How electricity works in United Kingdom.
UK electricity market 2026: Ofgem price cap, DNOs, MPAN, smart meters, Smart Export Guarantee, licensing, flexibility markets, renewables and upcoming reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Pound sterling (GBP) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
United Kingdom energy at a glance.
Key figures for households in United Kingdom. Each one links to its source on the full overview below.
Electricity price.
0.263 GBP per kWh for households, including taxes. Figures for Oct–Dec 2026.
Household use.
3,323 kWh a year for a typical household. Figures for 2024.
Renewable share.
52.1% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in United Kingdom.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for United Kingdom below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications United Kingdom requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in United Kingdom.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in United Kingdom, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in United Kingdom, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in United Kingdom.
The energy market in United Kingdom, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Great Britain (England, Scotland and Wales) runs one of the most liberalised electricity markets in the world: generation, supply and metering are competitive, while transmission and distribution are regulated monopolies overseen by Ofgem. Northern Ireland is part of the all-island Single Electricity Market with Ireland and has its own regulator, the Utility Regulator, so most of the rules described here apply to Great Britain unless stated otherwise.
Household electricity prices for most customers are limited by the Ofgem default tariff cap, reset every quarter. From 1 October to 31 December 2026 the capped average electricity unit rate is 26.32p/kWh with a standing charge of 54.83p/day for Direct Debit customers, after the government removed VAT from electricity bills for October 2026 to March 2027.
Renewables supplied 52.1% of UK generation in 2025, the second year above 50%, and 2025 was the first full year with no coal generation. Rooftop solar, home batteries and heat pumps are growing quickly, smart meters cover around three-quarters of domestic electricity supplies, and market-wide half-hourly settlement is due to be complete in May 2027.
Energy snapshot.
Headline figures for electricity in United Kingdom. Each shows its data year and links to its source.
- Population69,281,400 peopleSource 5mid-2024
- Households29,000,000 householdsSource 62025
- Average household size2.36 people/householdSource 62025
- Electricity use per household3,323 kWh/yrSource 72024
- Household price (GBP)0.263 GBP/kWhSource 1Oct–Dec 2026
- Household price (EUR)0.308 EUR/kWhSource 4Oct–Dec 2026
- Renewable electricity share52.1%Source 82025
- Solar capacity22.8 GWSource 10June 2026
- Wind capacity32 GWSource 11end 2025
- Energy storage capacity7.5 GWSource 122025
- Smart-meter share72%Source 13June 2026
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Yes
- Regulator
- Ofgem (Great Britain); Utility Regulator (Northern Ireland)
- System operator
- National Energy System Operator (NESO)
- Distribution networks
- 14 regional DNO licence areas owned by six groups, plus independent DNOs (IDNOs); NIE Networks in Northern Ireland
- Currency
- Pound sterling (GBP)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in United Kingdom.
- Household price (GBP)
- 0.263 GBP/kWh (Oct–Dec 2026)Source 1Price cap average unit rate, Direct Debit, England, Scotland and Wales. VAT is zero on electricity from 1 October 2026 to 31 March 2027. Plus a standing charge of 54.83p/day.
- Household price (EUR)
- 0.308 EUR/kWh (Oct–Dec 2026)Source 4Converted from 26.32p/kWh at the ECB reference rate of 30 September 2026 (EUR 1 = GBP 0.85463).
- Typical annual electricity bill
- 1,723 GBP/yr (Oct–Dec 2026 (annualised))Source 2Typical dual-fuel bill (electricity and gas) under the price cap, Direct Debit, at 2,500 kWh electricity and 9,500 kWh gas. The electricity part alone works out at about £858 a year at the capped unit rate and standing charge.
Household price trend (GBP per kWh).Source 3
| Oct 2021–Mar 2022 | 0.208 GBP/kWh |
|---|---|
| Apr–Sep 2022 | 0.2834 GBP/kWh |
| Oct 2022–Jun 2023 (EPG) | 0.34 GBP/kWh |
| Jul–Sep 2023 | 0.3011 GBP/kWh |
| Oct–Dec 2023 | 0.2735 GBP/kWh |
| Jan–Mar 2024 | 0.2862 GBP/kWh |
| Apr–Jun 2024 | 0.245 GBP/kWh |
| Jul–Sep 2024 | 0.2236 GBP/kWh |
| Oct–Dec 2024 | 0.245 GBP/kWh |
| Jan–Mar 2025 | 0.2486 GBP/kWh |
| Apr–Jun 2025 | 0.2703 GBP/kWh |
| Jul–Sep 2025 | 0.2573 GBP/kWh |
| Oct–Dec 2025 | 0.2635 GBP/kWh |
| Jan–Mar 2026 | 0.2769 GBP/kWh |
| Apr–Jun 2026 | 0.2467 GBP/kWh |
| Jul–Sep 2026 | 0.2611 GBP/kWh |
| Oct–Dec 2026 | 0.2632 GBP/kWh |
How the price cap works
Around half of household electricity costs are wholesale energy; the rest covers network charges (distribution and transmission), balancing costs, supplier operating costs, smart meter costs, policy costs and VAT. Ofgem recalculates the cap every quarter from these cost allowances. For October–December 2026, wholesale costs made up 47% of the Direct Debit cap, up from 44% the previous quarter, because of higher gas prices linked to conflict in the Middle East. The cap rose 4% to £1,723 for a typical dual-fuel household.
Taxes and levies
Domestic electricity normally carries 5% VAT. The government reduced it to zero for all electricity bills from 1 October 2026 to 31 March 2027; gas stays at 5%. From April 2026 the government also moved some policy costs off bills, which it estimated removed about £150 from an average annual energy bill. Climate Change Levy does not apply to households.
Regional differences
Unit rates and standing charges differ between the 14 distribution regions because network costs differ; North Wales and Merseyside and northern Scotland usually have the highest standing charges, while London has some of the lowest. Prepayment and Direct Debit rates are close, while Standard Credit (paying on receipt of a bill) costs more.
Trend
Capped unit rates climbed from about 21p/kWh in winter 2021/22 to a level of more than 50p/kWh in early 2023, though households paid no more than 34p/kWh because of the government Energy Price Guarantee. Since mid-2023 the cap has stayed between about 22p and 30p/kWh, which is still well above pre-2021 levels.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Standard variable (default) tariffs are limited by the Ofgem price cap, which sets maximum unit rates and standing charges by region and payment method each quarter. It caps rates, not total bills. |
| Fixed | Yes | Fixed-price contracts, typically 12–24 months, are offered by most suppliers and are not covered by the cap. Exit fees may apply. |
| Time-of-use | Yes | Smart time-of-use tariffs aimed at EV, heat pump and battery owners offer cheap overnight or off-peak windows. Older Economy 7 and Economy 10 multi-rate tariffs remain in use for storage heating. |
| Dynamic | Yes | Half-hourly tariffs that follow day-ahead wholesale prices are offered by a small number of suppliers and need a smart meter sending half-hourly data. Prices can go negative. |
| Prepayment | Yes | Prepayment is available through smart meters in prepay mode or legacy key/card meters. It has its own cap level, and rules on involuntary prepayment installation were tightened in 2023. |
| Other | Yes | Export tariffs under the Smart Export Guarantee (SEG) and supplier-specific export products pay households for electricity they send to the grid. |
Household prices compared with neighbouring countries (EUR per kWh).
