How electricity works in Georgia.
Georgia electricity 2026: GNERC regulation, GSE transmission, Telasi and Energo-Pro distribution, regulated step tariffs, net metering moving to net billing.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Georgian lari (GEL) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Georgia energy at a glance.
Key figures for households in Georgia. Each one links to its source on the full overview below.
Electricity price.
0.229 GEL per kWh for households, including taxes. Figures for 2026-S1.
Household use.
1,576 kWh a year for a typical household. Figures for 2025.
Renewable share.
80.4% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Georgia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Georgia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Georgia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Georgia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Georgia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Georgia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Georgia.
The energy market in Georgia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Georgia’s electricity system is built on hydropower. According to the regulator, GNERC, hydropower plants delivered 79.8% of the electricity sent out to the grid in 2025, gas-fired thermal plants 19.6% and the country’s single wind farm 0.6%. The first utility-scale solar plants came online in the second half of 2025. Rivers run high in spring and summer, when Georgia exports surplus power, and low in winter, when thermal plants and imports cover demand.
Household electricity is among the cheapest in Europe. Eurostat records an average household price of 0.2292 lari (€0.0731) per kWh including taxes for the first half of 2026. Households buy from a regulated “universal service supplier” at step tariffs set by GNERC: the price per kWh rises once monthly consumption passes 101 kWh, and again above 301 kWh.
Georgian State Electrosystem (GSE) runs the high-voltage grid and the electricity system. Two distribution companies cover the country: Telasi in Tbilisi and Energo-Pro Georgia everywhere else. A power exchange, GENEX, opened day-ahead and intraday markets on 1 July 2024. Full hourly balancing responsibility is scheduled for 1 July 2027. Households have been able to net-meter small generators since 2016. That scheme is now giving way to net billing in areas where connected micro-generation has reached its regulatory cap.
Energy snapshot.
Headline figures for electricity in Georgia. Each shows its data year and links to its source.
- Population3,941,100 peopleSource 61 Jan 2026
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per household1,576 kWh/yrSource 72025
- Household price (GEL)0.229 GEL/kWhSource 12026-S1
- Household price (EUR)0.073 EUR/kWhSource 22026-S1
- Renewable electricity share80.4 % of electricity generationSource 72025
- Solar capacityNot identified from a reliable public source.
- Wind capacity0.021 GWSource 52024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Georgian National Energy and Water Supply Regulatory Commission (GNERC)
- System operator
- Georgian State Electrosystem (GSE), transmission and system operator
- Distribution networks
- Two distribution system operators with separate territories: Telasi JSC (Tbilisi) and Energo-Pro Georgia JSC (the rest of the country).
- Currency
- Georgian lari (GEL)
- Voltage and frequency
- 220 V / 50 Hz
Electricity prices in Georgia.
- Household price (GEL)
- 0.229 GEL/kWh (2026-S1)Source 1Eurostat average household price including all taxes and levies, consumption band DC (2,500–4,999 kWh a year). GNERC gives a comparable 2025 household tariff of 19.88 tetri/kWh including taxes.
- Household price (EUR)
- 0.073 EUR/kWh (2026-S1)Source 2Eurostat’s own EUR value for band DC, so no separate conversion was applied. Comparing it with Eurostat’s lari figure (0.2292) implies about 3.14 GEL per euro for the period.
- Typical annual electricity bill
- 361 GEL/yr (2025–2026)Source 7Derived: 1,576 kWh, the average per household metering point (GNERC, 2025), multiplied by Eurostat’s 2026-S1 price of 0.2292 GEL/kWh. This is an indication, not an official typical bill. Because of the step tariff, households that use less pay a lower average price per kWh.
Household price trend (GEL per kWh).Source 1
| 2018-S1 | 0.2045 GEL/kWh |
|---|---|
| 2018-S2 | 0.2222 GEL/kWh |
| 2019-S1 | 0.2472 GEL/kWh |
| 2019-S2 | 0.2013 GEL/kWh |
| 2020-S1 | 0.2215 GEL/kWh |
| 2020-S2 | 0.2138 GEL/kWh |
| 2021-S1 | 0.2526 GEL/kWh |
| 2021-S2 | 0.2393 GEL/kWh |
| 2022-S2 | 0.238 GEL/kWh |
| 2023-S1 | 0.2378 GEL/kWh |
| 2023-S2 | 0.2489 GEL/kWh |
| 2024-S1 | 0.2078 GEL/kWh |
| 2024-S2 | 0.2084 GEL/kWh |
| 2025-S1 | 0.2294 GEL/kWh |
| 2025-S2 | 0.2307 GEL/kWh |
| 2026-S1 | 0.2292 GEL/kWh |
How the household price is built
GNERC sets the household tariff in three regulated parts: a supply tariff for the universal service supplier, a distribution tariff for Telasi or Energo-Pro Georgia, and GSE’s transmission tariff. Supply tariffs are set for one year and network tariffs for five-year regulatory periods. Telasi’s distribution tariffs were approved for 1 January 2026 to 1 January 2031. Energo-Pro Georgia received temporary distribution tariffs from 1 January to 1 April 2026, and GSE’s 2026 tariff was kept at its existing level. Because the target market model was postponed to 1 July 2027, GNERC held 2025 supply tariffs at their first-half-2025 level for the rest of the year.
