How electricity works in Puerto Rico.

Puerto Rico electricity 2026: LUMA, Genera and PREPA, PREB rates, net metering, 206,000 rooftop solar systems, home batteries, licensing and reforms.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in US dollar (USD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Puerto Rico energy at a glance.

Key figures for households in Puerto Rico. Each one links to its source on the full overview below.

  • Electricity price.

    0.253 USD per kWh for households, including taxes. Figures for 12 months to July 2026.

  • Household use.

    5,378 kWh a year for a typical household. Figures for 12 months to July 2026.

  • Renewable share.

    6% of electricity from renewable sources. Figures for 2024.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Puerto Rico.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Puerto Rico below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Puerto Rico requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Puerto Rico.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Puerto Rico, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Puerto Rico, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Puerto Rico.

Full overview

The energy market in Puerto Rico, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Puerto Rico, a US territory in the Caribbean, has a single island grid owned by the public utility, the Puerto Rico Electric Power Authority (PREPA). Since June 2021 the private company LUMA Energy has operated the transmission and distribution system and serves all of PREPA’s customers, about 1.39 million of them residential. Since 2023 Genera PR, a subsidiary of New Fortress Energy, has operated PREPA’s oil and gas power plants under a 10-year agreement, while PREPA keeps the hydroelectric plants. Independent producers, including the EcoEléctrica gas plant and the AES coal plant, sell power to PREPA under contracts.

Electricity comes overwhelmingly from imported fossil fuels. EIA estimates that oil produced about half of the electricity generated in 2024, natural gas 27% and coal 16%, with renewables about 6%. Prices follow fuel costs: households paid an average of 25.3 US cents per kWh in the 12 months to July 2026. Reliability is a serious problem. Customers lost an average of 36 hours of power to ordinary outages in 2025, plus 23 hours to major events, and the regulator’s 2026 rate order describes the generation fleet as being in an emergency.

Households have responded by installing solar panels and batteries. By June 2026 LUMA counted 206,007 distributed generation systems with 1,622 MW of capacity, almost all rooftop solar, and by the end of 2025 more than 171,000 homes and businesses had a battery. Net metering under Act 114-2007 is protected by law until a study that cannot start before January 2030. The Puerto Rico Energy Bureau (PREB) approved new base rates in April 2026, and LUMA is replacing the island’s meters with smart meters by 2028 using federal money.

Energy snapshot.

Headline figures for electricity in Puerto Rico. Each shows its data year and links to its source.

  • Population3,184,835 peopleSource 11 July 2025 (estimate)
  • Households1,242,609 householdsSource 22024
  • Average household size2.55 people/householdSource 32024
  • Electricity use per household5,378 kWh/yrSource 912 months to July 2026
  • Household price (USD)0.253 USD/kWhSource 1212 months to July 2026
  • Household price (EUR)0.226 EUR/kWhSource 1912 months to July 2026
  • Renewable electricity share6%Source 182024
  • Solar capacity1.784 GWSource 20mid-2026
  • Wind capacity0.102 GWSource 13July 2026
  • Energy storage capacity2.864 GWh (distributed batteries)Source 16End of 2025
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Single buyer
Homes can export to the grid
Yes
Home equipment in grid services
Developing
Regulator
Puerto Rico Energy Bureau (PREB / Negociado de Energía)
System operator
LUMA Energy, operator of PREPA’s transmission and distribution system, including system operation and dispatch
Distribution networks
One island-wide distribution network, owned by PREPA and operated by LUMA Energy; no other distribution companies
Currency
US dollar (USD)
Voltage and frequency
120/240 V / 60 Hz

Electricity prices in Puerto Rico.

Household price (USD)
0.253 USD/kWh (12 months to July 2026)Source 12EIA average residential revenue per kWh, including the fuel and purchased-power charges. Monthly averages ranged from 23.74¢ (January 2026) to 28.99¢ (June 2026). Calendar 2024 average: 23.67¢.
Household price (EUR)
0.226 EUR/kWh (12 months to July 2026)Source 19Converted from USD 0.2534/kWh at the ECB reference rate of USD 1.1206 per euro on 9 October 2026.
Typical annual electricity bill
1,363 USD/yr (12 months to July 2026)Source 10Derived: residential revenue of USD 1,893 million divided by 1,389,133 residential customers (EIA Tables 8.2 and 8.3), about USD 114 a month.

Household price trend (USD per kWh).Source 14

0.1790.2310.283201412 months to Jul 2026
Puerto Rico household electricity price, USD per kWh
20140.2631 USD/kWh
20150.2031 USD/kWh
20160.1793 USD/kWh
20170.2226 USD/kWh
20180.2073 USD/kWh
20190.2143 USD/kWh
20200.1924 USD/kWh
20210.2116 USD/kWh
20220.2829 USD/kWh
20230.2278 USD/kWh
20240.2367 USD/kWh
12 months to Jul 20260.2534 USD/kWh

How rates are set

PREB, part of the Public Service Regulatory Board, has exclusive authority under Act 57-2014 to approve PREPA’s rates and those of independent power producers. LUMA filed a full rate case on 3 July 2025, on behalf of PREPA, Genera and itself. LUMA asked for an increase in base-rate revenue of about 75%; PREB rejected it and approved a revenue requirement of about USD 1.78 billion a year for FY2026 to FY2028, excluding projects that federal money (mainly FEMA) should pay for. PREB denied all requests for reconsideration on 28 July 2026.

