Energy-market overview

How electricity works in Aruba.

Aruba electricity 2026: WEB Aruba generation, N.V. ELMAR distribution, Afl 0.34–0.46/kWh tiered tariffs, wind and solar share, DG contracts and smart meters.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Aruban florin (AWG) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Aruba energy at a glance.

Key figures for households in Aruba. Each one links to its source on the full overview below.

  • Electricity price.

    0.343 AWG per kWh for households, including taxes. Figures for 2026.

  • Renewable share.

    18.4% of electricity from renewable sources. Figures for 2023.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Aruba.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Aruba below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Aruba requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Aruba.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Aruba, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Aruba, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Aruba.

Full overview

The energy market in Aruba, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

Aruba is a single-island electricity system of about 108,000 people with no interconnection to any other grid. Two government-owned companies run it. WEB Aruba N.V. (Water- en Energiebedrijf Aruba) generates all public electricity, alongside seawater desalination, and delivers it 24 hours a day to N.V. ELMAR (Electriciteit-Maatschappij Aruba), which describes itself as the sole provider of electricity on the island. Both companies sit under Utilities Aruba N.V., a holding company whose sole shareholder is the Government of Aruba.

Most electricity comes from reciprocating engines burning fuel oil. WEB lists 252.4 MW of firm thermal capacity, the 30 MW Vader Piet wind park and a solar park, and expects a 2026 peak load of 172 MW. IRENA puts generation in 2023 at 853 GWh, of which 18% came from wind and solar. WEB says a second wind park at Rincon is under construction and is projected to lift the renewable share to about 35%.

Households pay a fixed charge of Afl 12.50 a month plus an energy charge in three consumption brackets, from Afl 0.3431 per kWh for the first 500 kWh to Afl 0.4645 per kWh above 1,000 kWh, effective from the November 2024 bill month. Rooftop solar panels and small wind turbines can be connected after inspection by ELMAR and certification by the Department for Technical Inspections (DTI); ELMAR states that such systems are meant to cover the owner’s own needs, not to generate profit from surplus energy.

Energy snapshot.

Headline figures for electricity in Aruba. Each shows its data year and links to its source.

  • Population108,785 peopleSource 242025
  • HouseholdsNot identified from a reliable public source.
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (AWG)0.343 AWG/kWhSource 12026
  • Household price (EUR)0.172 EUR/kWhSource 232026
  • Renewable electricity share18.4%Source 202023
  • Solar capacity0.015 GWSource 202024
  • Wind capacity0.03 GWSource 142026
  • Energy storage capacity0.004 GWhSource 142026
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
No independent electricity regulator identified; WEB Aruba and N.V. ELMAR are government-owned through Utilities Aruba N.V.
System operator
WEB Aruba N.V. (generation and system balancing)
Distribution networks
Single distributor: N.V. ELMAR owns and operates the whole island distribution grid and supplies all customers.
Currency
Aruban florin (AWG)
Voltage and frequency
60 Hz (household supply voltage not confirmed from an official source)

Electricity prices in Aruba.

Household price (AWG)
0.343 AWG/kWh (2026)Source 1ELMAR residential energy charge for the first 500 kWh a month, effective from the November 2024 bill month and still published in October 2026. A fixed charge of Afl 12.50 a month is added; at 500 kWh a month that brings the average to about Afl 0.368/kWh (derived). Higher brackets are Afl 0.3531 (501–1,000 kWh) and Afl 0.4645 (over 1,000 kWh). Whether any turnover tax is added on the bill was not confirmed.
Household price (EUR)
0.172 EUR/kWh (2026)Source 23Converted from Afl 0.3431/kWh at about Afl 1.998 per euro: the midpoint of the Centrale Bank van Aruba’s cash buying (197.87) and selling (201.68) rates per €100 published for 9 October 2026.
Typical annual electricity bill
Not identified from a reliable public source.