- Ireland€0.404
- Germany€0.37
- Belgium€0.35
- Denmark€0.331
- United Kingdom€0.308
- Netherlands€0.258
- France€0.2
- Norway€0.192
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,323 kWh/yr (2024)Source 7Mean domestic consumption per meter, Great Britain. Median was 2,471 kWh; Ofgem uses 2,500 kWh as its typical (medium) value for price cap bills.
- Average daily use per household
- 9.1 kWh/day (2024)Source 7Mean 3,323 kWh per domestic meter divided by 365. The median meter uses about 6.8 kWh/day.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,389 kWh/person/yr (residential) (2025)Source 8UK domestic consumption of 96.2 TWh divided by the mid-2024 population of 69.3 million.
- Heat pumps
- 60,000 installations in 2025 (2025)Source 14MCS-certified heat pump installations in 2025, a record year. No official count of the total heat pump stock is published; Census 2021 found 0.9% of homes in England and Wales heated mainly by renewable sources.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 1,864,000 zero-emission cars licensed (end March 2026)Source 15Up 32.9% on March 2025. Plug-in hybrids are additional.
- Electric cooking
- Not identified from a reliable public source.
Domestic users accounted for 29.8% of UK electricity demand in 2025. Domestic consumption rose 2.6% to 96.2 TWh but was still 7.1% below 2019, after sharp falls in 2022 and 2023 when prices rose. Efficient lighting and appliances have pushed long-term consumption down.
The mean GB household meter used 3,323 kWh in 2024 and the median 2,471 kWh. The gap is large because around 4% of domestic meters use more than 10,000 kWh, typically homes with electric heating, EVs or large properties. Mains gas is still the main heating fuel (73.8% of households in England and Wales in Census 2021), so most homes have low electricity demand for heating.
Electrification is changing this. MCS recorded over 60,000 certified heat pump installations and more than 40,000 home battery installations in 2025, and there were 1.86 million zero-emission cars on the road by March 2026. Households that switch to heat pumps or EVs commonly double their electricity use and are the main users of smart time-of-use tariffs.
Housing and households.
- Dwellings
- 25,600,000 dwellings (England) (31 March 2024)Source 16England only. Separate figures are published for Scotland, Wales and Northern Ireland.
- Owner-occupied
- 65 % of households (England) (2024–25)Source 17Census 2021 found 62.5% in England and Wales.
- Private rented
- 19 % of households (England) (2024–25)Source 17
- Social or public housing
- 16 % of households (England) (2024–25)Source 17
- Houses
- 77.9 % of households (England and Wales) (2021)Source 18Detached 23.2%, semi-detached 31.5%, terraced 23.2%.
- Apartments and flats
- 21.7 % of households (England and Wales) (2021)Source 18
- Urban population
- 83.3 % of population (2025)Source 19
Most UK homes are houses with their own roof, which suits rooftop solar. In Census 2021, 77.9% of households in England and Wales lived in houses or bungalows (23.2% detached, 31.5% semi-detached, 23.2% terraced) and 21.7% in flats. Flats are much more common in London and Scottish cities.
Owner-occupiers make up 65% of households in England (2024–25), private renters 19% and social renters 16%. Tenure matters for energy upgrades: owner-occupiers can install solar, batteries and heat pumps themselves, landlords must meet Minimum Energy Efficiency Standards (the government plans EPC band C for private rentals by October 2030), and social landlords use the Warm Homes: Social Housing Fund.
The housing stock is old. A large share was built before 1945, often with solid walls that are harder to insulate, which is one reason why heat pump retrofits and insulation programmes are central to government policy.
How the grid works in United Kingdom.
- TransmissionNational Energy System Operator (NESO), National Grid Electricity Transmission, SP Transmission, SSEN Transmission
- Distribution14 regional DNO licence areas owned by six groups, plus independent DNOs (IDNOs); NIE Networks in Northern Ireland
- MeteringRetail Energy Code Company (RECCo) and the Central Switching Service, Data Communications Company (DCC) and meter operators
- Supply6 or more retail suppliers
Physical flow
Large power stations, offshore wind farms and interconnectors feed the 400 kV and 275 kV transmission network (132 kV is also transmission in Scotland). Grid supply points step the voltage down into the distribution networks, which run from 132 kV (in England and Wales) through 33 kV and 11 kV down to the 400/230 V low-voltage network that serves homes. Most homes have a single-phase supply with a main fuse of 60–100 A at the cut-out.
Distribution in Great Britain is split into 14 licence areas owned by six groups: UK Power Networks (London, East and South East England), National Grid Electricity Distribution (Midlands, South West and South Wales), Northern Powergrid (North East and Yorkshire), Electricity North West (North West England), SP Energy Networks (central and southern Scotland, plus Merseyside and North Wales) and SSEN Distribution (northern Scotland and central southern England). Independent DNOs build and own networks on many new estates and connect to the host DNO. Northern Ireland has a single network owner, NIE Networks, and a separate system operator, SONI.
Commercial flow
Generators sell power to suppliers through long-term contracts, brokers, power exchanges and intraday trading. Each half-hour, NESO balances the system through the Balancing Mechanism and ancillary services. Elexon then settles the difference between each party’s contracted and metered volumes under the Balancing and Settlement Code. Suppliers pay Distribution Use of System (DUoS) and Transmission Network Use of System (TNUoS) charges and Balancing Services Use of System (BSUoS) costs, and pass them on in tariffs.
Meters are appointed by the supplier. Traditionally, Meter Operators (MOPs) install and maintain meters, Data Collectors and Data Aggregators read and process data, and Meter Asset Providers (MAPs) finance the meter. Under market-wide half-hourly settlement these roles are being restructured into Metering Service, Smart Data Service and Advanced Data Service roles.
Retail settlement and MHHS
Until recently, most domestic meters were settled using standard load profiles: the system assumed when energy was used, based on the meter’s profile class. Market-wide half-hourly settlement (MHHS) replaces this with actual half-hourly consumption for every meter, so suppliers bear the true cost of when their customers use power. The new central systems and code changes went live on 22 September 2025, migration of MPANs began on 22 October 2025, Elexon expected about 80% of meters to have migrated by October 2026, and all MPANs must migrate by 7 May 2027. Final settlement will then take four months instead of 14.
