Countries

Energy in Chad, explained.

How electricity works in Chad: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 10 October 2026.

Olmack in Chad: Not yet available.Olmack is not offered in Chad yet. The market information on this page is provided for reference. Information last checked 10 October 2026.
Energy-market overview

How electricity works in Chad.

Chad electricity 2026: SNE utility regulated by ARSE under Law 036/PR/2019, 13% access, thermal-led supply, 65 MW of solar under construction and a Cameroon link.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Central African CFA franc (XAF) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Chad energy at a glance.

Key figures for households in Chad. Each one links to its source on the full overview below.

  • Electricity price.

    85 XAF per kWh for households, including taxes. Figures for 2022.

  • Renewable share.

    5.7% of electricity from renewable sources. Figures for 2021.

  • Selling back to the grid.

    Can homes export electricity? Limited. Details are in the export section below.

Before you start

Four things to check in Chad.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Chad below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Chad requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Chad.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Chad, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Chad, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Chad.

Full overview

The energy market in Chad, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 10 October 2026.

On this page22 sections

Chad has one of the lowest rates of electricity access in the world: the World Bank estimates that 13.4% of the population had access in 2024, up from 10.9% in 2020. Supply has long relied on diesel and heavy-fuel-oil power stations. In its 2022 appraisal of the Chad Energy Access Scale Up Project, the World Bank described about 150 MW of thermal capacity serving N’Djamena and about 25 MW installed across 12 secondary cities, where only around 10 MW of 29 MW installed was available.

The sector is organised by Law No. 036/PR/2019 of 26 August 2019 on the electricity sector, which opened generation and distribution to private participation, created the regulator — the Autorité de Régulation du Secteur de l’Énergie Électrique (ARSE) — and widened the remit of the rural electrification agency ADERM. The national utility, the Société Nationale d’Électricité (SNE), serves N’Djamena and secondary cities and implements the Chad side of the Cameroon interconnection project. In rural towns, private operators run mini-grids under 20-year concessions awarded through state tenders supervised by ARSE.

ARSE reports that electricity consumption reached 737.9 GWh in 2025. Two solar plants totalling about 65 MW — 35 MWc at Ambougouna and 30 MW at Klessoum — were under construction in October 2026, and a 225 kV interconnection with Cameroon is being built with World Bank financing.

Energy snapshot.

Headline figures for electricity in Chad. Each shows its data year and links to its source.

  • Population21,003,705 peopleSource 12025
  • HouseholdsNot identified from a reliable public source.
  • Average household size5.8 people/householdSource 112014–15
  • Electricity use per householdNot identified from a reliable public source.
  • Household price (XAF)85 XAF/kWhSource 72022
  • Household price (EUR)0.129 EUR/kWhSource 62022
  • Renewable electricity share5.72%Source 42021
  • Solar capacityNot identified from a reliable public source.
  • Wind capacityNot identified from a reliable public source.
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter shareNot identified from a reliable public source.
Market structure
Vertically integrated
Homes can export to the grid
Limited
Home equipment in grid services
No
Regulator
Autorité de Régulation du Secteur de l’Énergie Électrique (ARSE)
System operator
Société Nationale d’Électricité (SNE), the state utility operating the N’Djamena and secondary-city networks
Distribution networks
SNE serves N’Djamena and secondary cities; private concessionaires operate rural mini-grids under 20-year concessions
Currency
Central African CFA franc (XAF)
Voltage and frequency
Not confirmed from an official source

Electricity prices in Chad.

Household price (XAF)
85 XAF/kWh (2022)Source 7The World Bank reported in March 2022 that residential tariffs ranged from CFAF 85/kWh (US$0.15) to CFAF 125/kWh (US$0.22), against an average production cost of about US$0.22/kWh. The lower end of the range is shown. No current official tariff schedule was readable from ARSE or SNE.
Household price (EUR)
0.129 EUR/kWh (2022)Source 6Converted from CFAF 85/kWh at about 657.6 XAF per euro, derived from World Bank 2025 average official exchange rates (581.93 XAF per US$ ÷ 0.88497 EUR per US$). The CFA franc is pegged to the euro. The upper end of the residential range (CFAF 125/kWh) is about EUR 0.19/kWh.
Typical annual electricity bill
Not identified from a reliable public source.

