Åland Islands energy at a glance.
Key figures for households in Åland Islands. Each one links to its source on the full overview below.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Åland Islands.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Åland Islands below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Åland Islands requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Åland Islands.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Åland Islands, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Åland Islands, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Åland Islands.
The energy market in Åland Islands, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Åland is an autonomous region of Finland made up of a main island group and an archipelago between Sweden and mainland Finland. It had 30,836 residents at the end of 2025. Åland makes its own laws in many areas, and the Government of Åland (Ålands landskapsregering) is the electrical safety authority and receives notifications for new power plants and high-voltage lines.
In 2025 Åland obtained 351 GWh of electricity in total. According to the statistics office ÅSUB, 63% was produced on the islands, mainly by wind power, 36% was imported from Sweden and 1% from mainland Finland. The backbone (“stamnät”) grid that brings in power from Sweden and mainland Finland is owned and run by Kraftnät Åland, which is also responsible for the system as a whole and for keeping reserve power available.
Most homes outside the town of Mariehamn are connected to the network of Ålands Elandelslag (ÅEA), a cooperative owned by its customers. ÅEA runs both a distribution business and an electricity retail business. Households can generate their own power under microproduction rules for installations up to 100 kVA, and housing companies can share rooftop solar through energy communities. Production and consumption are netted in 15-minute periods.
Energy snapshot.
Headline figures for electricity in Åland Islands. Each shows its data year and links to its source.
- Population30,836 peopleSource 131 Dec 2025
- Households14,600 householdsSource 2End of 2024
- Average household size2.1 people/householdSource 22024–2025
- Electricity use per householdNot identified from a reliable public source.
- Household price (EUR)Not identified from a reliable public source.
- Renewable electricity shareNot identified from a reliable public source.
- Solar capacityNot identified from a reliable public source.
- Wind capacityNot identified from a reliable public source.
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Unknown
- Regulator
- Government of Åland (Ålands landskapsregering) for notifications and electrical safety; Finnish electricity-market legislation applies through Åland regulation 2015:102. The authority supervising network tariffs was not confirmed.
- System operator
- Kraftnät Åland Ab – owns and runs the backbone (stamnät) grid and is system-responsible for Åland’s electricity supply
- Distribution networks
- Ålands Elandelslag (customer-owned cooperative) covers all of Åland except Mariehamn and parts of Lemland; Mariehamn has a separate local network
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Åland Islands.
- Household price (EUR)
- Not identified from a reliable public source.
- Typical annual electricity bill
- Not identified from a reliable public source.
A household bill on ÅEA’s network has five parts: a variable energy charge per kWh, a fixed basic fee for energy, a variable network (transmission) charge per kWh, a fixed network fee that depends on the size of the main fuse, and “elskatt”, which combines electricity tax and the security-of-supply fee. VAT is added. ÅEA’s fixed price of 7.4 c/kWh rises to 9.29 c/kWh with VAT, which implies a VAT rate of about 25.5% (our calculation).
Price changes in 2026
Network and energy charges are moving in opposite directions in 2026. ÅEA cut its network charges, both the fixed fee and the per-kWh charge, by 8% from 1 August 2026 because Kraftnät Åland lowered its backbone-grid charges. For a reference household using 10,000 kWh a year with a 3×20 A fuse, that saves about EUR 82 a year including VAT.
From 1 November 2026 ÅEA raises its variable energy charges by 49.5%, citing higher purchase costs and much higher market prices. Network charges, basic fees and electricity tax stay the same. ÅEA estimates that a typical customer’s total costs will be about 2–3% higher than in the previous winter.
