How electricity works in United States Virgin Islands.
US Virgin Islands electricity 2026: WAPA, PSC-set rates and the LEAC fuel charge, net energy billing at 75% of LEAC, rooftop solar, home batteries and VPP pilot.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in US dollar (USD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
United States Virgin Islands energy at a glance.
Key figures for households in United States Virgin Islands. Each one links to its source on the full overview below.
Electricity price.
0.332 USD per kWh for households, including taxes. Figures for 2024.
Household use.
6,026 kWh a year for a typical household. Figures for 2024.
Renewable share.
2.7% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in United States Virgin Islands.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for United States Virgin Islands below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications United States Virgin Islands requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in United States Virgin Islands.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in United States Virgin Islands, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in United States Virgin Islands, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in United States Virgin Islands.
The energy market in United States Virgin Islands, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
The US Virgin Islands (USVI), a US territory east of Puerto Rico, gets its electricity from a single public utility, the Virgin Islands Water and Power Authority (WAPA, also written VIWAPA). WAPA is an autonomous agency of the territorial government that generates, distributes and sells electricity and also supplies drinking water. It runs two separate island grids that are not connected to each other or to any neighbour: one serves St. Croix, and the other serves St. Thomas plus St. John and Water Island, which are linked to St. Thomas by undersea cables. The Virgin Islands Public Services Commission (PSC) sets WAPA’s rates.
Almost all electricity is made from imported fuel. According to EIA, propane produced 60% of WAPA’s electricity in 2025, fuel oil 37% and solar about 2%. Households pay some of the highest prices in the United States: the EIA average was 33.2 US cents per kWh in 2024, and the US Department of Energy puts the 2025 average at about 42 cents. About two-thirds of the price is a fuel surcharge, the Levelized Energy Adjustment Clause (LEAC), which the PSC resets regularly. In October 2026 WAPA asked the PSC for an emergency increase of 3 cents per kWh because fuel costs had risen.
Many households have their own solar panels, and most new systems come with batteries. EIA counts about 31 MW of customer-installed solar and 53 MW of batteries connected to it. The original net metering scheme filled its 15 MW cap in 2017. New systems now join Net Energy Billing, under which exported electricity earns a credit worth 75% of the LEAC. Since 2024 WAPA has connected two large solar farms on St. Croix. In 2026 the Virgin Islands Energy Office started paying owners of home Tesla Powerwalls to discharge them to the grid as a virtual power plant.
Energy snapshot.
Headline figures for electricity in United States Virgin Islands. Each shows its data year and links to its source.
- Population87,146 peopleSource 51 April 2020 (census)
- Households39,642 householdsSource 52020
- Average household size2.14 people/householdSource 52020
- Electricity use per household6,026 kWh/yrSource 42024
- Household price (USD)0.332 USD/kWhSource 42024
- Household price (EUR)0.296 EUR/kWhSource 92024
- Renewable electricity share2.7%Source 22024
- Solar capacity0.077 GWSource 12025–2026
- Wind capacity0 GWSource 32024
- Energy storage capacity0.062 GWSource 12023–2026
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Virgin Islands Public Services Commission (PSC)
- System operator
- Virgin Islands Water and Power Authority (WAPA), which runs separate systems for St. Croix and for St. Thomas–St. John–Water Island
- Distribution networks
- WAPA owns and operates all distribution in both island districts; no other distribution companies
- Currency
- US dollar (USD)
- Voltage and frequency
- 120/240 V / 60 Hz
Electricity prices in United States Virgin Islands.
- Household price (USD)
- 0.332 USD/kWh (2024)Source 4EIA average residential revenue per kWh (USD 88.6 million ÷ 267,063 MWh), including the LEAC fuel charge. The US Department of Energy gives a 2025 residential average of about USD 0.42/kWh. The LEAC alone was 22.22¢/kWh in July–September 2026, and WAPA has asked to raise it to 25.22¢ for October–December 2026.
- Household price (EUR)
- 0.296 EUR/kWh (2024)Source 9Converted from USD 0.3318/kWh at the ECB reference rate of USD 1.1206 per euro on 9 October 2026.
- Typical annual electricity bill
- 2,000 USD/yr (2024)Source 4Derived: residential revenue of USD 88,624,400 divided by 44,319 residential customers (EIA Table 12.8), about USD 167 a month.
Household price trend (USD per kWh).Source 4
| 2014 | 0.4932 USD/kWh |
|---|---|
| 2015 | 0.4277 USD/kWh |
| 2016 | 0.3429 USD/kWh |
| 2017 | 0.4135 USD/kWh |
| 2018 | 0.3457 USD/kWh |
| 2019 | 0.3875 USD/kWh |
| 2020 | 0.3435 USD/kWh |
| 2021 | 0.3375 USD/kWh |
| 2022 | 0.3369 USD/kWh |
| 2023 | 0.3317 USD/kWh |
| 2024 | 0.3318 USD/kWh |
How rates are set
WAPA does not set its own prices. The PSC, which also regulates water, telephone, cable TV and ferry companies, approves base rates and the LEAC on application by WAPA. Base rates cover WAPA’s non-fuel costs. The LEAC passes through the cost of fuel and is reset every quarter. The PSC handles LEAC matters in docket 702 and WAPA’s deferred fuel balance in docket 703. Its orders 9-2025 and 19-2025 dealt with the LEAC.
