Energy-market overview

How electricity works in Bermuda.

Bermuda electricity 2026: BELCO and the Regulatory Authority, 2026 tariff cuts and restructuring, fuel adjustment rate, solar feed-in tariff, 500 kW licence threshold and IRP.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Bermudian dollar (BMD) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Bermuda energy at a glance.

Key figures for households in Bermuda. Each one links to its source on the full overview below.

  • Household use.

    7,800 kWh a year for a typical household. Figures for 2026.

  • Renewable share.

    6.8% of electricity from renewable sources. Figures for 2026-H1.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Bermuda.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Bermuda below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Bermuda requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Bermuda.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Bermuda, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Bermuda, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Bermuda.

Full overview

The energy market in Bermuda, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Bermuda is an isolated, densely settled British Overseas Territory in the North Atlantic with no grid link to any other country. The Bermuda Electric Light Company (BELCO), owned by the Canadian group Algonquin Power & Utilities Corp, holds the island’s Transmission, Distribution and Retail (TD&R) licence and runs the oil-fired generating plant. Every home on the island buys its grid electricity from BELCO.

The sector is governed by the Electricity Act 2016 and regulated by the Regulatory Authority of Bermuda (RA), which sets BELCO’s allowed revenue and retail tariff, approves the quarterly Fuel Adjustment Rate (FAR), sets the feed-in tariff paid for exported solar power, issues generation licences and oversees the Integrated Resource Plan (IRP). Generating systems below 500 kW need no licence.

Almost all electricity comes from heavy fuel oil and diesel engines. In the first half of 2026, BELCO’s own figures show roughly 93% of grid supply came from its oil-fired plant, with the rest from the Tynes Bay waste-to-energy facility, a utility solar farm and rooftop solar exports. Two changes stand out in 2026. Base rates fell by 10.5% from 1 January. Then a restructured tariff, approved in July and taking effect on 1 August, unbundled bills and created separate classes for customers with solar, which raised fixed charges for solar households sharply.

Energy snapshot.

Headline figures for electricity in Bermuda. Each shows its data year and links to its source.

  • Population64,555 peopleSource 122025
  • Households27,418 householdsSource 112016
  • Average household size2.26 people/householdSource 112016
  • Electricity use per household7,800 kWh/yrSource 22026
  • Household price (BMD)Not identified from a reliable public source.
  • Household price (EUR)Not identified from a reliable public source.
  • Renewable electricity share6.8%Source 12026-H1
  • Solar capacityNot identified from a reliable public source.
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacity0.01 GWSource 212019
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Yes
Home equipment in grid services
No
Regulator
Regulatory Authority of Bermuda (RA)
System operator
Bermuda Electric Light Company Limited (BELCO), TD&R licensee
Distribution networks
No separate DSOs: BELCO holds the island’s single Transmission, Distribution and Retail licence and owns the whole network.
Currency
Bermudian dollar (BMD)
Voltage and frequency
120/240 V / 60 Hz

Electricity prices in Bermuda.

Household price (BMD)
Not identified from a reliable public source.
Household price (EUR)
Not identified from a reliable public source.
Typical annual electricity bill
Not identified from a reliable public source.

A BELCO bill has two main parts. The base tariff, made up of the facilities charge and the energy charges, recovers BELCO’s non-fuel costs and a regulated return. The RA sets it in a multi-year retail tariff review under its Retail Tariff Methodology. The Fuel Adjustment Rate then passes the actual cost of heavy fuel oil and diesel through to customers per kWh, and the RA reviews it each quarter against BELCO’s fuel purchases, sales and over- or under-recovery.

The 2026/27 tariff review

For 2026 the RA approved allowed revenue of BMD 236.9 million, BMD 16.8 million less than BELCO requested, and a rate of return of 7.85% against the 9.86% sought. Base rates fell by 10.5% and the average retail rate by about 7.6% for meters read on or after 1 January 2026. Residential energy charges fell by between 1.5 and 5.6 cents per kWh, depending on the block.

