How electricity works in Paraguay.
Paraguay electricity market 2026: state utility ANDE, almost 100% hydro from Itaipu, Yacyretá and Acaray, Pliego 21 tariffs, and new self-generation rules under Law 7599/2025.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Paraguayan guaraní (PYG) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Paraguay energy at a glance.
Key figures for households in Paraguay. Each one links to its source on the full overview below.
Electricity price.
403.82 PYG per kWh for households, including taxes. Figures for 2017–2026.
Household use.
4,193 kWh a year for a typical household. Figures for 2025.
Renewable share.
99.5% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Paraguay.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Paraguay below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Paraguay requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Paraguay.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Paraguay, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Paraguay, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Paraguay.
The energy market in Paraguay, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 10 October 2026.
On this page22 sections
Paraguay’s electricity sector is dominated by a single state company, the Administración Nacional de Electricidad (ANDE), created by Law 966 of 12 August 1964 as an autonomous, decentralised state enterprise. ANDE owns and operates the national interconnected system (Sistema Interconectado Nacional, SIN), runs its own Acaray hydro plant, buys Paraguay’s share of the two binational dams, and sells electricity to almost every final customer in the country. There is no independent electricity regulator and no wholesale market: tariffs are set in ANDE’s tariff schedule (Pliego de Tarifas), approved by executive decree, and energy policy sits with the Ministry of Public Works and Communications (MOPC) through its Vice-Ministry of Mines and Energy (VMME).
Almost all of Paraguay’s electricity comes from hydropower. Itaipu (14,000 MW, shared equally with Brazil) and Yacyretá (3,200 MW, shared equally with Argentina) are binational plants on the Paraná river; ANDE’s own Acaray plant adds 210 MW. In 2025 hydropower supplied 99.5% of generation and bioenergy the rest. Gross generation was 45,569 GWh, of which 15,539 GWh was exported, mainly as Itaipu surplus ceded to Brazil and Yacyretá surplus to Argentina (VMME).
Domestic demand is growing fast. Final electricity consumption rose 15.5% in 2025 to 22,510 GWh, and peak demand on the SIN reached 5,280 MW. In December 2025 Congress replaced the 2023 renewables law with Law 7599/2025, regulated by Decree 6034 of May 2026, which lets households and businesses self-generate from solar and other non-hydro renewables, inject surpluses up to 1 MW that ANDE must accept, and receive bill credits valued at a reference tariff.
Energy snapshot.
Headline figures for electricity in Paraguay. Each shows its data year and links to its source.
- Population7,013,078 peopleSource 12025
- Households1,770,885 householdsSource 32022
- Average household sizeNot identified from a reliable public source.
- Electricity use per household4,193 kWh/yrSource 42025
- Household price (PYG)403.8 PYG/kWhSource 52017–2026
- Household price (EUR)0.063 EUR/kWhSource 172026
- Renewable electricity share99.5%Source 142025
- Solar capacity0.003 GWSource 152025
- Wind capacityNot identified from a reliable public source.
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- No independent regulator: ANDE tariffs approved by executive decree; MOPC (Vice-Ministry of Mines and Energy) is the policy body and the authority for renewable self-generation under Law 7599/2025
- System operator
- ANDE (Administración Nacional de Electricidad), owner and operator of the SIN
- Distribution networks
- ANDE distributes nationwide; two private entities, CLYFSA in Villarrica and the Mennonite colonies’ association in the Chaco, buy from ANDE and resell in their areas
- Currency
- Paraguayan guaraní (PYG)
- Voltage and frequency
- 220 V (380/√3 V) single-phase, 380 V three-phase / 50 Hz
Electricity prices in Paraguay.
- Household price (PYG)
- 403.8 PYG/kWh (2017–2026)Source 5ANDE Pliego de Tarifas No. 21, residential low-voltage category 142, price for a household using 301–500 kWh in the month (the band that includes the derived average of about 350 kWh a month). The single band price applies to the whole month’s consumption: 311.55 G/kWh up to 50 kWh, 349.89 (51–150), 365.45 (151–300), 403.82 (301–500), 420.27 (501–1,000) and 435.51 above 1,000 kWh. VMME states that Pliego 21, approved by Decree 6904 of 10 March 2017, is the schedule in force. The tariff document does not say whether VAT is included in these energy prices. ANDE’s own tariff pages could not be accessed to confirm any later adjustment.
