How electricity works in Bhutan.
Bhutan electricity 2026: hydro-powered grid run by BPC, ERA-regulated subsidised tariffs, the pending LV tariff rise, solar licensing rules and the 2040 capacity plan.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Bhutanese ngultrum (BTN) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Bhutan energy at a glance.
Key figures for households in Bhutan. Each one links to its source on the full overview below.
Electricity price.
2.793 BTN per kWh for households, including taxes. Figures for 2026.
Renewable share.
100% of electricity from renewable sources. Figures for 2023.
Selling back to the grid.
Can homes export electricity? Limited. Details are in the export section below.
Four things to check in Bhutan.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Bhutan below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Bhutan requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Bhutan.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Bhutan, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Bhutan, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Bhutan.
The energy market in Bhutan, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Bhutan generates almost all of its electricity from run-of-river hydropower and exports most of it to India. IRENA records 10,536 GWh of generation in 2023, all but 1 GWh of it from hydro, and the Department of Energy reported 11,195 million units (GWh) in 2024 from 2,452 MW of hydro capacity. The 1,020 MW Punatsangchhu-II plant was completed in August 2025, and the 22.38 MWp Sephu solar plant, the country’s first utility-scale solar farm, came online in two phases in July and November 2025.
The sector is state-owned. Druk Green Power Corporation (DGPC) owns and operates the large hydropower plants; Bhutan Power Corporation (BPC) owns the transmission and distribution networks and supplies every customer in the country. Both are subsidiaries of Druk Holding and Investments. The Electricity Regulatory Authority (ERA), set up under the Electricity Act of Bhutan 2001 as the Bhutan Electricity Authority, licenses the sector and sets tariffs, while the Department of Energy in the Ministry of Energy and Natural Resources (MoENR) sets policy.
Household electricity is cheap and heavily subsidised. Low-voltage customers pay Nu 1.28 per unit for the first 100 units a month and Nu 2.66 above that, with the first 100 units free for rural households and the first 200 free in highland areas. In March 2026 the ERA approved a cost-reflective low-voltage tariff of Nu 5.63 per unit, and the government asked it to reconsider with affordability in mind. Hydropower supplies the country in summer, but winter river flows fall sharply and Bhutan imported about 1,500 million units from India in the 2024 lean season, which is driving its push into solar.
Energy snapshot.
Headline figures for electricity in Bhutan. Each shows its data year and links to its source.
- Population796,682 peopleSource 172025
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per householdNot identified from a reliable public source.
- Household price (BTN)2.793 BTN/kWhSource 32026
- Household price (EUR)0.026 EUR/kWhSource 182026
- Renewable electricity share100%Source 12023
- Solar capacity0.028 GWSource 22025
- Wind capacity0.001 GWSource 12024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Limited
- Home equipment in grid services
- No
- Regulator
- Electricity Regulatory Authority (ERA)
- System operator
- Bhutan Power System Operator (BPSO) under MoENR; BPC owns the transmission grid
- Distribution networks
- Bhutan Power Corporation (BPC) is the single national distribution licensee and retail supplier
- Currency
- Bhutanese ngultrum (BTN)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Bhutan.
- Household price (BTN)
- 2.793 BTN/kWh (2026)Source 3Derived: low-voltage block II energy rate of Nu 2.66/kWh (consumption above 100 units a month), plus 5% GST applied to electricity bills from 1 January 2026 (2.66 × 1.05). The first 100 units cost Nu 1.28 (free for rural customers; 200 units free in highland areas). Reported as the current tariff in June 2026; the ERA-approved Nu 5.63 rate had not been confirmed as in force at the time of research.
- Household price (EUR)
- 0.026 EUR/kWh (2026)Source 18The ngultrum is pegged at par to the Indian rupee. Converted at the ECB reference rate of EUR 1 = INR 108.3965 on 9 September 2026 (2.793 ÷ 108.3965 = 0.0258).
- Typical annual electricity bill
- Not identified from a reliable public source.
How prices are set
Under section 14 of the Electricity Act 2001 the ERA regulates retail tariffs, network charges and generation tariffs not covered by power purchase agreements, on the principle that tariffs should reflect the actual cost of efficient operation. Tariffs are reviewed every three years. The ERA sets a generation tariff for DGPC’s supply to the domestic market and a network and supply tariff for BPC, which together make up the retail price. Its Tariff Determination Regulation 2025, aligned with the National Energy Policy 2025, also introduced a tariff method for solar plants and prosumers.