Switching
Since July 2022, supplier switching has run through the Central Switching Service, operated by DCC under the Retail Energy Code, so a customer can switch supplier within days. The MPAN stays the same when you switch.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Department for Energy Security and Net Zero (DESNZ) | Sets energy policy and legislation, runs the Boiler Upgrade Scheme and Warm Homes Plan, publishes official energy statistics, and owns the Clean Power 2030 plan. |
| Regulator | Ofgem | Licenses generators, suppliers, network companies and the smart meter communications provider; sets network price controls (RIIO); runs the default tariff cap and administers SEG and ECO. |
| System operator | National Energy System Operator (NESO) | Publicly owned since October 2024. Balances supply and demand second by second through the Balancing Mechanism and ancillary services, runs the Capacity Market and the Demand Flexibility Service, and manages the connections queue. |
| TSO | National Grid Electricity Transmission, SP Transmission, SSEN Transmission | Own the high-voltage transmission network: National Grid ET in England and Wales, SP Energy Networks in southern Scotland, and Scottish and Southern Electricity Networks Transmission in northern Scotland. Offshore links are owned by separately licensed OFTOs. |
| DSO | Distribution Network Operators (DNOs) and IDNOs | 14 regional licence areas run by UK Power Networks, National Grid Electricity Distribution, Northern Powergrid, Electricity North West, SP Energy Networks and SSEN Distribution. Independent DNOs (IDNOs) own networks on many new housing developments. Each DNO now has a separate DSO function procuring local flexibility. |
| Settlement | Elexon | Administers the Balancing and Settlement Code (BSC): compares what each supplier, generator and Virtual Lead Party contracted with what was metered every half-hour, and charges imbalances. Elexon is delivering market-wide half-hourly settlement. |
| Data hub / registry | Retail Energy Code Company (RECCo) and the Central Switching Service | The Retail Energy Code governs switching, metering and data services. The Central Switching Service, run by DCC, handles supplier switches; distributor-run MPAS registration systems and the ECOES enquiry service hold meter point data. |
| Metering | Data Communications Company (DCC) and meter operators | DCC runs the national smart meter communications network. Suppliers appoint Meter Operators (MOPs) or Meter Asset Providers (MAPs) to own, install and maintain meters. A new not-for-profit licensee, DCC2, is due to take over from Smart DCC in November 2026. |
| Supplier | Licensed electricity suppliers | 17 active domestic suppliers in March 2026. Suppliers buy wholesale power, pay network charges, bill customers and are responsible for metering and smart meter installation. |
| Exchange | EPEX SPOT and Nord Pool (GB day-ahead and intraday) | Most power is traded bilaterally or through brokers. The day-ahead and intraday auctions on EPEX SPOT and Nord Pool set the reference prices used by dynamic tariffs and Contracts for Difference. |
| Flexibility market | DNO flexibility tenders (Piclo, Flexible Power) | DNOs buy local flexibility to manage congestion through platforms such as Piclo Flex and Flexible Power. Ofgem has appointed Elexon as the Market Facilitator to standardise local flexibility markets. |
Compared with the UK system.
| UK concept | United Kingdom equivalent | How it works |
|---|---|---|
| DNO | Distribution Network Operator (and IDNO) | Six DNO groups cover 14 regions, with IDNOs embedded inside them. Your DNO is set by where you live and cannot be changed. It owns the cable and cut-out up to the meter and handles power cuts (phone 105) and new connections. |
| National Grid/NESO | NESO plus three transmission owners | NESO operates the system; National Grid ET, SP Transmission and SSEN Transmission own the wires. Northern Ireland has SONI as its system operator. |
| MPAN | Meter Point Administration Number | 21-digit number (13-digit core) that identifies each electricity supply point in Great Britain. Northern Ireland uses an 11-digit MPRN issued by NIE Networks instead. |
| MPRN | Meter Point Reference Number (gas) | In Great Britain the MPRN identifies a gas supply point (6–10 digits, held on Xoserve’s systems), not an electricity supply point. |
| Meter operator | MOP / MAP / MSA | Suppliers appoint meter operators and meter asset providers. For smart meters, the supplier is responsible for installation and the meter is enrolled with DCC. |
| Supplier | Licensed supplier | Competitive retail market with free switching, governed by Ofgem standard licence conditions and the price cap for default tariffs. |
| Smart-meter infrastructure | DCC network (SMETS1 and SMETS2) | Single national communications network: suppliers, network operators and authorised third parties all send messages to meters through DCC. |
How a supply point is identified.
S 01 801 123 / 14 1234 5678 901 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Meter Point Administration Number (MPAN) |
| Who issues it? | The local distribution network operator (DNO or IDNO) when the supply point is created |
| Format | Full MPAN is printed as a two-line box headed "S". Top line (8 digits): profile class (2), meter time-switch code (3), line loss factor class (3). Bottom line, the core MPAN (13 digits): distributor ID (2), unique identifier (10), check digit (1). |
| Length | 21 digits in full; 13-digit core |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Printed on electricity bills (often in a box marked "S" or labelled "Supply number") and in the supplier’s app or online account. Households can also ask their DNO, found through the Energy Networks Association postcode search. |
| Electronic access | Suppliers, network operators and accredited parties look up MPANs, addresses and meter details through ECOES (Electricity Central Online Enquiry Service). Supplier switches go through the DCC-run Central Switching Service. |
| Third-party access | ECOES access is limited to licensed and accredited industry parties. Third parties such as price comparison sites, installers and energy apps need the customer’s consent and normally get the MPAN from the customer. Access to smart meter consumption data needs explicit consent through DCC or the supplier. |
| Who keeps the register | Each distributor runs a Meter Point Administration Service (MPAS) registration system for its area. ECOES aggregates the data, and the Central Switching Service holds the national registration record, under the Retail Energy Code. |
| Register scope | National |
What the MPAN identifies
An MPAN identifies a point where electricity leaves the distribution network and enters a property. It is not the meter serial number: if the meter is replaced, the MPAN stays the same, and it stays with the property when the occupant or supplier changes. A home with a separate export meter, or with an older off-peak circuit, may have two MPANs: one import and one export (export MPANs are allocated by the DNO when an export connection is registered).
How to read it
The top line describes how the supply is measured and charged. Profile class 00 means half-hourly metered; 01 is a domestic unrestricted (single-rate) supply; 02 is domestic Economy 7 or other off-peak; 03–08 are non-domestic. The meter time-switch code shows the register and timing setup (for example single rate or Economy 7), and the line loss factor class sets which network loss factor and distribution charges apply.
The 13-digit core is the unique identifier. Its first two digits are the distributor ID: 10 Eastern England, 11 East Midlands, 12 London, 13 Merseyside and North Wales, 14 West Midlands, 15 North East, 16 North West, 17 North Scotland, 18 South Scotland, 19 South East, 20 Southern, 21 South Wales, 22 South West and 23 Yorkshire. IDNOs have their own IDs. The last digit is a check digit calculated from the first 12 using a modulus-11 weighting, which lets systems catch typing errors.
Who holds the register
When a new connection is energised, the distributor creates the MPAN in its MPAS system. Suppliers register against that MPAN to supply the property. ECOES gives authorised users a consolidated national view (address, supplier, meter type, energisation status), and since 2022 the Central Switching Service holds the registration used for switching. Gas is administered separately: the MPRN identifies a gas meter point and is held by Xoserve, and households can find it through the Find My Supplier service.
Northern Ireland
Northern Ireland does not use MPANs. NIE Networks issues an 11-digit MPRN for each electricity supply point, in line with the all-island market arrangements shared with Ireland.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Supplier-set export tariff under the Smart Export Guarantee (any rate above zero), separate from import; feed-in tariff for legacy pre-2019 installations |
| Is there net metering? | No. Import and export are metered and priced separately. Exported kWh are paid at the export tariff rate; they do not offset imported kWh. |
| Who must offer an export tariff? | Licensed suppliers with at least 150,000 domestic customers must offer at least one SEG tariff, and the rate must always be above zero. Smaller suppliers can choose to offer one. |
| Which installations qualify for SEG? | Solar PV, onshore wind, hydro, anaerobic digestion and micro-CHP up to 5 MW (micro-CHP up to 50 kW). Installations up to 50 kW need MCS certification (or equivalent). Exported electricity stored in a battery also qualifies if it is accurately metered. |
| What is the G98 / G99 threshold? | EREC G98 covers fully type-tested micro-generators up to 16 A per phase (3.68 kW on a single-phase supply), connected first and then notified. Anything larger, including solar plus battery combinations above 16 A per phase, needs a G99 application to the DNO before connection. |
| Can export be limited instead of upgrading the network? | Yes. EREC G100 sets out how a customer limitation scheme (CLS) can cap export, so that, for example, a 6 kW inverter can be approved with a 3.68 kW export limit. |
| Is plug-in solar allowed? | Yes, since 27 August 2026 plug-in solar kits up to 800 W that meet the UK safety specification can be bought and connected to a standard socket without an electrician. The DNO still has to be notified. |
| Are feed-in tariffs still available? | No. The Feed-in Tariff closed to new applicants on 31 March 2019. Existing FIT installations keep their generation and deemed export payments for the rest of their 20–25-year terms. |
Connecting a home system.
