Energy in Nepal, explained.

How electricity works in Nepal: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Nepal: Not yet available.Olmack is not offered in Nepal yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Nepal.

Nepal electricity 2026: NEA ampere-based slab tariffs, hydropower exports, ERC open access rules, SC number and customer ID, smart meters, rooftop solar and VAT.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Nepalese rupee (NPR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Nepal energy at a glance.

Key figures for households in Nepal. Each one links to its source on the full overview below.

  • Electricity price.

    9.5 NPR per kWh for households, including taxes. Figures for FY2025/26 (unchanged in FY2026/27).

  • Household use.

    962 kWh a year for a typical household. Figures for FY2025/26.

  • Renewable share.

    100% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Nepal.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Nepal below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Nepal requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Nepal.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Nepal, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Nepal, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Nepal.

Full overview

The energy market in Nepal, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Nepal’s power sector is built around one state-owned, vertically integrated utility, the Nepal Electricity Authority (NEA). NEA owns most of the transmission grid, runs the national Load Dispatch Centre, buys the output of more than 200 private hydropower plants under power purchase agreements, trades electricity with India and distributes and sells power to almost every grid-connected household. The Electricity Regulatory Commission (ERC) approves retail tariffs and power purchase agreements, and since January 2026 has been issuing the rules for open access to the networks.

Households pay a rising-block tariff set by connection size (5, 15, 30 or 60 amperes) and monthly consumption. Energy charges run from nothing for the smallest 5-ampere users consuming up to 20 units a month to NRs 11.00/kWh above 250 units, plus a monthly minimum charge. From 17 July 2026 a 5% VAT applies to household consumption above 50 units a month, although the government agreed in principle in September 2026 to remove it.

Almost all of Nepal’s electricity comes from hydropower, mostly run-of-river plants that produce far more in the summer monsoon than in the dry winter. Installed capacity reached 4,120 MW in fiscal year 2025/26, more than the national peak demand of 2,479 MW, and Nepal was a net exporter of 2,794 GWh to India. Surplus monsoon output is now limited by transmission capacity, and grid-connected rooftop solar and battery storage remain small.

Energy snapshot.

Headline figures for electricity in Nepal. Each shows its data year and links to its source.

  • Population29,164,578 peopleSource 22021
  • Households6,666,937 householdsSource 32021
  • Average household size4.37 people/householdSource 22021
  • Electricity use per household962 kWh/yrSource 1FY2025/26
  • Household price (NPR)9.5 NPR/kWhSource 1FY2025/26 (unchanged in FY2026/27)
  • Household price (EUR)0.055 EUR/kWhSource 6FY2025/26
  • Renewable electricity share100%Source 72024
  • Solar capacity0.155 GWSource 1FY2025/26
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter share2%Source 1FY2025/26
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Electricity Regulatory Commission (ERC)
System operator
Nepal Electricity Authority, through its Load Dispatch Centre (Electricity System Operation Department)
Distribution networks
NEA distributes to about 5.9 million consumers through seven provincial offices and local distribution centres; 411 community rural electrification entities buy bulk power from NEA and serve about 456,000 consumers.
Currency
Nepalese rupee (NPR)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in Nepal.

Household price (NPR)
9.5 NPR/kWh (FY2025/26 (unchanged in FY2026/27))Source 1NEA single-phase domestic energy charge for consumption between 51 and 250 kWh a month, for every ampere rating. The monthly minimum charge and, from 17 July 2026, 5% VAT on units above 50 are extra. Energy charges range from NRs 0 (5-ampere, up to 20 units) to NRs 11.00 above 250 units.
Household price (EUR)
0.055 EUR/kWh (FY2025/26)Source 6Converted from NRs 9.50/kWh at the Nepal Rastra Bank euro rate for 1 October 2026 (mid of buying 173.88 and selling 174.56, about NRs 174.22 per euro).
Typical annual electricity bill
Not identified from a reliable public source.

Retail electricity prices in Nepal are set in NEA’s tariff schedule, which the Electricity Regulatory Commission approves. The current domestic structure dates from a reform introduced in Mangsir 2078 (November–December 2021). It cut the energy charge for the smallest 5-ampere connections to zero for up to 20 units a month, leaving only a NRs 30 minimum charge, and lowered rates for heavier users to encourage electric cooking. The same rates appear unchanged in NEA’s tariff appendix for FY2025/26, and the tariff was not changed for FY2026/27.

Household bills combine a monthly minimum charge, which depends on the ampere rating of the connection and the consumption block, with block energy charges. The lifeline benefit is large: in FY2025/26 NEA supplied about 217 GWh free of energy charge to some 2.59 million 5-ampere domestic consumers, with the cost covered under a government subsidy policy. NEA’s average selling price across all customers was NRs 9.68/kWh.

VAT from July 2026

Electricity bills carried no VAT until the Finance Act for FY2026/27. From 17 July 2026 households pay 5% VAT on units consumed above 50 a month, while all other customer categories pay 13% VAT on the whole bill. About 2.6 million households use more than 50 units. After public criticism, the NEA board set up a committee on 29 July 2026 to review the tariff, including seasonal pricing, and on 21 September 2026 the energy and finance ministers reached an in-principle agreement to remove VAT on electricity. No Cabinet decision had been reported by 1 October 2026.