Subsidies and cross-subsidy
The ERA calculated the unsubsidised cost of supplying low-voltage customers at Nu 4.85/kWh for 2022–25, against the Nu 2.66 rate customers actually paid. The gap is covered by a government subsidy (Nu 365.67 million in the 2022–25 tariff period; Nu 378 million was allocated for 2025–26) and by high-voltage industrial customers. Free lifeline units for rural and highland households have been provided since the second elected government.
The 2026 tariff review
In March 2026 the ERA approved new tariffs of Nu 5.63/kWh for low voltage, Nu 4.78 for medium voltage and Nu 2.88 for high voltage. The LV rate is made up of Nu 2.37 for DGPC’s generation cost and Nu 3.26 for BPC’s network cost. In April the Prime Minister asked the ERA to look again with affordability in mind; the ERA replied in May that it could not change its methodology, and in June The Bhutanese reported that a subsidy of about Nu 3 billion a year would be needed to hold the LV rate at Nu 3.12. The final household tariff applying from the review had not been confirmed from a published source at the time of research.
Comparison
MoENR has said Bhutan’s tariffs are the lowest in the region, comparing a revised rate of about Nu 5.68 per unit with roughly Nu 7 in West Bengal, Nu 8 in Assam and Nu 7.5 in Bangladesh.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Low-voltage (LV) block tariff approved for 2022–25 and still applied in mid-2026: Nu 1.28/kWh for 0–100 units a month and Nu 2.66/kWh above 100 units. Rural customers pay nothing for their first 100 units and highland customers nothing for their first 200. 5% GST is added to household bills from 1 January 2026. |
| Other | Yes | Medium- and high-voltage industrial tariffs combine an energy charge (Nu 1.6/kWh in 2022–25) with a monthly demand charge (Nu 170 per kVA for MV and Nu 496 per kVA for HV); a wheeling charge of Nu 0.23/kWh applies to power carried for others. |
| Time-of-use | No | No household time-of-use tariff is published. |
| Fixed | No | BPC is the only supplier, so there are no competing fixed-price contracts. |
| Dynamic | No | There is no domestic wholesale market or price-indexed tariff. |
| Prepayment | Unknown | Whether BPC offers prepayment metering to households was not confirmed from a source read for this profile. |
Household prices compared with neighbouring countries (EUR per kWh).
- China€0.065
- Bangladesh€0.061
- Nepal€0.055
- India€0.043
- Bhutan€0.026
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- Not identified from a reliable public source.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Domestic demand has risen very quickly, driven mainly by large industrial customers. The Department of Energy reports that national peak demand climbed from 375 MW in 2020 to 629 MW in 2022, 956 MW in 2023 and 1,026 MW in 2024, while firm (winter) generation capacity was only 415 MW until 2023 and 623 MW in 2024.
Households account for a small share of electricity. BPC’s 255,421 low-voltage customers (households, shops, offices and other small users) used about 10% of domestic electricity at the end of 2024, while 23 high-voltage customers with demand above 2 MW used 88%. In IRENA’s energy balance, households were the largest consumer of final energy in 2022 (57,760 TJ, 44% of the total), but most of that is firewood and other bioenergy rather than electricity.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- Not identified from a reliable public source.
The World Bank reports that 100% of Bhutan’s population had access to electricity in 2024, the result of a long rural electrification programme carried out by BPC across very difficult mountain terrain. Tariff design reflects geography: rural households receive their first 100 units a month free and households in highland areas their first 200.
Detailed census and housing-survey statistics on tenure and dwelling types were not available from the National Statistics Bureau website when this profile was researched, so they are left blank here.
How the grid works in Bhutan.
- TransmissionBhutan Power System Operator (BPSO), Bhutan Power Corporation Ltd (BPC)
- DistributionBhutan Power Corporation (BPC) is the single national distribution licensee and retail supplier
- MeteringBhutan Power Corporation Ltd (BPC)
- Supply1 or more retail suppliers
Physical flow
Bhutan’s large hydropower stations are Chukha (336 MW, 1986–88), Kurichhu (60 MW, 2001), Basochhu I and II (64 MW, 2001/04), Tala (1,020 MW, 2006–07), Dagachhu (126 MW, 2015), Mangdechhu (720 MW, 2019) and Nikachhu (118 MW, 2024). The 1,020 MW Punatsangchhu-II plant added six units between December 2024 and 27 August 2025, and a further 2,924 MW, including Punatsangchhu-I (1,200 MW) and Khorlochhu (600 MW), was listed as under construction or commissioning in 2025. The National Energy Policy 2025 put total installed capacity at 3,490 MW in June 2025.
