Countries

Energy in India, explained.

How electricity works in India: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in India: Not yet available.Olmack is not offered in India yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in India.

India electricity 2026: state DISCOM tariffs, CERC and SERC regulation, Grid-India, RDSS smart meters, PM Surya Ghar rooftop solar, net metering and licensing.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Indian rupee (INR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

India energy at a glance.

Key figures for households in India. Each one links to its source on the full overview below.

  • Electricity price.

    4.73 INR per kWh for households, including taxes. Figures for Tariffs as on 31 March 2024.

  • Household use.

    1,310 kWh a year for a typical household. Figures for FY2023-24.

  • Renewable share.

    24.1% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in India.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for India below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications India requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in India.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in India, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in India, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in India.

Full overview

The energy market in India, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

India runs one synchronous national grid but governs electricity at two levels. The Union government, the Central Electricity Regulatory Commission (CERC), the Central Electricity Authority (CEA) and the system operator Grid Controller of India (Grid-India) look after inter-state generation, transmission, power exchanges and technical standards. Each state has its own Electricity Regulatory Commission (SERC), which licenses distribution companies (DISCOMs) and sets the retail tariffs that households pay. There is therefore no single national electricity price: tariffs, subsidies, electricity duty and rooftop-solar rules all differ by state.

Households buy from their area DISCOM, most of which are state-owned. There were 72 distribution utilities in FY2024-25 (44 state-owned companies, 16 private companies and 12 state power departments), serving about 282 million domestic connections in March 2024. Under the Revamped Distribution Sector Scheme (RDSS) the Union government is funding the replacement of conventional meters with smart, mostly prepaid, meters: 7.24 crore (72.4 million) smart meters had been installed by 30 June 2026.

Coal still produced about 71% of electricity in 2025, but India is adding renewable capacity at record speed: around 45 GW of solar was installed in FY2025-26, and on 31 August 2026 installed solar capacity was 168 GW, including 32.6 GW of grid-connected rooftop systems. The PM Surya Ghar: Muft Bijli Yojana subsidy scheme had equipped more than 50 lakh (5 million) homes with rooftop solar by August 2026, with net metering under national consumer-rights rules and state regulations.

Energy snapshot.

Headline figures for electricity in India. Each shows its data year and links to its source.

  • Population1,463,865,525 peopleSource 12025
  • Households246,700,000 householdsSource 32011
  • Average household size4.9 people/householdSource 32011
  • Electricity use per household1,310 kWh/yrSource 5FY2023-24
  • Household price (INR)4.73 INR/kWhSource 6Tariffs as on 31 March 2024
  • Household price (EUR)0.043 EUR/kWhSource 7Tariffs as on 31 March 2024
  • Renewable electricity share24.1%Source 82025
  • Solar capacity168 GWSource 931 August 2026
  • Wind capacity58.5 GWSource 931 August 2026
  • Energy storage capacity8.7 GWh (battery)Source 27H1 2026
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Partially liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Central Electricity Regulatory Commission (CERC) for inter-state matters; a State or Joint Electricity Regulatory Commission in each state for distribution and retail tariffs
System operator
Grid Controller of India (Grid-India), through the National and Regional Load Despatch Centres; State Load Despatch Centres within states
Distribution networks
72 utilities (FY2024-25): 44 state-owned DISCOMs, 16 private distribution companies (for example in Delhi, Mumbai, Kolkata, Ahmedabad and Odisha) and 12 state power departments, each a monopoly in its licence area.
Currency
Indian rupee (INR)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in India.

Household price (INR)
4.73 INR/kWh (Tariffs as on 31 March 2024)Source 6Derived: median of the effective domestic rates (energy and fixed charges plus electricity duty) for a 2 kW, 200 kWh/month connection across 36 states and union territories, from CEA’s Electricity Tariff & Duty book 2024 (urban rate used where states publish separate urban and rural rates). State rates ranged from ₹2.05 (Dadra & Nagar Haveli and Daman & Diu) to ₹10.18/kWh (Maharashtra). There is no official national average household price, and the median is unweighted by population.
Household price (EUR)
0.043 EUR/kWh (Tariffs as on 31 March 2024)Source 7Converted from ₹4.73/kWh at the ECB euro reference rate of 30 September 2026 (₹108.8205 per euro).
Typical annual electricity bill
Not identified from a reliable public source.

Retail electricity prices in India are set state by state. Each DISCOM files an annual revenue requirement with its SERC, which then fixes tariffs for every consumer category. Domestic and agricultural tariffs are kept below the average cost of supply and are cross-subsidised by commercial and industrial consumers and by direct state subsidies; some states supply farm pumps free. As a result the price a household pays depends far more on where it lives and how much it uses than on wholesale costs.

CEA’s comparison of tariffs in force on 31 March 2024 shows the spread. For a 2 kW connection using 200 kWh a month, the effective rate including electricity duty ranged from ₹2.05/kWh in Dadra & Nagar Haveli and Daman & Diu to ₹10.18/kWh in Maharashtra; Delhi was ₹3.35, Tamil Nadu ₹2.81, Uttar Pradesh (urban) ₹7.06, Karnataka ₹8.73 and Bihar (urban) ₹9.68. Electricity duty is a state tax and also varies: Maharashtra charged 16% on domestic bills, while ten states and union territories levied none.

Costs, losses and reforms

DISCOM finances have long been the weak point. Aggregate technical and commercial (AT&C) losses fell to 15.04% in FY2024-25 from 22.62% in FY2013-14, the gap between average cost of supply and average revenue narrowed to ₹0.06/kWh, and distribution utilities reported a combined profit of ₹2,701 crore. Smart prepaid meters under RDSS, automatic annual tariff revision and a larger share of fixed costs recovered through fixed charges (proposed in the draft National Electricity Policy 2026) are the main levers being used to keep this improvement going.

Wholesale prices on the power exchanges are well below most retail tariffs: the average day-ahead price on the Indian Energy Exchange was ₹3.93/kWh in July–September 2025. National and state rules are pushing ToD tariffs that make electricity cheaper during solar hours, when abundant solar output lowers procurement costs.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesEvery household is on its SERC’s domestic tariff, usually a rising-block (slab) energy charge plus a fixed or demand charge per kW or per connection. Many state governments subsidise domestic tariffs, particularly for low-consumption and below-poverty-line households.
PrepaymentYesRDSS smart meters are designed to run in prepaid mode, and many DISCOMs offer a rebate on prepaid bills. In August 2026 the Ministry of Power told states that prepaid or postpaid is only a meter configuration and that smart meters are required either way.
Time-of-useLimitedTime-of-Day (ToD) tariffs are mainly applied to commercial and industrial consumers. The 2023 amendment to the Rights of Consumers Rules required ToD for C&I consumers above 10 kW from 1 April 2024, for other non-agricultural consumers from 1 April 2025 and immediately for any consumer given a smart meter, but implementation for households has been patchy and most still pay flat slab tariffs. A 2026 draft amendment would set new deadlines of 1 April 2027 (C&I above 10 kW) and 1 April 2028 (all others except agriculture), with solar-hour rates at least 20% below normal.
DynamicNoNo household tariffs track power-exchange prices. Wholesale prices on the day-ahead and real-time markets are used by DISCOMs, generators and large open-access consumers only.
OtherLimitedUnder the Green Energy Open Access Rules 2022, DISCOM consumers may ask their distributor for green power at a separate green tariff set by the SERC. Separate tariffs also apply to public EV charging stations.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,310 kWh/yr (FY2023-24)Source 5Derived: domestic electricity sales of 369,059.5 GWh in FY2023-24 divided by 281,715,538 domestic consumers on 31 March 2024 (CEA General Review 2025). This is use per domestic connection, not per household; no official per-household figure was identified.
Average daily use per household
3.59 kWh/day (FY2023-24)Source 5Derived from the 1,310 kWh/yr per domestic connection above, divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
1,400 kWh/person/yr (FY2023-24)Source 5All sectors: gross electricity consumed divided by mid-year population (CEA).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
2,300,000 EV sales in 2025 (2025)Source 44All electric vehicle registrations in calendar 2025 on the Vahan portal, 8% of all new vehicles: 1.28 million two-wheelers, about 0.8 million three-wheelers and 175,000 four-wheelers.
Electric cooking
0.64 % of homes (2019-21)Source 45Households using electricity as their primary cooking fuel (NFHS-5), as reported by the MECS programme. Most urban households cook with LPG or piped gas.