There is no regional price variation for NEA customers. The ERC issued a new Electricity Consumer Tariff Determination Directive in August 2026 that will govern future tariff petitions.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesNEA single-phase (230 V) domestic tariff by ampere rating. Energy charge per kWh: 0–20 units NRs 0 (5 A), 4.00 (15 A), 5.00 (30 A), 6.00 (60 A); 21–30 units 6.50; 31–50 units 8.00; 51–250 units 9.50; above 250 units 11.00. Monthly minimum charges rise with block and ampere rating, from NRs 30 (5 A, up to 20 units) to NRs 250 (60 A, above 250 units). A 5-ampere customer who exceeds 20 units pays NRs 3.00 for each of the first 20.
RegulatedYesThree-phase low-voltage (400 V) domestic customers pay a flat NRs 10.50/kWh from Ashad to Kartik (summer and monsoon) and NRs 11.50/kWh from Mangsir to Jestha (winter and spring), with a monthly minimum charge of NRs 1,100 up to 10 kVA and NRs 1,800 above.
Time-of-useLimitedTime-of-day tariffs with peak, normal and off-peak rates, differing between the Baishakh–Mangsir and Paush–Chaitra seasons, apply to larger non-domestic and EV charging customers with time-of-day meters. Ordinary single-phase households have no time-of-use option.
DynamicNoThere is no domestic wholesale market. Retail prices are fixed in the NEA tariff approved by the ERC.
OtherYesPublic EV charging stations on low voltage have their own category: a demand charge of NRs 200/kVA a month and an energy charge of NRs 5.75/kWh, well below the commercial rate of NRs 11.20/kWh.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
962 kWh/yr (FY2025/26)Source 1Derived from NEA figures: domestic customers took 41.76% of NEA’s 12,376 GWh sales (about 5,168 GWh) and made up 90.64% of its 5,927,440 consumers (about 5.37 million), giving roughly 962 kWh per domestic connection. Customers of community distributors are not counted individually. No official per-household figure was identified.
Average daily use per household
2.64 kWh/day (FY2025/26)Source 1Derived from the 962 kWh/yr per domestic connection figure above, divided by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
496 kWh/person/yr (FY2025/26)Source 1All sectors, as reported by NEA (465 kWh the year before).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
10,847 electric cars imported (FY2025/26)Source 28Electric cars, jeeps and vans imported in FY2025/26, 68.63% of all such imports (down 20.11% from 13,578 the year before). No official figure for the total fleet was identified.
Electric cooking
0.5 % of homes (2021)Source 4Households using electricity as their main cooking fuel in the 2021 census; firewood 51%, LPG 44.3%.

Nepal’s electricity use is low but growing quickly. Domestic consumption including NEA’s own use rose 9% to 12,376 GWh in FY2025/26. Households made up 90.64% of NEA’s consumers but about 42% of sales, while industry took about 37%. Per capita consumption reached 496 kWh, and average use per domestic connection works out at under 1,000 kWh a year, or about 2.6 kWh a day.

Most homes still cook with firewood or imported LPG: in the 2021 census only 0.5% of households cooked mainly with electricity. Because Nepal has surplus hydropower in the monsoon, government and NEA policy now aims to raise domestic demand through electric cooking, electric vehicles, irrigation and industry. Electric cars already dominate new car imports, at 68.63% of cars, jeeps and vans in FY2025/26.

National demand peaks in the evening and is highest in the warm, wet summer months; the national peak of 2,479 MW was recorded on 28 June 2026. In winter, when river flows are low, Nepal still imports electricity from India in the evening peak.

Housing and households.

Dwellings
5,643,945 houses (2021)Source 5Number of houses in the preliminary 2021 census results. The preliminary household count (6,761,059) was later revised to 6,666,937 in the final results; a final house count was not identified.
Owner-occupied
86% (2021)Source 4
Private rented
12.8% (2021)Source 4Households living in rented housing.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
66.2 % of population (2021)Source 2Population living in metropolitan cities, sub-metropolitan cities and municipalities, which since the 2017 local government restructuring include large semi-rural areas.

Nepal is a nation of owner-occupiers: 86% of households owned their home in the 2021 census and 12.8% rented. Renting is concentrated in the Kathmandu valley and other cities, where many tenants live in rooms or floors of family houses. NEA connects supply only in the name of the legal owner of the house or land, so tenants usually pay the landlord for electricity used through the owner’s connection.

In remote hill and mountain areas, where houses are scattered, solar home systems provided basic lighting before the grid arrived; AEPC had supported almost a million of them by FY2023/24. In 2021, 92.2% of households lit their homes mainly with electricity and 6.6% with solar.

How the grid works in Nepal.

  1. TransmissionNepal Electricity Authority — Transmission Directorate, NEA Load Dispatch Centre (Electricity System Operation Department)
  2. DistributionNEA distributes to about 5.9 million consumers through seven provincial offices and local distribution centres; 411 community rural electrification entities buy bulk power from NEA and serve about 456,000 consumers.
  3. MeteringNot identified from a reliable public source.
  4. Supply2 or more retail suppliers

Physically, power flows from hydropower plants in the hills and mountains, most of them run-of-river, through NEA’s 132 kV, 220 kV and 400 kV grid to 33/11 kV substations and then over 54,296 circuit-km of 11 kV and 163,490 circuit-km of low-voltage lines to customers. Grid coverage reached 97.6% of the country in FY2025/26; 18 of 753 local government areas were still not connected and rely on alternative energy.