- Choose an MCS-certified installer; MCS certification is needed for SEG on systems up to 50 kW and for most grants.
- For inverters up to 16 A per phase (about 3.68 kW single-phase), the installer connects first and notifies the DNO under EREC G98 within 28 days.
- For larger systems, or several units that together exceed 16 A per phase, the installer applies to the DNO under EREC G99 before installation and waits for approval. Export limitation under EREC G100 can be used to reduce the export capacity applied for.
- The installer commissions the system and issues the MCS certificate and the BS 7671 electrical installation certificate; building control notification is required for electrical work in England and Wales.
- The household makes sure it has a smart meter able to record half-hourly export and applies for a SEG tariff with any supplier offering one (not necessarily their import supplier).
- The supplier registers an export MPAN and pays for metered export from then on.
Households in Great Britain can export surplus electricity and be paid for it, but there is no net metering or netting of import against export. Since 2020 the Smart Export Guarantee has required large suppliers to offer an export tariff, with the rate left to the market. Rates range from a few pence to more than 15p/kWh for fixed rates, and some suppliers offer higher or time-varying export rates to their own import customers or to owners of particular batteries.
Network connection is handled by the DNO. Small type-tested inverters under EREC G98 can be connected and then notified, which covers most single-phase rooftop systems up to about 3.68 kW of inverter output. Larger systems and most solar-plus-battery systems need G99 approval, which can take several weeks and, in constrained areas, may come with an export limit or a requirement to pay for reinforcement. Export limitation under G100 is widely used to stay within existing network capacity.
Export is metered by the smart meter, which records export half-hourly. Under market-wide half-hourly settlement, export MPANs are settled on actual half-hourly data, which allows time-varying export tariffs.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Generation licence needed under Electricity Act 1989 s.4(1)(a) unless exempt. Class exemption for stations up to 10 MW, or up to 50 MW where declared net capacity is under 100 MW. Rooftop solar and home batteries are far below the threshold. | Ofgem (licence); DESNZ (exemption order) | Electricity (Class Exemptions from the Requirement for a Licence) Order 2001. Section 36 consent is needed for onshore stations above 50 MW in England and Wales (higher thresholds and different rules in Scotland). |
| Store electricity | Treated as a type of generation, so the same licence thresholds and class exemptions apply. No licence needed for domestic or small commercial batteries. | Ofgem | The Energy Act 2023 defined storage in law as a distinct type of generation. Standalone storage was removed from the NSIP planning regime in 2020. |
| Export to the grid | No licence. Needs a DNO connection agreement (G98 notification or G99 approval) and an export MPAN with a supplier. | DNO; supplier | Payment is through SEG or a supplier export tariff, or through a power purchase agreement for larger sites. |
| Supply (sell) electricity to consumers | Supply licence required under s.4(1)(c). Small supplier class exemption covers up to 5 MW, of which no more than 2.5 MW to domestic customers, normally through a licensed supplier. | Ofgem | Full supply licences require BSC, DCUSA, REC and SEC accession and meeting financial resilience rules introduced after supplier failures in 2021–22. |
| Distribute electricity | Distribution licence required unless exempt. Class exemptions cover small private networks (for example, up to 2.5 MW supplied to domestic customers). | Ofgem | Exempt private networks must still allow customers to choose their supplier and meet distribution code requirements. |
| Aggregate (Virtual Lead Party) | No Ofgem licence. Aggregators accede to the Balancing and Settlement Code as a Virtual Lead Party (VLP) or Asset Metering VLP and qualify with Elexon and NESO. | Elexon (BSC); NESO | BSC modification P415, approved by Ofgem in 2023, extends VLP access to wholesale markets. A load control licence for aggregators of domestic devices is planned (see below). |
| Trade wholesale electricity | No licence for trading itself. Physical traders must accede to the BSC to hold energy accounts; financial firms may need FCA authorisation. | Elexon; FCA | REMIT market integrity and transparency rules are enforced by Ofgem. |
| Balancing Mechanism | Register a Balancing Mechanism Unit through Elexon and NESO. Units under 1 MW can join through an aggregated (secondary) BMU via a VLP. | NESO; Elexon | NESO has been relaxing operational metering requirements for small aggregated assets to make the BM easier to access. |
| Capacity Market (CMU) | Prequalify Capacity Market Units of at least 1 MW de-rated (assets can be aggregated). Storage is de-rated by duration. | NESO (delivery body); Ofgem; DESNZ | T-4 and T-1 auctions each year. Demand-side response and aggregated batteries can take part. |
| Grid / ancillary services | No licence. Prequalify with NESO for frequency response (Dynamic Containment, Moderation, Regulation), reserve products and the Demand Flexibility Service, usually from 1 MW and aggregated. | NESO | Domestic devices take part through a supplier or aggregator, not directly. |
| Local flexibility (DNO) | No licence. Register on the DNO’s flexibility platform (for example Piclo Flex or Flexible Power) and meet its dispatch and metering requirements. | DNOs; Elexon as Market Facilitator | Many DNO tenders accept aggregated domestic assets with no minimum size. |
| Remote control of domestic assets (load control) | Currently no specific licence; smart chargepoints must meet the Electric Vehicles (Smart Charge Points) Regulations 2021. A load control licence for parties remotely controlling domestic EV chargers, heat pumps and home batteries is planned under the Smart Secure Electricity Systems programme. | DESNZ; Ofgem | DESNZ plans to lay the licensing regulations in autumn 2026, with the requirement to hold a licence expected from around 2028 after a transition period. |
Section 4 of the Electricity Act 1989 makes it an offence to generate, transmit, distribute, supply or participate in the operation of an interconnector without a licence or an exemption. Exemptions are set by the 2001 Class Exemptions Order. Households and most small businesses that install solar, batteries or heat pumps therefore need no licence: they need a network connection agreement from the DNO and, to be paid for export, a SEG or export tariff with a supplier.
Market participation runs mostly through industry codes rather than licences. Aggregators sign the Balancing and Settlement Code as Virtual Lead Parties to place flexibility into the Balancing Mechanism and, under P415, into wholesale markets. NESO procures frequency response, reserve and the Demand Flexibility Service through its own contracts, and DNOs procure local flexibility through competitive tenders.
The main gap is remote control of household devices. The Smart Secure Electricity Systems programme will bring in device-level rules for energy smart appliances (interoperability, cyber security, grid protection) and a load control licence for organisations that control large numbers of devices, so that mass switching cannot destabilise the grid.
Flexibility and grid services.