Homes used 369,060 GWh of electricity bought from utilities in FY2023-24, 27.3% of utility sales; industry took 33.3% and agriculture 20.4%. Including industrial captive generation, the domestic share of all consumption was 24%. Average use per domestic connection was about 1,310 kWh a year, or roughly 3.6 kWh a day, but the variation is very large: a rural home with lights, fans and a television may use well under 100 kWh a month, while an air-conditioned flat in a large city can use several times that in summer.

Cooling drives demand. The national peak reached a record 270.82 GW at 15:42 on 21 May 2026 during a heatwave, after successive records of 256.1 GW on 25 April and 257–265 GW between 18 and 20 May. The Ministry of Power attributed the growth to air conditioners and evaporative coolers in homes and businesses, and peak demand stayed above 260 GW for about three hours in the afternoon, when solar output was still high.

Electric mobility is growing quickly but is dominated by two- and three-wheelers, many of which are charged at home on ordinary domestic connections. Electric cooking remains rare, as LPG has been promoted for clean cooking. Per-capita consumption (1,400 kWh in FY2023-24) is low by international standards, and the draft National Electricity Policy 2026 aims for 2,000 kWh by 2030 and 4,000 kWh by 2047.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
86% (2011)Source 3Census 2011: 213.5 million of 246.7 million households lived in owned houses (95% in rural areas, 69% in urban areas).
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
35.7 % of population (2025)Source 2World Bank estimate based on UN urbanisation data.

Most Indian households own their home, especially in villages. In the 2011 census 86% of households lived in owned houses, 95% in rural areas and 69% in towns and cities, and over 40% of homes had one room or no exclusive room. Census 2027, whose house-listing phase ran between April and September 2026, will give the first update in fifteen years.

The housing stock shapes how small-scale energy is adopted. Rural and small-town homes are typically single-family buildings with flat concrete roofs that suit rooftop solar, and these owner-occupiers are the main users of the PM Surya Ghar scheme. In large cities many people live in multi-storey apartment blocks run by housing societies or resident welfare associations (RWAs); some state regulators, such as Maharashtra’s, have introduced group net metering so that residents can share a system on the common roof, and PM Surya Ghar pays a separate subsidy for systems serving common facilities.

How the grid works in India.

  1. TransmissionGrid Controller of India (Grid-India), Power Grid Corporation of India (POWERGRID) and other inter-state transmission licensees
  2. Distribution72 utilities (FY2024-25): 44 state-owned DISCOMs, 16 private distribution companies (for example in Delhi, Mumbai, Kolkata, Ahmedabad and Odisha) and 12 state power departments, each a monopoly in its licence area.
  3. MeteringAdvanced Metering Infrastructure Service Providers (AMISPs)
  4. Supply8 or more retail suppliers

Physically, power from coal, hydro, nuclear, gas and fast-growing solar and wind plants flows over 765 kV, 400 kV and 220 kV lines to state networks and then through 33 kV and 11 kV distribution to 230/400 V homes. The regional grids operate as one synchronous national grid (One Nation, One Grid, One Frequency), and inter-regional transfer capacity reached 120,340 MW on 31 March 2026. India also imports hydropower from Bhutan and Nepal and exports to Bangladesh over cross-border links.

Commercially, most power is bought by DISCOMs under long-term power purchase agreements with central, state and private generators, with tariffs either regulated or set by competitive bidding. The remainder is traded bilaterally through licensed traders or on the power exchanges. Grid-India schedules inter-state transactions and State Load Despatch Centres schedule transactions within their states, with deviations from schedule settled under CERC rules.

Reform of distribution is the main open question. The Electricity (Amendment) Bill 2025, published in draft in October 2025, would let several licensees supply in the same area over a shared network, but it had not been introduced in Parliament and the government signalled revisions after stakeholder objections. The draft National Electricity Policy 2026 also proposes distribution system operators and peer-to-peer trading of surplus rooftop power.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of PowerFrames national electricity policy and the rules made under the Electricity Act 2003 (including the Electricity (Rights of Consumers) Rules 2020), and runs RDSS and the battery storage viability gap funding.
MinistryMinistry of New and Renewable Energy (MNRE)Responsible for renewable energy policy and schemes, including PM Surya Ghar, PM-KUSUM and the Approved List of Models and Manufacturers (ALMM) for solar modules and cells.
RegulatorCentral Electricity Regulatory Commission (CERC)Regulates inter-state transmission, central generating companies, inter-state trading licensees, power exchanges and the ancillary services market, and sets the Indian Electricity Grid Code.
RegulatorState Electricity Regulatory Commissions (SERCs)One per state (joint commissions cover Goa and the union territories, and Manipur and Mizoram). They license DISCOMs, set retail tariffs, and make net-metering, supply-code and open-access regulations for their state.
RegulatorCentral Electricity Authority (CEA)Technical authority under the Ministry of Power: sets technical standards for grid connectivity, metering and safety, registers independent storage systems, plans capacity and publishes official statistics.
System operatorGrid Controller of India (Grid-India)Operates the National Load Despatch Centre and the Regional Load Despatch Centres, schedules inter-state power flows and runs the ancillary services market. Proposed as the single market coupling operator for the power exchanges.
TSOPower Grid Corporation of India (POWERGRID) and other inter-state transmission licenseesPOWERGRID owns most of the inter-state transmission system, alongside other transmission licensees; the Central Transmission Utility of India (CTUIL) plans the inter-state network. State transmission utilities own intra-state networks.
DSOState-owned DISCOMsFor example MSEDCL (Maharashtra), the UP DISCOMs under UPPCL, BESCOM in Karnataka and the Gujarat DISCOMs under GUVNL. Each is the network owner and the retail supplier in its area.
DSOPrivate distribution licenseesIncluding Tata Power-DDL and BSES Rajdhani and Yamuna (Delhi), Adani Electricity and Tata Power (Mumbai), CESC (Kolkata), Torrent Power (Ahmedabad, Surat and others) and the four Odisha DISCOMs run by Tata Power in joint ventures with the state utility GRIDCO.
ExchangePower exchanges: Indian Energy Exchange (IEX), Power Exchange India (PXIL) and Hindustan Power Exchange (HPX)CERC-regulated exchanges running day-ahead, real-time, term-ahead and green markets. Market coupling of the day-ahead and real-time markets is being introduced.
MeteringAdvanced Metering Infrastructure Service Providers (AMISPs)Private companies contracted by DISCOMs under RDSS to supply, install and run smart meters and their head-end and data systems for a monthly fee per meter (the TOTEX model). The meters and data serve the DISCOM.

