How electricity works in Azerbaijan.
Azerbaijan electricity market 2026: Tariff Council household tariffs from 8.4 qəpik/kWh, Azerenerji and Azerishiq, 150 kW active-consumer netting, licensing and market reform.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Azerbaijani manat (AZN) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Azerbaijan energy at a glance.
Key figures for households in Azerbaijan. Each one links to its source on the full overview below.
Electricity price.
0.091 AZN per kWh for households, including taxes. Figures for 2026.
Household use.
3,069 kWh a year for a typical household. Figures for 2025.
Renewable share.
12.6% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Azerbaijan.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Azerbaijan below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Azerbaijan requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Azerbaijan.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Azerbaijan, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Azerbaijan, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Azerbaijan.
The energy market in Azerbaijan, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Azerbaijan’s power system runs mainly on natural gas. In 2025 the country generated 28,683 million kWh. Gas-fired power stations and combined heat and power plants produced 86.6% of it, hydro 9.9%, solar 2.1%, waste incineration 0.8% and wind 0.6%, according to the State Statistical Committee. Azerbaijan is a net exporter: it exported 1,148 million kWh in 2025 and imported 177 million kWh.
The sector is still dominated by two state companies. Azerenerji OJSC owns most power stations and the high-voltage grid (110–500 kV), dispatches the system and trades with neighbouring countries. Azerishiq OJSC owns the distribution network up to 110 kV and is the supplier for households and most businesses. Retail prices are set by the Tariff (Price) Council. Since 2 January 2025 households pay 8.4 qəpik per kWh for the first 200 kWh a month, 10.0 qəpik for 200–300 kWh and 15.0 qəpik above 300 kWh, including VAT. A fixed charge of 1 manat a month was added from 1 January 2026.
The 2023 Law on Electric Power sets out a three-stage move from this vertically integrated model to a competitive market. A wholesale market run by a market operator is planned from July 2025 and full liberalisation from July 2028. Households can already become “active consumers”: they can install up to 150 kW of renewable generation, offset exports against imports and be paid for any net surplus at the wholesale tariff. Most new renewable capacity, however, comes from large solar and wind plants built by foreign investors under power purchase agreements.
Energy snapshot.
Headline figures for electricity in Azerbaijan. Each shows its data year and links to its source.
- Population10,262,400 peopleSource 81 Jan 2026
- Households2,293,800 householdsSource 92019 census
- Average household size4.19 people/householdSource 152024
- Electricity use per household3,069 kWh/yrSource 102025
- Household price (AZN)0.091 AZN/kWhSource 12026
- Household price (EUR)0.048 EUR/kWhSource 72026
- Renewable electricity share12.6%Source 102025
- Solar capacity0.378 GWSource 292026
- Wind capacity0.307 GWSource 292026
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Azerbaijan Energy Regulatory Agency (AERA); tariffs set by the Tariff (Price) Council
- System operator
- Azerenerji OJSC (transmission owner; Central Dispatch Office as system operator)
- Distribution networks
- One main distribution and supply company, Azerishiq OJSC, owning the network up to 110 kV nationwide
- Currency
- Azerbaijani manat (AZN)
- Voltage and frequency
- 220 V / 50 Hz
Electricity prices in Azerbaijan.
- Household price (AZN)
- 0.091 AZN/kWh (2026)Source 1Derived effective price for a household using the national average of about 256 kWh a month: 200 kWh at 8.4 qəpik, 56 kWh at 10.0 qəpik and the 1 manat monthly fixed charge, all including VAT. The tiered rates are 0.084, 0.10 and 0.15 AZN/kWh (Tariff Council Decision 19 of 29 December 2024; fixed charge from Decision 9 of 30 December 2025).
- Household price (EUR)
- 0.048 EUR/kWh (2026)Source 7Converted from 0.0914 AZN/kWh at the Central Bank of Azerbaijan official rate of 1.9093 AZN per EUR for 9 October 2026. The three tiers convert to EUR 0.044, 0.052 and 0.079/kWh.
- Typical annual electricity bill
- 281 AZN/yr (2026)Source 1Derived: about 23.38 AZN a month for 256 kWh (the national average implied by 2025 household consumption and 2019 census households) under the tiered tariff, including the 1 manat fixed charge. About EUR 147 at 1.9093 AZN/EUR (CBAR, 9 October 2026). This is an illustration, not an official typical bill.
Household price trend (AZN per kWh).Source 4
| Dec 2016 | 0.07 AZN/kWh |
|---|---|
| Nov 2021 | 0.08 AZN/kWh |
| Jan 2025 | 0.084 AZN/kWh |
How prices are set
Retail and wholesale electricity prices are approved by the Tariff (Price) Council on applications from Azerenerji and Azerishiq. One national tariff table covers the whole country, so there are no regional price differences. The table also sets wholesale purchase prices: 6.2 qəpik/kWh for Azerenerji and other conventional generation, 7.1 for small hydro, 7.3 for wind and 8.5 for solar and other renewables. Transmission costs 1.3 qəpik/kWh. Non-household customers pay 10.6 qəpik (industry and agriculture) or 12.5 qəpik (all others, including EV charging points).