The step tariff
Household tariffs rise in steps with monthly consumption. The first step covers up to 101 kWh, the second 101–301 kWh, and the third everything above 301 kWh. In 2025, Telasi-area households used 12% of their electricity in the lowest step, 51% in the second and 37% in the third. In the Energo-Pro area the split was 16%, 50% and 34% (GNERC). Telmico, the Tbilisi supplier, also administers a state electricity subsidy for socially vulnerable and large families. The subsidy was increased in May 2026.
Two price zones
The two regional universal service suppliers have different tariffs. Tbilisi Electricity Supply Company (Telmico) serves Telasi’s area and EP Georgia Supply serves Energo-Pro Georgia’s. Their supply components differ, as do the distribution tariffs of the two networks, so the same consumption costs a different amount in Tbilisi and in the regions.
Trend and comparison
Eurostat’s household price has stayed between about 0.20 and 0.25 GEL/kWh since 2018, rising from 0.2084 in the second half of 2024 to 0.2292 in the first half of 2026. In euro terms it was €0.0731/kWh in the first half of 2026. In GNERC’s 2025 comparison of household tariffs including taxes, only Azerbaijan (18.25 tetri/kWh) was cheaper than Georgia (19.88). Germany was the most expensive country in the comparison, at 123.96 tetri/kWh.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Households are supplied by the universal service supplier at tariffs set by GNERC. The final tariff is the sum of regulated supply, distribution and transmission charges. For households connected at 220–380 V, the supply component steps up with monthly consumption: 0–101 kWh, 101–301 kWh and above 301 kWh. For Tbilisi Electricity Supply Company the supply components were 1.590, 4.990 and 8.790 tetri/kWh; for EP Georgia Supply they were 1.068, 2.438 and 4.424 tetri/kWh. Network charges come on top of these (GNERC, 2025 report). |
| Other | Yes | Supplier-of-last-resort tariff: 18.661 tetri/kWh at Tbilisi Electricity Supply Company and 18.189 tetri/kWh at EP Georgia Supply (supply tariffs set by GNERC). This applies when a customer’s supplier fails. |
| Variable | Limited | Since March 2024 one independent supplier has sold electricity at deregulated prices. It held 0.2% of the retail market in 2025 (GNERC). |
| Time-of-use | Unknown | GNERC’s published household tariffs are stepped by monthly volume, not by time of day. No time-of-use household tariff was identified. |
| Dynamic | No | No household tariff indexed to the day-ahead price was identified. Wholesale trading for most of the market is still settled monthly until the target market model starts in July 2027. |
Household prices compared with neighbouring countries (EUR per kWh).
- Armenia€0.104
- Georgia€0.073
- Turkey€0.066
- Russia€0.062
- Azerbaijan€0.048
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 1,576 kWh/yr (2025)Source 7GNERC: average annual household consumption per metering point across Georgia. The regional average ranges from 931 kWh (Racha-Lechkhumi) to 2,053 kWh (Adjara). It is 1,790 kWh in Tbilisi. Because many accounts belong to seasonal or empty homes, an occupied household uses more.
- Average daily use per household
- 4.3 kWh/day (2025)Source 7Derived: 1,576 kWh a year per household metering point divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 800 kWh/person/yr (residential) (2025)Source 7Derived: household consumption of 1,257 GWh (Telmico) plus 1,895 GWh (EP Georgia Supply), 3,152 GWh in total (GNERC), divided by the population of 3,941,100 on 1 January 2026 (Geostat). Eurostat records 2,959 GWh of household electricity use in 2024.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Georgian households use relatively little electricity because most homes have mains gas. At the end of 2025, gas distributors had about 1.67 million retail customers, and households used 1,598 million m³ of gas, about half of national gas consumption (GNERC). Average household electricity use per metering point was 1,576 kWh in 2025. It is highest in Adjara (2,053 kWh) and Tbilisi (1,790 kWh), and lowest in the mountainous Racha-Lechkhumi and Kvemo Svaneti region (931 kWh). Tbilisi accounted for 40% of all household consumption.
Demand is growing. GNERC reports that national electricity consumption grew by an average of 3.4% a year between 2016 and 2025, and by 3.2% in 2025 alone. Household consumption rose 6.7% in Telasi’s area and 6.4% in Energo-Pro’s. The system used to peak in winter, but since 2024 it has peaked in summer. GNERC records a peak load of 2,535 MW in 2025.
