How electricity works in Iraq.
Iraq electricity 2026: Ministry of Electricity grid, gas and oil generation, high network losses, private generators, Kurdistan Runaki 24-hour power and new solar plants.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Iraqi dinar (IQD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Iraq energy at a glance.
Key figures for households in Iraq. Each one links to its source on the full overview below.
Renewable share.
1.6% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? No. Details are in the export section below.
Four things to check in Iraq.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Iraq below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Iraq requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Iraq.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Iraq, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Iraq, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Iraq.
The energy market in Iraq, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Electricity in Iraq is supplied by the state. In federal Iraq the Ministry of Electricity owns and runs generation, transmission and distribution through state general companies, and it buys additional power from privately financed "investment" power stations, from neighbouring countries and from the Kurdistan Region. The Kurdistan Region has its own Ministry of Electricity, which runs the network in Erbil, Sulaymaniyah, Duhok and Halabja.
Generation is almost entirely fossil-fuelled. In 2024 gas produced about 53% of Iraq's electricity and oil about 45%, with hydropower (1.3%) and solar (0.3%) making up the rest, according to Ember data. The federal power system handled 165.6 TWh in 2024, of which 58% came from Ministry of Electricity plants and the rest from investment plants, imports and purchases from the Kurdistan Region. More than half of the energy delivered to distribution companies was lost or not billed.
Supply does not meet demand in the hottest and coldest months, so many households also pay for power from neighbourhood diesel generators. The government is promoting solar: the first 250 MW phase of the 1,000 MW Shams Basra plant began operating in May 2026, and the Central Bank of Iraq finances low-interest loans for home solar systems. In the Kurdistan Region the Runaki project, launched in November 2024, was providing 24-hour grid power to more than 90% of residents by August 2026.
Energy snapshot.
Headline figures for electricity in Iraq. Each shows its data year and links to its source.
- Population46,118,793 peopleSource 82024
- Households8,054,385 householdsSource 82024
- Average household size5.73 people/householdSource 82024
- Electricity use per householdNot identified from a reliable public source.
- Household price (IQD)Not identified from a reliable public source.
- Household price (EUR)Not identified from a reliable public source.
- Renewable electricity share1.62%Source 32024
- Solar capacity0.042 GWSource 62024
- Wind capacity0 GWSource 62024
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter shareNot identified from a reliable public source.
- Market structure
- Single buyer
- Homes can export to the grid
- No
- Home equipment in grid services
- No
- Regulator
- Ministry of Electricity (federal) and Kurdistan Regional Government Ministry of Electricity; no independent regulator identified
- System operator
- Ministry of Electricity (federal grid)
- Distribution networks
- State general companies for electricity distribution (Baghdad, North, Centre, Middle Euphrates, South) under the Ministry of Electricity; the Kurdistan Region has its own ministry-run network. No supplier choice.
- Currency
- Iraqi dinar (IQD)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Iraq.
- Household price (IQD)
- Not identified from a reliable public source.
- Household price (EUR)
- Not identified from a reliable public source.
- Typical annual electricity bill
- Not identified from a reliable public source.
How prices are set
Household electricity in Iraq is a public service priced by the government. In federal Iraq the Ministry of Electricity sets tariffs and its distribution companies read meters and collect bills; in the Kurdistan Region the regional Ministry of Electricity does the same. Prices are far below the cost of supply: a 2023 World Bank report found that electricity utilities recovered slightly less than 10% of their costs because of low tariffs and weak billing, collection and loss control, with the difference covered by the state budget and state oil companies.
Two bills
Because grid power is rationed at peak times, many households pay two bills: one to the state distribution company and one to a neighbourhood generator owner, who sells a number of amperes for a monthly fee. A September 2026 report described grid supply falling to around 10 hours a day in peak summer and winter, generator fees of about 20,000 dinars per ampere a month, and middle-income families spending 1.1–1.25 million dinars a year on the two together. These are press figures, not official statistics.
