Countries

Energy in Pakistan, explained.

How electricity works in Pakistan: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in Pakistan: Not yet available.Olmack is not offered in Pakistan yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in Pakistan.

Pakistan electricity 2026: NEPRA uniform slab tariffs, CPPA-G and ISMO, 11 DISCOs and K-Electric, 14-digit reference numbers, net billing under the Prosumer Regulations 2026.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Pakistani rupee (PKR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Pakistan energy at a glance.

Key figures for households in Pakistan. Each one links to its source on the full overview below.

  • Electricity price.

    33.1 PKR per kWh for households, including taxes. Figures for 2026.

  • Household use.

    1,499 kWh a year for a typical household. Figures for FY2024-25.

  • Renewable share.

    46.8% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Pakistan.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Pakistan below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Pakistan requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Pakistan.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Pakistan, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Pakistan, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Pakistan.

Full overview

The energy market in Pakistan, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

Pakistan’s power sector is state-led and regulated by the National Electric Power Regulatory Authority (NEPRA). Eleven state-owned distribution companies (DISCOs) serve most of the country, while K-Electric, a privately owned and vertically integrated utility, serves Karachi and nearby areas. The Central Power Purchasing Agency (CPPA-G) buys power from generators on the DISCOs’ behalf, the National Grid Company (NGC, formerly NTDC) owns the high-voltage grid, and the Independent System and Market Operator (ISMO) dispatches the system and runs the new wholesale market, which began commercial operations in January 2026.

Households pay a nationally uniform, rising-block tariff set by the federal government on the basis of NEPRA determinations. In 2026 a protected household using up to 100 kWh a month pays Rs 10.54/kWh, while a non-protected household in the 201–300 kWh block pays Rs 33.10/kWh, before fixed charges, monthly fuel adjustments and 18% sales tax. Capacity payments to power plants make up about two-thirds of the cost of power purchased by the DISCOs.

High grid prices and cheap Chinese panels have driven one of the world’s fastest rooftop solar booms. Net-metered capacity reached 7,319 MW by March 2026, and Ember estimates that solar supplied about 21% of Pakistan’s electricity in 2025. In February 2026 NEPRA replaced net metering for new applicants with net billing under the Prosumer Regulations 2026, paying for exports at the national average energy purchase price rather than offsetting them unit for unit.

Energy snapshot.

Headline figures for electricity in Pakistan. Each shows its data year and links to its source.

  • Population241,490,000 peopleSource 12023
  • Households38,320,000 householdsSource 12023
  • Average household size6.33 people/householdSource 12023
  • Electricity use per household1,499 kWh/yrSource 2FY2024-25
  • Household price (PKR)33.1 PKR/kWhSource 42026
  • Household price (EUR)0.106 EUR/kWhSource 122026
  • Renewable electricity share46.8%Source 32025
  • Solar capacityNot identified from a reliable public source.
  • Wind capacity1.85 GWSource 32025
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter share5%Source 335 August 2026
Market structure
Single buyer
Homes can export to the grid
Yes
Home equipment in grid services
No
Regulator
National Electric Power Regulatory Authority (NEPRA)
System operator
Independent System and Market Operator (ISMO); National Grid Company of Pakistan (NGC) owns the transmission network
Distribution networks
Eleven state-owned DISCOs (LESCO, GEPCO, FESCO, IESCO, MEPCO, PESCO, HAZECO, TESCO, HESCO, SEPCO, QESCO) plus privately owned K-Electric in Karachi.
Currency
Pakistani rupee (PKR)
Voltage and frequency
230 V single-phase / 400 V three-phase, 50 Hz

Electricity prices in Pakistan.

Household price (PKR)
33.1 PKR/kWh (2026)Source 4Uniform variable rate for non-protected residential consumers in the 201–300 kWh/month block, unchanged from July 2025 into calendar year 2026. Excludes fixed charges, monthly fuel charge adjustments, quarterly adjustments and 18% sales tax. Rates range from Rs 3.95 (lifeline, up to 50 kWh) to Rs 47.69 above 700 kWh before the February 2026 rationalisation.
Household price (EUR)
0.106 EUR/kWh (2026)Source 12Converted from Rs 33.10/kWh at the State Bank of Pakistan average rate for authorised dealers published 1 October 2026 (Rs 312.7668 per euro).
Typical annual electricity bill
Not identified from a reliable public source.

Household price trend (PKR per kWh).Source 7

27.1430.734.26Before Jul 2024Jul 2024 – Jun 2025Jul 2025 – Dec 2025From Jan 2026
Pakistan household electricity price, PKR per kWh
Before Jul 202427.14 PKR/kWh
Jul 2024 – Jun 202534.26 PKR/kWh
Jul 2025 – Dec 202533.1 PKR/kWh
From Jan 202633.1 PKR/kWh

Electricity pricing in Pakistan has two layers. NEPRA determines a cost-based revenue requirement and tariff for each DISCO, built on its forecast of the power purchase price (PPP) that CPPA-G charges for generation and transmission. For calendar year 2026 NEPRA set the national average PPP at Rs 25.32/kWh, of which about 68% is fixed capacity and use-of-system charges and only Rs 8.13/kWh is fuel and energy cost, and the national average tariff at Rs 33.38/kWh. The federal government then notifies a uniform “applicable” tariff that is the same in every DISCO area and in Karachi, using subsidies and cross-subsidies to bridge the differences; it budgeted Rs 248 billion of subsidy for 2026.

The residential tariff is a steep rising-block structure. Lifeline and protected slabs are heavily subsidised, and the number of households qualifying as protected has grown quickly as rooftop solar and conservation reduce metered consumption: according to NEPRA’s 2026 decision, about 20.7 million consumers were in the lifeline and protected categories in June 2025. In February 2026 NEPRA approved a government motion that extended monthly fixed charges to protected and lower-use households while cutting the energy rate for heavier users by up to Rs 1.53/kWh, shifting more cost recovery into fixed charges.