Recent changes
Household prices have risen in small steps. From December 2016 households paid 7 qəpik for the first 250 kWh a month and 11 qəpik above that. From 1 November 2021 the structure changed to three bands: 8, 9 and 13 qəpik. From 2 January 2025 the bands rose to 8.4, 10.0 and 15.0 qəpik, and in 2026 a monthly fixed charge was added. The steepest rise has been in the top band, which affects homes that use electricity for heating or air conditioning.
Comparison
Even after these increases, Azerbaijani household electricity is among the cheapest in Europe and the South Caucasus, at under EUR 0.05/kWh for typical use. The low price reflects cheap domestic gas and state ownership. The 2023 Law on Electric Power describes its market reforms as intended in part to phase out subsidies, so tariffs are likely to come under further pressure as the wholesale market develops.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households pay the Tariff Council’s increasing-block tariff, including VAT: 8.4 qəpik/kWh for the first 200 kWh a month, 10.0 qəpik for 200–300 kWh and 15.0 qəpik for consumption above 300 kWh (Decision 19 of 29 December 2024, in force from 2 January 2025). “Monthly” means any 30 consecutive calendar days. |
| Other | Yes | A fixed charge of 1.0 manat a month applies to households and single-phase non-household consumers from 1 January 2026, and 3.0 manat to three-phase non-household consumers (Decision 9 of 30 December 2025). |
| Prepayment | Yes | Azerishiq installs prepaid smart meters. SMS meters start with 5 AZN of credit, send an alert below a 5 AZN reserve and cut supply automatically when the credit runs out. NFC meters are topped up with a card. The tariff is the same as for post-paid customers. |
| Time-of-use | No | There is no household day/night tariff. Day (08:00–22:00) and night (22:00–08:00) rates of 7.0 and 3.4 qəpik/kWh exist only for aluminium and ferrosilicon plants connected at 35–110 kV and using at least 5 million kWh a month. |
| Dynamic | No | No household tariff linked to wholesale prices exists. Under the 2023 Law on Electric Power only “free” consumers above a government-set annual consumption threshold may choose a supplier, and households currently stay on regulated supply. |
Household prices compared with neighbouring countries (EUR per kWh).
- Armenia€0.104
- Kazakhstan€0.076
- Georgia€0.073
- Turkey€0.066
- Russia€0.062
- Uzbekistan€0.049
- Azerbaijan€0.048
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,069 kWh/yr (2025)Source 10Derived: 7,040.8 million kWh consumed by households in 2025 (energy balance) divided by 2,293,800 households (2019 census). Because the household count is from 2019, this probably overstates current use per household somewhat.
- Average daily use per household
- 8.4 kWh/day (2025)Source 10Derived from the 3,069 kWh a year average household consumption.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 2,101 kWh/person/yr (2025)Source 10All sectors. Derived: 21,519.6 million kWh final electricity consumption in 2025 divided by the average of the 1 January 2025 and 1 January 2026 populations (10,243,650).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 50.1 % of homes (2024)Source 18Share of households with air conditioning in the 2024 household budget survey (52.1 units per 100 households; 66.7 per 100 in urban and 34.0 in rural households).
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households used 7,040.8 million kWh in 2025, about a third (32.7%) of final electricity consumption. Commerce and public services took 7,350.3 million kWh, industry and construction 4,472.2 million kWh and agriculture 2,248.0 million kWh. Baku accounted for 3,076.9 million kWh of household use.
Gas, not electricity, is the main household fuel. In the 2024 household budget survey 98.5% of households had mains gas, 49.1% had an individual heating system and 40.0% heated with a stove. Households burned 4,006 million cubic metres of gas in 2025. Electricity demand is therefore driven mainly by appliances, lighting and air conditioning, which half of households now own.
Network losses are significant. In 2025, 1,883.1 million kWh was lost in distribution networks and 392.0 million kWh in transmission, against 21,519.6 million kWh of final consumption.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 94.9% (2024)Source 16Share of surveyed households living in a home owned by the household (2024 household budget survey, table 86).
- Private rented
- 0.5% (2024)Source 16Households renting from private individuals (table 86).
- Social or public housing
- 4.6% (2024)Source 16Derived: homes owned by the state (4.4%) or a municipality (0.2%). This is public ownership, not a formal social-housing sector.
- Houses
- 69.2% (2024)Source 16Derived: private house (68.5%) plus part of a private house (0.7%), share of households (table 86).
- Apartments and flats
- 29.6% (2024)Source 16Derived: separate apartment (29.2%), part of an apartment (0.2%) and communal apartment (0.2%). A further 1.0% live in hostels.
- Urban population
- 54.3% (1 Jan 2026)Source 85,574,200 urban residents out of 10,262,400.
Almost all households own their home, and most live in houses rather than flats. Nationally 68.5% of households live in a private house. In Baku the pattern is reversed: 72.5% of households there live in apartments, compared with only 3.3% in rural areas. Much of the stock is old. About 55% of households live in buildings constructed between 1961 and 1990, and only 1.1% in homes built after 2020.
This split matters for small-scale solar. Rural and suburban owners of detached houses have their own roofs and their own Azerishiq connection, so they can use the active-consumer scheme directly. Flat dwellers in Baku’s Soviet-era blocks generally cannot.
How the grid works in Azerbaijan.