- Household price (EUR)
- 0.063 EUR/kWh (2026)Source 17Derived: 403.82 PYG/kWh divided by 6,374.96 PYG per euro, the Banco Central del Paraguay reference rate for 9 October 2026.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household electricity prices in Paraguay are set in ANDE’s Pliego de Tarifas, which applies to every installation served by ANDE throughout the country. The schedule is approved by the executive: VMME records that Pliego 21 was approved by Decree 6904 of 10 March 2017 and remains in force. Electro-intensive industries are covered by separate decrees and contracts with ANDE (Decree 7551 of 2017).
How the residential tariff works
Category 142 has six bands, from 311.55 guaraníes per kWh for up to 50 kWh a month to 435.51 for more than 1,000 kWh. The whole month is charged at the price of the band reached, so moving from 300 to 301 kWh raises the price of every kWh. Customers are also billed a minimum number of kWh according to the load they have contracted, which is set by the limiting breaker (llave limitadora or termomagnética) of the installation. The connection fee and security deposit are calculated from the same breaker size.
Social tariff
Law 3480/2008 gives family users consuming up to 300 kWh a month discounts of 25% to 75% on the residential tariff, inclusive of VAT, through category 141. Eligibility depends on the requirements of the law and its regulations, and the supply must have a breaker of up to 16 A.
Low prices in context
At about €0.06 per kWh at October 2026 exchange rates, household tariffs reflect a system supplied almost entirely by large, long-established hydro plants.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | All households served by ANDE pay the residential low-voltage tariff (category 142) for contracted loads up to 30 kW. There are six consumption bands, and the price of the band reached applies to the whole month’s consumption rather than in steps. ANDE also bills a minimum monthly consumption tied to the contracted load: 15 kWh up to 3 kW, rising to 240 kWh above 24 kW. |
| Other | Yes | Social tariff (category 141) under Law 3480/2008 for eligible family users and water-sanitation boards with a breaker of up to 16 A and use of up to 300 kWh a month: discounts of 75% for 0–100 kWh, 50% for 101–200 kWh and 25% for 201–300 kWh on the normal residential tariff. |
| Time-of-use | Limited | Pliego 21 defines peak hours (18:00–22:00 in summer, 17:00–21:00 in winter, Monday to Saturday) for medium- and high-voltage binomial tariffs. No time-of-use option for households was identified. |
| Dynamic | No | There is no wholesale market and no spot-linked tariff; ANDE sets prices through its regulated tariff schedule. |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,193 kWh/yr (2025)Source 4Derived: 7,425.63 GWh of residential electricity consumption in 2025 (VMME National Energy Balance) divided by 1,770,885 households in the 2022 census (INE). The household count is three years older than the consumption figure, so the true 2025 average per household is likely somewhat lower.
- Average daily use per household
- 11.5 kWh/day (2025)Source 4Derived: 4,193 kWh a year per household divided by 365 (see consumptionPerHousehold for the caveat on years).
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 4,228 kWh/person/yr (2025)Source 16All-sector electricity demand per person (Ember via Our World in Data).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 53.2 % of homes (2022)Source 3Derived: 930,301 occupied private dwellings with an air conditioner, summed from the departmental and Asunción tables of the 2022 census, divided by 1,749,336 occupied private dwellings. Ownership is highest in Asunción (81.1%).
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households used 7,426 GWh of electricity in 2025, 33.0% of final electricity consumption and the largest single sector (VMME). Electricity supplied 49.3% of all energy used in homes in 2025, ahead of biomass (40.0%, mainly firewood and charcoal) and LPG (about 10.7%). VMME notes a continuing shift towards electric cooking and that national electricity consumption overtook solid biomass for the first time in 2025.
Average use is high for the region, at roughly 4,200 kWh a year per household on the figures available. The climate is subtropical, with hot summers, and the 2022 census found air conditioners in about 53% of occupied dwellings and electric showers in a majority of homes in most departments. Demand peaks in summer: the 2025 SIN maximum of 5,280 MW occurred in December.
