How electricity works in Armenia.
Armenia electricity market 2026: PSRC-regulated household tariffs, one national DSO (ENA), 7-digit customer card numbers, net metering for prosumers, licensing and storage reform.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Armenian dram (AMD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Armenia energy at a glance.
Key figures for households in Armenia. Each one links to its source on the full overview below.
Electricity price.
42 AMD per kWh for households, including taxes. Figures for 2025.
Household use.
2,778 kWh a year for a typical household. Figures for 2025.
Renewable share.
36.5% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Armenia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Armenia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Armenia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Armenia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Armenia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Armenia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Armenia.
The energy market in Armenia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Armenia runs a compact, centrally planned power system built around one nuclear unit at Metsamor, several gas-fired plants, two large hydro cascades and a fast-growing fleet of small hydro and solar plants. In 2025 power plants supplied 9,348.4 GWh to the grid. Nuclear provided 28.9%, gas-fired plants 34.6%, the Vorotan and Sevan–Hrazdan hydro cascades 13.6%, and small hydro, solar and other plants 22.9%. The country is a net exporter: 1,500.7 GWh left the country in 2025, mainly to Iran and Georgia, while only 63 GWh was imported.
One company, Electric Networks of Armenia CJSC (ENA), owns the whole distribution network and is the "guaranteed supplier" for almost every household. Retail prices are set by the Public Services Regulatory Commission (PSRC). From 1 February 2026 households pay a day rate of 46.48 to 53.48 dram per kWh, depending on how much they use each month, and a night rate 10 dram lower. Socially vulnerable families pay 29.99 and 19.99 dram. Across all households, ENA billed 100.05 billion dram for 2,382 GWh in 2025, an average of 42.0 dram (about EUR 0.10) per kWh including 20% VAT.
The market was opened on 1 February 2022. By 2025 a third (33.2%) of electricity was bought on the liberalised market, almost all of it by large business users. Households have mainly taken part as prosumers. At the end of 2025 there were 50,059 "autonomous energy producers" with 640.1 MW of mostly rooftop solar, all on monthly net metering. A May 2026 amendment to the Law on Energy creates a storage licence from late 2026, and new laws on electricity and on renewables are being drafted.
Energy snapshot.
Headline figures for electricity in Armenia. Each shows its data year and links to its source.
- Population3,103,900 peopleSource 101 Jul 2026
- Households857,545 householdsSource 112022 census
- Average household size3.42 people/householdSource 112022 census
- Electricity use per household2,778 kWh/yrSource 42025
- Household price (AMD)42 AMD/kWhSource 52025
- Household price (EUR)0.104 EUR/kWhSource 122025
- Renewable electricity share36.5%Source 32025
- Solar capacity1.088 GWSource 3end 2025
- Wind capacity0.004 GWSource 3end 2025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Public Services Regulatory Commission (PSRC)
- System operator
- Electric Power System Operator CJSC (dispatch); High Voltage Electric Networks CJSC (transmission)
- Distribution networks
- One national DSO, Electric Networks of Armenia CJSC (ENA), with about 43,000 km of network and more than 1 million customers
- Currency
- Armenian dram (AMD)
- Voltage and frequency
- 220 V / 50 Hz (0.38/0.22 kV low-voltage network)
Electricity prices in Armenia.
- Household price (AMD)
- 42 AMD/kWh (2025)Source 5Derived average household price including 20% VAT: 100,050.01 million dram billed by ENA to the household group in 2025 divided by 2,382.12 GWh. It blends day, night and social-tariff consumption. The regulated rates in force from 1 February 2026 are 46.48 (up to 200 kWh/month), 48.48 (201–400 kWh) and 53.48 (over 400 kWh) dram/kWh by day and 36.48, 38.48 and 43.48 by night (PSRC Decision 478-N of 2021 as amended by 466-N of 30 December 2025).
- Household price (EUR)
- 0.104 EUR/kWh (2025)Source 12Converted from 42.0 AMD/kWh at the Central Bank of Armenia official rate of 405.58 AMD per EUR published on 9 October 2026. The 48.48 dram day rate for the 201–400 kWh band converts to EUR 0.1195/kWh.
- Typical annual electricity bill
- 116,670 AMD/yr (2025)Source 5Derived: 100,050.01 million dram billed to households in 2025 divided by 857,545 census households. That is about EUR 288 at 405.58 AMD/EUR (CBA, 9 October 2026). It is an average across all households, including those on social tariffs, not an official typical bill.
Armenian household prices are set once a year in a PSRC review that starts each September and takes effect on 1 February. In the review for February 2026 to January 2027, cost pressures added about 24.5 billion dram. They were a less favourable generation mix, curtailment payments to guaranteed renewable producers, loan repayments and dearer nuclear fuel. They were offset by about 24.5 billion dram of gains, mostly from earlier forecast-versus-actual volume corrections, so the net effect on ENA tariffs was zero. The only change for households was the fallback rate, which rose to 56.77 dram.
The 2026 tariff is built up as follows. The average cost of power bought by ENA is 18.163 dram/kWh. Transmission, system-operator and market-operator services add 2.599 dram. Distribution losses and own use add 2.113 dram, ENA’s own regulated margin 16.519 dram and VAT 7.879 dram. Distribution is charged by voltage. The 0.38 kV distribution tariff is 17.453 dram/kWh before VAT, against 1.136 dram at 110 kV.