Fuel costs and fuel duty

Fuel is the most volatile part of the bill. BELCO expects to spend about BMD 73.9 million on fuel in 2026, mostly hedged heavy fuel oil, which ranged from about BMD 91 to 109 per barrel across 2026 shipments. When the FAR rose on 1 July 2026, the government said fuel-duty relief kept about 2.19 c/kWh off bills, holding the rate at 14.226 c/kWh instead of about 16.46 c/kWh. The National Electricity Sector Policy 2026 commits to removing the fuel duty on electricity generation entirely, which the government estimates will save a household about BMD 375 a year.

Tariff restructuring

The RA began reviewing tariff design in 2022. A Ministerial Direction followed in May 2025, and the RA approved the new design on 7 July 2026. Fixed charges now track the cost of grid infrastructure more closely, because most of BELCO’s revenue requirement relates to connections and network capacity rather than to energy sold. Bills show generation and network costs separately, and solar customers have their own tariff classes. The government said its review found residential customers had carried a disproportionate share of fixed costs. Solar owners and environmental charities protested that fixed charges for residential solar customers would roughly triple, adding about BMD 100 a month.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesBELCO residential service is regulated by the RA. It has a monthly facilities charge graduated by average daily use (five bands from 0–10 kWh/day to over 50 kWh/day under the 2023 schedule) and energy charges in three blocks (0–250, 251–700 and over 700 kWh per cycle), so the rate per kWh rises with consumption. Base rates fell by 10.5% from 1 January 2026.
VariableYesThe Fuel Adjustment Rate (FAR) passes BELCO’s fuel costs through per kWh and is set each quarter. In 2026 it was 13.799 c/kWh in Q1, 13.784 c/kWh in Q2 and 14.226 c/kWh from 1 July. BELCO asked for 14.226 c/kWh to continue for Q4. Government fuel-duty relief kept about 2.19 c/kWh off the July rate.
OtherYesFrom 1 August 2026 the restructured tariff shows generation and network (delivery) costs separately and puts customers into tariff classes by how much they rely on the grid (full, partial or minimal). Customers with solar moved to classes with higher fixed charges.
Time-of-useNoNo household time-of-use or dynamic tariff was identified.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
7,800 kWh/yr (2026)Source 2Derived: the 650 kWh per billing cycle that BELCO uses as its "average-usage" residential example, multiplied by 12. This is an indicative figure, not a measured average. BELCO’s low- and high-usage examples are 200 kWh and 1,500 kWh per cycle.
Average daily use per household
21.4 kWh/day (2026)Source 2Derived from BELCO’s 650 kWh per billing cycle average-usage example (7,800 kWh/yr ÷ 365). Indicative only.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
8,079 kWh/person/yr (2026)Source 1All sectors. Derived: BELCO’s 2026 sales of 521,541 MWh (actual January–August plus forecast) divided by the 2025 World Bank population of 64,555. Approximate.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
Not identified from a reliable public source.

Household demand in Bermuda is driven by its humid subtropical climate. Monthly system peaks in BELCO’s FAR reports range from about 71 MW in early spring to more than 100 MW in July and August, so air-conditioning is the main seasonal load. A smaller winter peak of about 98 MW was recorded in February 2026.

Rising block energy charges and a facilities charge graduated by daily use make heavier users pay more per kWh. BELCO describes 650 kWh per billing cycle as average residential use, against 200 kWh for a low user and 1,500 kWh for a high user.

Housing and households.

Dwellings
28,192 dwellings (2016)Source 11
Owner-occupied
48% (2016)Source 11Share of households that were owner-occupied at the 2016 Census.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
100% (2025)Source 13

Bermuda has about 64,500 people, and the World Bank classes the whole population as urban. In 2016 the census counted 28,192 dwelling units and 27,418 private households, with 48% owner-occupied and an average household size of 2.26.