Outside households, the fastest growth is in the “other sectors” group, whose electricity use rose 49% in 2025 to 6,796 GWh.
Housing and households.
- Dwellings
- 1,749,336 dwellings (2022)Source 3Occupied private dwellings in the 2022 census, up from 1,223,165 in 2012. 98.6% had electricity.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 92.7% (2022)Source 3Derived: 1,621,209 dwellings classed as “casa o rancho” (house or rural dwelling) out of 1,749,336 occupied private dwellings. A further 3.9% were rented rooms (pieza de inquilinato) and 0.9% other types.
- Apartments and flats
- 2.5% (2022)Source 3Derived: 44,145 apartments (departamento o piso) out of 1,749,336 occupied private dwellings. In Asunción the share is 12.7%.
- Urban population
- 70.4% (2025)Source 1World Bank estimate (70.39%).
Paraguay’s housing stock is overwhelmingly made up of single houses: only about 2.5% of occupied dwellings were apartments in 2022, rising to 12.7% in the capital. Most homes therefore have their own roof and their own ANDE supply, which in principle suits rooftop solar. About seven in ten people live in urban areas, concentrated in Asunción, the surrounding Central department and Ciudad del Este (Alto Paraná).
Electricity reaches almost every home: 98.6% of occupied dwellings had electricity in the 2022 census, and the World Bank reports access for 99.8% of the population in 2024. Census data on housing tenure could not be verified for this profile.
How the grid works in Paraguay.
- TransmissionANDE – Administración Nacional de Electricidad
- DistributionANDE distributes nationwide; two private entities, CLYFSA in Villarrica and the Mennonite colonies’ association in the Chaco, buy from ANDE and resell in their areas
- MeteringANDE
- Supply1 or more retail suppliers
Power flows from three large hydro plants on the Paraná river system (Itaipu, Yacyretá and Acaray) into ANDE’s 500 kV and 220 kV transmission network, then through 66 kV and 23 kV lines to low-voltage distribution. ANDE is both the system operator and almost the only retailer, so there is no wholesale market, balancing market or supplier settlement process.
Binational dams
Itaipu (14,000 MW) and Yacyretá (3,200 MW) are owned in equal shares with Brazil and Argentina. Paraguay uses only part of its share; the rest is exported or ceded to the partner country. In 2025 exports were 15,539 GWh: 10,456 GWh of Itaipu surplus to Brazil and 5,084 GWh to Argentina, almost all Yacyretá surplus (VMME).
Losses and demand growth
Network losses were 7,191 GWh in 2025, a loss index of 24.4% of energy available for the domestic system, down from 26.5% in 2024. About 82% of losses occur in distribution. Peak demand rose 5.0% to 5,280 MW in 2025, and VMME’s transmission planning assumed peak-demand growth of about 6.6% a year over 2021–2030.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministerio de Obras Públicas y Comunicaciones (MOPC) – Viceministerio de Minas y Energía (VMME) | Sets energy policy, publishes the National Energy Balance and is the enforcement authority under Law 7599/2025: it licenses renewable projects above 1 MW, keeps the public ERNC register, sets the Reference Tariff for self-generators’ surplus and issues the guidelines for connection to the SIN. |
| TSO | ANDE – Administración Nacional de Electricidad | State-owned, vertically integrated utility. It owns and operates transmission at 500, 220 and 66 kV, dispatches the SIN, runs the Acaray plant, takes Paraguay’s share of Itaipu and Yacyretá energy, and supplies almost all final customers. |
| DSO | ANDE (distribution) | Distributes at 23 kV and low voltage (380 V three-phase, 220 V single-phase) across the country. Connection works for self-generators must meet ANDE’s technical standards. |
| Supplier | CLYFSA and the Mennonite colonies’ association | According to VMME, the Compañía de Luz y Fuerza de Villarrica (CLYFSA) and the Asociación de Colonias Menonitas buy energy from ANDE and resell it to customers in their own service areas. |
| Metering | ANDE | Installs and reads customer meters. Under Decree 6034/2026, a self-generator pays for the four-quadrant bidirectional meter, which then passes to ANDE ownership at no cost. |
Compared with the UK system.