Commercially, almost everything passes through NEA. Of the 18,624 GWh available in FY2025/26, private producers supplied 58%, NEA and its subsidiaries 36% and imports 6%. NEA buys private output under long-term PPAs approved by the ERC, sells to domestic customers at the regulated tariff and trades the surplus with India. Exports reached 3,965 GWh and imports 1,171 GWh, giving net exports of 2,794 GWh.

The model is starting to open up. The ERC’s Open Access Directive of January 2026 allows large generators, captive plants of 1 MW or more and large consumers to use the networks, with transmission charges set for the first time in 2026. The Electricity Bill 2080, which would restructure NEA and license private power traders, is still pending in Parliament.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy, Water Resources and Irrigation (MoEWRI)Sets energy policy and oversees NEA, the Department of Electricity Development and the Alternative Energy Promotion Centre.
MinistryDepartment of Electricity Development (DoED)Issues survey, generation, transmission and distribution licences under the Electricity Act 1992 for projects above 1 MW (very large projects go through the Investment Board Nepal), and the grid-connected alternative energy procedure.
RegulatorElectricity Regulatory Commission (ERC)Established under the Electricity Regulatory Commission Act 2017. Approves consumer tariffs and power purchase agreements, issued the Grid Code 2080, and in 2026 issued directives on open access, balancing and settlement, deviation settlement and metering. It set a transmission charge for the first time in 2026.
TSONepal Electricity Authority — Transmission DirectorateOwns and builds the 400 kV, 220 kV and 132 kV national grid (7,110 circuit-km at the end of FY2025/26) and the cross-border links with India.
System operatorNEA Load Dispatch Centre (Electricity System Operation Department)Schedules and dispatches NEA, subsidiary and private plants and cross-border flows from Syuchatar, Kathmandu, and issues curtailment instructions in the monsoon. The Open Access Directive names it the system operator.
DSONEA Distribution and Consumer Services DirectorateRuns the 33 kV, 11 kV and low-voltage networks, connects and meters customers, and bills about 5.93 million consumers through seven provincial offices, two division offices and local distribution centres.
DSOCommunity rural electrification entities (CREEs)411 community organisations and local governments in 41 districts that buy electricity in bulk from NEA and distribute it locally to about 456,479 consumers under NEA’s Community Electricity Distribution By-laws.
SupplierNepal Electricity Authority (NEA)Buys power from 227 operating private plants (3,459 MW) and its subsidiaries under PPAs, generates from its own plants, imports from and exports to India, and sells to all directly connected customers.
ExchangeIndian power exchange markets (day-ahead and real-time)Since May 2021 NEA has bought and sold electricity on the Indian power exchange alongside medium-term bilateral contracts with Haryana and Bihar and exchanges agreed by the Nepal–India Power Exchange Committee. Nepal also exports a small volume to Bangladesh through India.

Compared with the UK system.

Compared with the UK system.
UK conceptNepal equivalentHow it works
DNONEA distribution centre (or a community electricity entity)NEA’s local distribution centre owns the low-voltage network, connects the customer, installs and reads the meter, bills and collects payment. In some rural areas a community electricity entity does this, buying power in bulk from NEA. There is no separation between network company and retailer.
National Grid/NESONEA Transmission Directorate and Load Dispatch CentreNEA both owns the transmission grid and operates the system. There is no domestic balancing market: the Load Dispatch Centre dispatches plants under PPA terms and manages surpluses by curtailment and exports to India. ERC rules for balancing and settlement under open access were issued in 2026.
MPANSC No. (service connection number) with Customer ID and counterA connection is identified by the NEA distribution centre (counter) that serves it, the SC No. printed on the bill, whose middle digits show the monthly meter-reading day, and a Customer ID. All three are needed to view or pay a bill online. There is no national supply-point number.
MPRNNo equivalentThere is no piped gas network for homes. Households cook mainly with firewood or bottled LPG bought from dealers.
Meter operatorNEA (the distribution licensee)Meters are generally owned, tested, installed and sealed by NEA. A customer may buy a meter, but NEA must test and seal it. There are no independent meter operators.
SupplierNEAHouseholds cannot choose a supplier. NEA, or the local community entity, sells electricity at the approved tariff.
Smart-meter infrastructureNEA head-end system and meter data management systemNEA’s smart meters communicate with its own head-end system and meter data management system. There is no national data hub like the DCC. The ERC’s 2026 metering directive sets interoperability guidelines for smart meters, head-end and data management systems.

How a supply point is identified.

Counter: Maharajgunj; SC No. 052.14.207; Customer ID 168342 (fictional — read on the 14th of each month)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Service connection number (SC No.) and Customer ID, at a named NEA counter (distribution centre) (SC No.)
Who issues it?The NEA distribution centre that serves the premises
FormatThree numeric groups separated by dots (xxx.xx.xxx). The middle two digits are the day of the month on which the meter is read; the meaning of the other groups is not publicly documented. The Customer ID is a separate numeric customer number. A connection is uniquely identified only by the combination of counter, SC No. and Customer ID.
LengthSC No.: typically eight digits in a 3-2-3 dotted format. Customer ID: varies.
Stays with the property when you switch supplier?Yes
Where to find itPrinted on the monthly electricity bill and on the consumer’s payment card. Payment apps and the NEA billing website ask for the counter, SC No. and Customer ID.
Electronic accessBills can be viewed on NEA’s online billing portal and paid through banks, connectIPS and wallets such as eSewa and Khalti using the counter, SC No. and Customer ID. Customers can submit their own meter readings through NEA’s consumer portal, app or the 1150 hotline.
Third-party accessNo framework for third-party access to meter data. Banks and payment wallets use the identifiers only to fetch and pay bills.
Who keeps the registerNEA keeps customer and billing records in its computerised billing system (mPower) at each distribution centre; community electricity entities keep their own records.
Register scopePer DSO

A Nepali home connection is identified within the NEA distribution centre that serves it, not by a national code. When the owner of a house applies for a connection, with citizenship and land ownership certificates, building approval and a ward recommendation, the distribution centre installs the meter and records the connection under a service connection number (SC No.) and a Customer ID. Customers who pay online first choose their counter, the distribution centre or collection centre, then enter the SC No. and Customer ID.