What makes up the price

Base rates cover the costs of running the grid and the plants. Fuel and purchased power are recovered through separate adjustment charges, as are the contribution in lieu of taxes paid to municipalities, public lighting and subsidies required by law. Because of this the price changes month to month with oil and gas prices: the EIA monthly average for households ranged from 23.74¢ to 28.99¢/kWh in the first seven months of 2026. The new FY2027 base energy charge of 8.648¢/kWh is about a third of the 25.3¢ average price.

Changes from July 2026

The April 2026 order replaces the two-block residential tariff (a cheaper first 425 kWh) with a single energy rate from July 2026, and moves more of the cost into the fixed charge, which rises from $4 to $8 and then $16 a month in July 2027. PREB lowers the energy charge by about 3.3¢/kWh in FY2028 to compensate. Low-income tariffs get a fixed discount relative to the general residential rate.

Trends

Prices peaked in 2022, when the residential average reached 28.29¢/kWh as oil prices rose, and fell to 22.78¢ in 2023. Puerto Rico’s average price was the fifth highest among US states and territories in 2024, behind Hawaii, California, Connecticut and Rhode Island.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesGeneral Residential Service (GRS, rate 112). Base rates approved by PREB on 15 April 2026: in FY2026 (to June 2026) a $4 monthly customer charge plus 8.249¢/kWh for the first 425 kWh and 8.869¢ above that; from July 2026 (FY2027) an $8 customer charge and a flat 8.648¢/kWh; from July 2027 (FY2028) a $16 customer charge and 6.275¢/kWh. Fuel, purchased power, subsidies and other costs are added through separate adjustment charges.
OtherYesReduced residential rates: Lifeline Residential Service (LRS) for low-income customers ($5 customer charge and 3.002¢/kWh for the first 425 kWh in FY2027) and RH3 for public housing ($4 and 3.170¢). Residents of homes owned by the Public Housing Administration pay a fixed monthly rate (RFR) of $30–$50 depending on size.
Time-of-useLimitedThere is no general residential time-of-use tariff. LUMA has run a three-period EV time-of-use pilot since 30 April 2024, capped at 500 vehicles or chargers and billed from charger or vehicle data; 98 customers had enrolled by June 2025. Net metering customers cannot currently join it. Time-of-use rates exist for large customers at primary and transmission voltage.
DynamicNoThere is no wholesale market, so no tariff follows market prices.
FixedNoThere is no retail competition and no fixed-price contract. The fuel and purchased-power charges change with fuel and power purchase costs.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
5,378 kWh/yr (12 months to July 2026)Source 9Derived: residential sales of 7,471 GWh divided by an average of 1,389,133 residential customers (EIA Electric Power Monthly Tables 8.1 and 8.3). Consumption from rooftop solar used on site is not included.
Average daily use per household
14.7 kWh/day (12 months to July 2026)Source 9Derived from 5,378 kWh a year per residential customer, grid supply only.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
5,296 kWh/person/yr (retail sales, all sectors) (12 months to July 2026)Source 9Derived: 16,867 GWh of retail sales divided by the 2025 population estimate of 3,184,835. EIA notes that per-capita electricity use is less than half the average of the 50 states. Commercial customers use 47% of electricity, households 44% and industry about 9%.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

A typical Puerto Rican household took about 5,400 kWh a year from the grid in the 12 months to July 2026, around 450 kWh a month. Demand is highest in the hottest months, from June to October: residential sales in July 2026 were 784 GWh, against 462 GWh in February.

Grid sales understate what homes actually use, because the 206,000 rooftop solar systems supply part of their owners’ demand directly. More than 171,000 homes and businesses also have batteries for outages. Residential customer numbers have been stable at around 1.39 million since 2024, while the population has continued to fall slowly.

There is no space heating demand to electrify. Electrification of transport is at an early stage, and LUMA’s planning analysis found most residential transformers would need upgrades to handle widespread home EV charging.

Housing and households.

Dwellings
1,616,963 housing units (2024)Source 5374,354 (23%) were vacant, including seasonal homes.
Owner-occupied
69.3% (2024)Source 4Derived: 861,048 owner-occupied of 1,242,609 occupied homes.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
79.1% (2024)Source 6Derived: 1,089,054 detached and 189,542 attached single-unit homes out of 1,616,963 housing units.
Apartments and flats
20.8% (2024)Source 6Derived: 335,754 units in buildings with two or more homes; 73,764 are in buildings of 50 or more units.
Urban population
91.9% (2020 (census))Source 83,018,908 of 3,285,874 residents lived in Census-defined urban areas.

Most Puerto Ricans live in single-family houses that they own. Two-thirds of all housing units are detached houses and another 12% are attached single-family homes. Apartments account for about a fifth of homes.

With seven in ten households owning their home, the decision to install solar or a battery usually rests with the occupier. Nearly a quarter of housing units were vacant in 2024, including seasonal homes; EIA notes that the population has fallen from a peak of over 3.8 million in 2004.

How the grid works in Puerto Rico.