| UK concept | Paraguay equivalent | How it works |
|---|---|---|
| DNO | ANDE (or CLYFSA / Mennonite cooperatives in their areas) | There are no separate regional network companies. ANDE owns the distribution network nationally, apart from two small areas where private entities resell ANDE energy. |
| National Grid/NESO | ANDE | ANDE owns the transmission network and dispatches the SIN itself. The binational dams are run by Itaipu Binacional and the Entidad Binacional Yacyretá, which deliver Paraguay’s half of their output to ANDE. |
| MPAN | ANDE customer supply account (identifier not verified) | Each supply is a contract with ANDE at a given voltage and contracted load. There is no national standardised supply-point number designed for supplier switching, because there is no retail choice. |
| MPRN | No equivalent for electricity customers | No gas supply-point concept was identified; VMME data show homes use LPG, firewood and charcoal alongside electricity. |
| Meter operator | ANDE | Metering is part of ANDE’s monopoly service. Self-generators must fund a bidirectional meter that becomes ANDE property. |
| Supplier | ANDE (no choice) | Households cannot choose a supplier. Only “Large Consumers” with demand of at least 30 MW may buy directly from renewable generators under Law 7599, paying ANDE a transmission toll. |
| Smart-meter infrastructure | No national programme identified | No national smart-meter rollout, data hub or communications standard was identified from official sources. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | ANDE supply account (local name not verified) |
| Who issues it? | ANDE (or CLYFSA / Mennonite cooperative in their areas) |
| Format | Not verified. ANDE’s customer pages, where the account identifier printed on bills is explained, could not be accessed for this profile. |
| Length | Not verified |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the monthly ANDE bill; the exact label could not be verified from an official page. |
| Electronic access | Not verified from official sources for this profile. |
| Third-party access | No regulated third-party data-access scheme was identified. |
| Who keeps the register | ANDE’s commercial system. There is no separate national supply-point register; renewable self-generators are additionally entered in the MOPC’s public ERNC register. |
| Register scope | National |
A Paraguayan home’s supply is a contract with ANDE defined by its delivery voltage and contracted load. For low-voltage customers, the contracted load is set by the limiting breaker (llave limitadora or termomagnética) installed at the property. The breaker size determines the connection fee, the security deposit and the minimum monthly kWh that ANDE bills. The tariff category (for example 142 residential or 141 social) is attached to the same supply.
The supply point in law
Law 7599/2025 defines the supply point (punto de suministro) as the point where a self-generator, cogenerator, generator or exporter connects to the SIN, and the owner is responsible for keeping their installations in sound technical and safety condition. Decree 6034/2026 confirms that a self-generator injects its surplus at this point, which is the same ANDE supply point used for consumption. Credits for injected energy are recorded on the bill for that supply.
How it differs from an MPAN
Because ANDE is the only supplier for nearly all customers, the account identifier is used for billing, payment and service requests, not for switching. No national format, check digit or open-data register was identified. The local name and format of the identifier could not be verified, because ANDE’s website blocks automated access, so no example is given.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Net billing: injected energy is valued at the ERNC Reference Tariff (peak and off-peak), set each year by the MOPC from ANDE’s average generation cost, and credited against the bill. Cash is paid if the credit stays positive for six consecutive months. |
| Must ANDE accept exported energy? | Yes, if the injected power does not exceed 1 MW (Law 7599, Art. 12). Above 1 MW, ANDE may take the surplus at its discretion, considering system needs and network capacity. |
| How are credits valued? | Each month, energy supplied by ANDE is valued at the customer’s tariff and injected energy at the ERNC Reference Tariff. Any positive balance is carried forward against later consumption (Decree 6034, Art. 30). |
| Can surplus be paid in cash? | Yes. If the credit stays positive for six consecutive months, the self-generator is entitled to be paid the accumulated balance in money. |
| Can credits be transferred? | Yes. Credits may be assigned to third parties under conditions to be set by MOPC resolution, and the assignment must be notified to ANDE. |
| Who pays for grid reinforcement? | The self-generator pays for connection works. Where ANDE’s network must be reinforced, ANDE reimburses up to 50% of the cost through 20% discounts on the bill over two years (Law 7599, Art. 15). |
| Is there a capacity cap for distributed generation? | ANDE must report each year to the MOPC on the maximum self-generation capacity the SIN can absorb over the following two years and on suitable locations. The report is to be published on the MOPC and ANDE websites. |
Connecting a home system.