How tariffs are set

Under Law 036/PR/2019, ARSE examines and validates the tariffs charged to consumers. Retail prices for SNE customers are regulated and, according to the World Bank, have been set below the cost of supply: in 2022 residential tariffs ranged from CFAF 85 to CFAF 125 per kWh, while average production cost was about US$0.22/kWh, and diesel generation in off-grid areas costs more than US$0.5/kWh. Government subsidies to the sector were about US$84 million in 2019 (0.8% of GDP).

Why costs are high

Almost all grid electricity comes from diesel and heavy-fuel-oil plants, so costs track fuel prices. The World Bank put technical and commercial losses at about 40% and payment collection at only about 50%. In March 2026 an IMF mission discussed with ARSE electricity pricing mechanisms, tariff structure and adjustment, and market structure.

Outlook

Lower-cost supply is expected from the solar plants under construction and, once complete, imports over the Cameroon–Chad interconnection, which the World Bank says will enable affordable electricity imports from southern Cameroon.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesTariffs are examined and validated by ARSE under Law 036/PR/2019. The World Bank reported residential tariffs of CFAF 85–125/kWh in 2022, below the average production cost of about US$0.22/kWh.
PrepaymentLimitedThe Cameroon–Chad Power Interconnection Project provides about 100,000 smart/prepaid meters with commercial management and billing systems for N’Djamena. Current coverage was not published.
OtherYesRural mini-grid concessionaires charge tariffs set within the concession framework; in March 2026 ARSE and ADERM discussed how to structure these networks and make pricing fairer.
Time-of-useNoNo time-of-use tariff identified.
DynamicNoThere is no wholesale market, so no market-linked tariffs exist.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
Not identified from a reliable public source.
Average daily use per household
Not identified from a reliable public source.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
35.1 kWh/person/yr (2025)Source 12Derived, all sectors: 737.9 GWh consumption in 2025 (ARSE) ÷ 21,003,705 people (World Bank, 2025).
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
0 % of homes (2014–15)Source 11DHS 2014–15: 0% of households cooked with electricity, 3.1% with LPG/gas and 87.7% with wood.

Electricity plays a small part in household energy use. In the 2014–15 Demographic and Health Survey only 7.7% of households had electricity, and 87.7% cooked with wood. Grid access remains concentrated in towns: the World Bank reported in 2022 that about 20% of urban residents but less than 1% of rural residents had access, and that only about a third of N’Djamena was connected.

ARSE reports national consumption of 737.9 GWh in 2025, equivalent to about 35 kWh per person a year. Where the grid is absent or unreliable, households and businesses use diesel generators and, increasingly, solar home systems; the World Bank-financed energy access project had provided solar home systems to 30,000 households by December 2024, with 115,000 more in progress.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
27.6 % of population (2025)Source 2World Bank estimate (27.57%).

Chad is predominantly rural: the World Bank estimates that 27.6% of the population lived in urban areas in 2025. Average household size was 5.8 people in the 2014–15 DHS. Official data on tenure and dwelling types were not available in a readable form.

The country also hosts a large displaced population. The World Bank reported about 560,000 refugees and asylum seekers in 20 camps across nine provinces, and more than 406,000 internally displaced people, in December 2021; electrification of these areas relies mainly on off-grid solar.

How the grid works in Chad.