Large industrial users and electricity supplied to Abkhazia account for a large share of national demand. In 2025, direct consumers took 23.6% of domestic consumption and Abkhazia 17.0%. Regulated suppliers, who serve households and smaller businesses, supplied 51.9%.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- Not identified from a reliable public source.
Verified housing-stock statistics for Georgia (tenure, building type, number of dwellings) were not found in the sources consulted. The 2024 Population and Housing Census is the authoritative source, and its housing results are published by Geostat.
From the electricity data, about 2 million household metering accounts exist across the country, and Tbilisi accounts for 40% of household consumption. To connect a new home, the owner usually shows an extract from the Public Register (the property cadastre) when applying to the distribution company. So the supply account is tied to a registered property.
How the grid works in Georgia.
- TransmissionGeorgian State Electrosystem JSC (GSE)
- DistributionTwo distribution system operators with separate territories: Telasi JSC (Tbilisi) and Energo-Pro Georgia JSC (the rest of the country).
- MeteringNot identified from a reliable public source.
- Supply2 or more retail suppliers
Physical flow
Large hydro plants such as Enguri, together with the thermal plants at Gardabani, feed GSE’s transmission network. Power then passes into the medium- and low-voltage networks of Telasi and Energo-Pro Georgia. Transmission losses were 1.73% of the electricity entering the network in 2025. Distribution losses were 6.01% on Telasi’s network and 9.3% on Energo-Pro Georgia’s, which serves dispersed rural and mountain areas (GNERC). Supply reliability differs widely between the two: in 2025 the average customer lost supply for 11 hours 46 minutes through internal causes on Telasi’s network, and 61 hours 2 minutes on Energo-Pro’s.
Commercial flow
The market is in a transitional model. Most wholesale electricity is still traded under monthly bilateral contracts (10,542 GWh in 2025) or through ESCO’s balancing market (4,453 GWh, at a weighted average of 16.022 tetri/kWh). Only 130 GWh was traded on GENEX’s exchange, at an average of 131.3 GEL/MWh, mostly to cover network losses. Some hydro and thermal plants operate under public service obligations at regulated tariffs. These plants sell to the universal and public service suppliers, which then supply households and businesses at GNERC tariffs.
Cross-border
Georgia trades with Russia, Azerbaijan, Türkiye and Armenia. In 2025, 62% of imports came from Russia, and 74.5% of those imports went to supply Abkhazia. Exports, mostly to Türkiye in summer, fell by 51.2% in 2025. Georgia is also a transit route: 870 GWh passed through it in 2025, mainly from Azerbaijan to Türkiye.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Economy and Sustainable Development | Sets energy policy. The Government of Georgia approves the Electricity Market Model Concept and its timetable, and imposes public service obligations on suppliers and some generators. The ministry also leads security-of-supply planning. |
| Regulator | Georgian National Energy and Water Supply Regulatory Commission (GNERC) | Licenses generation, transmission, distribution and market operation. Sets regulated tariffs for transmission, distribution, public-service supply and public-service generators, and approves the network, retail-market and service-quality rules. It also handles consumer disputes and oversees guarantees of origin. |
| TSO | Georgian State Electrosystem JSC (GSE) | Owns and operates the transmission network and dispatches the system. GSE also holds a GNERC market-operation licence and calculates the residual energy mix. It is not yet certified as an unbundled TSO. |
| Settlement | Electricity System Commercial Operator (ESCO) | Buys and sells balancing electricity and runs the guaranteed-capacity mechanism. ESCO also runs the unified wholesale database and metering register, and holds compulsory-purchase contracts with new power plants. |
| Exchange | Georgian Energy Exchange JSC (GENEX) | Founded on 4 December 2019. Since 1 July 2024 it has operated the day-ahead and intraday electricity markets and their financial clearing. |
| DSO | Telasi JSC | Distribution system operator for Tbilisi. It connects new customers, registers subscribers and reads meters monthly. |
| DSO | Energo-Pro Georgia JSC | Distribution system operator for the rest of Georgia, including Batumi, Kutaisi and Rustavi. In 2025, 6,152.9 GWh entered its network. |
| Supplier | Tbilisi Electricity Supply Company LLC (Telmico) | Universal service and public service supplier in Telasi’s area, with 43.3% of the retail market in 2025. |
| Supplier | EP Georgia Supply JSC | Universal service and public service supplier in Energo-Pro Georgia’s area, with 56.5% of the retail market in 2025. |
Compared with the UK system.