- TransmissionAzerenerji OJSC, Central Dispatch Office (Azerenerji)
- DistributionOne main distribution and supply company, Azerishiq OJSC, owning the network up to 110 kV nationwide
- MeteringNot identified from a reliable public source.
- Supply2 or more retail suppliers
Physical flow
Large gas-fired stations, such as the Azerbaijan Thermal Power Plant, combined heat and power plants, the hydro plants on the Kur and other rivers, and the new solar and wind farms feed Azerenerji’s 110–500 kV transmission network. Azerishiq takes power from it into distribution networks of up to 110 kV and delivers it to homes at 220 V. The system is synchronised or interconnected with Russia, Georgia and Iran, and exported 1,148 million kWh in 2025.
Commercial flow
Today the money flows through state companies at regulated prices. Azerenerji generates or buys power, including from private renewable plants under power purchase agreements, and sells it at a regulated wholesale tariff to Azerishiq, which bills end users at Tariff Council prices. The Law on Electric Power changes this in stages. In the second stage, from 1 July 2025 to 30 June 2028, a market operator buys electricity from all generators, except renewable plants selling to the guaranteed buyer, and sells it to all suppliers. In the third stage, from 1 July 2028, the market operator becomes independent and competitive market rules take effect. AERA still describes the current market as a vertically integrated monopoly.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy | Sets energy policy and leads renewable-energy auctions and investment agreements with developers. Under the AERA licensing page, it currently issues permits for transmission, distribution, electricity export and import, and generation above the capacity limit set by the Cabinet of Ministers. |
| Regulator | Azerbaijan Energy Regulatory Agency (AERA) | Energy regulator. It regulates electricity and gas utilities, issues commissioning acts for electrical installations above the Cabinet-set capacity, inspects billing meters, handles consumer complaints and takes part in tariff regulation. The 2023 Law on Electric Power transfers licensing of generation, transmission and distribution to the regulator from 1 July 2028. |
| Regulator | Tariff (Price) Council | Government body that approves all regulated electricity tariffs: wholesale purchase prices, transmission, and retail tariffs for households and businesses. |
| TSO | Azerenerji OJSC | Wholly state-owned. It runs the state power stations, which produce about 90% of the country’s electricity, and owns the 110, 220, 330 and 500 kV network. It is also the wholesale seller to Azerishiq, sells directly to a few large consumers on the transmission network, and handles electricity imports, exports and transit. |
| System operator | Central Dispatch Office (Azerenerji) | Dispatches the power system, provides system services (frequency and voltage control, reserves) and manages synchronous or island operation with the Russian, Iranian and Georgian systems. Its SCADA/EMS covers 46 energy facilities through a main and a back-up control centre and five regional monitoring centres. |
| DSO | Azerishiq OJSC | Distribution and supply operator. It owns distribution lines up to 110 kV (including 110 kV submarine cables) and their substations. It connects customers, installs and owns household meters, bills households and businesses, and runs regional electricity network branches across the country. |
| Supplier | Azerishiq OJSC (supply) | The regulated supplier to households. Under the 2023 law, distribution and supply must be separated financially and functionally in the first stage and legally from the second stage. |
Compared with the UK system.
| UK concept | Azerbaijan equivalent | How it works |
|---|---|---|
| DNO | Azerishiq OJSC | A single state company owns and operates almost all distribution networks up to 110 kV and is also the retail supplier. Unlike a UK DNO, it bills customers directly and runs prepaid metering. |
| National Grid/NESO | Azerenerji OJSC and its Central Dispatch Office | Azerenerji owns the high-voltage grid and dispatches the system, but it also owns most generation and sells wholesale to Azerishiq. The 2023 law requires legal separation of generation and transmission and a separate market operator, first as a subsidiary of the transmission operator and from July 2028 as an independent company. |
| MPAN | Azerishiq subscriber code (abonent kodu) | Each household account is identified by a subscriber code issued by Azerishiq when the supply contract is signed. It is used for payments, debt checks and applications to increase capacity. It is an account number, not a standardised meter-point code, and its format is not published. |
| MPRN | Gas distributor’s subscriber account | Gas is supplied under separate subscriber accounts held by the gas distributor. When a property changes hands, the previous consumer must clear any gas debt and pass the certificate to the new consumer. No national gas meter-point format was identified. |
| Meter operator | Azerishiq OJSC | Household meters are supplied, installed and replaced at the energy supply company’s expense. AERA can inspect billing meters when there is a dispute. |
| Supplier | Azerishiq (regulated supplier) | Households cannot choose their supplier. The 2023 law lets only “free” consumers, whose annual use is at or above a threshold set by the government, choose a supplier. Others are supplied at regulated prices by an authorised supplier. |
| Smart-meter infrastructure | Azerishiq prepaid smart meters | There is no DCC-style national data hub. Azerishiq’s smart meters are mainly a prepayment tool, topped up by SMS or NFC card. The law says the network operator need not read smart meters monthly, and smart-meter roll-out falls under the energy-efficiency law. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Subscriber code (abonent kodu) |
| Who issues it? | Azerishiq OJSC |
| Format | Account code assigned by Azerishiq to each subscriber card when the electricity purchase-and-sale contract is signed. The format and length are not published, and Azerishiq’s online lookup form does not enforce a fixed pattern. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On Azerishiq bills and the supply contract. It can also be looked up with the “Find your debt and code” tool on azerishiq.az, which also searches by name and district. Prepaid meters additionally carry a meter number. |
| Electronic access | Through the Azerishiq personal cabinet and e-services, the e-government portal (e-gov.az) and payment platforms. Debt certificates are free and immediate at ASAN service and ASAN Kommunal centres. |
| Third-party access | No framework was identified for third parties such as installers or energy-service companies to access consumption data with consent. |
| Who keeps the register | Azerishiq customer database |
| Register scope | National |
Azerbaijan does not use an EAN-style meter-point identifier. A household connection is identified by its Azerishiq subscriber code. To become a subscriber, a household applies to open a new subscriber card. It provides proof of residence from the housing management office, a copy of the title document (kupça or order) and, for new buildings, the technical conditions. Azerishiq then signs an electricity purchase-and-sale contract and issues a new code.
