How electricity works in Czechia.
Czechia electricity market 2026: prices, ČEPS and three DSOs, the 18-digit EAN, rooftop solar and home batteries, energy sharing, licensing and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Czech koruna (CZK) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Czechia energy at a glance.
Key figures for households in Czechia. Each one links to its source on the full overview below.
Electricity price.
7.845 CZK per kWh for households, including taxes. Figures for 2025-H2.
Household use.
3,637 kWh a year for a typical household. Figures for 2025.
Renewable share.
16.8% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Czechia.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Czechia below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Czechia requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Czechia.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Czechia, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Czechia, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Czechia.
The energy market in Czechia, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Czechia has a fully liberalised electricity market. Every household can choose its supplier, there is no regulated end-user energy price, and ERÚ (the Energy Regulatory Office) regulates only the network and system components of the bill. ČEPS runs the transmission grid, and three regional distribution companies, ČEZ Distribuce, EG.D and PREdistribuce, serve almost all of the 6.27 million supply points. OTE, the market operator, registers every supply point, settles imbalances and runs the day-ahead and intraday markets.
Generation is dominated by nuclear power (42% of output in 2025) and coal (35%). Renewables supplied about 17% of generation, mostly bioenergy and solar, and Czechia remains a net exporter of electricity. Rooftop solar on family houses grew very quickly after 2022: by the end of 2025 the country had about 239,000 solar plants with 5.16 GWp, and most new household systems come with a battery.
A series of amendments to the Energy Act, known as Lex OZE I, II and III, has changed how households take part in the market. Since August 2024 households can share electricity through the Electricity Data Centre (EDC). Since August 2025 small generators up to 100 kW need no licence and storage is a defined activity. From August 2026 the EDC also handles storage registration and technical flexibility aggregation. Since 1 January 2026 the state, not consumers, pays the cost of supporting older renewable plants, which lowered regulated charges on every bill.
Energy snapshot.
Headline figures for electricity in Czechia. Each shows its data year and links to its source.
- Population10,915,839 peopleSource 21 Jan 2026
- Households4,579,000 householdsSource 32025
- Average household size2.3 people/householdSource 42025
- Electricity use per household3,637 kWh/yrSource 132025
- Household price (CZK)7.845 CZK/kWhSource 12025-H2
- Household price (EUR)0.322 EUR/kWhSource 12025-H2
- Renewable electricity share16.8%Source 122025
- Solar capacity4.74 GWSource 1331 Dec 2025
- Wind capacity0.38 GWSource 1331 Dec 2025
- Energy storage capacity2.43 GWhSource 13Dec 2025
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Energy Regulatory Office (Energetický regulační úřad, ERÚ)
- System operator
- ČEPS, a.s.
- Distribution networks
- Three regional DSOs (ČEZ Distribuce, EG.D, PREdistribuce) plus many small local distribution systems
- Currency
- Czech koruna (CZK)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Czechia.
- Household price (CZK)
- 7.845 CZK/kWh (2025-H2)Source 1Eurostat average household price for the 2,500–4,999 kWh/yr band, all taxes and levies included. It predates the removal of the renewable-support charge from bills on 1 January 2026.
- Household price (EUR)
- 0.322 EUR/kWh (2025-H2)Source 1Eurostat’s own EUR figure for the same band (all taxes), converted by Eurostat at its average exchange rate for the period; no separate conversion applied here.
- Typical annual electricity bill
- Not identified from a reliable public source.
Household price trend (CZK per kWh).Source 1
| 2019-H1 | 4.49 CZK/kWh |
|---|---|
| 2019-H2 | 4.54 CZK/kWh |
| 2020-H1 | 4.85 CZK/kWh |
| 2020-H2 | 4.77 CZK/kWh |
| 2021-H1 | 4.66 CZK/kWh |
| 2021-H2 | 4.79 CZK/kWh |
| 2022-H1 | 6.0269 CZK/kWh |
| 2022-H2 | 4.2145 CZK/kWh |
| 2023-H1 | 7.5546 CZK/kWh |
| 2023-H2 | 7.6648 CZK/kWh |
| 2024-H1 | 8.4583 CZK/kWh |
| 2024-H2 | 8.3277 CZK/kWh |
| 2025-H1 | 7.948 CZK/kWh |
| 2025-H2 | 7.845 CZK/kWh |
A Czech electricity bill has two parts. The commodity part (silová elektřina) is priced freely by the supplier. The regulated part, set each year by ERÚ in its price decision, covers distribution, transmission system services, the fees of OTE and the EDC, and until 2025 a contribution to the support of renewable sources (POZE). Electricity tax and VAT are added on top.
The regulated part depends on the distribution tariff (distribuční sazba) and the main circuit-breaker size, and can differ between the three DSO areas. The two-rate tariffs give a cheaper low-rate period for homes with electric water heating, storage or direct heating, heat pumps or an EV charger. At the end of 2025, 2.78 million household supply points were on the standard single-rate D02d tariff, 1.00 million on D25d, and about 0.4 million each on the heating tariffs D45d and D57d.
The 2026 cut in regulated charges
On 16 December 2025 the government decided to pay the full cost of supporting older renewable plants from the state budget. ERÚ issued an amended price decision on 29 December 2025, so from 1 January 2026 no consumer pays the POZE contribution, which for households had been 495 CZK/MWh before VAT. The average regulated component for low-voltage customers fell from 2,772 to 2,352 CZK/MWh (−15.1%). For a family house heated by electricity it fell by 27.1%, and for a flat using electricity only for cooking by 9.5%. The cut applies whatever contract the customer has, including fixed-price contracts.
Price level and trend
Eurostat puts the average household price for the 2,500–4,999 kWh band at 7.85 CZK/kWh (about €0.32/kWh) in the second half of 2025, among the higher prices in central Europe. Prices rose by about 60% between the second half of 2021 and 2023 during the energy crisis, with a temporary dip in the second half of 2022. Prices have eased slightly since their 2024 peak, and the 2026 change will show in Eurostat data for 2026.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Fixed | Yes | Suppliers offer contracts with the energy price fixed for one to three years. Since August 2025 the penalty for leaving a fixed-term contract early is capped at 40% of the value of the energy not yet consumed. |
| Variable | Yes | Open-ended products whose price the supplier can change after notice. Suppliers must now announce price decreases as well as increases. |
| Time-of-use | Yes | Two-rate distribution tariffs, with the low-rate period switched by the DSO’s ripple control (HDO): D25d (8 low-rate hours, water heating), D26d (8 hours, storage heating), D27d (8 hours, EV charging), D45d, D56d and D57d (20 hours, direct electric heating and heat pumps) and D61d (weekend property). Suppliers price high and low rates separately. ČEZ Prodej also offers a “Dynamický tarif” with 10 fixed weekday price bands for customers with an interval meter. |
| Dynamic | Limited | Spot-indexed products exist. A genuine spot contract needs an interval (smart) meter, and settlement has been in 15-minute intervals since October 2025. ERÚ has warned about products sold as “spot” to customers without such a meter. |
| Regulated | No | There is no regulated end-user energy price. ERÚ sets only the regulated components (distribution, system services, market-operator and EDC fees, and the renewable-support charge, which is zero from 2026). |
Household prices compared with neighbouring countries (EUR per kWh).