Where the electricity comes from
ÅEA’s 2025 fuel-mix disclosure for the electricity it sold was 29.9% renewable, 27.3% nuclear and 42.8% fossil. This differs from Åland’s physical supply, of which 63% was produced locally, mainly from wind. The disclosure describes the origin of the power ÅEA bought, not where it was generated.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Fixed | Yes | ÅEA offers a fixed energy price. From 1 November 2026 it is 7.4 c/kWh plus VAT (9.29 c/kWh including VAT). |
| Variable | Yes | ÅEA’s variable energy charges are set seasonally, with higher prices in winter. They rise by 49.5% from 1 November 2026 because of higher purchase costs and market prices. ÅEA says this is about 14% above the previous winter’s energy price. |
| Dynamic | Unknown | ÅEA’s price page refers to spot-price options and shows variable market prices, but the terms are in the tariff booklet, which could not be read. |
| Other | Yes | Green electricity options are offered by ÅEA. Their price and certification were not confirmed. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 11,383 kWh/person/yr (2025)Source 1All sectors. Derived: total electricity supply of 351 GWh in 2025 divided by the 30,836 population at 31 December 2025 (both ÅSUB). Includes network losses.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Åland used 351 GWh of electricity in 2025, or about 11,400 kWh per resident across all sectors (our calculation from ÅSUB figures). Separate household figures were not found. ÅEA uses a 10,000 kWh a year customer on a 3×20 A fuse as its reference for higher-consumption homes.
Car ownership is very high, at about 27,000 cars or 880 per 1,000 people. The Government of Åland gives grants for fast-charging points for businesses and for charging points at blocks of flats. The regional sustainability agenda aims to halve road-traffic emissions compared with 2005.
Housing and households.
- Dwellings
- 17,300 dwellings (End of 2024)Source 2ÅSUB: “over 17,300” dwellings in total including vacant ones, of which about 14,600 were permanently occupied.
- Owner-occupied
- 70% (2024)Source 2ÅSUB: “over 70 per cent” of households own their home.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 70% (2024)Source 2Share of households. Derived: three in five live in small houses (detached/semi-detached) and one in ten in terraced houses (ÅSUB).
- Apartments and flats
- 25% (2024)Source 2ÅSUB: “just over a quarter” of households live in blocks of flats.
- Urban population
- Not identified from a reliable public source.
At the end of 2024 Åland had over 17,300 dwellings, of which about 14,600 were permanently occupied. Three in five households live in small houses, one in ten in terraced houses and just over a quarter in blocks of flats. Over 70% of households own their home, and ownership rose in 2024 as the rental stock shrank. Close to 5,000 dwellings, more than a quarter of the stock, were built in the 2000s. The average floor area is 48 m² per person.
This mix of owner-occupied detached houses with their own roofs and main fuses suits rooftop solar and household batteries. Blocks of flats can use ÅEA’s energy-community model to share one solar installation between residents without changing meters. Since 2008 Åland has followed Swedish building regulations, and energy declarations are required when buildings are sold or let.
How the grid works in Åland Islands.
- TransmissionKraftnät Åland Ab
- DistributionÅlands Elandelslag (customer-owned cooperative) covers all of Åland except Mariehamn and parts of Lemland; Mariehamn has a separate local network
- MeteringÅlands Elandelslag (ÅEA)
- Supply1 or more retail suppliers
Physically, Åland sits between two larger systems. The backbone grid owned by Kraftnät Åland imports electricity from Sweden and mainland Finland and carries local wind output around the islands. In 2025 imports covered 37% of supply (36% from Sweden, 1% from Finland), and local production, mainly wind, covered 63%. Kraftnät Åland is system-responsible and keeps reserve power available in case a link fails.
Below the backbone, ÅEA runs a 10 kV and 0.4 kV distribution network across the countryside and archipelago, adding about 20 km of line, six substations and around 150 new connections a year. Mariehamn, the only town, has its own network.