What drives the price
WAPA burns propane and diesel (No. 2 oil), shipped directly to its two power plants. Propane is much cheaper: WAPA’s 2026 filing assumes delivered prices of USD 1.30 a gallon for propane and USD 4.61 for diesel, which has risen 25% since the previous quarter. WAPA therefore runs the units that can burn propane first. In the October 2026 filing the fuel component alone is 27.91¢/kWh, and WAPA is absorbing 4.56¢/kWh of costs to hold the charge down. The filing assumes line losses of 9.2% and power-plant own use of 6.5%.
Comparison and trends
The EIA residential average has fallen from 49.3¢/kWh in 2014 to about 33–34¢ since 2020, as propane replaced oil. It is still about double the US residential average of 16¢. NREL notes that WAPA has severe financial problems, including unpaid bills from large customers, tariffs that do not cover operating costs and customers leaving the grid for their own solar systems. The price of electricity is therefore driven both by fuel costs and by how much of its costs WAPA is allowed to recover.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | A single PSC-approved residential rate with two energy blocks: the first 250 kWh a month is cheaper than additional use. WAPA’s published all-in rates from 1 February 2020 were 40.03¢/kWh for the first 250 kWh and 42.65¢ above that (commercial 46.54¢). NREL quotes 40.85¢ and 43.47¢ in August 2023. The bill is made up of the base rate, a payment-in-lieu-of-taxes (PILOT) surcharge, a self-insurance surcharge, a surcharge for retiree benefits (OPEB) and the LEAC fuel charge. |
| Variable | Yes | The LEAC passes fuel costs through to customers, together with PSC regulatory costs, purchases of renewable power and the cost of ultra-pure water. The PSC sets it every quarter. For July–September 2026 it was 22.22¢/kWh, after WAPA absorbed 3.66¢ of cost. On 5 October 2026 WAPA filed an emergency request to raise it by 3¢ to 25.22¢ for October–December 2026, which would add about USD 12 a month to a 400 kWh bill. The PSC may approve, change or reject the request. |
| Time-of-use | No | WAPA publishes no time-of-use tariff for households. |
| Dynamic | No | There is no wholesale market and no tariff that follows market prices. |
| Other | Yes | Net Energy Billing for customers with solar: electricity exported to the grid earns a credit worth 75% of the current LEAC. The credit reduces the next bill and resets to zero at the end of each month. |
Household prices compared with neighbouring countries (EUR per kWh).
- Saint Kitts and Nevis€0.513
- United States Virgin Islands€0.296
- Puerto Rico€0.226
- United States€0.161
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 6,026 kWh/yr (2024)Source 4Derived: residential sales of 267,063 MWh divided by 44,319 residential customers (EIA Electric Power Annual, Table 12.8). Electricity from rooftop solar used on site is not included. WAPA’s October 2026 fuel-charge filing uses 400 kWh a month (4,800 kWh a year) as a typical residential bill.
- Average daily use per household
- 16.5 kWh/day (2024)Source 4Derived from 6,026 kWh a year per residential customer, grid supply only.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 7,172 kWh/person/yr (retail sales, all sectors) (2024 sales / 2020 population)Source 4Derived: 625,026 MWh of retail sales in 2024 divided by the 2020 census population of 87,146. The years are mixed because no official population estimate for 2024 was found. EIA reports that households used about 43% of electricity, industry 34% and commercial customers 24%.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 227 registered electric vehicles (April 2023)Source 29Bureau of Motor Vehicles data supplied by the Energy Office: 227 electric vehicles out of 70,564 registered vehicles, less than 0.5%.
- Electric cooking
- Not identified from a reliable public source.
Households used 267 GWh of grid electricity in 2024, 43% of WAPA’s sales, about 6,000 kWh per residential account. With no heating load, demand is driven by air conditioning, refrigeration and water heating, and it is high in all seasons because temperatures barely change through the year. Electricity is also used to make drinking water: WAPA’s potable water comes from seawater reverse-osmosis plants inside both power stations.
The residential average hides wide differences. NREL notes that many households with rooftop solar and batteries hardly draw on the grid and keep their connection mainly as backup. Grid sales therefore understate how much electricity homes use. Residential sales have risen every year since 2018, from 191 GWh to 267 GWh in 2024, as the number of homes recovered after the 2017 hurricanes.
NREL estimated in 2024 that the average household spent about 4.5% of median income on electricity in 2019, more than twice the US average of 2.1%. Median household income in the territory is about two-thirds of the US figure.
Housing and households.
- Dwellings
- 57,257 dwellings (2020)Source 630.8% of dwellings (17,615) were vacant on census day, including 3,916 used seasonally or for recreation.
- Owner-occupied
- 47.8 % of occupied homes (2020)Source 6
- Private rented
- 52.2 % of occupied homes (2020)Source 6All renter-occupied homes. The census profile does not separate public housing from private rentals.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 49.1 % of dwellings (2020)Source 6Derived: one-unit detached (41.0%) plus one-unit attached (8.1%). Mobile homes are a further 0.9%.
- Apartments and flats
- 49.6 % of dwellings (2020)Source 6Derived: buildings with 2 units (14.3%), 3–4 (13.6%), 5–9 (10.3%), 10–19 (6.5%) and 20 or more (4.9%).
- Urban population
- 95.4 % of population (2025)Source 8
Housing is split almost evenly between single-family houses and small multi-unit buildings, mainly duplexes and buildings with 3 to 9 units. Only 4.9% of homes are in buildings with 20 or more units. Just over half of occupied homes are rented. These figures matter for rooftop solar: WAPA’s Net Energy Billing agreement is written for customers who own both the home and the solar system, and the application must include the deed.