  1. TransmissionSNE, SNE
  2. DistributionSNE serves N’Djamena and secondary cities; private concessionaires operate rural mini-grids under 20-year concessions
  3. MeteringSNE
  4. Supply1 or more retail suppliers

Physical structure

According to the World Bank (2022), all existing grid generation is diesel or heavy fuel oil: about 150 MW serves N’Djamena, and 12 secondary cities have about 25 MW installed between them, of which only around 10 MW was available. These systems are isolated from one another. ARSE reported 737.9 GWh of consumption in 2025.

New supply

ARSE reported in October 2026 that two solar plants were under construction: 35 MWc at Ambougouna under the RESPITE project and 30 MW at Klessoum developed by Scatec, together about 65 MW. ARSE also lists solar-plus-storage projects by Savannah Energy (300 MW in southern Chad and 100 MW for the capital), thermal power agreements with K Énergie (2024), and a 3 MWc solar plant with electrification of 20 rural localities under an ONEE–SNE agreement funded by the Islamic Development Bank and signed on 24 February 2025.

Interconnection with Cameroon

The Cameroon–Chad Power Interconnection Project (World Bank P168185) includes a 225 kV single-circuit line of 196 km from Maroua through Kousseri to the Chad border, fed from Cameroon’s southern grid. Its Chad component finances network densification in N’Djamena, about 100,000 smart/prepaid meters, SCADA and commercial management and billing systems. The project closing date was set at 31 December 2027, and its results framework targets 438,000 MWh a year of electricity traded between the two countries.

Commercial flow

No wholesale electricity market was identified. SNE sells to its customers at tariffs validated by ARSE, and new independent producers are contracted project by project. Third-party access to networks is governed by Decree 1840, and production licences by Decree 1841.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry responsible for energyResponsible for energy policy. The implementing decrees of the 2019 electricity law, including the ARSE organisation decree (No. 1842/PR/MPME/2019), carry the ministry’s reference.
RegulatorAutorité de Régulation du Secteur de l’Énergie Électrique (ARSE)Created by Law 036/PR/2019 of 26 August 2019 and organised by Decree 1842/PR/MPME/2019 of 8 November 2019. A public administrative body with legal personality and management autonomy. Issues and renews licences and authorisations for production, transport, distribution and sale of electricity, validates tariffs, oversees public–private partnerships, audits and inspects operators and handles consumer complaints.
SupplierSociété Nationale d’Électricité (SNE)National utility. Serves about a third of N’Djamena and about 22,000 customers in 12 secondary cities (World Bank, 2022), and implements the Chad components of the Cameroon–Chad interconnection project.
TSOSNENo separate transmission company identified; SNE implements the transmission investments. The law provides for notional unbundling of generation, transmission and distribution; transmission conditions are set by Decree 1843.
DSOSNE and rural mini-grid concessionairesSNE distributes in the capital and secondary cities. ARSE lists nine independent mini-grid operators — ZIZ Énergie, Alternaprod, Denali, Green Energy, Sahel Énergie, Enerso, GSU, SRN and Set Power — selected through state concession tenders for 20-year periods covering specific localities.
System operatorSNEOperates the separate, isolated thermal networks of N’Djamena and the secondary cities.
MeteringSNEInstalls and reads meters for its customers; about 100,000 smart/prepaid meters for N’Djamena are financed under the Cameroon–Chad interconnection project.

Compared with the UK system.

Compared with the UK system.
UK conceptChad equivalentHow it works
DNOSNE (towns) and mini-grid concessionaires (rural localities)There are no regional network companies. SNE runs the networks in N’Djamena and secondary cities; elsewhere, private operators build and run local mini-grids under 20-year concessions supervised by ARSE.
National Grid/NESOSNEChad has no national interconnected grid: the capital and secondary cities are served by separate thermal-based systems. SNE operates them. A 225 kV interconnection with Cameroon is under construction.
MPANSNE customer/contract number (and meter number)A connection is identified by the account opened with SNE (or with the local mini-grid operator) and the meter at the premises. No national supply-point register or published numbering format was identified.
MPRNNo equivalentNo piped gas distribution network for households was identified; most households cook with wood.
Meter operatorSNE / concessionaireThe utility or mini-grid operator supplies and owns the meter; there is no competitive metering market.
SupplierSNECustomers cannot choose their supplier. Their supplier is SNE or the concessionaire for their locality, at tariffs validated by ARSE; disputes can be taken to ARSE, which acts as mediator.
Smart-meter infrastructureUtility prepaid/smart metersNo national smart-meter programme or data hub. Smart and prepaid meters are being deployed by SNE in N’Djamena through donor-financed projects.