Aggregation of home equipment: Yes
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing Mechanism | Yes | 1 MW per BMU (smaller assets aggregated) | Yes | NESO / Elexon. NESO accepts bids and offers each half-hour to balance the system. Batteries are now a major BM participant. VLPs can aggregate small assets into secondary BMUs. |
| Frequency response (Dynamic Containment, Moderation, Regulation) | Yes | 1 MW | Yes | NESO. Day-ahead auctions for fast-acting response services, mostly provided by grid-scale batteries. |
| Reserve (Quick Reserve, Slow Reserve, Balancing Reserve) | Yes | 1 MW | Yes | NESO. Newer reserve products replacing older STOR and Fast Reserve arrangements. |
| Capacity Market | Yes | 1 MW de-rated | Yes | NESO (delivery body). Pays capacity providers to be available during system stress. Battery de-rating depends on duration. |
| Demand Flexibility Service | Yes | None for households (via provider) | Yes | NESO. Pays households and businesses, through suppliers and aggregators, to shift demand. Since November 2024 it is a year-round in-merit margin service; nearly 2 million MPANs were registered in winter 2024/25. |
| Wholesale (day-ahead and intraday) | Developing | — | Limited | EPEX SPOT, Nord Pool; Elexon (P415). Suppliers optimise customer devices against wholesale prices through dynamic tariffs. P415 opens wholesale trading of flexibility to independent VLPs. |
| Local flexibility (DNO tenders) | Yes | Varies by DNO; often no minimum | Yes | DNOs; Elexon (Market Facilitator). Sustain, Secure, Dynamic and Restore products to manage local network congestion, procured through Piclo Flex, Flexible Power and DNO portals. |
Great Britain has one of the most open flexibility markets in Europe. Distributed assets can earn money from the Balancing Mechanism, frequency response, reserve, the Capacity Market, the Demand Flexibility Service and DNO local flexibility tenders, and nearly all of these accept aggregated portfolios. Households take part indirectly: through a supplier’s smart tariff or a third-party aggregator that controls their EV charger, heat pump or battery.
Market-wide half-hourly settlement is a key enabler, because once every meter is settled on half-hourly data suppliers are directly rewarded for moving demand into cheap periods. Upcoming load control licensing and energy smart appliance standards are intended to make this mass control of devices secure.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Piclo Flex | Independent marketplace used by several DNOs and NESO trials to tender local flexibility. |
| Flexible Power | Shared portal used by a group of DNOs to dispatch and pay flexibility providers. |
| NESO Demand Flexibility Service | National demand-shifting service open to households through participating suppliers and aggregators. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Supplier-led rollout since 2012; 72% of all meters smart or advanced in June 2026 |
| Reading interval | 30 minutes |
| Smart and advanced meters (GB) | 42 million (June 2026) |
| Share of all meters | 72% |
| Homes with a smart electricity meter | ~75% (71% in smart mode, 3.8% in traditional mode) |
| Operating in smart mode | 92% of smart meters |
| Installs, Q2 2026 | 1.1 million (large suppliers) |
| Meter generations | SMETS1 (early, now migrated to DCC) and SMETS2 (current standard) |
| Communications | DCC network: cellular (Central and South regions) and long-range radio (North region); Zigbee home area network |
| Data access | Monthly reads by default; daily with opt-out; half-hourly for settlement with opt-out to daily; other half-hourly uses need opt-in consent |
Who does what
Energy suppliers are responsible for installing smart meters and replacing old ones. Every smart meter in Great Britain communicates through a single national network run by the Data Communications Company (DCC) under a licence from Ofgem. Suppliers, DNOs and authorised third parties all send and receive meter messages through DCC, so a smart meter keeps working when the customer switches supplier. Ofgem awarded a new Smart Meter Communication Licence to DCC2 Ltd, a not-for-profit subsidiary of the Smart Energy Code Company, with handover from the current operator planned for November 2026.
SMETS1 and SMETS2
Early SMETS1 meters used each supplier’s own communications and often lost smart functions after a switch; most have since been migrated onto the DCC network. SMETS2 meters have been installed since 2018 and connect to DCC by design. Each home also has a Zigbee home area network linking the electricity meter, gas meter and in-home display, and consumer access devices can read near-real-time data from it.
Data and consent
Smart meters record consumption every 30 minutes. Under the data access and privacy framework, suppliers may collect monthly data for billing without consent, daily data unless the customer opts out, and half-hourly data for settlement unless the customer opts out to daily. Using half-hourly data for marketing or other purposes needs explicit opt-in consent. Third parties such as energy apps and installers can register as DCC Other Users, or use services such as n3rgy or Hildebrand Glow (Glowmarkt), to access a household’s data with its consent. The government is developing a broader energy Smart Data scheme under the Data (Use and Access) Act 2025.
Installation obligations
The rollout was not mandatory for consumers; households may refuse a smart meter. Suppliers face annual minimum installation requirements set by government and enforced by Ofgem. Remaining non-smart meters are concentrated in flats, rural areas with weak signal and homes with complex metering such as Radio Teleswitch Service meters, which are being replaced as that service is shut down.
Renewable electricity.
Electricity generation mix (2025).
- Gas: 31.8%
- Wind: 29.5%
- Bioenergy: 14%
- Nuclear: 12.2%
- Solar: 6.9%
- Hydro: 1.8%
- Oil, other fuels and storage: 3.8%
- Renewable electricity share
- 52.1% (2025)Source 8Share of UK electricity generation (DUKES 2026). Quarter 2 2026 reached a record 55.8%.
- Home solar
- 267,032 MCS-certified solar installations in 2025 (2025)Source 14Record year, 31% above 2011. A separate GW figure for domestic rooftop capacity was not identified for 2026.
- Solar added each year
- 2.2 GW (July 2025–June 2026)Source 10
- Solar PV
- 22.8 GW (June 2026)Source 10
- Onshore wind
- 15.9 GW (end 2025)Source 11
- Offshore wind
- 16.1 GW (end 2025)Source 11
- All renewables
- 66.3 GW (Q2 2026)Source 9
- Grid-scale batteries
- 7.5 GW (2025)Source 12
Targets.
- Clean Power 2030: at least 95% of GB generation from low-carbon sources by 2030.
- Offshore wind 43–50 GW, onshore wind 27–29 GW and solar 45–47 GW by 2030 (Clean Power 2030 Action Plan).
- Legally binding net zero greenhouse gas emissions by 2050 (Climate Change Act 2008, amended 2019).
- Warm Homes Plan ambition to put solar on up to 3 million more homes by 2030.
Renewables generated 153.0 TWh in 2025, 52.1% of UK generation, with wind alone at 29.5%. Solar output rose 34% to a record 20.1 TWh. Gas still supplied 31.8% and is usually the price-setting fuel, while nuclear fell to 12.2% because of outages at the remaining reactors. The last coal plant, Ratcliffe-on-Soar, closed in September 2024.
Offshore wind is the backbone of the system, with about 16 GW operating and 11.5 GW under construction. Onshore wind in England was effectively blocked by planning policy from 2015 until the restrictions were lifted in July 2024. Solar reached 22.8 GW in June 2026 across more than two million installations, and the Contracts for Difference round that closed in February 2026 secured a record 4.9 GW of solar.
Imports matter: net imports were 29.7 TWh in 2025, mostly from France and Norway. In Quarter 2 2026 renewables reached a record 55.8% share of generation.
Energy storage.
- Home batteries
- 40,000 MCS-certified battery installations in 2025 (2025)Source 14More than 40,000, nearly double the previous record. No official figure for total installed home battery capacity was found.
- Grid-scale storage
- 7.5 GW (2025)Source 122.3 GW was energised in 2025. GB batteries produced 2.3 TWh with 85% average round-trip efficiency. Energy capacity (GWh) is not published officially.
Great Britain has the largest grid-scale battery fleet in Europe: 7.5 GW at the end of 2025 according to DESNZ, mostly one- to two-hour lithium-ion systems earning revenue from wholesale trading, the Balancing Mechanism, frequency response and the Capacity Market. Newer projects are increasingly two hours or longer.
Home batteries are growing quickly alongside rooftop solar. They have been VAT-free since February 2024, including retrofits, and many suppliers offer tariffs or export rates designed for battery owners. Domestic installations must follow BS 7671, the IET Code of Practice for Electrical Energy Storage Systems and, for fire safety, PAS 63100:2024.