| UK concept | Georgia equivalent | How it works |
|---|---|---|
| DNO | Distribution system operator (Telasi JSC; Energo-Pro Georgia JSC) | There are two regional monopolies: Telasi in Tbilisi and Energo-Pro Georgia in the rest of the country. Each must be legally and functionally separate from supply. GNERC sets their tariffs, allowed losses and reliability incentives. |
| National Grid/NESO | Georgian State Electrosystem (GSE) | GSE owns the transmission network and also dispatches the system, so the roles of National Grid Electricity Transmission and NESO sit in one company. ESCO, not GSE, settles balancing electricity. |
| MPAN | Subscriber (customer) number | There is no national standard supply-point code like the MPAN. Each connection has a subscriber account held by the distribution company and the regional supplier, and is linked to the meter number and the property’s cadastral code. |
| MPRN | Gas subscriber number with the gas distributor | Gas is separate. Sixteen gas distribution licensees each keep their own customer accounts. The largest are Tbilisi Energy, SOCAR Georgia Gas and SakOrgGas. |
| Meter operator | The distribution company | The distribution company owns and reads household meters. In Tbilisi, Telasi reads them during the last four days of each month, and the supplier then bills on that reading. There is no separate competitive metering market. |
| Supplier | Universal service supplier (Telmico or EP Georgia Supply) | Households are served by the regulated supplier for their area at GNERC tariffs. An independent supplier has operated since March 2024, but switching is negligible. |
| Smart-meter infrastructure | DSO-led meter upgrades | There is no central data-communications company like the UK’s DCC and no national rollout target. Distribution companies install smart meters as part of their GNERC-approved investment plans. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Subscriber number (customer account number) |
| Who issues it? | Assigned when the distribution company registers a new subscriber (Telasi in Tbilisi, Energo-Pro Georgia elsewhere). The regional supplier uses the same account. |
| Format | A numeric account number. Neither distribution company publishes an official format or length specification, and no national standard (such as an EAN-based code) applies. |
| Length | Not published in an official source |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | Printed on the monthly electricity bill. Telmico also gives it to customers who supply their address, the property owner’s name, the cadastral code, their personal ID number and the meter number. |
| Electronic access | Through the suppliers’ online accounts, for example Telmico’s personal account (my.telmico.ge), where customers can see debt and pay bills. Telasi accepts online applications for new connections. |
| Third-party access | No regulated framework for third parties to access consumption data was identified. The supplier and distribution company hold the data. |
| Who keeps the register | Each distribution company keeps its own subscriber database. ESCO runs a separate unified wholesale metering register for wholesale participants. |
| Register scope | Per DSO |
Georgia has no national supply-point identifier comparable to the British MPAN or a European EAN code. A household connection is identified by its subscriber account with the regional distribution company. That account is linked to the meter number and to the property’s entry in the Public Register (its cadastral code).
How a connection is created
To get a new connection in Tbilisi, the owner applies to Telasi online, at a business centre or by email. The application needs an extract from the Public Register, a copy of an ID document, and proof of payment of 50–100% of the connection fee. Owner consent or a power of attorney is needed where relevant. The procedure follows GNERC’s Electricity Distribution Network Rules. Telasi completed 6,090 new connections in 2025.
Supply contract and change of occupier
The customer then signs an electricity supply agreement with the universal service supplier for the area. When a property changes hands, the new owner submits an updated agreement with ID and ownership documents. Telmico handles this by email or at its service centres. Whether the account number stays the same after a change of owner is not stated in the sources consulted.
Meter reading and data
Meters belong to the distribution company. Telasi reads meters during the last four days of each month, and the supplier issues a bill within two days. Customers can ask for a laboratory check of their meter. No national data hub or consumer data-sharing scheme exists.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Net metering: export offsets consumption, and net-metering consumers do not pay network service charges. Net billing (up to 100 kW): exported electricity is credited at the weighted average price of electricity supplied by the universal or public service supplier. Any credit carries forward and can be paid out once a year in December. |
| How many systems are connected? | At 31 December 2025, 2,497 micro-generation plants with 320,942 kW were connected under net metering. Installed capacity rose 123% in 2025. GNERC notes growing interest from large commercial and industrial users. |
| Is there a cap? | Yes. Total micro-generation in a distribution network is capped at 20% of that network’s peak load. Energo-Pro Georgia’s network reached the cap on 28 February 2025. Telasi’s network was at 10.5% at the end of 2025, or 11.9% including pending applications. |
| What is the size limit? | Where the 20% cap has been reached, plants above 100 kW cannot be connected, and existing plants cannot be expanded beyond 100 kW. |
| Is virtual net metering allowed? | Only under the common-transformer-substation principle. Generation and consumption sites must share the same transformer substation. |
| When does net metering end? | Plants connected before 1 January 2027 stay on net metering. Net billing becomes mandatory for everyone from 1 January 2033. |
Connecting a home system.
- Apply to the distribution company (Telasi or Energo-Pro Georgia) to connect the micro-generation plant under the Electricity Distribution Network Rules.
- The distribution company checks the request against the cap on micro-generation, which is 20% of that network’s peak load.
- Where the cap has been reached, the connection is made under net billing and is limited to 100 kW.
- Agree the settlement terms with the supplier. The universal or public service supplier must buy surplus electricity; an independent supplier may choose whether to.
- Owners of plants of 50 kW or more must reconfirm installed capacity every three years.