How a supply point is identified.

Illustrative only: SNE account 0123456789, meter 12345678 (fictional; real formats are not published)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?SNE customer account (contract) number, with meter number (Account no.)
Who issues it?SNE (or the mini-grid concessionaire) when a supply contract is opened
FormatAn account or contract number in the utility’s billing system, linked to the meter installed at the premises. The numbering format is not published.
LengthNot published
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the electricity bill (ARSE states that consumers are entitled to a readable, detailed bill) and, for prepaid customers, on the meter and purchase receipts.
Electronic accessNo official customer portal or open data service was identified.
Third-party accessNo framework for third-party access to metering data was identified. Installers obtain account and meter details from the customer.
Who keeps the registerEach utility’s own customer and metering records (SNE, and each concessionaire for its locality); no national register was identified.
Register scopePer DSO

What identifies a connection

Chad has no industry-wide supply-point identifier comparable to an MPAN. Because customers cannot switch supplier, a connection is identified by the customer account opened with the utility that serves the area — SNE in N’Djamena and the secondary cities, or a mini-grid concessionaire in a rural locality — together with the meter at the premises. Each operator keeps its own customer and meter records.

Rights and information

ARSE lists seven consumer rights, including non-discriminatory access to the grid in line with technical standards, a readable and detailed bill with transparent tariffs and the right to contest it, protection of personal data, and mediation by ARSE in disputes, with binding regulatory decisions.

Metering

The rollout of about 100,000 smart/prepaid meters in N’Djamena under the Cameroon–Chad interconnection project links meter identifiers to new commercial management and billing systems. Whether account numbers stay with a property when the occupier changes is not published.

Fictional example

A household in N’Djamena might hold SNE account 0123456789 with meter 12345678. Both numbers are invented: neither SNE nor ARSE publishes the numbering format.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Limited
Net meteringUnknown
Net billingUnknown
How exported electricity is paidIndependent producers sell under bilateral agreements with SNE or within concessions; no household export tariff or net-metering scheme was identified.
Can households sell solar power back to the grid?No net-metering, net-billing or feed-in scheme for households was identified from ARSE or World Bank sources.
Can private companies generate and sell electricity?Yes. The 2019 law liberalised the sector to promote private participation in generation and distribution. Producers need an ARSE licence, and rural operators are selected through state concession tenders.
What size thresholds apply?The capacity thresholds in Decree 1841 and Law 036/PR/2019 could not be read from the published documents.

Connecting a home system.

  1. Obtain the relevant authorisation from ARSE: production licences are issued under Decree 1841, with fees fixed by Arrêté 028.
  2. Agree grid access with the network operator under Decree 1840 on supply and third-party access to electricity networks.
  3. Sign a power purchase or supply agreement with SNE (or operate within a concession).