- Design a renewable self-generation system (solar, wind, biomass or geothermal; not hydro) mainly for own consumption.
- Register with the MOPC in the public ERNC register (projects up to 1 MW); projects above 1 MW need an ERNC licence of up to 30 years.
- Sign a Connection and Supply Contract (Contrato de Conexión y Suministro ERNC) with ANDE or the local concessionaire, following MOPC guidelines.
- Fund the connection works, including the four-quadrant bidirectional meter, built to ANDE technical standards.
- Inject surplus energy and receive monthly credits on the ANDE bill at the Reference Tariff.
Self-generation from non-hydro renewables was first regulated by Law 6977/2023. Law 7599, promulgated on 7 December 2025 and published in corrected form in the Official Gazette on 12 December 2025, repealed and replaced it. Decree 6034 of 19 May 2026 regulates the new law.
The scheme is a net-billing arrangement rather than one-for-one net metering. Consumption is charged at the normal ANDE tariff, while exports are valued at the ERNC Reference Tariff. This is based on ANDE’s cost of generation, own and purchased, by time band and voltage level, including technical losses. ANDE must send its cost report by 31 March each year. The law exempts self-generators from fees for their first five years of supply, after which the MOPC may set a fee of up to 1% of transactions.
A self-generator may also sell its whole surplus to a Large Consumer (at least 30 MW of demand) at a freely agreed price, paying a transmission toll to ANDE, and may supply related activities on the same premises.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (non-hydro renewables) | ERNC licence from the MOPC for projects above 1 MW (up to 30 years, renewable); registration only in the ERNC register for self-generators and cogenerators up to 1 MW | MOPC (VMME) | Law 7599/2025, Arts. 8 and 10. Licence applications must include a project description, site, environmental authorisation where applicable, installed capacity and the connection point. |
| Self-consumption with export | Registration in the ERNC register (up to 1 MW) plus a Connection and Supply Contract with ANDE | MOPC; ANDE | ANDE must accept surpluses up to 1 MW of injected power. The same generating equipment may not be used by more than one self-generator. |
| Sell to third parties | Only to a Large Consumer ERNC (demand of at least 30 MW) under a purchase contract, plus a transport contract and toll with ANDE | MOPC; ANDE | Large Consumers buy for their own use and may not resell. Households cannot buy from anyone other than ANDE. |
| Supply / retail to households | Not open to competition | ANDE | ANDE supplies nationally. CLYFSA and the Mennonite colonies’ association resell ANDE energy in their areas. |
| Export electricity abroad | ERNC Exporter licence from the MOPC and an export contract with a foreign buyer, plus a transport contract with ANDE | MOPC; ANDE | ANDE allocates transmission capacity for exports each year (requests by 1 July), using price contests if capacity is short. |
| Store energy | No standalone storage licence category identified; ANDE tenders for renewable supply may include storage or be for storage alone | ANDE; MOPC | Law 7599 defines energy storage systems (Art. 4) and Decree 6034 allows storage in ANDE tenders. |
| Aggregate, trade, balancing, grid services, VPP | No framework | — | There is no wholesale, balancing or ancillary-services market open to third parties; ANDE runs the system directly. |
| Remote control of customer assets | No specific rule identified | — | Connection contracts must cover power quality, metering and suspension conditions under MOPC guidelines. |
Licensing in Paraguay is built around the state monopoly. Hydro generation and the binational dams sit outside Law 7599. Independent production and transmission of electricity are governed by Law 3009/2006, which was amended by Law 7299/2024. For non-hydro renewables, the MOPC grants licences above 1 MW and keeps the public ERNC register of self-generators, cogenerators, generators and exporters. ANDE may buy from licensed renewable generators through international public tenders for contracts of up to 30 years.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale energy | No | — | No | ANDE. There is no wholesale market. ANDE buys Paraguay’s share of binational hydro output and may contract renewable generators by tender. |
| Ancillary / balancing services | No | — | No | ANDE. Frequency and reserve services are provided within ANDE’s own operation of the SIN; no third-party market was identified. |
Distributed resources cannot take part in energy or flexibility markets, because none exist outside ANDE. Rooftop systems can export under the Law 7599 net-billing scheme, and credits can be assigned to third parties, but there is no aggregator role or demand-response programme in the regulations reviewed.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national programme identified |
| Reading interval | Not identified |
| Meter for self-generators | Four-quadrant bidirectional meter, paid for by the self-generator and transferred to ANDE (Decree 6034/2026) |
| Meter owner | ANDE |
No national smart-meter programme, penetration figure or data-access arrangement was identified from official sources. The 2026 self-generation rules require bidirectional metering for anyone exporting, with the technical requirements to be set in MOPC guidelines and ANDE’s connection contracts.