Because just over half of households rent, many residents depend on their landlord’s decisions about investing in solar or batteries. Planning law exempts small rooftop solar arrays of up to 400 sq ft from planning permission.

How the grid works in Bermuda.

  1. TransmissionBermuda Electric Light Company Limited (BELCO)
  2. DistributionNo separate DSOs: BELCO holds the island’s single Transmission, Distribution and Retail licence and owns the whole network.
  3. MeteringBELCO
  4. Supply1 or more retail suppliers

Physical system

Bermuda’s power system is a small, isolated island grid. BELCO’s FAR reports list its available generators as two groups of heavy-fuel-oil engines (N1–N4, at the North Power Station commissioned in 2020, and E5–E8) and four gas turbines (GT5–GT8) burning light fuel oil, which run only for short periods. The 10 MW Nolan Smith battery provides fast reserve: it responds within 50 milliseconds when a generator trips and can sustain output for up to 30 minutes. BELCO says it has retired eight of its 16 engines and four of its eight gas turbines since the newer plant came into service.

Monthly peak demand was between about 71 and 103 MW over the 12 months to August 2026. BELCO’s own generation is topped up by power bought from the government’s Tynes Bay waste-to-energy plant and from the 6 MW Solar Finger solar farm at the airport. System losses are about 10% of gross generation.

Commercial flow

BELCO is the single buyer and the single seller. Independent generators with a bulk generation licence sell to BELCO under agreements approved by the RA, and rooftop solar exports are bought at the RA-set feed-in tariff. BELCO recovers its costs through the regulated base tariff plus the FAR. There is no wholesale market, power exchange or retail competition.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry of Home Affairs (Government of Bermuda)Sets national electricity policy (National Electricity Sector Policy 2026), issues Ministerial Directions to the RA and makes regulations under the Electricity Act 2016, including the licence threshold.
RegulatorRegulatory Authority of Bermuda (RA)Independent regulator under the Regulatory Authority Act 2011 and the Electricity Act 2016. Grants TD&R, bulk generation and large-scale self-supply licences, sets BELCO’s retail tariff and the quarterly FAR, sets the feed-in tariff and runs the IRP process.
System operatorBermuda Electric Light Company Limited (BELCO)TD&R licensee. Runs the oil-fired engines and gas turbines, the 10 MW battery, the transmission and distribution network, metering, billing and customer service. It is the single buyer of power from independent generators.
MeteringBELCOOwns, installs and reads all revenue meters. It has deployed Advanced Metering Infrastructure using radio-frequency spectrum approved by the RA.
SupplierBELCOThe only retail supplier. There is no customer choice of supplier.

Compared with the UK system.

Compared with the UK system.
UK conceptBermuda equivalentHow it works
DNOBELCO (TD&R licensee)BELCO owns and operates the whole island network under one licence. There are no separate regional distribution companies.
National Grid/NESOBELCOBELCO balances supply and demand in real time with its own engines, gas turbines and 10 MW battery, and dispatches purchased power from Tynes Bay and the solar farm. There is no independent system operator and no wholesale market.
MPANBELCO account / premises and meter numberThere is no national supply-point register or standard identifier. A connection is identified within BELCO’s own customer system by the account and the meter at the premises.
MPRNNo equivalent identifiedNo piped-gas supply-point identifier or gas network register was identified in Bermuda’s energy regulation. The RA’s regulated energy sector covers electricity and fuels, not a mains gas grid.
Meter operatorBELCOMetering is part of BELCO’s regulated service. There are no competing meter operators.
SupplierBELCOThere is a single regulated retailer, and households cannot switch. Prices are set by the RA, not by competition.
Smart-meter infrastructureBELCO AMIBELCO runs its own Advanced Metering Infrastructure network, which sends meter data by RF and feeds BELCO’s customer portal. There is no national smart-meter data company like the DCC.

How a supply point is identified.