Export is open to licensed producers selling to SNE or operating mini-grid concessions, but no scheme for small-scale or household export was identified. Self-generation with diesel generators and stand-alone solar is widespread where the grid is absent.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityARSE production licence under Decree 1841 (conditions and procedures for issuing production licences); thresholds not confirmed.ARSELicence fees fixed by Arrêté 028.
Self-generation (rooftop or off-grid solar)Not confirmed from a readable official source; no specific household self-generation rules identified.ARSESolar home systems are being distributed under the World Bank-financed energy access project.
Store electricityNo separate storage licence category identified.Not identifiedSolar-plus-storage projects are listed by ARSE among independent producers.
Export to the gridLicensed producers sell to SNE under agreements; grid access under Decree 1840.ARSE / SNENo household export scheme identified.
Transmit electricityAuthorisation from ARSE; conditions set by Decree 1843.ARSENo separate transmission company identified.
Distribute and sell electricity (rural mini-grids)20-year concession for specific localities, awarded through state tenders under ARSE supervision.State / ARSENine concessionaires listed by ARSE.
Aggregate, trade, wholesale, balancing, grid services, VPP, remote control of assetsNo licence category exists because there is no wholesale, balancing or aggregation market.Not applicableSNE balances its own networks.

Law 036/PR/2019 is implemented by a set of decrees published by ARSE: Decree 1839 (organisation of ADERM), Decree 1840 (supply and third-party access to electricity networks), Decree 1841 (production licences), Decree 1842 (organisation of ARSE), Decree 1843 (transmission conditions) and Decree 2384/PR/2020 (the Electricity Energy Fund). Arrêté 028 sets licence fees. ARSE issues and renews licences and authorisations for production, transport, distribution and sale.

Flexibility and grid services.

Aggregation of home equipment: No

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale marketNo—NoNone exists; SNE buys from independent producers under bilateral agreements.
Balancing and reservesNo—NoSNE. Provided by SNE’s own plants on each isolated network.
Demand responseNo—NoNo programme identified.

There are no flexibility or balancing markets and no framework for aggregating distributed assets. Each network is balanced by its operator.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutDonor-financed rollout of about 100,000 smart/prepaid meters in N’Djamena under the Cameroon–Chad interconnection project; no penetration figure published
Reading intervalNot published
ProgrammeCameroon–Chad Power Interconnection Project, Chad component
Meters plannedAbout 100,000 smart/prepaid meters
Associated systemsCommercial management and billing systems; SCADA
Project closing date31 December 2027
Third-party data accessNo framework identified

Chad has no national smart-meter programme or central data hub. Smart and prepaid metering is being introduced by SNE in N’Djamena with World Bank financing, alongside new billing systems, to tackle commercial losses and weak collection.

Renewable electricity.

Electricity generation mix (2021).

  • Fossil (diesel/heavy fuel oil): 94.3%
  • Renewables: 5.7%
Source 4
Renewable electricity share
5.72% (2021)Source 4Renewable electricity output as a share of total output (World Bank WDI). Chad had no cross-border interconnection in service, so generation is equivalent to supply.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Thermal (N’Djamena)
150 MW (2022)Source 7“About 150 MW”, all thermal.
Thermal (12 secondary cities, installed)
25 MW (2022)Source 7“About 25 MW” installed; the PAD also cites 10 MW available versus 29 MW installed.
Solar under construction (Ambougouna + Klessoum)
65 MW (2026)Source 1735 MWc (RESPITE, Ambougouna) + 30 MW (Scatec, Klessoum).

Targets.

  • 20% renewable energy in national production by 2030 (ARSE strategic goals)
  • Electricity access of 53% by 2030 (National Electricity Emergency Plan, cited by the World Bank and ARSE)
  • Tchad Connexion 2030: overall access of 60% and 30% rural access by 2030 (ARSE)
  • More than 300 hybrid mini-power plants in rural areas by 2030 (ARSE)

Current mix

Grid electricity is almost entirely thermal. The World Bank’s series shows renewables at 5.7% of output in 2021, the latest year available; the type of renewable source is not broken down in that series.

Solar pipeline

Utility-scale solar is the focus of new investment. In October 2026 ARSE reported 35 MWc at Ambougouna and 30 MW at Klessoum under construction. The World Bank cited the Djermaya (28 MW) and Quadran (30 MW) solar IPP projects in 2022, and ARSE lists larger solar-plus-storage projects by Savannah Energy.