Legal framework
Åland has its own legislative powers under the Self-Government Act. Landskapsförordning (2015:102) applies Finland’s national electricity-market legislation in Åland. Under that regulation, building a power plant above 500 kVA or electricity lines above 1,000 V needs only a notification to the Government of Åland rather than a permit, and work may not start until 30 days after notification. Building and environmental permits may still be needed. Electrical safety is regulated by Åland’s own law (2017:38), with the Government of Åland as the authority.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Government of Åland (Ålands landskapsregering) – Infrastructure Department | Receives notifications for power plants above 500 kVA and lines above 1,000 V under regulation 2015:102. It is the electrical safety authority, sets energy and climate policy, runs energy grants and leads Projekt Sunnanvind for offshore wind. |
| TSO | Kraftnät Åland Ab | Owns and operates the backbone (stamnät) grid, which carries electricity from Sweden and mainland Finland. It is system-responsible for Åland’s electricity supply and responsible for reserve power in the backbone grid. Its charges feed into distribution tariffs. |
| DSO | Ålands Elandelslag (ÅEA) | Customer-owned cooperative founded in 1957. It serves all of Åland except Mariehamn and parts of Lemland (Järsö and Nåtö), with about 13,700 connection points, 3,342 km of lines (1,215 km at 10 kV) and 1,065 10/0.4 kV substations. |
| DSO | Mariehamn local network operator | Mariehamn is outside ÅEA’s area and has its own distribution network. The city fully owns Mariehamns Energi Ab, but that company’s network role could not be confirmed from a readable source. |
| Supplier | Ålands Elandelslag (ÅEA) – electricity trading | Sells fixed, variable and green electricity contracts. Microproducers sell surplus power under an agreement with an electricity retailer. |
| Metering | Ålands Elandelslag (ÅEA) | Meters connections in its area with Kamstrup OMNIPOWER meters. It provides the Min El portal, where consumption is organised by metering point (“mätarplats”). |
Compared with the UK system.
| UK concept | Åland Islands equivalent | How it works |
|---|---|---|
| DNO | Ålands Elandelslag (ÅEA); separate Mariehamn network | Like a UK DNO, ÅEA owns and runs the local network and connects homes and generators. Unlike a DNO, it is a cooperative owned by its customers, it also sells electricity, and there are only two network areas: ÅEA’s rural and archipelago area and the town of Mariehamn. |
| National Grid/NESO | Kraftnät Åland | Kraftnät Åland combines the roles of transmission owner and system operator for the islands. It runs the backbone grid and the links to Sweden and mainland Finland, and is responsible for reserve power. It is much smaller than NESO: Åland’s total supply was 351 GWh in 2025. |
| MPAN | Metering point (“mätarplats”) held by the network operator | Each connection is a metering point registered with the network operator. ÅEA’s Min El portal lists a customer’s metering points separately. The format of the identifier was not published on ÅEA’s pages. |
| MPRN | Not identified | No household gas network or gas supply-point number was identified in the sources read. ÅSUB reports that light heating oil was the largest oil product sold in Åland in 2025. |
| Meter operator | The network operator (ÅEA) | There is no separate meter-operator market. ÅEA owns and reads the meters on its network and supplies the HAN modules customers use to read live data. |
| Supplier | Electricity retailer (elhandlare), e.g. ÅEA | The bill separates energy (from the retailer) from network charges (from the network operator). ÅEA does both, and offers fixed, variable and green contracts. How many other retailers actively sell to Åland households was not confirmed. |
| Smart-meter infrastructure | Kamstrup OMNIPOWER meters with HAN modules | Meters are remotely read by the network operator. Customers can add a HAN module (RJ45 or RJ12/P1) to read live data every 10 seconds. ÅEA says a new generation of meters will have the HAN port built in. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Metering point (mätarplats) |
| Who issues it? | The local network operator: Ålands Elandelslag outside Mariehamn; the Mariehamn network operator in the town |
| Format | Not published. ÅEA’s pages refer to metering points in the Min El portal and to an 8-digit meter number used to activate HAN modules, but not to the structure of the metering-point code. |
| Length | Not confirmed |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the network operator’s invoice and in ÅEA’s Min El online portal, where each metering point is listed separately. |
| Electronic access | ÅEA’s Min El portal shows consumption per metering point and can export up to five years of history to Excel, for example for energy declarations. |
| Third-party access | In Min El, customers can share data with another person or company through a power of attorney, a time-limited or permanent sharing link, or by adding a co-customer. |
| Who keeps the register | Each network operator keeps the records of the metering points on its own network. Whether Åland’s metering points are included in Fingrid’s national Datahub could not be confirmed. |
| Register scope | Per DSO |
An electricity connection in Åland is administered by the network operator whose area it is in: ÅEA for the countryside and archipelago, and Mariehamn’s own network operator in the town. Each connection is a metering point (“mätarplats”) in that operator’s records, with a meter and a main fuse size that sets the fixed network fee.
