How electricity works in Jordan.
Jordan electricity market 2026: subsidised block tariffs, EMRC, NEPCO single buyer, JEPCO, IDECO, EDCO, rooftop solar net value billing and licensing.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Jordanian dinar (JOD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Jordan energy at a glance.
Key figures for households in Jordan. Each one links to its source on the full overview below.
Electricity price.
0.05 JOD per kWh for households, including taxes. Figures for 2026.
Household use.
3,870 kWh a year for a typical household. Figures for 2024.
Renewable share.
26.9% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Jordan.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Jordan below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Jordan requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Jordan.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Jordan, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Jordan, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Jordan.
The energy market in Jordan, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Jordan runs a single-buyer electricity system. The state-owned National Electric Power Company (NEPCO) owns the transmission grid, dispatches the power stations and buys their output, then sells it in bulk to three privately owned distribution companies. JEPCO, IDECO and EDCO each hold a fixed territory, own the local network and meters, and bill every customer in their area, so households cannot choose a supplier. The Energy and Minerals Regulatory Commission (EMRC) licenses the sector, sets every tariff and writes the rules for connecting rooftop solar. The General Electricity Law No. 10 of 2025 now provides the legal basis, including licences for storage and for wholesale and retail supply.
Household tariffs are rising-block and heavily subsidised for registered Jordanian families: 50 fils per kWh for the first 300 kWh a month, 100 fils for 301–600 kWh and 200 fils above 600 kWh, with a small fixed monthly credit for moderate users. Households that are not registered for the subsidy pay a flat 120 fils per kWh up to 1,000 kWh a month. A monthly fuel price difference charge can be added to all bills; it was set at zero for August and September 2026.
Renewables produced 26.92% of electricity in 2024, natural gas 58.08% and oil shale 15%. Customer-owned systems are unusually important: by the end of 2025 the EMRC counted 82,401 net metering systems with 889 MW of capacity, plus 722 wheeling systems (337 MW). The 2025–2035 energy strategy, approved in May 2026, targets 40% renewable electricity by 2035 and plans battery and pumped storage.
Energy snapshot.
Headline figures for electricity in Jordan. Each shows its data year and links to its source.
- Population12,045,180 peopleSource 20July 2026
- Households2,433,671 householdsSource 212024
- Average household size4.8 people/householdSource 212023
- Electricity use per household3,870 kWh/yrSource 122024
- Household price (JOD)0.05 JOD/kWhSource 12026
- Household price (EUR)0.062 EUR/kWhSource 442026
- Renewable electricity share26.9%Source 92024
- Solar capacity2.19 GWSource 9End 2024
- Wind capacity0.621 GWSource 9End 2024
- Energy storage capacity0.013 GWhSource 412018
- Smart-meter share91.3%Source 14Q3 2025
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Energy and Minerals Regulatory Commission (EMRC)
- System operator
- National Electric Power Company (NEPCO)
- Distribution networks
- Three private distribution companies with exclusive territories that also supply and bill customers: JEPCO (centre), IDECO (north) and EDCO (south, east and Jordan Valley)
- Currency
- Jordanian dinar (JOD)
- Voltage and frequency
- 230 V / 50 Hz (400 V three-phase)
Electricity prices in Jordan.
- Household price (JOD)
- 0.05 JOD/kWh (2026)Source 1Subsidised household tariff for the first 300 kWh a month (50 fils), in force since 1 July 2024 and confirmed as still applied in January 2026. Registered households pay 100 fils for 301–600 kWh and 200 fils above 600 kWh; unregistered households pay 120 fils up to 1,000 kWh and 150 fils above. A 1 fils/kWh rural electrification charge and any fuel price difference charge are added.
- Household price (EUR)
- 0.062 EUR/kWh (2026)Source 44Converted from JOD 0.050/kWh at EUR 1 = JOD 0.8012, the mid-point of the Central Bank of Jordan euro rate (797.49–804.86 fils) on 1 October 2026. The unsubsidised 120 fils rate equals about EUR 0.150/kWh at the same rate.