Off-grid and mini-grids

The Chad Energy Access Scale Up Project (US$295 million, World Bank) finances solar home systems, solar for health centres and schools, grid connections in N’Djamena and mini-grids in 12 secondary cities intended to provide 55,000 new connections. By December 2024 it had electrified 33 health centres and schools, with 217 more in progress.

Energy storage.

Home batteries
Not identified from a reliable public source.
Grid-scale storage
Not identified from a reliable public source.

Battery storage in Chad appears mainly as part of solar home systems, hybrid mini-grids and announced solar-plus-storage projects. No storage-specific regulation was identified.

Storage projects.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
Société Nationale d’Électricité (SNE)Main national utility; sole supplier in N’DjamenaNoNoNoNo

SNE supplies the capital and secondary cities. In rural localities, the nine mini-grid concessionaires listed by ARSE (ZIZ Énergie, Alternaprod, Denali, Green Energy, Sahel Énergie, Enerso, GSU, SRN and Set Power) are the local suppliers. There is no retail competition. SNE does not have an official website that could be reached, so the regulator’s site is linked.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Autorité de Régulation du Secteur de l’Énergie Électrique (ARSE)RegulatorElectricity sector regulatorLicenses operators, validates tariffs, supervises concessions and handles consumer complaints.
Société Nationale d’Électricité (SNE)DistributionNational utilityGenerates, distributes and supplies electricity in N’Djamena and secondary cities.
Agence de Développement de l’Électrification Rurale et de la Maîtrise de l’Énergie (ADERM)Renewable EnergyRural electrification and energy efficiency agencyDevelops rural electrification, including rural power plants such as Guelendeng.
Agence Tchadienne de Normalisation (ATNOR)GovernmentNational standards agencyWorking with ARSE on quality standards for energy services.
World Bank – Chad Energy Access Scale Up ProjectRenewable EnergyDevelopment lenderUS$295 million programme for grid connections, mini-grids and off-grid solar.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Network accessDecree 1840 on supply and third-party access to electricity networksGovernment of ChadTechnical content could not be read.
TransmissionDecree 1843 on electricity transmission conditionsGovernment of ChadTechnical content could not be read.
Product and service qualityNational standards (ATNOR)Agence Tchadienne de NormalisationARSE and ATNOR agreed in March 2026 to strengthen quality standards in energy services; specific equipment standards were not named.

Permissions.

Permissions.
PermissionRequiredLevelDetail
ARSE production licenceLimitedNationalRequired for electricity production under Decree 1841; thresholds and any exemptions for small systems could not be confirmed.
Grid connectionYesNationalConnection by SNE or the local concessionaire; consumers have a right to non-discriminatory connection under technical standards (ARSE).
Building or planning approvalLimitedLocalNo specific rules for rooftop solar identified.

No specific permitting process for household solar or batteries was identified. Larger producers need an ARSE licence and an agreement with SNE; rural operators are selected by concession tender.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Chad Energy Access Scale Up Project (World Bank)ActiveDonor-funded access programmeUS$295 million for grid connections in N’Djamena, mini-grids in secondary cities, and solar home systems and stand-alone solar for public facilities.Mar 2022 – Jun 2027
Cameroon–Chad Power Interconnection Project (World Bank)ActiveDonor-funded infrastructure225 kV interconnection plus N’Djamena network densification and about 100,000 smart/prepaid meters.To 31 Dec 2027

Data and connectivity.

Fixed broadband
Not identified from a reliable public source.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

According to the World Bank, 12.6% of people used the internet in 2024. The communications technology used by SNE’s smart/prepaid meters is not published.

Grid conditions.