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,637 kWh/yr (2025)Source 13Derived: ERÚ household small-consumer (MOO) consumption of 16,656.1 GWh in 2025 divided by 4,579.0 thousand households (Eurostat). The MOO category covers 5.48 million supply points, including second homes and garages, so this is an approximation, not a published per-household statistic. Eurostat’s household final consumption for 2024 (15,634.6 GWh) gives 3,436 kWh.
- Average daily use per household
- 10 kWh/day (2025)Source 13Derived: 3,637 kWh/yr (see household consumption) divided by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,527 kWh/person/yr (2025)Source 13Residential only. Derived: ERÚ household small-consumer consumption of 16,656.1 GWh divided by the population on 1 January 2025 (10,909,500, Eurostat). Total electricity demand per capita (all sectors) was 6.42 MWh in 2025 (Ember).
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 57,611 battery-electric passenger cars (2025)Source 9Stock of battery-electric cars out of 6,774,399 registered passenger cars (Eurostat). There were also 35,513 plug-in hybrids.
- Electric cooking
- Not identified from a reliable public source.
ERÚ records household consumption (the MOO category) of 16,656 GWh in 2025, up 6.5% on 2024. Divided across 4.58 million households that is about 3,600 kWh a year, but use varies widely with the distribution tariff. Derived from ERÚ tariff statistics, single-rate D02d supply points averaged about 1,640 kWh in 2025, while those on the D57d heating tariff averaged about 7,800 kWh.
Electricity is a common heating fuel. About 850,000 household supply points are on the 20-hour heating tariffs (D45d, D56d, D57d), and a further million use the D25d tariff for electric water heating. National demand peaks on cold winter mornings: ČEPS recorded an all-time high load of 12,318 MW on 12 January 2026, and the 2025 peak was 11,720 MW on 19 February.
Transport electrification is small but growing: the battery-electric car fleet rose from 22,441 in 2023 to 57,611 in 2025.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 75.1 % of population (2025)Source 654.3% own outright and 20.8% have a mortgage or loan.
- Private rented
- 18.8 % of population (2025)Source 6Tenants paying market rent.
- Social or public housing
- 6.1 % of population (2025)Source 6Tenants paying reduced rent or living rent-free (Eurostat category), including municipal housing.
- Houses
- 48.7 % of population (2025)Source 737.4% detached and 11.3% semi-detached or terraced.
- Apartments and flats
- 51 % of population (2025)Source 735.2% live in buildings with 10 or more dwellings.
- Urban population
- 72.9 % of population (2025)Source 11
Czech housing is split almost evenly between houses and flats. About half the population lives in flats, many in the large prefabricated panel estates (paneláky), and the other half in houses, mostly detached. Three-quarters of people live in a home their household owns. Many flats are owner-occupied units in buildings run by an owners’ association (SVJ) or a housing co-operative.
Family houses have carried the rooftop solar boom: by 2024 roughly 86% of solar systems were on family-house roofs. In blocks of flats each flat normally has its own supply point and EAN. Shared rooftop systems can now supply the flats through electricity sharing, and sharing within one apartment building is exempt from distribution charges on the shared electricity.
How the grid works in Czechia.
- TransmissionČEPS, a.s.
- DistributionThree regional DSOs (ČEZ Distribuce, EG.D, PREdistribuce) plus many small local distribution systems
- MeteringOTE, a.s., Elektroenergetické datové centrum (EDC)
- Supply8 or more retail suppliers
Electricity flows from large plants, mainly the Dukovany and Temelín nuclear stations and coal-fired plants, through ČEPS’s 400/220 kV grid to the three regional DSOs. They take it down through 110 kV, 22 kV (and in places 35 kV or 10 kV) to the 0.4 kV low-voltage networks that supply homes. ČEZ Distribuce alone runs 48,929 medium-to-low-voltage transformers. Interconnectors link Czechia with Germany, Poland, Austria and Slovakia, and the country is a structural net exporter: net exports were 7.4 TWh in 2025, with large flows south to Austria and Slovakia.
Commercially, every supply point is registered with OTE under its EAN, and every market participant is, or has delegated to, a balance-responsible party (subjekt zúčtování) whose imbalances OTE settles. Suppliers buy power bilaterally, on futures markets or on OTE’s day-ahead and intraday markets, and the household pays one bill to its supplier covering both energy and regulated charges.
Since the Lex OZE amendments, two data hubs work side by side: OTE for supplier registration and settlement, and the EDC for electricity sharing and, from August 2026, storage and flexibility. A household connection is administered by the local DSO, which connects the property, installs the meter and approves any generator or battery before it operates in parallel with the grid.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Industry and Trade (MPO) | Drafts energy legislation, including the Lex OZE amendments to the Energy Act (Act 458/2000 Sb.), and the national energy and climate plan. It also recognises renewable-energy installer qualifications. |
| Regulator | Energy Regulatory Office (ERÚ) | Independent regulator based in Jihlava. It issues licences, sets the regulated price components each year, issues the decrees on connection conditions and electricity market rules, approves the distribution and transmission codes and handles consumer disputes. The State Energy Inspection (SEI) supervises compliance. |
| TSO | ČEPS, a.s. | State-owned transmission system operator and system operator. It runs the 400 kV and 220 kV grid and balances the system, buying balancing services (FCR, aFRR, mFRR) from generators, batteries and aggregators. ČEPS connected to the European aFRR platform PICASSO when it went live on 1 June 2022. |
| DSO | ČEZ Distribuce, a.s. | The largest DSO, part of the ČEZ group, covering most of the country outside Prague and the south. 3,817,787 supply points at the end of 2025. |
| DSO | EG.D, a.s. | Distribution network for South Moravia and South Bohemia (formerly E.ON Distribuce). 1,594,021 supply points at the end of 2025. |
| DSO | PREdistribuce, a.s. | Distribution network for Prague, part of the PRE group. 853,819 supply points at the end of 2025. |
| Data hub / registry | OTE, a.s. | State-owned market operator. It registers supply points and supplier switches, settles imbalances, runs the day-ahead and intraday markets as nominated electricity market operator (NEMO), administers payments of renewable support and issues guarantees of origin. More than 6.3 million electricity supply points were in its systems at the end of 2025. |
| Data hub / registry | Elektroenergetické datové centrum (EDC) | Electricity Data Centre created under Lex OZE II. Since August 2024 it has registered sharing groups and allocated shared electricity in 15-minute intervals. From 1 August 2026 it also handles storage registration, technical flexibility aggregation and a “network traffic light” for grid capacity. By 2030 it is to run up to 15 services, including a central metering database. |
| Exchange | OTE day-ahead and intraday markets | The Czech spot market is run by OTE and coupled with the European day-ahead (SDAC) and intraday (SIDC) markets. |
| Supplier | Licensed electricity traders | Many licensed suppliers compete for households. ČEZ Prodej, the largest, supplied 2,702,098 supply points in December 2025. |
Compared with the UK system.