All the large plants are run-of-river, so output follows the monsoon. In summer Bhutan generates far more than it needs and exports the surplus to India; in winter, generation drops and the country imports. The Department of Energy put firm winter power at about 455 MW (around 19% of capacity), and imports during the dry season rose from 240 million units in 2022 to 680 million in 2023 and about 1,500 million in 2024.
Commercial flow
There is no domestic wholesale market. DGPC sells electricity for domestic use to BPC at an ERA-determined generation tariff (an average of Nu 1.60/kWh, or Nu 2.37/kWh in the March 2026 determination), and exports surplus power to India under intergovernmental arrangements; Punatsangchhu-II exports began on 20 September 2025 at an expected tariff of about Nu 5.10 per unit. A share of output from the large plants is royalty energy for the government, which The Bhutanese reports at about 13% of yearly generation. BPC distributes and sells to all consumers at regulated tariffs.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Department of Energy, Ministry of Energy and Natural Resources (MoENR) | Sets energy policy, including the National Energy Policy 2025 and the target of 25,000 MW of capacity by 2040, and plans generation expansion. Under the Electricity Act the Minister approves power-system expansion plans and sets general tariff policy. |
| Regulator | Electricity Regulatory Authority (ERA) | Established by the Electricity Act 2001 (originally as the Bhutan Electricity Authority). Issues and exempts licences, determines tariffs, and makes technical regulations such as the Grid Code Regulation 2024 and the Licensing Regulation for Solar Power Plant 2024. |
| System operator | Bhutan Power System Operator (BPSO) | Shown by the Department of Energy as an agency under MoENR alongside the ERA. Solar licensees must inform the ERA and the system operator before commissioning and interconnecting a plant. |
| TSO | Bhutan Power Corporation Ltd (BPC) | Owns and maintains the transmission network (66 kV and above, as defined in the Electricity Act) that links the hydropower plants to load centres and to the Indian grid. |
| DSO | Bhutan Power Corporation Ltd (BPC) | The only distribution licensee, running the network below 66 kV nationwide and connecting new customers and rooftop solar systems. |
| Supplier | Bhutan Power Corporation Ltd (BPC) | Sole retail supplier, with 255,517 customers at the end of 2024: 255,421 low-voltage, 73 medium-voltage and 23 high-voltage. |
| Metering | Bhutan Power Corporation Ltd (BPC) | Installs and reads customer meters; its myBPC app lets customers submit self meter readings to avoid estimated bills. |
Compared with the UK system.
| UK concept | Bhutan equivalent | How it works |
|---|---|---|
| DNO | BPC (single distribution licensee) | There are no regional network companies. BPC owns the distribution network nationwide and is also the only supplier, so the network operator and the retailer are the same company. |
| National Grid/NESO | BPC (transmission owner) and BPSO (system operator) | BPC owns the transmission grid; system operation is assigned to the Bhutan Power System Operator under MoENR. Cross-border flows with India are managed under bilateral government agreements rather than a market. |
| MPAN | BPC customer account | A supply is identified by the customer record in BPC’s billing system, used to pay bills and to log in to its online services. There is no separate national supply-point number. |
| MPRN | No equivalent | There is no piped gas network for homes; cooking fuels such as LPG are sold in cylinders. |
| Meter operator | BPC | BPC supplies, installs and reads meters. For grid-connected solar, the ERA requires metering able to measure electricity flowing in both directions at the connection point. |
| Supplier | BPC (single supplier) | Households cannot switch supplier. Tariffs are set by the ERA and are the same nationwide, with free lifeline units for rural and highland customers. |
| Smart-meter infrastructure | No national smart-meter programme published | There is no DCC-style communications network. BPC offers digital billing and self meter reading through the myBPC app; no national smart-meter rollout figures were identified. |
How a supply point is identified.