When a home changes hands, the new owner or tenant must get a certificate from Azerishiq confirming that the previous occupant has no unpaid electricity bills. This points to the supply account being tied to the premises. However, no published rule says whether the code itself stays with the property or is reissued, so this is left unconfirmed.
New connections are requested online through azerishiq.az or the e-government portal, or in person at ASAN service and ASAN Kommunal centres. Applicants provide ID, proof of ownership and a load report. Fees follow Cabinet of Ministers decisions, and connection is made within 12 or 24 days depending on the payment option. Flats in buildings that already have general technical conditions need no separate technical conditions, project or connection fee. Owners who later want more capacity apply online with their subscriber code and the kW figure in their original technical conditions, and the system calculates the extra fee.
Azerishiq is the single national holder of the customer register. There is no separate data hub, and meter data stay within Azerishiq’s billing system.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Net metering over a reporting period. Net imports are paid at the consumer’s retail tariff; any net export is paid by the supplier at the current wholesale tariff. |
| Who counts as an active consumer? | A legal entity or individual that consumes electricity and also generates up to 150 kW (inclusive) from renewable energy sources (Law No. 339-VIQ of 31 May 2021, Article 1.1.12; Law on Electric Power, Article 1.1.1). |
| How is surplus electricity settled? | Under Article 10 of the renewable-energy law, surplus is fed into the distribution network for later offset. If imports exceed exports at the end of the reporting period, the consumer pays the difference at the retail tariff for their consumer group. If exports exceed imports, the supplier pays the difference at the existing wholesale tariff. |
| What wholesale price applies to solar surplus? | The law refers to the “existing wholesale tariff” without naming a figure. The Tariff Council’s current table sets a wholesale price of 8.5 qəpik/kWh for solar and other renewable producers and 6.2 qəpik/kWh for conventional generation. No published decision confirming which rate applies to active consumers was identified. |
| Who pays for the meter? | The active consumer installs a bidirectional meter at their own expense (Article 10.3). Ordinary household meters are supplied by the energy supply company. |
| Who sets the detailed rules? | The rules for applying the active-consumer support mechanism are set by the body designated by the executive authority (Article 10.4). |
Connecting a home system.
- Size the installation: an active consumer may generate up to 150 kW (inclusive) from renewable sources while also consuming electricity.
- Apply to Azerishiq for connection or a capacity change through azerishiq.az, the e-government portal or ASAN service.
- Install, at the consumer’s own expense, a meter that records both electricity sent to the grid and electricity taken from it, and connect to the network.
- Exports are offset against imports over the reporting period set in the implementing rules.
- At the end of the period, pay for any net import at the retail tariff, or receive payment for any net export at the wholesale tariff.
Small renewable generators were given a legal route to the grid by the 2021 Law on the Use of Renewable Energy Sources in Electricity Production. The law lists support for active consumers as one of its support mechanisms, alongside guaranteed tariffs for auctioned projects and tax and customs measures. The 2023 Law on Electric Power confirms that active consumers may sell the surplus beyond their own consumption under the renewable-energy law, and lets consumers store electricity for their own use.