Almost a third of dwellings were empty on census day in 2020. Some are holiday homes, and some were still damaged from Hurricanes Irma and Maria in 2017. The population fell by 18% between 2010 and 2020.
How the grid works in United States Virgin Islands.
- TransmissionVirgin Islands Water and Power Authority (WAPA)
- DistributionWAPA owns and operates all distribution in both island districts; no other distribution companies
- MeteringWAPA
- Supply1 or more retail suppliers
Physical system
The USVI has two power systems. St. Croix, about 40 miles to the south, is served from the Richmond plant: three combustion turbines (units 17, 19 and 20) and a bank of 18 rented 1.1 MW Aggreko engines that burn propane. St. Thomas is served from the Randolph E. Harley plant: combustion turbines plus seven Wärtsilä engines installed in 2018 and 2023 that burn mainly propane. A 9 MW, 2-hour battery at the plant provides black start and frequency regulation. St. John and Water Island are fed from St. Thomas through undersea cables, and a backup diesel unit is kept on St. John. Neither system is connected to Puerto Rico or the British Virgin Islands.
Rebuilding after 2017
Hurricanes Irma and Maria destroyed 80–90% of the transmission and distribution system in 2017 (EIA). Since then WAPA has replaced wooden poles with composite poles rated for winds of 200 mph (88% of 7,592 had been installed by September 2023), moved feeders underground and added generators that can burn either propane or diesel. Most of this work is funded by FEMA and HUD. In September 2026 WAPA had completed eight undergrounding projects and three more were under way. The US Department of Energy and its national laboratories are helping WAPA plan how to use more than USD 3 billion of federal funding through a grid modernisation roadmap.
Commercial flow
There is no wholesale market. WAPA buys power under bilateral contracts from independent producers: the solar farms (BMR Energy’s Spanish Town and Donoe plants, and the newer Hogensborg and Petronella farms) and Aggreko’s engines, for which WAPA supplies the fuel. It recovers these costs through its rates and the renewable-energy line of the LEAC. Customers pay WAPA directly.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Regulator | Virgin Islands Public Services Commission (PSC) | Regulates electric, potable water, telephone, cable TV and ferry utilities. It approves WAPA’s base rates, the quarterly LEAC fuel charge and its general terms of service, and certifies qualifying facilities that sell power to WAPA. |
| Ministry | Virgin Islands Energy Office (VIEO) | The territorial government’s energy office. It runs federal energy programmes (weatherisation, revolving loan fund, electric-vehicle rebates) and the VIBES 2.0 virtual power plant pilot. |
| System operator | Virgin Islands Water and Power Authority (WAPA) | Vertically integrated public utility: it owns and dispatches the Randolph E. Harley power plant on St. Thomas (about 167 MW) and the Richmond plant on St. Croix (90.7 MW including 19.8 MW of rented Aggreko engines), and balances each island system itself. |
| DSO | WAPA | Owns the distribution networks. St. Thomas has five substations on a 34 kV loop feeding 15 kV circuits, and St. John and Water Island are connected by undersea cable. St. Croix uses 13.2 kV and 25 kV feeders from two substations linked by a 69 kV underground line. |
| Supplier | WAPA | The only retail supplier, serving about 54,500 electricity customers (2024), 44,319 of them residential. |
| Metering | WAPA | Installs and reads all meters, including the two-way meters used for net billing, and is renovating its advanced metering (AMI) system. |
Compared with the UK system.
| UK concept | United States Virgin Islands equivalent | How it works |
|---|---|---|
| DNO | WAPA | There is one network operator for the whole territory. WAPA owns and runs the distribution systems on St. Croix and on St. Thomas–St. John–Water Island, as well as the power plants. |
| National Grid/NESO | WAPA control rooms at the Harley and Richmond plants | There is no separate transmission or system operator. Each island grid is a small isolated system: peak demand was about 60 MW on St. Thomas and 45 MW on St. Croix in 2023. WAPA balances it from its own central power plant, and the two systems are not connected. |
| MPAN | WAPA account number and meter number | There is no national supply-point register or standard identifier. WAPA identifies a connection by the customer’s account number, which appears on bills and is used for online payment and the net billing application, and by the meter number at the premises. |
| MPRN | None | There is no gas supply point identifier. The territory produces no natural gas, and the propane WAPA burns is shipped to its plants and stored on site. |
| Meter operator | WAPA | WAPA owns, installs and reads meters and reprograms or replaces them when a customer joins Net Energy Billing. Customers provide the meter base to WAPA’s permanent meter base requirements. |
| Supplier | WAPA (no choice) | There is no retail competition. Every grid customer buys from WAPA at PSC-approved rates, and a third party may lease a solar system to a homeowner but may not sell electricity to them. |
| Smart-meter infrastructure | WAPA AMI system | Unlike the UK’s national DCC network, metering communications are run by WAPA. WAPA says it will use its AMI renovation to confirm the size of customers’ solar systems. No coverage figures are published. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | WAPA account number (with the meter number) (Account No.) |
| Who issues it? | Virgin Islands Water and Power Authority (WAPA) |
| Format | Not published. WAPA does not publish the structure of its account or meter numbers. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the WAPA bill, and in the Click2Gov online account used to pay bills. The meter number is printed on the meter at the premises. |
| Electronic access | Customers can view and pay bills online through WAPA’s Click2Gov portal. Net Energy Billing applications are filed through the government’s MyGov portal or by email to WAPA, quoting the account number. |
| Third-party access | No public data-access or data-sharing framework exists. Solar installers apply on the customer’s behalf using a copy of the WAPA bill. The Energy Office’s virtual power plant reads battery data through Tesla’s systems, not WAPA’s meters. |
| Who keeps the register | WAPA customer information and billing system |
| Register scope | National |
There is no territory-wide supply-point identifier like the UK MPAN. Each connection is a WAPA account in WAPA’s own billing system, the only one in the territory. The account number identifies the customer relationship and the meter number identifies the physical connection. WAPA does not publish the format of either, so no example is given here.