Customer account 100012345 (fictional; illustrative only)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | BPC customer account |
| Who issues it? | Bhutan Power Corporation, when a new connection is approved |
| Format | Customer record in BPC’s billing system, printed on the electricity bill and linked to the meter at the premises. BPC does not publish the name, length or structure of the identifier. |
| Length | Not published by BPC |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the BPC electricity bill and in the myBPC app and customer portal. |
| Electronic access | The myBPC app (launched 2022) lets customers view and pay bills, submit self meter readings and request services such as power clearance, temporary connections and line shifting, with access tied to the customer’s registered mobile number. |
| Third-party access | No regulated scheme gives installers or other third parties access to consumption data. For rooftop solar up to 30 kWp, BPC as distribution licensee keeps records of each system (applicant, capacity and location) and reports them to the ERA every six months. |
| Who keeps the register | Bhutan Power Corporation’s customer and billing system |
| Register scope | National |
How a home is identified
Bhutan has a single distribution licensee and supplier, so there is no separate national register of supply points of the kind found in liberalised markets. Each connection is a customer record in BPC’s billing system, linked to the meter at the premises; it is the reference used on bills, for payments and in the myBPC app. BPC does not publish the format or length of this identifier, so the example above is illustrative only.
Connecting a new supply
New connections and changes such as temporary supplies or shifting lines are requested from BPC, increasingly through its Customer Centric Portal and the myBPC app. Because BPC is the only distributor and retailer, the same company handles the network connection, the meter, the account and the bill.
Solar systems and the register
Rooftop solar adds a second set of records. Under the ERA’s Licensing Regulation for Solar Power Plant 2024, a rooftop system of up to 30 kWp must be registered with BPC, which must give concurrence for it to be integrated with the distribution system and must report each system’s owner, capacity and location to the ERA twice a year. Larger systems hold an exemption certificate or licence from the ERA and sign an interconnection agreement with BPC. Whether the customer account stays with the property when occupants change was not stated in any source read, so it is left blank here.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Limited |
| Net metering | Limited |
| Net billing | No |
| How exported electricity is paid | Grid-connected solar is billed at a feed-in tariff determined by the ERA. Until the ERA published its solar tariff framework in December 2025, an interim net-metering tariff order applied; the household export rate under the new framework was not published in a source read for this profile. |
| Who can apply? | An individual applicant must be a legal resident of Bhutanese nationality; firms, institutions and other bodies must be registered under Bhutanese law. |
| Is there a size threshold? | Rooftop systems up to 30 kWp per premises register with BPC only. Rooftop systems above 30 kWp up to 1,000 kWp and ground-mounted systems up to 300 kWp need an ERA licence exemption. Ground-mounted systems above 300 kWp up to 3,000 kWp, and utility-scale plants above 3,000 kWp, need a licence. |
| How is exported electricity paid for? | The regulation says billing is at the feed-in tariff determined by the ERA. An interim net-metering tariff order applied until the ERA’s solar tariff framework (Tariff Determination Regulation 2025) was issued in December 2025. ERA staff research published in 2026 put a fair feed-in tariff for solar at Nu 4.34–5.82/kWh, well above the Nu 2.66 retail tariff. |
| What fees apply? | Licensees and exempt licensees pay an application fee and an annual licence fee under the Regulatory Fees Regulation 2006, due by the end of June each year, with interest of 1.5% a month on late payment. |
| What reporting is required? | Licensees and exempt licensees submit generation data to BPC periodically and an annual generation report to the ERA by 31 January, and report accidents to the ERA. |
Connecting a home system.
- Check the category: rooftop systems up to 30 kWp (Category 1A) are exempt from applying to the ERA; rooftop systems above 30 kWp and up to 1,000 kWp (1B) and ground-mounted systems up to 300 kWp (2A) need an ERA licence exemption; larger ground-mounted and utility-scale plants need a full licence.
- For a Category 1A rooftop system, register with BPC as distribution licensee and obtain its concurrence for integration with the distribution system, following BPC’s procedure and document list.
- For Categories 1B and 2A, apply to the ERA using the Schedule 1 form; the ERA assesses the applicant’s ability to operate safely, roof or ground area, interconnection arrangements and any network reinforcement, and decides within 30 days of receiving complete information.
- Sign an interconnection agreement with BPC covering technical and commercial risks such as back-feed and islanding.
- Install metering able to measure electricity in both directions at the connection point, and follow the Grid Code Regulation 2024 and the Regulation for Grid Integration of Distributed Energy Resources 2021.
Rooftop solar in Bhutan has to compete with some of the cheapest grid electricity in the region, so uptake by households has been small. The ERA’s 2024 solar regulation, which replaced 2022 guidelines on licence exemptions for distributed generation below 500 kWp, created a simple path for systems of up to 30 kWp: no application to the regulator, just registration with BPC and its agreement to connect.