Renewable electricity.
Electricity generation mix (2025).
- Hydropower: 99.5%
- Bioenergy: 0.5%
- Renewable electricity share
- 99.5% (2025)Source 14Share of generation (Ember via Our World in Data): hydropower 99.47%, bioenergy 0.53%. Paraguay is a large net exporter (net imports of −15.7 TWh in 2025), so a consumption-based share would be no lower. VMME also records 14.6 GWh of solar generation in 2025, which rounds to zero in the Ember series.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 1.95 MW (2025)Source 15Derived: 3.116 MW in 2025 minus 1.166 MW in 2024 (IRENA via Our World in Data).
- Itaipu (binational, 50% Paraguay)
- 14,000 MWSource 7Total installed capacity, shared equally with Brazil.
- Yacyretá (binational, 50% Paraguay)
- 3,200 MWSource 7Total installed capacity, shared equally with Argentina.
- Acaray (ANDE)
- 210 MWSource 7
- Solar PV
- 3.1 MW (2025)Source 15
Targets.
- National Energy Policy to 2050 approved by Decree 2553/2024 (replacing the 2040 policy of Decree 6092/2016).
- Law 7599/2025 aims to diversify generation with non-hydro renewables and to gradually reduce reliance on forest biomass and hydrocarbons.
Paraguay’s electricity is almost entirely renewable because of hydropower. Non-hydro renewables are tiny: solar generated 14.6 GWh in 2025, 2.3 times the 2024 level but still a small fraction of total output, and the VMME balance records solar self-generation in the Mennonite colonies. Wind speeds are low over most of the country; VMME cites potential only in a few areas and for small isolated systems in the Chaco.
Biomass matters far more for final energy than for electricity. Firewood and charcoal still supplied 40% of household energy in 2025, and bioenergy is used widely in industry. Law 7599 and Decree 6034 now let ANDE tender for solar and other renewables, with or without storage, to meet domestic demand growth.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage was recognised in law for the first time by Law 7599/2025. It defines energy storage systems, including electrochemical batteries and pumped hydro, as technologies that store energy for later release to improve flexibility, reliability and the integration of non-hydro renewables. Under Decree 6034/2026, ANDE tenders for renewable energy may include storage or be held for storage alone. No operating projects were identified.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| ANDE – Administración Nacional de Electricidad | Supplies almost all customers nationally | No | Limited | No | Yes |
ANDE is the sole electricity seller for almost all of Paraguay. VMME lists two private exceptions: the Compañía de Luz y Fuerza de Villarrica (CLYFSA) and the Asociación de Colonias Menonitas in the Chaco, which buy energy from ANDE and resell it in their service areas. Because all supply is hydro-based, no separate “green” tariff exists.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Viceministerio de Minas y Energía (MOPC) | Government | Energy policy, energy balance, ERNC licensing and register | Authority for renewable self-generation, Reference Tariff and connection guidelines under Law 7599/2025. |
| ANDE – Administración Nacional de Electricidad | Transmission | State utility: transmission, distribution, supply and system operation | Every household connection, tariff and export contract runs through ANDE. |
| Itaipu Binacional | Renewable Energy | Operator of the 14,000 MW Itaipu dam (Paraguay–Brazil) | Source of most of Paraguay’s electricity and of its exports to Brazil. |
| Entidad Binacional Yacyretá (EBY) | Renewable Energy | Operator of the 3,200 MW Yacyretá dam (Paraguay–Argentina) | Second binational hydro source; surplus exported to Argentina. |
| Instituto Nacional de Estadística (INE) | Consumer | National statistics office | Census data on households, dwellings and appliance ownership. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | ANDE technical standards and specifications; MOPC connection guidelines under Decree 6034/2026 | ANDE; MOPC | Connection works for self-generators must meet ANDE’s standards (Law 7599, Art. 15). MOPC guidelines must cover connection point, voltage level, power quality, tests and certifications, and metering. |
| Metering | Four-quadrant bidirectional meter | MOPC / ANDE | Required for self-generators; detailed requirements set in the Connection and Supply Contract. |
| Supply voltages | ANDE Pliego de Tarifas No. 21 | ANDE | Standard delivery voltages: 220 kV, 66 kV, 23 kV and 380 V three-phase (380/√3 V single-phase). |
| Installer accreditation | None identified | — | No national register of solar installers was identified. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Registration in the ERNC register | Yes | National | Required for self-generators and cogenerators up to 1 MW; above 1 MW an ERNC licence is needed. |