Regulated generation tariffs vary widely. For 2026–27 the nuclear plant is paid 15.127 dram/kWh and the ContourGlobal Vorotan hydro cascade 6.404 dram/kWh (both excluding VAT). The gas-fired plants are paid separately for capacity and energy. The Metsamor nuclear unit has a five-month planned outage from 1 April 2026. To stop this pushing up tariffs, 12.3 billion dram of state-budget support was built into its tariff, so it can keep selling to the regulated market using electricity bought from the balancing provider.
There are no regional price differences, because ENA covers the whole country at one set of tariffs. The tiered household structure (bands up to 200, 201–400 and over 400 kWh a month) rewards low consumption. Social tariffs for families on the Government’s vulnerability list cut the rate by roughly a third.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | ENA, as guaranteed supplier, sells at PSRC tariffs that include VAT. From 1 February 2026 households on 0.38 kV pay a day rate of 46.48 dram/kWh up to 200 kWh a month, 48.48 for 201–400 kWh and 53.48 above 400 kWh. Socially vulnerable families listed under Government Decision 1122-N pay 29.99 by day and 19.99 at night. |
| Time-of-use | Yes | Every regulated tariff has day and night rates. For households the night rate is 10 dram lower than the day rate: 36.48, 38.48 or 43.48 dram/kWh, depending on monthly consumption. Business users on 6(10), 35 and 110 kV pay 50.48/40.48, 44.48/40.48 and 41.98/37.98. |
| Other | Yes | There is a fallback rate of 56.77 dram/kWh (54.61 before February 2026). ENA charges it when it resumes supply under the retail-market rules, or when a customer obliged to leave regulated supply has not become a qualified consumer or chosen another supplier by the deadline. |
| Variable | Limited | Since 1 February 2022 any consumer may buy from a licensed supplier at negotiated prices and pay ENA only the regulated distribution tariff (17.453 dram/kWh before VAT at 0.38 kV from February 2026). In practice the liberalised segment is business users. At the end of 2025, 32 suppliers held licences and 12 were active. |
| Dynamic | No | No household tariff linked to hourly wholesale prices was identified. Wholesale trading moved to hourly settlement under the 2022 market model. |
Household prices compared with neighbouring countries (EUR per kWh).
- Armenia€0.104
- Georgia€0.073
- Turkey€0.066
- Azerbaijan€0.048
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 2,778 kWh/yr (2025)Source 4Derived: 2,382.12 GWh distributed to the "population" (household) customer group in 2025 (PSRC report on ENA volumes) divided by 857,545 census households. It excludes rooftop-solar output consumed on site and is a national average, not a metered median.
- Average daily use per household
- 7.6 kWh/day (2025)Source 4Derived from the 2,778 kWh a year average household consumption.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- Not identified from a reliable public source.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households are ENA’s largest customer group. In 2025 they took 2,382 GWh, about 49% of the 4,846 GWh that ENA sold at regulated tariffs, and roughly a third of all electricity consumed in the country. In the first half of 2026 household consumption was 1,304 GWh, and the winter months are clearly higher (December 2025: 284 GWh against 167 GWh in October).
Gas dominates home heating, which keeps average electricity use moderate. In the 2022 census, 51.8% of households (444,254) said their main heating was an individual system running on gas or electricity, and 13.4% used a gas stove. Only 7.8% (66,482) named an electric heater as their main heating, while 16.3% heated mainly with a wood stove.
Final consumption across the economy was 7,259.5 GWh in 2025, up 6.6% on 2024. Liberalised-market customers took 2,413.6 GWh, up 27.5%. Distribution losses were 507.5 GWh, or 6.5% of what entered the distribution network.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 89.4% (2022 census)Source 11Derived: 766,459 of 857,545 households live in a dwelling owned by a household member (census table 8.11).
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- 1.6% (2022 census)Source 11Derived: 8,899 households in state-owned and 4,578 in community-owned dwellings (census table 8.11). Treat this as public ownership, not a formal social-housing sector.
- Houses
- 47.3% (2022 census)Source 11Derived: 391,492 households in a detached house plus 14,178 in part of a house, out of 857,545 (census table 8.1).
- Apartments and flats
- 50.7% (2022 census)Source 11Derived: 433,888 households in a flat in a multi-apartment building plus 978 in part of a flat (census table 8.1).
- Urban population
- 63.9% (1 Jul 2026)Source 10Derived: 1,983,600 urban residents out of 3,103,900.
Armenia is a nation of owner-occupiers. Almost 90% of households live in a home owned by a member of the household. Housing is split almost evenly between Soviet-era and newer apartment blocks, concentrated in Yerevan and the larger towns, and individual houses, which dominate in villages and on the edges of towns.
This split matters for rooftop solar. Houses with their own roof and ENA connection can become autonomous energy producers directly. Flat dwellers generally cannot, but the law lets producers and consumers form an "autonomous group" of up to 1,050 kW, which allows output from one site to be counted against consumption at other connection points. In 2025 there were 1,082 such groups, and 1,101 autonomous producers were producing at one point and consuming at another.
How the grid works in Armenia.
- TransmissionHigh Voltage Electric Networks CJSC (HVEN), Electric Power System Operator CJSC
- DistributionOne national DSO, Electric Networks of Armenia CJSC (ENA), with about 43,000 km of network and more than 1 million customers
- MeteringNot identified from a reliable public source.