When people move in or out, they tell ÅEA through its move-in/move-out form, which also sets up or ends the electricity contract. ÅEA’s pages do not say whether the metering-point identifier stays the same when the occupant changes, so this is marked as unconfirmed.
There are separate numbers to be aware of. The meter number is an 8-digit number printed on the meter, and ÅEA asks for it, together with name and address, when a customer orders a HAN module. The metering-point identifier used for contracts and data is shown on the invoice and in Min El. ÅEA does not publish its length or structure, so no fictional example is given here. Fingrid’s Datahub holds data for around 4 million Finnish electricity usage points, but whether Åland’s metering points are part of it was not confirmed.
Microproduction and energy communities are tied to metering points. In an energy community, each metering point can belong to only one community, and production is shared between metering points by calculation, without new meters.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Surplus is sold under an agreement with an electricity retailer at a contractual (market-linked) price; negative market prices can mean the producer pays for surplus |
| What counts as microproduction? | On ÅEA’s network, an installation counts as microproduction if its maximum connected power is 100 kVA or less. Larger installations pay the normal producer tariffs. |
| Which technologies are covered? | Solar panels, wind turbines, batteries, vehicle-to-grid (V2G) chargers and generators can all be connected under the microproduction process. |
| How is surplus netted? | Production and consumption are netted within each 15-minute period. Only the net surplus in a quarter-hour counts as export. |
| Do microproducers pay network charges? | Yes. ÅEA says microproducers pay transmission tariffs on both imports and exports. Electricity used directly on site avoids variable network charges, electricity tax and VAT, so ÅEA advises sizing systems to use as much output as possible on site. |
| Can I be charged for exporting? | Yes. ÅEA warns that electricity-market prices can be negative, and the producer then has to pay for surplus fed into the grid. |
| When is a government notification needed? | Power plants with a rated output above 500 kVA must be notified to the Government of Åland at least 30 days before construction starts (regulation 2015:102). |
Connecting a home system.
- Before buying equipment, submit a prior notification (förhandsanmälan) to ÅEA to find out how much production your connection can take.
- After ÅEA responds, submit the detailed equipment specification form to reserve grid capacity.
- Have the system installed by a registered electrical contractor in line with SFS 6000, using CE-marked equipment.
- The installer sends a completion notice to the network operator.
- Sign an agreement with an electricity retailer to sell any surplus.
Households in Åland can connect solar panels, small wind turbines and batteries and export surplus power. On ÅEA’s network the first step is a prior notification, made before any equipment is bought, so that ÅEA can say how much export capacity the connection can take. The installer must be a registered electrical contractor, and the installation must follow SFS 6000.
There is no feed-in tariff and no annual net metering. Consumption and production are netted only within each 15-minute period, and any surplus is sold to an electricity retailer under a separate agreement. The value of exported power therefore follows market prices and can be negative.