There is a single published tariff for each customer class, set out by ELMAR. Households pay a fixed monthly charge, which ELMAR says contributes to the cost of transport and maintenance of the distribution network, and an energy charge per kWh. The energy charge rises with consumption in three brackets, so homes with heavy air-conditioning use pay a higher marginal price: about 35% more per kWh above 1,000 kWh a month than in the first 500 kWh.

What drives the price

Around four-fifths of Aruba’s electricity is generated from fuel oil in WEB’s engine plants, so the cost of imported fuel is the main cost driver. Businesses pay higher rates than households: the small commercial energy charge (Afl 0.5444/kWh) is close to 60% above the first residential bracket. ELMAR charges the same small commercial rate, Afl 0.5444/kWh, at its public EV ChargeUp stations.

Prepaid and post-paid

Customers can switch between post-paid billing and ELMAR’s SmartUp prepaid meter. Prepaid rates mirror the standard tariffs, and the SmartUp portal shows balance, daily use and hourly consumption.

How the price compares

At about €0.17 per kWh for the first bracket, the first residential bracket is the cheapest; the three-tier structure raises the average price for high-consumption homes. No official series of past residential tariffs was found, so no price history is shown.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesELMAR residential (from November 2024 bill month): fixed charge Afl 12.50 a month; energy charge Afl 0.3431/kWh for the first 500 kWh, Afl 0.3531/kWh for 501–1,000 kWh and Afl 0.4645/kWh above 1,000 kWh. Billing cycle about 30 days.
PrepaymentYesSmartUp prepaid meters at the same residential rates; the Afl 12.50 monthly fixed charge is deducted on top-up. Top-up via the Pay.aw app, ELMAR offices or CITGO service stations.
RegulatedYesSmall commercial (up to 500 kVA): Afl 100 a month plus Afl 0.5444/kWh. Non-commercial (churches, schools): Afl 100 plus Afl 0.4910/kWh. Large commercial (500 kVA and above): Afl 10.50 per installed (or registered peak) kVA a month plus Afl 0.5236/kWh.
Time-of-useNoELMAR publishes no time-of-use or dynamic tariff.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
9,253 kWh/person/yr (2024)Source 22Total electricity demand (all sectors) per person, Ember/Energy Institute data via Our World in Data. Includes WEB’s energy-intensive seawater desalination and the tourism sector.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Aruba’s electricity demand is high for a population of about 108,000 because of year-round air-conditioning, a large hotel sector and the electricity used by WEB to desalinate seawater for the island’s drinking water. Total demand per person was about 9,250 kWh in 2024 according to Ember data. WEB projects an average load of 121 MW in 2026, with a peak of 172 MW.

No official breakdown of total household electricity use was found. ELMAR’s residential tariff states that it covers household uses such as lighting, ventilation, kitchen appliances, refrigerators, televisions and air-conditioning units.

ELMAR launched its EV ChargeUp project on 1 December 2022 and lists public chargers at about a dozen sites, including fast chargers at ELMAR Hato. The stations support CHAdeMO, CCS1 and SAE J1772 connectors.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
61.7 % of population (2025)Source 25

Aruba is a small, densely settled island; the World Bank classifies about 62% of residents as urban, with Oranjestad and San Nicolas the main towns. Housing statistics from the Central Bureau of Statistics could not be accessed for this profile, so tenure and dwelling-type shares are not given.

For electricity purposes, what matters is the connection process. Every new or modified building must have its installation designed by a DTI-certified electrician, who submits the required capacity (kVA) through ELMAR’s Certified Electrician portal. ELMAR’s Planning and Inspection department decides where the connection point goes and how the electrical niche (NIS) holding the meter must be built. When a tenant takes on a supply, the owner co-signs the application or provides an authorisation letter.

How the grid works in Aruba.