Opening an account is tied to the premises and to the person. For permanent residential service WAPA asks for proof of ownership or tenancy (deed or lease, plus a landlord verification form for tenants), government photo ID, the name of the previous occupant or the meter number, and an electric line right of easement. The physical address must be clearly marked. A load requirement form signed by a licensed electrician is needed for homes over 25 kW. For a first connection or after major building work, the Department of Planning and Natural Resources (DPNR) must also issue a Certificate of Final Electrical Inspection. Fees are USD 30 for single-phase or USD 83 for three-phase service, plus a minimum refundable deposit of USD 111. Service is normally connected 3–5 business days after all documents are received.
The meter stays with the building, but the account and its contracts do not. WAPA states that when a home is sold or an account is closed, any net metering agreement expires and the new owner must apply for Net Energy Billing and sign a new interconnection agreement. The new occupant opens a new account using the previous occupant’s name or the meter number.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Net Energy Billing: exports are credited at 75% of the current LEAC fuel charge (about USD 0.165/kWh in June 2025). The credit is used against the next bill and resets to zero each month. Fixed charges cannot be offset. Legacy residential net metering customers with systems of 10 kW AC or less keep full retail credit. |
| Is net metering still available? | Only for legacy customers. Net metering under Act 7075 (2009) reached its 15 MW cap in June 2017 and closed to new applicants. Under 12 V.I.C. § 1149, legacy systems above 10 kW AC were moved to Net Energy Billing on 1 January 2026. Residential systems of 10 kW AC or less stay on net metering until the home is sold or the account closes. Their credits reset each year on 31 December. |
| Is there a system size limit? | There is no fixed cap for Net Energy Billing, but the AC rating (DC nameplate × 0.8) may not exceed 100% of the customer’s service rating unless the customer pays for upgrades. Systems over 15 kW DC need a hosting capacity study and over 250 kW DC a feasibility study. The old net metering scheme was limited to 20 kW for homes and 100 kW for businesses. |
| Which technical standards apply? | Inverters must be listed to UL 1741 SA and modules to UL 1703. Systems must follow IEEE 1547-2017 and IEEE 1547.1, the adopted National Electrical Code and local building codes, and batteries must follow NFPA 855. An accessible external disconnect is required, and the system must disconnect within 0.16 s when the grid fails, with no intentional islanding. |
| Can I opt out of Net Energy Billing? | No. WAPA says Net Energy Billing is the only programme that allows a grid connection. A system that does not export can still be installed but must be designed not to send power to the grid. |
| Can WAPA disconnect my system? | Yes, during system emergencies or maintenance, if hazards exist or if the system harms other customers. WAPA must notify the customer and reconnect once conditions return to normal. |
| How long does the agreement last? | Five years from the first bill with exports, renewing automatically for further five-year terms unless either side gives 60 days’ notice. It ends if the customer closes the account. |
Connecting a home system.
- Installer or homeowner prepares stamped engineering drawings with a single-line diagram and applies to DPNR for an electrical permit.
- Submit the Net Energy Billing application and Interconnection Application and Compliance Form to WAPA (by email or MyGov) with the WAPA bill, deed, application fee receipt, DPNR permit receipt, equipment data sheets and photographs of the meter, main breaker, roof and battery location.
- WAPA reviews the design. Systems over 15 kW DC need a grid hosting capacity study, and systems over 250 kW DC also need an interconnection feasibility study. WAPA may allow only a non-export system where the local transformer cannot take more exports.
- A Virgin Islands licensed contractor and licensed electrician install the system, and DPNR inspects it and issues the final electrical certificate.
- Submit the final certificate plus photographs of the red safety placard and the green-painted service weather head. WAPA may inspect and approve within 30 working days.
- WAPA reprograms or replaces the meter with a two-way meter and starts net billing. The one-time interconnection fee is USD 250.
Households can export, but exports are worth less than electricity bought from the grid. Under Net Energy Billing each exported kWh earns 75% of the LEAC, the fuel part of the price, which is roughly 16–19¢ at 2025–2026 levels. Electricity bought from WAPA costs about twice that once base rates and surcharges are added. As a result, most new systems are sized to cover the home’s own use and include a battery: WAPA’s FAQ says 99% of Net Energy Billing systems include storage. NREL describes many solar homes as largely “load-defected”, using WAPA mainly as backup.
