How electricity works in Bolivia.
Bolivia electricity market 2026: AETN-regulated tariffs, CNDC dispatch, DELAPAZ, CRE and ELFEC, Tarifa Dignidad, net metering for rooftop solar and new 1–6 MW distributed generation.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Bolivian boliviano (BOB) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Bolivia energy at a glance.
Key figures for households in Bolivia. Each one links to its source on the full overview below.
Electricity price.
0.122 USD per kWh for households, including taxes. Figures for 2025.
Household use.
1,266 kWh a year for a typical household. Figures for 2025.
Renewable share.
36.1% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Bolivia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Bolivia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Bolivia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Bolivia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Bolivia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Bolivia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Bolivia.
The energy market in Bolivia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Bolivia’s power sector is organised under the Electricity Law (Ley 1604 of 21 December 1994), which separates generation, transmission and distribution. Policy is set by the Ministry of Hydrocarbons and Energies through its Vice-Ministry of Electricity and Renewable Energy; the regulator is the Autoridad de Fiscalización de Electricidad y Tecnología Nuclear (AETN), which approves every tariff in the country; and the national interconnected system (Sistema Interconectado Nacional, SIN) is dispatched by the Comité Nacional de Despacho de Carga (CNDC), which also runs the wholesale market (Mercado Eléctrico Mayorista, MEM). The state company ENDE and its subsidiaries are the largest group among the generators and transmitters registered in the MEM.
Households cannot choose their supplier. Each home is a regulated customer of the distributor in its area: DELAPAZ in La Paz, the CRE cooperative in Santa Cruz, ELFEC in Cochabamba, and smaller departmental distributors and cooperatives elsewhere. At the end of 2025 there were about 3.07 million residential customers, and the average residential tariff in the SIN was 12.24 US cents per kWh before VAT, according to AETN statistics. Households using up to 70 kWh a month receive a 25% discount under the Tarifa Dignidad.
Natural gas supplies most of Bolivia’s electricity, about 62% in 2025, with hydropower about 28% and solar, wind and biomass together about 8%. Since 2021 households and businesses have been able to install renewable distributed generation and offset their consumption through net metering. A February 2026 decree (DS 5549) added a medium-scale category of 1 to 6 MW connected to distribution networks, paid at a stabilised price set by AETN.
Energy snapshot.
Headline figures for electricity in Bolivia. Each shows its data year and links to its source.
- Population11,365,333 peopleSource 12024
- HouseholdsNot identified from a reliable public source.
- Average household sizeNot identified from a reliable public source.
- Electricity use per household1,266 kWh/yrSource 62025
- Household price (BOB)0.122 USD/kWhSource 82025
- Household price (EUR)0.109 EUR/kWhSource 322025
- Renewable electricity share36.1%Source 332025
- Solar capacity0.194 GWSource 342025
- Wind capacity0.135 GWSource 352025
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Partially liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- AETN (Autoridad de Fiscalización de Electricidad y Tecnología Nuclear); policy by the Ministry of Hydrocarbons and Energies
- System operator
- CNDC (Comité Nacional de Despacho de Carga), operator of the SIN and the wholesale market
- Distribution networks
- Regional distribution concessions with regulated tariffs: DELAPAZ (La Paz), CRE cooperative (Santa Cruz), ELFEC (Cochabamba), plus departmental distributors, ENDE systems and rural cooperatives
- Currency
- Bolivian boliviano (BOB)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Bolivia.
- Household price (BOB)
- 0.122 USD/kWh (2025)Source 8Average residential tariff in the SIN for 2025: 12.24 US cents per kWh, excluding VAT (IVA), as published by AETN. Tariffs are billed in bolivianos; AETN reports averages in US cents. Municipal street-lighting and refuse charges collected on the bill are not included. By distributor (SIN and isolated systems, 2025): CRE 12.00, ELFEC 12.91, ENDE Deoruro 13.93, CESSA 11.35, SEPSA 11.89, SETAR 11.55, ENDE DelBeni 10.76 US cents/kWh.
- Household price (EUR)
- 0.109 EUR/kWh (2025)Source 32Derived: US$0.1224/kWh divided by US$1.1206 per euro, the ECB euro reference rate for 9 October 2026. Excludes VAT, like the source figure.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (BOB per kWh).Source 8
| 2016 | 0.093 BOB/kWh |
|---|---|
| 2017 | 0.0981 BOB/kWh |
| 2018 | 0.103 BOB/kWh |
| 2019 | 0.1044 BOB/kWh |
| 2020 | 0.1004 BOB/kWh |
| 2021 | 0.1017 BOB/kWh |
| 2022 | 0.1058 BOB/kWh |
| 2023 | 0.11 BOB/kWh |
| 2024 | 0.1131 BOB/kWh |
| 2025 | 0.1224 BOB/kWh |
Bolivian household tariffs are fully regulated. AETN approves each distributor’s tariff structure for a four-year period through a tariff study, and the published tariff passes through the wholesale purchase cost and the distribution component. The average purchase price in the wholesale market in 2025 was US$57.99 per MWh, according to CNDC, made up of energy (33.2%), capacity (35.8%) and transport (31.0%).