Bills also carry a monthly fuel charge adjustment, quarterly tariff adjustments and general sales tax at 18%. The provincial electricity duty (1.5% for households) and the Rs 35 PTV licence fee were removed from bills in July 2025. Tariffs moved onto a calendar-year rebasing cycle from January 2026; previous rebasings took effect each July, including a Rs 7.12/kWh increase for the 201–300 kWh block in July 2024.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesUniform national residential (A-1) tariff applied by every DISCO and by K-Electric. Lifeline: up to 50 kWh Rs 3.95, 51–100 kWh Rs 7.74. Protected (low-use households within the 200 kWh a month limit): 1–100 kWh Rs 10.54, 101–200 kWh Rs 13.01. Non-protected: 1–100 Rs 22.44, 101–200 Rs 28.91, 201–300 Rs 33.10, 301–400 Rs 36.46 (after the February 2026 cut), with higher rates for heavier use up to about Rs 47 above 700 kWh.
Time-of-useLimitedThe uniform residential schedule includes a time-of-use option at Rs 46.85/kWh peak and Rs 40.53/kWh off-peak in CY2026, plus a fixed charge; most households are billed on the block tariff.
OtherYesMonthly fixed charges. From February 2026 they were extended to protected and lower-use households (Rs 200 a month for protected 1–100 kWh users, rising by slab to Rs 675 for the heaviest users); lifeline consumers remain exempt.
PrepaymentLimitedThe tariff schedule includes a prepaid metering category, but almost all households are on post-paid monthly bills based on meter readings.
DynamicNoNo household tariff follows wholesale prices. Monthly fuel charge adjustments pass actual fuel costs through to all consumers with a lag.

Household prices compared with neighbouring countries (EUR per kWh).

  • Pakistan€0.106
  • India€0.043

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
1,499 kWh/yr (FY2024-25)Source 2Derived: household-sector grid consumption of 57,455 GWh in FY2024-25 (Pakistan Economic Survey 2025-26) divided by the 38.32 million households counted in the 2023 census. Excludes electricity that households generate and use from their own solar systems, and the census household count includes homes without a grid connection. No official per-household figure was identified.
Average daily use per household
4.11 kWh/day (FY2024-25)Source 2Derived from the 1,499 kWh/yr per-household figure (household grid consumption divided by 2023 census households, divided by 365).
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
469 kWh/person/yr (FY2024-25)Source 2Derived: total grid consumption of 113,140 GWh in FY2024-25 divided by the 2023 census population. All sectors; excludes self-consumed rooftop solar. Ember puts total demand including distributed solar at about 0.7 MWh per person in 2025.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
0.11 % of homes (2023)Source 1Electricity as the main cooking fuel. Wood (52.72%) and piped natural gas (37.83%) dominate.

Households are the largest users of grid electricity in Pakistan. In FY2024-25 they took 57,455 GWh, 50.8% of the 113,140 GWh consumed, ahead of industry (25.8%), commercial users (8.6%) and agriculture (5.2%). In July–March FY2025-26 the household share fell to 47.5% as industrial use rose and more homes generated their own power. Spread over 38 million households, grid use averages roughly 1,500 kWh a year, or about 4 kWh a day, though use is very uneven between hot southern cities and rural homes.

Demand peaks in the long, hot summer, when fans, refrigerators and air conditioners run and evening load rises sharply after sunset. Rooftop solar has changed the daily profile: midday demand on the grid has fallen while evening peaks remain, and grid sales have grown far more slowly than the number of consumers. For its 2026 power purchase price forecast NEPRA assumed only 1% growth in DISCO demand.

Most cooking and much winter heating use wood or piped gas rather than electricity: only 0.11% of households named electricity as their main cooking fuel in the 2023 census.

Housing and households.

Dwellings
38,292,556 housing units (2023)Source 1
Owner-occupied
81.9% (2023)Source 1Rural 88.94%, urban 71.02%.
Private rented
11.9% (2023)Source 1Rented housing units (rural 4.15%, urban 23.82%). A further 4.20% are occupied rent-free.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
38.9 % of population (2023)Source 1

Most Pakistanis live in rural areas and own their homes. In the 2023 census 82% of housing units were owner-occupied and 12% rented, with renting concentrated in cities (24% of urban units) and especially in Islamabad, Karachi and other large urban centres. Households are large, averaging 6.3 people.

Housing quality varies sharply by province. Two-thirds of homes are pacca, rising to 81% in Punjab and 97% in Islamabad, while kacha homes make up 64% of the stock in Balochistan. The 2023 census recorded solar panels as the main source of lighting for 7.74% of households (11.19% in rural areas and 26.4% in Balochistan), reflecting off-grid solar use in areas with weak or no grid supply. Flat concrete roofs on urban pacca houses are well suited to rooftop solar, but tenants in rented homes and flats depend on the owner’s consent.

How the grid works in Pakistan.

  1. TransmissionNational Grid Company of Pakistan (NGC), Independent System and Market Operator (ISMO)
  2. DistributionEleven state-owned DISCOs (LESCO, GEPCO, FESCO, IESCO, MEPCO, PESCO, HAZECO, TESCO, HESCO, SEPCO, QESCO) plus privately owned K-Electric in Karachi.
  3. MeteringPower Information Technology Company (PITC), Private Power and Infrastructure Board (PPIB)
  4. Supply6 or more retail suppliers

Physically, power flows from hydro plants in the north, nuclear plants at Chashma and Karachi, imported and Thar coal plants, gas and RLNG plants, and wind and solar farms in Sindh through NGC’s 500 kV and 220 kV grid to the DISCOs’ 132 kV, 11 kV and 400/230 V networks. Installed capacity reached 49,651 MW by March 2026 including 7,319 MW of net-metered systems, while 13 IPPs with 5,105 MW had been closed. Karachi is supplied by K-Electric’s own plants and network plus imports from the national grid.