Storage projects.
- Connections reform pipeline: NESO’s December 2025 results re-ordered the connections queue (722 GW previously) and expect to offer connections to over 283 GW of generation and storage by 2035, including more than 80 GW of battery storage.
- Long-duration storage cap and floor: Ofgem’s cap and floor scheme supports long-duration storage such as pumped hydro, with the first projects assessed in 2025–26.
- Pumped hydro: Existing pumped hydro storage at Dinorwig, Ffestiniog, Cruachan and Foyers provides around 3 GW. Pumped storage averaged 81% efficiency in 2025.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Octopus Energy | ~24% of domestic electricity (Ofgem, Q4 2024); largest supplier | Yes | Yes | Yes | Yes |
| British Gas | ~20% of domestic electricity (Ofgem, Q4 2024) | Yes | Yes | Limited | Yes |
| E.ON (E.ON Next) | ~16% of domestic electricity (Ofgem, Q4 2024) | Yes | Yes | Limited | Yes |
| OVO Energy | ~12.6% of domestic electricity (Ofgem, Q4 2024) | Yes | Yes | Limited | Yes |
| EDF | ~10.5% of domestic electricity (Ofgem, Q4 2024) | Yes | Yes | Limited | Yes |
| ScottishPower | ~8.2% of domestic electricity (Ofgem, Q4 2024) | Yes | Yes | Limited | Yes |
Ofgem counted 17 active domestic suppliers in March 2026, down from around 70 before the 2021–22 wave of supplier failures. Six large suppliers serve the large majority of homes. Octopus Energy overtook British Gas as the largest electricity supplier in 2024 and has continued to gain customers. Market shares above are from Ofgem’s retail market indicators for Q4 2024; more recent supplier-specific shares are published only in Ofgem’s interactive charts.
All large suppliers must offer an SEG export tariff and install smart meters. Smart time-of-use and EV tariffs are now widespread, while fully dynamic half-hourly tariffs are offered by fewer suppliers.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Department for Energy Security and Net Zero | Government | Energy policy, legislation and statistics | Publishes DUKES, Energy Trends, smart meter and solar deployment statistics, and runs the Warm Homes Plan. |
| Great British Energy | Government | Publicly owned energy investment company | Funds and co-invests in clean energy projects, including rooftop solar on schools, hospitals and public buildings. |
| Ofgem | Regulator | Gas and electricity regulator for Great Britain | Sets the price cap, licenses market participants and administers SEG, ECO and network price controls. |
| Utility Regulator (Northern Ireland) | Regulator | Energy and water regulator for Northern Ireland | Regulates the separate Northern Ireland electricity market and NIE Networks. |
| National Energy System Operator (NESO) | Transmission | Electricity system operator and energy planner | Runs balancing, the Capacity Market, the Demand Flexibility Service and the connections queue. |
| Energy Networks Association | Distribution | Trade body for network operators | Publishes EREC G98, G99 and G100 and the postcode search for finding your DNO. |
| Elexon | Market | BSC administrator and MHHS implementer | Runs electricity settlement, VLP registration and market-wide half-hourly settlement. |
| Smart DCC | Metering | Smart meter communications network operator | Operates the national smart meter network and the Central Switching Service. |
| MCS (Microgeneration Certification Scheme) | Renewable Energy | Installer and product certification | MCS certification is needed for SEG export payments and Boiler Upgrade Scheme grants. |
| RenewableUK | Renewable Energy | Trade association for wind, marine and storage | Publishes the EnergyPulse database of UK wind and storage projects. |
| Solar Energy UK | Solar | Solar and storage trade association | Represents the solar industry and contributes to policy and technical guidance. |
| Electricity Storage Network | Storage | Storage industry group | Industry voice on storage regulation, connections and market access. |
| Association for Decentralised Energy | Flexibility | Trade body for flexibility, demand-side response and heat networks | Represents aggregators and runs the Flex Assure code of conduct for flexibility providers. |
| Citizens Advice | Consumer | Statutory energy consumer advocate (England and Wales) | Advises households on bills, switching, smart meters and complaints. |
| Home Energy Scotland | Consumer | Scottish Government energy advice and grants service | Runs the Home Energy Scotland Grant and Loan for heat pumps, solar and batteries in Scotland. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Wiring regulations | BS 7671 (IET Wiring Regulations, 18th edition) | IET / BSI | Amendment 3 (2024) added Chapter 57 on stationary batteries and Section 826 on prosumer installations. All domestic electrical work must comply. |
| Grid connection (small) | EREC G98 | Energy Networks Association | Type-tested micro-generators up to 16 A per phase; connect then notify the DNO within 28 days. |
| Grid connection (larger) | EREC G99 | Energy Networks Association | Generation and storage above G98 limits; application to the DNO before connection. Includes protection, anti-islanding and fault ride-through settings. |
| Export limitation | EREC G100 | Energy Networks Association | Rules for customer limitation schemes that cap export or import. |
| Installer accreditation (solar) | MCS MIS 3002 | MCS | Design and installation standard for solar PV systems. |
| Installer accreditation (batteries) | MCS MIS 3012 | MCS | Design and installation standard for battery storage systems. |
| Battery fire safety | PAS 63100:2024 | BSI | Fire protection requirements for battery storage in homes, including location limits (for example, not in escape routes or sleeping areas). |
| Energy storage practice | IET Code of Practice for Electrical Energy Storage Systems | IET | Guidance on safe design, installation and operation of storage systems. |
| EV charging | Electric Vehicles (Smart Charge Points) Regulations 2021; IET Code of Practice for EV Charging | DESNZ / OZEV; IET | Private chargepoints sold in Great Britain must be smart, have default off-peak charging and randomised delay, and meet security requirements. |
| Smart meters | SMETS2 / Smart Energy Code | DESNZ / SEC Panel | Technical specification and code governing smart meters and DCC services. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Planning permission – rooftop solar (England) | Limited | National | Permitted development under the General Permitted Development Order, Part 14 Class A, provided panels do not protrude more than 0.2 m. Restrictions apply to listed buildings and some conservation area elevations. |
| Planning permission – heat pumps (England) | Limited | National | Permitted development. Since 29 May 2025 the 1 m boundary rule has been removed, up to two units are allowed and the size limit is 1.5 m³, subject to noise requirements (MCS 020). |
| Planning permission – Scotland, Wales, Northern Ireland | Limited | Regional | Each nation has its own permitted development rules. Rooftop solar is generally permitted development, but conditions for heat pumps and listed or conservation properties differ. |
| Home battery | No | National | No planning permission for an internal battery in a dwelling; must be installed to BS 7671 and PAS 63100 and, above G98 limits, approved by the DNO. |
| DNO approval | Limited | Regional | G98 notification after installation up to 16 A per phase; G99 application before installation above that. |
| Building regulations / Part P | Yes | Mixed | Notifiable electrical work in England and Wales must be self-certified by a competent person scheme member or notified to building control. Scotland requires a building warrant for some work. |
| Listed building consent | Yes | Local | Needed for solar or heat pumps on or within the curtilage of a listed building. |
Most rooftop solar, heat pumps and home batteries in England need no planning application because of permitted development rights, but the rules are set separately in Scotland, Wales and Northern Ireland. Listed buildings, conservation areas and World Heritage Sites have extra limits.