  1. TransmissionLUMA Energy, Puerto Rico Electric Power Authority (PREPA / AEE)
  2. DistributionOne island-wide distribution network, owned by PREPA and operated by LUMA Energy; no other distribution companies
  3. MeteringLUMA Energy
  4. Supply1 or more retail suppliers

Physical system

The largest power plants, including Costa Sur (766 MW), EcoEléctrica (580 MW) and the AES coal plant at Guayama (454 MW), are in the south, while most people live in the north, so power must cross the mountainous interior on long transmission lines. Utility-scale capacity was 5,925 MW in July 2026, of which 3,668 MW burns oil and 1,399 MW natural gas. Much of it is old and unreliable: forced outages at baseload units reached 30% in June 2025, and PREB found a loss of load expectation of 32.5 days a year, against an industry standard of 0.1 days.

Reliability

Hurricanes Irma and María destroyed much of the network in 2017. The last unplanned island-wide blackout was in April 2025, according to the US Department of Energy. Excluding major events, customers lost an average of 36 hours of power in 2025 and had almost 16 interruptions; major events added 23 hours. LUMA has to shed load when generation cannot meet demand.

Commercial flow

PREPA is the single buyer: it pays Genera to run its own plants and buys power under contracts from EcoEléctrica, AES and renewable producers such as the Santa Isabel wind farm. LUMA bills every customer on PREPA’s behalf. There is no wholesale market or retail competition. In March 2025 PREB told PREPA to ask the Public-Private Partnerships Authority to run competitive procurement of new generation.

Who does what.

Who does what.
RoleOrganisationWhat it does
RegulatorPuerto Rico Energy Bureau (PREB / Negociado de Energía de Puerto Rico)Part of the Public Service Regulatory Board. Approves all rates, net metering rules and interconnection regulations, certifies electric service companies, approves the integrated resource plan and supervises the LUMA and Genera contracts’ performance metrics.
System operatorLUMA EnergyPrivate operator of PREPA’s transmission and distribution system since 1 June 2021. Runs the control centre and dispatch, maintains the network, reads meters, bills customers on PREPA’s behalf and handles new connections and solar interconnections.
TSOPuerto Rico Electric Power Authority (PREPA / AEE)Public corporation that owns the generation, transmission and distribution assets and is the single buyer of power from independent producers. It operates the hydroelectric plants through HydroCo, set up in 2023, and is subject to the federal PROMESA oversight law.
DSOLUMA Energy (on behalf of PREPA)The single distribution network serves the whole territory. LUMA manages it through operating districts such as Bayamón, Caguas, Carolina and Ponce.
SupplierGenera PRNot a retail supplier. A New Fortress Energy subsidiary that has operated, maintained and, where applicable, decommissioned PREPA’s thermal power plants (Costa Sur, Aguirre, San Juan, Palo Seco and peaking units) since 2023 under a 10-year agreement.
MeteringLUMA EnergyOwns no meters itself but installs, reads and maintains PREPA’s meters, and is carrying out the federally funded smart meter (AMI) rollout.

Compared with the UK system.

Compared with the UK system.
UK conceptPuerto Rico equivalentHow it works
DNOLUMA Energy, operating PREPA’s networkOne distribution network for the whole island, owned by PREPA and run by the private operator LUMA. There are no regional network companies.
National Grid/NESOLUMA Energy (system operator)LUMA operates the high-voltage transmission system and dispatches the plants, including load shedding when generation is short. The grid is isolated, with no interconnectors.
MPANLUMA premises ID and account numberThere is no national supply-point number. LUMA’s billing system identifies the location by a premises ID and the customer by an account number, both shown on the bill, together with the meter number.
MPRNNo equivalentNo gas supply-point identifier is relevant: imported LNG is used mainly at power plants and industrial sites, according to EIA.
Meter operatorLUMA EnergyLUMA installs and maintains every meter. Customers cannot choose a meter provider.
SupplierPREPA, with LUMA as billing agentThere is no retail choice. Every customer is a PREPA customer, billed by LUMA at rates set by PREB.
Smart-meter infrastructureLUMA AMI programmeThere is no central data company like the DCC. LUMA is replacing legacy meters with AMI meters with its own communications and head-end systems, paid for by FEMA and HUD Community Development Block Grant funds.

How a supply point is identified.

Fictional: Premises ID 4417302968; account number 7720415539; meter number KP3108842; rate 112 (General Residential Service)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Premises ID (ID localidad) and account number (número de cuenta) (Premises ID)
Who issues it?LUMA Energy, in PREPA’s customer billing system, when a service is connected or a customer opens an account
FormatNumeric premises ID identifying the service address, plus a separate customer account number and a meter number. LUMA’s 2021 model bill shows both IDs as 10-character fields; LUMA does not publish the numbering rules.
Length10 characters (premises ID and account number, as shown on LUMA’s model bill)
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the LUMA bill: the account number at the top of the first page, and the premises ID with the service address, rate, meter number and readings in the service and meter information section. The bill also has a net metering section for solar customers.
Electronic accessCustomers can manage their account and pay bills through the Mi LUMA website and app.
Third-party accessThere is no open data hub. Installers use the customer’s account details when registering a solar system on LUMA’s interconnection portal.
Who keeps the registerLUMA, in PREPA’s customer care and billing system
Register scopeNational

Puerto Rico has no regulated supply-point identifier like the UK’s MPAN. Because one company serves the whole island and customers cannot switch, the only register is the billing system that LUMA took over from PREPA in 2021.