Georgia introduced net metering in 2016 for consumers who own renewable micro-generation plants. Exported electricity offsets consumption, and participants do not pay network service charges. GNERC considers that this shifts network costs onto other customers, especially under virtual net metering. To limit the impact, the regulator capped total micro-generation in each network, first at 2% of the network’s peak load and later in stages up to 20%.
Energo-Pro Georgia’s network reached the 20% cap in February 2025, which in practice stopped new connections. Parliament responded by amending the Law on Energy and Water Supply on 10 June 2025. Where the cap has been reached, GNERC may now allow plants of up to 100 kW to connect under net billing. Under net billing the consumer pays the normal supply, system and market charges for electricity taken from the grid, and the supplier pays for electricity exported. By the end of 2025, 91 customers with 2,557.4 kW had connected under net billing in Energo-Pro’s area. Telasi customers can still join net metering until 31 December 2026, provided the cap is not reached first.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | A GNERC generation licence is held by 24 generators, mainly large hydro and thermal plants and the Kartli wind farm. Micro-generation under net metering or net billing is connected through the distribution company and does not need a licence. | GNERC | In 2025, 84 generators traded on the wholesale market, far more than the 24 licensees, so many smaller plants operate without a licence. The statutory licence threshold was not confirmed from a primary source. |
| Store electricity | No storage-specific licence or registration regime was identified. | GNERC / Ministry of Economy and Sustainable Development | GNERC’s 2025 report does not mention electricity storage. |
| Export to the grid (household) | No licence is needed. A connection agreement with the distribution company is required under the net metering or net billing rules, subject to the 20% network cap and the 100 kW limit. | Telasi / Energo-Pro Georgia under GNERC rules | Plants of 50 kW and above must reconfirm their capacity every three years. |
| Supply / sell to final customers | Regulated supply to households and small businesses is a public service obligation the Government assigns to the universal service suppliers. Independent suppliers may also sell at deregulated prices. | Government of Georgia (public service obligations); GNERC (tariffs and retail rules) | Three suppliers were active in 2025. The independent supplier, Free Supplier LLC, has been active since March 2024 and held 0.2% of the market. |
| Aggregate | No aggregator role or licence was identified. | GNERC | Not provided for in the current transitional market model. |
| Wholesale trading | Participation as a qualified wholesale market participant registered with ESCO. Trading on GENEX’s day-ahead and intraday markets is voluntary for eligible participants. | ESCO; GENEX | Wholesale participants in 2025: 61 direct consumers, 11 wholesale suppliers, 84 generators and 8 exporters. |
| Balancing | Balancing electricity is bought and sold by ESCO and settled monthly. Hourly imbalance responsibility and a balancing and ancillary services market are planned for 1 July 2027. | ESCO; GSE | GNERC sets methodologies for the operator of the balancing and ancillary services market. |
| Grid services / VPP / remote control of assets | No framework was identified that lets distributed assets or virtual power plants provide grid services. | GSE / GNERC | Expected to depend on the target market model. |
GNERC issues licences for generation, transmission, distribution and market operation. Its 2025 list shows 24 generation licensees, two distribution licensees (Telasi and Energo-Pro Georgia), one transmission licensee (GSE), and two market-operation licensees (GENEX and GSE). Retail supply to households is regulated mainly through public service obligations, which the Government assigns to the universal service suppliers at GNERC tariffs.
Small producers, including households and businesses with micro-generation, connect through the distribution company under GNERC’s Distribution Network Rules and settle with their supplier under the Retail Market Rules. The current transitional model has no aggregation, storage or VPP roles.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing electricity (ESCO) | No | — | No | ESCO. Settles monthly differences between contracted and actual volumes. Its sellers are power plants under PPA/CfD, deregulated plants, thermal plants and imports. 4,453 GWh was traded in 2025. |
| Day-ahead and intraday markets | Restricted | — | No | GENEX. Hourly trading began on 1 July 2024. Participation is voluntary and open to wholesale participants: generators, suppliers, direct consumers and the network operators buying to cover losses. 130 GWh was traded in 2025. |
| Balancing and ancillary services market | Developing | — | Unknown | GSE / ESCO. Planned for the target market model on 1 July 2027, together with hourly imbalance responsibility. |
| Guaranteed capacity | No | — | No | ESCO. Pays designated thermal plants (Gardabani, G-Power, Mtkvari Energy, Georgian International Energy Corporation) a fee set by GNERC to stay available. |
Georgia has no market through which households or aggregated distributed resources can sell flexibility. The market still runs on a transitional model: monthly bilateral contracts, monthly balancing settled by ESCO, and a small hourly exchange. The Government postponed the full target model, with hourly imbalance responsibility and a balancing and ancillary services market, to 1 July 2027 (Government Resolution No. 233 of 26 June 2025).