  1. TransmissionWEB Aruba N.V.
  2. DistributionSingle distributor: N.V. ELMAR owns and operates the whole island distribution grid and supplies all customers.
  3. MeteringN.V. ELMAR
  4. Supply1 or more retail suppliers

Electricity in Aruba flows through two state-owned companies. WEB Aruba generates power and delivers it to ELMAR, which distributes and sells it to every customer on the island. The arrangement dates from 1964, when an agreement between the island government, ELMAR and WEB made WEB the supplier of all the electricity ELMAR needs and ELMAR responsible for building and maintaining the distribution grid. Since 1990 ELMAR’s shares have been held by the government holding company Utilities Aruba N.V., which also owns WEB.

Generation fleet

WEB lists 252.4 MW of firm thermal capacity: 232.4 MW of reciprocating engines in four plants (RECIP I to IV, the last a 102 MW plant commissioned in 2022) and a 20 MW gas turbine. The commissioning of RECIP IV ended 64 years of steam-boiler generation. Renewables comprise the 30 MW Vader Piet wind park, completed in 2009, and the Sunrise Solar Park at Lago Heights, commissioned in 2018. WEB has said it plans to switch from heavy fuel oil to natural gas.

Reliability

Because the island is isolated, WEB carries a large reserve: firm capacity is well above the projected 172 MW peak. WEB sets itself a loss-of-load target of no more than 24 hours of outage a year. Flywheels (5 MW for 12 minutes) and a battery help absorb fluctuations from wind and solar.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryGovernment of ArubaSole shareholder of Utilities Aruba N.V., which owns WEB Aruba and N.V. ELMAR. Energy policy is set by the minister holding the energy portfolio.
System operatorWEB Aruba N.V.Generates all public electricity (engine plants, gas turbine, wind, solar) and keeps the island system in balance with an Intelligent Generation Management System and Intelligent Load Shedding (2021). Also desalinates and distributes drinking water.
DSON.V. ELMAROwns and operates the distribution grid (more than 400 km, around 800 transformers in its history timeline) and buys all its electricity from WEB under an agreement dating from 1964.
SupplierN.V. ELMARSole retail supplier: holds the customer contract, bills every home and business and runs the SmartUp prepaid service.
MeteringN.V. ELMAROwns, installs and reads all meters, including bi-directional distributed-generation meters, and is replacing them with smart meters.

Compared with the UK system.

Compared with the UK system.
UK conceptAruba equivalentHow it works
DNON.V. ELMAROne company owns the entire island distribution network at 12 kV and low voltage. There are no regional networks or independent network operators.
National Grid/NESOWEB Aruba N.V.There is no separate transmission or system operator. WEB, the sole public generator, matches generation to demand and manages frequency with its generation management system, flywheels and battery.
MPANELMAR Location NumberEach connected address has a seven-digit Location Number beginning with 5, printed on the bill beside the six-digit Customer Number. It identifies the supply location rather than a national registration number.
MPRNNo equivalentAruba has no piped natural-gas network for homes, so there is no gas supply-point number.
Meter operatorN.V. ELMARMetering is part of ELMAR’s monopoly; customers cannot appoint a meter operator.
SupplierN.V. ELMARThere is no retail competition. Every customer has a contract with ELMAR, post-paid or prepaid.
Smart-meter infrastructureELMAR smart meter programmeELMAR runs its own smart-meter system: meters send daily reads and intra-day load profiles and report loss of supply. There is no central data company like the DCC.

How a supply point is identified.

5038412 (fictional Location Number); 104729 (fictional Customer Number)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Location Number
Who issues it?N.V. ELMAR
FormatSeven digits beginning with 5, shown on bills as 5XXXXXX. A separate six-digit Customer Number beginning with 1 (1XXXXX) identifies the account holder.
Length7 digits (Location Number); 6 digits (Customer Number)
Stays with the property when you switch supplier?Yes
Where to find itAt the top of every ELMAR statement, next to the Customer Number; both are used to make payments online.
Electronic accessThrough ELMAR’s e-Connect customer portal (customer.elmar.aw) and, for prepaid customers, the SmartUp portal, which shows daily and hourly consumption.
Third-party accessNo data-access scheme for third parties is published. Certified electricians interact with ELMAR through its Certified Electrician (CE) portal for connection and solar requests.
Who keeps the registerN.V. ELMAR customer and location records
Register scopeNational

ELMAR’s statement explanation shows two identifiers. The Customer Number (format 1XXXXX) belongs to the person who holds the contract. The Location Number (format 5XXXXXX) belongs to the connected premises. Both appear at the top of the bill and are used for online payments.