The original net metering scheme under Act 7075 paid full retail credit but closed in 2017 once it reached its 15 MW cap. A temporary Net Energy Billing scheme, agreed by the government, WAPA, the Energy Office and the PSC, was introduced in late 2021. Under 12 V.I.C. § 1149, legacy net metering ended for systems over 10 kW AC on 1 January 2026, and smaller residential systems keep full retail credit for as long as the home and account stay the same.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for own use (rooftop solar) | No generation licence. Needs a DPNR electrical permit and final electrical certificate, and installation by a Virgin Islands licensed contractor and licensed electrician. Parallel operation needs WAPA’s interconnection approval. | DPNR; WAPA | Systems that do not export are still subject to WAPA’s interconnection requirements and DPNR permits. |
| Export electricity to the grid | Net Energy Billing agreement and Interconnection Agreement with WAPA. The applicant must own the home and the system. Systems over 15 kW DC need a hosting capacity analysis, and over 250 kW DC a feasibility study. | WAPA (credit rate tied to the PSC-approved LEAC) | One-time fee of USD 250; five-year renewable term. |
| Store electricity (home battery) | No licence. Batteries are declared in the interconnection form and must meet NFPA 855, with DPNR permitting and inspection. Battery locations must be shown in the application. | DPNR; WAPA | New structures built to house equipment have separate DPNR permit requirements. |
| Sell electricity to WAPA as an independent producer | Bilateral power purchase agreement with WAPA. The PSC requires qualifying facilities (QF) to submit information for certification. | WAPA; PSC | Existing producers include BMR Energy (solar) and Aggreko (rented engines). The PSC’s QF information requirements date from 2012. |
| Supply / sell electricity to consumers | Not open to competitors: WAPA is the only retail supplier. A third party may lease or maintain a customer’s system but not sell electricity to the customer. | PSC; WAPA | Definition in WAPA’s interconnection requirements for customer-owned renewable generation. |
| Aggregate / virtual power plant | No licensing framework. The only aggregation is the VIBES 2.0 pilot run by the Energy Office with WAPA, using Tesla as the platform. It is open only to Net Energy Billing or net metering customers with Tesla Powerwalls. | VIEO; WAPA | Initial three-year pilot. |
| Wholesale trading, balancing and grid services | There is no wholesale, balancing or ancillary services market. WAPA provides all balancing and reserves itself. | WAPA | Frequency regulation comes from WAPA’s 9 MW battery and its generators. |
| Remote control of customer assets | Only by contract within the VIBES 2.0 pilot. Tesla dispatches enrolled Powerwalls during events, and owners can opt out or change their backup reserve in the Tesla app. | VIEO (programme terms) | WAPA can also refuse exports or disconnect a system in emergencies under its interconnection terms. |
The USVI has no licensing regime for small energy activities because the sector is a single public utility. What applies instead is building and electrical permitting by DPNR, contractor and electrician licensing, WAPA’s interconnection contract and PSC rate regulation. Large generators reach the market only by signing a contract with WAPA, which then counts the cost in its rates and the LEAC.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| VIBES 2.0 virtual power plant pilot | Developing | One Tesla Powerwall | Yes | Virgin Islands Energy Office with WAPA; Tesla platform. Enrolled Powerwalls are discharged together during grid events. In the first test (reported on 24 August 2026) about 1.5 MW came from 120 sites across all three islands for 30 minutes. Two later tests delivered 2.5 MWh: about 800 kW from 190 batteries on St. Thomas–St. John and 500 kW from 108 batteries on St. Croix. In 2026 owners receive USD 1,000 per Powerwall, up to USD 4,000, and about USD 244,000 had been paid or was being processed by mid-September 2026. |
| Wholesale energy, balancing and ancillary services | No | — | No | WAPA. No market exists. WAPA dispatches its own plants, the contracted producers and its utility battery. |
Flexibility is at the pilot stage. The VIBES 2.0 tests in August and September 2026 showed that hundreds of home batteries could reduce the load on the Harley and Richmond plants on command. There is no tariff or market that pays for flexibility outside the pilot, and only Tesla Powerwalls can take part at launch. Because each island grid peaks at only 45–60 MW, a few MW of coordinated home batteries can make a noticeable difference.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| VIBES-2.0-VPP | Energy Office pilot for Tesla Powerwall owners enrolled in Net Energy Billing or net metering. It runs for an initial three years, and the Energy Office estimates the territory’s potential at 20 MWh. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | WAPA-owned AMI; renovation under way, no coverage figure published |
| Reading interval | Not published |
| Meter owner | WAPA |
| Net billing meter | Two-way meter installed or reprogrammed by WAPA after final inspection |
| Data hub | None; data held in WAPA’s billing system |
| Customer portal | Click2Gov online account (billing and payment) |
Metering is entirely WAPA’s responsibility. WAPA’s 2025 net metering FAQ says its AMI renovation will be used to check the size of customers’ solar systems, which shows that interval data is being used for net billing. WAPA has not published the number of advanced meters, the reading interval or any customer access to interval data.
Renewable electricity.
Electricity generation mix (2025).
- Propane (LPG): 60%
- Fuel oil: 37%
- Solar: 2%
- Renewable electricity share
- 2.7% (2024)Source 2EIA International Energy Statistics: 0.018 TWh of solar out of 0.678 TWh generated (rounded territory estimates). EIA’s territory profile puts solar at about 2% of WAPA’s generation in 2025. Electricity from rooftop solar used on site is not counted. The USVI has no electricity imports, so the shares of generation and consumption are the same.
- Home solar
- 31 MW (all customer-installed systems) (2026)Source 1EIA does not separate homes from businesses.
- Solar added each year
- Not identified from a reliable public source.
- Utility-scale solar (Hogensborg, Petronella, Donoe, Spanish Town)
- 45.6 MW (2025)Source 1Derived: 22 + 13 + 6.4 MW (EIA) + 4.2 MW AC Spanish Town (NREL).
- Customer-installed solar
- 31 MW (2026)Source 1
- Wind
- 0.1 MW (2024)Source 3
- Fossil-fuelled generation
- 316 MW (2024)Source 3Out of 346.1 MW of total capacity.