Commercially, CPPA-G buys almost all power under long-term contracts with capacity and energy payments and passes the cost to the DISCOs through the NEPRA-determined power purchase price. Capacity payments are fixed whether or not plants run, which is why falling grid sales push up per-unit costs. The DISCOs bill consumers at the uniform tariff, and the federal government covers the difference between determined and applicable tariffs through subsidies.

The Competitive Trading Bilateral Contract Market (CTBCM) is meant to move away from the single-buyer model. NEPRA declared 22 January 2026 the start of commercial market operations and approved an auction mechanism under which up to 800 MW of bulk demand (consumers of 1 MW or more) can buy directly from generators using the grid. The first 400 MW wheeling auction was launched in September 2026 with bids due by 20 November 2026. Households remain outside the competitive market.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Energy (Power Division)Sets power policy, owns the state-owned DISCOs, generation companies, NGC and CPPA-G, and files motions with NEPRA to set the uniform consumer-end tariff.
RegulatorNational Electric Power Regulatory Authority (NEPRA)Licenses generation, transmission, distribution, supply, trading and market operation under the NEPRA Act 1997; determines tariffs and the power purchase price; issues the Grid Code, the Consumer Service Manual and the Prosumer Regulations 2026; grants prosumer concurrences.
TSONational Grid Company of Pakistan (NGC)Legal successor of the National Transmission and Despatch Company (NTDC), renamed in 2025. Owns and maintains the 500 kV and 220 kV national grid.
System operatorIndependent System and Market Operator (ISMO)Incorporated in December 2024 and given the system operator licence by NEPRA in April 2025. Dispatches generation, prepares the generation expansion plan (IGCEP) and administers the competitive market and wheeling auctions under CTBCM.
SupplierCentral Power Purchasing Agency (Guarantee) Limited (CPPA-G)The single buyer: holds the power purchase agreements with public and private generators and recovers their costs from the DISCOs through the power purchase price.
DSOEx-WAPDA distribution companies (XWDISCOs)Eleven state-owned companies, each with an exclusive service area: LESCO (Lahore), GEPCO (Gujranwala), FESCO (Faisalabad), IESCO (Islamabad), MEPCO (Multan), PESCO (Peshawar), HAZECO (Hazara), TESCO (former tribal areas), HESCO (Hyderabad), SEPCO (Sukkur) and QESCO (Quetta). They own the 132 kV and lower networks and are also the retail suppliers.
DSOK-Electric (KE)Privately owned, vertically integrated utility serving more than 3.7 million customers in Karachi and adjoining parts of Sindh and Balochistan; generates, transmits, distributes and supplies power, and buys additional power from the national grid.
MeteringPower Information Technology Company (PITC)State-owned IT company that runs billing systems and the online bill service for the ex-WAPDA DISCOs and supports the AMI programme.
Data hub / registryPrivate Power and Infrastructure Board (PPIB)Investment agency for private power, which has taken over the functions of the Alternative Energy Development Board (AEDB), including the certification and enlistment of solar installers.

Compared with the UK system.

Compared with the UK system.
UK conceptPakistan equivalentHow it works
DNODISCO (or K-Electric in Karachi)Each area has one distribution company that owns the local network and is also the only retailer. It connects customers, installs and reads meters, bills, collects payment and processes prosumer applications. There is no separation of network and supply for households.
National Grid/NESONGC (transmission owner) and ISMO (system and market operator)Since the 2024–25 restructuring of NTDC, NGC owns and builds the grid and ISMO dispatches it, plans capacity and runs the CTBCM wholesale market. Generators are dispatched centrally under long-term contracts; there is no balancing market.
MPANConsumer reference number (Reference No.)A 14-digit number issued by the DISCO for each connection and printed on every bill, written in groups of 2, 5 and 7 digits. It is the key used for bill payments, change of name, load extension and prosumer applications. K-Electric uses a 13-digit account number instead.
MPRNGas consumer number (SNGPL or SSGC)Piped gas is supplied by two state gas utilities, Sui Northern and Sui Southern, with their own consumer numbers; there is no link to the electricity reference number.
Meter operatorThe DISCOMeters are installed, read and maintained by the distribution company under NEPRA’s Consumer Service Manual. Prosumers pay for the bidirectional meter. Under a planned public–private partnership, private AMI service providers may install and operate smart meters for some DISCOs.
SupplierThe DISCO (supplier of last resort)Households cannot choose a supplier. Competitive supply under CTBCM is limited to bulk consumers of 1 MW and above through licensed electric power suppliers and wheeling auctions.
Smart-meter infrastructureDISCO AMI systems and K-Electric AMIAbout 2.1 million AMI meters had been installed by August 2026, each DISCO running its own head-end system. There is no national data hub comparable to the DCC.

How a supply point is identified.

13 15422 0846193 (fictional): batch 13, sub-division 15422, consumer serial 0846193

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Consumer reference number (Reference No.) (Ref. No.)
Who issues it?The distribution company for the area (one of the 11 DISCOs); K-Electric issues its own account numbers in Karachi
FormatDISCOs: 14 digits printed in three groups of 2, 5 and 7 digits (for example 24-13311-5200305 on a NEPRA prosumer concurrence). The first group is the billing batch (the meter-reading and billing cycle), the second the five-digit sub-division code of the DISCO office that serves the connection, and the third the consumer’s serial number within that sub-division. Bills also show a separate customer ID and the meter number. K-Electric: 13-digit account number beginning 0400.
LengthDISCOs: 14 digits. K-Electric account number: 13 digits.
Stays with the property when you switch supplier?Yes
Where to find itPrinted prominently on every monthly bill. Under NEPRA’s Consumer Service Manual, meters in multi-occupancy buildings must be labelled with the consumer’s name and reference number.
Electronic accessCustomers can view and download duplicate bills online from the DISCO or PITC web bill service by entering the reference number or customer ID, and pay through banks and mobile wallets. K-Electric customers use the 13-digit account number for its app, website and SMS service (8119).
Third-party accessNo framework for third-party access to meter data. Banks, mobile wallets and bill-payment apps use the reference number only to fetch and pay bills. The number is quoted on net-metering and prosumer concurrences issued by NEPRA.
Who keeps the registerEach DISCO keeps its own consumer and billing database, with billing systems for the ex-WAPDA DISCOs run by PITC; K-Electric keeps its own. There is no national register of supply points.
Register scopePer DSO

A Pakistani household connection is identified by its DISCO, not by a national code. When a new connection is approved through the DISCO’s Application and Agreement (A&A) form, it is assigned to a sub-division and a billing batch and given a reference number, which then appears on every bill and on every later request: change of name, extension or reduction of load, change of tariff or a prosumer application. NEPRA’s Consumer Service Manual describes it simply as a dedicated number allotted to a consumer for identification.