Because ELMAR is the only distributor and supplier, its own records serve as the national register; there is no separate central data hub. When someone moves, ELMAR requires them to cancel the contract at the old location and start a new contract at the new one, which shows that the location, not the customer, is tied to the meter and connection. A tenant must provide an authorisation letter, and the owner co-signs the application. After a death, transfer requires the certified death certificate and proof of heirship.

Rooftop solar applications are filed against the installation address through the CE portal and, once approved, the existing meter at that location is replaced by a bi-directional distributed-generation (DG) meter.

New connections

A new supply starts with a DTI-certified electrician submitting the required capacity through the CE portal. ELMAR checks grid capacity, specifies the connection point and electrical niche, and ELMAR and DTI jointly sign the inspection card after a site survey. ELMAR’s terms say the connection is normally completed within five business days once approved. A standard connection fee applies, set according to capacity (single or three-phase), connection type and distance to the network; larger developments needing network extension pay a one-off infrastructure contribution under a contract.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringUnknown
Net billingUnknown
How exported electricity is paidUnder a DG-Contract with ELMAR (its Distributed Generation Policy). Surplus fed in before the contract starts is not paid for. The compensation rate is not published online.
Can households export?Yes, surplus from approved solar panels or small wind turbines flows into ELMAR’s grid. ELMAR says the aim is to cover the owner’s own needs, not to make a commercial profit from excess production.
How is surplus credited?Under the customer’s DG-Contract. ELMAR says a well-sized system can bring a monthly statement down to Afl 0, but it does not publish the credit rate or whether surplus is netted kWh-for-kWh.
Is there a size limit?No published kW limit. ELMAR assesses grid capacity at each location before preliminary approval.
Who certifies the installation?The Department for Technical Inspections (DTI) of the Government of Aruba, after documentation is submitted by a certified installer.

Connecting a home system.

  1. A DTI-certified electrician registers and submits the request on ELMAR’s CE portal: customer details, solar or wind, address and total kW.
  2. ELMAR inspects the location and checks grid capacity.
  3. On preliminary approval, ELMAR issues an information package and a preliminary approval code (PAC), valid for one year.
  4. The customer chooses a certified installer, who submits the inspection request with proof of ownership, plot plan, installation diagram and module and inverter data sheets.
  5. The customer signs a solar waiver accepting that surplus during testing earns no payment.
  6. The Department for Technical Inspections (DTI) certifies the installation.
  7. The customer signs the DG-Contract, connects, and ELMAR installs a digital bi-directional DG meter.

Aruba allows distributed generation from solar panels and small wind turbines connected to ELMAR’s grid, but treats it as self-consumption with an exchange of surplus rather than a commercial sale. The customer must sign ELMAR’s solar waiver, which confirms that the customer needs a separate agreement with ELMAR to qualify for its Distributed Generation Policy (“DG-Contract”), and that any surplus generated during testing, before the contract starts, cannot be claimed or paid for.