Targets.
- Act 7075 (2009): renewables to supply 30% of WAPA’s peak generating capacity by 2025 (not met) and 50% by 2044.
- VI-100 study: the Energy Office is analysing routes to 100% renewable energy, funded by a DOE grant; no legal target has been set.
Renewables still supply only a few per cent of WAPA’s output, but capacity has grown quickly since 2024. Two large solar farms on St. Croix, Petronella and Hogensborg, are expected to produce 4,889 MWh and 4,447 MWh in October–December 2026, and solar is forecast to cover about 18% of St. Croix sales in that quarter. On St. Thomas the rebuilt Donoe farm is the only utility solar plant, and the Fortuna I and II solar projects are in development.
Many more projects are planned. In 2024 NREL listed solar-plus-storage contracts with VI Electron of about 115 MW AC on the two systems, wind farms by Advance Power of 16.5 MW (Bovoni, St. Thomas) and 29.7 MW (St. Croix), and FEMA-funded microgrids on St. John and at Adventure on St. Croix. Together these would give renewable capacity of 175% of peak demand on St. Thomas and 194% on St. Croix. EIA notes that WAPA approved the wind contracts in 2023 but that no utility-scale wind had been built when it last updated its profile in May 2026.
Rooftop solar, about 31 MW, is the largest renewable resource. It is mostly behind the meter and so does not appear in WAPA’s generation statistics.
Energy storage.
- Home batteries
- 53 MW (2026)Source 1Battery capacity connected to small-scale solar systems (homes and businesses).
- Grid-scale storage
- 9 MW (2-hour) (2023)Source 29Battery at the Randolph E. Harley plant on St. Thomas, funded by HUD disaster recovery grants, used for black start and frequency regulation.
Batteries are common in USVI homes because outages and hurricanes make backup power valuable and because Net Energy Billing pays less for exports. According to WAPA, 99% of Net Energy Billing systems include storage, and EIA counts 53 MW of customer batteries, almost as much as peak demand on St. Croix. Battery installations must meet NFPA 855 and are declared in the interconnection application.
Storage projects.
- Harley plant battery (St. Thomas): 9 MW, 2-hour battery installed in 2023; WAPA forecasts 940 MWh of output from it in October–December 2026.
- Planned solar-plus-storage and microgrids: NREL’s 2024 list includes 64.4 MWh at West End (St. Thomas), 18.4 MWh each at Coral Bay (St. John) and Centerline Road (St. Croix), 30 MWh with the Bovoni wind farm, and FEMA microgrid batteries of 8 MWh (St. John) and 20 MWh (Adventure, St. Croix).
- VIBES 2.0 virtual power plant: Aggregated residential Powerwalls, dispatched for the first time in 2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Virgin Islands Water and Power Authority (WAPA) | 100% (sole utility; 54,520 customers in 2024) | No | No | No | Yes |
There is no supplier choice. WAPA has also supplied drinking water since it was created in 1964, and the two services share offices, billing and governance. A nine-member governing board oversees it.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Virgin Islands Public Services Commission | Regulator | Utility regulator | Approves WAPA base rates, the quarterly LEAC fuel charge and terms of service. |
| Virgin Islands Energy Office | Government | Territorial energy office | Runs efficiency, weatherisation, e-mobility and virtual power plant programmes and the VI-100 study. |
| Virgin Islands Water and Power Authority | Distribution | Sole electric utility | Generation, networks, metering, supply and the Net Energy Billing programme. |
| Department of Planning and Natural Resources | Government | Building and electrical permits | Issues electrical permits and the final electrical certificate WAPA needs before net billing starts. |
| US Department of Energy, Office of Electricity | Government | Federal grid support | Leads the USVI grid modernisation roadmap with the national laboratories and manages grid resilience grants. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Inverters | UL 1741 SA | UL | Required for all grid-connected inverters in WAPA’s interconnection requirements. |
| Grid connection | IEEE 1547-2017 and IEEE 1547.1-2017 | IEEE | Interconnection and conformance testing. The system must stop energising within 0.16 s on loss of grid voltage, with no intentional islanding. |
| PV modules | UL 1703 | UL | Modules must be listed by a nationally recognised testing laboratory. |
| Electrical installation | National Electrical Code (as adopted) and local building codes | NFPA / DPNR | Enforced through DPNR permits and final inspection. |
| Battery storage / fire | NFPA 855 | NFPA | Required for all storage installations. A red safety placard at the meter, an accessible disconnect and a green-painted service weather head are also required. |
| Installer accreditation | Virgin Islands contractor licence and licensed electrician | Government of the Virgin Islands | Both licence numbers must be entered on WAPA’s interconnection form. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Electrical permit and final inspection | Yes | National | DPNR permit before installation; WAPA will not start net billing until it receives the final electrical certificate. |
| Utility interconnection approval | Yes | National | WAPA must approve before the system runs in parallel with the grid. It may inspect within 30 working days and may require non-export operation. |
| Grid studies | Limited | National | Hosting capacity analysis above 15 kW DC; feasibility study above 250 kW DC. |
| Building permit for new structures | Limited | National | Needed if new structures are built for the equipment, such as carports or battery enclosures. |
The territory has a single level of government for permits, so there is no separate municipal planning layer. DPNR handles building and electrical permits, and WAPA handles grid approval.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net Energy Billing | Active | Net billing | Exports credited at 75% of the current LEAC, with the credit reset monthly; one-time fee of USD 250. | — |
| Net metering (Act 7075 legacy) | Closed | Net metering | Closed to new applicants in June 2017. Residential systems of 10 kW AC or less keep full retail credit. Larger systems moved to Net Energy Billing on 1 January 2026. | 2009 – 2017 (new enrolments) |
| VIBES 2.0 virtual power plant incentive | Active | Enrolment payment | USD 1,000 per eligible Tesla Powerwall, up to USD 4,000 per household in the 2026 launch year, plus payments linked to participation. | 2026 – (three-year pilot) |
| Weatherization Assistance Program | Active | Grant (efficiency measures) | For households below 200% of the federal poverty level: efficient lighting, air-conditioner, refrigerator and water heater replacements and similar measures, worth up to about USD 9,000. | — |
| Energy efficiency revolving loan fund | Active | Interest-rate buy-down | USD 576,170 of DOE funding to buy down interest rates on efficiency loans to low-income homeowners through community lenders. | — |
| Federal Residential Clean Energy Credit (25D) | Closed | Tax credit | 30% credit for solar, wind and batteries of 3 kWh or more; not available for property placed in service after 31 December 2025. | — |
| Solar for All (EPA) | Closed | Grant | The Energy Office still describes a Virgin Islands Solar for All programme, but EPA announced on 7 August 2025 that it would no longer run Solar for All after Congress repealed its funding. | — |
Data and connectivity.