How a supply point is identified.
QuestionAnswer
What is it called?BELCO customer account and meter
Who issues it?BELCO
FormatNo public, standardised supply-point identifier format. BELCO identifies a connection by the customer account and the meter installed at the premises, both printed on the bill.
LengthNot publicly specified
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the BELCO bill and in the BELCO online customer portal (portal.belco.bm).
Electronic accessCustomers can view accounts and bills and pay through BELCO’s online portal. AMI meters provide interval data to BELCO, and BELCO says the portal gives customers more detailed consumption information.
Third-party accessNo regulated framework for third-party access to meter data or supply-point details was identified.
Who keeps the registerBELCO’s internal customer and metering systems
Register scopeNational

Bermuda has nothing like the UK’s MPAN. There is one utility for the whole island, no supplier switching and therefore no central registration service, so a home’s supply point exists only as a record in BELCO’s customer, billing and metering systems.

In practice a household’s connection is administered through its BELCO account, which is tied to the premises and to the meter BELCO has installed there. The physical meter and service connection belong to BELCO and stay at the property, while the account is held by whoever takes the supply. BELCO has not published a format or length for its account or premises numbers, so no example is given here.

Every revenue meter is BELCO’s property. BELCO has replaced older meters with two-way AMI smart meters that communicate by radio. The RA approved the radio spectrum and checked emissions against US FCC limits. For a solar home, BELCO installs metering that records both imports and exports, and its FAR reports show "PV buyback" as a separate line.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingYes
How exported electricity is paidRegulated feed-in tariff set by the RA under its Feed-in Tariff Methodology, based on the generation costs BELCO avoids. Imports are billed at the normal retail tariff. The rate was cut from BMD 0.2265/kWh to 0.131/kWh in October 2023, and the government says it is under review.
Is there a size limit for household systems?Systems below 500 kW installed capacity need no licence under the Electricity (Licence Threshold) Regulations 2018. BELCO’s interconnection requirements apply to all grid-tied systems.
How much is exported power worth?The RA sets the feed-in tariff. It was BMD 0.2265/kWh from 2019, then cut to BMD 0.131/kWh in October 2023 after the RA found the earlier calculation had not reflected avoided costs. No verified 2026 rate was found.
Do solar customers pay different fixed charges?Yes, from 1 August 2026. The restructured tariff puts customers into classes by grid reliance, and solar households pay higher facilities charges than before.
Can I go off-grid or self-consume without exporting?Self-consumption below 500 kW needs no licence. Larger self-supply systems need a large-scale self-supply licence from the RA.

Connecting a home system.

  1. Choose an installer and design a system below the 500 kW licence threshold (no generation licence needed).
  2. Check planning: rooftop arrays up to 400 sq ft are exempt from planning permission. Larger or ground-mounted systems need a planning application.
  3. Apply to BELCO for interconnection and sign BELCO’s distributed generation interconnection agreement, which governs export and the feed-in rebate.
  4. BELCO completes its connection checks and metering so that exports are recorded separately (shown as "PV buyback" in BELCO’s fuel-adjustment reporting).
  5. Exports are credited at the RA’s feed-in tariff, and the account moves to the relevant solar tariff class under the 2026 restructured tariff.

Rooftop solar has been the main way Bermudian households take part in the electricity system. BELCO buys exported energy at the RA’s feed-in tariff, and the household continues to buy its imports at the retail tariff. Under this net-billing arrangement, energy used on site saves the full retail rate, while exports earn only the lower feed-in rate.

The economics shifted twice. In 2023 the RA cut the feed-in tariff by about 42%, saying the 2018 methodology had overcompensated solar customers by more than BMD 254,000 over a year. Then from 1 August 2026 the restructured tariff raised fixed charges for solar customers. The government has acknowledged that solar owners faced a feed-in tariff "held low by a flawed calculation" and says fair charges and fair compensation must move together.