Prices over time
The average residential tariff in the SIN rose from 9.30 US cents/kWh in 2016 to 11.31 cents in 2024 and 12.24 cents in 2025, excluding VAT (AETN). These are averages across all residential customers, including those receiving Tarifa Dignidad and other discounts.
Taxes and municipal charges
The bill (aviso de cobranza) also collects municipal charges for street lighting and refuse collection, which belong to the local authority rather than the distributor. In Santa Cruz, both depend on the amount of electricity consumed, and the refuse charge also depends on the location of the connection. Members of the CRE cooperative also pay membership contributions on the bill.
Social tariffs
The Tarifa Dignidad, in place since 2006, is funded by contributions from electricity companies. In 2025 discounts totalled about Bs 102 million. Households registered as distributed generators cannot receive Tarifa Dignidad (DS 4477).
Exchange rate
Tariffs are set and billed in bolivianos, while AETN reports averages in US cents. The Central Bank of Bolivia’s official rate was 11.85 bolivianos per US dollar on 9 October 2026, so 2025 figures in dollars should be read alongside current boliviano tariffs.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Every household pays the domestic (domiciliaria) tariff approved by AETN for its distributor. Charges are set in consumption ranges, with a minimum or fixed charge; the same tariff applies throughout a distributor’s area of operation (CRE). |
| Other | Yes | Tarifa Dignidad: a 25% discount on the monthly bill for domestic customers using no more than 70 kWh a month (DS 28653 of 2006, continued by DS 1948 of 2014). In 2025 an average of about 965,000 domestic customers benefited. |
| Other | Yes | Under Law 1886, customers over 60 receive a 20% discount on the first 100 kWh consumed each month at their home, for one domestic connection. |
| Time-of-use | Limited | Medium- and large-demand customers are billed by time-of-day blocks (high, medium and low). No time-of-use option for households was identified. |
| Dynamic | No | No spot-linked tariff is offered to regulated customers; wholesale costs pass through regulated tariffs. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 1,266 kWh/yr (2025)Source 6Derived: 3,886.26 GWh of residential electricity sales in 2025 divided by 3,070,620 residential customers (SIN plus isolated systems) at the end of 2025, both from the AETN digital statistical yearbook. This is the average per residential account, not per household.
- Average daily use per household
- 3.47 kWh/day (2025)Source 6Derived: 1,266 kWh a year per residential account divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- Not identified from a reliable public source.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Residential customers bought 3,886 GWh in 2025, about 37% of electricity sold to final customers in Bolivia. Industry (2,837 GWh), general and commercial users (2,056 GWh) and mining (881 GWh) account for most of the rest (AETN).
Average use per residential account is about 1,270 kWh a year, or roughly 3.5 kWh a day, but it varies widely by climate. The lowlands of Santa Cruz and Beni are hot, and CRE notes that consumption rises in summer because of air conditioning and refrigeration. The highland cities of La Paz, El Alto and Oruro have low cooling demand. About 31% of domestic customers received the Tarifa Dignidad discount in 2025, which is limited to those using 70 kWh a month or less.
Housing and households.
- Dwellings
- 4,480,201 dwellings (2024)Source 1Total dwellings counted in the 2024 census (2,898,140 urban, 1,582,061 rural).
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 69% (2024)Source 1Derived: 7,846,708 urban residents out of 11,365,333 in the 2024 census. The World Bank estimate for 2025 is 71.6% (source wb-urban).
About seven in ten Bolivians live in urban areas, mainly in the La Paz–El Alto, Santa Cruz and Cochabamba metropolitan areas, which are served by DELAPAZ, CRE and ELFEC respectively. Rural electrification has been extended through ENDE systems and rural cooperatives; the World Bank reports electricity access for 96.6% of the population in 2024.
A new domestic connection requires the customer to build the meter mounting (a pillar, recessed box or panel) to the distributor’s specification, show proof of identity and occupancy, and have no outstanding debts with the distributor (CRE). Housing tenure and building-type data from the 2024 census could not be verified for this profile.
How the grid works in Bolivia.