| UK concept | Czechia equivalent | How it works |
|---|---|---|
| DNO | Provozovatel distribuční soustavy (PDS) | Three regional DSOs, ČEZ Distribuce, EG.D and PREdistribuce, each a licensed monopoly in its area, plus small local distribution systems (for example in industrial sites). Unlike UK DNOs they also own and read the meters, connect generators and storage, and register the supply point. ERÚ sets their tariffs. |
| National Grid/NESO | ČEPS, a.s. | One state-owned company owns the transmission grid and is also the system operator, combining roles that in Great Britain are split between National Grid Electricity Transmission and NESO. ČEPS buys balancing services, including from aggregated batteries, and takes part in the European balancing platforms. |
| MPAN | EAN kód odběrného místa | An 18-digit EAN code assigned when the supply point is first registered. It starts 859 (Czechia) and 1824 (OTE), followed by a block that identifies the DSO area, a serial number and a check digit. It is printed on contracts and bills and is used for switching, connections and electricity sharing. Since 1 July 2025 a solar system that exports has its own production EAN, separate from the consumption EAN. |
| MPRN | EIC kód (gas) | Gas supply points use a separate 16-character EIC code beginning 27ZG, followed by the gas DSO’s network code, a serial number and a check character, under identification rules issued by OTE. Gas and electricity identifiers are separate, as in the UK. |
| Meter operator | DSO | There is no competitive meter-operator market. The DSO owns, installs, reads and replaces the meter, including the smart (AMM) meters it must install free of charge at qualifying supply points by 1 July 2027. A customer who wants a smart meter sooner can request one and pay a fee. |
| Supplier | Obchodník s elektřinou (licensed trader) | Households choose any licensed supplier, and switches are processed through OTE’s central system. In 2025, 596,136 electricity supply points switched supplier. The supplier bills both the commodity and the regulated distribution charges on one invoice. |
| Smart-meter infrastructure | DSO head-end systems + OTE and EDC data hubs | There is no DCC equivalent. Each DSO runs its own AMM communications and passes measured data to OTE for settlement and to the EDC for sharing and flexibility. The EDC is planned to become a central metering database by 2030. |
How a supply point is identified.
859182400512345670 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | EAN kód odběrného místa (EAN) |
| Who issues it? | The local DSO, when it registers a new supply point (odběrné místo) on its network, using the number range allocated under OTE’s identification rules. |
| Format | Positions 1–3: “859”, the GS1 prefix for Czechia. Positions 4–7: “1824”, the code of OTE, the market operator. Positions 8–12: a five-digit block identifying the DSO area (secondary sources give 00100–00299 for EG.D, 00300–00399 for PREdistribuce and 00400–00899 for ČEZ Distribuce). Positions 13–17: serial number of the supply point. Position 18: check digit. |
| Length | 18 digits |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | On the supply contract and on every electricity bill from the supplier, and in the DSO’s and supplier’s online customer portals. Exporting solar owners also have a separate production EAN, issued from 1 July 2025. |
| Electronic access | Customers can see their EAN and consumption in the DSO and supplier portals. Owners of interval or smart meters can see 15-minute data where the DSO provides it. Members of sharing groups see allocated shared electricity through the EDC. |
| Third-party access | The EAN is how DSOs, OTE, suppliers and the EDC exchange customer, metering and settlement data. A new supplier, an installer applying for a generator connection, a sharing group or an aggregator uses the EAN, with the customer’s authorisation where required. |
| Who keeps the register | The DSO keeps the technical register of supply points on its network. OTE holds the central commercial register (all supply points have been registered individually in OTE’s system), and the EDC registers supply points that take part in sharing, storage or flexibility. |
| Register scope | National |
Every Czech electricity connection has an EAN code identifying the supply point (odběrné místo). The code is created when the supply point is registered and ceases only when the supply point itself is removed. ČEZ’s guidance is explicit that the EAN does not move with the owner but stays fixed to the supply point. A change of occupier, owner or supplier therefore does not change it.
How the code is built
The EAN is an 18-digit number in the GS1 format. It always begins 859 (Czechia) and 1824 (OTE). Comparison sites and supplier guidance agree that the next five-digit block shows which DSO registered the supply point: 001xx–002xx for EG.D, 003xx for PREdistribuce and 004xx–008xx for ČEZ Distribuce. The remaining digits are a serial number and a final check digit. A supply point in the ČEZ Distribuce area might therefore have an EAN such as 859182400512345670 (fictional). Gas supply points have a different, 16-character EIC code.
What it is used for
The EAN is needed to switch supplier, to apply for a new connection or a change in circuit-breaker size, to connect a solar system or battery, and to join a sharing group. Since amended market rules took effect on 1 July 2025, generation fed into the grid must be recorded separately: a household with an exporting solar system has its original EAN for consumption and a second, production EAN for exports, and needs a contract with a trader that takes on balancing responsibility for the exported electricity. EG.D alone reported about 20,000 affected customers.
Registration
OTE was set up in 2001 with the aim of eventually registering every supply point individually, and its system now holds all of them. It records the supply point’s master data (metering type, voltage level, consumption category), measured values, the supplier and the balance-responsible party. Supply points with non-interval meters are settled using standard load profiles (TDD). The EDC keeps a parallel register of the supply points taking part in sharing, storage and flexibility.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Supplier-defined. Exported electricity is sold to a licensed trader under a purchase contract, at a fixed price, a spot-linked price or under a “virtual battery” product. There is no statutory export tariff for new household systems and no annual netting. In early 2025, for example, ČEZ offered 2,590 CZK/MWh before VAT for new contracts, PRE 1,300 CZK/MWh and E.ON 2,999–3,152 CZK/MWh depending on the product. |
| Is there a simplified route for small systems? | Yes. A microsource (mikrozdroj) of up to 10.8 kW and 16 A per phase on low voltage can be connected in a simplified mode, but only with zero export: the reserved power is zero and the system must prevent feed-in except for momentary flows. Above 800 W the loop impedance must be measured (limit 0.47 Ω for sources up to 16 A per phase, 0.75 Ω up to 10 A). The DSO checks the application within 8 working days and sends a contract within 10 working days (Decree 16/2016 Sb., §16). |
| Can the DSO refuse export? | Yes, where the grid lacks capacity or safety is at risk. Refusals rose from 14% of requests in 2021 to 27% in 2024. In the 12 months to mid-2026 EG.D refused over 6,700 requests (30% of applications), and ČEZ Distribuce limited about 18% of requests and rejected 9%. A system can often still be connected without export. |
| Do household systems need a licence? | No, for plants up to 100 kW that are not run as a business, do not receive operating support and are the only generator at the supply point (from August 2025; previously 50 kW). Occasional sales of surplus do not by themselves count as running a business. |
| Do rooftop systems need planning permission? | Generally not. Since 1 August 2025 renewable plants of up to 100 kW are minor structures under the Building Act, and rooftop installations up to 100 kW need no permit if they do not affect load-bearing structures and meet fire-safety rules. In heritage zones the heritage authority must still approve the installation. |
| Can surplus be shared instead of sold? | Yes. Since August 2024 an active customer can share electricity with up to 11 supply points, and energy communities with up to 1,000, with allocation in 15-minute intervals by the EDC. Shared electricity carries distribution charges, except within one apartment building. |
Connecting a home system.
- Check that the planned inverter is on the DSO’s list of approved types. Since 1 January 2025 only inverters certified against the EU grid-connection code (RfG) and annex 4 of the Distribution Code (PPDS) can be connected.