Compared with the UK system.

Compared with the UK system.
UK conceptIndia equivalentHow it works
DNODISCOM (distribution licensee)A DISCOM owns and runs the low and medium-voltage network in its licence area, but unlike a UK DNO it is also the retailer: it connects the home, installs the meter, bills and collects payment. Most are state-owned companies; a few areas are run by private licensees or franchisees.
National Grid/NESOGrid-India, CTUIL and POWERGRID; State Load Despatch CentresGrid-India operates the national grid and schedules inter-state flows, CTUIL plans inter-state transmission and POWERGRID and private licensees own it. Within each state a State Load Despatch Centre balances the state system, so there are two layers of system operation.
MPANDISCOM consumer number (also called account, CA or service connection number)Each connection is identified by a number issued by its DISCOM, in that utility’s own format; for example MSEDCL uses a 12-digit consumer number together with a billing-unit code. There is no national supply-point number or central register.
MPRNCity gas distribution customer ID / LPG consumer numberPiped natural gas is supplied by city gas distribution companies with their own customer numbers, and most homes use bottled LPG registered with an oil marketing company. Neither is linked to the electricity number.
Meter operatorDISCOM, increasingly through an AMISPMeters are the DISCOM’s responsibility. Under RDSS, smart meters are installed and operated for the DISCOM by contracted AMISPs; consumers cannot appoint their own meter operator.
SupplierThe same DISCOMHouseholds cannot choose their supplier except where an SERC has granted parallel distribution licences, which the Electricity Act allows; in suburban Mumbai consumers can switch between Adani Electricity and Tata Power. Consumers with demand of 100 kW or more can buy green power through open access instead.
Smart-meter infrastructureDISCOM/AMISP head-end and meter data systems under RDSSSmart meters built to IS 16444 communicate with head-end systems run for each DISCOM, using the IS 15959 (DLMS/COSEM) data model. There is no national data hub like the DCC; each DISCOM holds its own meter data and offers it to customers through its app or portal.

How a supply point is identified.

Consumer No. 170034582916, BU 4593 (fictional, MSEDCL style: 12-digit consumer number and 4-digit billing unit)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Consumer number (account number, contract account or service connection number) (Consumer No.)
Who issues it?The DISCOM licensed for the area
FormatUtility-specific numeric identifier; there is no national format. Some utilities pair it with a location code: MSEDCL (Maharashtra) uses a 12-digit consumer number plus a 4-digit billing unit (BU) code identifying the office that bills the connection.
LengthVaries by DISCOM (for example 12 digits plus a 4-digit BU code at MSEDCL)
Stays with the property when you switch supplier?Yes
Where to find itPrinted at the top of every electricity bill and on prepaid recharge receipts; also shown in the DISCOM’s app and web portal once registered.
Electronic accessDISCOM portals let consumers view and pay bills with the consumer number, typically with a one-time password sent to the registered mobile number (MSEDCL requires the consumer number, billing unit and OTP). Smart-meter customers see consumption and prepaid balance in the utility app.
Third-party accessBill payment by banks and fintech apps runs through Bharat Connect (formerly the Bharat Bill Payment System, operated by NPCI Bharat BillPay), using the DISCOM and the consumer number. The PM Surya Ghar national portal links rooftop-solar applications to the consumer number. There is no general framework for third parties to obtain a household’s meter data.
Who keeps the registerEach DISCOM’s own customer, metering and billing system. No national register of supply points exists.
Register scopePer DSO

A home connection in India is defined by its DISCOM. When a household applies for a new connection under the state supply code and the Electricity (Rights of Consumers) Rules 2020, it becomes a consumer of the licensee for that area and is given a consumer number. That number is used for every later step: paying bills, raising complaints, changing the name on the connection, increasing the sanctioned load, replacing the meter or applying for rooftop solar.

Format and location

Because there are 72 distribution utilities, there are many formats. MSEDCL, the state DISCOM for most of Maharashtra, identifies a connection by a 12-digit consumer number and a 4-digit billing-unit code; its online bill service asks for both and then sends a one-time password to the registered mobile number and email. Other DISCOMs use their own account-number lengths and office codes. Whatever the format, the number appears on the bill and in the utility app, and the meter carries its own separate serial number.

Who keeps the records and what moves with the property

There is no central registry: each DISCOM keeps its own consumer database, and because a household cannot normally switch supplier there is nothing to coordinate between companies. The connection and its number belong to the premises. When a property is sold or a tenant moves in, the new occupier applies to the DISCOM for a change of name on the existing connection rather than receiving a new number.

Third-party use is limited to payments and scheme administration. Banks, wallets and payment apps take bills through Bharat Connect by asking for the DISCOM and consumer number. For rooftop solar, applicants enter their consumer number on the PM Surya Ghar national portal, which passes the application to the DISCOM for feasibility and net-meter installation; the subsidy is paid to the bank account once the DISCOM confirms commissioning.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingYes
How exported electricity is paidSet by each SERC. Under net metering, exports offset imports within the billing or settlement period and any surplus at the end of the settlement year is paid at a rate fixed by the SERC. Some states also offer net billing or gross metering, where exports are paid at a regulated feed-in rate.
Who can export and how large can the system be?Any consumer can become a prosumer under the Electricity (Rights of Consumers) Rules. Net metering is allowed up to 500 kW or the sanctioned load, whichever is lower; above that, gross metering or net billing applies. SERCs set the detailed limits, such as maximum sizes on single-phase connections.
Does the DISCOM have to strengthen the network?Yes for small systems: since 2024 the DISCOM must carry out any network strengthening needed for rooftop systems up to 5 kW at its own cost.
Can flat owners share a system?It depends on the state. Some regulators, such as Maharashtra’s, allow group net metering so that housing societies and RWAs can share one system, and PM Surya Ghar subsidises systems serving common facilities at ₹18,000/kW up to 500 kW.
How much is earned from exports?It depends on the state. MNRE reported that more than 12 lakh PM Surya Ghar households earned a combined ₹421 crore from surplus power in FY2024-25, about ₹3,500 each.
What changes are proposed?A March 2026 draft amendment would leave net metering, net billing, gross metering and net feed-in to SERC regulations, allow net-metering charges for systems above 5 kW, and let SERCs require storage at prosumer sites above 500 kW. It was proposed to take effect on 1 October 2026 but had not been confirmed as notified when this profile was updated.

Connecting a home system.