- TransmissionCNDC – Comité Nacional de Despacho de Carga, ENDE Transmisión, ISA Bolivia and TESA
- DistributionRegional distribution concessions with regulated tariffs: DELAPAZ (La Paz), CRE cooperative (Santa Cruz), ELFEC (Cochabamba), plus departmental distributors, ENDE systems and rural cooperatives
- MeteringNot identified from a reliable public source.
- Supply3 or more retail suppliers
Gas-fired plants, hydropower in the Andes and growing solar, wind and biomass output feed the SIN, which links the main cities. Remote areas, particularly in Beni and Pando, are supplied by isolated systems. CNDC dispatches generation on the SIN and settles transactions between generators, distributors and non-regulated consumers in the MEM.
Distributors buy energy and capacity in the MEM and sell it to regulated customers at tariffs approved by AETN. For a household the distributor is the only point of contact: it connects the home, installs and reads the meter, bills energy along with municipal charges, approves distributed generation and handles complaints. AETN is the body to appeal to if a complaint is not resolved.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministerio de Hidrocarburos y Energías | Sets energy policy through the Vice-Ministry of Electricity and Renewable Energy and is responsible for executing electricity decrees such as DS 5549 on medium-scale distributed generation. |
| Regulator | AETN – Autoridad de Fiscalización de Electricidad y Tecnología Nuclear | Approves tariffs for every distributor, regulates distributed generation (installer register, net-metering rules, autoproducer registration), manages Tarifa Dignidad compensation and publishes the sector’s statistical yearbook. |
| System operator | CNDC – Comité Nacional de Despacho de Carga | Dispatches the SIN and administers the wholesale market (MEM). It registers MEM agents and, under DS 5549, settles the energy injected by medium-scale distributed generators. |
| TSO | ENDE Transmisión, ISA Bolivia and TESA | Transmission companies registered in the MEM. State-owned ENDE Transmisión operates lines across eight departments. |
| DSO | DELAPAZ | Distributor for La Paz department, with 930,416 residential customers at the end of 2025, the largest in the country. |
| DSO | CRE R.L. (Cooperativa Rural de Electrificación) | Customer-owned cooperative distributing in Santa Cruz department, with 774,402 residential customers at the end of 2025. |
| DSO | ELFEC S.A. | Distributor for Cochabamba, with 632,174 residential customers at the end of 2025. |
| DSO | Other departmental distributors | ENDE Deoruro (Oruro), CESSA (Chuquisaca), SEPSA (Potosí), SETAR (Tarija), ENDE DelBeni (Beni), ENDE systems in Pando and smaller towns, and rural cooperatives. |
Compared with the UK system.
| UK concept | Bolivia equivalent | How it works |
|---|---|---|
| DNO | Distribuidor (distribution concession holder) | Each department or area is served by one distributor, such as DELAPAZ or the CRE cooperative, which owns the local network. Unlike a UK DNO, it also supplies and bills all regulated customers in its area. |
| National Grid/NESO | CNDC plus transmission companies | CNDC dispatches the SIN and runs the wholesale market. Transmission assets belong to separate companies, mainly ENDE Transmisión, ISA Bolivia and TESA. |
| MPAN | Código fijo / código de cliente (account number) | A distributor-issued customer number that uniquely identifies the supply in the distributor’s database and is used for all procedures and payments. It is not a national, standardised code and is not used for switching. |
| MPRN | Separate gas account (where piped gas exists) | Piped natural gas is supplied and billed separately, with no link to the electricity account number. |
| Meter operator | The distributor | The distributor installs, reads and certifies the meter. For distributed generation, the distributor verifies the metering equipment. |
| Supplier | The same distributor (regulated customers) | Households are regulated customers of their distributor at AETN-approved tariffs. Only a small number of large non-regulated consumers (eight were listed as MEM agents) buy in the wholesale market. |
| Smart-meter infrastructure | None at national level | There is no national smart-metering programme or central data platform. Meters are read manually each month, and readings can be estimated where access is not possible. |
How a supply point is identified.