Kurdistan Region
Under the Runaki project, households that receive 24-hour grid power no longer need a generator subscription. The regional government says about 80% of Runaki subscribers, especially low-income households, now pay less than they did for grid power and generators combined. The average August 2026 bill of 34,000 dinars for 462 kWh implies roughly 74 dinars per kWh (derived; not a published tariff).
Exchange rate
In October 2026 the government changed the official dinar rate from 1,320 to 1,500–1,520 dinars per US dollar. Dinar prices for electricity therefore convert to fewer euros or dollars than before.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Federal households are billed by their state distribution company at tariffs set by the Ministry of Electricity. The current dinar rates and block structure could not be verified on an accessible official page. |
| Regulated | Limited | Kurdistan Region (Runaki): households on 24-hour supply pay monthly bills to the regional electricity directorates. In August 2026 the average bill was 34,000 dinars for an average of 462 kWh per billing cycle, ranging from 27,000 dinars in Halabja to 38,000 dinars in Duhok. Bills must be paid within 50 days. |
| Other | Yes | Neighbourhood private generators: households buy a fixed number of amperes for a monthly fee, about 20,000 dinars per ampere in a September 2026 report, rising sharply in summer. This is a separate, unregulated supply alongside the grid. |
| Time-of-use | No | No household time-of-use tariff was identified. |
| Dynamic | No | There is no wholesale market to which household prices could be linked. |
Household prices compared with neighbouring countries (EUR per kWh).
- Turkey€0.066
- Jordan€0.062
- Saudi Arabia€0.049
- Kuwait€0.015
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- Not identified from a reliable public source.
- Average daily use per household
- Not identified from a reliable public source.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,756 kWh/person/yr (2024)Source 2World Bank indicator for electric power consumption per capita, all sectors (1,755.7 kWh in 2024, up from 1,377.4 kWh in 2023). Ember puts per-capita demand at 0.9 times the global average.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- Not identified from a reliable public source.
Households are the largest electricity users in Iraq. In 2024 the federal distribution companies billed 67.5 TWh, of which domestic customers took 36.5 TWh (54%), government 17.7%, industry 11.0%, commercial customers 6.7% and agriculture 1.7%. A further 8.7% was billed to "encroachers", users connected without authorisation. These figures exclude the Kurdistan Region.
Demand peaks in summer, and again in winter. Supply falls short at these times. In August 2026 a member of the parliamentary electricity committee said generation was about 22,000 MW while national demand was about 60,000 MW; these figures were not published by the ministry.
Per-capita consumption across all sectors was about 1,756 kWh in 2024, according to the World Bank, below the world average. Billed sales understate real use: in 2024 the federal distribution companies received 149.5 TWh but billed 67.5 TWh, with the rest lost technically or through unauthorised use.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- Not identified from a reliable public source.
- Private rented
- Not identified from a reliable public source.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- Not identified from a reliable public source.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 69.9 % of population (2025)Source 2World Bank.
Iraq held its first full population and housing census in 37 years in November 2024. It counted 46.1 million residents in 8.05 million households, an average of about 5.7 people per household (derived), much larger than in Europe. About 70% of people live in towns and cities, according to the World Bank.
Detailed housing results by tenure and dwelling type were not available on an accessible official page for this profile, so they are shown as not identified. The government ordered ministries and state institutions to install solar panels in February 2026.
How the grid works in Iraq.
- TransmissionMinistry of Electricity transmission companies
- DistributionState general companies for electricity distribution (Baghdad, North, Centre, Middle Euphrates, South) under the Ministry of Electricity; the Kurdistan Region has its own ministry-run network. No supplier choice.
- MeteringNot identified from a reliable public source.