- Submit a connection application to the DSO, online or on paper, with the EAN, a cadastral map, the owner’s consent, a single-line diagram, the main circuit-breaker size, the generator’s installed power, the requested export (reserved) power and any battery capacity.
- The DSO checks completeness and, if the grid has capacity, sends a draft connection contract within 15 working days of a complete low-voltage application. If it cannot connect the system, it must say so in writing within the same period, giving reasons and provisional future conditions.
- Sign the connection contract (on low voltage the applicant has 30 days to accept) and pay any connection contribution.
- Install the system using a qualified electrician; an electrical inspection report (revize) is required.
- Apply to the DSO for commissioning. The system may run in parallel with the grid only with the DSO’s consent; the DSO replaces or reprograms the meter to record exports.
- Sign a purchase contract with a trader for exported electricity, which also takes on balancing responsibility for the production EAN. Without it, exports are not paid for.
Czech households with solar export under a market model. All imports are billed in full, with regulated charges, and exports are sold separately to a trader. There has never been general net metering for small systems. Operating support for older renewable plants is not available to new household systems, and since 2026 its cost has been met from the state budget rather than from bills.
Export prices are therefore set by traders and have fallen as midday surpluses have grown. Spot-linked contracts can turn negative on sunny summer afternoons, and several suppliers now offer remote curtailment or virtual-battery products instead. ČEZ’s FlexiEnergie, for example, pays solar customers a small monthly reward for allowing remote curtailment.
Because export is worth much less than imported electricity, the economics of household solar depend on self-consumption. That explains why most new systems include a battery, why heat pumps and hot-water heating are shifted into solar hours, and why electricity sharing has spread quickly: by 30 June 2026 the EDC had 28,345 sharing groups with 30,255 production sites, 49,388 consumption points and 137 GWh of shared electricity in total.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | No licence for plants up to 100 kW that are not operated as a business, receive no operating support and are the only generator at the supply point. Above 100 kW, or for business or supported plants, an ERÚ generation licence is needed. Plants over 1 MW also need a state authorisation from the Ministry of Industry and Trade. | ERÚ; MPO | All grid-connected plants still need a DSO connection contract and DSO consent before parallel operation. The threshold rose from 10 kW to 50 kW in 2023 and to 100 kW from August 2025. |
| Store electricity | Storage (akumulace) is a licensed activity under Lex OZE III. No licence is needed for non-business storage of up to 100 kW where it is the only storage device at the supply point, or for storage whose installed power is no more than 20% above that of the licensed plant it is connected to. | ERÚ | Standalone grid-connected batteries have been allowed since October 2025, with storage-specific network charging. Batteries up to 10.8 kW can use the simplified zero-export connection. |
| Export to the grid | No licence for exempt plants up to 100 kW. A DSO connection contract with non-zero reserved power, a production EAN and a purchase contract with a trader are needed. | DSO (connection); trader (contract) | The trader buying the exports normally takes on balancing responsibility for the production EAN. |
| Share electricity | No licence. Active customers share with up to 11 supply points; energy communities with up to 1,000. Sharing must be registered with the EDC, and the participating points need interval meters. | EDC; DSO (meters) | Traders may not make a customer’s right to share conditional on the supply contract. |
| Sell / supply electricity to consumers | Electricity trading licence (licence na obchod s elektřinou). The administrative fee is CZK 100,000. | ERÚ | Suppliers must register with OTE and either be balance-responsible or delegate this to a balance-responsible party. |
| Wholesale trading | Electricity trading licence, plus registration as a market participant with OTE and a settlement contract (balance responsibility) for spot-market trading. | ERÚ; OTE | Traders also register under EU REMIT. |
| Aggregate | An aggregator must hold an electricity trading licence. It registers the “aggregator” role with OTE, signs a regulating-energy settlement contract with OTE and a framework agreement with ČEPS, and registers with the EDC. Under Lex OZE III it no longer has to be the customer’s supplier. A direct flexibility provider offering only its own assets needs no licence. | ERÚ; OTE; ČEPS; EDC | Independent aggregation for balancing services started on 1 August 2026; commercial (market) flexibility aggregation is scheduled for December 2027. |
| Balancing / grid services | Technical qualification by ČEPS for each product (FCR, aFRR, mFRR) and a framework agreement with ČEPS. Small units can take part through an aggregation block. | ČEPS | aFRR energy is exchanged through PICASSO. Long-term aFRR+ capacity prices fell from 20.8 EUR/MW/h in 2025 to 10.8 EUR/MW/h for 2026. |
| Virtual power plant / remote control of assets | No separate licence. Commercial operation of a portfolio for balancing services follows the aggregator rules above, and household devices must use approved inverters and respect DSO connection conditions. | ČEPS; DSO; OTE | Suppliers already offer remote curtailment of household solar (for example ČEZ FlexiEnergie). |
Licensing is set by the Energy Act (Act 458/2000 Sb.) and administered by ERÚ. The key thresholds are 10.8 kW, up to which a microsource can use the simplified zero-export connection, and 100 kW, up to which a non-business generator or storage device needs no licence. Above 1 MW a generation licence also needs a state authorisation from the Ministry of Industry and Trade.
Lex OZE II (Act 469/2023 Sb., in force from 1 January 2024) introduced the active customer, energy communities, electricity sharing and the EDC. Lex OZE III (Act 87/2025 Sb., mainly in force from 1 August 2025, with later stages up to 2028) added storage, flexibility and aggregation, raised the licence threshold to 100 kW and strengthened consumer contract rules.
Flexibility and grid services.
Aggregation of home equipment: Yes
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency Containment Reserve (FCR) | Yes | — | Yes | ČEPS. Capacity bought by ČEPS from qualified units and aggregation blocks. Batteries are increasingly active. |
| Automatic Frequency Restoration Reserve (aFRR) | Yes | — | Yes | ČEPS / PICASSO. Long-term aFRR+ capacity averaged 10.8 EUR/MW/h for 2026 (7.0 EUR/MW/h in the second half), about half the 2025 level, as batteries and aggregators entered. ČEPS now buys downward aFRR and mFRR only in daily auctions. |
| Manual Frequency Restoration Reserve (mFRR) | Yes | — | Yes | ČEPS. Capacity and energy from qualified units and aggregated portfolios, including cogeneration units and controllable demand. |
| Independent aggregation via EDC | Developing | — | Yes | EDC / OTE. From 1 August 2026 the EDC evaluates technical flexibility aggregated by independent aggregators for balancing services. Commercial flexibility (trading flexibility on energy markets) is scheduled for December 2027. |
| Day-ahead and intraday wholesale | Restricted | — | Limited | OTE. Open to registered market participants with balance responsibility. Households take part indirectly through spot-indexed supply or export contracts. |
| Local (DSO) flexibility | Developing | — | No | DSOs / EDC. The EDC’s “network traffic light” from August 2026 shows grid limits for activating flexibility. ERÚ plans a pilot low-voltage distribution tariff using distribution flexibility by 2028, available more widely to customers with AMM meters from 2030. |
Czechia’s main flexibility market is ČEPS’s market for balancing services. Aggregators already compete there with large generators: the aggregator Nano Energies won 12% of the volume in ČEPS’s long-term auctions for 2026 and provides more than 280 MW. Battery storage, cogeneration units and controllable consumption have pushed capacity prices down sharply.