The main approvals for a household are therefore technical: the DNO (G98 or G99), building regulations compliance for electrical work, and MCS certification if the household wants SEG payments or grants. From 24 March 2027 the Future Homes Standard will require most new homes in England to have low-carbon heating and rooftop solar, after a transition period.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Smart Export Guarantee (SEG) | Active | Export payment | Large suppliers must offer at least one export tariff above zero for solar, wind, hydro, AD and micro-CHP up to 5 MW. Rates are set by suppliers. | January 2020 – ongoing |
| 0% VAT on energy-saving materials | Active | VAT relief | Zero VAT on installation of solar panels, heat pumps, insulation and battery storage (including standalone and retrofit batteries since 1 February 2024) in homes. Reverts to 5% from 1 April 2027. | 1 April 2022 – 31 March 2027 |
| Zero VAT on electricity bills | Active | VAT relief | VAT on all electricity bills reduced from 5% to zero; gas remains at 5%. | 1 October 2026 – 31 March 2027 |
| Boiler Upgrade Scheme | Active | Grant | £7,500 towards an air source or ground source heat pump (£9,000 for eligible off-gas-grid homes from 21 July 2026 to 31 March 2027), and £2,500 for air-to-air heat pumps and heat batteries. England and Wales; MCS installer required. | May 2022 – 2029/30 (funded) |
| Warm Homes Plan – consumer loans | Active | Loan | Low- and zero-interest loans for solar panels, batteries and heat pumps, part of the £15 billion Warm Homes Plan, being rolled out in phases from 2026. | 2026 – 2029/30 |
| Warm Homes: Local Grant | Active | Grant | Fully funded insulation, heat pumps and solar for low-income households in England, delivered by local authorities. Due to merge into a single low-income programme from 2027/28. | 2025 – 2028 |
| Energy Company Obligation (ECO4) | Active | Supplier obligation | Supplier-funded efficiency and heating upgrades for low-income homes. Extended by nine months and closes on 31 December 2026, to be replaced by Warm Homes Plan grants funded through taxation. | April 2022 – 31 December 2026 |
| Great British Insulation Scheme | Closed | Supplier obligation | Single-measure insulation scheme; closed on 31 March 2026. | April 2023 – 31 March 2026 |
| Home Energy Scotland Grant and Loan | Active | Grant | Scottish Government grants and interest-free loans for heat pumps, insulation, solar and batteries in Scotland (Boiler Upgrade Scheme does not apply). | — |
| Feed-in Tariff | Closed | Feed-in tariff | Closed to new applicants on 31 March 2019; existing installations continue to receive payments. | April 2010 – March 2019 (new entrants) |
Data and connectivity.
- Fixed broadband
- 87 % of residential premises with gigabit-capable broadband (2025)Source 33Full fibre available to 23.7 million residential premises.
- 4G coverage
- 96 % of UK landmass, good outdoor 4G from at least one operator (2025)Source 33
- 5G coverage
- 97 % of premises, outdoor 5G from at least one operator (2025)Source 33
Smart meters do not use household broadband. They communicate through the DCC wide area network, which uses cellular networks in central and southern Great Britain and a dedicated long-range radio network in northern England and Scotland. Inside the home, the meters, in-home display and consumer access devices use a Zigbee home area network.
Batteries, inverters, EV chargers and heat pumps usually connect to the cloud through the household’s Wi-Fi or a built-in cellular modem, and suppliers or aggregators control them through manufacturer APIs. Common protocols include OCPP for chargepoints and Modbus or SunSpec for inverters. Energy smart appliance rules will introduce common interoperability and cyber security requirements.
Grid conditions.
- National peak demand
- 51.5 GW (winter 2025)Source 8UK peak demand in winter as reported in DUKES 2026, up 8.8% on 2024.
- Annual electricity demand
- 323 TWh (2025)Source 8Total UK electricity demand including losses and energy industry use; final consumption was 275.5 TWh.
- Generation capacity
- 74.5 GW (de-rated) (2025)Source 8De-rated capacity accounts for the intermittency of wind and solar; installed (nameplate) capacity is higher.
- Interconnection
- 10.3 GW (2026)Source 32Ten interconnectors to France (4 GW), Norway (1.4 GW), Denmark (1.4 GW), Netherlands (1 GW), Belgium (1 GW), Ireland (1 GW) and Northern Ireland (0.5 GW). NeuConnect to Germany (1.4 GW) is under construction.
- Curtailment
- 1.7 GBP billion constraint costs (2024/25)Source 30Cost of transmission constraint actions, mostly paying Scottish wind to turn down and gas plant further south to turn up. Total balancing costs were £2.7 billion.
Demand and adequacy
UK electricity demand was 323 TWh in 2025, still below 2019 levels, but peak winter demand rose to 51.5 GW. NESO’s Winter Outlook for 2025/26 forecast a de-rated margin of 6.1 GW, the highest since 2019/20, helped by more battery storage and the new Greenlink interconnector to Ireland.
Constraints
The main bottleneck is transmission from Scotland, where much of the wind is, to demand in England. When the boundary is full, NESO pays wind farms to reduce output and gas plants in the south to increase it. Constraint costs reached £1.7 billion of the £2.7 billion balancing bill in 2024/25 and could rise sharply before major new links, such as the Eastern Green Link HVDC cables, are completed later this decade.
Connections reform
The connections queue had grown to around 722 GW, several times what is needed. Under reforms approved by Ofgem in 2025, NESO reordered it using readiness and strategic alignment with Clean Power 2030 ("Gate 2"). In December 2025 it said it expected to offer connections to over 283 GW of generation and storage and 99 GW of demand, with new offers for projects connecting up to 2030 issued from mid-2026. Small domestic connections under G98 and G99 are not part of this queue.
Clean Power 2030
The government’s Clean Power 2030 plan aims for at least 95% low-carbon generation in Great Britain by 2030, with unabated gas kept as reserve. It relies on rapid growth in offshore wind, solar, onshore wind and storage, and on network expansion.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Market-wide half-hourly settlement completes | Upcoming | 7 May 2027 | Migration began on 22 October 2025; all MPANs must be settled on half-hourly data by May 2027, cutting final settlement from 14 to four months and supporting time-of-use and dynamic tariffs. |
| New smart meter communications licensee (DCC2) | Upcoming | November 2026 | Ofgem awarded the successor Smart Meter Communication Licence to DCC2 Ltd, a not-for-profit subsidiary of the Smart Energy Code Company, with handover from Smart DCC planned for November 2026. |
| Zero VAT on electricity | Current | 1 October 2026 – 31 March 2027 | VAT removed from all electricity bills for six months; gas VAT unchanged at 5%. |
| Plug-in solar legalised | Current | 27 August 2026 | Plug-in solar kits up to 800 W meeting the UK safety specification can be bought from retailers and plugged into a household socket, with the DNO notified. |
| ECO4 ends; Warm Homes Plan grants take over | Upcoming | 31 December 2026 | The supplier-funded Energy Company Obligation closes and low-income support moves to taxpayer-funded Warm Homes Plan grants, consolidated into a single programme from 2027/28. |
| 0% VAT on energy-saving materials ends | Upcoming | 1 April 2027 | Installation of solar, batteries, heat pumps and insulation in homes moves from 0% to 5% VAT unless the relief is extended. |
| Future Homes Standard | Upcoming | 24 March 2027 (with transition to 2028) | Published 24 March 2026. New homes in England will need low-carbon heating, no gas connection and rooftop solar equivalent to about 40% of ground floor area. |
| Energy smart appliances and load control licensing | Upcoming | Regulations from autumn 2026; licence required around 2028 | Under the Smart Secure Electricity Systems programme, organisations that remotely control domestic EV chargers, heat pumps and batteries will need a load control licence from Ofgem, and devices will have to meet interoperability and cyber security standards. |
| Electricity market reform (REMA): no zonal pricing | Current | July 2025 | The government rejected zonal wholesale pricing on 10 July 2025 and chose “reformed national pricing”, keeping one GB wholesale price while improving locational signals through network charges, a Strategic Spatial Energy Plan and connections reform. |
| Connections reform (Gate 2) | Current | 2025–2027 | NESO and DNOs are re-issuing connection offers based on project readiness and Clean Power 2030 needs, replacing the old first-come, first-served queue. |
| Smart Data scheme for energy | Upcoming | To be confirmed | The Data (Use and Access) Act 2025 enables a Smart Data scheme letting consumers share their energy data securely with authorised third parties. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Medium | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | More than 2 million UK solar installations by mid-2026 and a record 267,032 MCS-certified installations in 2025; SEG export payments and 0% VAT available. |
| Distributed energy market | High | Over 60,000 heat pump and over 40,000 battery MCS installations in 2025; 1.86 million zero-emission cars; 22.8 GW solar. |
| Grid flexibility market | High | Aggregated assets can access the Balancing Mechanism, ancillary services, Capacity Market, Demand Flexibility Service and DNO tenders; nearly 2 million MPANs registered for DFS in 2024/25. |
| Energy storage adoption | High | 7.5 GW grid-scale batteries at end 2025, the largest in Europe, and record home battery installations in 2025. |
| Renewable growth environment | High | Renewables 52.1% of generation in 2025 and a record 55.8% in Q2 2026; Clean Power 2030 target of 95% low-carbon generation. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 37 sources
- Changes to energy price cap between 1 October and 31 December 2026. Ofgem, 2026. accessed 1 October 2026.