- Supply2 or more retail suppliers
Physical flow
In 2024 the federal system handled 165.6 TWh. Ministry of Electricity power stations generated 96.6 TWh: gas turbines 58.3 TWh, steam plants 32.0 TWh, hydropower 3.5 TWh and diesel units 2.9 TWh. Investment power stations and imports supplied 59.7 TWh and the Kurdistan Region 9.3 TWh. Power is carried over the 400 kV and 132 kV networks to distribution substations and then to homes over 33 kV and 11 kV lines.
Losses
Losses are among the highest in the world. In 2024 the distribution companies received 149.5 TWh and lost or consumed internally 82.0 TWh, or 54.9%, with branch losses ranging from 23% to 70%. The ministry's 2025 statistical report put distribution losses at 80.6 TWh, 52% of the 154.0 TWh received. Losses include technical losses on old networks and unbilled use through unauthorised connections.
Commercial flow
There is no wholesale market. The Ministry of Electricity acts as the single buyer: it generates most power itself and pays investment plants, neighbouring countries and the Kurdistan Region for the rest. According to the ministry's 2025 report, 59% of the 170.1 TWh supplied in 2025 came from government stations and 41% was purchased. Distribution companies sell to customers at government-set tariffs.
Generators
The gap between supply and demand is filled by private diesel generators in residential neighbourhoods, which run on their own small local networks and sell supply by the ampere. They are separate from the public grid.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Electricity (federal) | Owns and operates the federal power system: power stations through its production companies, the 400 kV and 132 kV transmission network, and distribution. It also sets tariffs, signs contracts with investment power stations and arranges imports. The Electricity Minister in 2026 is Ali Wahib. |
| Ministry | Ministry of Electricity, Kurdistan Regional Government | Runs generation purchases, transmission and distribution in the Kurdistan Region, and the Runaki 24-hour electricity project. It also sells power to the federal grid (9.3 TWh in 2024). |
| TSO | Ministry of Electricity transmission companies | State companies under the ministry run 54 substations at 400 kV (46,350 MVA) and 317 at 132 kV (56,721 MVA) across the federal governorates (2024), and dispatch generation. |
| DSO | General companies for electricity distribution | Five state distribution companies cover federal Iraq: Baghdad (Rusafa, Karkh and Sadr branches), North, Centre, Middle Euphrates and South. They operate 901 33/11 kV substations (57,615 MVA in 2024), connect and meter customers and collect bills. |
| Supplier | Investment (independent) power stations | Privately financed plants that sell their output to the Ministry of Electricity. In 2024 they had 10,678 MW of design capacity, the largest single group in the federal system. |
Compared with the UK system.
| UK concept | Iraq equivalent | How it works |
|---|---|---|
| DNO | General company for electricity distribution | Five state companies, organised in governorate branches, own and operate the local networks. Unlike UK DNOs they also bill and collect payment from households, so network and supply are not separated. |
| National Grid/NESO | Ministry of Electricity transmission companies and dispatch | The ministry owns the high-voltage network and decides which plants run. There is no independent system operator or wholesale market. |
| MPAN | Subscriber (account) number on the electricity bill | Each connection is recorded by the distribution branch and identified by an account number and meter number on the bill. No national structured code like the MPAN has been published. |
| MPRN | No equivalent | No household gas supply-point identifier was identified in the sources used for this profile. |
| Meter operator | Distribution company | The distribution company installs, owns and reads the meter. There is no separate metering market. |
| Supplier | Distribution company (no retail choice), plus private generator owners | Households cannot choose a grid supplier. Many also buy a separate, unregulated supply from a neighbourhood generator owner, which has no UK equivalent. |
| Smart-meter infrastructure | No national smart-meter system identified | No national smart-meter programme or data hub like the DCC was identified on an accessible official source. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Subscriber account number (raqm al-hisab) |
| Who issues it? | Branch of the state distribution company (federal) or regional electricity directorate (Kurdistan Region) |
| Format | A numeric account number assigned to each metered connection and printed on the bill together with the meter number. The exact structure and length could not be verified on an accessible official page. |
| Length | Not verified from an accessible official source |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the electricity bill and the meter record held by the local distribution branch. |
| Electronic access | The Kurdistan Region runs an online Runaki services portal for subscribers. Details of online access to federal account and consumption data could not be verified. |
| Third-party access | No data-access or consent framework for third parties was identified. |
| Who keeps the register | Subscriber records held by each distribution company branch (federal) and by the Kurdistan Region electricity directorates. |
| Register scope | Per DSO |
In Iraq a home connection is identified by its subscription with the local distribution branch, not by a national supply-point code. A household applies to the branch for a connection; the branch installs a meter, opens an account and issues bills, which carry the account and meter numbers used to pay or query the bill.