- Supply4 or more retail suppliers
Physical flow
Electricity is produced by the nuclear plant at Metsamor, gas-fired plants (Armpower, Yerevan TPP, Hrazdan TPP and the Hrazdan-5 unit), the ContourGlobal Vorotan and Sevan–Hrazdan hydro cascades, about 191 small hydro plants, 100 licensed solar plants and tens of thousands of rooftop systems. The large plants feed HVEN’s high-voltage network, which delivered 9,267.8 GWh in 2025, of which 1,500.7 GWh was exported. ENA’s distribution network carries power to homes at 0.38/0.22 kV.
Commercial flow
Most generators sell under regulated direct contracts to ENA as guaranteed supplier, or on unregulated contracts to licensed suppliers and qualified consumers. The rest is traded on the day-ahead market. Imbalances are settled in the balancing market, where one licensed generator is the balancing provider until the end of 2027. Customers of other suppliers still pay ENA for distribution, and the Settlement Center settles all volumes hourly.
Cross-border trade is growing. In the first half of 2026, 647.9 GWh went to Iran and 63.9 GWh to Georgia. Since the market opened, about 370 GWh has been imported from Georgia and 756 GWh exported to it. A new Armenia–Georgia high-voltage line is expected to raise the usable capacity of that interconnection.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Territorial Administration and Infrastructure | Ministry responsible for energy infrastructure policy, including the Energy Sector Development Strategic Programme to 2040 (Government Decision 48-L of 14 January 2021). |
| Regulator | Public Services Regulatory Commission (PSRC) | Independent regulator. It licenses every regulated energy activity, sets generation, network and retail tariffs, approves the wholesale and retail market rules and the transmission and distribution network rules, and monitors procurement and investment by regulated companies. |
| TSO | High Voltage Electric Networks CJSC (HVEN) | State transmission licensee, set up by Government Decision 450 of 20 July 1998. It owns the high-voltage grid and is building new Armenia–Georgia transmission capacity under the KfW-backed Caucasian Electricity Transmission Network project. Transmission losses were 1.97% in 2025. |
| System operator | Electric Power System Operator CJSC | Holds the exclusive licence to dispatch generation, transmission and distribution, including imports and exports. It may curtail plants without a purchase guarantee for up to 2,200 hours a year when system security requires. |
| Settlement | Settlement Center CJSC | Market-operator and settlement body, paid through the market-operator tariff. Wholesale trading runs through a single electronic market-management programme with hourly settlement. |
| DSO | Electric Networks of Armenia CJSC (ENA) | The only distribution licensee, formed in 2002 by merging four regional companies. It has about 43,000 km of network and more than 1 million customers. ENA is also the guaranteed supplier, so it bills almost all households and signs the net-flows contracts with autonomous producers. It invested about 28.1 billion dram in 2025. |
| Supplier | Licensed electricity suppliers | At the end of 2025, 32 companies held supply licences and 12 were active, alongside 9 wholesale traders and 45 qualified consumers buying directly on the wholesale market. |
| Exchange | Day-ahead market | The wholesale market has three parts: direct contracts (long-term, regulated and unregulated), a day-ahead market and balancing. By the end of 2025, 135,837 day-ahead deals had been concluded since the market opened. |
Compared with the UK system.
| UK concept | Armenia equivalent | How it works |
|---|---|---|
| DNO | Electric Networks of Armenia (ENA) | A single company holds the distribution licence for the whole country. It connects new consumers and prosumer installations at PSRC-set fees and reads the meters. Unlike a UK DNO it is also the default (guaranteed) supplier. |
| National Grid/NESO | HVEN (transmission) + Electric Power System Operator + Settlement Center | The roles are split between three bodies. HVEN owns the transmission network, the system operator dispatches all plants and cross-border flows, and the Settlement Center runs the market and settlement. Balancing is provided by one generation licensee with an exclusive right until 31 December 2027. |
| MPAN | ENA customer card number (Քարտի համար) | Each ENA customer account is identified by a 7-digit card number. It is used to register for ENA’s online portal, to pay bills and on supply and net-flows contracts. It is an account identifier issued by the network company, not a standardised national meter-point code. |
| MPRN | Gazprom Armenia gas account | Gas is distributed and sold by Gazprom Armenia CJSC at PSRC tariffs, under its own customer accounts. No national gas meter-point format was identified. |
| Meter operator | ENA | Metering of household connections is part of ENA’s distribution role. It buys and installs the meters (for example, electronic multi-tariff meters bought by tender in 2025–26) and swaps them when customers move to the liberalised market. |
| Supplier | Guaranteed supplier (ENA) or licensed supplier | Households stay with ENA at regulated tariffs unless they choose a licensed supplier. Large consumers above set thresholds are required to leave regulated supply, either as qualified consumers or through a supplier. |
| Smart-meter infrastructure | No national programme identified | There is no DCC-style national data hub. Meter data are held by ENA and passed to the Settlement Center for market settlement. |
How a supply point is identified.