Structure of the number

The 14 digits are usually printed with spaces or hyphens as 2-5-7. The first two digits are the batch, which groups connections read and billed on the same schedule (NEPRA’s manual notes, for instance, that connections with automatic meter reading are placed in a separate batch). The next five identify the sub-division office of the DISCO and the last seven are the consumer’s serial within it. Because the batch can change when billing is reorganised, a connection’s number can be corrected; NEPRA concurrence letters show the batch and serial digits of a reference number being corrected while the sub-division code stays the same.

Who keeps the records and what happens on a move

There is no central registry. Each DISCO keeps its own records, and only one DISCO serves each area, so there is no supplier switching to coordinate. The connection and its number stay with the premises: when a property is sold, the Consumer Service Manual makes it obligatory for the new owner to apply for a change of name, with proof of ownership, the last paid bill and an updated security deposit.

K-Electric

In Karachi, K-Electric identifies customers by a 13-digit account number (its own example begins 0400…). The account number is used for bills, complaints and K-Electric’s SMS and app services, and K-Electric’s new-connection forms also refer to the existing meter, account or consumer number of neighbouring connections.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringLimited
Net billingYes
How exported electricity is paidNet billing for new prosumers since 9 February 2026: exports are bought by the DISCO at the national average energy purchase price (NAEPP), imports are billed at the applicable consumer tariff, and the net financial difference is settled on the monthly bill. Prosumers with net-metering agreements signed under the 2015 regulations keep unit-for-unit net metering until their agreement expires.
Which systems are covered?Solar, wind and biogas distributed generation from 1 kW to 1 MW connected to a DISCO network under the NEPRA (Prosumer) Regulations 2026 (S.R.O. 251(I)/2026, in force from 9 February 2026).
How large can a system be?No larger than the consumer’s sanctioned load. New connections are refused on a distribution transformer once distributed generation on it reaches 80% of its rated capacity. Systems of 250 kW and above need a load-flow study.
How are exports paid?At the national average energy purchase price. Press reports at the time of notification put this at about Rs 10–11/kWh; NEPRA’s power purchase price decision for calendar year 2026 sets the NAEPP at Rs 8.13/kWh. Imports are billed at the normal tariff (Rs 33.10/kWh in the 201–300 kWh block, for example), so self-consumption is worth several times more than export.
What happens to existing net-metering customers?After public criticism and a request from the Power Division, NEPRA amended regulation 21 so that approvals and agreements made under the 2015 net-metering regulations, and more than 5,000 applications filed by 8 February 2026 (250.8 MW), continue to be billed under the old rules until the agreement expires. About 466,000 consumers were registered for net metering in February 2026.
Is there a fee or licence?No generation licence is needed. NEPRA issues a prosumer concurrence; in April 2026 it withdrew the Rs 1,000/kW fee for systems up to 25 kW, with effect from 9 February 2026. Larger systems pay the fee once.
How long is the agreement?Five years for new prosumers, renewable by mutual consent, compared with seven years under the 2015 regulations.

Connecting a home system.

  1. Engage an installer enlisted with PPIB under the AEDB (Certification) Regulations 2021 and apply to the DISCO, quoting the consumer reference number; systems may not exceed the sanctioned load.
  2. The DISCO acknowledges the application within five working days and completes the technical assessment within 15 days, including a load-flow study for systems of 250 kW and above and a check that the distribution transformer is not already at its 80% limit.
  3. The DISCO forwards the case to NEPRA, which issues a prosumer concurrence under section 14B(5) of the NEPRA Act; systems above 25 kW pay a one-time fee of Rs 1,000 per kW.
  4. The prosumer pays the interconnection costs, and the DISCO installs a bidirectional (or dual) meter within 15 days of payment.
  5. Sign a five-year agreement with the DISCO, renewable by mutual consent; net billing then applies from the next billing cycle.

Pakistan introduced net metering for distributed generation of 1 kW to 1 MW in 2015. Uptake was slow until rising tariffs and a collapse in panel prices made rooftop solar one of the cheapest ways for households and businesses to cut bills. Net-metered capacity grew from 2,813 MW in March 2025 to 7,319 MW in March 2026. Because the grid’s costs are mostly fixed capacity payments, the government argued that net-metered customers were shifting costs onto other consumers.

The Prosumer Regulations 2026 replaced net metering with net billing on 9 February 2026. The regulations as first notified would also have moved existing prosumers to net billing and monthly settlement. After the Prime Minister intervened, NEPRA amended them to protect existing agreements until expiry and to process applications filed before 9 February under the old regime, and in April 2026 removed the licensing fee for small systems. New household systems therefore earn far less for exports than before, which favours sizing for self-consumption and, increasingly, adding batteries.