  1. Register on the PM Surya Ghar national portal (or the DISCOM’s rooftop portal), choosing the state and DISCOM and entering the consumer number.
  2. The DISCOM checks technical feasibility; under the 2024 rules no feasibility study is needed for systems up to 10 kW, and larger systems must be assessed within 15 days.
  3. Choose a registered vendor and install the system using ALMM-listed modules (with domestically made cells for subsidised systems from 1 June 2026) and certified inverters.
  4. Submit the installation details; the DISCOM installs or tests the bi-directional net meter and commissions the system, which the rules require within 15 days.
  5. For subsidised systems, the commissioning report triggers payment of the central financial assistance directly to the consumer’s bank account.

India allows and actively promotes household export. The national framework is set by the Electricity (Rights of Consumers) Rules 2020, amended in 2021 to allow net metering up to 500 kW and in February 2024 to simplify connections. The details, including settlement periods, the price paid for surplus units and banking restrictions, are set in each state’s net-metering or rooftop-solar regulations, so a system in Maharashtra and one in Tamil Nadu can be treated quite differently.

Under net metering a single bi-directional meter records both imports and exports and the household pays for the net. Most residential systems are net-metered because the PM Surya Ghar subsidy requires a grid-connected system and the scheme is designed around self-consumption with credits for surplus. Larger systems may use gross metering, where all output is sold to the DISCOM at a regulated tariff, or net billing, where exports are valued separately from imports.

DISCOMs with many rooftop systems have argued that net metering shifts costs to other consumers because daytime exports are credited against evening consumption. This is why recent state orders and the 2026 draft national amendment move towards time-of-day settlement, charges on larger systems and, in some states, restrictions on drawing banked solar energy during evening peaks.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityNo licence: generation is de-licensed under section 7 of the Electricity Act 2003, provided the plant meets CEA grid-connectivity standards. Hydro schemes above a capital-cost threshold set by the central government need CEA concurrence (section 8).CEA (technical standards); CERC or SERC (tariffs where regulated)Captive plants may be built without a licence (section 9). Selling the output still requires a buyer, open access or a licensed trader.
Rooftop or behind-the-meter generationNo licence. Connection approval from the DISCOM under the Rights of Consumers Rules and the SERC’s rooftop regulations; no feasibility study up to 10 kW.DISCOM; SERCNet metering up to 500 kW or the sanctioned load, whichever is lower.
Store electricityNo licence. Storage is part of the power system (Electricity Rules 2005, rule 18). An independent storage system must be registered with CEA; since September 2025 consumers may own and operate storage, which is treated as part of the consumer’s installation.CEA (registration of independent storage)Storage owners may sell, lease or rent storage capacity to utilities, load despatch centres and, under the 2025 amendment, consumers.
Export to the gridNo licence; export under the DISCOM’s net-metering, net-billing or gross-metering arrangement approved by the SERC.SERC; DISCOMCompensation rates and settlement periods differ by state.
Sell or supply electricity to consumersDistribution licence from the SERC to supply consumers in an area. Generators may instead sell to consumers of 100 kW or more through green energy open access.SERCSmall-scale rural distribution may be exempted (for example through panchayats, co-operatives or franchisees). Multiple licensees per area are proposed in the draft Electricity (Amendment) Bill 2025.
Trade electricityTrading licence: from CERC for inter-state trading, or from the SERC for trading within a state, under the licensing regulations of the commission concerned.CERC / SERCDistribution licensees may trade without a separate licence.
Wholesale market participationNo licence for buyers or sellers as such: participants join a power exchange as a member or client and need open-access permission from the relevant load despatch centre.CERC (exchanges); NLDC/RLDC/SLDC (open access)Day-ahead, real-time, term-ahead and green markets; coupling of exchange markets is being introduced.
Balancing and ancillary servicesNo licence; providers must qualify under the CERC (Ancillary Services) Regulations 2022, which allow generators, storage and demand response, standalone or aggregated, with a minimum of 1 MW for secondary and tertiary reserves.CERC; Grid-India (NLDC)Several states are creating parallel intra-state frameworks.
Aggregate assets or customersNo national aggregator licence. Aggregation is allowed for ancillary services at 1 MW and above; state demand-response rules such as Rajasthan’s 2026 regulations provide for registered aggregators.CERC; SERCsThe 2026 draft Rights of Consumers amendment would make each SERC specify a demand-response framework, including eligibility of demand response providers.
Operate a virtual power plantNot defined in law. A VPP must use the routes above: ancillary services (1 MW minimum), exchange trading through a licensed trader or member, or a state demand-response programme.CERC; SERCsNo residential VPP market identified.
Remotely control customer assetsNo specific licence. Control must be agreed with the consumer; power-sector entities must follow CEA cyber-security guidelines, and CEA published draft binding cyber-security regulations in 2024.CEASmart meters can disconnect and reconnect supply, for example when a prepaid balance runs out, under DISCOM control.

The Electricity Act 2003 licenses networks, supply and trading but not generation. Anyone may build a power plant that meets CEA’s technical standards, and households need only their DISCOM’s connection approval to install rooftop solar. Distribution licences, which carry the right to sell to consumers, are granted by the SERCs, while trading licences are granted by CERC for inter-state trade and by the SERCs within a state.

Energy storage has been given a specific status by rules rather than by a licence category. The Electricity (Amendment) Rules 2022 made storage part of the power system and made independent storage a de-licensed activity subject to CEA registration; the Electricity (Amendment) Rules 2025, notified on 19 September 2025, extended the right to develop, own and operate storage to consumers.

Aggregation of small distributed assets is at an early stage. National ancillary-services rules already let storage and demand response take part, alone or aggregated, from 1 MW, and several states are writing demand-flexibility regulations. Rajasthan’s 2026 regulations set demand-flexibility obligations on DISCOMs (0.25% of the previous year’s peak in 2026-27, rising to 2% in 2029-30) and let them procure from registered aggregators, with consumers free to switch aggregator without cost.

Flexibility and grid services.

Aggregation of home equipment: Limited

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Day-ahead market (DAM)Restricted—LimitedIEX, PXIL, HPX. Daily auction for delivery the next day. Participants are DISCOMs, generators, open-access consumers and traders; household assets have no direct route.
Real-time market (RTM)Restricted—LimitedIEX, PXIL, HPX. Intraday auctions for delivery shortly afterwards, used by DISCOMs and generators to rebalance portfolios.
Secondary and tertiary reserve ancillary services (SRAS, TRAS)Yes1 MWYesGrid-India (NLDC). Under the CERC (Ancillary Services) Regulations 2022, generators, energy storage and demand response may provide reserves on a standalone or aggregated basis if connected to the inter-state or intra-state transmission system.
State demand-response and demand-flexibility programmesDeveloping—LimitedDISCOMs under SERC regulations. Eighteen states have demand-side management regulations; Rajasthan’s 2026 demand-flexibility regulations add binding targets and registered aggregators, and Gujarat began framing ancillary-services and demand-flexibility regulations in July 2026.
Green day-ahead and term-ahead marketsRestricted—NoIEX, PXIL, HPX. Exchange markets for renewable energy, used by obligated entities and open-access buyers; not open to household systems.

India has deep wholesale markets but almost no route for household devices to earn from flexibility yet. Exchange trading and ancillary services are open to storage and demand response in principle, but the 1 MW minimum, the need for open-access permission and the monopoly position of DISCOMs mean that small assets would have to be aggregated and dispatched through the DISCOM or a state programme.