2304718 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Customer card number (Քարտի համար) |
| Who issues it? | Electric Networks of Armenia CJSC (ENA) |
| Format | Numeric account number assigned by ENA to each customer card. ENA’s online portal checks it against the pattern of exactly seven digits. |
| Length | 7 digits |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On ENA bills, notices and the customer’s supply contract. To register on the ENA portal a customer enters the card number, their passport or ID-card number and the date the contract was signed. |
| Electronic access | Through the ENA customer portal (customers.ena.am), which also accepts online applications to connect to the network and to change the name on a card. |
| Third-party access | No public framework was identified for third parties such as installers or energy-service companies to read consumption data with consent. Suppliers in the liberalised market receive metering data through the market settlement process. |
| Who keeps the register | ENA customer database (single national DSO) |
| Register scope | National |
Armenia does not use a standardised meter-point code like the UK MPAN or the European EAN. A household connection is identified by its ENA customer card number. ENA issues this 7-digit number when the consumer signs the supply contract, and it then appears on bills and payment systems. Because ENA is the only DSO and the guaranteed supplier, the number is in effect both the network identifier and the supply-account identifier.
When a home changes hands, ENA offers a "card renaming" application to put the existing card in the new customer’s name. This points to the number following the connection, but ENA does not publish an explicit rule, so whether the number always stays with the property has not been confirmed.
A new connection is made under the PSRC distribution network rules and the standard connection fees. A household that installs solar becomes an autonomous energy producer by applying to ENA. ENA connects the installation, and the guaranteed supplier signs a separate net-flows (exchange) contract for the same connection point. Autonomous producers that produce at one point and consume at another, or that form an autonomous group, have several card numbers linked within ENA’s billing.
There is no separate central register or data hub. ENA holds the customer and meter records, and sends hourly volumes for suppliers’ customers to the Settlement Center for wholesale settlement.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Monthly net metering. Surplus carries forward month to month and is paid once a year at the annual minimum price of imbalance sales in the balancing market. |
| Who can become an autonomous energy producer? | Any consumer, household or business, that generates from renewable sources mainly for its own needs. It must hold a net-flows contract with the guaranteed supplier and must not hold a generation licence for that installation. No licence is needed while building or operating the installation. |
| Is netting hourly? | No. The Law on Energy nets the electricity exported and consumed each month, whatever hour it was produced or used. If consumption exceeds exports in a month, the difference is billed at the PSRC tariff for the customer group. |
| What is paid for surplus? | Surplus left at the end of the settlement year (1 May to 30 April) is paid by the guaranteed supplier at the annual minimum price at which wholesale-market participants sold electricity from imbalances in the balancing market. |
| Can I use output at another address? | Yes. Autonomous producers may produce at one or more points and consume at the same or different points, and may form autonomous groups with other consumers. Distribution charges may apply under the market rules. |
| What if I want to sell on the wholesale market instead? | An autonomous producer can give up that status, with no right to return, and trade on the wholesale market under the market rules. Separately, "micro-energy producers" with plants up to 150 kW may sell to wholesale-market participants without a generation licence (except while building hydro plants). A 2025 amendment opened the competitive market to autonomous producers of 150–500 kW on equal terms. |
| Can export be curtailed? | Licensed plants without a purchase guarantee built after 1 July 2024 may be curtailed by the system operator for up to 2,200 hours a year (raised from 1,080 hours in April 2025). No equivalent published limit for household prosumers was identified. |
Connecting a home system.
- Size the system: the installed capacity may not exceed the maximum capacity in the consumer’s supply contract for that connection point, and never more than 150 kW (1,050 kW in total for an autonomous group).
- Apply to ENA as distribution licensee for connection of the generating installation under the distribution network rules.
- ENA connects the installation and fits or adapts metering for two-way flows.
- Sign the net-flows (exchange) contract with the guaranteed supplier, using the PSRC model form.
- Each month exports and imports are netted. The settlement year runs from 1 May to 30 April, and any surplus left at the end of April is paid out.
Armenia’s prosumer regime is one of the most generous in the region. Households and businesses can install up to 150 kW of renewable generation per connection point without a licence and offset it against consumption month by month. Output is credited at the full retail tariff within the month and carried forward, and only the annual leftover is paid at a wholesale-related price.