Compensation has been the weak point. ERA staff have written that projects in operation before December 2025 had no tariff framework and were not compensated, which is why the ERA issued an interim net-metering order. The Tariff Determination Regulation 2025 now sets out how solar and prosumer tariffs are calculated, including a capital-cost benchmark of up to Nu 50,000 per kW for rooftop systems under 30 kWp, but the resulting household export rate had not been published in a source read for this profile.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Licence from the ERA under section 18 of the Electricity Act 2001; the ERA may exempt generation, including below 500 kW, under section 19. | Electricity Regulatory Authority | Large hydropower is developed by DGPC or through intergovernmental and public–private partnership models. |
| Rooftop solar up to 30 kWp | Exempt from applying to the ERA; must register with BPC and obtain its concurrence for grid integration. | Bhutan Power Corporation (registration); ERA (rules) | Licensing Regulation for Solar Power Plant 2024, Category 1A, in force from 17 May 2024. |
| Rooftop solar above 30 kWp to 1,000 kWp; ground-mounted up to 300 kWp | ERA licence exemption certificate (Categories 1B and 2A), decided within 30 days of a complete application. | Electricity Regulatory Authority | Application fee and annual fee under the Regulatory Fees Regulation 2006. |
| Ground-mounted solar above 300 kWp to 3,000 kWp; utility solar above 3,000 kWp | Full ERA licence (Category 2B or 3); utility-scale projects also need a permit to survey. Applicants must show secured financing, at least one year of relevant experience and an electrical engineer and accountant on staff. | Electricity Regulatory Authority | Licence applications are publicly advertised under the Act. |
| Store electricity | No separate storage licence category was identified in the Act or the solar regulation. | — | The National Energy Policy 2025 lists battery energy storage among implementation mechanisms. |
| Export to the grid | Only from a registered, exempt or licensed plant with an interconnection agreement with BPC and bi-directional metering. | ERA; BPC | Billing at the feed-in tariff determined by the ERA. |
| Transmission and system operation | Licence from the ERA (section 18). | Electricity Regulatory Authority | BPC owns transmission; system operation is assigned to the BPSO. |
| Distribution and supply | Licence from the ERA (sections 18 and 22). | Electricity Regulatory Authority | BPC is the only distribution and supply licensee. |
| Bulk supply, trading, export or import | Licence from the ERA: the Act requires a licence for sale, export or import, and section 22 lists bulk supply and trading as licensable activities. | Electricity Regulatory Authority | Cross-border trade with India is governed by bilateral agreements. |
| Wholesale and balancing markets | Not applicable: there is no domestic wholesale or balancing market. | — | Domestic supply is sold by DGPC to BPC at ERA-determined tariffs. |
| Aggregation / virtual power plant | No licence category for aggregators identified. | — | No market for aggregated distributed resources exists. |
| Remote control of customer assets | No framework identified. | — | Solar plants must comply with the Grid Code Regulation 2024 and the Regulation for Grid Integration of Distributed Energy Resources 2021. |
Section 18 of the Electricity Act 2001 prohibits anyone from engaging in construction, generation, transmission, system operation, distribution, sale, export or import of electricity without a licence from the ERA. Section 19 lets the ERA exempt people from licensing, expressly including generation below 500 kW, on terms it sets. Licence applications must include a technical and economic description, environmental assessment, a proposed tariff calculation and other consents, and are advertised in a national newspaper.
For distributed solar, the Licensing Regulation for Solar Power Plant 2024 replaces case-by-case exemptions with five categories. Household-scale rooftop systems of up to 30 kWp simply register with BPC; larger rooftop and small ground-mounted systems receive an exemption certificate; and larger plants need a full licence. All licensees and exempt licensees must comply with the ERA’s regulations, codes and directives, and non-compliance can lead to fines and sanctions.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency and reserve | No | — | No | BPSO / DGPC hydropower plants. Balancing is provided by hydropower plants and by power exchange with India; no market is open to distributed assets. |
| Solar IPP and PPP procurement | Restricted | — | No | Department of Energy / DGPC. Solar projects are developed through government financing, public–private partnerships and domestic independent power producers, under ERA licences. |
| Demand response | No | — | No | No household demand-response programme or time-of-use tariff is published. |
Bhutan has no flexibility market and no legal role for aggregators. Its main flexibility challenge is seasonal rather than daily: run-of-river hydropower floods the system with surplus in summer and falls well short of demand in winter, when Bhutan imports from India. The government’s answer is new generation, especially solar, which produces most in the dry, clear winter months; Sephu’s highest monthly output so far was 3.30 million units in December.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| myBPC | BPC’s customer app for bills, payments, self meter reading and service requests. It is not a flexibility platform. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national smart-meter rollout published |
| Reading interval | Monthly billing reads |
| Meter ownership | BPC installs and reads customer meters |
| Self meter reading | Available through the myBPC app to avoid estimated bills |
| Solar metering | Bi-directional metering required at the connection point (ERA solar regulation 2024) |
| Customers | 255,517 at the end of 2024 (255,421 low-voltage) |
No national smart-meter programme or penetration figure was found from BPC or the ERA. BPC’s digital services focus on billing: the myBPC app, launched in 2022, lets customers check and pay bills and submit their own meter readings so they are not billed on estimates. Grid-connected solar systems must have meters that record both import and export.