The policy direction is towards more household flexibility. Time-of-day tariffs with cheaper solar hours, RDSS smart meters that record interval data, the September 2025 rule allowing consumers to own storage, and state demand-flexibility regulations together create the building blocks. The 2026 draft Rights of Consumers amendment would require every SERC to specify a demand-response framework covering eligibility of providers, incentives, measurement, verification and settlement.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Indian Energy Exchange (IEX)The largest power exchange, running day-ahead, real-time, term-ahead, green and cross-border markets.
Grid-India ancillary servicesProcures and dispatches secondary and tertiary reserves under CERC rules.
Market coupling (proposed)CERC’s April 2026 draft would make coupling of the day-ahead and real-time markets mandatory, with Grid-India as the single market coupling operator.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutUnion-funded RDSS programme: 7.24 crore smart meters installed by 30 June 2026 (5.73 crore under RDSS) against 20.33 crore sanctioned.
Reading intervalSet in DISCOM and AMISP specifications under IS 16444 and IS 15959; no single national household interval identified.
Smart meters installed (30 June 2026)7.24 crore (72.4 million), including transformer and feeder meters
Installed under RDSS5.73 crore
Sanctioned under RDSS20.33 crore: 19.79 crore consumer, 52.53 lakh transformer and 2.05 lakh feeder meters
RDSS end date31 March 2028
Delivery modelAMISPs paid per meter per month (TOTEX)
StandardsIS 16444 (smart meters), IS 15959 (DLMS/COSEM data exchange)

Smart metering in India is run by DISCOMs and paid for largely through the Revamped Distribution Sector Scheme, launched in 2021, which funds prepaid smart meters for consumers alongside meters on distribution transformers and feeders for energy accounting. Most DISCOMs contract Advanced Metering Infrastructure Service Providers that install the meters, run the communications and head-end systems and are paid a monthly fee per meter over the contract period. IntelliSmart, a joint venture of EESL and the National Investment and Infrastructure Fund, is one of the largest.

Progress has been slower than originally planned, but has accelerated: by 30 June 2026, 7.24 crore smart meters had been installed, of which 5.73 crore under RDSS, against 20.33 crore sanctioned, and the scheme’s end date is 31 March 2028. The CEA metering regulations as amended in 2026 require supply through Indian Standard smart meters wherever communication networks exist, and in August 2026 the Ministry of Power reminded states that this applies whether the meter is set to prepaid or postpaid mode.

For households, smart meters mean app-based recharge and consumption tracking, and they are the precondition for time-of-day tariffs. The government has also promised safeguards, including bill rebates for prepaid installations and no penalties based on recorded maximum demand. Meter data stays with each DISCOM; there is no national data hub.

Renewable electricity.

Electricity generation mix (2025).

  • Coal: 70.8%
  • Solar: 9.4%
  • Hydro: 8.6%
  • Wind: 5%
  • Nuclear: 2.6%
  • Gas: 2.3%
  • Bioenergy: 1.1%
  • Other fossil: 0.2%
Source 8
Renewable electricity share
24.1% (2025)Source 8Share of generation from renewables (hydro 8.55%, solar 9.42%, wind 5.0%, bioenergy 1.11%). Including nuclear (2.59%), clean sources supplied 26.67%.
Home solar
14.8 GW (August 2026)Source 14Rooftop capacity commissioned under PM Surya Ghar (more than 50 lakh homes). Total grid-connected rooftop capacity of all sectors was 32.59 GW.
Solar added each year
45 GW (FY2025-26)Source 11Described by the Minister of New and Renewable Energy as around 45 GW, the highest annual addition to date. A further 17.78 GW was added in April–August 2026 (MNRE).
Solar (all)
168 GW (31 August 2026)Source 9
Grid-connected rooftop solar
32.6 GW (31 August 2026)Source 9
Wind
58.5 GW (31 August 2026)Source 9
Large hydro
52.1 GW (31 August 2026)Source 9
Small hydro
5.18 GW (31 August 2026)Source 9
Bioenergy (bagasse and non-bagasse cogeneration, waste to energy)
11.8 GW (31 August 2026)Source 9Sum of MNRE categories: 9,821 MW bagasse, 1,048 MW non-bagasse, 324 MW grid and 554 MW off-grid waste to energy.
Nuclear
8.78 GW (31 August 2026)Source 10

Targets.

  • 500 GW of non-fossil generating capacity by 2030.
  • Updated NDC (2026): 60% of installed electricity capacity from non-fossil sources by 2035 and a 47% cut in emissions intensity of GDP from 2005 levels.
  • Renewable Consumption Obligation for DISCOMs, open-access and captive users rising from 29.91% in 2024-25 to 43.33% in 2029-30, including a distributed renewable energy component.
  • PM Surya Ghar: rooftop solar for one crore (10 million) households by FY2026-27.
  • Net zero emissions by 2070.

India’s electricity is still mainly coal-fired, but the share is starting to fall. In 2025 coal supplied 70.8% of generation and output from coal plants fell, while solar reached 9.4% and wind 5.0%; renewables including hydro supplied 24.1% and clean sources including nuclear 26.7%. Capacity has moved faster than generation: non-fossil sources made up more than half of the 554.5 GW installed on 31 August 2026, meeting the 2030 NDC target of 50% early.

Solar dominates new build. Around 45 GW was added in FY2025-26, mostly ground-mounted parks in Rajasthan, Gujarat and Maharashtra won in national auctions run by SECI and other agencies, plus about 8.7 GW of rooftop systems. Industrial policy shapes the market: modules for most projects must be on MNRE’s Approved List of Models and Manufacturers, and from 1 June 2026 government-backed projects, including subsidised home systems, must also use cells on the new ALMM List-II.

Integration is the growing challenge. Solar meets a large share of daytime peak demand, but evening peaks still rely on coal, hydro and imports of flexibility from storage. This has prompted battery storage tenders, viability gap funding, ToD tariffs that reward daytime use, and in the March 2026 draft rules an option for regulators to require storage at large prosumer installations.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
8.7 GWh (H1 2026)Source 27Battery storage installed by mid-2026 according to IESA and CES; about 70% of capacity added in H1 2026 was merchant. Mercom reported 5.9 GWh at 31 March 2026.

Grid-scale battery storage has grown from almost nothing in 2025: installed capacity rose from 0.78 GWh in December 2025 to 8.7 GWh by mid-2026, and was expected to exceed 10 GWh by the end of 2026. Growth is driven by standalone projects contracted by state DISCOMs and central agencies with viability gap funding, by merchant batteries trading on the exchanges, and by solar-plus-storage and round-the-clock renewable tenders.

Rules are being put in place alongside. Storage is recognised as part of the power system, independent storage needs only CEA registration, and consumers have been allowed to own storage since September 2025. CEA has notified technical standards for battery systems that take effect in April 2027, and its advisory calls for grid-forming inverters on projects of 50 MW and above. The Ministry has also allowed DISCOMs to use surplus PM Surya Ghar funds for battery integration at rooftop-solar sites.

Storage projects.