What the SC number shows

The SC No. is written in three groups separated by dots. The middle two digits give the day of the Nepali month on which the meter is read, which matters because NEA bills on monthly readings: customers who submit their own readings online do so within a week of that date. Because bill-payment systems also ask for the counter, the SC No. on its own is not a national identifier.

Who keeps the records

There is no central registry or switching system, because NEA is the only supplier in its areas. Each distribution centre maintains its customers in NEA’s mPower billing system. The connection belongs to the property: when a house is sold or inherited, the new owner applies for a meter (name) transfer with the land ownership certificate and the previous owner’s consent, after all dues are paid. If only one party attends, NEA publishes a 35-day notice in a national newspaper before transferring.

In areas served by a community rural electrification entity the customer is a member or customer of that entity, which keeps its own records and buys power from NEA through a bulk meter.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringLimited
Net billingYes
How exported electricity is paidNet billing. Since 2022 NEA credits exported rooftop solar electricity at a fixed NRs 5.94/kWh, compared with retail energy charges of up to NRs 11.00/kWh. Before July 2022 the rate was NRs 7.30/kWh.
What sizes are allowed?Under NEA’s solar PV procedure, household rooftop systems range from 500 W to 10 kW. Connections are made at 230 V for systems up to 5 kW, 400 V for 5–40 kW and 11 kV above 40 kW.
How are exports paid?Exports are valued at a fixed rate (NRs 5.94/kWh since 2022) and offset against the value of electricity bought from NEA, rather than unit for unit. The 2018 procedure settled surpluses at the end of each month.
Which technical rules apply?NEA requires a power factor between 0.85 lagging and 0.95 leading. Under NEPQA-2025, inverters must meet IEC 61727, IEC 62116 (anti-islanding), IEC 62891 and IEC 62109-1/-2, with output frequency within 50 Hz ±2.5%, and must follow the Grid Code limits.
Do larger solar plants need a licence?Grid-connected alternative energy projects up to 1 MW need an electricity production permit from NEA under the DoED Grid-Connected Alternative Energy Development Procedure 2078; above 1 MW a DoED licence is required.
Is the scheme stable?Not fully. NEA stopped buying rooftop solar in July 2022 and restored purchases at the lower net billing rate. The procedure’s validity has been extended periodically, and industry reports say rooftop export remains weakly incentivised.

Connecting a home system.

  1. Apply to the local NEA distribution centre to connect a grid-tied solar system to the existing connection; no separate electricity generation permit is needed for a household net-metering system.
  2. Use equipment that meets AEPC’s NEPQA quality standards, including a grid-tied inverter certified to IEC 61727 and IEC 62116.
  3. NEA installs a bi-directional meter and inspects the system; the customer signs a connection agreement with NEA.
  4. Each month the distribution centre bills imports at the tariff and credits exports at the net billing rate.

Households and businesses in Nepal can connect rooftop solar to the grid and export surplus electricity, but the arrangement has changed several times. NEA introduced a solar PV procedure in 2017–18 allowing net metering, with surplus energy bought at NRs 7.30/kWh. In July 2022 it stopped purchases, then resumed them as net billing at NRs 5.94/kWh, about 40% below the retail rate for heavier users.

Because exports earn much less than the retail energy charge, rooftop systems pay back mainly through self-consumption. Commercial and industrial roofs make up most grid-connected rooftop capacity; AEPC recorded 18,293 kWp of rooftop solar installed through its programmes by FY2023/24. The ERC’s 2026 metering directive includes provisions for import–export metering that may shape future arrangements.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityNo licence up to 1,000 kW under the Electricity Act 1992 (hydro plants of 100–1,000 kW must notify the authorities). Above 1 MW, survey and generation licences from DoED; projects of 500 MW or more go through the Investment Board Nepal. Grid-connected alternative energy up to 1 MW needs an NEA production permit; household net-metering systems need no permit.DoED (Ministry of Energy); Investment Board Nepal; NEAGeneration licences may run up to 50 years under the Act; selling to NEA also needs an ERC-approved PPA.
Store electricityNo specific licence category for battery storage was identified. NEA plans a 100 MW battery system in a public–private partnership model.DoED; ERCBehind-the-meter batteries used for backup need no licence. Storage hydropower is licensed as generation.
Export to the grid (households)No licence or production permit; connection approval and agreement with the NEA distribution centre.NEACredited by net billing at NRs 5.94/kWh.
Distribute or supply electricityDistribution licence under the Electricity Act 1992 above 1,000 kW; once a distribution licence is issued for an area no competing licence may be granted there. Community entities distribute under agreements with NEA.DoED; NEA (community distribution)In practice NEA is the only large distributor; there is no retail competition.
Trade electricityThe Open Access Directive refers to trading licensees, but no legal mechanism for granting trading licences exists until a new Electricity Act is passed. NEA’s subsidiary Nepal Power Trading Company holds an earlier licence but is not yet trading.ERC; Parliament (Electricity Bill 2080)NEA does all cross-border trading, including on the Indian power exchange.
Wholesale market and open accessNo domestic wholesale market. Since January 2026 open access is available to generators of 5 MW or more, captive plants of 1 MW or more and consumers with contract demand of 5 MW or more, at specified voltages.ERCMinimum transaction of 1 MW domestically and 10 MW cross-border; charges include transmission, wheeling and cross-subsidy surcharges.
Balancing and grid servicesNo market for balancing or ancillary services. ERC issued Balancing and Settlement and Deviation Settlement Mechanism directives in 2026 for open access users.ERC; NEA Load Dispatch CentreThese settle deviations from schedules; they do not create a market for small assets.
Aggregation, VPP and remote control of assetsNo licence category or rules for aggregators, virtual power plants or third-party control of household devices.ERCThe draft metering directive envisages consumer apps for peak load management, but no programme exists.