Exported volumes are still modest. BELCO’s 2026 figures show about 4.8 GWh of net PV buyback, against around 546 GWh generated by BELCO itself.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityNo licence below 500 kW installed capacity. At or above 500 kW, a Bulk Generation licence (s.20 Electricity Act 2016) to sell to the grid, or a Large-Scale Self-Supply licence for own use.Regulatory Authority of BermudaThreshold set by the Electricity (Licence Threshold) Regulations 2018, BR 32/2018. It was briefly reduced to 250 kW from 5 April to 31 May 2021.
Generate for own use with surplus export (large sites)Bulk Generation Sole Use Installation (BGSUI) licence for generators above 500 kW that mainly supply themselves and export surplus, reported as up to 30% of output.Regulatory Authority of BermudaCreated by the Electricity Amendment Act 2024, in force 31 March 2025.
Store electricityNo separate storage licence identified. Storage paired with a system below 500 kW is treated as part of the installation. Utility storage is operated by BELCO under its TD&R licence.Regulatory Authority of BermudaGrid-tied batteries remain subject to BELCO interconnection requirements.
Export to the gridBelow 500 kW: BELCO interconnection agreement, with no licence needed. Larger exports require a bulk generation or BGSUI licence and a power purchase arrangement approved by the RA.BELCO / Regulatory Authority of BermudaCompensated at the RA-set feed-in tariff.
Transmit, distribute and sell (supply) electricityTD&R licence. BELCO is the only holder, so third-party retail supply is not available.Regulatory Authority of BermudaBELCO’s tariffs, revenue and service standards are regulated by the RA.
Aggregation, VPP, trading, wholesale, balancing and grid servicesNo market or licence category exists. There is no wholesale market or flexibility market, and BELCO procures balancing internally.Regulatory Authority of BermudaThe Electricity (Innovative Licence) Regulations 2023 allow time-limited sandbox licences for new technologies or business models.
Remote control of distributed assetsNo specific framework identified. Any utility control of customer assets would be governed by BELCO’s interconnection terms.BELCO / Regulatory Authority of BermudaNot addressed in published RA materials reviewed.

The Electricity Act 2016 makes generating electricity a licensed activity, but anything below the licence threshold is exempt. The threshold is 500 kW, so households and most small businesses can install solar and batteries without a licence and deal only with BELCO for connection and with the planning authority where needed.

Above the threshold, the RA grants three main kinds of licence: TD&R (held only by BELCO), Bulk Generation for plants selling to the grid, and Large-Scale Self-Supply for big own-use systems. The 2024 amendments added the BGSUI licence for large self-suppliers that export surplus. The Innovative Licence Regulations 2023 provide a regulatory sandbox.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Operating reserve / frequency responseNo—NoBELCO. Provided by BELCO’s own plant and its 10 MW Nolan Smith battery. There is no market through which customer-owned assets can offer reserve.
Demand responseNo—NoBELCO. No residential demand-response or time-of-use programme was identified.

Bermuda has no wholesale or flexibility markets. BELCO, as the vertically integrated utility, handles balancing, reserve and dispatch internally. Its 10 MW battery was installed to provide fast reserve when a generator trips, which BELCO says saves fuel and maintenance costs.

There is no aggregator framework or virtual power plant programme. The National Electricity Sector Policy 2026 moves planning towards a least-cost, technology-neutral IRP, which could value distributed resources in future, but no participation route existed as of October 2026.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutBELCO Advanced Metering Infrastructure deployed; share installed not published
Reading intervalNot published
OwnerBELCO
CommunicationsRadio frequency (spectrum use approved by the RA)
Emissions standardUS FCC specifications (RA spot-tested)
Customer accessBELCO online portal

BELCO began replacing meters with two-way smart meters around 2018. In June 2018 the government said the RA had approved the radio spectrum the meters use and confirmed they met US FCC exposure limits, and that each meter transmits for less than a second a day in total. BELCO describes Advanced Metering Infrastructure and a new customer portal as part of the operational improvements behind its 2026 rate cut.

Neither BELCO nor the RA has published a penetration figure or a standard reading interval. Smart meters are not used for time-of-use pricing, because no such tariff is offered.

Renewable electricity.