The terms of the DG-Contract, including how exported kWh are valued, are not published on ELMAR’s website, so this profile does not state a rate. Prospective owners obtain them from ELMAR in the information package issued with preliminary approval.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity (utility scale)Carried out by WEB Aruba; no public licensing regime for independent generators identifiedGovernment of Aruba (shareholder of WEB and ELMAR)All grid generation in WEB’s published fleet belongs to WEB or is operated for it; no independent generator licence process is published.
Generate for own use (rooftop solar or small wind)No licence; ELMAR grid approval, DTI certification and a DG-Contract with ELMARN.V. ELMAR; DTIPreliminary approval code valid one year; system must be installed by a certified installer.
Store electricity (behind the meter)No specific rule published; installation work falls under DTI electrical certificationDTINo battery-specific connection rules found on ELMAR’s website.
Export to the gridOnly under an ELMAR DG-ContractN.V. ELMARSurplus before the contract starts is waived without payment.
Distribute electricityExclusive to N.V. ELMARGovernment of ArubaELMAR originated as a concession holder (1950) and is now government-owned.
Supply / sell to customersExclusive to N.V. ELMARGovernment of ArubaNo retail competition; ELMAR also sells EV charging at Afl 0.5444/kWh.
Aggregate, trade, balancing services, VPP or remote control of assetsNot possible: no wholesale market or ancillary-service market exists—Balancing is performed internally by WEB.
Electrical installation workMust be carried out by a DTI-certified electricianDTIELMAR publishes the DTI certified electrician list.

Aruba has no published electricity licensing framework comparable to a regulator-run system. Generation, distribution and supply are carried out by two government-owned companies, and the only route for private parties to put power on the grid that is publicly documented is ELMAR’s distributed-generation process for customers’ own solar panels and windmills.

Technical safety is policed by the government’s Department for Technical Inspections (DTI). Every connection, alteration and DG system needs a DTI-certified electrician and DTI sign-off before ELMAR connects or changes the meter.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency control and reservesNo—NoWEB Aruba N.V.. Provided by WEB’s own engines, flywheel park, battery and Intelligent Generation Management System; there is no market for third parties.
Load sheddingNo—NoWEB Aruba N.V.. WEB’s Intelligent Load Shedding system (2021) disconnects load automatically in emergencies; it is not a paid demand-response scheme.

With one generator, one distributor and no wholesale market, Aruba has no route for households or aggregators to sell flexibility. Balancing is handled inside WEB. ELMAR’s smart meters gather intra-day load profiles, which could support future tariff or demand-side measures, but no such programme is published.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutIn progress: ELMAR is replacing all meters with smart meters
Reading intervalLoad profiles gathered through the day; register reads daily; hourly consumption shown to prepaid customers
Responsible partyN.V. ELMAR
PenetrationNot published
Outage notificationMeter notifies ELMAR immediately when supply is lost
PrepaidSmartUp prepaid meters; switch between post-paid and prepaid
Customer accesse-Connect portal; SmartUp portal

ELMAR says it is replacing all of its meters with smart meters to standardise services. The meters collect load profiles through the day and send energy reads daily, and they notify ELMAR straight away if a customer loses supply. Customers can move between post-paid and prepaid status without changing supplier. Distributed-generation customers receive a digital bi-directional meter that records import and export separately.

Renewable electricity.

Electricity generation mix (2023).

  • Oil: 82%
  • Wind: 15%
  • Solar: 3%
Source 20
Renewable electricity share
18.4% (2023)Source 20Derived from IRENA: 157 GWh of renewable generation (131 GWh wind, 26 GWh solar) out of 853 GWh. Aruba has no interconnection, so the generation and consumption shares are the same. Ember data shown by Our World in Data gives 17% for 2024 (14% wind, 3% solar).
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Wind
30 MW (2026)Source 14
Solar PV (all)
15 MW (2024)Source 20
Solar PV (WEB Sunrise park)
6.1 MW (2026)Source 14
Thermal (engines and gas turbine)
252.4 MW (2026)Source 14

Targets.

  • WEB projects that the Rincon wind park, under construction, will raise renewable energy to about 35% of production.
  • WEB plans to replace heavy fuel oil with natural gas.

Wind is Aruba’s main renewable source. The Vader Piet wind park on the windward coast has 10 turbines of 3 MW and, according to WEB, supplies 16–17% of the island’s electricity. IRENA records 131 GWh of wind generation in 2023 against 26 GWh of solar. The largest solar plant is WEB’s Sunrise Solar Park at Lago Heights, commissioned in 2018; IRENA counts about 15 MW of solar in total in 2024, including distributed systems.