Energy communities
ÅEA lets housing companies, and producers of up to 1 MVA with several metering points, form an energy community behind a single grid connection. Output is first credited to the building’s common electricity (lighting, heating, ventilation) and the rest is shared between members by agreed shares, calculated every 15 minutes. No new meters are needed. Surplus can either go back to the housing company for sale or be sold by each member under their own retailer agreement.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (microproduction) | Up to 100 kVA: prior notification to and agreement with the network operator; no government notification | Network operator (ÅEA in its area) | Installation by a registered electrical contractor, to SFS 6000, with CE-marked equipment. |
| Generate electricity (larger plants) | Above 500 kVA: notification to the Government of Åland at least 30 days before construction, instead of a permit | Government of Åland (Ålands landskapsregering) | Landskapsförordning 2015:102. Building permits under planning law and environmental permits may also be needed. 100–500 kVA plants connect under the network operator’s producer tariffs. |
| Build electricity lines | Lines and transmission installations above 1,000 V nominal voltage: notification to the Government of Åland 30 days before construction | Government of Åland | Landskapsförordning 2015:102. |
| Store electricity (batteries) | Behind-the-meter batteries go through the network operator’s microproduction process; no separate storage licence identified | Network operator | ÅEA lists batteries and V2G chargers among equipment connected under microproduction rules. |
| Export / sell surplus | Agreement with an electricity retailer; no generator licence identified for microproducers | Electricity retailer (contract) | Transmission tariffs apply to exports as well as imports. |
| Share production (energy community) | Agreement with the network operator; producer up to 1 MVA; all members behind the same grid connection | Network operator (ÅEA) | Each metering point can be in only one community. Allocation is by 15-minute calculation. |
| Electrical installation work | Only registered electrical contractors with a certified safety leader (Eb1/S-1, Eb2/S-2 or Eb3/S-3 certificate issued by Åland’s authority) | Government of Åland (electrical safety authority) | Åland law 2017:38. Lay people may only do minor tasks such as changing fuses or bulbs. |
| Supply, aggregation, VPP, balancing, grid services and remote control of assets | No Åland-specific rules identified; Finnish electricity-market legislation applies through regulation 2015:102 | Not confirmed | Whether the Finnish Energy Authority supervises these activities in Åland could not be confirmed from a readable source. |
Small-scale generation in Åland is mainly handled with the network operator, not the government. Up to 100 kVA, a household or business deals with ÅEA (or Mariehamn’s network) through a prior notification and connection agreement, uses a registered electrical contractor and sells any surplus through a retailer.
The Government of Åland becomes involved above 500 kVA, and for lines above 1,000 V, through a notification at least 30 days before construction. This replaces a permit under regulation 2015:102, which applies Finland’s electricity-market legislation in Åland. Electrical work is controlled through Åland’s own electrical safety law and certificates.
Flexibility and grid services.
Aggregation of home equipment: Unknown
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Reserve power in the backbone grid | Unknown | — | Unknown | Kraftnät Åland. Kraftnät Åland is responsible for reserve power in the backbone grid. Whether distributed assets can provide reserves was not confirmed, because Kraftnät Åland’s website could not be accessed. |
No flexibility or demand-response market specific to Åland was identified. Kraftnät Åland is responsible for the system and for reserve power, but its procurement arrangements were not available.
At household level, ÅEA’s energy communities and 15-minute netting already reward matching consumption to local production. The HAN interface gives real-time meter data that home energy-management systems can use.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Remotely read Kamstrup OMNIPOWER meters on ÅEA’s network; a new meter generation with built-in HAN ports is planned |
| Reading interval | 15 minutes for production netting and energy communities; HAN gives live data every 10 seconds |
| Meter model (ÅEA) | Kamstrup OMNIPOWER |
| Customer interface | HAN-NVE module (RJ45) or HAN-P1 module (RJ12) |
| Live data | Power, current and voltage every 10 seconds; kWh hourly (HAN-NVE) or every 10 seconds (HAN-P1) |
| Online history | Up to 5 years in Min El |
| Smart-meter share | Not published |
ÅEA uses Kamstrup OMNIPOWER meters. Customers who want live data can request a HAN module by emailing ÅEA with their 8-digit meter number, name and address, and fit it themselves in the slot on the meter. The HAN-NVE module (RJ45) gives instant values every 10 seconds and energy readings hourly. The HAN-P1 module (RJ12) gives both every 10 seconds.
ÅEA says the next generation of meters will have a built-in HAN port, so separate modules will no longer be needed. No date for this replacement was published.
Consumption data is available in ÅEA’s Min El portal, with export of up to five years of history and options to share data with others. Netting for microproduction and energy-community allocation uses 15-minute periods.
Renewable electricity.
- Renewable electricity share
- Not identified from a reliable public source.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Wind
- Not identified from a reliable public source.