| Connection and Supply Contract with ANDE | Yes | National | Needed to connect to the SIN and inject surpluses; signed after registration or licensing. |
| Environmental authorisation | Limited | National | Licence applications must include prior environmental authorisation “if applicable” (Decree 6034). |
| Planning / building permission | Limited | Local | No national rule specific to rooftop solar was identified; municipal requirements may apply. |
For a household system, the essential steps are registration with the MOPC and a contract with ANDE. The MOPC must publish its administrative procedures on its website, and ANDE has to certify network capacity for larger injections.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net billing for renewable self-generators (Law 7599/2025) | Active | Net billing | Surplus injected up to 1 MW must be accepted by ANDE and is credited at the ERNC Reference Tariff; positive balances are paid in cash after six months. | From December 2025; regulated by Decree 6034 of May 2026 |
| Fee exemption for ERNC generators | Active | Fee exemption | No fees may be charged to ERNC self-generators, generators or exporters for their first five years of supply; afterwards the MOPC may set a fee of up to 1% of transactions. | — |
| Investment incentive regimes | Active | Tax incentives | ERNC projects may use the general investment incentive law (Law 60/90), the free-zone regime (Law 523/1995) and Laws 117/1991 and 5542/2015 from the pre-operational stage onwards. | — |
| Social tariff (Law 3480/2008) | Active | Bill discount | Discounts of 25–75% for eligible family users consuming up to 300 kWh a month. | — |
Data and connectivity.
- Fixed broadband
- 12.9 fixed subscriptions per 100 people (2023)Source 2
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
In the 2022 census about 56% of occupied dwellings had an internet connection (976,438 of 1,749,336, summed from INE departmental tables), and in Asunción 79%. No smart-meter communications standard was identified.
Grid conditions.
- National peak demand
- 5.28 GW (2025)Source 4SIN maximum demand of 5,280 MW in December 2025, up 5.0% from 5,027 MW in 2024.
- Annual electricity demand
- 29.4 TWh (2025)Source 4Electricity for total domestic demand (final consumption plus ANDE own use plus losses): 29,431.80 GWh. Final consumption alone was 22,509.5 GWh.
- Generation capacity
- 8.82 GWSource 7Derived Paraguayan share: 50% of Itaipu (7,000 MW) plus 50% of Yacyretá (1,600 MW) plus Acaray (210 MW) and Chaco thermal units (6.1 MW), from a VMME page last updated in 2021. Physical installed capacity at the three hydro plants totals 17,410 MW.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
Paraguay has far more generation than it uses, but its constraint is the network. Losses are high (24.4% in 2025), and VMME planning listed 221 transmission and transformation works needed over 2021–2030 on the 220 kV and 500 kV corridors. Fast-growing large loads add to the pressure on the network.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Law 7599/2025 on non-hydro renewables | Current | 7 December 2025 (published 11–12 December 2025) | Replaced Law 6977/2023. Covers self-generation, cogeneration, IPPs, exports, large consumers and storage, with the MOPC as authority. |
| Decree 6034/2026 regulating Law 7599 | Current | 19 May 2026 | Sets credit calculation, cash settlement, metering, connection works, licensing content and ANDE tender rules (including storage). |
| MOPC implementing resolutions | Upcoming | Not confirmed | Decree 6034 requires MOPC resolutions on connection guidelines, contract guidelines, the annual Reference Tariff, credit assignment and licence procedures. Their publication could not be confirmed. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | High | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | National solar capacity was about 3.1 MW in 2025 (IRENA). A net-billing scheme exists under Law 7599, but very low tariffs limit savings. |
| Distributed energy market | Low | Self-generation was regulated in 2023 and modernised in 2025–2026; solar output was 14.6 GWh in 2025. |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market; ANDE operates the system as a vertically integrated monopoly. |
| Energy storage adoption | Low | Storage defined in law only since December 2025; no operating projects identified. |
| Renewable growth environment | Low | Generation is already about 99.5% renewable (hydro); additions of non-hydro capacity were about 2 MW in 2025. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 17 sources
- World Development Indicators: population, urban population, access to electricity – Paraguay. World Bank, 2025. accessed 10 October 2026.