Aruba has steady trade winds and strong sunshine, but its small, isolated grid limits how much variable output can be absorbed without storage. WEB uses flywheels, a battery and automated generation management for this. Its next step is the Rincon wind park, which WEB projects will lift renewables to about 35%.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
4 MWh (2026)Source 141 MW / 4 MWh battery listed by WEB, plus a 5 MW, 12-minute flywheel park.

Storage on Aruba is utility-owned and used for system stability rather than energy trading. WEB’s flywheels respond in fractions of a second to smooth wind and solar fluctuations, and its battery pilot was set up to work out how storage can fit into the generation mix. No incentives or connection rules specific to home batteries are published.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
N.V. ELMAR100% (sole supplier)NoNoNoLimited

ELMAR is the only electricity supplier on Aruba. Export is possible only through its DG-Contract, whose rate is not published.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Government of ArubaGovernmentOwner of the utilities and policy-makerSole shareholder of Utilities Aruba N.V., which owns WEB and ELMAR.
WEB Aruba N.V.TransmissionGenerator and system operatorProduces all public electricity and keeps the system balanced.
N.V. ELMARDistributionDistributor, supplier and meter ownerHandles connections, billing, metering and solar/wind interconnection.
Department for Technical Inspections (DTI)RegulatorElectrical safety inspection and certificationCertifies electricians, installations and distributed-generation systems.
Central Bureau of Statistics Aruba (CBS)GovernmentNational statistics officePublishes census and household statistics.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Electrical installationsDTI regulations and inspection cardDepartment for Technical Inspections (DTI)Parcels must comply with DTI regulations and ELMAR requirements before connection.
Installer accreditationDTI-certified electricianDTIELMAR publishes the list of DTI-certified electricians.
Grid connection (solar and wind)ELMAR DG inspection process and Distributed Generation PolicyN.V. ELMARRequires module and inverter data sheets; no named inverter standard is published.
Meter enclosureElectrical niche (NIS) instructionsN.V. ELMARELMAR specifies how and where the niche housing the meter is built.

Permissions.

Permissions.
PermissionRequiredLevelDetail
ELMAR preliminary approval (grid capacity check)YesNationalRequested via the CE portal; the resulting PAC is valid for one year.
DTI electrical certificationYesNationalRequired before interconnection of any DG system.
Proof of ownership / owner consentYesNationalProof of ownership not older than six months must accompany the inspection request.
Building or planning permit for rooftop solarUnknownNationalNo requirement identified on ELMAR’s or the government’s pages.

Permission for a home solar or wind system is administered mainly by ELMAR and DTI. The documents include a plot plan of the parcel, the latest inspection card for the property’s installation and the installation diagram.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Distributed generation contract (DG-Contract)ActiveExport creditCustomers with approved solar panels or windmills can offset their consumption with surplus fed into ELMAR’s grid under a DG-Contract; compensation terms are not published.—

Data and connectivity.

Fixed broadband
17.5 fixed subscriptions per 100 people (2022)Source 26
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

ELMAR’s smart meters send daily reads and load profiles back to the utility and notify outages; ELMAR does not publish the communication technology used. ELMAR reported a cyber attack on its network systems in September 2025 and said the electricity grid itself stayed protected while applications were restored.

Grid conditions.

National peak demand
0.172 GW (2026)Source 14WEB’s projected maximum peak load for 2026; average load 121 MW.
Annual electricity demand
0.853 TWh (2023)Source 20Total generation; Aruba has no imports or exports.
Generation capacity
0.289 GW (2026)Source 14Derived: 252.4 MW thermal plus 36.1 MW wind and solar listed by WEB. IRENA gives 282 MW for 2024.
Interconnection
0 GWSource 17Isolated island grid; all electricity is generated by WEB on Aruba.
Curtailment
Not identified from a reliable public source.