Today, the only way households can respond to price signals is the step tariff, which charges more per kWh as monthly consumption rises.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| GENEX trading platform | Exchange for day-ahead and intraday electricity trading. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | DSO-led upgrades; no national target or published penetration figure |
| Reading interval | Monthly reading for billing |
| Meter owner/reader | Distribution company (Telasi, Energo-Pro Georgia) |
| Billing reading | Monthly; Telasi reads in the last four days of the month |
| Smart-meter investment | Included in Telasi’s 2025 investment programme (GNERC) |
| Wholesale metering | ESCO unified metering register; GSE automated commercial metering system (ASCME) |
Household meters belong to, and are read by, the distribution companies. GNERC approves their investment plans, which for 2026–2030 were agreed in 2025, and monitors them. Telasi’s 2025 investments of 161.6 million GEL included installing and commissioning smart meters. Energo-Pro Georgia’s low-voltage rehabilitation projects included new meters. Neither company’s smart-meter share is published in the sources consulted.
At wholesale level, GSE invested in its Automated System for Commercial Metering of Electricity and Capacity (ASCME), and ESCO keeps the unified wholesale metering register. Hourly metering will become more important when hourly imbalance settlement starts under the target market model.
Renewable electricity.
Electricity generation mix (2025).
- Hydro: 79.8%
- Natural gas: 19.6%
- Wind: 0.6%
- Renewable electricity share
- 80.4 % of electricity generation (2025)Source 7Hydro (79.8%) plus wind (0.6%) as a share of electricity delivered to the busbar (GNERC). Solar produced 5 GWh. Georgia was a net importer in 2025 (consumption 14,614 GWh against generation of 13,568 GWh, a difference of about 7%), so the share of consumption is slightly lower. Eurostat records 80.2% renewable gross generation in 2024 (11,421.9 of 14,234.1 GWh).
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Hydro
- 3.103 GW (2024)Source 5
- Wind
- 0.021 GW (2024)Source 5
- Net-metered micro-generation (all technologies)
- 0.321 GW (31 Dec 2025)Source 72,497 plants, 320,942 kW. GNERC does not split this by technology.
- Total installed (all sources)
- 3.46 GWSource 8Energy Community country data, which gives renewables 74.78% of installed capacity.
Targets.
- Georgia is an Energy Community Contracting Party (since 1 July 2017) and has committed to transposing its acquis, including the renewable energy directive.
- A guarantee-of-origin scheme operates under the Law on Promoting the Generation and Consumption of Energy from Renewable Sources.
Hydropower is the backbone of Georgian electricity. Enguri HPP alone held a 24.9% share of generation among producers in 2025 (GNERC). Thermal plants at Gardabani run on gas imported almost entirely from Azerbaijan and cover the winter shortfall. Their share of output has fallen from 23.2% in 2023 to 19.6% in 2025. The only wind farm is the 21 MW Kartli plant. Utility-scale solar arrived in the second half of 2025 and produced 5 GWh that year.
Distributed generation has grown quickly through net metering. Its capacity rose by an average of 162.9% a year between 2016 and 2025, reaching 320.9 MW. Some new plants are supported through power purchase agreements or contracts for difference: GNERC’s market description lists PPA/CfD power plants and plants under a support scheme as separate wholesale categories.
Guarantees of origin certified 1,975,395 MWh of electricity in 2024. Since August 2025, suppliers have had to show customers the sources of the electricity they supplied. The 2024 residual mix (consumption not covered by guarantees of origin) was 73.19% hydro, 24.76% natural gas, 0.74% wind, 1.11% nuclear (from imports) and 0.15% solar.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Georgia’s storage comes mainly from its hydro reservoirs, which hold back water for the low-flow winter months. No battery storage capacity, storage licence regime or storage-specific market rules were identified in GNERC’s 2025 report or the other sources consulted. Storage would become more relevant with the planned move to hourly imbalance settlement and an ancillary services market in 2027.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| EP Georgia Supply JSC | 56.5% of the retail market (2025) | Unknown | Unknown | No | Yes |
| Tbilisi Electricity Supply Company LLC (Telmico) | 43.3% of the retail market (2025) | Unknown | Unknown | No | Yes |
The retail market is highly concentrated: GNERC puts its Herfindahl–Hirschman Index at 5,060 for 2025. Each of the two regulated suppliers serves its own distribution area. The only independent supplier, Free Supplier LLC, held 0.2% of the market in 2025. The Energy Community reports that 0.11% of electricity is supplied at non-regulated prices.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Economy and Sustainable Development of Georgia | Government | Energy policy, market model and security of supply | Sets the timetable for market reform and renewable support. |
| Georgian National Energy and Water Supply Regulatory Commission (GNERC) | Regulator | Energy and water regulator | Sets tariffs and the net metering and net billing rules, and licenses operators. |