Until 2026 aggregation in practice meant a licensed trader pooling assets. Lex OZE III created a framework for independent aggregators: from 1 August 2026 the EDC evaluates aggregated technical flexibility for balancing services, and aggregation of commercial flexibility is scheduled for December 2027. Household assets, chiefly home batteries and heat pumps, can be pooled, but the distribution-network side of flexibility (local congestion products and flexible distribution tariffs) is still at the pilot stage.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| PICASSO | European aFRR energy platform. ČEPS connected at launch on 1 June 2022. |
| EDC (Elektroenergetické datové centrum) | Registration of sharing groups, storage and flexibility, and evaluation of aggregated technical flexibility from August 2026. |
| OTE spot markets | Czech day-ahead and intraday electricity markets. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | DSO-led legal rollout: free smart meters for qualifying supply points by 1 July 2027, all two-rate supply points by 2032 |
| Reading interval | 15 minutes for interval and smart meters; other households are read annually and settled on standard load profiles |
| Free installation by 1 July 2027 | Supply points using over 6 MWh a year, exporting solar, EV chargers and similar |
| Supply points to equip by mid-2027 | About 850,000 |
| Installed, March 2026 | ČEZ Distribuce ~320,000; EG.D 140,000+; PREdistribuce 65,000 |
| ČEZ Distribuce early-installation fee | CZK 5,897 plus CZK 1,947–4,957 a year |
| Sharing participants | Free interval meter within three months for systems under 50 kW |
| Meter owner | Local DSO |
Smart metering is a DSO responsibility under the metering decree (Decree 359/2020 Sb., as amended). From 1 July 2024 the DSOs have three years to install smart meters free of charge at supply points using more than 6 MWh a year and at points with exporting solar, an EV charger or significant electric heating. That is about 850,000 meters by 30 June 2027. All two-rate supply points are to have smart metering by 2032. Customers outside these groups can ask for a smart meter early but pay for it.
In March 2026 ČEZ Distribuce reported about 320,000 smart meters, installing 5,000–9,000 a week, EG.D more than 140,000 and PREdistribuce 65,000. Smart and interval meters record in 15-minute intervals, which sharing, spot contracts and flexibility need. Most households still have conventional meters read once a year and are settled on standard load profiles.
Renewable electricity.
Electricity generation mix (2025).
- Nuclear: 42.3%
- Coal: 35.2%
- Bioenergy: 8%
- Solar: 5.8%
- Gas: 5.4%
- Hydro: 2.3%
- Wind: 0.8%
- Other fossil: 0.2%
- Renewable electricity share
- 16.8% (2025)Source 12Share of domestic generation (bioenergy 8.01%, solar 5.81%, hydro 2.26%, wind 0.75%). Including nuclear, low-carbon sources were 59.13%. The EU directive-based RES-E share of consumption was 19.2% in 2025 (Eurostat).
- Home solar
- 251 MWp added in 2025 (2025)Source 43About 24,000 new family-house systems were connected in 2025 (Solar Association), against nearly 41,000 with 429 MW in 2024. No official total for installed residential capacity was identified; in 2024 about 86% of all solar systems were on family houses.
- Solar added each year
- 0.696 GW (2025)Source 43Solar Association: 27,298 new plants and 696 MW in 2025 (−28% on 2024), of which 251 MWp residential, 370 MWp business and 75 MWp ground-mounted.
- Solar
- 4.74 GW (31 Dec 2025)Source 13
- Nuclear
- 4.35 GW (31 Dec 2025)Source 13
- Steam (mainly coal)
- 9.22 GW (31 Dec 2025)Source 13
- Gas (combined cycle, gas and combustion)
- 2.85 GW (31 Dec 2025)Source 13Combined cycle 1,363.4 MW plus gas and combustion plants 1,481.8 MW.
- Pumped hydro
- 1.17 GW (31 Dec 2025)Source 13
- Hydro
- 1.12 GW (31 Dec 2025)Source 13
- Wind
- 0.38 GW (31 Dec 2025)Source 13
Targets.
- Updated national energy and climate plan (approved by the government in 2024): 30% renewable share of energy consumption by 2030.
- Coal phase-out by 2033; oil and gas by 2050 (national plan).
- Two new 1,000 MW APR-1000 nuclear units at Dukovany (contract with KHNP signed 4 June 2025), targeted for 2036 and 2037.
Czechia’s electricity is mostly low-carbon because of nuclear power: Dukovany and Temelín produced 32.1 TWh in 2025, 42% of generation, after output rose 8% year on year. Coal still produced about 35%, and renewables only about 17%, mainly bioenergy (8%) and solar (5.8%). Hydro output fell by 40% in the dry year of 2025. Wind is marginal at 378 MW.
Solar is the growth technology. Installed capacity rose from about 2.2 GW in 2021 to 4.74 GW at the end of 2025 (ERÚ), driven first by a household boom and then by business and ground-mounted plants. The household market has slowed: 24,000 family-house systems were connected in 2025, against about 41,000 in 2024. The Solar Association attributes this to market saturation and to changes in subsidies.
Energy storage.
- Home batteries
- 2,197.6 MWh (Dec 2025)Source 13ERÚ capacity of registered storage devices of up to 1 MWh each, used here as a proxy for home batteries. At the end of 2024 the Solar Association counted 157,507 storage systems, and 81% of new family-house solar systems that year included a battery.
- Grid-scale storage
- 232.5 MWh (Dec 2025)Source 13Derived: ERÚ storage in devices above 1 MWh (107.2 MWh at 1–10 MWh plus 125.3 MWh at 10–100 MWh). Excludes the SUAS GROUP battery commissioned in August 2026 and 1,171.5 MW of pumped hydro.
Czechia has one of the highest rates of home battery adoption in central Europe because household solar has been paired with storage from the start: grants under the Nová zelená úsporám programme supported batteries per kWh, and low export prices reward self-consumption. ERÚ recorded 2,430 MWh of registered storage at the end of 2025, up from 1,892 MWh a year earlier, and over 90% of it is in units of up to 1 MWh.
Grid-scale storage is only now arriving. Lex OZE III defined storage as an activity, and standalone batteries could connect to distribution networks from October 2025. The storage association AKU-BAT reported reservation requests amounting to thousands of MWh. The 57 MW / 120 MWh SUAS GROUP battery commissioned in August 2026 is the largest so far. Most projects aim at ČEPS balancing services and wholesale price arbitrage, though falling balancing prices are already affecting their business case.
Storage projects.
- SUAS GROUP Lipnice (Sokolov district): 57 MW / 120 MWh battery at the Lipnice solar plant, commissioned on 18 August 2026 and described as the largest in Czechia. It provides ČEPS balancing services and trades on day-ahead and intraday markets.
- ČEZ Ostrava-Vítkovice: 10 MW battery commissioned in February 2024 by the ČEZ group, used for grid stabilisation.