This has driven very fast growth. Autonomous producers rose from 16 in 2016 to 4,144 in 2020, 17,112 in 2023 and 50,059 at the end of 2025. Installed capacity rose from 76.8 MW in 2020 to 640.1 MW. In the first half of 2026, net flows from autonomous producers to ENA came to 309.6 GWh.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | PSRC generation licence required, except (a) generation solely for own needs, (b) micro-energy producers up to 150 kW (except hydro during construction) and (c) autonomous energy producers up to 150 kW per connection point. | PSRC | In 2025 the PSRC issued 31 generation licences: 13 to plants giving up the purchase guarantee, 12 for own-needs plants and 6 for small hydro. |
| Store electricity | New storage licence (Article 35.1 of the Law on Energy), added by Law HO-228-N of 11 May 2026 and in force six months after publication. Secondary rules are being drafted. | PSRC | On 1 October 2026 the PSRC was still working with consultants on the secondary legislation for storage facilities. Thresholds and exemptions had not been published. |
| Export surplus from a home system | No licence. Requires autonomous-producer status, an ENA connection and a net-flows contract with the guaranteed supplier. | ENA / guaranteed supplier, under PSRC market rules | Capacity is capped at the contracted maximum, never more than 150 kW per point. |
| Sell electricity to wholesale participants | Generation licence or micro-energy-producer status (up to 150 kW). Qualified consumers may also resell surplus bought on the wholesale market. | PSRC | Exports are allowed only after domestic demand is met, as confirmed by the market operator. |
| Supply electricity to consumers | Supply licence. Guaranteed (last-resort) supply is a separate licence held by ENA. | PSRC | 12 supply licences were issued in 2025, and 32 suppliers held licences at year end. |
| Wholesale trading, import and export | Wholesale trade licence. It cannot be held by the guaranteed supplier, generators, the market or system operator, or transmission and distribution licensees. | PSRC | Three wholesale-trade licences were issued in 2025, and nine traders were registered at year end. |
| Aggregation / virtual power plant | No aggregator licence category in the Law on Energy. Autonomous groups (up to 1,050 kW) pool prosumers for netting but do not trade on the wholesale market. | PSRC | The draft new Law on Electricity was still being prepared at the end of 2025. |
| Balancing services | Exclusive right and obligation of one generation licensee until 31 December 2027. | PSRC / system operator | The draft laws provide for competitive balancing after the transition. |
| Remote control of assets / curtailment | The network rules let the system operator stop or limit output from licensed plants without a purchase guarantee for up to 2,200 hours a year. For certain plant types the licensing procedure requires remote-disconnection capability. | PSRC / Electric Power System Operator | This applies to licensed generators. No remote-control requirement for household systems was identified. |
| EV charging | No licence. Anyone, including a consumer, may provide EV charging. | Law on Energy, Article 23(1.2) | EV charging is outside regulation under the Law on Energy. |
Article 23 of the Law on Energy lists the licensed activities: generation, transmission, distribution, supply and guaranteed supply, system and market operation, wholesale trade, and gas import and export. Storage is being added. Buying electricity to resell is allowed only for licensees, unless the law provides otherwise.
The exemptions are what make small-scale generation simple. Autonomous and micro-energy producers need no licence, and nor does generation solely for own needs. In 2025 the PSRC also simplified the licensing paperwork for consumers whose plant connects through their own installation and does not exceed its maximum capacity.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing market | No | — | No | Balancing service provider (generation licensee) / Electric Power System Operator. Balancing is provided by one generation licensee under an exclusive right until 31 December 2027. In 2025, 1,704.07 GWh of balancing energy was sold and 1,044.05 GWh bought. |
| Day-ahead market | Restricted | Licensed generators, suppliers, traders, qualified consumers; micro-producers up to 150 kW | No | Settlement Center (market operator). Hourly day-ahead trading through the electronic market-management programme. Small producers can take part as micro-energy producers or through a supplier, but there is no aggregator role. |
| Direct contracts (regulated and unregulated) | Restricted | — | No | Settlement Center (market operator). Long-term, regulated and unregulated (domestic and cross-border) direct contracts. By the end of 2025 about 138,317 contracts had been concluded since the market opened. |
| Demand response / DSO flexibility | No | — | No | No demand-response or local flexibility market for households or small sites was identified. |
Flexibility is still organised around large plants. The gas-fired units and the hydro cascades balance the system, and the balancing service has been an exclusive, regulated role. Households take part only through day/night tariffs and the monthly netting of rooftop solar, which gives no signal about when power is exported.
This is starting to change. Draft new laws on electricity and on renewable energy and energy efficiency, prepared with USAID and World Bank support, would introduce competitive balancing, an intraday market and the possibility for transmission and distribution operators to own storage. The May 2026 amendment to the Law on Energy creates a storage licence, and the PSRC is drafting the rules to go with it.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Electricity market information (PSRC) | PSRC page listing the wholesale and retail market rules, the network rules and market statistics. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter programme or penetration figure identified |
| Reading interval | Not identified for households (wholesale settlement is hourly) |
| Meter owner | ENA (distribution licensee) |
| Household tariffs | Day and night rates for all regulated groups |
| Market switching | Customers moving to the liberalised market get meters adapted for hourly settlement |
| Recent procurement | Three-phase 100 A electronic multi-tariff meters, contracted in January 2026 |
Metering is ENA’s responsibility. All regulated customers have day and night rates, so meters must record at least two registers. In its review of the market, the PSRC noted that ENA was carrying out a large-scale meter replacement programme and adding meters to the market-management system. This was one reason the deadline for some customers to move to the liberalised market was pushed back from February 2026.
No figures were found for remotely read or interval-capable household meters. Readers should not assume UK-style smart functionality, such as in-home displays or half-hourly data for third parties.
Renewable electricity.
Electricity generation mix (2025).
- Gas: 34.6%
- Nuclear: 28.9%
- Large hydro: 13.6%
- Small hydro, solar, wind and other: 22.9%
- Renewable electricity share
- 36.5% (2025)Source 3Derived share of generation supplied to the grid: large hydro (ContourGlobal Vorotan cascade 882.2 GWh and the Sevan–Hrazdan cascade 390 GWh) plus "other plants" (2,138.4 GWh, mainly small hydro and solar) out of 9,348.4 GWh. The "other plants" line may contain small non-renewable units. PSRC itself reports that small hydro and other renewable plants supplied 24% of generation. Armenia is a net exporter, so the generation share is used.
- Home solar
- 0.64 GW (end 2025)Source 3Capacity of all autonomous energy producers (households and businesses up to 150 kW per point). PSRC does not publish a household-only figure. R2E2 reported 769 MW of autonomous solar PV on 1 June 2026.