| Georgian State Electrosystem (GSE) | Transmission | Transmission and system operator | Connects large plants and dispatches the system. |
| Electricity System Commercial Operator (ESCO) | Market | Balancing, settlement, guaranteed capacity | Registers wholesale participants and settles balancing. |
| Georgian Energy Exchange (GENEX) | Market | Day-ahead and intraday markets | Publishes hourly prices. |
| Telasi JSC | Distribution | DSO for Tbilisi | Handles connections and micro-generation applications in Tbilisi. |
| Energo-Pro Georgia JSC | Distribution | DSO for the regions | Handles connections and net billing outside Tbilisi. |
| Energy Community Secretariat | Government | Treaty body overseeing Georgia’s alignment with EU energy law | Publishes country data and implementation assessments. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (distribution) | Electricity Distribution Network Rules (GNERC Resolution No. 19, 2021) | GNERC | Govern new connections, micro-generation caps (20% of peak load), net billing and three-yearly capacity reconfirmation for plants of 50 kW and above. |
| Retail settlement and prosumers | Electricity Retail Market Rules (GNERC Resolution No. 47 of 13 August 2020) | GNERC | Define supply contracts, bills and settlement for net metering and net billing. |
| Supply quality and reliability | Service Quality Rules (GNERC Resolution No. 20 of 28 June 2021) | GNERC | SAIDI/SAIFI reporting with financial incentives and penalties for DSOs. |
| Unbundling | GNERC Resolution No. 39 of 16 July 2020 | GNERC | Legal, functional and accounting unbundling of DSOs; annual compliance reports. |
| Inverters and anti-islanding | Not identified | — | No national inverter or anti-islanding standard was identified in the sources consulted. |
| Installer accreditation | Not identified | — | No solar or electrical installer certification scheme was identified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| DSO connection approval | Yes | National | Required for any micro-generation plant. It depends on remaining headroom under the 20% cap, and where the cap is reached on the 100 kW limit and net billing. |
| Supply agreement with micro-generation terms | Yes | National | The settlement terms with the supplier follow GNERC’s Retail Market Rules. |
| Generation licence | Limited | National | Needed for licensed power plants, not for net-metering or net-billing micro-generation. |
| Planning / building permission | Limited | Mixed | Rules for rooftop installations were not verified from an official source. |
For a household or business, the main step is the distribution company’s approval to connect the plant, followed by settlement terms with the supplier. Both are governed by GNERC rules. Whether a plant can connect depends on headroom in that network. In Energo-Pro Georgia’s area new connections are limited to net billing up to 100 kW.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering for micro-generation | Active | Net metering | Exported electricity offsets consumption, and participants are exempt from network service charges. New connections are possible only where the network is below its 20% cap. Telasi’s area remains open until 31 December 2026; Energo-Pro Georgia’s area reached the cap in February 2025. Plants connected before 1 January 2027 keep net metering until net billing becomes mandatory in 2033. | 2016 – 31 Dec 2032 (for existing plants) |
| Net billing for micro-generation (up to 100 kW) | Active | Export payment | Surplus electricity is bought by the universal or public service supplier at the weighted average price of supplied electricity. Credit carries forward and can be paid out each December. | From 2025 |
| Electricity subsidy for socially vulnerable and large families | Active | Social subsidy | A state subsidy on electricity bills, applied by the supplier. The amount was increased in May 2026. | — |
| Guarantees of origin | Active | Certificate scheme | A voluntary scheme certifying renewable electricity. It certified 1,975,395 MWh in 2024. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
No official data on smart-meter communications technology or national connectivity coverage was identified in the sources consulted. Distribution companies choose the communications for their own meter upgrades, and no national smart-metering communications standard has been published.
Grid conditions.
- National peak demand
- 2.535 GW (2025)Source 7System peak load of 2,535 MW (GNERC, Annex 4). The peak has occurred in summer since 2024.
- Annual electricity demand
- 14.6 TWh (2025)Source 7Domestic electricity consumption from GNERC’s electricity balance (14,614 million kWh), up 3.2% on 2024.
- Generation capacity
- 3.46 GWSource 8Total installed capacity from the Energy Community country page.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Georgia’s grid is strongly seasonal. In winter, demand exceeds domestic generation and the gap is filled with imports and gas-fired output. In summer, high river flows produce surpluses that are exported, mainly to Türkiye. In 2025, generation delivered to the grid fell 3% to 13,568 GWh while consumption rose 3.2% to 14,614 GWh. Imports rose 26.9% and exports fell 51.2%.