- Pumped-hydro storage: Pumped-hydro plants with 1,171.5 MW in total (ERÚ), the traditional source of storage in the Czech system.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| ČEZ Prodej | 2,702,098 supply points (December 2025, OTE) | Unknown | Yes | Limited | Yes |
| E.ON Energie | — | Unknown | Yes | Unknown | Yes |
| Pražská energetika (PRE) | — | Unknown | Yes | Unknown | Yes |
| innogy Energie | — | Unknown | Yes | Unknown | Yes |
| CENTROPOL ENERGY | 221,824 supply points (December 2025, OTE) | Unknown | Yes | Unknown | Unknown |
| Pražská plynárenská | 94,884 electricity supply points (December 2025, OTE) | Unknown | Yes | Unknown | Unknown |
| EP ENERGY TRADING | 85,065 supply points (December 2025, OTE) | Unknown | Yes | Unknown | Unknown |
| Nano Energies | — | Yes | Yes | Unknown | Unknown |
Every supplier can serve every household in the country, and time-of-use pricing is universal because suppliers must price the high- and low-rate periods of the DSO’s two-rate distribution tariffs. Meters belong to the DSO, so no supplier installs smart meters itself.
The market is concentrated: ČEZ Prodej alone supplies 2.7 million of the more than 6.3 million supply points registered with OTE. Switching is active, with 596,136 electricity supply points changing supplier in 2025, one of the highest figures on record. Market shares for suppliers other than those listed with figures were not verified from OTE data for this profile.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Industry and Trade (MPO) | Government | Energy policy and legislation | Drafts the Energy Act amendments, the national energy and climate plan and the flexibility action plan. |
| Energy Regulatory Office (ERÚ) | Regulator | Regulator | Licences, annual price decisions, connection and market-rule decrees, and statistics on the electricity system. |
| ČEPS, a.s. | Transmission | TSO and system operator | Buys balancing services and sets technical qualification rules for batteries and aggregators. |
| ČEZ Distribuce | Distribution | Largest DSO | Connection rules, approved inverter list and capacity maps for 3.8 million supply points. |
| EG.D | Distribution | DSO for South Moravia and South Bohemia | Connection and smart-meter rollout in its area. |
| PREdistribuce | Distribution | DSO for Prague | Connection and metering in Prague. |
| OTE, a.s. | Market | Market operator and supply-point registry | Registers supply points and switches, runs spot markets and settles imbalances and aggregation. |
| Elektroenergetické datové centrum (EDC) | Metering | Electricity data hub | Registers sharing, storage and flexibility and allocates shared electricity. |
| Solární asociace | Solar | Solar industry association | Publishes national solar and storage installation statistics and subsidy overviews. |
| AKU-BAT CZ | Storage | Energy storage association | Represents battery storage developers and reports on connection demand for standalone batteries. |
| Komora obnovitelných zdrojů energie | Renewable Energy | Renewable energy chamber | Cross-technology renewable industry body. |
| Státní fond životního prostředí (SFŽP) | Government | State Environmental Fund | Administers Nová zelená úsporám and Modernisation Fund programmes for solar, storage and heat pumps. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (generators) | EU Regulation 2016/631 (RfG); PPDS annex 4 | European Commission; DSOs (approved by ERÚ) | Annex 4 of the Distribution Code (Pravidla provozování distribučních soustav) sets the rules for parallel operation of generators and storage with the distribution network. Generating modules are classified by size (A1, A2 and above). |
| Inverters | ČSN EN 50549-1 with type certificate or approved test protocol | CENELEC (adopted as ČSN); SZÚ test lab 1045.1; DSO labs | Since 1 January 2025 only inverter types on the DSO’s approved list can be connected. Proof is a certificate from the accredited lab of the Strojírenský zkušební ústav, a test protocol from the ČEZ Distribuce or EG.D laboratories, or an ERÚ exemption. |
| Connection conditions | Decree 16/2016 Sb. on connection to the electricity system | ERÚ | Defines microsources (up to 10.8 kW, 16 A per phase), the simplified zero-export connection, impedance limits and DSO deadlines. |
| Metering | Decree 359/2020 Sb. on electricity metering | ERÚ | Sets metering types and the smart-meter installation obligations and deadlines. |
| Installer qualification | Government Decree 194/2022 Sb. (electrical competence); Act 406/2000 Sb. §10d (renewable installer authorisation) | Government; MPO | Electrical work requires competence under Decree 194/2022 Sb., which replaced Decree 50/1978 Sb. on 1 July 2022. Subsidised installations must be carried out by a holder of the “Elektromontér fotovoltaických systémů” (26-014-H) authorisation under §10d of the Energy Management Act. |
| Fire safety | Fire-safety conditions for installing electricity generators (building and fire regulations) | Fire Rescue Service of the Czech Republic (HZS ČR) | Rooftop systems are permit-free only if fire-safety conditions are met. HZS ČR publishes guidance on state fire supervision of solar plants up to 50 kW. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Building permit for rooftop solar up to 100 kW | No | National | Since 1 August 2025 renewable plants up to 100 kW are minor structures (drobné stavby) and building alterations to install them need no permit, provided load-bearing structures and the building’s use are unchanged and fire-safety rules are met. Specially protected areas are excluded. |
| Heritage approval | Limited | Local | On a listed building, or in a heritage reserve, zone or protective zone, the heritage authority decides on the installation. The National Heritage Institute must give a written opinion. |
| DSO connection approval | Yes | Regional | Every grid-parallel generator or battery needs a connection contract with the DSO and its consent to commissioning, including zero-export microsources. |
| ERÚ licence | Limited | National | Only above 100 kW, or for business operation, supported plants, or several generators or storage devices at one supply point. |
| Registration of sharing, storage or flexibility | Limited | National | Needed with the EDC only for those who share electricity, register storage or provide flexibility. |
Permitting for household solar is light. Since August 2025 the Building Act treats renewable plants up to 100 kW as minor structures, and if an authority does not decide on a solar project up to 100 kW within 30 days of a complete application, it is deemed approved. The practical constraint is the grid connection, not planning: DSOs refuse or limit export for a growing share of applications in congested areas.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Nová zelená úsporám 2026+ (interest-free loans) | Active | Interest-free loan | Since June 2026 the state programme for family houses and apartment buildings has been based mainly on interest-free loans, provided through banks from 16 September 2026: up to CZK 750,000 for partial and CZK 2,000,000 for comprehensive renovation of a family house, and CZK 250,000–750,000 per flat. Eligible measures include photovoltaics with storage, heat pumps and efficient water heating. | Applications 25 Jun 2026 – 31 Oct 2029 or until funds run out |
| NZÚ Light 2026+ (grants for vulnerable households) | Active | Grant | Grants of up to CZK 400,000 per household for recipients of social benefits, low-income pensioners and disability pensioners, of which up to CZK 150,000 for heat sources and renewable energy. | From 25 Jun 2026 |
| Nová zelená úsporám – family-house grants (NZÚ Light 2025, “Oprav dům po babičce”) | Closed | Grant | Grants for solar, batteries and heat pumps for owner-occupiers, with a total allocation of CZK 16.5 billion. Acceptance of new applications was suspended because the allocation was used up; previously submitted applications are still processed. | 20 Feb 2025 – suspended before 1 Jan 2026 |
| Modernisation Fund RES+ (business and public solar) | Closed | Grant | Calls RES+ 1/2025 (self-consumption solar of 50 kWp–5 MWp, up to 30% of costs), 3/2025 (municipal buildings) and 4/2025 (municipal and community solar, with optional batteries). | 1 Jul 2025 – 30 Jan 2026 |
| State funding of renewable support (POZE) | Active | Levy removal | Since 1 January 2026 the cost of operating support for older renewable plants is paid from the state budget, so the POZE contribution on bills is zero (previously 495 CZK/MWh before VAT for households). | From 1 Jan 2026 |
Data and connectivity.