Código fijo 0123456 (fictional; format varies by distributor)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Código fijo (CRE) / código de cliente / número de cuenta |
| Who issues it? | The local distributor |
| Format | A numeric account number assigned by the distributor in its own customer database. CRE bills also show a separate alphanumeric location code (código de ubicación) that identifies the customer by geographical location and is usually marked on the meter panel, plus the meter serial number. |
| Length | Varies by distributor (not nationally standardised) |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | At the top of the monthly bill (aviso de cobranza); CRE lists it as item 1 on its bill. It is also used in distributors’ apps and online services. |
| Electronic access | Customers use the number to check and pay bills through distributor apps and websites (for example CRE Móvil and CRE Digital) and banks or collection centres. |
| Third-party access | Anyone with the number can usually check and pay a bill, and CRE accepts complaints from non-account holders. There is no regulated data-sharing scheme for third parties. For an autoproducer registration, the distributor issues a certificate stating the customer code (AETN requirements, 2026). |
| Who keeps the register | Each distributor’s commercial system. AETN collects customer data from distributors for statistics and Tarifa Dignidad, but there is no national supply-point register. |
| Register scope | Per DSO |
In Bolivia a home’s electricity supply is identified by the account number the distributor creates when the connection is approved. CRE calls it the código fijo and describes it as the unique identifier each customer has in its database, used as the reference for every procedure with CRE or at a payment centre. The bill also shows the meter serial number, the tariff category (activity, demand size and voltage level) and, at CRE, a location code tied to the geographical position of the supply.
When the occupant changes
Under Article 18 of the public electricity supply regulation (RSPSE), a new owner or occupier must take the supply contract in their own name and prove possession of the property. CRE handles this as a change of account holder (cambio de titularidad): the existing account is transferred, provided neither the account nor the new holder has debts. The supply therefore remains attached to the property while the holder changes.
How it differs from an MPAN
Households cannot change supplier, so the number is not used for switching and there is no national format or central register. It does, however, play a role in distributed generation: AETN requires a certificate from the distributor stating the customer code when someone registers as an autoproducer, and net-metering credits are recorded against that account.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Yes |
| Net billing | No |
| How exported electricity is paid | Net metering in kWh: each month, energy exported is netted against energy consumed, and any surplus becomes a kWh credit that can be used for up to 24 months (AETN Resolution 380/2024). The minimum or fixed charge is still payable. Medium-scale distributed generators (1–6 MW) are paid a stabilised energy price set by AETN. |
| What size of system qualifies? | Nanogeneration up to 10 kW, microgeneration above 10 kW and up to 50 kW, minigeneration above 50 kW and up to 500 kW, and macrogeneration above 500 kW (autoproducers only) under DS 4477 as amended by DS 5167. DS 5549 added medium-scale distributed generation from 1 MW to 6 MW connected to medium-voltage networks. |
| Which technologies are allowed? | Only renewable sources. AETN’s autoproducer requirements mention solar, wind, biomass, cogeneration and mini-hydro. |
| Can a household sell power to a neighbour? | No. A distributed generator may not supply energy to third parties, and installers may not be paid by selling the energy generated or injected (DS 5167). |
| What happens to unused credits? | Surplus kWh are stored as unused monthly energy and applied to later bills, oldest first, for a maximum of 24 months from the month of injection (AETN Resolution 380/2024). |
| How are larger customers treated? | Customers billed by time blocks (large demand) are netted separately in high, medium and low blocks. Autoproducers in any category can inject at one site and withdraw at another within the same distributor’s area (remote injection and withdrawal), paying a charge for use of the network. |
| Do distributed generators keep the Tarifa Dignidad? | No. DS 4477 excludes registered distributed generators from the Tarifa Dignidad. |
Connecting a home system.
- Hire an installation company registered with AETN and enabled by the local distributor to design the system.
- The installer registers the project with the distributor, which approves or rejects the design.
- Pay for any connection adjustments, which must follow the distributor’s technical specifications.
- The distributor inspects the installation and verifies the meter and electrical installation.
- Sign a distributed-generator contract with the distributor, which then records exports and applies net-metering credits.
Bolivia introduced distributed generation in March 2021 with Supreme Decree 4477, which allowed regulated customers to connect small renewable systems to the distribution network and be paid for surplus energy. Supreme Decree 5167 of June 2024 changed the payment to net metering for all registered distributed generators, raised the minigeneration limit to 500 kW, and created autoproducers with remote injection and withdrawal. AETN’s Resolution 380/2024 sets out how distributors calculate bills.
Distributors must approve or reject projects, inspect and verify connections, sign contracts with generators and credit exported energy. DS 5167 also sets fines for distributors that refuse access without technical or legal justification or fail to compensate injected energy.