Renewable electricity.
Electricity generation mix (2023).
- Hydro: 100%
- Solar: 0%
- Renewable electricity share
- 100% (2023)Source 1IRENA: 10,536 GWh generated, of which 10,535 GWh hydro and 1 GWh solar. Bhutan is a large net exporter, so the generation share is used; in winter it imports electricity from India (about 1,500 million units in the 2024 lean season), whose generation mix is not counted here.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 2 MW (2024)Source 1IRENA records a 2 MW net solar addition in 2024. In 2025 the 22.38 MWp Sephu plant was commissioned.
- Hydro
- 2,452 MW (2024)Source 1Before Punatsangchhu-II (1,020 MW), whose six units were commissioned between December 2024 and August 2025. The National Energy Policy 2025 put total capacity at 3,490 MW in June 2025.
- Solar PV
- 3 MW (2024)Source 1Rose to about 28 MW in 2025 with the Sephu plant (see snapshot).
- Wind
- 1 MW (2024)Source 1
- Non-renewable (standby)
- 8 MW (2024)Source 1
Targets.
- 25,000 MW of installed capacity by 2040, including 15,000 MW of hydropower and 5,000 MW of solar (National Energy Policy 2025)
- Department of Energy planning: about 16 GW of hydro and 2.5 GW of solar by 2034
- Energy security by 2034, supporting the goal of a high-income economy
Bhutan’s electricity is effectively 100% renewable, all of it hydropower apart from a sliver of solar. The Department of Energy estimates hydropower potential at 36,888 MW (33,000 MW techno-economically viable), solar at 12,018 MW and wind at 761 MW.
Solar is now being built to fill the winter gap. The Sephu plant in Wangdue Phodrang, financed by the Asian Development Bank and the government, was commissioned in two phases (17.38 MWp on 19 July 2025 and 5 MWp on 3 November 2025) and is designed to produce about 33 million units a year. DGPC is installing about 35 MWp of rooftop solar on public buildings with ADB financing; the first 7.83 MWp, on 187 buildings, was completed by July 2026. Earlier projects include a 2.60 MW plant at Dechencholing and a 1.60 MW rooftop array at the Royal Academy in Paro.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
No grid-scale battery storage project was identified. The National Energy Policy 2025 lists battery energy storage systems among the mechanisms for meeting its capacity goals, and the Department of Energy notes that its hydropower potential figure excludes pumped-storage potential.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Bhutan Power Corporation Ltd (BPC) | Sole supplier; 255,517 customers at the end of 2024 | No | No | No | Limited |
BPC is the only electricity supplier. Every customer pays the ERA-approved national tariff for their voltage class, and households cannot switch. Because all domestic generation is already renewable, there are no separate green tariffs.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Department of Energy, Ministry of Energy and Natural Resources | Government | Energy policy and planning | Sets the National Energy Policy 2025 and the hydro and solar capacity plan to 2040. |
| Electricity Regulatory Authority (ERA) | Regulator | Licensing and tariff regulator | Issues licences and exemptions, including for rooftop solar, and determines all domestic tariffs. |
| Bhutan Power Corporation Ltd (BPC) | Distribution | Transmission, distribution and supply | Connects all customers and registers rooftop solar systems up to 30 kWp. |
| Druk Green Power Corporation Ltd (DGPC) | Renewable Energy | State hydropower and solar generator | Operates the major hydropower plants and is building rooftop solar on public buildings. |
| Druk Holding and Investments (DHI) | Government | State holding company | Owns BPC and DGPC on behalf of the government. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | ERA Grid Code Regulation 2024 | Electricity Regulatory Authority | Solar licensees must follow its procedures before commissioning. |
| Distributed generation | Regulation for Grid Integration of Distributed Energy Resources 2021 | Electricity Regulatory Authority | Referenced by the solar licensing regulation for interconnection. |
| Solar licensing | Licensing Regulation for Solar Power Plant 2024 | Electricity Regulatory Authority | In force from 17 May 2024; five capacity categories. |
| Metering | Bi-directional metering at the interconnection point | Licensing Regulation for Solar Power Plant 2024, section 49 | Must measure energy flow in both directions and consumption. |
| Safety | Electricity Regulatory Authority – Safety Regulation 2008 | Electricity Regulatory Authority | Serious safety incidents must be reported to the ERA. |