- Fixed broadband
- 79.2 % of households with a broadband subscription (2020)Source 691.1% of households had a computer.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Most homes have broadband, which the internet-connected battery virtual power plant relies on: Tesla dispatches the batteries over the owners’ internet connections, not through WAPA’s meters. The PSC also regulates telephone and cable TV companies.
Grid conditions.
- National peak demand
- 0.105 GW (2023)Source 29Sum of the two separate systems’ peaks reported by plant operators in July 2023: about 60 MW on St. Thomas and 45 MW on St. Croix. The peaks do not occur at the same moment. Feeder data for 2022 showed 57.0 MW and 39.4 MW.
- Annual electricity demand
- 0.625 TWh (2024)Source 4Retail sales (625,026 MWh). EIA International Energy Statistics give 0.678 TWh of generation and 0.050 TWh of losses.
- Generation capacity
- 0.346 GW (2024)Source 3
- Interconnection
- 0 GW (2024)Source 2No connections to other countries or territories, and none between St. Croix and St. Thomas. St. John and Water Island are connected to St. Thomas by undersea cables.
- Curtailment
- Not identified from a reliable public source.
Each island system is small, with installed capacity far above peak demand because old units are derated and backup is needed. Reliability is the main concern. Supplies of propane were interrupted in 2018 and 2022 over unpaid bills, and in 2023 the government bought out Vitol’s propane infrastructure and supply contract using USD 145 million of HUD funds. Planned renewable capacity is large compared with demand, and NREL warns that integrating it will need careful technical work by a small utility staff.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Legacy net metering ends for systems above 10 kW AC | Current | 1 January 2026 | Under 12 V.I.C. § 1149, larger legacy systems moved to Net Energy Billing (75% of LEAC). Residential systems of 10 kW AC or less remain on net metering. |
| Emergency LEAC increase request | Upcoming | Filed 5 October 2026; PSC decision pending | WAPA asked the PSC to raise the fuel charge by 3¢/kWh, from 22.22¢ to 25.22¢, for October–December 2026 because diesel prices rose. |
| VIBES 2.0 virtual power plant tests | Current | August–September 2026 | First aggregated dispatches of home batteries; incentives of up to USD 4,000 per household in 2026. |
| Utility-scale wind, solar-plus-storage and microgrids | Upcoming | Not scheduled | Wind contracts approved in 2023 (up to 35 MW on St. Croix and 20 MW on St. Thomas), the Fortuna I and II solar projects on St. Thomas, and FEMA-funded microgrids are in development. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | High | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | About 31 MW of customer-installed solar (EIA), equal to roughly 30% of the combined peak demand of the two systems; the 15 MW net metering cap was filled by 2017. |
| Distributed energy market | High | 53 MW of customer batteries alongside 31 MW of rooftop solar (EIA); 99% of Net Energy Billing systems include storage (WAPA). |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market; the only route is the VIBES 2.0 pilot, which dispatched about 1.3–1.5 MW in its 2026 tests. |
| Energy storage adoption | High | Customer batteries (53 MW) exceed St. Croix’s peak demand of about 45 MW; WAPA also runs a 9 MW utility battery. |
| Renewable growth environment | Medium | Renewables supplied about 2–3% of generation in 2024–2025, but 35 MW of new utility solar was connected in 2024–2025 and large wind and solar-plus-storage contracts are in development. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 31 sources
- U.S. Virgin Islands territory energy profile: overview (last updated 21 May 2026). US Energy Information Administration, 2026. accessed 9 October 2026.
- International Energy Statistics: U.S. Virgin Islands electricity generation, consumption and trade (API query). US Energy Information Administration, 2024. accessed 9 October 2026.
- International Energy Statistics: U.S. Virgin Islands electricity capacity by source (API query). US Energy Information Administration, 2024. accessed 9 October 2026.
- Electric Power Annual, Table 12.8 Virgin Islands by sector, 2014 through 2024. US Energy Information Administration, 2025. accessed 9 October 2026.
- 2020 Island Areas Censuses: U.S. Virgin Islands Demographic Profile, DP1 (data.census.gov API). US Census Bureau, 2022. accessed 9 October 2026.