Licensing in Nepal is split between the Department of Electricity Development, which issues survey, generation, transmission and distribution licences under the Electricity Act 1992, and the Electricity Regulatory Commission, which approves tariffs and PPAs and now writes market rules. The 1992 Act exempts generation, transmission and distribution up to 1,000 kW from licensing, which is why small hydro, solar and community schemes can operate without a licence.

For households, the relevant permission is NEA’s connection approval for a rooftop system. Activities common in liberalised markets, such as independent retail supply, private trading, aggregation and virtual power plants, have no legal basis yet. The pending Electricity Bill 2080 would separate generation, transmission and distribution and create trading licences.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Domestic wholesale energy marketNo—NoNEA. There is no power exchange in Nepal. NEA buys under fixed-price PPAs and dispatches centrally.
Open access (bilateral use of networks)Restricted5 MW (generators and consumers); 1 MW (captive plants)NoERC rules; NEA system operator. Introduced by the Open Access Directive of January 2026 and amended in Ashwin 2083 (September–October 2026). Only large parties qualify.
Balancing and ancillary servicesNo—NoNEA Load Dispatch Centre. Frequency and reserves are provided by hydropower plants, especially reservoir and peaking plants, under central dispatch. 2026 ERC directives on balancing and deviation settlement apply to scheduled open access users.
Cross-border markets (India)No—NoNEA. NEA trades on Indian day-ahead and real-time markets and under bilateral contracts. No other Nepali party can do so yet.

Distributed energy resources cannot take part in energy or flexibility markets in Nepal. Flexibility comes from storage and peaking hydropower, imports from India in the winter evening peak, and curtailment of private hydropower in the monsoon, when transmission limits mean up to about 900 MW could not be used at times in 2026.

The 2026 ERC directives are the first step towards a market framework, but they are designed for large generators and consumers. Demand-side flexibility for households would need smart meters, time-of-use tariffs and rules for aggregators, none of which are yet in place.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutEarly stage: NEA has fitted smart meters to more than 121,050 consumers, mainly three-phase and larger users, with a second phase and a public–private rollout in major cities planned.
Reading intervalNot published for household meters. Interface meters under the 2026 ERC metering directive record 15-minute blocks.
Consumers with smart meters (FY2025/26)More than 121,050
Three-phase whole-current meters procured72,000 (FY2018/19) and 150,000 (FY2022/23)
CT-operated smart meters configured9,000
SystemsNEA head-end system and meter data management system
Regulatory frameworkERC Installation and Operation of Meters Directives 2083
Data hubNone; NEA holds all meter data

Smart metering in Nepal began with three-phase consumers. NEA’s Smart Metering and Smart Grid Project bought 72,000 three-phase whole-current meters in FY2018/19 and 150,000 more in FY2022/23, all communicating with a head-end system whose data feeds a meter data management system. It is also fitting smart meters on feeders, distribution transformers and at boundaries between distribution centres to track losses, which fell to 12.16% in FY2025/26.

Most single-phase households still have conventional meters read monthly by meter readers with handheld devices, or by customers themselves. NEA plans a second smart meter phase and a public–private rollout in major cities with Asian Development Bank support. The ERC’s metering directive, published in September 2026, says that consumers in areas with communication networks shall receive smart meters within timelines set by the government or the ERC, and that AMI systems must include prepayment functionality and be interoperable.

Renewable electricity.

Electricity generation mix (2024).

  • Hydro: 98.8%
  • Solar: 1.1%
  • Wind: 0.1%
Source 7
Renewable electricity share
100% (2024)Source 7Share of domestic generation: hydro 98.83%, solar 1.08%, wind 0.09%. NEA’s diesel and multi-fuel standby plants recorded no output in FY2025/26. Imports from India (about 6% of energy available in FY2025/26) are not included.
Home solar
18.3 MWp (Cumulative to FY2023/24)Source 24Solar rooftop systems installed through AEPC programmes (all sectors, not only homes). AEPC also counted 996,647 off-grid solar home systems.
Solar added each year
Not identified from a reliable public source.
Hydropower (all owners)
3,905.9 MW (FY2025/26)Source 1NEA 583.2 MW, NEA subsidiaries 748.4 MW, private producers 2,574.3 MW.
Solar (grid-connected)
154.9 MW (FY2025/26)Source 1
Bagasse
6 MW (FY2025/26)Source 1
Thermal (diesel/multi-fuel standby)
53.4 MW (FY2025/26)Source 1
Total installed capacity
4,120.3 MW (FY2025/26)Source 14,115.7 MW grid-connected; 529 MW added during the year.