Medium-scale distributed generation
DS 5549 of 18 February 2026 created a separate category of 1 to 6 MW renewable plants connected to medium-voltage distribution networks. They must not inject into the main transmission system (the STI) and do not take part in the SIN’s economic dispatch. On that basis they are not treated as licensed generation, but they need an AETN authorisation and a contract with the distributor. CNDC records their injections monthly and the cost is shared among wholesale buyers in proportion to their consumption.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (grid scale) | Licence or concession under the Electricity Law (Ley 1604) for plants that inject into the SIN; thresholds below which no licence is needed were being revised in 2026 | AETN | AETN presented a regulation changing the power limits for activities that need no licence in July 2026; the new limits were not stated in the source. |
| Generate for own use with export (distributed generation) | No generation licence; registration with the distributor and a distributed-generator contract, up to 500 kW (macrogeneration above 500 kW for autoproducers) | Distributor; AETN rules | Renewable sources only; installed by an AETN-registered installer. |
| Autoproduction with remote injection and withdrawal | Inscription as an autoproducer with AETN plus registration with the distributor; requires the distributor’s interconnection viability certificate (CVI), due within 15 days | AETN / distributor | Network-use charge applies to remote withdrawals. |
| Medium-scale distributed generation (1–6 MW) | AETN authorisation; not a generation licence or concession provided injection is only into distribution networks and the plant is outside SIN dispatch | AETN; CNDC for settlement | Created by DS 5549 (February 2026). |
| Store electricity | No specific storage licence identified; a behind-the-meter battery is part of the customer’s installation | AETN | Grid-scale storage treatment not verified. |
| Sell to households (supply) | Only the distribution concession holder supplies regulated customers in its area; distributed generators may not supply third parties | AETN | No competitive retail for households. |
| Wholesale trading and balancing | Participation in the MEM as a registered agent (generator, transmitter, distributor or non-regulated consumer) | CNDC / AETN | CNDC listed 12 generators, 4 transmitters, 10 distributors and 8 non-regulated consumers. |
| Aggregation, VPP, grid services and remote control of assets | No framework for independent aggregators identified | AETN / CNDC | Distributed generators may not sell to third parties, which rules out peer-to-peer trading. |
| Install distributed generation | Installation companies must be inscribed with AETN and registered and enabled with each distributor; certificates are valid for three years under Resolution 301/2026 | AETN / distributor | Certificates cover project design (type 1), installation (type 2) and, from 2026, medium-scale projects (type 3). |
Licensing in Bolivia follows the Electricity Law of 1994 and its regulations, with AETN as the licensing and regulatory authority and CNDC coordinating the interconnected system. Distributed generation is deliberately kept outside the licence regime: small systems are handled through the distributor, and medium-scale plants need an AETN authorisation instead of a generation licence.
Installer registration is the main gatekeeper for rooftop solar. AETN keeps a public list of registered installation companies, last updated on 1 October 2026, showing each firm’s certificate, validity and the size categories it may work on.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale electricity market (MEM) | Restricted | — | No | CNDC. Transactions among registered generators, transmitters, distributors and non-regulated consumers, priced through energy, capacity and transport components. Households and small generators cannot participate directly. |
| Medium-scale distributed generation settlement | Developing | 1 MW | No | CNDC. Under DS 5549 and CNDC Operating Standard No. 39, energy from 1–6 MW plants in distribution networks is paid at an AETN stabilised price through the MEM. |
| Demand response for households | No | — | No | No programme identified. |
System flexibility in Bolivia comes from gas-fired plants and hydro reservoirs dispatched by CNDC. There is no framework for aggregators or virtual power plants, and households cannot be paid for flexibility services.
Net metering gives rooftop generators an incentive to offset their own consumption over a month, and credits can be carried for up to 24 months, so there is little price signal to shift use or exports within the day for households.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| CNDC portal | Real-time demand curve, operating results, statistics on generation, demand and capacity, and the list of MEM agents. |
| AETN GENDIS | AETN’s digital tool for distributed-generation registration. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national programme identified; conventional meters read monthly |
| Reading interval | Monthly reading |
| Who installs and reads | The local distributor |
| Meter types in use | Electromechanical (disc) and electronic meters with a pulse LED, according to CRE |
| Reading | Manual monthly reading; bills mark whether a reading was read or estimated |
| Distributed generation | Metering for distributed generation is verified by the distributor; autoproducers pay for their own metering equipment |
No national smart-metering policy, rollout target or data hub was identified. CRE’s bill explanation shows that readings are taken monthly by meter readers, with estimated readings used when the meter cannot be reached, and that bills show the meter serial number and a 13-month consumption history.
Distributed generation requires metering that records both consumption and injection; DS 4477 as amended makes the distributor responsible for verifying it.
Renewable electricity.
Electricity generation mix (2025).
- Gas: 62.4%
- Hydro: 27.9%
- Bioenergy: 3.2%
- Solar: 2.9%
- Wind: 2.1%
- Oil: 1.5%
- Renewable electricity share
- 36.1% (2025)Source 33Share of generation (Ember via Our World in Data): hydropower 27.88%, bioenergy 3.23%, solar 2.93% and wind 2.05%. CNDC reports a similar picture for the SIN alone in 2025: thermal 68.5%, hydro 27.2%, solar 2.9% and wind 1.4%.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 0.017 GW (2025)Source 34Derived: 0.19424 GW at end-2025 minus 0.17707 GW at end-2024 (IRENA via Our World in Data).