LUMA’s model bill, filed with PREB in 2021 (case NEPR-MI-2021-0008), separates three numbers. The account number identifies the customer relationship and is what customers quote for payments and enquiries. The premises ID (ID localidad) is linked to the service address. The meter number identifies the physical meter, whose readings, multiplier and consumption days are printed on the bill along with the rate code, such as 112 for General Residential Service.

For a solar installation, the system is registered against the customer’s account on LUMA’s interconnection portal. For systems up to 25 kW, once a licensed engineer or expert electrician who is a certified installer certifies the installation, LUMA fits a net meter and must show net metering credits on the bill within 30 days of receiving the certification.

Whether the premises ID is kept for later occupants is not stated in published documents. LUMA does not publish the format rules for any of these numbers, so the fictional example only follows the field lengths of the model bill.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingNo
How exported electricity is paidNet metering: exports are credited kWh for kWh against consumption at the customer’s rate; surplus credit left at the June billing cycle is 75% bought by the utility at a rate set by PREB and 25% given to public schools
What size of system can a household connect?Up to 25 kW for residential customers. Commercial, government, industrial, agricultural, educational and hospital customers can connect up to 1 MW at distribution voltage and up to 5 MW at 38 kV or 115 kV.
Can LUMA refuse a small system because the feeder is full?No. Under Act 114-2007 a full feeder is not a reason to block a system of up to 25 kW; any required feeder upgrades are paid for by the requesting company.
How long is net metering guaranteed?Under Act 114 as amended (most recently by Act 10-2024), PREB’s study of net metering cannot begin before January 2030. The current policy continues during the study and for at least 12 months after any decision, and existing customers keep their terms for at least 20 years from their net metering contract.
Do larger systems need studies?Systems under 1 MW use an expedited process; for 500 kW to 1 MW PREB may require reliability studies. Interconnection rules for systems up to 5 MW are modelled on FERC’s Small Generator Interconnection Procedures.
Can batteries export?Yes, when enrolled in LUMA’s Customer Battery Energy Sharing programme, under which batteries send power to the grid during declared supply shortfalls.

Connecting a home system.

  1. Choose a certified renewable energy installer; the installation must be designed and certified by a licensed engineer or expert electrician (perito electricista) who is a certified photovoltaic installer.
  2. Register the project on LUMA’s Conexión LUMA portal (systems up to 25 kW) or the PREP LUMA portal (larger systems), and check the hosting capacity map and service transformer tool if needed.
  3. Submit the installer’s certification that the system meets the interconnection requirements, including the smart inverter settings sheet and IEEE 1547-2018 compliance report.
  4. For systems up to 25 kW the system is treated as interconnected once certified, without an interconnection study; larger systems are evaluated by LUMA within 90 days.
  5. LUMA installs a bidirectional meter and shows net metering credits on the bill no later than 30 days after receiving the certification.

Puerto Rico has had net metering since August 2007. Act 114-2007, amended by Act 17-2019 and Act 10-2024, sets out the rules. Each kWh exported is credited against a kWh consumed in the billing cycle. Unused credit carries forward, and at the June billing cycle each year 75% of the remaining surplus is bought by the utility and 25% goes to reduce public schools’ electricity bills. The law forbids any charge on prosumers’ own generation.

The scheme has grown very fast. Connected distributed generation rose from 238 MW at 31,880 installations in June 2021 to 1,622 MW at 206,007 installations in June 2026, an average of about 3,850 new systems a month in 2025. EIA reports that rooftop solar made up 20% of Puerto Rico’s generating capacity at the end of 2025 and 81% of all new capacity added between 2016 and 2025.

PREB cannot begin its review of net metering compensation until January 2030. In the 2026 rate case LUMA testified that net metering work is funded through the application fee paid by applicants, and PREB removed a USD 1.0 million net metering item from base rates for that reason.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use (net metering)No PREB certification; net metering agreement with LUMA. Residential limit 25 kW.LUMA (interconnection); PREB (rules)Persons generating for their own use under net metering are excluded from the definition of an electric service company in Regulation 8701.
Install a solar or battery systemMust be certified by a licensed engineer or expert electrician who is a member of the professional association and a certified renewable energy installerProfessional associations; installer certificationCertification triggers automatic interconnection for systems up to 25 kW.
Generate and sell to PREPA (independent power producer)PREB certification as an electric service company, a power purchase agreement and PREB review of the contractPREBAnnual fees in Regulation 8701 depend on capacity.
Sell output of distributed generators to other customersPREB certification where the aggregate capacity is 1 MW or morePREBApplies whether or not the generators or their customers are in the net metering programme.
Store electricityPREB certification for companies offering storage services where any storage unit is 1 MW or more; home batteries need only LUMA interconnectionPREB; LUMA
Export to the gridNet metering agreement and bidirectional meter from LUMALUMASize limits of 25 kW, 1 MW or 5 MW depending on customer type and voltage.
Supply / retail electricityNo retail competition. Companies offering electricity billing or resale services need PREB certification.PREBAll grid customers are PREPA customers billed by LUMA.
Transmission (wheeling) servicePREB certificationPREBRegulation 8701 lists wheeling as a certified activity.
Aggregate batteries / virtual power plantNo separate aggregator licence identified; participation through LUMA’s PREB-approved Customer Battery Energy Sharing programmeLUMA; PREBInstallers such as Sunrun and Tesla manage fleets of customer batteries in the programme. Sunrun’s scheme is approved by PREB until 30 June 2028.
Wholesale trading, balancing and grid servicesNo wholesale or balancing market existsLUMA (system operator)LUMA dispatches plants and buys capacity through PREPA contracts.
Operate a microgridRegistration with PREB, compliance certification and annual reportsPREBPREB forms NEPR-D01 to NEPR-D03.
Remote control of customer assetsThrough the battery-sharing programme agreement; customers can set a reserve and opt out of eventsLUMA