Because the distribution company is also the only seller of grid electricity, there is no switching between suppliers and no need for a national register of supply points. Records are kept by each company and its governorate branches. In the Kurdistan Region, Runaki customers are managed by the regional electricity directorates and an online services portal.
The account number's structure and length, and whether it stays with the property when occupants change, could not be confirmed from an accessible official source, so no example is given. Neighbourhood generator supplies have no formal identifier; they are informal agreements with the generator owner.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Unknown |
| Net metering | Unknown |
| Net billing | Unknown |
| How exported electricity is paid | No generally available payment for household exports was identified on an accessible official source. |
| Can households sell solar electricity to the grid? | No established, generally available household export or net-metering scheme was identified on an accessible official source as of October 2026. |
| Is there financing for home solar? | Yes. The Central Bank of Iraq finances solar loans through state banks. In September 2026 Rasheed Bank offered up to 30 million dinars over up to seven years at 3% a year, with up to six months before repayment starts. |
| Are there technical connection rules? | Applicable grid-connection standards for small systems could not be verified on an accessible official page. |
Connecting a home system.
- Choose a supplier and installer for the solar system.
- Apply for financing if needed, for example a Central Bank of Iraq-funded solar loan through a state bank such as Rasheed Bank.
- Install the system, usually to supply the home directly and reduce reliance on the grid and generators.
- Contact the local distribution branch before connecting any system to the grid; rules for grid-connected household systems could not be verified.
Household solar in Iraq is mainly used to cover the hours when grid power is cut and to reduce payments to private generators, rather than to export. A September 2026 report put the cost of a system able to supply 15 amperes at about 7 million dinars.
The government supports uptake through low-interest loans financed by the Central Bank of Iraq and administered with the Ministry of Environment and state banks. No verified rules for exporting household solar power to the grid, or for payment for exports, were identified, so export is shown as unknown rather than available.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (utility scale) | Contract with the Ministry of Electricity; private plants are built as investment projects that sell their output to the ministry. | Ministry of Electricity (federal); KRG Ministry of Electricity (Kurdistan Region) | Investment plants had 10,678 MW of design capacity in federal Iraq in 2024. |
| Generate electricity (household solar for own use) | No licence requirement identified for off-grid or self-consumption systems; any grid connection is a matter for the distribution company. | Distribution company | Thresholds and exemptions could not be verified on an accessible official page. |
| Store electricity | No specific storage licensing regime identified. | Ministry of Electricity | Utility storage is being procured alongside large solar projects. |
| Export to the grid | No household export scheme identified. | Distribution company | See the export section. |
| Sell or supply electricity to households | Reserved to the state distribution companies (federal) and regional directorates (Kurdistan Region). | Ministry of Electricity; KRG Ministry of Electricity | Neighbourhood generator supply is a separate local activity overseen by local authorities; its rules were not verified. |
| Aggregation, trading, balancing, grid services, VPP and remote control of assets | No market or licence category exists for these activities. | Ministry of Electricity | There is no wholesale or ancillary-services market. |
Iraq has no independent electricity regulator and no general licensing regime for market activities. The Ministry of Electricity (and in the Kurdistan Region the regional ministry) owns the networks, buys all wholesale power and sells to customers, so private participation takes the form of contracts with the ministry rather than licences to trade.