Alongside the regulated route, a very large amount of solar operates behind the meter without any export arrangement. Renewables First estimated that 27–33 GW of solar had been deployed by January 2026, against 6.8 GW registered for net metering in September 2025.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityNEPRA generation licence under section 14B of the NEPRA Act for power plants. Distributed generation of 1 kW–1 MW under the Prosumer Regulations 2026 needs a NEPRA prosumer concurrence instead of a licence.NEPRAConcurrence fee Rs 1,000/kW above 25 kW; none at or below 25 kW. Utility-scale projects also need procurement through the IGCEP and PPIB.
Store electricityNo specific licence category or rules for behind-the-meter household batteries identified. Batteries used only for backup or self-consumption need no approval beyond normal wiring rules.NEPRAFrom September 2026 solar and wind projects in wheeling auctions must have co-located storage of at least 10% of firm capacity.
Export to the grid (households)No licence. DISCO technical approval, NEPRA prosumer concurrence and a five-year agreement with the DISCO.DISCO; NEPRAOnly solar, wind and biogas; system no larger than sanctioned load.
Sell or supply electricity to othersElectric power supplier licence under section 23E of the NEPRA Act and the Licensing (Electric Power Supplier) Regulations 2022. Categories are supplier of last resort (the DISCOs), competitive supplier and, under a draft amendment, on-site supplier for bulk consumers on the same premises.NEPRAA generator holding a concurrence or generation licence may not supply consumers without a supply licence.
Distribute electricityNEPRA distribution licence. Held by the 11 DISCOs, K-Electric and some housing-society distributors such as DHA Energy, licensed in July 2026.NEPRAPrivatisation of FESCO, GEPCO and IESCO was under way in 2026.
Wholesale tradingParticipation in CTBCM as a registered market participant; trading licences were introduced by the 2018 amendments to the NEPRA Act. Bulk consumers of 1 MW or more can buy through wheeling auctions administered by ISMO.NEPRA; ISMOCPPA-G continues to hold legacy contracts for the DISCOs.
Market and system operationSystem and market operator licence, held by ISMO since April 2025.NEPRAGrid Code 2023 governs system operation.
Aggregation, VPP, balancing and grid servicesNo licence category or market for aggregators, virtual power plants or third-party balancing services identified.NEPRA; ISMOReserves come from contracted power plants under ISMO dispatch.
Remote control of customer assetsNo specific regime. DISCOs control their own AMI meters.DISCOsNo rules identified for third-party control of household inverters or batteries.

The NEPRA Act 1997, extensively amended in 2018, separates the licensed activities of generation, transmission, distribution, supply, trading and system and market operation. Distribution (owning and operating wires) and supply (selling to consumers) are licensed separately, with the DISCOs holding both and acting as suppliers of last resort in their areas.

For households the relevant permission is not a licence but the prosumer concurrence, which NEPRA issues on the DISCO’s recommendation and which names the consumer reference number, system size, sanctioned load, inverter and installer. Installers themselves must be enlisted with PPIB, which requires a Pakistan Engineering Council licence in the solar specialisation, tax registration and a bank guarantee.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Competitive bilateral market (CTBCM) and wheeling auctionsDeveloping1 MW bulk consumersNoISMO. Commercial market operations began on 22 January 2026. Up to 800 MW of bulk demand may be allocated through wheeling auctions; the first 400 MW auction closes on 20 November 2026. Open only to large consumers and generators.
Balancing and ancillary servicesNo—NoISMO. Frequency control and reserves are provided by contracted power plants under central dispatch; no market is open to demand or distributed assets.
Demand responseNo—NoDISCOs. No paid demand-response programme for households identified. Shortages have historically been managed by load-shedding by feeder.

Distributed energy resources cannot yet take part in energy or flexibility markets in Pakistan. The only commercial interface for a household system is the prosumer agreement with its DISCO. The CTBCM reforms create a wholesale market for large consumers but do not provide for aggregators or small assets.

Flexibility is nevertheless becoming a central issue. Rooftop solar has hollowed out midday demand while evening peaks remain, business groups have raised concerns about wind curtailment, and the regulator now requires storage alongside new renewables in the wheeling auctions. The draft IGCEP 2025-35 assumes net metering alone will add a further 8,120 MW.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
ISMOAdministers the CTBCM market and wheeling auctions.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutEarly stage: 2,125,296 AMI meters installed nationwide by 5 August 2026, about 5% of connections; a 10-million-meter programme is being structured with the IFC.
Reading intervalNot standardised for households; most homes have electromechanical or static meters read monthly.
AMI meters installed (5 Aug 2026)2,125,296
IESCO1,150,000
GEPCO348,135
MEPCO229,719
LESCO119,372
FESCO111,948
PESCO60,685
K-Electric50,599
HESCO / SEPCO / QESCO / HAZECO / TESCO19,620 / 13,432 / 9,194 / 7,659 / 1,377
Government connectionsDISCOs told to fit AMI on 90% by 30 September 2026
Data hubNone; each DISCO runs its own system

Pakistan’s smart metering is driven mainly by the aim of reducing theft, billing errors and losses rather than by retail market needs. Islamabad’s IESCO accounts for more than half of the meters installed so far. In April 2026 the Power Division signed a transaction advisory agreement with the IFC to design a service-provider or public–private partnership model for 10 million single-phase smart meters, and PPIB is to procure a private AMI service provider for LESCO, MEPCO, PESCO, HAZECO and QESCO.

In August 2026 the Power Division ordered DISCOs to fit AMI meters to 90% of federal and provincial government connections by the end of September, to improve billing and reconciliation of government arrears. Each DISCO runs its own head-end system and data stays with the utility.

Renewable electricity.

Electricity generation mix (2025).

  • Hydro: 23.3%
  • Gas: 21.9%
  • Solar: 20.7%
  • Coal: 16.3%
  • Nuclear: 14.4%
  • Wind: 2.5%
  • Other fossil (oil): 0.7%
  • Bioenergy: 0.3%
Source 3
Renewable electricity share
46.8% (2025)Source 3Share of total generation including Ember’s estimate of distributed (rooftop) solar: hydro 23.28%, solar 20.67%, wind 2.52%, bioenergy 0.31%. Nuclear adds 14.36%. Official grid-only statistics for FY2024-25 show hydro at 31.5% and other renewables at 4.5% of grid generation (Pakistan Economic Survey).
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Hydro
11,615 MW (March 2026)Source 2
Net-metered distributed generation (mostly solar)
7,319 MW (March 2026)Source 2
All renewables excluding hydro (incl. net metering)
10,101 MW (March 2026)Source 2
Wind
1.85 GW (2025)Source 3
Solar (Ember dataset)
3.72 GW (2025)Source 3Ember’s capacity series; it does not capture most unregistered rooftop solar.