National peak demand
Not identified from a reliable public source.
Annual electricity demand
0.738 TWh (2025)Source 12737.9 GWh electricity consumption (ARSE).
Generation capacity
0.175 GW (2022)Source 7Derived: about 150 MW in N’Djamena + about 25 MW in 12 secondary cities, all thermal (World Bank). Excludes solar under construction and private self-generation.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Chad’s networks are small, isolated and thermal. The World Bank reported technical and commercial losses of about 40% and collection of about 50% of billing in 2022, and noted that only about 10 MW of 29 MW installed in secondary cities was available. The 225 kV interconnection with Cameroon is intended to bring imports from Cameroon’s hydro-based southern grid.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
Utility-scale solar plants under constructionUpcoming2026–202735 MWc at Ambougouna (RESPITE) and 30 MW at Klessoum (Scatec), about 65 MW in total.
Cameroon–Chad 225 kV interconnectionUpcomingProject closing 31 December 2027Links Chad to Cameroon’s grid and finances smart/prepaid metering in N’Djamena.
Tchad Connexion 2030Upcoming2030National programme targeting 60% overall access, 30% rural access and more than 300 hybrid mini-power plants.
Law 036/PR/2019 on the electricity sectorCurrent26 August 2019Liberalised generation and distribution, created ARSE and expanded ADERM’s mandate.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity use—Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoption—Low below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionLowNo official rooftop solar data; solar home systems reached 30,000 households under the World Bank project by December 2024.
Distributed energy marketLowGrid access of 13.4% (2024); nine rural mini-grid concessionaires listed by ARSE; no household export scheme.
Grid flexibility marketLowNo wholesale, balancing or demand-response markets.
Energy storage adoptionLowNo operating grid-scale battery identified; storage limited to solar home systems and planned projects.
Renewable growth environmentMediumRenewables 5.7% of output (2021); about 65 MW of solar under construction in 2026 against roughly 175 MW of thermal capacity.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 21 sources
  1. Population, total – Chad (SP.POP.TOTL). World Bank, 2025. accessed 10 October 2026.
  2. Urban population (% of total) – Chad (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 10 October 2026.
  3. Access to electricity (% of population) – Chad (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 10 October 2026.
  4. Renewable electricity output (% of total) – Chad (EG.ELC.RNEW.ZS). World Bank, 2021. accessed 10 October 2026.
  5. Individuals using the Internet – Chad (IT.NET.USER.ZS). World Bank, 2024. accessed 10 October 2026.
  6. Official exchange rate (LCU per US$, period average) – Chad and Euro area (PA.NUS.FCRF). World Bank, 2025. accessed 10 October 2026.
  7. Project Appraisal Document – Chad Energy Access Scale Up Project (P174495). World Bank, 2022. accessed 10 October 2026.
  8. Implementation Status and Results Report, Seq. 6 – Chad Energy Access Scale Up Project. World Bank, 2024. accessed 10 October 2026.
  9. Disclosable Restructuring Paper – Cameroon–Chad Power Interconnection Project (P168185). World Bank, 2024. accessed 10 October 2026.
  10. Projects API – World Bank projects in Chad. World Bank, 2026. accessed 10 October 2026.
  11. Chad DHS – household indicators (API). The DHS Program, 2014–15. accessed 10 October 2026.
  12. ARSE – home page (consumption 2025, access, Tchad Connexion 2030). Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  13. Présentation de l’ARSE. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  14. Opérateurs indépendants. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  15. Consommateurs – droits. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  16. Textes réglementaires. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  17. 65 MW solaires en chantier, le Tchad accélère sa transition énergétique. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  18. Vers une électricité plus accessible et mieux gérée. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  19. L’ARSE et l’ATNOR renforcent leur collaboration. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  20. Renforcement de la coopération : le FMI en visite de travail à l’ARSE. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.
  21. Visite de la centrale électrique de Guelendeng. Autorité de Régulation du Secteur de l’Énergie Électrique, 2026. accessed 10 October 2026.

Questions about energy in Chad.

Talk to us about Olmack in Chad.Tell us about your home, housing portfolio or school estate in Chad. We'll explain what is possible there now.