Private developers take part as investment power stations and, increasingly, solar developers under agreements with the ministry, such as TotalEnergies at Shams Basra. Activities such as aggregation, trading or providing grid services have no legal category because no market exists for them.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale energy market | No | — | No | No wholesale market exists; the Ministry of Electricity is the single buyer. |
| Balancing and ancillary services | No | — | No | Ministry of Electricity. Balancing is carried out within the state system; no market for third-party services was identified. |
Iraq has no flexibility or ancillary-services markets for distributed assets. Demand is managed by rationing supply at peak times, with power cut by area and households relying on generators, batteries and solar to cover the gaps.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | No national rollout identified |
| Reading interval | Not applicable |
| Meter owner | Distribution company |
| National smart-meter statistics | Not identified |
No national smart-meter programme or penetration statistics were identified on an accessible official source. Meters are installed and read by the distribution companies. Reducing unbilled consumption is a stated priority, and in 2024 the federal distribution companies recorded 5.9 TWh of sales to unauthorised users.
Renewable electricity.
Electricity generation mix (2024).
- Gas: 53%
- Oil: 45.4%
- Hydropower: 1.3%
- Solar: 0.3%
- Renewable electricity share
- 1.62% (2024)Source 3Share of electricity generation from hydropower (1.34%) and solar (0.29%), Ember data via Our World in Data. Net imports were 7.1 TWh against 149.7 TWh of generation in 2024 (about 4.5% of supply), so the generation share is used. IRENA reports a 3% renewable share (3,030 of 118,464 GWh) for 2023, reflecting a different generation total.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- Not identified from a reliable public source.
- Hydropower
- 1.557 GW (2024)Source 6The Ministry of Electricity reports 1,864 MW of design capacity in seven hydro stations in federal Iraq (2024).
- Solar
- 0.042 GW (2024)Source 6Shams Basra added 250 MW in May 2026.
- Wind
- 0 GW (2024)Source 6
Targets.
- Shams Basra: 1,000 MW of solar developed with TotalEnergies; 250 MW operating from May 2026.
- A December 2025 agreement covers a further 3,000 MW solar project with battery storage and transmission.
- February 2026 government directive for ministries and state institutions to install solar panels.
Iraq has very little renewable electricity. In 2024 hydropower and solar provided about 1.6% of generation, and Ember puts clean sources at 2% with wind and solar at 0.3%. Hydropower depends on river and reservoir levels; the ministry's 2025 report shows hydro output falling 50.8%, from 3.48 TWh in 2024 to 1.71 TWh in 2025, because of drought.
Solar resources are strong, especially in the south and west. Large solar projects have started to come online: the first 250 MW of TotalEnergies' Shams Basra plant began operating in May 2026, and a 3,000 MW solar-plus-storage agreement was signed in December 2025. The government also promotes rooftop systems through low-interest loans and requires state institutions to install solar.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Battery storage is at an early stage. Grid-scale storage is being planned as part of large solar projects, while households use batteries with solar panels or inverters to bridge scheduled power cuts.
Storage projects.