Act 57-2014 requires every electric power company to be certified by PREB. Regulation 8701 defines which companies this covers: producers selling to PREPA under power purchase agreements, companies selling the output of distributed generators of 1 MW or more, storage service providers with a unit of 1 MW or more, and companies offering billing, resale or wheeling services. Households and businesses generating for their own use under net metering do not need certification.

In practice the main control on small systems is the installer. Act 114-2007 requires a licensed engineer or expert electrician who is also a certified renewable energy installer to certify each system, and that certification is what allows systems up to 25 kW to connect without an interconnection study.

Flexibility and grid services.

Aggregation of home equipment: Limited

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Customer Battery Energy Sharing (emergency battery dispatch)Yes—YesLUMA. When LUMA forecasts a supply shortfall it calls grid events, and enrolled home batteries supply the home and export to the grid. Aggregators such as Sunrun (PowerOn) and Tesla manage the batteries; Sunrun pays $1.00 per kWh used or exported during events and reported 43 events between July and October 2025, with an average of 23.8 MW per event from about 38,500 batteries.
Wholesale energy, capacity and balancing marketsNo—NoNone. There is no market. Generation is dispatched by LUMA and paid for under PREPA contracts.

Puerto Rico has no wholesale or flexibility market, but its large fleet of home batteries has been used as an emergency resource since 2023. Under the Customer Battery Energy Sharing programme, expanded in summer 2025, installers aggregate customer batteries into virtual power plants that discharge during grid events. Participants keep a backup reserve and can opt out of events.

How much the programme can be relied on is disputed. In the 2026 rate case, the Solar and Energy Storage Association said the programme provided more than 40 MW of peak support, while PREB’s consultant said the highest emergency dispatch so far had been about 15 MW, and that LUMA cannot yet treat these resources as firm capacity. PREB asked LUMA to evaluate ways to firm up distributed resources in its interconnection proceeding.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Sunrun PowerOn Puerto RicoVirtual power plant launched in November 2023; about 34,000 homes took part on average in summer 2025.
Tesla Virtual Power Plant (Puerto Rico)Powerwall owners can enrol in LUMA’s battery-sharing programme.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutLUMA AMI rollout funded by FEMA and HUD; plan to replace about 1.48 million legacy meters, 82% by June 2028
Reading intervalNot published
Planned AMI meters installed (cumulative)169,000 by June 2026; 683,000 by June 2027; 1,223,000 by June 2028; 1,484,000 after that
FundingInstallation, systems integration and operating costs funded by FEMA and the Community Development Block Grant, according to LUMA in the rate case
Legacy systemMainly electromechanical meters, read manually or through the Two-Way Automatic Communication System (TWACS)
Related federal workDOE’s Puerto Rico Energy Resilience Fund pays for repairs to damaged meter enclosures and risers so that smart meters can be fitted safely

Puerto Rico is starting a full replacement of its meters. LUMA plans to replace all legacy meters with advanced metering infrastructure over about three years, with meters installed area by area as the communications network reaches them; outside these areas it still fits new legacy meters for new connections and net metering customers.

PREB has excluded duplicate meter spending from base rates and criticised LUMA’s AMI plan for not covering customer-facing uses such as time-of-use rates. The rollout is still at an early stage, and no published figure shows how many smart meters are actually installed.

Renewable electricity.

Electricity generation mix (2024).

  • Oil: 51%
  • Natural gas: 27%
  • Coal: 16%
  • Solar: 4.8%
  • Wind: 0.9%
  • Hydro: 0.2%
  • Biomass and waste: 0.1%
Source 18
Renewable electricity share
6% (2024)Source 18EIA International Energy Statistics: 1.2 TWh of renewable generation (mainly solar) out of 20.0 TWh in total. EIA’s territory figures for 2023–2024 are rounded estimates. The utility-scale wind, solar and landfill-gas plants under contract to PREPA supplied 2.7–3.7% of sales each month in January–June 2026 (LUMA quarterly report). Puerto Rico has no interconnection, so generation and consumption shares are the same.
Home solar
206,007 installations (distributed generation) (June 2026)Source 20Includes homes and businesses. Roughly one in seven LUMA customers (derived from 1,518,281 customers in July 2026).
Solar added each year
0.404 GW (July 2025 – June 2026)Source 20Derived: distributed capacity rose from 1,217.8 MW to 1,622.2 MW. In calendar 2025 it rose by 428 MW.
Distributed (rooftop) solar
1.622 GW (June 2026)Source 20206,007 systems; wind accounts for none of it.
Utility-scale solar
0.161 GW (July 2026)Source 13
Wind
0.102 GW (July 2026)Source 13
Hydro
0.098 GW (July 2026)Source 1320 units, most over 70 years old (EIA); hydro availability was 29% in April–June 2026 (Genera quarterly report).

Targets.