- Energy price cap (default tariff) update from 1 October 2026. Ofgem, 2026. accessed 1 October 2026.
- The history of Ofgem’s energy price cap. Energyhelpline (compiled from Ofgem announcements), 2026. accessed 1 October 2026.
- Euro foreign exchange reference rates – GBP. European Central Bank, 2026. accessed 1 October 2026.
- Population estimates for the UK, England, Wales, Scotland and Northern Ireland: mid-2024. Office for National Statistics, 2025. accessed 1 October 2026.
- Families and households in the UK: 2025. Office for National Statistics, 2026. accessed 1 October 2026.
- Subnational electricity and gas consumption summary report 2024. DESNZ, 2025. accessed 1 October 2026.
- Digest of UK Energy Statistics (DUKES) 2026, Chapter 5: Electricity. DESNZ, 2026. accessed 1 October 2026.
- Energy Trends: UK, April to June 2026. DESNZ, 2026. accessed 1 October 2026.
- UK solar capacity hits 22.8 GW as market prepares for plug-in launch (DESNZ solar deployment data). pv magazine, 2026. accessed 1 October 2026.
- UK wind energy pipeline in 2025: a year in review. RenewableUK EnergyPulse, 2026. accessed 1 October 2026.
- Grid-scale battery storage statistics (Energy Trends special article). DESNZ, 2026. accessed 1 October 2026.
- Smart meters in Great Britain, quarterly update June 2026. DESNZ, 2026. accessed 1 October 2026.
- The 2026 low carbon landscape. MCS, 2026. accessed 1 October 2026.
- Vehicle licensing statistics: January to March 2026. Department for Transport, 2026. accessed 1 October 2026.
- Dwelling stock estimates, England: 31 March 2024. Ministry of Housing, Communities and Local Government, 2025. accessed 1 October 2026.
- English Housing Survey 2024 to 2025: headline report. Ministry of Housing, Communities and Local Government, 2025. accessed 1 October 2026.
- Housing, England and Wales: Census 2021. Office for National Statistics, 2023. accessed 1 October 2026.
- Urban population (% of total population) – United Kingdom. World Bank, 2025. accessed 1 October 2026.
- Retail market indicators. Ofgem, 2026. accessed 1 October 2026.
- Market-wide Half Hourly Settlement and the BSC. Elexon, 2026. accessed 1 October 2026.
- Successor Smart Meter Communication Licence decision. Ofgem, 2026. accessed 1 October 2026.
- Smart Export Guarantee (SEG). Ofgem, 2026. accessed 1 October 2026.
- Warm Homes Plan. DESNZ, 2026. accessed 1 October 2026.
- Energy Company Obligation (ECO). Ofgem, 2026. accessed 1 October 2026.
- VAT on energy-saving materials and heating equipment (VAT Notice 708/6). HM Revenue & Customs, 2026. accessed 1 October 2026.
- Households can save as plug-in solar panels come to market. DESNZ, 2026. accessed 1 October 2026.
- Smart Secure Electricity Systems: implementing the load control licensing regime. Ofgem, 2026. accessed 1 October 2026.
- Winter Outlook 2025/26. NESO, 2025. accessed 1 October 2026.
- Annual Balancing Services Spend Report 2024/2025. NESO, 2025. accessed 1 October 2026.
- Connections reform. NESO, 2026. accessed 1 October 2026.
- Next steps for electricity interconnection in Great Britain. DESNZ, 2026. accessed 1 October 2026.
- Connected Nations 2025. Ofcom, 2025. accessed 1 October 2026.
- Future Homes Standard published 24 March 2026 (coverage). Mortgage Solutions, 2026. accessed 1 October 2026.
- REMA summer update: zonal pricing out, reformed national pricing in. CMS, 2025. accessed 1 October 2026.
- Find out who your gas or electricity supplier is. Citizens Advice, 2026. accessed 1 October 2026.
- New UK planning rules for heat pumps come into effect, one metre rule scrapped. pv magazine, 2025. accessed 1 October 2026.
Questions about energy in United Kingdom.
From 1 October to 31 December 2026, the Ofgem price cap limits the average standard variable electricity rate to 26.32p per kWh plus a standing charge of 54.83p per day for Direct Debit customers in England, Scotland and Wales. This includes no VAT, because VAT on electricity is zero until 31 March 2027. Rates vary by region, and fixed tariffs can be higher or lower.
The Meter Point Administration Number is the unique 21-digit reference (13-digit core) for an electricity supply point in Great Britain. It is created by the local network operator, stays with the property, and is printed on your electricity bill. The first two digits of the core identify your distribution region.
In Great Britain the MPAN identifies an electricity supply point and the MPRN identifies a gas supply point. In Northern Ireland, electricity supply points also use an 11-digit MPRN issued by NIE Networks.
Yes. Suppliers with 150,000 or more domestic customers must offer a Smart Export Guarantee tariff, paying for each kWh exported as measured by a smart meter. There is no net metering, and installations up to 50 kW need MCS certification to qualify.
For inverters up to 16 A per phase (about 3.68 kW single-phase), the installer connects the system and notifies the DNO under G98 within 28 days. Larger systems, including most solar-plus-battery setups, need G99 approval from the DNO before installation. Export can be capped under G100 to fit network limits.
It depends on where you live. Great Britain has 14 distribution regions run by six groups: UK Power Networks, National Grid Electricity Distribution, Northern Powergrid, Electricity North West, SP Energy Networks and SSEN. You can check by postcode on the Energy Networks Association website or by calling 105.
At the end of June 2026 there were 42 million smart and advanced meters in homes and small businesses in Great Britain, 72% of all meters. Around three-quarters of homes had a smart electricity meter, and 92% of smart meters were working in smart mode.
No. Installation of solar panels, batteries and heat pumps in homes is zero-rated for VAT until 31 March 2027, after which the rate is due to return to 5%.