Uptake data for active consumers are not published. AERA describes several self-supply plants, some connected to the grid, and one active consumer operating in island mode. Because the retail price is low (8.4 qəpik/kWh in the first band) and gas is used for heating and cooking, savings from household solar are modest. A Ministry of Energy programme has nevertheless installed more than 8 MW of solar panels on over 2,500 private houses, public buildings and social facilities in the territories being resettled.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Permit needed above 500 kW for hydro and biomass/biogas plants and above 150 kW for all other plants (Law on Electric Power, Article 8.1.1). Below these thresholds no generation permit is required. | Ministry of Energy (until the regulator takes over under Article 8.2 on 1 July 2028) | Permits may be issued to legal entities or individuals. Large renewable projects are awarded by auction or direct negotiation, followed by an investment agreement and a power purchase agreement with the guaranteed buyer. |
| Operate electrical installations | Permit or commissioning act required for electrical installations above 150 kW (Article 8.1.4). | AERA | AERA issues commissioning certificates for new and reconstructed installations: 139 in 2024. |
| Export surplus from a home system | No licence up to 150 kW. The consumer must qualify as an active consumer, install a bidirectional meter and connect through Azerishiq. | Azerishiq; rules by the designated executive body | Settlement under Article 10 of Law No. 339-VIQ (net metering with wholesale-price payment for net surplus). |
| Store electricity | No separate storage licence. Generators may store the electricity they produce (Article 12.2.4) and consumers may store electricity for their own use (Article 19.7.4). | Law on Electric Power | Storage is defined in Article 1.1.30 of the 2023 law. Standalone grid-scale storage is not yet covered by any specific licensing procedure identified in this research. |
| Transmission and distribution | Permit required (Article 8.1.2–8.1.3), issued only to legal entities that own or use the network. | Ministry of Energy (regulator from 1 July 2028) | Held by Azerenerji (transmission) and Azerishiq (distribution). Network operators may not generate or supply electricity once the unbundling rules apply. |
| Supply / sell to consumers | Regulated supply by Azerishiq. Competitive supply to eligible consumers is part of the market model phased in from 2025 to 2028. | Ministry of Energy / regulator | Suppliers must be legally and economically independent from network operators; that requirement takes effect in 2028. |
| Electricity import and export | Separate permit (Article 8.1.5). | Body designated by the executive authority (Ministry of Energy) | Azerenerji currently handles cross-border trade. |
| Wholesale trading | From 1 July 2025 the market operator, as a subsidiary of the transmission operator, buys from generators and sells to suppliers under temporary wholesale-market rules. Bilateral contracts and a competitive market follow from July 2028. | Market operator; rules approved by the designated body | The market operator may not buy or sell electricity for its own account once it is independent. |
| Aggregation, VPP and balancing services | No aggregator licence or VPP framework identified. System services are provided through Azerenerji’s Central Dispatch Office. | — | No route for distributed assets to offer balancing was identified. |
| Remote control of assets | No rule identified requiring remote control of household systems. Azerishiq’s prepaid meters can disconnect supply automatically when credit runs out. | — | — |
Licensing is in transition. Under the AERA licensing page, the Ministry of Energy currently issues permits for transmission, distribution, export and import, and generation above the limit set by the Cabinet of Ministers. AERA issues commissioning acts for larger electrical installations. The 2023 Law on Electric Power lists the permitted activities in Article 8, but the provision handing permit-issuing to the regulator applies only from 1 July 2028.
For small systems the thresholds matter most. Solar and wind installations up to 150 kW need no generation permit, which matches the active-consumer limit. Hydro and biomass plants are exempt up to 500 kW.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| System services (frequency, voltage, reserves) | No | — | No | Azerenerji Central Dispatch Office. Provided by Azerenerji’s own plants under central dispatch. No market for third-party providers was identified. |
| Wholesale market (second stage) | Restricted | — | No | Market operator (subsidiary of the transmission operator). From 1 July 2025 the market operator buys from generators and sells to suppliers under temporary wholesale rules. This is a single-buyer arrangement rather than an open exchange. |
| Demand response | No | — | No | No demand-response or flexibility scheme for households or small businesses was identified. Households have no time-of-use tariff. |
There is no route for household batteries, EV chargers or aggregated small assets to earn money from flexibility. The system is balanced by Azerenerji’s gas-fired and hydro plants, and households pay flat tiered tariffs with no time signal. The phased market reform focuses first on unbundling and a central wholesale buyer. Competitive arrangements in which flexibility could be priced are scheduled only for the third stage, from July 2028.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Prepaid smart (SMS and NFC-card) meters installed by Azerishiq; no national penetration figure published |
| Reading interval | Not identified |
| Meter owner and installer | Azerishiq (cost borne by the supply company) |
| Meter types | Smart SMS meters and NFC-card meters, both prepaid |
| Starting credit | 5 AZN on SMS meters; 5 or 10 AZN on NFC meters depending on the district |
| Legal basis | Law on Electric Power, Article 29.10, referring to Article 11 of the energy-efficiency law |
Azerishiq’s smart meters are designed mainly around prepayment and collection. Customers top up through banks, post offices, payment terminals and online platforms. The meter alerts them by SMS when the balance falls to the 5 AZN reserve and cuts supply when the credit runs out. NFC meters are topped up with a card that carries one payment at a time.
The Law on Electric Power exempts network operators from the duty to read smart meters every month and links smart-meter roll-out to the 2021 energy-efficiency law. No official data were found on the number of smart meters, interval readings, or consumer and third-party access to consumption data.
Renewable electricity.
Electricity generation mix (2025).
- Natural gas and other fuels (power and CHP plants): 86.6%
- Hydro: 9.9%
- Solar: 2.1%
- Waste incineration: 0.8%
- Wind: 0.6%
- Renewable electricity share
- 12.6% (2025)Source 10Derived share of generation: hydro 2,842.5, solar 600.4 and wind 172.3 million kWh out of 28,683.0 million kWh. Waste incineration (222.1 million kWh) is excluded. Azerbaijan is a net exporter, so the generation share is used.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Hydro
- 1.444 GW (2026)Source 2965 hydro plants (Ministry of Energy). The State Statistical Committee recorded 1,118.56 MW at the end of 2025.
- Solar
- 0.378 GW (2026)Source 2910 solar plants. 255.64 MW at the end of 2025 (State Statistical Committee).
- Wind
- 0.307 GW (2026)Source 296 wind plants. 303.8 MW at the end of 2025 (State Statistical Committee).
- Bioenergy / waste
- 0.037 GW (2026)Source 29One 37 MW bio power plant (Ministry of Energy). The statistics list a 32 MW municipal solid waste plant at the end of 2025.