Targets.

  • National goal of 28,500 MW of installed capacity by 2035, backed by NEA.
  • Further capacity under construction: 213 projects totalling 6,472 MW had reached financial closure by FY2025/26.
  • NEA plans to expand solar and study battery storage to improve dry-season supply.

Nepal’s electricity is almost entirely renewable because it comes from hydropower. Most plants are run-of-river, so output peaks in the June–September monsoon and falls sharply in winter, when Nepal imports from India. Only a few storage and peaking plants, such as Kulekhani and the 140 MW Tanahu project under construction, can shift water between seasons or hours.

Capacity is growing fast: 529 MW was commissioned in FY2025/26, almost all by private producers, and PPAs now cover 12,135 MW. Solar is becoming more important for dry-season supply. NEA now procures grid-connected solar through tariff-based competitive bidding, while AEPC has supported nearly a million off-grid solar home systems and mini-grids in remote areas.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Nepal’s main form of energy storage is reservoir hydropower, of which there is little: the Kulekhani cascade near Kathmandu and the Tanahu project under construction. Battery storage has so far been limited to off-grid solar systems and household inverter-battery backup units, which are not counted in official statistics.

With a monsoon surplus and a winter deficit, NEA sees storage as a way to improve dry-season security and grid stability, and plans its first utility-scale battery system. NEPQA-2025 sets quality requirements for batteries used in PV systems, including IEC 62619 for lithium-ion.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Nepal Electricity Authority (NEA)5,927,440 consumers (FY2025/26)NoLimitedNoYes
Community rural electrification entitiesAbout 456,479 consumers through 411 entitiesNoNoNoUnknown

There are no competing retail suppliers in Nepal. NEA serves almost all customers at the ERC-approved tariff, and community electricity entities resell NEA power in some rural areas. Since the grid is supplied almost entirely by hydropower, NEA does not offer separate green tariffs.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy, Water Resources and IrrigationGovernmentEnergy ministrySets energy policy and oversees NEA, DoED and AEPC.
Department of Electricity Development (DoED)GovernmentLicensing departmentIssues generation, transmission and distribution licences and the grid-connected alternative energy procedure.
Electricity Regulatory Commission (ERC)RegulatorElectricity regulatorApproves tariffs and PPAs and issues the Grid Code and open access, balancing and metering directives.
Nepal Electricity Authority (NEA)DistributionState utility: transmission, system operation, distribution and supplyConnects and bills almost every household and publishes the sector’s main statistics.
Investment Board NepalGovernmentInvestment agency for large projectsHandles hydropower projects of 500 MW or more.
Alternative Energy Promotion Centre (AEPC)Renewable EnergyGovernment renewable energy agencyRuns renewable energy subsidy programmes, publishes the NEPQA quality standards and supports rooftop solar, mini-grids and clean cooking.
Independent Power Producers’ Association, Nepal (IPPAN)Renewable EnergyIndustry associationRepresents the private hydropower and solar producers that supply most of Nepal’s electricity.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionNepal Electricity Grid Code 2080Electricity Regulatory CommissionIssued in August 2023; covers connection, operation, maintenance and development of the grid and the duties of grid owners, system operators and users.
Inverters (utility interface)IEC 61727, IEC 62891 and IEC 62109-1/-2 (NEPQA-2025)AEPC (adopting IEC standards)Output 230 V ±10% single-phase or 400 V ±10% three-phase, 50 Hz ±2.5%; certificates from an IECEE/IECRE-listed laboratory.
Anti-islandingIEC 62116AEPC (NEPQA-2025)Required test certificate for grid-connected PV inverters.
PV modules and batteriesIEC 61215, IEC 61730; batteries IEC 61427 and IEC 62619 (NEPQA-2025)AEPCProducts used in AEPC-supported systems are tested and certified by the Renewable Energy Test Station.
MeteringERC Installation and Operation of Meters Directives 2083; smart meters to IEC 62052-11, IEC 62053-21 and IEC 62056Electricity Regulatory CommissionStatic meters required; consumer meters owned by the licensee and bearing the NS mark or equivalent.
Rooftop PV connectionNEA solar PV procedure (connection voltage by size, power factor 0.85 lag–0.95 lead)Nepal Electricity Authority230 V up to 5 kW, 400 V for 5–40 kW, 11 kV above 40 kW.

Permissions.

Permissions.
PermissionRequiredLevelDetail
NEA connection approval (rooftop solar)YesNationalApplied through the local distribution centre, which installs a bi-directional meter and inspects the system.
Electricity production permitLimitedNationalNot needed for household net-metering systems; needed from NEA for grid-connected alternative energy projects up to 1 MW. DoED licence above 1 MW.
Building permitLimitedLocalNo specific national rule for rooftop solar was identified; municipalities approve building works under their bylaws.
Owner consentLimitedNationalNEA supplies only in the name of the legal owner of the house or land, so a tenant needs the owner to apply.
Equipment certificationLimitedNationalNEPQA-2025 certification applies to equipment in AEPC-supported programmes; inverters must meet IEC grid-interface standards.