- Fixed broadband
- 95.5 % of households (2025)Source 8Households with internet access (Eurostat: 95.47%).
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Almost all Czech households have internet access, which supports app-based monitoring and control of inverters, batteries and heat pumps. Supply points in sharing groups or flexibility portfolios rely on the DSO’s interval or smart meter, whose 15-minute data is passed to OTE and the EDC. Low-rate periods are still switched mainly by the DSOs’ ripple-control (HDO) system.
Grid conditions.
- National peak demand
- 12.3 GW (12 Jan 2026)Source 54All-time record instantaneous load reported by ČEPS. The 2025 annual maximum was 11,720 MW on 19 February 2025 (ERÚ).
- Annual electricity demand
- 68.7 TWh (2025)Source 13Gross domestic consumption (+2.2% on 2024). Gross generation was 76.4 TWh.
- Generation capacity
- 23.8 GW (31 Dec 2025)Source 13
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The Czech system has ample conventional capacity and exports in most months. The constraints that affect households are local: low-voltage and medium-voltage networks in areas with dense rooftop solar, especially in South Moravia, often cannot accept more export. In early 2025 the regional DSOs held connection requests for a few tens of thousands of MW of solar and wind and several thousand MW of standalone storage, much of which may never be built.
ERÚ expects further growth in solar, heat pumps, EV charging and storage. It is reforming network tariffs: capacity pricing for high and very high voltage changes from 1 January 2027, and a low-voltage tariff using distribution flexibility is to be piloted by 2028.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Renewable support charge removed from bills | Current | 1 Jan 2026 | POZE is fully funded by the state budget; regulated charges for low-voltage customers fell by 15.1% on average. |
| Lex OZE III (Act 87/2025 Sb.) | Current | 1 Aug 2025 (staged to 2028) | Storage and aggregation defined, licence threshold raised to 100 kW, standalone batteries allowed from October 2025, stronger consumer contract rules. |
| Separate production EAN for exporting generators | Current | 1 Jul 2025 | Exports are recorded on their own EAN with balancing responsibility contracted with a trader. |
| 15-minute settlement | Current | Oct 2025 | Imbalance settlement and spot products moved from hourly to 15-minute intervals. |
| EDC storage, technical flexibility aggregation and network traffic light | Current | 1 Aug 2026 | Independent aggregators can provide aggregated flexibility for balancing services, evaluated by the EDC. |
| New capacity pricing at high voltage | Upcoming | 1 Jan 2027 | Reserved capacity charges replaced by charges for reserved input and maximum power drawn at 110 kV and 22 kV levels. |
| Smart-meter deadline for qualifying supply points | Upcoming | 30 Jun 2027 | About 850,000 supply points (over 6 MWh a year, exporting solar, EV chargers) must have DSO smart meters; all two-rate points by 2032. |
| Commercial flexibility aggregation | Upcoming | Dec 2027 | Aggregation of flexibility for energy-market trading, evaluated through the EDC and OTE. |
| Flexible low-voltage distribution tariff | Upcoming | Pilot by 2028; wider from 2030 | ERÚ plans a distribution tariff using distribution flexibility for customers with AMM meters. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | About 239,000 solar plants with 5.16 GWp at the end of 2025, most on family houses; nearly 41,000 family-house systems were connected in 2024 and 24,000 in 2025. |
| Distributed energy market | High | Rooftop solar with batteries is common, 28,345 sharing groups were registered by June 2026, and independent aggregation started in August 2026, although export is increasingly limited by grid capacity. |
| Grid flexibility market | Medium | ČEPS balancing markets are open to aggregators (one aggregator supplies over 280 MW), and independent aggregation via the EDC started in August 2026, but commercial flexibility only follows in December 2027 and DSO flexibility is at the pilot stage. |
| Energy storage adoption | High | ERÚ recorded 2,430 MWh of storage at the end of 2025, over 90% in units of up to 1 MWh, and 81% of new family-house solar systems in 2024 included a battery. |
| Renewable growth environment | Low | The renewable share of generation was flat at about 17% in 2024–2025 (Ember), solar additions fell 28% to 696 MW in 2025 and wind capacity is under 0.4 GW. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 58 sources
- Electricity prices for household consumers – bi-annual data (nrg_pc_204). Eurostat, 2026. accessed 1 October 2026.
- Population on 1 January (tps00001). Eurostat, 2026. accessed 1 October 2026.
- Number of households by household composition (lfst_hhnhtych). Eurostat, 2025. accessed 1 October 2026.
- Average household size (lfst_hhantych). Eurostat, 2025. accessed 1 October 2026.
- Complete energy balances (nrg_bal_c). Eurostat, 2024. accessed 1 October 2026.
- Distribution of population by tenure status (ilc_lvho02). Eurostat, 2025. accessed 1 October 2026.
- Distribution of population by dwelling type (ilc_lvho01). Eurostat, 2025. accessed 1 October 2026.
- Level of internet access – households (isoc_ci_in_h). Eurostat, 2025. accessed 1 October 2026.
- Passenger cars by type of motor energy (road_eqs_carpda). Eurostat, 2025. accessed 1 October 2026.
- Share of energy from renewable sources (nrg_ind_ren). Eurostat, 2025. accessed 1 October 2026.
- Urban population (% of total population) – Czechia. World Bank, 2025. accessed 1 October 2026.
- Yearly electricity data – Czechia. Ember, 2025. accessed 1 October 2026.
- Roční zpráva o provozu elektrizační soustavy České republiky 2025. Energetický regulační úřad (ERÚ), 2026. accessed 1 October 2026.
- ERÚ vydal změnový cenový výměr, kterým upravuje regulované ceny elektřiny na rok 2026 (tisková zpráva, 29. 12. 2025). Energetický regulační úřad (ERÚ), 2025. accessed 1 October 2026.
- Aktualizace harmonogramu a trendů Koncepce propojení nového designu trhu v elektroenergetice s požadavky na změnu v regulovaných cenách a tarifech. Energetický regulační úřad (ERÚ), 2025. accessed 1 October 2026.
- Vyhláška č. 16/2016 Sb., o podmínkách připojení k elektrizační soustavě (consolidated 2026). ČEZ Distribuce (text of ERÚ decree), 2026. accessed 1 October 2026.
- Slovníček pojmů: EAN. ČEZ. accessed 1 October 2026.
- Co je EAN a EIC kód elektroměru a plynoměru. Kupní síla. accessed 1 October 2026.
- Příloha č. 4 – EIC kódy (Řád provozovatele lokální distribuční soustavy). Energetický regulační úřad (ERÚ). accessed 1 October 2026.
- Majitelé fotovoltaik a dalších obnovitelných zdrojů musí mít nově dva EAN kódy. Echo24, 2025. accessed 1 October 2026.
- Registrace odběrných míst na trhu s elektřinou u operátora trhu. OTE, a.s., 2018. accessed 1 October 2026.
- Nejvíc nových odběratelů loni získala v elektřině EP ENERGY TRADING, a.s., v plynu ČEZ Prodej, a.s. (tisková zpráva). OTE, a.s., 2026. accessed 1 October 2026.