  • Viability Gap Funding for 30 GWh of BESS: Approved in June 2025: ₹5,400 crore from the Power System Development Fund at ₹18 lakh per MWh, with 25 GWh allocated to 15 states and 5 GWh to NTPC. It follows an earlier scheme for 13.2 GWh.
  • Pumped storage: About 7 GW of pumped storage was operating at the end of 2025, with a further 12 GW under construction; CEA’s roadmap targets 100 GW by 2035-36.
  • Storage pipeline: IESA and CES counted a 260 GWh tender pipeline in mid-2026 after 47 GWh of tenders in the first half of the year; most tenders are for two-hour standalone systems.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Maharashtra State Electricity Distribution Co. (MSEDCL / Mahavitaran)State-owned DISCOM for Maharashtra outside the Mumbai licence areas; Maharashtra had 26.6 million domestic connections in March 2024 (all utilities)LimitedLimitedNoYes
Uttar Pradesh Power Corporation (UPPCL) and its four DISCOMsUttar Pradesh had 30.4 million domestic connections in March 2024, the most of any stateLimitedLimitedNoYes
Bangalore Electricity Supply Company (BESCOM)—LimitedLimitedNoYes
Tata Power (Tata Power-DDL in Delhi, Mumbai distribution and four Odisha DISCOMs)—LimitedLimitedNoYes
BSES Rajdhani and BSES Yamuna (Delhi)—LimitedLimitedNoYes
Adani Electricity Mumbai—LimitedLimitedNoYes
CESC (Kolkata)—LimitedLimitedNoYes
Torrent Power—LimitedLimitedNoYes

There is no retail competition for households in most of India: the DISCOM for an area is both network owner and supplier, and tariffs are set by the SERC. The largest groups by customers are the state-owned utilities of the most populous states, such as the UP DISCOMs, MSEDCL, the Tamil Nadu and Karnataka distribution companies and the Bihar, Rajasthan, Gujarat and Andhra Pradesh DISCOMs. Private licensees serve Delhi, Mumbai, Kolkata, Ahmedabad and Surat, and the four Odisha DISCOMs are run by Tata Power in joint ventures with GRIDCO. Suburban Mumbai is the main exception to the single-supplier model: since parallel licensing began in 2008, consumers there can switch between Adani Electricity and Tata Power, and in 2025 MERC consulted on further parallel licences for Adani, Tata and Torrent groups.

All DISCOMs must offer net metering under their state’s regulations and can supply green power at an SERC-approved green tariff on request. Time-of-day tariffs and smart meters are spreading but their availability for households differs by utility, so the availability shown here is a general guide rather than a guarantee for every customer.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of PowerGovernmentNational electricity policy, rules and RDSSIssues the Rights of Consumers Rules, storage rules, ToD requirements and smart-meter directions.
Ministry of New and Renewable Energy (MNRE)GovernmentRenewable energy policy and schemesRuns PM Surya Ghar and PM-KUSUM, publishes official capacity data and maintains the ALMM lists.
Central Electricity Regulatory Commission (CERC)RegulatorCentral regulatorRegulates power exchanges, ancillary services, inter-state transmission and trading.
Forum of RegulatorsRegulatorCoordination body of CERC and the SERCsDevelops model regulations that states use for net metering, open access and other topics.
Central Electricity Authority (CEA)RegulatorTechnical authority and statisticsSets metering, connectivity, safety and storage standards and publishes official sector data.
Grid Controller of India (Grid-India)TransmissionNational system operatorRuns national and regional load despatch, ancillary services and real-time grid data.
Power Grid Corporation of India (POWERGRID)TransmissionLargest inter-state transmission ownerBuilds and operates most of the national high-voltage network.
REC LimitedDistributionNodal agency for RDSSAdministers RDSS funding, including smart-meter projects, with PFC.
Indian Energy Exchange (IEX)MarketLargest power exchangePublishes day-ahead and real-time prices used as the wholesale benchmark.
Solar Energy Corporation of India (SECI)Renewable EnergyCentral renewable and storage procurement agencyRuns national auctions for solar, wind, hybrid and storage projects.
National Solar Energy Federation of India (NSEFI)SolarSolar industry associationRepresents developers, manufacturers and installers in policy discussions.
India Energy Storage Alliance (IESA)StorageStorage and e-mobility industry alliancePublishes market reviews of battery storage deployment and runs India Energy Storage Week.
Bureau of Indian Standards (BIS)MeteringNational standards bodyPublishes and certifies the IS standards for smart meters, inverters and solar modules.
Prayas (Energy Group)ConsumerIndependent research and consumer-interest groupAnalyses tariffs, smart metering and regulation from a consumer perspective and takes part in regulatory hearings.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection of distributed generationCEA (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations 2013, as amendedCEAApplies to rooftop solar and other generation connected below 33 kV; protection, power quality and disconnection requirements.
Grid connection (large plants, storage)CEA (Technical Standards for Connectivity to the Grid) Regulations 2007; draft replacement regulations 2026CEAThe July 2026 draft adds inverter-based resources, grid-forming converters, ride-through and frequency response, and covers battery storage and bulk consumers at 33 kV and above.
Inverter safetyIS 16221 (Parts 1 and 2), equivalent to IEC 62109BISSafety of power converters in PV systems, including grid-interactive and hybrid inverters.
Anti-islandingIS 16169:2019BISTest procedure confirming that grid-connected PV inverters stop exporting when the grid fails.
Smart metersIS 16444 and IS 15959 (DLMS/COSEM companion specification)BISRequired for smart meters supplied under RDSS and the CEA metering regulations.
Metering rulesCEA (Installation and Operation of Meters) Regulations, as amended (latest 2026)CEARequire supply through IS-compliant smart meters where communication networks exist; cover net meters for prosumers.
Solar modules and cellsApproved List of Models and Manufacturers (ALMM) List-I (modules) and List-II (cells)MNREList-II applies to government-backed projects, including subsidised rooftop systems, from 1 June 2026.
Battery storageCEA technical standards for battery energy storage systemsCEANotified in 2026, effective from April 2027.

Permissions.

Permissions.
PermissionRequiredLevelDetail
DISCOM connection approval (rooftop solar)YesMixedNational rules set timelines (no feasibility study up to 10 kW; commissioning within 15 days); procedures are run by each DISCOM under SERC regulations.
Generation licenceNoNationalGeneration is de-licensed under the Electricity Act 2003.
Planning or building permissionLimitedLocalRooftop solar on an existing building is generally treated as an installation, not a development; local building byelaws, heritage areas or structural requirements may apply.
Owner or society consentLimitedLocalTenants need the owner’s consent; in apartment buildings the housing society or RWA controls the common roof.
Electrical inspector approvalLimitedRegionalRequired by some states above certain capacities or voltages; thresholds differ by state.
Storage registration with CEALimitedNationalRequired for independent storage systems; storage owned by a consumer is treated as part of the consumer’s installation.

For a household, the main gatekeeper is the DISCOM. The Rights of Consumers Rules set national deadlines and remove the feasibility study for systems up to 10 kW, while state regulations decide size limits, metering arrangements and paperwork. Applications under PM Surya Ghar are made online and passed to the DISCOM automatically.