GNERC reports that GSE’s 2025 investment fell well short of plan: it spent 46.8 million GEL against 231.2 million GEL planned, because of disputes with contractors over new lines and substations. Both distribution networks are investing heavily: Telasi spent 161.6 million GEL and Energo-Pro Georgia 265.3 million GEL in 2025.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Day-ahead and intraday markets launched | Current | 1 July 2024 | GENEX began hourly trading. The rest of the wholesale market still settles monthly. |
| Net billing introduced where micro-generation caps are reached | Current | 2025 | Amendment to the Law on Energy and Water Supply of 10 June 2025, with matching changes to the Retail Market and Distribution Network Rules. Plants up to 100 kW may connect under net billing. |
| Supplier energy-mix disclosure on bills | Current | August 2025 | Bills show the sources of the electricity supplied in 2024. |
| Telasi distribution tariffs for 2026–2030 | Current | 1 January 2026 | A five-year regulatory period. Energo-Pro Georgia had temporary tariffs from January to April 2026. |
| Cut-off for new net-metering connections | Upcoming | 1 January 2027 | Only plants connected before this date stay on net metering. |
| Target electricity market model | Upcoming | 1 July 2027 | Hourly trading across all wholesale segments, hourly imbalance responsibility, and a balancing and ancillary services market. The date was postponed by Government Resolution No. 233 of 26 June 2025. |
| Net billing becomes mandatory | Upcoming | 1 January 2033 | All micro-generation moves from net metering to net billing. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | 2,497 net-metered micro-generation plants in total (all technologies and customer types) out of about 2 million household accounts at the end of 2025 (GNERC). |
| Distributed energy market | Medium | 320.9 MW of net-metered micro-generation, up 123% in 2025. Energo-Pro Georgia’s network reached its 20% cap (GNERC). |
| Grid flexibility market | Low | No aggregation or ancillary-services access for distributed resources. The balancing and ancillary services market is planned for July 2027. |
| Energy storage adoption | Low | No operational battery storage identified; no storage-specific rules. |
| Renewable growth environment | Medium | 87 MW of new hydro and solar plants commissioned in 2025, the first utility-scale solar, and fast growth in net-metered capacity (GNERC). The renewable share is already high because of hydropower. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 13 sources
- Electricity prices for household consumers (nrg_pc_204), Georgia, band DC, national currency, all taxes. Eurostat, 2026. accessed 10 October 2026.
- Electricity prices for household consumers (nrg_pc_204), Georgia, band DC, EUR, all taxes. Eurostat, 2026. accessed 10 October 2026.
- Gross production of electricity by fuel (nrg_bal_peh), Georgia, 2024. Eurostat, 2024. accessed 10 October 2026.
- Supply, transformation and consumption of electricity (nrg_cb_e), Georgia, household consumption. Eurostat, 2024. accessed 10 October 2026.
- Electricity production capacities for renewables (nrg_inf_epcrw), Georgia. Eurostat, 2024. accessed 10 October 2026.
- Population and Demography – key indicators. National Statistics Office of Georgia (Geostat), 2026. accessed 10 October 2026.
- Activity Report of 2025. Georgian National Energy and Water Supply Regulatory Commission (GNERC), hosted by the Energy Community, 2026. accessed 10 October 2026.
- Georgia – Contracting Party page. Energy Community Secretariat. accessed 10 October 2026.
- About GENEX. Georgian Energy Exchange JSC. accessed 10 October 2026.
- ESCO functions. Electricity System Commercial Operator (ESCO). accessed 10 October 2026.
- Become a subscriber – connection of a new facility. Telasi JSC. accessed 10 October 2026.
- Frequently asked questions. Tbilisi Electricity Supply Company (Telmico). accessed 10 October 2026.
- Telmico home page (news: electricity subsidy amount increased). Tbilisi Electricity Supply Company (Telmico), 2026. accessed 10 October 2026.
Questions about energy in Georgia.
Eurostat puts the average household price at 0.2292 lari (€0.0731) per kWh including taxes in the first half of 2026. That is one of the lowest prices in Europe. Tariffs are set by GNERC and rise in steps as monthly consumption passes 101 kWh and 301 kWh, and they differ between Tbilisi and the regions.
Telmico (Tbilisi Electricity Supply Company) supplies Tbilisi, and EP Georgia Supply supplies the rest of the country. Both are regulated universal service suppliers. One independent supplier exists but held only 0.2% of the market in 2025.
Yes. Since 2016, micro-generation has been able to use net metering. In networks where total micro-generation has reached 20% of peak load, which happened in Energo-Pro Georgia’s area in February 2025, new plants of up to 100 kW connect under net billing instead. The supplier pays for surplus electricity at the weighted average supply price.
Georgia has no national standard supply-point code. Each connection has a subscriber number held by the distribution company (Telasi or Energo-Pro Georgia) and used by the supplier. It is shown on the bill and linked to the meter number and the property’s cadastral code.
About 80%. In 2025, hydropower delivered 79.8% of generation and wind 0.6%. Gas-fired plants supplied 19.6%, mostly in winter (GNERC).
Georgian State Electrosystem (GSE) runs transmission and dispatch. Telasi distributes in Tbilisi and Energo-Pro Georgia in the rest of the country. GNERC regulates the sector, ESCO settles balancing, and GENEX runs the power exchange.
The Government has scheduled the target market model, with hourly imbalance responsibility and a balancing and ancillary services market, for 1 July 2027.