- Svého dodavatele elektřiny a plynu loni změnilo téměř 800 tisíc odběratelů (tisková zpráva). OTE, a.s., 2026. accessed 1 October 2026.
- Agregátor/Poskytovatel flexibility – pokyny k testování v CS OTE. OTE, a.s.. accessed 1 October 2026.
- EDC spouští nové služby pro stabilitu sítí a plánuje další rozvoj. TZB-info, 2026. accessed 1 October 2026.
- EDC letos rozšíří služby o nové funkce k akumulaci energie nebo řízení sítí. oEnergetice.cz, 2026. accessed 1 October 2026.
- Chci sdílet elektřinu vyrobenou fotovoltaikou, ale nevím jak na to. Deník.cz, 2024. accessed 1 October 2026.
- Novela energetického zákona (lex OZE III), 87/2025 Sb.. Právní prostor, 2025. accessed 1 October 2026.
- Začnou platit novely energetického zákona týkající se plynu a ukládání energie. oEnergetice.cz, 2025. accessed 1 October 2026.
- Limit pro povinnou licenci na výrobu elektřiny se od srpna zvýšil. oEnergetice.cz (ERÚ), 2025. accessed 1 October 2026.
- Czechia introduces new licensing rules for energy storage. ESS News, 2025. accessed 1 October 2026.
- Navigating Energy Law: A Guide for Investors and Businesses in the Czech Republic. ARROWS advokátní kancelář, 2026. accessed 1 October 2026.
- Připojení výroben a akumulace (OZE). ČEZ Distribuce, 2026. accessed 1 October 2026.
- Připojení mikrozdroje, výrobny nebo akumulace spojené s výrobnou do 100 kW. ČEZ Distribuce, 2026. accessed 1 October 2026.
- Změny v procesu připojování výrobního modulu A1/A2. ČEZ Distribuce, 2025. accessed 1 October 2026.
- Každý třetí zdroj nepřipojí. Odmítání solárů distributory pokračuje. Seznam Zprávy, 2026. accessed 1 October 2026.
- Kdo dostane chytrý elektroměr dřív? Ten, kdo má starý, nebo kdo si ho zaplatí. Seznam Zprávy, 2026. accessed 1 October 2026.
- Výměna elektroměrů zrychluje, pro některá místa je povinná. ČT24, 2026. accessed 1 October 2026.
- Přehled distribučních sazeb elektřiny. ČEZ. accessed 1 October 2026.
- ČEZ Prodej spouští Dynamický tarif. TZB-info, 2026. accessed 1 October 2026.
- Dynamické ceníky elektřiny jsou lákavé, ale rizikové. Pozor i na triky dodavatelů. TZB-info, 2026. accessed 1 October 2026.
- Za prodej přetoků ze solárů bude méně peněz kvůli změnám v síti. Seznam Zprávy, 2025. accessed 1 October 2026.
- Výroční zpráva Solární asociace 2025. Solární asociace, 2026. accessed 1 October 2026.
- V ČR loni začaly přibývat velké solární elektrárny, trh domácností zpomalil. oEnergetice.cz (Solární asociace data), 2025. accessed 1 October 2026.
- Dotace na opatření zahrnující instalaci FVE či akumulaci – aktualizace k 1. 1. 2026. Solární asociace, 2026. accessed 1 October 2026.
- Nová zelená úsporám: domácnosti mohou začít s přípravou žádostí. Státní fond životního prostředí / Nová zelená úsporám, 2026. accessed 1 October 2026.
- Finanční instituce mohou začít poskytovat bezúročné úvěry z programu Nová zelená úsporám. Státní fond životního prostředí / Nová zelená úsporám, 2026. accessed 1 October 2026.
- SUAS GROUP spustila na Sokolovsku největší bateriové úložiště v Česku. oEnergetice.cz, 2026. accessed 1 October 2026.
- Skupina ČEZ zahájila v Ostravě-Vítkovicích provoz největší baterie v Česku. oEnergetice.cz, 2024. accessed 1 October 2026.
- Energetici zapojí do distribuce samostatné baterie, žádosti jsou pro tisíce MWh. oEnergetice.cz (AKU-BAT CZ), 2025. accessed 1 October 2026.
- Aktuální úprava FVE a stavební zákon; povolení FVE do 100 kW. Ústav územního rozvoje (conference presentation), 2025. accessed 1 October 2026.
- ENTSO-E welcomes the first exchange on the European balancing platform PICASSO. ENTSO-E, 2022. accessed 1 October 2026.
- Balancing services market is changing as ČEPS auctions show rise of aggregators and pressure on flexibility prices. oEnergetice.cz, 2026. accessed 1 October 2026.
- Česká rozvodná elektrická síť byla kvůli mrazům pod rekordním náporem. Seznam Zprávy (ČEPS data), 2026. accessed 1 October 2026.
- Vláda projednala přeměnu energetiky. Podíl zelených zdrojů se má zdvojnásobit. ČT24, 2024. accessed 1 October 2026.
- Czech-KHNP Dukovany contract signed after court lifts injunction. World Nuclear News, 2025. accessed 1 October 2026.
- Informace pro zájemce o instalaci OZE (NZÚ Light). MAS Broumovsko+, 2024. accessed 1 October 2026.
- Nařízení vlády č. 194/2022 Sb., o požadavcích na odbornou způsobilost k výkonu činnosti na elektrických zařízeních. TZB-info, 2022. accessed 1 October 2026.
Questions about energy in Czechia.
Eurostat puts the average household price at 7.85 CZK/kWh (about €0.32/kWh) including taxes in the second half of 2025, for the 2,500–4,999 kWh band. From 1 January 2026 regulated charges fell by about 15% on average because the state took over the cost of renewable support. The final price depends on the supplier’s energy price and the distribution tariff.
The EAN code of the supply point (EAN kód odběrného místa): an 18-digit number beginning 8591824, assigned by the DSO when the supply point is registered. It stays with the property, is printed on every bill and contract, and is used for switching supplier, connecting solar and joining sharing groups.
Yes. You need a connection contract with the DSO that allows export, a production EAN and a purchase contract with a trader. Export prices are set by the trader; there is no net metering. Systems up to 10.8 kW can be connected more simply if they do not export at all.
Not for a non-business system of up to 100 kW that is the only generator (or storage device) at the supply point. Larger or commercial systems need an ERÚ licence, and every grid-connected system needs DSO approval.
ČEZ Distribuce (most of the country), EG.D (South Moravia and South Bohemia) and PREdistribuce (Prague), plus small local distribution systems. ČEPS operates the transmission grid.
Yes. Since August 2024 an active customer can share electricity with up to 11 supply points and an energy community with up to 1,000, registered with the Electricity Data Centre (EDC). Interval meters are required and shared electricity is allocated in 15-minute intervals.
DSOs must install smart meters free of charge by 1 July 2027 at supply points using over 6 MWh a year, with exporting solar or an EV charger, and at all two-rate supply points by 2032. Other customers can request one earlier for a fee.
The broad Nová zelená úsporám grants for family houses were suspended after the funds ran out. Since June 2026 the programme offers interest-free loans for renovations including solar with storage, and grants only for vulnerable households.