Electricity generation mix (2026 (Jan–Jun)).

  • Oil (HFO and diesel): 93.2%
  • Waste-to-energy (Tynes Bay): 3.8%
  • Utility solar (Solar Finger): 2%
  • Rooftop solar exports: 1%
Source 1
Renewable electricity share
6.8% (2026-H1)Source 1Derived from BELCO’s actual figures for Q1–Q2 2026 in the Q4 2026 FAR report: Tynes Bay waste-to-energy (9,843 MWh), Solar Finger solar farm (5,240 MWh) and rooftop solar exports (2,586 MWh) as a share of total grid supply including BELCO’s gross generation (241,445 MWh). It counts all waste-to-energy output as renewable, and solar alone was about 3%. It excludes rooftop solar that is used on site. Ember data via Our World in Data report about 1.6% for 2024, all from bioenergy, and show no solar. There is no interconnection.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Utility solar (airport solar farm)
0.006 GWSource 206 MW commercial solar farm.
Battery storage (BELCO)
0.01 GW (2019)Source 21
Wind
Not identified from a reliable public source.

Targets.

  • The 2019 Integrated Resource Plan, approved by the RA, set an objective of 85% renewable generation by 2035.
  • The National Electricity Sector Policy 2026 replaces fixed targets with a least-cost, technology-neutral IRP process. Projections cited in it are about 7% by 2030, 35% by 2040 and around 50% by 2050.

Bermuda’s electricity is overwhelmingly oil-fired. BELCO’s 2026 FAR data show its own plant produced about 241 GWh in the first half of the year, against about 10 GWh from Tynes Bay, 5 GWh from the airport solar farm and 2.6 GWh of net rooftop exports. Ember’s series via Our World in Data records only bioenergy (about 1.6% in 2024) and no solar, which understates the solar now on the system.

Offshore wind of 60–120 MW has been studied and procured. A 60 MW farm was estimated to be able to meet about a third of current demand. A wave-energy pilot has also been proposed. None was in operation by October 2026.

Policy has moved from aspiration to least-cost planning. The 2019 IRP set an 85% renewable objective by 2035. In 2026 the government’s new sector policy said it would replace aspirational targets with a practical, evidence-based IRP process. The current IRP round, begun with BELCO’s proposal and a public consultation in 2024–25, had not been finalised by October 2026.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
0.01 GW (2019)Source 21Nolan Smith BESS, 10 MW, up to 30 minutes of discharge.

Storage in Bermuda has so far been used for grid reliability rather than shifting solar energy. BELCO’s 10 MW battery provides reserve capacity for its generating plant. Home batteries fall under the same 500 kW licence exemption as other small installations, but no market data on their uptake was found.

Storage projects.

  • Nolan Smith Battery Energy Storage System (BELCO): 10 MW reserve battery that responds automatically within 50 milliseconds to generation faults and can discharge for up to 30 minutes. It won an industry energy award in 2019, and BELCO says it cuts CO₂ emissions by about 4,500 tonnes a year.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
BELCO (Bermuda Electric Light Company Limited)100% (sole TD&R licensee)NoNoNoYes

BELCO is the only electricity retailer in Bermuda and is owned by Algonquin Power & Utilities Corp. Customers cannot choose their supplier. The RA regulates prices, revenue and service standards.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Regulatory Authority of BermudaRegulatorElectricity, telecoms and other utilities regulatorSets tariffs, the FAR and the feed-in tariff, licenses generators and runs the IRP.
Ministry of Home AffairsGovernmentMinistry responsible for energy policyIssues the National Electricity Sector Policy and Ministerial Directions to the RA.
BELCODistributionVertically integrated utility (TD&R licensee)Generation, network, metering, billing and interconnection of all solar systems.
GreenrockRenewable EnergyEnvironmental charityCampaigns on sustainability and renewable energy policy.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Grid connectionBELCO distributed generation interconnection agreement and requirementsBELCO (under RA oversight)Governs connection, metering and the feed-in rebate for small generators.
Licensing thresholdElectricity (Licence Threshold) Regulations 2018 (BR 32/2018)Minister responsible for energy500 kW installed capacity.
Smart meters (radio)US FCC RF exposure specificationsRegulatory Authority of Bermuda (spectrum approval)RA approved spectrum use and carried out Maximum Permissible Exposure tests.
Inverters / anti-islandingNot publicly specifiedBELCONo published national inverter standard was identified. Requirements are set in BELCO’s interconnection terms.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Planning permission (rooftop solar)LimitedNationalSmall installations up to 400 sq ft are exempt. Larger arrays need planning permission.
Generation licenceLimitedNationalRequired only at or above 500 kW installed capacity.
Utility interconnection approvalYesNationalBELCO interconnection agreement for any grid-tied system.