- Solar PV
- 0.194 GW (2025)Source 34
- Wind
- 0.135 GW (2025)Source 35
Natural gas has dominated Bolivian power generation, and its share varies with hydro output: gas supplied about 64.5% in 2024 and 62.4% in 2025, while hydropower rose from 24.4% to 27.9% (Ember). By effective capacity in the SIN, CNDC lists thermal plants at 67.5%, hydro 20.3%, solar 4.7%, wind 3.8% and biomass 3.7% of 3,534.5 MW.
Utility-scale solar and wind have been built mainly by ENDE companies, which generated 202 GWh from solar and 234 GWh from wind in 2025 (AETN). Solar capacity has grown slowly, from 0.17 GW in 2021 to 0.19 GW in 2025, and wind has stayed at 0.135 GW since 2023. Distributed generation reforms in 2024 and 2026 aim to increase renewable output in distribution networks. No current national renewable target was verified for this profile.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
No official statistics on battery storage were identified. Hydro reservoirs provide the system’s main storage. Because net-metering credits can be banked for up to 24 months, the billing rules themselves give households little financial reason to store solar output; batteries are mainly relevant for backup and off-grid use.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| DELAPAZ | ~30% of residential customers (Dec 2025) | No | Limited | No | Yes |
| CRE R.L. | ~25% of residential customers (Dec 2025) | No | Limited | No | Yes |
| ELFEC S.A. | ~21% of residential customers (Dec 2025) | No | Limited | No | Yes |
Households do not choose their supplier: the distributor for their area supplies them at AETN-approved tariffs. DELAPAZ, CRE and ELFEC together served about 76% of residential customers at the end of 2025. Other distributors include ENDE Deoruro (148,192 residential customers), SEPSA (156,354), SETAR (145,080), CESSA (133,131) and ENDE DelBeni (74,541).
“Export tariff” is marked Yes because every distributor must apply net metering to registered distributed generators; it is a kWh credit, not a cash payment. “Time-of-use” is Limited because time blocks apply to larger customers, not households.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministerio de Hidrocarburos y Energías | Government | Energy policy, including the Vice-Ministry of Electricity and Renewable Energy | Proposes and executes electricity decrees, including the distributed-generation reforms. |
| AETN | Regulator | Electricity and nuclear technology regulator | Approves tariffs, regulates distributed generation and publishes the sector statistics yearbook. |
| CNDC | Market | System and wholesale market operator | Dispatches the SIN, settles the MEM and publishes real-time and annual statistics. |
| ENDE Transmisión | Transmission | State transmission company | Operates transmission lines in eight departments. |
| DELAPAZ | Distribution | Distributor for La Paz | Largest distributor by residential customers. |
| CRE R.L. | Distribution | Cooperative distributor for Santa Cruz | Publishes bill explanations, connection procedures and distributed-generation guidance. |
| ELFEC S.A. | Distribution | Distributor for Cochabamba | Third-largest distributor by residential customers. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Distributed generation framework | DS 4477 (2021), amended by DS 5167 (2024) and DS 5549 (2026) | Government of Bolivia | Size categories, obligations and compensation principles. |
| Net metering | AETN Resolution 380/2024 – regulation on payment for energy injected into the distribution network | AETN | Monthly kWh balance with credits carried for up to 24 months. |
| Installer accreditation | AETN Resolution 301/2026 (modified by Resolution 405/2026) – register of distributed-generation installation companies | AETN | Three-year certificates; free registration. |
| Autoproducer registration | AETN Resolution 314/2026 – legal and technical requirements for autoproducers | AETN | Requires a project by a registered installer and the distributor’s interconnection viability certificate. |
| Medium-scale DG in the wholesale market | CNDC Operating Standard No. 39 – treatment of energy injected by medium-scale distributed generators | CNDC | Implements DS 5549 settlement. |
| Grid connection | Distributor technical specifications | Each distributor | Connection adjustments must follow the distributor’s technical specifications; national equipment standards for inverters were not verified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Distributor approval of distributed generation | Yes | National | The distributor approves the project, inspects the installation, verifies metering and signs a contract before connection. |
| Registered installer | Yes | National | Systems must be designed and installed by a company inscribed with AETN and enabled by the distributor. |
| AETN inscription | Limited | National | Needed for autoproducers (including remote injection and withdrawal) and an AETN authorisation for medium-scale 1–6 MW plants; not for ordinary household net metering. |
| Municipal approvals | Unknown | Local | Not verified for this profile. |
For a household, the distributor and a registered installer are the main points of approval. Connecting without the distributor’s authorisation is prohibited and can lead to fines.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net metering for distributed generation | Active | Net metering | Registered generators up to 500 kW offset exports against consumption each month, with kWh credits valid for 24 months. | Since 2021 (net metering since 2024) |
| Medium-scale distributed generation (GDME) | Active | Regulated energy price | Renewable plants of 1–6 MW on medium-voltage networks are paid an AETN stabilised price settled through the MEM. | From February 2026 |
| Tarifa Dignidad | Active | Social tariff | 25% discount for domestic customers using up to 70 kWh a month; not available to registered distributed generators. | Since 2006 |
| Senior citizens’ discount (Law 1886) | Active | Bill discount | 20% off the first 100 kWh a month for customers over 60, on one domestic connection. | — |
Data and connectivity.