- 3,000 MW solar project with battery storage: Agreement signed in December 2025 covering solar generation, battery storage and transmission.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| State general companies for electricity distribution (Ministry of Electricity) | All grid customers in federal Iraq | No | No | No | Unknown |
| Kurdistan Regional Government Ministry of Electricity (Runaki) | All grid customers in the Kurdistan Region | No | No | No | Unknown |
There is no retail competition. In federal Iraq the state distribution companies are the only grid suppliers; in the Kurdistan Region the regional ministry supplies customers, increasingly on 24-hour Runaki service. Private neighbourhood generators sell a parallel, locally arranged supply.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Electricity | Government | Owner and operator of the federal power system | Sets tariffs, runs generation, transmission and distribution, and contracts private and imported power. |
| Ministry of Electricity, Kurdistan Regional Government | Government | Electricity authority for the Kurdistan Region | Runs the regional network and the Runaki 24-hour electricity project. |
| Statistics and Geographic Information Systems Authority (formerly Central Statistical Organization) | Government | National statistics office | Publishes annual electricity statistics and ran the 2024 census with the Ministry of Planning. |
| Central Bank of Iraq | Government | Central bank | Finances the low-interest renewable energy and solar loan initiative. |
| Ministry of Environment | Government | Environmental policy | Promotes solar uptake and works with the Central Bank on residential solar loans. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection | Not identified | Ministry of Electricity | No published grid-connection standard for small generators could be verified on an accessible official page. |
| Supply voltage | 230 V / 50 Hz | Ministry of Electricity | Low-voltage supply via 33/11 kV distribution networks. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Distribution company approval for grid connection | Limited | Regional | Any connection to the public network goes through the local distribution branch; specific rules for small generators were not verified. |
| Planning permission for rooftop solar | Limited | Local | No national rule identified; local municipal requirements may apply. |
No consolidated national permitting process for household solar was identified. Systems built for self-consumption are typically installed without grid connection; anything that connects to the public network involves the distribution company.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Central Bank of Iraq renewable energy and solar loan initiative | Active | Low-interest loan | Loans through state banks for citizens and employees to buy solar and renewable systems. In September 2026 Rasheed Bank offered up to 30 million dinars over up to seven years at 3% a year, with a grace period of up to six months. | — |
Data and connectivity.
- Fixed broadband
- 81.5 % of population using the internet (2024)Source 2World Bank: individuals using the internet (81.47%).
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
About 81% of Iraqis used the internet in 2024, mostly over mobile networks. The Kurdistan Region's Runaki programme uses an online services portal for subscribers. No national smart-meter communications standard was identified.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 165.6 TWh (2024)Source 1Total energy in the federal system (generation, imports, investment plants and purchases from the Kurdistan Region): 165,630,355 MWh. Excludes the Kurdistan Region's own consumption. The ministry's 2025 report gives about 170.1 TWh for 2025.
- Generation capacity
- 39.2 GW (2024)Source 1Design capacity of federal power stations including investment plants (39,165 MW); average actual output was 18,855 MW. Excludes the Kurdistan Region. IRENA reports 33.97 GW nationally (32,368 MW non-renewable + 1,599 MW renewable) at end-2024.
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- Not identified from a reliable public source.
The federal grid cannot meet peak demand, so power is rationed by area, and supply hours fall in summer and winter. In 2024 ministry plants averaged 18,855 MW of actual output against 39,165 MW of design capacity, reflecting fuel shortages, ageing units and maintenance.
Iraq depends on imports of electricity and of gas for its power stations. Net electricity imports were 7.1 TWh in 2024, according to Ember data, and in 2025 41% of supply was purchased from investment plants and neighbouring countries. Low river flows also cut hydropower output by half in 2025.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Official dinar exchange rate changed | Current | October 2026 | The official rate moved from 1,320 to 1,500–1,520 dinars per US dollar, raising the dinar cost of imported equipment such as solar panels and batteries. |
| Runaki 24-hour electricity in the Kurdistan Region | Upcoming | End of 2026 | Launched in November 2024 and covering more than 90% of residents by August 2026; the regional government aims to reach all homes and businesses by the end of 2026. |
| Shams Basra solar plant expansion | Upcoming | 2026 onwards | The first 250 MW began operating in May 2026; further phases will take the plant to 1,000 MW. |
| State institutions to install solar | Current | February 2026 | Government directive for ministries and state institutions to install solar panels to reduce grid demand. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | — | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | — | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | — | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | No official statistics on household solar; Central Bank-financed solar loans are active, but no household export scheme was identified. |
| Distributed energy market | Low | No framework for distributed generation to sell to the grid; private diesel generators are the main distributed supply. |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market; the Ministry of Electricity is the single buyer. |
| Energy storage adoption | Low | No operating grid-scale battery storage identified; a 3,000 MW solar-plus-storage agreement was signed in December 2025. |
| Renewable growth environment | Low | Renewables provided about 1.6% of generation in 2024 and solar capacity was 42 MW; the first 250 MW of Shams Basra came online in 2026. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 18 sources
- Electricity projects statistics tables 2024 (Ministry of Electricity data). Statistics and Geographic Information Systems Authority, Iraq, 2024. accessed 9 October 2026.