Aruba’s grid is a single island system. WEB’s firm capacity of about 252 MW comfortably exceeds the projected 2026 peak of 172 MW, which leaves room to cover engine outages. ELMAR’s distribution network runs at 12 kV from substations such as Pos Abou, down to low-voltage connections. Network extensions for new developments are paid through an infrastructure contribution agreed in a contract with ELMAR.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Residential tariff with three consumption bracketsCurrentNovember 2024Fixed charge Afl 12.50 a month; Afl 0.3431, 0.3531 and 0.4645 per kWh for up to 500, 501–1,000 and over 1,000 kWh.
Smart-meter replacementCurrentOngoingELMAR is replacing all meters with smart meters.
Rincon wind parkUpcomingNot statedWEB says the wind park is under construction and projects renewables reaching about 35%.
Switch from heavy fuel oil to natural gasUpcomingNot confirmed (WEB had scheduled 2025)WEB’s technology page describes the planned introduction of natural gas to replace heavy fuel oil.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowAbout 15 MW of solar in total (IRENA 2024), of which 6.1 MW is WEB’s park; no residential figure published.
Distributed energy marketLowDG allowed only for own use under a DG-Contract; no published compensation rate.
Grid flexibility marketLowNo wholesale or ancillary-service market; balancing done internally by WEB.
Energy storage adoptionLow1 MW / 4 MWh battery and a 5 MW flywheel park, both utility-owned.
Renewable growth environmentMedium18% renewable generation in 2023 (IRENA); Rincon wind park projected to lift it to about 35% (WEB).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 26 sources
  1. Rates. N.V. ELMAR, 2024. accessed 9 October 2026.
  2. Understanding your statement. N.V. ELMAR. accessed 9 October 2026.
  3. About ELMAR. N.V. ELMAR. accessed 9 October 2026.
  4. Our history. N.V. ELMAR. accessed 9 October 2026.
  5. Smart meter. N.V. ELMAR. accessed 9 October 2026.
  6. Prepaid meter and SmartUp portal. N.V. ELMAR. accessed 9 October 2026.
  7. Solar panels and windmills. N.V. ELMAR. accessed 9 October 2026.
  8. Solar panels and windmills inspection process. N.V. ELMAR. accessed 9 October 2026.
  9. Waiver Solar Installation. N.V. ELMAR, 2017. accessed 9 October 2026.
  10. Inspection (new connections). N.V. ELMAR. accessed 9 October 2026.
  11. Applying for a new meter. N.V. ELMAR. accessed 9 October 2026.
  12. Network expansion and new connection services. N.V. ELMAR. accessed 9 October 2026.
  13. Electric Vehicles ChargeUp Stations. N.V. ELMAR. accessed 9 October 2026.
  14. Power production figures. WEB Aruba N.V., 2026. accessed 9 October 2026.
  15. Technologies used (energy). WEB Aruba N.V.. accessed 9 October 2026.
  16. Energy production history. WEB Aruba N.V.. accessed 9 October 2026.
  17. Energy production. WEB Aruba N.V.. accessed 9 October 2026.
  18. Loss of load expectation. WEB Aruba N.V.. accessed 9 October 2026.
  19. Organization. WEB Aruba N.V.. accessed 9 October 2026.
  20. Energy Profile: Aruba. IRENA. accessed 9 October 2026.
  21. Share of electricity production by source – Aruba. Our World in Data (Ember; Energy Institute), 2024. accessed 9 October 2026.
  22. Per capita electricity demand – Aruba. Our World in Data (Ember; Energy Institute), 2024. accessed 9 October 2026.
  23. Daily exchange rates. Centrale Bank van Aruba, 2026. accessed 9 October 2026.
  24. Population, total – Aruba. World Bank, 2025. accessed 9 October 2026.
  25. Urban population (% of total population) – Aruba. World Bank, 2025. accessed 9 October 2026.
  26. Fixed broadband subscriptions (per 100 people) – Aruba. World Bank, 2022. accessed 9 October 2026.

Questions about energy in Aruba.

Talk to us about Olmack in Aruba.Tell us about your home, housing portfolio or school estate in Aruba. We'll explain what is possible there now.