- Fuel-fired (mainly gas)
- 6.857 GW (end 2025)Source 11Fuel-fired electricity and CHP plants, out of 8,567 MW total installed capacity.
Targets.
- Raise renewables to at least 30% of installed capacity in the energy mix by 2030 (Ministry of Energy).
- More than 2 GW of green-energy projects planned by 2027.
- Voluntary commitment to cut emissions by 40% by 2050.
Renewables have long meant hydro, which supplied 2,842.5 million kWh in 2025. Utility-scale solar arrived with the 230 MW Garadagh plant, built by Masdar and opened on 26 October 2023; solar output rose from 80.7 million kWh in 2023 to 600.4 million kWh in 2025. Wind capacity jumped from 64 MW to 303.8 MW during 2025, and wind output tripled to 172.3 million kWh.
A large pipeline follows. Masdar is building 445 MW of solar at Bilasuvar, where the first panel went in on 2 October 2025, 315 MW of solar at Neftchala and 240 MW of wind in Absheron and Garadagh. bp is building the 240 MW Shafag solar plant in Jabrayil to supply the Sangachal terminal through a “virtual transmission” arrangement. The 100 MW Gobustan plant, awarded at a 2024 auction, opened on 16 September 2026. Two 50 MW plants in Jabrayil (Ufug and Shams) started construction in October 2025, and two 25 MW plants in Nakhchivan signed agreements in February 2026.
Projects are procured under the 2021 renewable-energy law by auction or direct negotiation, with a power purchase agreement and guaranteed tariff from the guaranteed buyer. The Ministry estimates technical potential at 135 GW onshore and 157 GW offshore, and economic potential at 27 GW, including 23 GW of solar and 3 GW of wind.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is recognised in the 2023 Law on Electric Power. Generators may store the electricity they produce and consumers may store it for their own needs. The state’s duties include keeping enough generation and storage capacity to meet demand. No storage-specific licence, tariff or procurement round was identified. As host of COP29, Azerbaijan launched the Global Energy Storage and Grids Pledge, which supports scaling global storage to 1,500 GW by 2030.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Azerishiq OJSC | Regulated supplier to households nationwide | No | No | No | Yes |
| Azerenerji OJSC | Direct retail sales to a limited number of large transmission-connected consumers | No | Limited | No | No |
There is no competitive household retail market. Azerishiq supplies households at Tariff Council prices, and Azerenerji sells directly to a few large industrial users connected to the transmission network. The 2023 law lets “free” consumers above a government-set annual consumption threshold choose a supplier; no household supply competition exists today.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy | Government | Energy policy, renewable auctions and investment agreements | Publishes renewable capacity, project and target information and signs agreements with developers. |
| Azerbaijan Energy Regulatory Agency (AERA) | Regulator | Energy regulator | Publishes tariffs, connection rules, consumer guidance and commissioning statistics. |
| Tariff (Price) Council | Regulator | Approves regulated tariffs | Source of all current and past electricity tariff decisions. |
| Azerenerji OJSC | Transmission | State generator, transmission owner and system operator | Runs the high-voltage grid, central dispatch and cross-border trade. |
| Azerishiq OJSC | Distribution | Distribution network operator and supplier | Handles connections, meters, subscriber codes and billing for households. |
| State Statistical Committee | Government | National statistics office | Publishes the energy balance, capacity and generation tables and household surveys used in this profile. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (household) | Cabinet of Ministers Decision 399 (3 November 2023) on connecting construction facilities to the network, and Decision 422 (21 November 2023) on the connection-fee methodology | Cabinet of Ministers | Azerishiq cites these decisions for connection fees. AERA’s connection page also refers to Decision 327 of 24 July 2018. |
| Active-consumer metering | Law No. 339-VIQ, Article 10.3 (bidirectional metering) | Milli Majlis | The meter must measure both import and export. Detailed implementing rules are set by the designated executive body. |
| Technical regulation and metrology | Law on Technical Regulation (2019); Law on Ensuring the Uniformity of Measurements (2013) | Milli Majlis | General framework listed by AERA. No national standards specific to inverters or anti-islanding were identified. |
| Rules for electricity use | Rules for the Use of Electricity, Cabinet Decision 18 of 2 February 2005 | Cabinet of Ministers | Long-standing consumer-side rules referred to by AERA. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Network connection / capacity increase | Yes | National | Application to Azerishiq online, through e-gov.az or at ASAN centres, with ID, proof of ownership and a load report. Connection within 12 or 24 days depending on the payment option. |
| Generation permit | Limited | National | Only above 150 kW (500 kW for hydro and biomass). Household systems below this need none. |
| Commissioning act | Limited | National | AERA issues commissioning acts for electrical installations above the capacity set by the Cabinet of Ministers (150 kW under the 2023 law). |
| Bidirectional meter | Yes | National | Active consumers must install one at their own expense to use net metering. |
| Planning permission | Unknown | Local | No specific rule for rooftop solar on existing homes was identified. |
For a household system the practical steps are the Azerishiq connection or capacity application and the bidirectional meter. Systems up to 150 kW fall below both the generation-permit threshold and the commissioning-act threshold.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Active-consumer net metering | Active | Net metering | Renewable systems up to 150 kW can offset exports against imports. Any net surplus at the end of the reporting period is paid at the wholesale tariff. | Since 14 July 2021 |
| Guaranteed tariffs for auctioned renewable projects | Active | Power purchase agreement | Utility-scale projects selected by auction or direct negotiation sign a power purchase agreement with the guaranteed buyer at a guaranteed tariff for the contract term. | — |
| Tax and customs support for renewables | Active | Tax / customs relief | The renewable-energy law lists mechanisms under the Tax Code and the Customs Tariff law as support measures. The specific reliefs were not verified for this profile. | — |
Data and connectivity.