- Solar added each year
- 0.22 GW (2025)Source 3Derived: autonomous-producer capacity rose from 420.5 MW to 640.1 MW during 2025. Licensed solar additions are not included. Licensed plants entering operation in 2025 totalled 109.7 MW of solar, alongside 2.2 MW of small hydro.
- Solar (licensed plants)
- 0.448 GW (end 2025)Source 3100 plants, including the 55 MW Masrik-1 plant in Gegharkunik, which started operating on 15 May 2025. A further 183 MW was under construction.
- Solar and other (autonomous producers)
- 0.64 GW (end 2025)Source 350,059 autonomous energy producers.
- Small hydro
- 0.403 GW (end 2025)Source 3191 plants, with 20 more (38 MW) under construction.
- Wind
- 0.004 GW (end 2025)Source 3Four plants.
Targets.
- Energy Sector Development Strategic Programme to 2040 (Government Decision 48-L, 14 January 2021).
- Strategic target of 395 MW of plants up to 30 MW by 2030. This was already exceeded, at 593 MW, by 31 December 2025 (PSRC).
- Expected solar share of 15% by 2030 (R2E2 Fund).
Hydropower has long been Armenia’s main domestic renewable resource. Solar has been the growth engine since 2019, first through rooftop autonomous producers and then through licensed plants. Masrik-1, the first utility-scale plant, was licensed at a regulated 16.3 dram/kWh. Newer plants increasingly build without a purchase guarantee and sell on the competitive market. In 2025 the PSRC licensed 21 such solar projects, with expected investment of about 14 billion dram.
Plants that do have a guarantee sell all their output at PSRC tariffs for 15 years (small hydro) or 20 years (other renewables). For July 2025 to June 2026 these tariffs ranged from 10.363 dram/kWh (small hydro on drinking-water conduits) to 41.871 dram/kWh (the earliest wind and solar groups). From 1 February 2026 to 1 February 2028, most guaranteed producers may give up the guarantee for good and move to the competitive market.
Rapid solar growth is causing integration problems. For 2026–27 the PSRC expects 168.29 GWh of forced curtailment of guaranteed producers, with compensation built into tariffs. Plants without a guarantee may be curtailed for up to 2,200 hours a year.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Until 2026 Armenian law had no licence category for electricity storage, and batteries could only sit behind the meter of a consumer or generator. Law HO-228-N of 11 May 2026 adds Article 35.1, "Storage licences", to the Law on Energy, in force six months after official publication. The PSRC is drafting the secondary legislation, with technical assistance funded through Helvetas.
The draft new Law on Electricity would also allow the transmission and distribution operators to build, own and operate storage. This is aimed at managing the solar-driven curtailment and balancing pressures described above.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Electric Networks of Armenia (guaranteed supplier) | 4,846 GWh in 2025, about 67% of final consumption | No | Yes | No | Yes |
| Energy Supply LLC | 26.78% of liberalised-segment consumption (646.46 GWh, 2025) | Unknown | Unknown | Unknown | Unknown |
| Enerex CJSC | 6.85% of liberalised-segment consumption (165.41 GWh, 2025) | Unknown | Unknown | Unknown | Unknown |
| Energy Provider LLC | 3.90% of liberalised-segment consumption (94.17 GWh, 2025) | Unknown | Yes | No | Unknown |
Almost every household buys from ENA at regulated tariffs. In 2025 the liberalised segment took 2,413.5 GWh (33.2% of consumption). Qualified consumers buying directly on the wholesale market took 55.03% of that, followed by Energy Supply (26.78%), Enerex (6.85%), Energy Provider (3.90%), and Manana Group and Ecovil Energy (2.09% each). The suppliers’ own sites describe business-focused offers. No competitive household offer was identified.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Public Services Regulatory Commission (PSRC) | Regulator | Energy, water and telecoms regulator | Sets every electricity tariff, licenses generators, suppliers and storage, and publishes quarterly system and market data. |
| Ministry of Territorial Administration and Infrastructure | Government | Government ministry covering energy infrastructure | Policy owner for the energy strategy and the draft electricity and renewables laws. |
| High Voltage Electric Networks CJSC | Transmission | Transmission licensee | Owns the high-voltage grid and is building the Armenia–Georgia interconnection. |
| Electric Power System Operator CJSC | Transmission | System operator (dispatch) | Dispatches all generation and cross-border flows and curtails plants when needed. |
| Electric Networks of Armenia CJSC | Distribution | Sole DSO and guaranteed supplier | Connects homes and solar systems, issues customer card numbers and runs net metering. |
| Renewable Resources and Energy Efficiency Fund of Armenia (R2E2) | Renewable Energy | Public fund for renewables and energy efficiency | Publishes up-to-date installed capacity of autonomous solar, wind and small hydro. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (distribution) | Distribution network rules of the electricity market (PSRC Decision 523-N, 25 Dec 2019) | PSRC | Connection procedure, metering and replacement of meters for customers entering the market. |
| Grid connection (transmission) | Transmission network rules (PSRC Decision 522-N, 25 Dec 2019) | PSRC | Includes curtailment rules for plants without a purchase guarantee. |
| Retail market and prosumers | Retail market commercial rules (PSRC Decision 517-N, 25 Dec 2019) | PSRC | Supplier switching, autonomous producers and net-flows contracts. |
| Wholesale market | Wholesale market commercial rules (PSRC Decision 516-N, 25 Dec 2019) | PSRC | Direct-contract, day-ahead and balancing market design. |
| Primary law | Law on Energy HO-148 (2001, as amended) | National Assembly | Articles 56.1–56.3 cover autonomous and micro-energy producers. Article 35.1 adds storage licences. |
| Inverters / anti-islanding | Not identified | — | No published national inverter or anti-islanding standard for household systems was identified in the sources reviewed. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| DSO connection of a generating installation | Yes | National | ENA must connect an applicant seeking autonomous-producer status under the distribution network rules. |
| Net-flows contract with the guaranteed supplier | Yes | National | Signed on the PSRC model form. It establishes monthly netting and the annual surplus payment. |
| Generation licence | Limited | National | Not required for autonomous or micro-energy producers up to 150 kW, or for generation solely for own needs. Required for other plants. |