Bermuda is a single jurisdiction, so planning, licensing and grid connection are all handled nationally. Household rooftop solar typically needs only BELCO approval, plus planning permission if the array exceeds 400 sq ft.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Feed-in tariff for distributed generationActiveExport paymentRA-set rate paid by BELCO for exported energy, BMD 0.131/kWh from October 2023. The government says it is under review.—
Fuel-duty relief on electricity generationActiveTax reliefGovernment relief held about 2.19 c/kWh off the FAR from 1 July 2026. The National Electricity Sector Policy 2026 commits to eliminating the duty on generation fuel.From July 2026
Customs duty relief on solar equipmentActiveDuty reliefZero import duty on solar equipment (Legal 500 Bermuda guide, June 2026).—

Data and connectivity.

Fixed broadband
51.3 subscriptions per 100 people (2024)Source 14
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband reaches about half the population per 100 people, as the World Bank measures it. BELCO’s smart meters communicate over BELCO’s own RF network rather than public mobile networks. No national protocol requirements for home energy devices were identified.

Grid conditions.

National peak demand
0.103 GW (2026)Source 1Maximum 15-minute peak of 102,552 kW in July 2026.
Annual electricity demand
0.52 TWh (2026)Source 1BELCO sales of 521,541 MWh (actual January–August plus forecast September–December).
Generation capacity
Not identified from a reliable public source.
Interconnection
0 GWIsolated island grid, with no interconnectors.
Curtailment
Not identified from a reliable public source.

Because the grid is isolated, BELCO must keep enough reserve on line to cover the loss of its largest unit. The 10 MW battery is central to that. System losses are about 10% of gross generation. BELCO’s FAR reports list frequent short maintenance and forced outages on individual engines, but the RA notes that the island does not regularly experience blackouts.