- Solar PV
- Not identified from a reliable public source.
Targets.
- Energy and Climate Strategy for Åland to 2030: at least 60% renewable energy and at least 60% locally produced renewable electricity; CO₂ emissions at least 60% below 2005.
- Climate neutrality by 2035.
- Sustainability agenda indicator: 100% of electricity use from fossil-free sources.
- Projekt Sunnanvind: offshore wind areas of 674 km² with an estimated 4 GW and 20 TWh a year at full development.
Local electricity production in Åland is mainly wind power, and in 2025 local production met 63% of the islands’ 351 GWh supply (ÅSUB). The rest was imported, mostly from Sweden. ÅSUB does not break the local share down by technology on its pages, so no generation mix is shown.
The Energy and Climate Strategy to 2030 aims for at least 60% locally produced renewable electricity, and the region aims to be climate-neutral by 2035. The government’s Energiportalen tracks emissions from electricity, heating and transport.
Offshore wind: Projekt Sunnanvind
The Government of Åland’s Projekt Sunnanvind is preparing large-scale offshore wind in 674 km² of northern Åland waters identified as suitable in the maritime spatial plan. At full development, output is estimated at 4 GW and 20 TWh a year, about 60 times Åland’s current electricity use, so most would be exported. A 2026 report with Gasgrid looked at the conditions for a hydrogen market on Åland.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
No published data on battery storage in Åland was found. Household batteries and V2G chargers can be connected through ÅEA’s microproduction process. Because exports are netted every 15 minutes and can face negative prices, storing midday solar for later use on site is worth more than exporting it.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Ålands Elandelslag (ÅEA) | — | Yes | Unknown | Unknown | Limited |
ÅEA is the main retailer for households on its own network, offering fixed (9.29 c/kWh incl. VAT from November 2026), seasonal variable and green contracts. Microproducers sell surplus “via an agreement with an electricity retailer”, which implies a choice of retailer, but the market shares of other retailers serving Åland were not published.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Government of Åland (Ålands landskapsregering) | Government | Regional government, electrical safety authority and energy policy | Receives plant and line notifications, issues electrical certificates, runs energy grants and Projekt Sunnanvind. |
| Kraftnät Åland Ab | Transmission | Backbone grid owner and system operator | Runs the grid that links Åland to Sweden and mainland Finland and keeps reserve power available. |
| Ålands Elandelslag (ÅEA) | Distribution | Cooperative network operator and electricity retailer | Connects homes and microproducers across rural Åland and the archipelago and runs energy communities. |
| Ålands statistik- och utredningsbyrå (ÅSUB) | Government | Statistics office | Publishes electricity supply, housing and population statistics. |
| Mariehamns Energi Ab | Distribution | Company 100% owned by the City of Mariehamn | Municipal energy company of the town, which has a network separate from ÅEA. Its exact network role was not confirmed. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Electrical installations | SFS 6000 (low-voltage installations) | Finnish Standards Association SFS | ÅEA requires microproduction installations to meet SFS 6000 and use CE-marked equipment. |
| Installer authorisation | Electrical safety law for Åland (2017:38); Eb1/S-1, Eb2/S-2, Eb3/S-3 certificates | Government of Åland | Contractors must be registered and employ a certified electrical safety leader. |
| Grid connection of generators | Network operator connection terms and technical specifications | Ålands Elandelslag | Connection conditions, network service terms and technical specifications are published by ÅEA as PDFs. Which inverter standards they cite was not confirmed. |
| Buildings | Swedish building regulations (applied since 2008); energy declarations | Government of Åland | Swedish energy-accounting rules have applied since 1 January 2015. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Network operator prior notification (microproduction) | Yes | Local | Must be submitted to ÅEA before buying equipment; sets how much production the connection can take. |
| Government notification | Limited | Regional | Only for power plants above 500 kVA and lines above 1,000 V; 30-day wait before construction. |
| Building permit | Limited | Local | May be required under planning and building law; the threshold for rooftop solar was not confirmed. |
| Environmental permit | Limited | Regional | May be required under Åland’s environmental protection law for larger plants. |