| Connection fee for a new house connection | Yes | National | Single-phase standard connection: 10 kVA costs 166,000 dram in Yerevan or 124,000 elsewhere, and 14 kVA costs 199,000 or 140,000. Local permit fees are added. Flats pay nothing because the developer pays, and socially vulnerable families get a free single-phase connection. |
| Building permit for rooftop PV | Unknown | Local | No national rule on planning consent for rooftop solar was identified in the sources reviewed. |
For a household the essential steps are commercial and technical, not planning ones: an ENA connection for the installation and a net-flows contract. Connection fees for new consumers are standardised nationally by the PSRC. Larger 0.4 kV connections cost 229,000 dram plus 16,000 dram per kVA in Yerevan, or 9,000 dram per kVA elsewhere.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Autonomous energy producer net metering | Active | Net metering | Monthly netting of exports against consumption at the full retail tariff for systems up to 150 kW. Annual surplus is paid at the minimum balancing-market imbalance price. | — |
| Feed-in tariffs with purchase guarantee (licensed renewables) | Active | Feed-in tariff | Guaranteed purchase of all output for 15 years (small hydro) or 20 years (other renewables) at PSRC tariffs, which are reviewed each July. For 2025–26 they ranged from 10.363 to 41.871 dram/kWh before VAT. | Tariffs shown: 1 Jul 2025 – 30 Jun 2026 |
| Social electricity tariff | Active | Social tariff | 29.99 dram/kWh by day and 19.99 at night for families on the vulnerability list under Government Decision 1122-N. | — |
| Free single-phase connection for vulnerable families | Active | Connection fee waiver | No connection fee for socially vulnerable families seeking a single-phase connection within settlement boundaries. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
No public information was found on the communications technology ENA uses for meter reading. Monitoring of solar and battery systems relies on the owner’s own internet connection, since there is no regulated data channel equivalent to the UK DCC.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 7.77 TWh (2025)Source 3Domestic delivery from the high-voltage network (7,767 GWh), including distribution losses. Final consumption was 7,259.5 GWh.
- Generation capacity
- Not identified from a reliable public source.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- 168.3 GWh (Feb 2026 – Jan 2027 (forecast))Source 2Forecast forced curtailment of producers with a purchase guarantee: 43.31 GWh at Masrik-1 and 124.98 GWh at small guaranteed solar plants.
Two features shape grid conditions. First, a large share of generation comes from a single nuclear unit, so its outages matter: the five-month refuelling and maintenance outage from April 2026 meant the thermal plants and imports had to fill the gap. Second, midday solar output, from both licensed plants and more than 50,000 rooftop systems, is already forcing curtailment of guaranteed plants. Plants without a guarantee accept up to 2,200 hours a year of possible curtailment.
Exports to Iran and Georgia give the system an outlet. New Armenia–Georgia transmission capacity under the Caucasian Electricity Transmission Network project is meant to increase regional trade.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Storage licence (Law HO-228-N) | Upcoming | Six months after publication of the 11 May 2026 law | Adds Article 35.1 "Storage licences" and other changes to the Law on Energy. The PSRC is drafting the secondary rules for storage facilities. |
| Phased exit from regulated supply | Upcoming | 1 Feb 2027 – 1 Feb 2030 | Retail-market rules set a year-by-year timetable, based on consumption volume and regardless of voltage, by which consumers must become qualified consumers or choose a supplier. The liberalised share is forecast to reach 38% in 2027. |
| End of exclusive balancing provider | Upcoming | 31 Dec 2027 | The exclusive right to provide balancing given to one generation licensee expires. |
| New Laws on Electricity and on Renewable Energy and Energy Efficiency | Upcoming | In drafting (2025–26) | Prepared with USAID and World Bank support. They would provide for unbundling, competitive balancing, TSO/DSO storage ownership, an intraday market and temporary supply. |
| Option to leave the purchase guarantee | Current | 1 Feb 2026 – 1 Feb 2028 | Licensed small hydro, solar and wind producers (except hydro on drinking or irrigation water conduits) may give up the guaranteed purchase for good and trade competitively. |
| Wider market access for larger prosumers and consumers | Current | 2025 (Law HO-111-N of 14 May 2025 and later 2025 amendments) | Amendments adopted in 2025 let autonomous producers of 150–500 kW join the competitive market on equal terms. Under Law HO-111-N, consumers at 6(10) kV or above using more than 1 million kWh per point and more than 12 million kWh in total had to become qualified consumers by 1 August 2025. |
| Longer curtailment window for unguaranteed plants | Current | 9 Apr 2025 | PSRC Decision 136-N raised the maximum curtailment of such plants from 1,080 to 2,200 hours a year. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | 50,059 autonomous producers with 640.1 MW at the end of 2025 (up from 31,249 and 420.5 MW a year earlier), against about 858,000 households and more than 1 million ENA customers. |
| Distributed energy market | High | Small hydro (403 MW), licensed solar (448 MW) and autonomous producers (640 MW) together exceed 1.4 GW. In H1 2026, small hydro, solar and net autonomous flows supplied 1,244 GWh of the 4,967 GWh generated. |
| Grid flexibility market | Low | Balancing is an exclusive regulated role until the end of 2027, there is no aggregator licence and no demand-response market. Hourly day-ahead trading exists only for licensed participants. |
| Energy storage adoption | Low | No storage licence was yet in force, and no grid-scale battery was identified. The storage licence created in May 2026 is still awaiting secondary rules. |
| Renewable growth environment | High | Autonomous-producer capacity grew 52% in 2025. Masrik-1 (55 MW) entered service, 109.7 MW of licensed solar was commissioned and 183 MW more was under construction. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 17 sources
- ENA retail electricity tariffs from 1 February 2026 (Decision 478-N as amended by 466-N). Public Services Regulatory Commission, 2026. accessed 9 October 2026.