  • 100% renewable electricity by 2050 (Act 17-2019, kept by Act 1-2025)
  • Interim targets of 40% by 2025 and 60% by 2040 removed by Act 1-2025

Renewable generation is still a small part of the mix, about 6% in 2024, and most of it now comes from rooftops. Utility-scale renewables have grown little in a decade: the main projects are the Santa Isabel and Punta Lima wind farms, several solar farms including Humacao, Oriana and AES Ilumina, and two landfill gas plants. Together the renewable plants under contract to PREPA supplied about 3–4% of sales each month in early 2026.

Act 17-2019 set targets of 40% renewable electricity by 2025, 60% by 2040 and 100% by 2050, and banned coal from 2028. Act 1-2025 removed the interim targets while keeping the 2050 goal, and EIA reports that the coal ban was repealed and the AES coal plant’s contract extended to 2032.

Rooftop solar has filled the gap. Distributed capacity grew from 238 MW in mid-2021 to 1,622 MW in mid-2026, adding around 400 MW a year, and is now larger than the island’s gas-fired capacity. Under LUMA’s storage programme, a 100 MW solar farm with 55 MW of batteries is due online by the end of 2026.

Energy storage.

Home batteries
171,372 homes and businesses with batteries (End of 2025)Source 16Total energy capacity 2,864 MWh, from PREB data.
Grid-scale storage
Not identified from a reliable public source.

Battery storage in Puerto Rico is mostly in homes. Frequent outages have made solar-plus-battery systems the standard residential installation, and by the end of 2025 more than 171,000 customers had a battery, with 2,864 MWh of storage between them. Some of this is used by the grid through LUMA’s battery-sharing programme.

Grid-scale storage is behind schedule. Genera’s 430 MW battery programme had not delivered any capacity by the time of PREB’s April 2026 rate order, which treated batteries, temporary generators and new peaking plants as the main short-term fixes for the generation shortfall.

Storage projects.

  • Genera utility-scale battery programme: 430 MW at six power-plant sites to provide fast frequency support and resource adequacy.
  • Accelerated Storage Addition Program (ASAP): LUMA programme under PREB case NEPR-MI-2024-0002, begun in 2025, to add battery storage for grid reliability and stability.
  • 100 MW solar farm with 55 MW battery (ASAP): Scheduled to come online by the end of 2026, according to EIA.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
LUMA Energy (billing on behalf of PREPA)All grid customers: 1,518,281 in July 2026, of which 1,389,455 residentialNoLimitedNoYes

There is no supplier choice. LUMA serves and bills every customer on behalf of PREPA at tariffs set by PREB. The competitive part of the market is behind the meter, where solar and battery installers sell, lease or finance systems to households.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Puerto Rico Energy Bureau (Negociado de Energía de Puerto Rico)RegulatorEnergy regulatorSets rates, net metering and interconnection rules, certifies electric service companies and publishes case files and performance data.
Public Service Regulatory Board (Junta Reglamentadora de Servicio Público)RegulatorParent body of the Energy BureauHouses PREB and the Independent Consumer Protection Office.
LUMA EnergyDistributionTransmission and distribution operator, system operator and billing agentHandles connections, solar interconnection, meters, bills and the battery-sharing programme.
Puerto Rico Electric Power Authority (PREPA / AEE)GovernmentPublic utility that owns the power systemOwner of the grid and plants, single buyer of power and operator of hydro plants.
Genera PRMarketOperator of PREPA’s thermal power plantsRuns most of the island’s generation and is installing utility-scale batteries.
Puerto Rico Public-Private Partnerships Authority (P3A)GovernmentPublic-private partnerships agencyWas asked in March 2025, under a PREB order, to run competitive procurement of new generation.
US Department of Energy, Office of ElectricityGovernmentFederal grid supportRuns the USD 1 billion Puerto Rico Energy Resilience Fund and grid assessments.
Solar and Energy Storage Association of Puerto Rico (SESA)SolarIndustry associationRepresents solar and storage companies; took part in the 2025–26 rate case.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Inverters and interconnectionIEEE 1547-2018 with LUMA smart inverter settings (Technical Bulletin 2024-001)IEEE; LUMAA smart inverter settings sheet must be included with the IEEE 1547-2018 compliance report for each inverter.
Interconnection proceduresFERC Small Generator Interconnection Procedures and Agreement (Order 2006) as the model for systems up to 5 MWAct 114-2007; PREBProcedures must be uniform across the island.
Installer certificationLicensed engineer or expert electrician (perito electricista) who is a certified renewable energy installerAct 114-2007; professional associationsTheir certification allows automatic interconnection of systems up to 25 kW.
Net metering size limits25 kW residential; 1 MW at distribution voltage; 5 MW at 38 kV or 115 kVAct 114-2007

Permissions.

Permissions.
PermissionRequiredLevelDetail
LUMA interconnection (up to 25 kW)LimitedNationalNo application or study needed; the system is interconnected once a certified engineer or electrician certifies it and it is registered on the Conexión LUMA portal.
LUMA interconnection (over 25 kW)YesNationalLUMA evaluates applications within 90 days; systems of 500 kW–1 MW may need reliability studies.
Net metering agreementYesNationalNeeded to receive credit for exports; LUMA must show credits on the bill within 30 days of certification.
PREB certificationNoNationalNot required for households generating for their own use.