| Registered electrical contractor | Yes | Regional | Electrical work must be done by a contractor registered with Åland’s safety authority. |
For a home solar or battery system, the key steps are the network operator’s prior notification and the use of a registered electrical contractor. Government notification applies only to plants above 500 kVA. Building and environmental permits may apply depending on the project and the municipality’s planning rules.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Grant for fast charging of electric vehicles (businesses) | Active | Grant | 35% of installation costs, up to EUR 30,000 on mainland Åland; 40%, up to EUR 35,000, in the archipelago. For VAT-registered companies, housing companies and property companies. Apply before work starts; applications accepted all year. | — |
| Grant for replacing oil boilers (businesses) | Active | Grant | 25% of approved costs, up to EUR 20,000, for converting oil heating to fossil-free energy. For VAT-registered companies and housing companies. Pre-approval required. | — |
| Grant for EV chargers at blocks of flats | Active | Grant | 25% of approved costs, up to EUR 5,000, for at least two charging points at existing multi-dwelling buildings. Open since 1 June 2024. | From 1 June 2024 |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
No Åland-specific broadband or mobile coverage statistics were found. For metering, ÅEA’s meters are read remotely, and customers can access local data through the HAN interface (RJ45 HAN-NVE or RJ12 P1), which home energy-management systems can read.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 0.351 TWh (2025)Source 1Total electricity supply (351 GWh): 63% local production, 36% imports from Sweden, 1% from mainland Finland.
- Generation capacity
- Not identified from a reliable public source.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Åland’s electricity system is small, with 351 GWh of supply in 2025, and relies heavily on its links to Sweden and mainland Finland. Kraftnät Åland is system-responsible and holds reserve power for when imports are interrupted. ÅEA expects new rural connections to take up to six months, or up to a year where a new 10 kV line and substation are needed.
The planned offshore wind areas of Projekt Sunnanvind (4 GW, 20 TWh a year at full development) would turn Åland from a net importer into a large exporter. That would need new export infrastructure, which the government is studying, including a hydrogen option.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| ÅEA variable energy charges rise 49.5% | Upcoming | 1 November 2026 | Variable energy charges rise because of higher purchase costs and market prices. The fixed price becomes 7.4 c/kWh + VAT (9.29 c/kWh incl. VAT). Network charges, basic fees and electricity tax are unchanged. |
| ÅEA network charges cut 8% | Current | 1 August 2026 | Fixed and variable transmission charges reduced after Kraftnät Åland lowered its backbone-grid costs (about EUR 82 a year saving for a 10,000 kWh, 3×20 A household). |
| New generation of electricity meters | Upcoming | Not announced | ÅEA says new-generation meters will have a built-in HAN port, replacing the plug-in HAN modules. |
| Projekt Sunnanvind offshore wind | Upcoming | Planning stage (page updated January 2026) | 674 km² of offshore wind areas in the maritime spatial plan, estimated at 4 GW / 20 TWh a year at full development; 2026 report with Gasgrid on a hydrogen market. |
| Energy and Climate Strategy targets | Upcoming | 2030 / 2035 | At least 60% locally produced renewable electricity and 60% lower CO₂ emissions than 2005 by 2030; climate neutrality by 2035. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | — | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | — | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | A clear microproduction route (≤100 kVA) and energy communities exist, but no installation or capacity figures were published. |
| Distributed energy market | Medium | 63% of 2025 supply produced locally, mainly wind; energy communities with 15-minute virtual allocation for housing companies; batteries and V2G covered by microproduction rules. |
| Grid flexibility market | Low | No Åland flexibility or demand-response market identified; reserves are the responsibility of Kraftnät Åland. |
| Energy storage adoption | Low | No published storage data or storage-specific support identified. |
| Renewable growth environment | Medium | Wind already supplies most local production; 2030 target of at least 60% local renewable electricity; Projekt Sunnanvind plans 4 GW offshore wind, still at planning stage. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 25 sources
- Vanliga frågor om Åland. Ålands statistik- och utredningsbyrå (ÅSUB), 2026. accessed 10 October 2026.