- World Development Indicators – Iraq (population, urban population, electricity use per capita, internet users). World Bank, 2024–2025. accessed 9 October 2026.
- Share of electricity production by source – Iraq (Ember data). Our World in Data / Ember, 2024. accessed 9 October 2026.
- Net electricity imports – Iraq (Ember data). Our World in Data / Ember, 2024. accessed 9 October 2026.
- Iraq – country electricity profile. Ember, 2026. accessed 9 October 2026.
- Energy Profile: Iraq. IRENA, 2025. accessed 9 October 2026.
- A Tale of Two Transitions: Iraq's Energy Sector and Macroeconomic Stability in a Climate-Constrained World. World Bank, 2023. accessed 9 October 2026.
- Iraq's final national census: Population reaches 46.1M. Shafaq News, 2025. accessed 9 October 2026.
- Two electricity bills strain Iraqi household budgets. Shafaq News, 2026. accessed 9 October 2026.
- Iraq loses 80.6M MWh of electricity in 2025. Shafaq News, 2026. accessed 9 October 2026.
- Iraq purchases 41% of its electricity supply. Shafaq News, 2026. accessed 9 October 2026.
- Runaki delivers 24-hour power to 90%+ of residents in KRI. Shafaq News, 2026. accessed 9 October 2026.
- KRI electricity debt discount does not apply to Runaki bills. Shafaq News, 2026. accessed 9 October 2026.
- Parliament to host Iraq's electricity minister over 12,000 MW losses. Shafaq News, 2026. accessed 9 October 2026.
- Rasheed Bank offers seven-year solar loans. Shafaq News, 2026. accessed 9 October 2026.
- Shams Basra solar project begins operations with 250 MW. Shafaq News, 2026. accessed 9 October 2026.
- Iraq orders ministries to adopt solar power. Shafaq News, 2026. accessed 9 October 2026.
- New dinar rate threatens Iraqi medicine prices. Shafaq News, 2026. accessed 9 October 2026.
Questions about energy in Iraq.
Grid electricity is priced by the government far below cost; a 2023 World Bank report found utilities recovered under 10% of their costs. The current federal tariff schedule could not be verified for this profile. In the Kurdistan Region the average Runaki bill was 34,000 dinars a month in August 2026. Many households also pay a neighbourhood generator, about 20,000 dinars per ampere a month in a 2026 report.
State distribution companies under the Ministry of Electricity supply federal Iraq, and the Kurdistan Regional Government Ministry of Electricity supplies the Kurdistan Region. There is no choice of supplier. Private neighbourhood generators provide extra supply when the grid is cut.
About 1.6% of generation in 2024, from hydropower and solar, according to Ember data. Gas produced about 53% and oil about 45%.
No generally available household export or net-metering scheme was identified on an accessible official source as of October 2026. Home solar is mainly used to cover power cuts, supported by Central Bank-financed low-interest loans.
There is no national supply-point code. Each connection has an account with the local distribution branch, and the account and meter numbers printed on the bill identify it.
Demand in summer and winter exceeds what the grid can supply, and more than half the energy delivered to distribution companies is lost or unbilled. In 2024 ministry plants averaged about 18,900 MW of output against 39,200 MW of design capacity.
A Kurdistan Regional Government programme, launched in November 2024, that provides 24-hour grid electricity with metered monthly bills, replacing the need for generator subscriptions. It covered more than 90% of residents by August 2026.