- 2020 Island Areas Censuses: U.S. Virgin Islands Selected Housing Characteristics, DP4 (data.census.gov API). US Census Bureau, 2022. accessed 9 October 2026.
- Population of the United States Virgin Islands: 2010 and 2020 (Table 1). US Census Bureau, 2021. accessed 9 October 2026.
- Urban population (% of total population), Virgin Islands (U.S.) (API). World Bank, 2025. accessed 9 October 2026.
- ECB euro reference exchange rate, US dollar (9 October 2026). European Central Bank, 2026. accessed 9 October 2026.
- Kilowatt per hour rate. Virgin Islands Water and Power Authority, 2020. accessed 9 October 2026.
- Electric rate (rate components as of 1 March 2022). Virgin Islands Water and Power Authority, 2022. accessed 9 October 2026.
- WAPA Electric LEAC Model – Emergency Review, October–December 2026 (preliminary draft, 15 September 2026). Virgin Islands Water and Power Authority, 2026. accessed 9 October 2026.
- WAPA submits emergency fuel-cost adjustment to the PSC (5 October 2026). Virgin Islands Water and Power Authority, 2026. accessed 9 October 2026.
- WAPA moves from response to rebuilding as infrastructure work advances (25 September 2026). Virgin Islands Water and Power Authority, 2026. accessed 9 October 2026.
- Net Energy Billing Program. Virgin Islands Water and Power Authority, 2026. accessed 9 October 2026.
- Sunsetting of the Net Metering Program: FAQs. Virgin Islands Water and Power Authority (VIEnergize), 2025. accessed 9 October 2026.
- Residential Net Energy Billing Program application, Interconnection Agreement and Interconnection Requirements (v.9, 9 April 2025). Virgin Islands Water and Power Authority, 2025. accessed 9 October 2026.
- Requirements for Contract Application: Residential Electric Service – Permanent Power (revised 13 March 2025). Virgin Islands Water and Power Authority, 2025. accessed 9 October 2026.
- Application and Contract for Service (residential). Virgin Islands Water and Power Authority, 2020. accessed 9 October 2026.
- About WAPA. Virgin Islands Water and Power Authority, 2026. accessed 9 October 2026.
- U.S. Virgin Islands Public Services Commission. Virgin Islands Public Services Commission, 2026. accessed 9 October 2026.
- Water & Energy orders (Orders 9-2025, 19-2025 and 20-2025, dockets 702 and 703). Virgin Islands Public Services Commission, 2025. accessed 9 October 2026.
- Virgin Islands Energy Office. Virgin Islands Energy Office, 2026. accessed 9 October 2026.
- VIBES-2.0-VPP Virtual Power Plant Pilot Program. Virgin Islands Energy Office, 2026. accessed 9 October 2026.
- Powerwalls become a power plant: Virgin Islands VPP delivers in initial grid test (24 August 2026). Virgin Islands Energy Office, 2026. accessed 9 October 2026.
- VIEO issues nearly $250K in incentives as VPP grid impact grows (16 September 2026). Virgin Islands Energy Office, 2026. accessed 9 October 2026.
- Weatherization Assistance Program. Virgin Islands Energy Office, 2026. accessed 9 October 2026.
- U.S. Virgin Islands. US Department of Energy, Office of Electricity, 2026. accessed 9 October 2026.
- U.S. Virgin Islands 2023 Energy Baseline Report (NREL/TP-7A40-88770, May 2024). National Renewable Energy Laboratory (hosted by US Department of Energy), 2024. accessed 9 October 2026.
- Residential Clean Energy Credit. Internal Revenue Service, 2026. accessed 9 October 2026.
- Solar for All. US Environmental Protection Agency, 2025. accessed 9 October 2026.
Questions about energy in United States Virgin Islands.
EIA put the average residential price at 33.2 US cents per kWh in 2024, and the US Department of Energy gives about 42 cents for 2025, more than double the US average. Roughly two-thirds of the price is the LEAC fuel charge, which was 22.22¢/kWh in July–September 2026. WAPA has asked the PSC to raise it by 3¢.
The Virgin Islands Water and Power Authority (WAPA) is the only electric utility. It generates, distributes and sells electricity on St. Thomas, St. John, Water Island and St. Croix, and it also supplies drinking water. Its rates are set by the Virgin Islands Public Services Commission.
Yes, through WAPA’s Net Energy Billing programme. Exported electricity earns a bill credit worth 75% of the LEAC fuel charge, and the credit resets each month. You need DPNR permits, a licensed installer, WAPA’s interconnection approval and a two-way meter; the one-time fee is USD 250.
Not for new customers. Net metering under Act 7075 reached its 15 MW cap in 2017. Legacy residential systems of 10 kW AC or less keep full retail credit, and larger legacy systems were moved to Net Energy Billing on 1 January 2026.
There is no standard supply-point number. Each connection is identified by the WAPA account number on the bill and the meter number at the premises, both held in WAPA’s own billing system. The account and any net metering agreement end when the home is sold.
Yes, in a pilot. The Energy Office’s VIBES 2.0 virtual power plant pays Tesla Powerwall owners USD 1,000 per battery (up to USD 4,000) in 2026, and tests in August and September 2026 discharged more than 1 MW from hundreds of home batteries on both island grids.
In 2025, propane generated about 60% of WAPA’s electricity, fuel oil 37% and solar about 2% (EIA). St. Croix and St. Thomas have separate power plants and grids, and there are no connections to other islands apart from undersea cables from St. Thomas to St. John and Water Island.