- Review of electricity-sector tariffs for 1 Feb 2026 – 31 Jan 2027. Public Services Regulatory Commission, 2025. accessed 9 October 2026.
- Annual report of the Public Services Regulatory Commission, 2025. Public Services Regulatory Commission, 2026. accessed 9 October 2026.
- Electricity generated and supplied, Q4 and full year 2025 (consumption by ENA customer group). Public Services Regulatory Commission, 2026. accessed 9 October 2026.
- Commodity deliveries and payments in the electricity sector, 2025 (ENA sales by customer group). Public Services Regulatory Commission, 2026. accessed 9 October 2026.
- Electricity generated and supplied, Q2 and H1 2026. Public Services Regulatory Commission, 2026. accessed 9 October 2026.
- Questions and answers: electricity connections. Public Services Regulatory Commission. accessed 9 October 2026.
- Drafting of secondary legislation on storage facilities discussed (2 October 2026). Public Services Regulatory Commission, 2026. accessed 9 October 2026.
- Law of the Republic of Armenia on Energy (HO-148), current consolidated text. ARLIS (Armenian Legal Information System). accessed 9 October 2026.
- Permanent population number of the Republic of Armenia as of 1 July 2026. Statistical Committee of the Republic of Armenia (Armstat), 2026. accessed 9 October 2026.
- The main results of the RA Census 2022 (section 8: housing and living conditions). Statistical Committee of the Republic of Armenia (Armstat), 2023. accessed 9 October 2026.
- Official exchange rates (EUR 405.58 AMD, 9 October 2026). Central Bank of Armenia, 2026. accessed 9 October 2026.
- About ENA. Electric Networks of Armenia CJSC. accessed 9 October 2026.
- ENA customer portal (registration by 7-digit card number). Electric Networks of Armenia CJSC. accessed 9 October 2026.
- R2E2 Fund home page: installed autonomous solar, wind and small hydro capacity. Renewable Resources and Energy Efficiency Fund of Armenia, 2026. accessed 9 October 2026.
- High Voltage Electric Networks CJSC. High Voltage Electric Networks CJSC. accessed 9 October 2026.
- Electricity market: rules and indicators. Public Services Regulatory Commission. accessed 9 October 2026.
Questions about energy in Armenia.
From 1 February 2026 households pay 46.48 dram/kWh by day for up to 200 kWh a month, 48.48 for 201–400 kWh and 53.48 above 400 kWh, with night rates 10 dram lower, all including VAT. Socially vulnerable families pay 29.99 and 19.99 dram. In 2025 households paid ENA an average of 42.0 dram/kWh, about EUR 0.10.
Almost all households are supplied by Electric Networks of Armenia (ENA), which owns the national distribution network and is the guaranteed supplier at PSRC tariffs. Since February 2022 consumers may choose a licensed supplier, but the competitive market serves mainly businesses.
There is no standard meter-point code. A household connection is identified by its 7-digit ENA customer card number, which appears on bills and contracts and is used to register on ENA’s online portal.
Yes. As an "autonomous energy producer" you can install up to 150 kW of renewable generation (capped at your contracted capacity) without a licence. Exports are netted against your consumption each month, and surplus left at the end of the May–April settlement year is paid at the minimum balancing-market price.
A storage licence was added to the Law on Energy in May 2026 and takes effect six months after publication. The PSRC is still drafting the detailed rules, so thresholds and any exemptions for home batteries had not been published as of October 2026.
In 2025 large hydro supplied about 13.6% of generation, and small hydro, solar and other plants about 22.9%, so roughly 36% was renewable. Gas-fired plants supplied 34.6% and nuclear 28.9%.
A standard single-phase connection for a detached house costs 166,000 dram (10 kVA) or 199,000 dram (14 kVA) in Yerevan, and 124,000 or 140,000 dram elsewhere, plus local permit fees. New flats are connected at the developer’s cost.