- Fixed broadband subscriptions (per 100 people) – Paraguay. World Bank, 2023. accessed 10 October 2026.
- Censo Nacional de Población y Viviendas 2022 – Caracterización de viviendas y hogar (resultados finales). Instituto Nacional de Estadística (INE), 2022. accessed 10 October 2026.
- Balance Energético Nacional 2025. Viceministerio de Minas y Energía (MOPC), 2025. accessed 10 October 2026.
- ANDE Pliego de Tarifas No. 21. ANDE, published by the Viceministerio de Minas y Energía, 2017. accessed 10 October 2026.
- Comercialización (electricity sales and tariffs). Viceministerio de Minas y Energía (MOPC). accessed 10 October 2026.
- Generación (generation plants). Viceministerio de Minas y Energía (MOPC), 2021. accessed 10 October 2026.
- Transmisión y Distribución. Viceministerio de Minas y Energía (MOPC). accessed 10 October 2026.
- Ley No. 7599 de modernización del régimen que regula y fomenta la generación de energía eléctrica a partir de fuentes de energías renovables no convencionales no hidráulicas (Gaceta Oficial No. 301). Gaceta Oficial de la República del Paraguay, via VMME, 2025. accessed 10 October 2026.
- Decreto No. 6034 por el cual se reglamenta la Ley No. 7599/2025. Presidencia de la República / MOPC, 2026. accessed 10 October 2026.
- Decretos – Sector Recursos Energéticos. Viceministerio de Minas y Energía (MOPC). accessed 10 October 2026.
- Leyes – Sector Recursos Energéticos. Viceministerio de Minas y Energía (MOPC). accessed 10 October 2026.
- Energía solar y eólica. Viceministerio de Minas y Energía (MOPC). accessed 10 October 2026.
- Share of electricity generation by source – Paraguay (Ember). Our World in Data, 2025. accessed 10 October 2026.
- Installed solar PV capacity – Paraguay (IRENA). Our World in Data, 2025. accessed 10 October 2026.
- Per capita electricity demand – Paraguay (Ember). Our World in Data, 2025. accessed 10 October 2026.
- Cotizaciones de monedas – 9 October 2026. Banco Central del Paraguay, 2026. accessed 10 October 2026.
Questions about energy in Paraguay.
Under ANDE’s Pliego de Tarifas No. 21, residential prices range from 311.55 guaraníes per kWh (up to 50 kWh a month) to 435.51 (above 1,000 kWh). A household using 301–500 kWh pays 403.82 G/kWh, about €0.063 at October 2026 exchange rates.
The state company ANDE generates, transmits, distributes and sells electricity to almost all customers. Households cannot choose a supplier.
Yes. About 99.5% of generation in 2025 was hydropower, mainly from the binational Itaipu and Yacyretá dams, and the rest bioenergy.
Yes. Under Law 7599/2025 and Decree 6034/2026, registered self-generators can inject surplus energy. ANDE must accept up to 1 MW of injected power. Exports are credited at the ERNC Reference Tariff, and balances that stay positive for six months are paid in cash.
Not for systems up to 1 MW: these only need registration in the MOPC’s ERNC register and a connection contract with ANDE. Projects above 1 MW need an ERNC licence.
There is no standardised supply-point number. Each home has a supply contract with ANDE, defined by its tariff category and the contracted load set by its breaker, and is identified by ANDE’s own customer account. With no supplier switching, there is no national switching register.