BELCO has a transmission upgrade project under way to replace ageing cables and to cope with more variable renewable output.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
2026/27 retail tariff: base rates cut 10.5%Current2026-01-01RA allowed revenue of BMD 236.9 million and a 7.85% return for 2026. The average retail rate fell about 7.6%.
Retail tariff restructuringCurrent2026-08-01Approved 7 July 2026 after a May 2025 Ministerial Direction. It brings unbundled generation and network charges, higher fixed charges and new tariff classes for customers with solar.
National Electricity Sector Policy 2026Current2026-07Replaces aspirational renewable targets with least-cost IRP planning and commits to eliminating the fuel duty on generation. The draft was consulted on from 20 April to 21 May 2026.
Electricity Amendment Act 2024 (BGSUI licence)Current2025-03-31New licence for large own-use generators above 500 kW to export surplus power.
New Integrated Resource PlanUpcomingNot scheduledThe IRP round that began with BELCO’s proposal and consultations in 2024–25 was not finalised by October 2026. The RA asked to extend the planning horizon to 20 years, and BELCO’s proposal models scenarios to 2050.
Feed-in tariff reviewUpcomingNot scheduledThe government says the RA is reviewing the feed-in tariff alongside the new charges.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity cost—Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useHighLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMediumThere is an established rooftop solar market with several local installers and a feed-in tariff, but exports total only about 4.8 GWh a year, and 2026 tariff changes raised fixed charges for solar homes.
Distributed energy marketMediumA 500 kW licence exemption allows small-scale generation and storage without a licence, but there is a single buyer and no aggregation.
Grid flexibility marketLowNo wholesale, flexibility or demand-response markets. BELCO handles all balancing.
Energy storage adoptionLowOne 10 MW utility battery, with no data on home batteries.
Renewable growth environmentLowAbout 7% of grid supply in H1 2026, including waste-to-energy. Offshore wind and other large projects are not yet built, and targets have been replaced by least-cost planning.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 26 sources
  1. BELCO Fuel Adjustment Report Q4 2026 (letter to the RA, 21 September 2026). Regulatory Authority of Bermuda / BELCO, 2026. accessed 10 October 2026.
  2. BELCO Announces Lower Electricity Rates. Bernews, 2025. accessed 10 October 2026.
  3. Average household could see $20 trimmed off their BELCO bill. Bermuda Broadcasting Company, 2025. accessed 10 October 2026.
  4. Retail Tariff Design Restructuring. Regulatory Authority of Bermuda, 2026. accessed 10 October 2026.
  5. Minister of Home Affairs addresses recent BELCO rate change announcement. Government of Bermuda, 2026. accessed 10 October 2026.
  6. Fuel duty relief shields households as electricity fuel adjustment rises today, 1 July. Government of Bermuda, 2026. accessed 10 October 2026.
  7. Home Affairs Minister: National Electricity Sector Policy consultation. Government of Bermuda, 2026. accessed 10 October 2026.
  8. Solar customers stand up against rates rise approval (Royal Gazette). now.solar / The Royal Gazette, 2026. accessed 10 October 2026.
  9. Regulator defends Belco rate increase. The Royal Gazette, 2023. accessed 10 October 2026.
  10. How much should Belco pay you for electricity?. The Royal Gazette, 2022. accessed 10 October 2026.
  11. 2016 Population and Housing Census Preliminary Report (Ministerial Statement). Government of Bermuda, Department of Statistics, 2016. accessed 10 October 2026.
  12. Population, total — Bermuda (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
  13. Urban population (% of total) — Bermuda (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 10 October 2026.
  14. Fixed broadband subscriptions per 100 people — Bermuda (IT.NET.BBND.P2). World Bank, 2024. accessed 10 October 2026.
  15. Share of electricity generation by source — Bermuda. Our World in Data (Ember), 2024. accessed 10 October 2026.
  16. Electricity (Licence Threshold) Regulations 2018. Bermuda Laws Online, 2018. accessed 10 October 2026.
  17. Electricity Sector Licences. Regulatory Authority of Bermuda. accessed 10 October 2026.
  18. Electricity Tariffs (Feed-in Tariff, Retail Tariff, FAR). Regulatory Authority of Bermuda. accessed 10 October 2026.
  19. Electricity Sector. Regulatory Authority of Bermuda. accessed 10 October 2026.
  20. Renewable Energy Comparative Guide: Bermuda (Legal 500). Mondaq / Legal 500, 2026. accessed 10 October 2026.
  21. Belco wins energy award. The Royal Gazette, 2019. accessed 10 October 2026.
  22. ‘Stop blaming BELCO for things we don’t control’. Bermuda Broadcasting Company, 2025. accessed 10 October 2026.
  23. Smart Meters. Government of Bermuda, 2018. accessed 10 October 2026.
  24. BELCO Backs Fuel Tax Removal Proposal. Bernews, 2026. accessed 10 October 2026.
  25. Blueprint for energy sector is not late, says RA. Bermuda Broadcasting Company, 2025. accessed 10 October 2026.
  26. Rates & Service Rules (tariffs effective 1 January 2023). BELCO, 2023. accessed 10 October 2026.

Questions about energy in Bermuda.

Talk to us about Olmack in Bermuda.Tell us about your home, housing portfolio or school estate in Bermuda. We'll explain what is possible there now.