Targets.

  • Alternative and Renewable Energy Policy 2019: 30% of installed capacity from non-hydro renewables by 2030.
  • Draft IGCEP 2025-35 (ISMO): hydropower about 34% and variable renewables about 27% of installed capacity by 2035, with net metering adding 8,120 MW.

Pakistan’s generation mix has changed quickly. Hydro from the Indus system, nuclear power and domestic Thar coal have displaced imported fuel oil and LNG, and Ember estimates that solar, almost all of it distributed, rose to 20.7% of generation in 2025 from 5.1% in 2022 and 12.6% in 2024. Including hydro, Ember puts renewables at 46.8% of generation. Official grid statistics, which do not include self-consumed rooftop output, show hydro at 31.5% and other renewables at 4.5% of grid generation in FY2024-25.

The solar boom has been driven by consumers rather than by policy targets. Utility-scale solar and wind procurement has been slow, while imports of Chinese modules rose to around 17–18 GW a year. Planning documents struggle to keep up: the draft IGCEP 2025-35 falls short of the 2019 policy target for non-hydro renewables even as distributed solar reshapes demand. The 2025-26 federal budget introduced a 10% sales tax on imported solar panel components, cut from a proposed 18%.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Batteries in Pakistan are mostly behind the meter. Lithium iron phosphate batteries are increasingly sold with rooftop solar to cover evening use and load-shedding, and the move from net metering to net billing strengthens the case for storing midday output rather than exporting it. Renewables First estimated that battery imports more than tripled to 4.6 GWh in 2025, with homes the largest segment.

Grid-scale storage is only beginning. No large battery is reported as operating; the first requirement for storage comes through the wheeling auctions, and storage features in planning studies for remote areas such as Gwadar.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Lahore Electric Supply Company (LESCO)—NoLimitedNoYes
Islamabad Electric Supply Company (IESCO)1.15 million AMI meters installed by August 2026NoLimitedNoYes
Faisalabad Electric Supply Company (FESCO)—NoLimitedNoYes
Gujranwala Electric Power Company (GEPCO)—NoLimitedNoYes
Multan Electric Power Company (MEPCO)—NoLimitedNoYes
K-ElectricMore than 3.7 million customers in Karachi and surrounding areasNoLimitedNoYes

There are no competing retail suppliers for households. Each consumer is served by the DISCO for its area, or by K-Electric in Karachi, at the uniform national tariff, and every distributor offers export under the prosumer framework: K-Electric connected 9,676 net-metered customers with more than 230 MW in January–November 2025. FESCO, GEPCO and IESCO, which together serve more than 14 million consumers, were offered for privatisation in 2026, with expressions of interest due between August and September.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry of Energy (Power Division)GovernmentPower-sector ministryOwns the state utilities and sets tariff, subsidy and solar policy.
National Electric Power Regulatory Authority (NEPRA)RegulatorElectricity regulatorDetermines tariffs, issues licences and prosumer concurrences, and publishes the Prosumer Regulations, Grid Code and Consumer Service Manual.
National Grid Company of Pakistan (NGC)TransmissionTransmission ownerOwns and builds the national 500 kV and 220 kV grid.
Independent System and Market Operator (ISMO)MarketSystem and market operatorDispatches the grid, prepares the IGCEP and runs the CTBCM wheeling auctions.
Central Power Purchasing Agency (CPPA-G)MarketSingle buyerHolds the power purchase agreements and publishes market and settlement data.
K-ElectricDistributionVertically integrated utility for KarachiThe only private, vertically integrated utility; serves Pakistan’s largest city.
Private Power and Infrastructure Board (PPIB)Renewable EnergyPrivate power and renewables agencyTook over AEDB functions, including enlistment of certified solar installers.
Pakistan Solar AssociationSolarSolar industry associationRepresents solar importers, distributors and installers in policy debates such as the move to net billing.
Renewables FirstRenewable EnergyEnergy think tankPublishes widely cited estimates of solar and battery imports and distributed solar deployment.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connection (transmission)NEPRA Grid Code 2023NEPRAApproved in March 2023, replacing the Grid Code 2005; adapted to the CTBCM market structure and covers renewable plant requirements in more detail.
Distributed generationNEPRA (Prosumer) Regulations 2026 (S.R.O. 251(I)/2026)NEPRASets eligibility (1 kW–1 MW), capacity limits, transformer cap, metering, application timelines and net billing.
Metering, connection and billingConsumer Service Manual (January 2021)NEPRAProcedures for new connections, change of name, metering installation, meter reading (including AMR) and bill contents, including exported and imported units for net metering.
Installer accreditationAEDB (Certification) Regulations 2021PPIB (formerly AEDB)Enlistment requires a Pakistan Engineering Council licence under solar specialisation codes (EE-11 or ME-07), tax registration, details of installed projects and a four-year bank guarantee of PKR 500,000.
Electrical contractorsPakistan Engineering Council contractor licensingPakistan Engineering CouncilPEC licence categories (C-3 to C-6 and above) determine the size of work an installer may take on.

Permissions.

Permissions.
PermissionRequiredLevelDetail
DISCO technical approvalYesNationalUnder the Prosumer Regulations; acknowledgement within 5 working days and assessment within 15 days.
NEPRA prosumer concurrenceYesNationalIssued on the DISCO’s recommendation; fee of Rs 1,000/kW only above 25 kW.
Generation licenceNoNationalNot needed for distributed generation up to 1 MW under the Prosumer Regulations.
Owner consentLimitedNationalNeeded where the applicant does not own the premises; the connection is in the name of the registered consumer.
Planning permissionUnknownLocalNo specific planning requirement for rooftop solar identified; local building by-laws apply.