| Tariffs | Tariff Determination Regulation 2025 | Electricity Regulatory Authority | Includes solar and prosumer tariff methodology from December 2025. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Registration with BPC (rooftop up to 30 kWp) | Yes | National | Registration and BPC concurrence for integration with the distribution system. |
| ERA licence exemption or licence | Limited | National | Needed for rooftop systems above 30 kWp, all ground-mounted systems and utility-scale plants. |
| Interconnection agreement with BPC | Yes | National | Required for licensed and exempt solar plants tied to the grid. |
| Consent from public authority | Limited | Mixed | The ERA considers consent from a public authority, where applicable, when assessing exemption applications. |
| Planning permission | Unknown | Local | A specific planning rule for rooftop solar was not identified. |
For most homes the only step is registration with BPC. Larger installations go to the ERA, which assesses the applicant’s capability, the available roof or land area, the interconnection and any network reinforcement, and any consent needed from public authorities, and gives a decision within 30 days of receiving complete information.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Free lifeline electricity for rural and highland households | Active | Bill subsidy | Rural low-voltage customers receive their first 100 units a month free and highland customers their first 200, funded by the government; Nu 378 million was allocated for domestic power subsidies in 2025–26. | — |
| Subsidised low-voltage tariff | Active | Tariff subsidy | The government keeps the low-voltage rate (Nu 2.66 above 100 units) below the ERA’s unsubsidised cost of supply, funded partly from hydropower royalty revenue. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Electricity customer services in Bhutan are increasingly digital: the myBPC app handles billing, payments and self meter reading through customers’ mobile numbers. No information was found on remote communications for household meters.
Grid conditions.
- National peak demand
- 1.026 GW (2024)Source 2Up from 956 MW in 2023 and 629 MW in 2022.
- Annual electricity demand
- Not identified from a reliable public source.
- Generation capacity
- 3.49 GW (June 2025)Source 15As stated for the National Energy Policy 2025; solar and wind together were about 6 MW. IRENA recorded 2.465 GW at the end of 2024, before Punatsangchhu-II.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The grid’s central problem is seasonal. The Department of Energy put the firm power of existing plants at about 455 MW (around 19% of installed capacity), and charted firm capacity of 623 MW in 2024 against a 1,026 MW peak, so Bhutan imported heavily from India in the lean months. New capacity is the main response: Punatsangchhu-II adds 199 MW of winter firm power, and the plan to 2040 envisages 25,000 MW of capacity, requiring about US$26 billion of investment.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Licensing Regulation for Solar Power Plant 2024 | Current | 17 May 2024 | Five categories of solar plant; rooftop systems up to 30 kWp register with BPC only. |
| Punatsangchhu-II fully commissioned | Current | 27 August 2025 | All six units of the 1,020 MW plant online; exports to India from 20 September 2025. |
| National Energy Policy 2025 | Current | 2025 | 25,000 MW of capacity by 2040, including 15,000 MW hydro and 5,000 MW solar. |
| Tariff Determination Regulation 2025 with solar tariff framework | Current | December 2025 | Cost-plus method for generation, network, solar and prosumer tariffs, replacing the interim net-metering order. |
| GST on electricity bills | Current | 1 January 2026 | 5% GST applied to household electricity bills. |
| Low-voltage tariff revision | Upcoming | Approved by ERA March 2026; implementation not confirmed | ERA-approved LV tariff of Nu 5.63/kWh (from Nu 2.66) under review by the government for affordability and subsidy options. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No household rooftop solar capacity figure is published; total solar was 3 MW at the end of 2024 (IRENA) and grid tariffs of Nu 1.28–2.66/kWh are among the lowest in the region. |
| Distributed energy market | Low | Rooftop systems up to 30 kWp only need BPC registration, but a solar compensation framework was only issued in December 2025. |
| Grid flexibility market | Low | No domestic wholesale, balancing or flexibility market and no aggregator licence. |
| Energy storage adoption | Low | No grid-scale or household battery storage identified. |
| Renewable growth environment | High | Punatsangchhu-II (1,020 MW) and Sephu solar (22.38 MWp) came online in 2025, about 2,900 MW of hydro is under construction, and policy targets 25,000 MW by 2040. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 19 sources
- Energy Profile: Bhutan. IRENA, 2025. accessed 10 October 2026.