For a household, connecting rooftop solar mainly means dealing with the local NEA distribution centre. Since the 2025 amendment to DoED’s grid-connected alternative energy procedure, no separate production permit is needed for domestic net-metering systems. Larger commercial plants up to 1 MW need an NEA production permit, and anything above 1 MW needs a DoED licence and a PPA approved by the ERC.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Free lifeline electricity for 5-ampere householdsActiveTariff subsidyDomestic 5-ampere customers using up to 20 units a month pay only the NRs 30 minimum charge. In FY2025/26 NEA supplied about 217 GWh free of energy charge to about 2.59 million such consumers under a government subsidy policy.Since Mangsir 2078 (late 2021)
VAT exemption for the first 50 unitsActiveVAT reliefSince VAT on electricity was introduced on 17 July 2026, household consumption up to 50 units a month is exempt; 5% applies above that. The government has agreed in principle to remove VAT on electricity altogether.From 17 July 2026
Rooftop solar net billingActiveExport paymentNEA credits exported rooftop solar electricity at NRs 5.94/kWh (reported rate since 2022).—
Renewable Energy Subsidy Policy (2022)ActiveGrantAEPC subsidy framework for renewable energy technologies such as solar home systems, mini and micro hydro, solar pumps and clean cooking, aiming at universal access to clean, reliable energy by 2030. Current subsidy amounts were not verified.—
Reduced tariff for public EV chargingActiveTariffPublic EV charging stations pay NRs 5.75/kWh on low voltage (NRs 5.60 at 11 kV and 33 kV), about half the commercial rate.—

Data and connectivity.

Fixed broadband
3,420,000 fixed (FTTH) subscriptions (Mid-March 2026)Source 27Fibre-to-the-home subscriptions (11.12% of all broadband subscriptions), from Nepal Telecommunications Authority data.
4G coverage
26,580,000 4G subscriptions (Mid-March 2026)Source 2786.24% of all broadband subscriptions. Many people hold more than one SIM.
5G coverage
Not identified from a reliable public source.

Mobile 4G is the main form of internet access in Nepal, with fibre-to-the-home growing in towns. For metering, NEA’s smart meters report to a head-end system, and the ERC’s 2026 metering directive allows RF, power-line carrier or cellular communication and requires smart meters to follow IEC 62056 (DLMS/COSEM) for interoperability. Prepayment meters are allowed where no communication network exists.

Grid conditions.

National peak demand
2.479 GW (FY2025/26)Source 1National peak on 28 June 2026. System peak including exports was 3,226 MW on 6 July 2026.
Annual electricity demand
15.1 TWh (FY2025/26)Source 1National energy demand in NEA’s energy balance, excluding exports (system energy including exports was 19.08 TWh).
Generation capacity
4.12 GW (FY2025/26)Source 1
Interconnection
1.2 GW (FY2025/26)Source 1NEA exports up to 1,200 MW and imports around 750 MW over its links with India. The 13th Joint Working Group in July 2026 agreed 1,650 MW export and 1,400 MW import on the Dhalkebar–Muzaffarpur and Dhalkebar–Sitamarhi 400 kV lines combined.
Curtailment
900 MW (reported daily spill) (Monsoon 2026)Source 29Press report of about 900 MW of hydropower being spilled each day in July 2026 because of transmission limits; NEA’s Load Dispatch Centre issued regular curtailment instructions. No official annual curtailment figure was identified.

Nepal’s grid has moved from shortage to seasonal surplus: installed capacity of 4,120 MW now far exceeds the national peak demand of 2,479 MW. The main constraints are transmission: from late May 2026 NEA’s Load Dispatch Centre issued regular instructions to hydropower projects to cut output, with more than 30 projects classed as contingency plants that cannot run at full capacity because of transmission limits, and floods on the Bhotekoshi in August 2026 cut exports.