- Fixed broadband
- 12.1 subscriptions per 100 people (2024)Source 5Fixed broadband subscriptions per 100 people (World Bank IT.NET.BBND.P2), not a share of households.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
With no smart-metering programme, there is no national meter communications network. Distributors offer bill checking and payment through apps and websites.
Grid conditions.
- National peak demand
- 1.76 GW (2025)Source 21SIN peak demand (potencia de punta) of 1,759.7 MW in 2025. CNDC’s live panel showed a daily maximum of 1,980 MW on 9 October 2026.
- Annual electricity demand
- 11.2 TWh (2025)Source 21SIN energy demand of 11,176.2 GWh; gross generation was 11,795.7 GWh.
- Generation capacity
- 3.53 GW (2025)Source 21Effective generation capacity of the SIN: 3,534.5 MW. Isolated systems are additional.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Effective capacity in the SIN (3,534.5 MW) is about twice the 2025 peak demand (1,759.7 MW). Most of it is gas-fired. The average wholesale purchase price in 2025 was US$57.99/MWh.
Demand outside the SIN is met by isolated systems, mainly thermal, in parts of Beni, Pando and other remote areas.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Medium-scale distributed generation (DS 5549) | Current | 18 February 2026 | Created 1–6 MW renewable generation in medium-voltage distribution networks, paid at an AETN stabilised price through the MEM, outside the generation licence regime. It also allows distributed generation at EV charging stations. |
| New installer register rules | Current | 15 May 2026 | AETN Resolution 301/2026 (modified by Resolution 405/2026) set free registration and three-year certificates for distributed-generation installers, adding a category for medium-scale projects. |
| Package of distribution-network renewable regulations | Current | 31 July 2026 | AETN presented five instruments: compensation rules for medium-scale DG, changes to the power limits for activities needing no licence, installer registry rules, autoproducer registration rules, and technical rules under DS 5616 allowing distributors to develop renewable projects. |
| Net metering for distributed generation (DS 5167) | Current | 5 June 2024 | Replaced the earlier payment mechanism with net metering for all registered generators, implemented by AETN Resolution 380/2024 from July 2024. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | Net metering with 24-month kWh credits for systems up to 500 kW and a public installer register exist, but no official rooftop-solar statistics were identified and households lose the Tarifa Dignidad if they register. |
| Distributed energy market | Medium | DG framework covers nano to macro systems, remote injection for autoproducers and, since 2026, 1–6 MW plants settled in the MEM. |
| Grid flexibility market | Low | MEM limited to registered agents; no aggregator, demand-response or ancillary-service access for small assets identified. |
| Energy storage adoption | Low | No official battery-storage capacity figures identified. |
| Renewable growth environment | Low | Solar capacity rose only from 0.177 to 0.194 GW in 2025 and wind has been flat at 0.135 GW since 2023 (IRENA); renewables were 36% of 2025 generation. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 35 sources
- Censo de Población y Vivienda 2024 – resultados principales. Instituto Nacional de Estadística (INE), 2024. accessed 9 October 2026.
- Population, total – Bolivia (SP.POP.TOTL). World Bank, 2025. accessed 9 October 2026.
- Urban population (% of total population) – Bolivia (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 9 October 2026.
- Access to electricity (% of population) – Bolivia (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 9 October 2026.
- Fixed broadband subscriptions (per 100 people) – Bolivia (IT.NET.BBND.P2). World Bank, 2024. accessed 9 October 2026.
- Anuario estadístico digital – ventas de electricidad a consumidor final en Bolivia (SIN y SA) y generación bruta. AETN, 2025. accessed 9 October 2026.
- Número de consumidores por categoría (SIN y sistemas aislados verticalmente integrados). AETN, 2025. accessed 9 October 2026.