Building and electrical-safety requirements are local or state matters. In practice most single-family rooftop systems need no separate building permission, but apartment residents need their society’s agreement and some states require an electrical inspector’s approval for larger systems.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
PM Surya Ghar: Muft Bijli YojanaActiveGrantCentral financial assistance for residential rooftop solar: ₹30,000/kW for the first 2 kW and ₹18,000 for the third kW, capped at ₹78,000 (₹33,000 and ₹19,800 in special-category states and union territories). Housing societies and RWAs receive ₹18,000/kW for common facilities up to 500 kW. Outlay ₹75,021 crore; more than 50 lakh homes and 14.8 GW installed, and ₹28,024 crore paid by August 2026.February 2024 – March 2027 (FY2026-27)
Net metering for prosumersActiveNet meteringExports offset imports up to 500 kW or the sanctioned load under the Rights of Consumers Rules, with surplus paid at SERC-set rates.—
Reduced GST on solar equipmentActiveVAT reliefGST on solar cells, modules and other renewable devices cut from 12% to 5% from 22 September 2025.From 22 September 2025
PM-KUSUMClosedGrantSupport for farm solar pumps, pump solarisation and decentralised solar plants (₹34,422 crore). The current phase ended in March 2026 for new sanctions; projects with agreements signed by 31 December 2025 may be completed by 31 March 2027. A successor PM-KUSUM 2.0 is under consideration.2019 – March 2026
Viability Gap Funding for battery storageActiveGrant₹5,400 crore for 30 GWh of standalone battery storage at ₹18 lakh per MWh, for utility-scale projects procured by states and NTPC.Approved June 2025
Green Energy Open AccessActiveMarket accessConsumers with contracted demand of 100 kW or more (including aggregated connections in the same division) can buy renewable power through open access; DISCOM consumers can request green power at a green tariff.From June 2022

Data and connectivity.

Fixed broadband
48.1 million fixed wired broadband subscriptions (July 2026)Source 47TRAI. Total broadband subscriptions, mostly mobile, were 1,094.48 million; fixed wireless access added 18.84 million.
4G coverage
Not identified from a reliable public source.
5G coverage
99.9 % of districts (December 2025)Source 48Share of districts with 5G service, stated in Parliament on 3 December 2025 (5.08 lakh 5G base stations at 31 October 2025). Not a population-coverage figure.

Mobile networks carry almost all Indian internet use: of 1,094 million broadband subscriptions in July 2026, about 1,030 million were mobile, and 5G was available in nearly every district by the end of 2025. This matters for smart metering, because smart meters need a communication network to be read remotely, and consumers manage prepaid balances through mobile apps.

Smart meters follow the IS 15959 data model based on DLMS/COSEM. Bill payments run over the Bharat Connect network, and rooftop-solar applications and subsidy payments are handled online through the PM Surya Ghar portal. No national protocol for controlling household energy devices was identified.

Grid conditions.

National peak demand
270.8 GW (21 May 2026)Source 35All-time peak demand met, at 15:42 on 21 May 2026 (Ministry of Power).
Annual electricity demand
2,082.8 TWh (2025)Source 8Ember estimate of electricity demand including captive generation; generation was 2,081.6 TWh.
Generation capacity
554.5 GW (31 August 2026)Source 10Coal 224.4 GW, lignite 6.4 GW, gas 19.1 GW, diesel 0.3 GW, hydro 52.1 GW, other renewables 243.5 GW, nuclear 8.8 GW (utility capacity, CEA).
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

India’s grid has moved from shortage to broad adequacy, but peaks are rising fast. Demand reached a record 270.82 GW on 21 May 2026, and the Ministry reported very small shortfalls on the day (0.18 GW in solar hours and 2.57 GW in non-solar hours). Solar now covers a large part of afternoon peaks, so the tightest periods are in the evening, when solar output falls and demand remains high.

