay Electricity Supply Corporation. accessed 9 October 2026.
  16. Paying electricity bills online. Mandalay Electricity Supply Corporation. accessed 9 October 2026.
  17. The 2024 Myanmar Population and Housing Census: Provisional Results. Department of Population, 2025. accessed 9 October 2026.
  18. The 2024 Myanmar Population and Housing Census: Highlights of the Union Report. Department of Population, 2025. accessed 9 October 2026.
  19. Reference exchange rates, 9 October 2026. Central Bank of Myanmar, 2026. accessed 9 October 2026.
  20. Yearly electricity data (Myanmar, 2024). Ember, 2025. accessed 9 October 2026.
  21. Access to electricity (% of population) – Myanmar. World Bank, 2024. accessed 9 October 2026.
  22. Electric power consumption (kWh per capita) – Myanmar. World Bank, 2024. accessed 9 October 2026.
  23. Fixed broadband subscriptions (per 100 people) – Myanmar. World Bank, 2024. accessed 9 October 2026.

Questions about energy in Myanmar.

Talk to us about Olmack in Myanmar.Tell us about your home, housing portfolio or school estate in Myanmar. We'll explain what is possible there now.