- Fixed broadband
- 21.8 subscriptions per 100 people (2024)Source 37Fixed broadband subscriptions per 100 people (World Bank / ITU). In the 2024 household budget survey 92.4% of households reported internet access.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Internet use is high: 90.8% of people used the internet in 2025 (World Bank). Azerishiq’s prepaid meters communicate with customers by SMS, and NFC meters are topped up with a card. Azerenerji’s transmission SCADA uses a fibre-optic network and the ICCP protocol to exchange data with neighbouring systems. No regulated data channel exists for third-party monitoring of household energy systems.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 27.7 TWh (2025)Source 10Total domestic electricity supply (production plus imports minus exports), including energy-sector own use (3.91 TWh) and network losses (2.28 TWh). Final consumption was 21.52 TWh.
- Generation capacity
- 8.567 GW (end 2025)Source 11Total installed plant capacity at the end of 2025.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The grid has a large gas-fired base and comfortable capacity relative to demand: 8.6 GW installed against 27.7 TWh of annual supply. Distribution losses were 1,883 million kWh in 2025, about 8% of the electricity entering final use and distribution losses combined.
Cross-border links shape the system’s future. The Ministry of Energy is promoting four export corridors: Caspian–Black Sea–Europe (agreed with Georgia, Romania and Hungary in December 2022), Central Asia–Azerbaijan (with Kazakhstan and Uzbekistan, November 2024), Azerbaijan–Türkiye–Europe through Nakhchivan, and Azerbaijan–Georgia–Türkiye–Bulgaria. A 330/110/10 kV substation has been commissioned at Jabrayil as a hub for renewable power from the territories being resettled.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Law on Electric Power in force | Current | 1 January 2024 | Replaced the 1998 Law on Electric Power Industry and the 1999 Law on Power and Heat Plants. It defines active consumers, eligible consumers and storage, and sets a three-stage move to a competitive market. |
| Second market stage: central wholesale market | Current | 1 July 2025 – 30 June 2028 | A market operator, set up as a subsidiary of the transmission operator, buys electricity from all generators (except renewable plants selling to the guaranteed buyer) and sells it to all suppliers. Distribution and supply are to be legally separated. |
| Household fixed charge | Current | 1 January 2026 | Monthly fixed charge of 1.0 manat for households and single-phase non-household consumers, and 3.0 manat for three-phase non-household consumers (Tariff Council Decision 9 of 30 December 2025). |
| Third market stage: full market and independent market operator | Upcoming | 1 July 2028 | An independent market operator, competitive supply to eligible consumers, and permit-issuing for generation, transmission and distribution transferred to the regulator. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No published count of active consumers. AERA mentions only several self-supply plants and one island-mode active consumer. Retail tariffs are very low (8.4–15.0 qəpik/kWh). |
| Distributed energy market | Low | Generation is dominated by state gas-fired plants (86.6% in 2025). Distributed generation is limited to a few privatised small hydro plants, self-supply plants and more than 8 MW of panels in the resettled territories. |
| Grid flexibility market | Low | No aggregator role, demand-response scheme or household time-of-use tariff. System services are provided by Azerenerji under central dispatch. |
| Energy storage adoption | Low | No operating grid-scale battery and no storage licence or procurement identified. The law only allows storage by generators and for consumers’ own use. |
| Renewable growth environment | Medium | Solar output rose from 80.7 to 600.4 million kWh between 2023 and 2025, and wind capacity from 64 to 303.8 MW in 2025. About 1.2 GW is under construction (Bilasuvar, Neftchala, Absheron–Garadagh, Shafag), but renewables were still only 12.6% of generation in 2025. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 38 sources
- Tariffs (prices) — domestic electricity tariffs. Azerbaijan Energy Regulatory Agency, 2026. accessed 10 October 2026.
- Domestic electricity tariffs (annex to Tariff Council Decision 19 of 29 December 2024, as amended 30 December 2025). Tariff (Price) Council of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Decision 9 of 30 December 2025 amending Decision 19 of 29 December 2024 on domestic electricity tariffs. Tariff (Price) Council of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Utility tariffs — electricity tariff decisions 2016–2025. Tariff (Price) Council of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Decision 14 of 16 October 2021 on domestic electricity tariffs. Tariff (Price) Council of the Republic of Azerbaijan, 2021. accessed 10 October 2026.
- Decision 17 of 28 November 2016 on domestic electricity tariffs. Tariff (Price) Council of the Republic of Azerbaijan, 2016. accessed 10 October 2026.
- Official exchange rates of the manat, 9 October 2026. Central Bank of the Republic of Azerbaijan, 2026. accessed 10 October 2026.
- Table 1.4 — Change in population size. State Statistical Committee of the Republic of Azerbaijan, 2026. accessed 10 October 2026.