New 400 kV lines are being built inside Nepal (Hetauda–Dhalkebar, New Butwal–Lamahi) and to India (Dhalkebar–Sitamarhi, Butwal–Gorakhpur), and studies are under way for links to China. System losses were 12.16% in FY2025/26.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Open Access DirectiveCurrent9 January 2026; amended Ashwin 2083 (September–October 2026)Allows generators of 5 MW or more, captive plants of 1 MW or more and consumers with 5 MW contract demand to use the networks, with NEA’s system operation department as system operator.
Balancing, deviation settlement and grievance directivesCurrentShrawan–Ashwin 2083 (August–September 2026)ERC directives on balancing and settlement, deviation settlement and open access grievances, completing the first set of open access rules.
First regulated transmission chargeCurrentBhadra 2083 (2026)The ERC set a transmission charge for the first time: NRs 412,755 per MW per month for long and medium-term open access and 57 paisa/kWh for short-term access.
Electricity Consumer Tariff Determination Directive 2083CurrentAugust 2026New ERC directive governing how consumer tariffs are determined, ahead of NEA’s tariff review.
VAT on electricityCurrent17 July 20265% VAT on household consumption above 50 units a month and 13% on other customers’ bills. Ministers agreed in principle on 21 September 2026 to remove it; a Cabinet decision was pending.
NEA tariff review and seasonal pricingUpcomingCommittee formed 29 July 2026An NEA board committee is reviewing tariffs, including separate monsoon and dry-season prices, with recommendations to go to the ERC.
Installation and Operation of Meters Directives 2083UpcomingPublished September 2026 (document marked draft)Requires smart meters for consumers in areas with communication networks within set timelines, prepayment functionality and interoperable AMI.
Electricity Bill 2080UpcomingPending in ParliamentWould replace the Electricity Act 1992, unbundle NEA into separate generation, transmission and distribution entities and license private power traders.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareHighLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionLowLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowAEPC recorded 18.3 MWp of rooftop solar across all sectors by FY2023/24, and exports are credited at NRs 5.94/kWh, below retail rates.
Distributed energy marketLowGrid-connected distributed generation is small; nearly a million off-grid solar home systems serve remote homes, and community entities distribute to about 456,000 consumers.
Grid flexibility marketLowNo domestic wholesale, balancing or demand-response market; open access since 2026 is limited to parties of 1–5 MW or more.
Energy storage adoptionLowNo grid battery storage identified as operating; a first 100 MW NEA system is planned.
Renewable growth environmentHigh529 MW commissioned in FY2025/26 (about 15% growth) and 6,472 MW under construction after financial closure.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 34 sources
  1. A Year in Review — Fiscal Year 2025/2026 (Annual Report). Nepal Electricity Authority, 2026. accessed 1 October 2026.
  2. Official size of Nepal’s population in 2021. Onlinekhabar (reporting National Statistics Office census results), 2023. accessed 1 October 2026.
  3. Census 2021 final report: households and household size. Setopati (reporting National Statistics Office census results), 2023. accessed 1 October 2026.
  4. National Census 2021: significant shift in the lifestyle and usage of amenities in Nepali households. The Annapurna Express, 2023. accessed 1 October 2026.
  5. Average annual growth rate lowest in eight decades (preliminary census results). The Himalayan Times, 2022. accessed 1 October 2026.
  6. Foreign exchange rates, 1 October 2026. Nepal Rastra Bank, 2026. accessed 1 October 2026.
  7. Yearly electricity data (Nepal, 2024). Ember, 2026. accessed 1 October 2026.
  8. Households using over 50 electricity units to pay five percent VAT, others face 13 percent. The Kathmandu Post, 2026. accessed 1 October 2026.
  9. Government weighs scrapping VAT on electricity. The Kathmandu Post, 2026. accessed 1 October 2026.
  10. NERC to implement new power tariff rates. The Himalayan Times, 2021. accessed 1 October 2026.
  11. Boosting share of alternative energy in power mix remains a challenge for Nepal. The Kathmandu Post, 2023. accessed 1 October 2026.
  12. Call for reconnecting rooftop solar plants to grid. The Kathmandu Post, 2022. accessed 1 October 2026.
  13. Amendments to Procedure for Purchase of Electricity from Solar PV Systems, 2074 (776th NEA Board meeting, unofficial translation). Nepal Electricity Authority (via energypedia), 2018. accessed 1 October 2026.
  14. Amendment to the Solar Energy Development Procedure. Nepal Watch, 2025. accessed 1 October 2026.
  15. Electricity Act, 2049 (1992). Asia Pacific Energy Portal (UN ESCAP). accessed 1 October 2026.
  16. Brief on Open Access Directives 2026 (2082). Pioneer Law Associates, 2026. accessed 1 October 2026.
  17. Open Access Transmission/Distribution (First Amendment) Directive, 2083. Electricity Regulatory Commission, 2026. accessed 1 October 2026.
  18. Balancing and Settlement Directives, 2083. Electricity Regulatory Commission, 2026. accessed 1 October 2026.
  19. Deviation Settlement Mechanism Directives, 2083. Electricity Regulatory Commission, 2026. accessed 1 October 2026.
  20. Electricity Consumer Tariff Determination Directive, 2083. Electricity Regulatory Commission, 2026. accessed 1 October 2026.
  21. Electricity Regulatory Commission (Installation and Operation of Meters) Directives, 2083. Electricity Regulatory Commission, 2026. accessed 1 October 2026.
  22. Transmission line tariff fixed for the first time, 57 paisa per unit. Kantipur, 2026. accessed 1 October 2026.
  23. Hydropower Project Registration in Nepal: Notes for Developers and Lenders (2026). Mondaq, 2026. accessed 1 October 2026.
  24. Progress at a Glance: Year in Review FY 2080/81 (2023/24). Alternative Energy Promotion Centre, 2024. accessed 1 October 2026.
  25. Nepal Photovoltaic Quality Assurance 2025 (NEPQA-2025). Alternative Energy Promotion Centre, 2025. accessed 1 October 2026.
  26. Nepal’s Electricity Regulatory Commission introduces 2080 Electricity Grid Code. ShareSansar, 2023. accessed 1 October 2026.
  27. 4G keeps growing fast in Nepal, while users still face slow speeds and patchy coverage. The Kathmandu Post, 2026. accessed 1 October 2026.
  28. EV imports down 20% in 2025/26. Himal Press, 2026. accessed 1 October 2026.
  29. Hydro wasted. Nepali Times, 2026. accessed 1 October 2026.
  30. NEA directs hydropower projects to cut output amid monsoon surplus and transmission constraints. The Kathmandu Post, 2026. accessed 1 October 2026.
  31. New customer application form. Nepal Electricity Authority. accessed 1 October 2026.
  32. Meter transfer form. Nepal Electricity Authority. accessed 1 October 2026.
  33. How to pay NEA electricity bill online. Nepali Telecom, 2017. accessed 1 October 2026.
  34. How to check utility bills online in Nepal. Onlinekhabar. accessed 1 October 2026.