For a household solar or battery system, the main step is the installer’s certification and registration with LUMA. The law treats systems of up to 25 kW as interconnected once certified, and LUMA cannot refuse them because the local feeder is full.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net metering (Act 114-2007, as amended by Act 10-2024)ActiveNet meteringExports credited kWh for kWh; 75% of annual surplus bought by the utility. Current terms are protected until a PREB study that cannot start before January 2030, and existing customers are grandfathered for at least 20 years.Since August 2007
Battery-sharing payments (Customer Battery Energy Sharing)ActivePayment for grid servicesBattery owners enrolled through aggregators are paid for energy delivered during grid events; Sunrun pays $1.00 per kWh.Sunrun PowerOn approved to 30 June 2028
Puerto Rico Energy Resilience FundActiveFederal grant programmeUSD 1 billion programme run by DOE’s Office of Electricity. DOE has reallocated it towards grid repairs, transformers, transmission lines, feeder automation and repairs to meter equipment ahead of smart meter installation.—
US Residential Clean Energy Credit (section 25D)ClosedFederal tax credit30% federal tax credit for home solar and batteries; not available for property placed in service after 31 December 2025.2022 – 31 December 2025

Data and connectivity.

Fixed broadband
86.3 % of households (2024)Source 7Households with a broadband subscription of any type (1,071,824 of 1,242,609); 54.6% have cable, fibre or DSL.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Most households have internet access, and 1.03 million have a mobile data plan. Aggregators such as Sunrun and Tesla manage enrolled batteries through their own apps and online platforms; customers adjust their event reserve in the Sunrun or Tesla app. LUMA’s new AMI meters will use its own communications network.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
16.9 TWh (retail sales) (12 months to July 2026)Source 9Retail sales of 16,867 GWh. EIA estimates total generation at 20.0 TWh in 2024.
Generation capacity
5.925 GW (utility-scale) (July 2026)Source 13Excludes about 1.62 GW of distributed solar. Much of the thermal capacity is unavailable at any time: system plant availability was 47–55% in April–June 2026 according to Genera’s quarterly report to PREB.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

The generation system cannot reliably meet demand. PREB’s 2026 rate order found an expected loss of load of 32.5 days a year and very high forced outage rates at baseload units; Aguirre unit 1 (450 MW) suffered a catastrophic generator failure in February 2025. LUMA has had to use load shedding, and temporary generators, new peaking plants and batteries are the main short-term measures.