- Bostäder och boendeförhållanden 2024. Ålands statistik- och utredningsbyrå (ÅSUB), 2024. accessed 10 October 2026.
- Om oss. Ålands Elandelslag. accessed 10 October 2026.
- Elnät. Ålands Elandelslag. accessed 10 October 2026.
- Ny elanslutning. Ålands Elandelslag. accessed 10 October 2026.
- Producera din egen el. Ålands Elandelslag. accessed 10 October 2026.
- Förhandsanmälan om mikroproduktion. Ålands Elandelslag. accessed 10 October 2026.
- Energisammanslutningar. Ålands Elandelslag. accessed 10 October 2026.
- Kamstrup HAN-modul. Ålands Elandelslag. accessed 10 October 2026.
- Tips om Min El. Ålands Elandelslag. accessed 10 October 2026.
- Fakturor – vad betyder allt på fakturan?. Ålands Elandelslag. accessed 10 October 2026.
- Elpriser från och med 1 november 2026. Ålands Elandelslag, 2026. accessed 10 October 2026.
- Vi sänker avgifterna för elöverföring 1.8.2026. Ålands Elandelslag, 2026. accessed 10 October 2026.
- Elens ursprung. Ålands Elandelslag, 2025. accessed 10 October 2026.
- Priser. Ålands Elandelslag. accessed 10 October 2026.
- Elnätsinnehavare. Ålands landskapsregering. accessed 10 October 2026.
- El och energi. Ålands landskapsregering. accessed 10 October 2026.
- Bidrag och stöd för energiinstallationer. Ålands landskapsregering, 2026. accessed 10 October 2026.
- Energiportalen. Ålands landskapsregering. accessed 10 October 2026.
- Ålands klimatpåverkan och förnyelsebar energi. Ålands landskapsregering. accessed 10 October 2026.
- Projekt Sunnanvind. Ålands landskapsregering, 2026. accessed 10 October 2026.
- Elsäkerhet och hissäkerhet. Ålands landskapsregering. accessed 10 October 2026.
- Hållbar utveckling år 2026. Ålands statistik- och utredningsbyrå (ÅSUB), 2026. accessed 10 October 2026.
- Datahub. Fingrid. accessed 10 October 2026.
- Bolag och samfund. Mariehamns stad. accessed 10 October 2026.
Questions about energy in Åland Islands.
In 2025 Åland obtained 351 GWh of electricity. 63% was produced locally, mainly by wind power, 36% was imported from Sweden and 1% from mainland Finland (ÅSUB).
Kraftnät Åland owns and runs the backbone grid that brings power from Sweden and mainland Finland and is system-responsible. Ålands Elandelslag, a customer-owned cooperative, runs the distribution network everywhere except Mariehamn and parts of Lemland. Mariehamn has its own network.
From 1 November 2026 Ålands Elandelslag’s fixed energy price is 7.4 c/kWh plus VAT (9.29 c/kWh including VAT). Network charges, a fixed fee based on fuse size and electricity tax come on top. Its variable energy charges rise 49.5% from the same date, while network charges were cut by 8% in August 2026.
Yes. On ÅEA’s network, installations up to 100 kVA count as microproduction. Production and consumption are netted every 15 minutes, and surplus is sold under an agreement with an electricity retailer at market-linked prices, which can be negative. Network charges apply to exports too.
You must send a prior notification to the network operator before buying equipment, and a registered electrical contractor must install the system to SFS 6000. Plants above 500 kVA must also be notified to the Government of Åland 30 days before construction. Building permits may apply depending on the project.
Yes. ÅEA lets housing companies form an energy community. Solar output first covers the building’s common electricity and the rest is shared between residents every 15 minutes by agreed shares, without new meters.
Each connection is a metering point (“mätarplats”) registered with the local network operator and shown on the invoice and in ÅEA’s Min El portal. ÅEA does not publish its format. The separate 8-digit meter number is used for ordering HAN modules.