For a household the process runs through the DISCO, which assesses the connection and forwards the case to NEPRA for a concurrence. NEPRA has continued to issue concurrences for small systems in 2026 (for example a 6.96 kW system in MEPCO’s area in September 2026), while the fee was removed for systems up to 25 kW. Systems that never export need no approval beyond normal wiring safety.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net billing (Prosumer Regulations 2026)ActiveNet billingExports bought by the DISCO at the national average energy purchase price; five-year agreements for systems of 1 kW–1 MW up to sanctioned load.9 February 2026 – ongoing
Net metering (NEPRA net-metering regulations 2015)ClosedNet meteringClosed to new applicants from 9 February 2026. Existing agreements, and applications filed by 8 February 2026, continue under the old terms until the agreement expires.2015 – 8 February 2026
Punjab free solar schemeActiveGrant (in-kind)Punjab government programme providing solar systems free to low-income households selected by lottery; extended to December 2026 with more than 94,000 systems at a cost of about Rs 10 billion.Extended to December 2026
Protected and lifeline tariffsActiveSocial tariffSubsidised rates for households using up to 200 kWh a month (protected) or up to 100 kWh (lifeline), funded by federal subsidy and cross-subsidy.—

Data and connectivity.

Fixed broadband
152 million broadband subscriptions (August 2025)Source 42PTA data: broadband penetration 61.09%; 148 million of the subscriptions are mobile broadband.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Pakistan is a mobile-first market. Of 152 million broadband subscriptions in August 2025, 148 million were mobile, and fixed broadband is limited mainly to cities. Electricity bills are commonly paid through mobile wallets and banking apps using the reference number.

Each DISCO’s AMI meters report to its own head-end system. No national protocol or interface standard for remote monitoring or control of household inverters and batteries was identified.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
177.6 TWh (2025)Source 3Includes Ember’s estimate of distributed solar. Official grid consumption was 113,140 GWh in FY2024-25.
Generation capacity
49.7 GW (March 2026)Source 2Includes 7.319 GW of net-metered capacity.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Pakistan has far more generating capacity than it uses on the grid: 49.7 GW installed against grid sales that have barely grown, as rooftop solar displaces daytime purchases. Because most generation costs are fixed capacity payments, spreading them over fewer units raises tariffs, which in turn encourages more consumers to install solar and batteries. NEPRA’s CY2026 forecast put fixed costs at about 68% of the power purchase price.