The DOE’s 2028 goals for the resilience fund include no more than three interruptions per customer per year and restoring power to 90% of customers within 10 days after a major weather event.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
New base rates from the April 2026 rate orderCurrent1 July 2026Residential customer charge rises from $4 to $8 a month and the two-block energy rate becomes a flat 8.648¢/kWh. PREB denied all requests for reconsideration on 28 July 2026.
Second step of residential rate designUpcoming1 July 2027Customer charge rises to $16 a month and the base energy charge falls to 6.275¢/kWh.
Smart meter rolloutUpcomingFY2027–FY2028LUMA plans 683,000 AMI meters by June 2027 and 1,223,000 by June 2028, funded by FEMA and HUD.
Net metering studyUpcomingNot before January 2030PREB may review net metering compensation only after a study that cannot begin before January 2030; current terms continue during it and for at least 12 months after any decision.
Act 1-2025 amends energy policyCurrent2025Removed the 40% (2025) and 60% (2040) renewable targets while keeping 100% by 2050. EIA reports the 2028 coal ban was repealed and the AES coal contract extended to 2032.
End of the federal 25D creditCurrent1 January 2026The 30% federal tax credit for home solar and batteries no longer applies to systems placed in service after 2025.
Utility-scale batteries and new generation procurementUpcoming2026 onwardsGenera’s 430 MW battery programme, LUMA’s Accelerated Storage Addition Program and the competitive procurement of new generation ordered by PREB in March 2025.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useHighLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionHigh206,007 distributed generation systems with 1,622 MW connected by June 2026, roughly one per seven grid customers, growing by about 400 MW a year (LUMA quarterly report to PREB).
Distributed energy marketHighRooftop solar was 20% of total generating capacity at the end of 2025 and 81% of new capacity in 2016–2025; 171,372 customers had batteries totalling 2,864 MWh (EIA, PREB).
Grid flexibility marketLowNo wholesale, balancing or flexibility market; the only route is LUMA’s emergency battery-sharing programme, which delivered tens of MW per event.
Energy storage adoptionHighMore than 171,000 homes and businesses had batteries at the end of 2025, about one in nine grid customers, while no utility-scale batteries were reported in operation.
Renewable growth environmentMediumRenewables supplied about 6% of generation in 2024 and utility-scale capacity has barely grown, but rooftop solar is adding around 400 MW a year; interim renewable targets were removed in 2025.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 36 sources
  1. Annual estimates of the resident population for states and Puerto Rico, 2020–2025 (NST-EST2025-ALLDATA). US Census Bureau, 2025. accessed 9 October 2026.
  2. American Community Survey 2024 1-year, table B11001 Household type. US Census Bureau, 2024. accessed 9 October 2026.
  3. American Community Survey 2024 1-year, table B25010 Average household size by tenure. US Census Bureau, 2024. accessed 9 October 2026.
  4. American Community Survey 2024 1-year, table B25003 Tenure. US Census Bureau, 2024. accessed 9 October 2026.
  5. American Community Survey 2024 1-year, tables B25001 Housing units and B25002 Occupancy status. US Census Bureau, 2024. accessed 9 October 2026.
  6. American Community Survey 2024 1-year, table B25024 Units in structure. US Census Bureau, 2024. accessed 9 October 2026.
  7. American Community Survey 2024 1-year, table B28002 Presence and types of internet subscriptions. US Census Bureau, 2024. accessed 9 October 2026.
  8. 2020 Census state urban and rural population (State_Urban_Rural_Pop_2020_2010). US Census Bureau, 2020. accessed 9 October 2026.
  9. Electric Power Monthly, Table 8.1 Puerto Rico sales of electricity to ultimate customers. US Energy Information Administration, 2026. accessed 9 October 2026.
  10. Electric Power Monthly, Table 8.2 Puerto Rico revenue from sales of electricity. US Energy Information Administration, 2026. accessed 9 October 2026.
  11. Electric Power Monthly, Table 8.3 Puerto Rico number of ultimate customers. US Energy Information Administration, 2026. accessed 9 October 2026.
  12. Electric Power Monthly, Table 8.4 Puerto Rico average price of electricity. US Energy Information Administration, 2026. accessed 9 October 2026.
  13. Electric Power Monthly, Table 8.5 Net summer capacity of utility-scale units by technology for Puerto Rico. US Energy Information Administration, 2026. accessed 9 October 2026.
  14. Electric Power Annual, Table 12.4 Puerto Rico average price of electricity, 2014–2024. US Energy Information Administration, 2025. accessed 9 October 2026.
  15. Puerto Rico territory energy profile: overview (last updated 21 May 2026). US Energy Information Administration, 2026. accessed 9 October 2026.
  16. Rooftop solar photovoltaic systems account for 20% of Puerto Rico’s capacity mix. US Energy Information Administration (Today in Energy), 2026. accessed 9 October 2026.
  17. Duration of power outages in Puerto Rico not caused by major events increased 19% in 2025. US Energy Information Administration (Today in Energy), 2026. accessed 9 October 2026.
  18. International Energy Statistics: Puerto Rico electricity generation by source (API query). US Energy Information Administration, 2024. accessed 9 October 2026.
  19. ECB euro reference exchange rate, US dollar (9 October 2026). European Central Bank, 2026. accessed 9 October 2026.
  20. LUMA FY2026 Q4 performance metrics by area: renewable and DSM (case NEPR-MI-2019-0007). Puerto Rico Energy Bureau, 2026. accessed 9 October 2026.
  21. Genera generation quarterly metrics, Q4 FY2026 (case NEPR-MI-2019-0007, Exhibit 1). Puerto Rico Energy Bureau, 2026. accessed 9 October 2026.
  22. Rate Review. Puerto Rico Energy Bureau, 2025. accessed 9 October 2026.
  23. Final Resolution and Order on Electricity Rates, case NEPR-AP-2023-0003 (15 April 2026). Puerto Rico Energy Bureau, 2026. accessed 9 October 2026.
  24. Resolución y Orden Final – Resumen Ejecutivo, case NEPR-AP-2023-0003. Puerto Rico Energy Bureau, 2026. accessed 9 October 2026.
  25. Resolution and Order on motions for reconsideration, case NEPR-AP-2023-0003 (28 July 2026). Puerto Rico Energy Bureau, 2026. accessed 9 October 2026.
  26. Puerto Rico Net Metering Program Act, Act No. 114 of 16 August 2007, as amended (rev. 17 January 2025). Puerto Rico Energy Bureau (Office of Management and Budget text), 2025. accessed 9 October 2026.
  27. Puerto Rico Energy Public Policy Act, Act No. 17 of 11 April 2019. Puerto Rico Energy Bureau, 2019. accessed 9 October 2026.
  28. PREPA motion in compliance, case NEPR-MI-2025-0001 (Act 1-2025 and procurement of new generation). Puerto Rico Energy Bureau, 2025. accessed 9 October 2026.
  29. Regulation 8701: amendments to the Regulation on Certification, Annual Fees and Operational Plans for Electric Service Companies. Puerto Rico Energy Bureau, 2016. accessed 9 October 2026.
  30. Certifications. Puerto Rico Energy Bureau, 2026. accessed 9 October 2026.
  31. Revised petition for approval of LUMA’s model customer bill, with exhibits (case NEPR-MI-2021-0008). Puerto Rico Energy Bureau, 2021. accessed 9 October 2026.
  32. Renewable Energy (interconnection portals, IEEE 1547-2018 smart inverter settings). LUMA Energy, 2026. accessed 9 October 2026.
  33. Sunrun PowerOn Puerto Rico. Sunrun, 2026. accessed 9 October 2026.
  34. Puerto Rico. US Department of Energy, Office of Electricity, 2026. accessed 9 October 2026.
  35. Puerto Rico Energy Resilience Fund. US Department of Energy, Office of Electricity, 2026. accessed 9 October 2026.
  36. Residential Clean Energy Credit. Internal Revenue Service, 2026. accessed 9 October 2026.

Questions about energy in Puerto Rico.

Talk to us about Olmack in Puerto Rico.Tell us about your home, housing portfolio or school estate in Puerto Rico. We'll explain what is possible there now.