- Evolución de la tarifa promedio a consumidor final por categoría en el SIN (¢USD/kWh sin IVA). AETN, 2025. accessed 9 October 2026.
- Tarifa promedio a consumidor final por categoría (¢USD/kWh sin IVA), SIN y SAVI. AETN, 2025. accessed 9 October 2026.
- Tarifa Dignidad – consumidores domiciliarios beneficiados e importes descontados. AETN, 2025. accessed 9 October 2026.
- Tarifa Dignidad. AETN, 2026. accessed 9 October 2026.
- Generación Distribuida. AETN, 2026. accessed 9 October 2026.
- Decreto Supremo N° 4477 (24 March 2021) – generación distribuida. Government of Bolivia (via AETN), 2021. accessed 9 October 2026.
- Decreto Supremo N° 5167 (5 June 2024) – modifies DS 4477. Government of Bolivia (via AETN), 2024. accessed 9 October 2026.
- Decreto Supremo N° 5549 (18 February 2026) – generación distribuida de media escala. Government of Bolivia (via AETN), 2026. accessed 9 October 2026.
- Resolución AETN N° 380/2024 – Reglamento de Retribución por la Energía Inyectada a la Red de Distribución. AETN, 2024. accessed 9 October 2026.
- Requisitos legales y técnicos para la inscripción como autoproductor con generación distribuida (RAETN 314/2026). AETN, 2026. accessed 9 October 2026.
- Empresas instaladoras de generación distribuida (actualizado 1 octubre 2026). AETN, 2026. accessed 9 October 2026.
- Difusión de nuevas reformas para impulsar las energías renovables en las redes de distribución. AETN, 2026. accessed 9 October 2026.
- Empresas eléctricas. AETN, 2026. accessed 9 October 2026.
- Resumen estadístico del SIN – gestión 2025; demanda del día. CNDC, 2025. accessed 9 October 2026.
- Agentes del MEM. CNDC, 2026. accessed 9 October 2026.
- Ministerio de Hidrocarburos y Energías – estructura y noticias. Ministerio de Hidrocarburos y Energías, 2026. accessed 9 October 2026.
- Generación distribuida. CRE R.L., 2026. accessed 9 October 2026.
- Aviso de cobranza por consumo de energía eléctrica (PD) – explicación. CRE R.L., 2019. accessed 9 October 2026.
- Cambio de titularidad (domiciliario). CRE R.L., 2026. accessed 9 October 2026.
- Requisitos solicitud nueva conexión (domiciliario). CRE R.L., 2026. accessed 9 October 2026.
- Descuento a personas mayores (Ley 1886). CRE R.L., 2026. accessed 9 October 2026.
- Conocé las tarifas. CRE R.L., 2026. accessed 9 October 2026.
- Preguntas frecuentes. CRE R.L., 2026. accessed 9 October 2026.
- Tipo de cambio oficial (9 October 2026). Banco Central de Bolivia, 2026. accessed 9 October 2026.
- Euro foreign exchange reference rates – USD, 9 October 2026. European Central Bank, 2026. accessed 9 October 2026.
- Share of electricity production by source – Bolivia (Ember). Our World in Data / Ember, 2025. accessed 9 October 2026.
- Installed solar PV capacity – Bolivia (IRENA). Our World in Data / IRENA, 2025. accessed 9 October 2026.
- Cumulative installed wind energy capacity – Bolivia (IRENA). Our World in Data / IRENA, 2025. accessed 9 October 2026.
Questions about energy in Bolivia.
The average residential tariff in the national interconnected system was 12.24 US cents per kWh in 2025, excluding VAT, according to the regulator AETN. Tariffs are set for each distributor and billed in bolivianos, with municipal street-lighting and refuse charges added to the bill.
No. Households are regulated customers of the distributor for their area, such as DELAPAZ in La Paz, CRE in Santa Cruz or ELFEC in Cochabamba, at tariffs approved by AETN.
Yes, through net metering. A registered system installed by an AETN-registered company can export surplus energy; each month exports are netted against consumption, and leftover kWh credits can be used for up to 24 months. Credits are not paid in cash.
The closest equivalent is the account number your distributor gives your supply, called the código fijo at CRE, shown at the top of your bill. It is unique within that distributor’s database but is not a national standardised code.
A 25% discount on the bill for domestic customers who use no more than 70 kWh a month, in place since 2006. About 965,000 customers benefited on average in 2025.
AETN regulates tariffs and the sector, the Ministry of Hydrocarbons and Energies sets policy, and CNDC operates the national interconnected system and wholesale market.
About 36% of electricity generated in 2025 came from renewable sources, mainly hydropower (28%), with biomass, solar and wind making up the rest. Natural gas supplied about 62%.