Network constraints are local rather than national. The Prosumer Regulations freeze new distributed generation on a transformer once it reaches 80% of rating, and large systems need load-flow studies. Transmission companies have until January 2027 to complete node assessment studies for the wheeling market.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
NEPRA (Prosumer) Regulations 2026: net billingCurrent9 February 2026Net metering replaced by net billing at the national average energy purchase price for new prosumers; five-year agreements; transformer cap of 80%; size limited to sanctioned load.
Protection of existing net-metering agreements and fee waiverCurrentFebruary–April 2026Regulation 21 amended so pre-9 February agreements and applications stay under the 2015 rules until expiry; concurrence fee withdrawn for systems up to 25 kW.
Tariff rationalisation and fixed chargesCurrentFebruary 2026Fixed monthly charges extended to protected and lower-use households; energy rates cut by up to Rs 1.53/kWh for heavier users. Tariff rebasing moved to a calendar-year cycle from January 2026.
CTBCM commercial operations and wheeling auctionsCurrent22 January 2026; first auction bids due 20 November 2026Start of the competitive bilateral market for bulk consumers of 1 MW or more; 400 MW first auction with a 10% co-located storage requirement for solar and wind.
Privatisation of FESCO, GEPCO and IESCOUpcomingExpressions of interest August–September 2026Sale of 51–100% of the first batch of DISCOs with management control, after transferring selected assets and liabilities to a special purpose vehicle.
National smart-meter programmeUpcomingStructuring from April 2026IFC advising on a service-provider or PPP model for 10 million single-phase smart meters; PPIB to procure an AMI service provider for five DISCOs.
IGCEP 2025-35UpcomingRevised draft April 2026ISMO’s capacity expansion plan, under NEPRA review, assuming 8,120 MW of additional net metering by 2035.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareMediumLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionLowLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionHigh7,319 MW of net-metered capacity (March 2026) and about 466,000 net-metering consumers, plus an estimated 27–33 GW of solar deployed in total (Renewables First, January 2026).
Distributed energy marketHighEmber estimates solar at 20.7% of generation in 2025, mostly distributed; 7.74% of households used solar as their main lighting source in the 2023 census.
Grid flexibility marketLowSingle-buyer system with central dispatch; CTBCM only open to bulk consumers of 1 MW or more; no aggregator, balancing or demand-response framework for distributed assets.
Energy storage adoptionMediumEstimated 4.6 GWh of battery imports in 2025, 2.4 GWh for homes (Renewables First), but no grid-scale battery reported as operating.
Renewable growth environmentHighEmber shows solar generation up 84.5% in 2025 to 36.6 TWh; net-metered capacity rose from 2,813 MW to 7,319 MW in the year to March 2026.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 47 sources
  1. 7th Population & Housing Census 2023: National Census Report. Pakistan Bureau of Statistics, 2025. accessed 1 October 2026.
  2. Pakistan Economic Survey 2025-26, Chapter 14: Energy. Finance Division, Government of Pakistan, 2026. accessed 1 October 2026.
  3. Yearly electricity data (Pakistan, 2025). Ember, 2026. accessed 1 October 2026.
  4. Decision of the Authority in the matter of motion filed by the Federal Government with respect to recommendation of consumer end tariff (CY2026). National Electric Power Regulatory Authority, 2026. accessed 1 October 2026.
  5. Decision in the matter of Power Purchase Price Forecast for CY 2026. National Electric Power Regulatory Authority, 2026. accessed 1 October 2026.
  6. Nepra slightly reduces national average electricity tariff for 2026. Profit by Pakistan Today, 2026. accessed 1 October 2026.
  7. Nepra issues countrywide uniform tariff for FY25-26. The News International, 2025. accessed 1 October 2026.
  8. Nepra rubber-stamps govt’s request for tariff rebasing. Dawn, 2024. accessed 1 October 2026.
  9. Power tariffs rise nationwide as Nepra imposes fixed charges on all households. Aaj English TV, 2026. accessed 1 October 2026.
  10. Pakistan’s power regulator introduces Rs200–675 fixed monthly charges for domestic consumers. Profit by Pakistan Today, 2026. accessed 1 October 2026.
  11. Govt abolishes electricity duty on bills, offers relief to consumers. Profit by Pakistan Today, 2025. accessed 1 October 2026.
  12. Average rates for authorised dealers (conversion rates), 1 October 2026. State Bank of Pakistan, 2026. accessed 1 October 2026.
  13. Nepra pulls the plug on net-metering. Dawn, 2026. accessed 1 October 2026.
  14. Pakistan solar ends net metering. Nukta, 2026. accessed 1 October 2026.
  15. Amendment in NEPRA (Prosumer) Regulations, 2026 – draft for publication (regulation 21). National Electric Power Regulatory Authority, 2026. accessed 1 October 2026.
  16. Reversing earlier decisions, Nepra exempts pre-Feb 9 prosumers from new regulations. The Nation, 2026. accessed 1 October 2026.
  17. Nepra abolishes licence requirement, fee for small solar users. Dawn, 2026. accessed 1 October 2026.
  18. PM halts shift from net metering to net billing, Owais Leghari tells NA. Aaj English TV, 2026. accessed 1 October 2026.
  19. Prosumer Concurrence No. PC/3200/2026 (MEPCO). National Electric Power Regulatory Authority, 2026. accessed 1 October 2026.
  20. Prosumer Concurrence No. PC/880/2026 (FESCO). National Electric Power Regulatory Authority, 2026. accessed 1 October 2026.
  21. Corrigendum to distributed generation concurrence NMC/2498/2024 (reference number correction). National Electric Power Regulatory Authority, 2025. accessed 1 October 2026.
  22. Consumer Service Manual (January 2021). National Electric Power Regulatory Authority, 2021. accessed 1 October 2026.
  23. Contact Us (SMS service with 13-digit account number). K-Electric. accessed 1 October 2026.
  24. Who we are. K-Electric. accessed 1 October 2026.
  25. Year in review: K-Electric shows steady progress during 2025. K-Electric, 2026. accessed 1 October 2026.
  26. Nepra notifies KE base tariff at Rs32.37 per unit. Dawn, 2026. accessed 1 October 2026.
  27. National Grid Company begins restructuring under new framework. Profit by Pakistan Today, 2025. accessed 1 October 2026.
  28. Pakistan’s power regulator approves first electricity wheeling auction mechanism. Profit by Pakistan Today, 2026. accessed 1 October 2026.
  29. Pakistan to seek bids this month for first 400 MW competitive power auction. Arab News Pakistan, 2026. accessed 1 October 2026.
  30. Nepra mandates battery storage for renewables auction. Profit by Pakistan Today, 2026. accessed 1 October 2026.
  31. Amendment in NEPRA Licensing (Electric Power Supplier) Regulations, 2022 – draft for publication. National Electric Power Regulatory Authority, 2026. accessed 1 October 2026.
  32. Privatisation of FESCO, GEPCO, IESCO moves ahead as PC board clears key restructuring plans. Profit by Pakistan Today, 2026. accessed 1 October 2026.
  33. Over 2.12m smart meters installed nationwide to curb power theft. Associated Press of Pakistan, 2026. accessed 1 October 2026.
  34. Pakistan signs IFC advisory deal for rollout of 10 million smart meters. Pakistan Today, 2026. accessed 1 October 2026.
  35. Discos directed to install AMI meters at government offices by deadline. Energy Update, 2026. accessed 1 October 2026.
  36. Pakistan’s installed PV capacity estimated above 27 GW. pv magazine, 2026. accessed 1 October 2026.
  37. Pakistan BESS imports surge 220% to 4.6 GWh in 2025. TaiyangNews (Renewables First data), 2026. accessed 1 October 2026.
  38. Pakistan plans up to 70,720MW power expansion by 2035 amid demand risks. The News International, 2026. accessed 1 October 2026.
  39. IGCEP 2025-35 and the renewable energy targets. Dawn, 2025. accessed 1 October 2026.
  40. Press release: NEPRA approves Grid Code 2023 and grants system operator licence. National Electric Power Regulatory Authority, 2023. accessed 1 October 2026.
  41. Check list for enlistment of installer with PPIB under AEDB (Certification) Regulations, 2021. Private Power and Infrastructure Board. accessed 1 October 2026.
  42. Number of cellular subscribers reaches 197 miln. Associated Press of Pakistan (PTA data), 2025. accessed 1 October 2026.
  43. Pakistan sells 480MHz for $507 million in 5G spectrum auction. Arab News Pakistan, 2026. accessed 1 October 2026.
  44. Free solar panel scheme to be extended. Associated Press of Pakistan, 2026. accessed 1 October 2026.
  45. Pakistan to get Advanced Metering Infrastructure in five Discos. Business Recorder, 2026. accessed 1 October 2026.
  46. Frequently Asked Questions (new connections, billing). Islamabad Electric Supply Company. accessed 1 October 2026.
  47. Govt slashes GST on imported solar panel parts. Zameen News, 2025. accessed 1 October 2026.

Questions about energy in Pakistan.

Talk to us about Olmack in Pakistan.Tell us about your home, housing portfolio or school estate in Pakistan. We'll explain what is possible there now.