Transmission is being expanded to carry renewable power from Rajasthan, Gujarat and other resource-rich states to load centres; inter-regional capacity is planned to reach 143 GW by 2027. Many distribution networks remain weak, with higher losses and outages in rural areas, which is why RDSS funds network strengthening alongside smart meters.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Smart meters mandatory under amended CEA metering regulationsCurrent2026Supply must be through IS-compliant smart meters where communication networks exist, in prepaid or postpaid mode; RDSS funding runs to 31 March 2028.
ALMM List-II for solar cellsCurrent1 June 2026Government-backed projects, including subsidised home systems, must use domestically made cells on the approved list. PM Surya Ghar applicants who forgo the subsidy are exempt until 31 March 2027.
Consumers may own energy storageCurrent19 September 2025The Electricity (Amendment) Rules 2025 extended rule 18 so that consumers can develop, own and operate storage as part of their installation.
Electricity (Rights of Consumers) Amendment Rules 2026UpcomingProposed from 1 October 2026 (draft of 12 March 2026)Would introduce demand-response frameworks, ToD deadlines of 1 April 2027 for C&I above 10 kW and 1 April 2028 for others, cheaper solar hours, net-metering charges for systems above 5 kW, optional storage requirements above 500 kW, connection timelines and abnormal-bill reviews.
Market coupling of power exchangesUpcomingDraft regulations April 2026CERC proposes mandatory coupling of day-ahead and real-time markets, with Grid-India as single market coupling operator; Grid-India would publish the procedure within six months of notification.
Electricity (Amendment) Bill 2025UpcomingNot yet introduced in ParliamentDraft would allow multiple distribution licensees to supply over shared networks under SERC oversight; under revision after consultation.
National Electricity Policy 2026UpcomingDraft January 2026Would replace the 2005 policy, with resource-adequacy planning, automatic tariff revision, distribution system operators, storage and peer-to-peer trading of distributed renewable energy.
New grid connectivity standardsUpcomingDraft July 2026; BESS standards effective April 2027CEA draft regulations to replace the 2007 grid-connectivity standards, and separate battery storage standards effective April 2027.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumMore than 50 lakh homes and 14.8 GW under PM Surya Ghar by August 2026, adding about 16,000 systems a day in July 2026, but this is still around 2% of the 282 million domestic connections.
Distributed energy marketMedium32.59 GW of grid-connected rooftop solar and 6.63 GW of off-grid solar (August 2026), plus farm-pump solarisation under PM-KUSUM; behind-the-meter storage only recently permitted.
Grid flexibility marketMediumLiquid day-ahead and real-time exchange markets and an ancillary-services market open to storage and aggregated demand response from 1 MW, but no national route for household assets and state demand-response frameworks only emerging.
Energy storage adoptionMediumBattery capacity rose from 0.78 GWh to 8.7 GWh in the first half of 2026 with a 260 GWh tender pipeline and viability gap funding; household storage is not recorded.
Renewable growth environmentHighAround 45 GW of solar added in FY2025-26 and 20.9 GW of renewables in April–August 2026; non-fossil capacity above 50% of the total.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 56 sources
  1. Population, total – India. World Bank, 2025. accessed 1 October 2026.
  2. Urban population (% of total population) – India. World Bank, 2025. accessed 1 October 2026.
  3. India’s housing situation (Census 2011 housing data). Ideas for India. accessed 1 October 2026.
  4. Houselisting, first phase of Census 2027, to take place between April and September. Deccan Herald, 2026. accessed 1 October 2026.
  5. All India Electricity Statistics: General Review 2025 (data for 2023-24). Central Electricity Authority, 2025. accessed 1 October 2026.
  6. Electricity Tariff & Duty and Average Rates of Electricity Supply in India (as on 31 March 2024), Table 1(b). Central Electricity Authority, 2024. accessed 1 October 2026.
  7. Euro foreign exchange reference rates: Indian rupee (30 September 2026). European Central Bank, 2026. accessed 1 October 2026.
  8. Yearly electricity data (India, 2025). Ember, 2026. accessed 1 October 2026.
  9. Physical progress: installed renewable capacity as on 31 August 2026. Ministry of New and Renewable Energy, 2026. accessed 1 October 2026.
  10. All India installed capacity of power stations as on 31 August 2026. Central Electricity Authority (National Power Portal), 2026. accessed 1 October 2026.
  11. India records highest-ever annual solar capacity addition, says Union Minister Pralhad Joshi. All India Radio News, 2026. accessed 1 October 2026.
  12. India’s smart meter population at 7.24 crore: Parliament. T&D India, 2026. accessed 1 October 2026.
  13. Ministry of Power accelerates smart meter rollout as Centre directs states and UTs to ensure nationwide compliance. SolarQuarter, 2026. accessed 1 October 2026.
  14. PM Surya Ghar scheme crosses 50 lakh installations as July delivers record 5.06 lakh additions. Swarajya, 2026. accessed 1 October 2026.
  15. PM-Surya Ghar scheme: MNRE details rooftop solar subsidy guidelines for residential consumers. SolarQuarter, 2026. accessed 1 October 2026.
  16. MNRE clarifies ALMM List-II exemption for PM Surya Ghar users. TaiyangNews, 2026. accessed 1 October 2026.
  17. India cuts GST on solar cells and modules to lower costs. pv magazine, 2025. accessed 1 October 2026.
  18. PM-KUSUM project deadlines extended amid financing challenges; transition to KUSUM 2.0 planned. SolarQuarter, 2026. accessed 1 October 2026.
  19. Ministry of Power approves net metering for rooftop systems up to 500 kW capacity. Renewable Watch, 2021. accessed 1 October 2026.
  20. MoP notifies Electricity (Rights of Consumers) Amendment Rules, 2024. Indian Infrastructure, 2024. accessed 1 October 2026.
  21. Comments on Draft Electricity (Rights of Consumers) Amendment Rules, 2026. Centre for Energy Regulation, IIT Kanpur, 2026. accessed 1 October 2026.
  22. Ministry of Power issues draft NEP 2026. Power Line, 2026. accessed 1 October 2026.
  23. Electricity Amendment Bill: Centre signals course correction after stakeholder pushback. Down To Earth, 2026. accessed 1 October 2026.
  24. CERC proposes market coupling, Grid-India to act as market coupling operator. Energetica India, 2026. accessed 1 October 2026.
  25. The Electricity (Amendment) Rules, 2025 explained: new rules for energy storage systems. King Stubb & Kasiva, 2025. accessed 1 October 2026.
  26. Demystifying energy storage systems under the Electricity (Amendment) Rules. Khaitan & Co, 2023. accessed 1 October 2026.
  27. India’s energy storage requirement set to jump from 1 GWh to 888 GWh by 2035-36, says report at IESW 2026. BioEnergy Times, 2026. accessed 1 October 2026.
  28. India adds 4.6 GWh of battery storage capacity in Q1. ESS News, 2026. accessed 1 October 2026.
  29. EnergyWatts: August 2026 monthly update on India’s energy storage market. JMK Research, 2026. accessed 1 October 2026.
  30. Power ministry announces INR 5,400 crore viability gap funding to support 30 GWh BESS development. pv magazine India, 2025. accessed 1 October 2026.
  31. CERC (Ancillary Services) Regulations, 2022. Grid Controller of India, 2022. accessed 1 October 2026.
  32. RERC notifies demand flexibility regulations with DFPO targets. Power Peak Digest, 2026. accessed 1 October 2026.
  33. Discoms post ₹2,701 crore profit in FY25 after years of losses. Outlook Business, 2026. accessed 1 October 2026.
  34. Volume of interregional electricity transfer down 2.7 per cent in FY26. T&D India, 2026. accessed 1 October 2026.
  35. Power demand tracker: India meets all-time high power demand of 270.8 GW. Down To Earth, 2026. accessed 1 October 2026.
  36. View and pay bill (consumer number and billing unit). Maharashtra State Electricity Distribution Co. Ltd. accessed 1 October 2026.
  37. Bharat BillPay enables seamless electricity bill payments in Andhra Pradesh and Telangana. NPCI Bharat BillPay. accessed 1 October 2026.
  38. Consumers with aggregate demand of 100 kW can avail green energy open access. Mercom India, 2023. accessed 1 October 2026.
  39. Ministry of Power introduces Renewable Consumption Obligation to boost green energy use. SolarQuarter, 2025. accessed 1 October 2026.
  40. India’s Nationally Determined Contribution (2031-2035). Drishti IAS, 2026. accessed 1 October 2026.
  41. CEA issues Draft CEA (Technical Standards for Connectivity to the Grid) Regulations, 2026. Power Line, 2026. accessed 1 October 2026.
  42. IS 16169:2019 – Test procedure of islanding prevention measures for utility-interconnected PV inverters. Bureau of Indian Standards, 2019. accessed 1 October 2026.
  43. CEA notifies draft CEA (Cyber Security in Power Sector) Regulations, 2024. Indian Infrastructure, 2024. accessed 1 October 2026.
  44. India’s electric vehicle market accounts for 8% of new vehicle registrations in 2025: Vahan portal data. All India Radio News, 2026. accessed 1 October 2026.
  45. Challenges and opportunities of promoting electric cooking in India. Modern Energy Cooking Services (MECS), 2025. accessed 1 October 2026.
  46. Access to electricity improves across states, urban-rural divide remains: NFHS-5. Down To Earth. accessed 1 October 2026.
  47. Telecom Subscription Data as on 31 July 2026 (Press Release No. 116/2026). Telecom Regulatory Authority of India, 2026. accessed 1 October 2026.
  48. 5G coverage now available in 99.9 percent of Indian districts, with over 5 lakh BTS installed. TelecomTalk, 2025. accessed 1 October 2026.
  49. IEX volume grows 16 per cent in Q2FY26. T&D India, 2025. accessed 1 October 2026.
  50. The Electricity Act, 2003 (sections 7–14). Central Electricity Authority, 2003. accessed 1 October 2026.
  51. Differential pricing: new electricity rule amendments aim to promote ToD tariffs. Power Line, 2023. accessed 1 October 2026.
  52. Amendments to the Electricity (Rights of Consumers) Rules, 2020. Drishti IAS, 2024. accessed 1 October 2026.
  53. Explanatory memorandum: second amendment to MERC rooftop solar (net metering) regulations. Maharashtra Electricity Regulatory Commission, 2024. accessed 1 October 2026.
  54. Tata Power takes over NESCO, makes clean sweep of Odisha discoms. T&D India, 2021. accessed 1 October 2026.
  55. Energy News Monitor, Volume XX Issue 37 (parallel distribution licensing in Mumbai). Observer Research Foundation. accessed 1 October 2026.
  56. India installs record 44 GW solar and 6 GW wind capacity in FY2026. JMK Research, 2026. accessed 1 October 2026.

Questions about energy in India.

Talk to us about Olmack in India.Tell us about your home, housing portfolio or school estate in India. We'll explain what is possible there now.