- Energy Sector in Bhutan (Asia Clean Energy Forum presentation, 4 June 2025). Department of Energy, Ministry of Energy and Natural Resources, 2025. accessed 10 October 2026.
- Nu 3 bn in subsidies needed to ensure domestic power tariff does not double. The Bhutanese, 2026. accessed 10 October 2026.
- Govt asks ERA to relook at domestic power tariff, keeping affordability in mind. The Bhutanese, 2026. accessed 10 October 2026.
- Electricity tariffs revised in line with government mandates, Bhutan has the lowest tariffs in the region: MoENR. The Bhutanese, 2026. accessed 10 October 2026.
- National Assembly MPs raise concerns over proposed electricity tariff revision. Bhutan Broadcasting Service, 2026. accessed 10 October 2026.
- 5% GST and Tariff revision will mean higher power bills. The Bhutanese, 2025. accessed 10 October 2026.
- Licensing Regulation for Solar Power Plant 2024. Electricity Regulatory Authority, 2024. accessed 10 October 2026.
- Licensing Regulation for Solar Power Plant 2024 launched, installation now requires license. Bhutan Broadcasting Service, 2024. accessed 10 October 2026.
- Solar Power Integration in Bhutan: A Tariff-Based Competitiveness Analysis (Zorig Melong Vol. 9 Issue 1). College of Science and Technology, Royal University of Bhutan (authors from the ERA Tariff Department), 2026. accessed 10 October 2026.
- Electricity Act of Bhutan 2001. Royal Government of Bhutan (via ADB Law and Policy Reform), 2001. accessed 10 October 2026.
- Bhutan to export P-II power to India from 20th September 2025. The Bhutanese, 2025. accessed 10 October 2026.
- Sephu Solar Plant injects 13.55 million units into national grid. The Bhutanese, 2026. accessed 10 October 2026.
- Bhutan commissions first utility-scale solar plant. pv magazine, 2025. accessed 10 October 2026.
- Diversifying energy sources beyond hydropower under new energy policy. The Bhutanese, 2025. accessed 10 October 2026.
- Bhutan Commissions 7.83 MW Rooftop Solar Project Across 187 Public Buildings. SolarQuarter, 2026. accessed 10 October 2026.
- Bhutan country data. World Bank, 2025. accessed 10 October 2026.
- ECB euro reference exchange rate: Indian rupee (INR). European Central Bank, 2026. accessed 10 October 2026.
- myBPC app listing. Bhutan Power Corporation (app store listing). accessed 10 October 2026.
Questions about energy in Bhutan.
Households on the low-voltage tariff pay Nu 1.28 per unit for the first 100 units a month and Nu 2.66 per unit above that, plus 5% GST since January 2026. Rural households get their first 100 units free and highland households their first 200. In March 2026 the ERA approved a rise to Nu 5.63 per unit, which the government asked it to reconsider.
Bhutan Power Corporation (BPC) is the only distributor and retailer. Druk Green Power Corporation (DGPC) runs the large hydropower plants, and the Electricity Regulatory Authority (ERA) sets tariffs and issues licences.
Practically all of it. IRENA records 10,536 GWh of generation in 2023, of which 10,535 GWh was hydropower and 1 GWh solar. In winter Bhutan imports some electricity from India.
Not for rooftop systems up to 30 kWp: you register with BPC and obtain its agreement to connect. Larger rooftop systems and small ground-mounted systems need an exemption certificate from the ERA, and larger plants need a full licence.
Grid-connected solar must have bi-directional metering and is billed at a feed-in tariff set by the ERA. An interim net-metering order applied until the ERA issued its solar tariff framework in December 2025; the resulting household export rate had not been published at the time of research.
There is no national supply-point number. Each connection is a customer account in BPC’s billing system, shown on the bill and used in the myBPC app.
Its hydropower plants are run-of-river, so output falls sharply in the dry winter months while demand keeps growing. Imports from India reached about 1,500 million units in the 2024 lean season.