- Table 6.7 — Distribution of households by household size (census data). State Statistical Committee of the Republic of Azerbaijan, 2019. accessed 10 October 2026.
- Energy balance 3.1.18 — Electricity, 2007–2025. State Statistical Committee of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Table 5.3 — Plant capacity, MW. State Statistical Committee of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Table 5.4 — Production of electricity, million kWh. State Statistical Committee of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Table 5.8 — Electricity consumed by the population by economic region. State Statistical Committee of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Table 4.1.6 — Consumption of energy products in households. State Statistical Committee of the Republic of Azerbaijan, 2025. accessed 10 October 2026.
- Household budget survey 2024, Table 1 — Average household size. State Statistical Committee of the Republic of Azerbaijan, 2024. accessed 10 October 2026.
- Household budget survey 2024, Table 86 — Households by dwelling size, type and ownership. State Statistical Committee of the Republic of Azerbaijan, 2024. accessed 10 October 2026.
- Household budget survey 2024, Table 100 — Amenities of households. State Statistical Committee of the Republic of Azerbaijan, 2024. accessed 10 October 2026.
- Household budget survey 2024, Tables 128/142 — Durable goods in households. State Statistical Committee of the Republic of Azerbaijan, 2024. accessed 10 October 2026.
- Household budget survey 2024, Table 114 — Place of residence of households. State Statistical Committee of the Republic of Azerbaijan, 2024. accessed 10 October 2026.
- Law of the Republic of Azerbaijan on Electric Power (11 April 2023). President of the Republic of Azerbaijan, 2023. accessed 10 October 2026.
- Law No. 339-VIQ on the Use of Renewable Energy Sources in Electricity Production (31 May 2021). e-qanun.az (Ministry of Justice legal database), 2021. accessed 10 October 2026.
- Legal acts — laws. Azerbaijan Energy Regulatory Agency, 2026. accessed 10 October 2026.
- Electricity market structure. Azerbaijan Energy Regulatory Agency, 2026. accessed 10 October 2026.
- History of development of the electric power system. Azerbaijan Energy Regulatory Agency, 2026. accessed 10 October 2026.
- Connection to the electricity network. Azerbaijan Energy Regulatory Agency, 2026. accessed 10 October 2026.
- Licenses and permissions. Azerbaijan Energy Regulatory Agency, 2026. accessed 10 October 2026.
- Check your energy bill. Azerbaijan Energy Regulatory Agency, 2026. accessed 10 October 2026.
- Results report 2024. Azerbaijan Energy Regulatory Agency, 2024. accessed 10 October 2026.
- The use of renewable energy sources in Azerbaijan. Ministry of Energy of the Republic of Azerbaijan, 2026. accessed 10 October 2026.
- About meters (smart SMS and NFC meters). Azerishiq OJSC, 2026. accessed 10 October 2026.
- Residential consumers — subscription and obligations. Azerishiq OJSC, 2026. accessed 10 October 2026.
- Find your debt and code. Azerishiq OJSC, 2026. accessed 10 October 2026.
- Your questions — network connection. Azerishiq OJSC, 2026. accessed 10 October 2026.
- Network connection — technical conditions and 2025 connection statistics. Azerishiq OJSC, 2026. accessed 10 October 2026.
- Energy system management (Central Dispatch Office). Azerenerji OJSC, 2026. accessed 10 October 2026.
- General information. Azerenerji OJSC, 2026. accessed 10 October 2026.
- Fixed broadband subscriptions (per 100 people) — Azerbaijan. World Bank (ITU data), 2024. accessed 10 October 2026.
- Individuals using the Internet (% of population) — Azerbaijan. World Bank (ITU data), 2025. accessed 10 October 2026.
Questions about energy in Azerbaijan.
Households pay 8.4 qəpik per kWh for the first 200 kWh a month, 10.0 qəpik for 200–300 kWh and 15.0 qəpik above 300 kWh, including VAT (from 2 January 2025). There is also a fixed charge of 1 manat a month from 1 January 2026. A household using the national average of about 256 kWh a month pays roughly 0.091 AZN/kWh, about EUR 0.048.
Azerishiq OJSC, the state distribution and supply company, supplies households across the country at Tariff Council prices. Households cannot choose another supplier.
Yes. A consumer generating up to 150 kW from renewables is an “active consumer”. Exports are offset against imports, and any net surplus at the end of the reporting period is paid by the supplier at the wholesale tariff. You need a bidirectional meter, installed at your own expense.
The closest equivalent is the Azerishiq subscriber code (abonent kodu), issued when the supply contract is signed. It is shown on bills and used for payments and applications. It is an account code rather than a standard meter-point number, and its format is not published.
No generation permit is needed for solar or wind up to 150 kW (500 kW for hydro or biomass). You must apply to Azerishiq for connection or a capacity change and install a meter that records both import and export.
In 2025 hydro, solar and wind produced 12.6% of the 28,683 million kWh generated, according to the State Statistical Committee. The rest came almost entirely from gas-fired plants. The government aims for at least 30% renewables in installed capacity by 2030.
Gradually. The 2023 Law on Electric Power created a three-stage transition. A central wholesale market run by a market operator applies from July 2025, and full competition with an independent market operator is scheduled from July 2028. Households remain on regulated supply.