- Typical annual electricity bill
- 187 JOD/yr (2026)Source 1Derived illustration for a registered household using the 2024 average of about 322 kWh a month: 300 kWh at 50 fils plus 22.5 kWh at 100 fils, less the JOD 2.00 monthly support credit, plus 1 fils/kWh rural charge (about JOD 15.6 a month). Excludes any meter charges and the fuel price difference charge (zero in August–September 2026). An unregistered household using the same amount would pay about JOD 465 a year at 120 fils.
How the household tariff is built
The EMRC issues a single national tariff schedule that the three distribution companies must apply. The current schedule, effective 1 July 2024, keeps the household structure introduced in April 2022, which split homes into a subsidised and an unsubsidised group. When that structure was introduced the EMRC said 58% of subscribers used 1–300 kWh a month, 35% used 301–600 kWh and 7% used more.
Subsidy is claimed per meter through the government platform, not through the distribution company. The applicant enters the meter number and the subscription (reference) number from the bill. A meter cannot be registered if it is disconnected, temporary (a home under construction), or linked to a solar system whose inverter is larger than 3.6 kW single-phase. Service meters for the common parts of residential blocks receive the subsidised rate automatically.
Other charges
The bill adds the rural electrification "fils" (1 fils per kWh, passed to a rural electrification fund) and any fuel price difference charge set monthly by the EMRC. A minimum monthly charge of JOD 1.75 applies to households using 85 kWh or less (subsidised) or 14 kWh or less (unsubsidised). Customers with solar continue to pay meter charges and the rural fils on energy taken from the grid.
Cost recovery
Household tariffs do not cover the full cost of supply. The government projected NEPCO’s losses for 2026 at about JOD 573 million, equivalent to 1.2% of GDP, and its July 2026 energy vision commits to time-of-use pricing for households once smart meters are fully installed. The EMRC said on 2 July 2026 that no decision had been issued to apply time-of-use pricing to homes or to raise household tariffs. A reliable long-run series of the average household price was not found, so no price history is shown.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Subsidised rising-block tariff for households registered on the government subsidy platform (kahraba.gov.jo): 50 fils/kWh for 1–300 kWh a month, 100 fils for 301–600 kWh and 200 fils above 600 kWh. A fixed credit of JOD 2.50 a month is deducted for consumption of 51–200 kWh and JOD 2.00 for 201–600 kWh. Eligible are Jordanian heads of family (one meter of their choice), Jordanian women married to non-Jordanians, and some Gaza-origin and temporary-passport holders. |
| Regulated | Yes | Unsubsidised household tariff for meters not registered for support (for example second homes, foreign residents or families that did not register): 120 fils/kWh for 1–1,000 kWh a month and 150 fils above 1,000 kWh. A home using under 50 kWh a month for three months in a row is treated as unoccupied and moved automatically to this tariff. |
| Time-of-use | Limited | Since 1 July 2024, time-of-use rates apply to EV charging, telecoms, medium and large industry, extractive industry and (optionally) water pumping. Home EV charging is billed at 160 fils/kWh at peak (17:00–23:00), 118 fils at partial peak (14:00–17:00 and 23:00–05:00) and 108 fils off-peak (05:00–14:00). General household consumption is not on time-of-use pricing. |
| Variable | Yes | The EMRC sets a monthly fuel price difference charge in fils per kWh that is applied to all sectors and shown on the bill. It was zero for August and September 2026. |
| Fixed | No | There is no competitive retail market, so households cannot buy a fixed-price contract or switch supplier. |
| Dynamic | No | There is no wholesale spot market and no tariff linked to wholesale prices. |
Household prices compared with neighbouring countries (EUR per kWh).
- Lebanon€0.238
- Jordan€0.062
- Saudi Arabia€0.049
- Egypt€0.02
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,870 kWh/yr (2024)Source 12Derived: residential consumption of 9,418.85 GWh in 2024 (EMRC) divided by 2,433,671 households (Department of Statistics, 2024). The EMRC category is "residential and regular use", so it may include a small amount of non-household use.
- Average daily use per household
- 10.6 kWh/day (2024)Source 12Derived from the annual figure of about 3,870 kWh per household (residential consumption divided by households).
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,986 kWh/person/yr (all sectors) (2024)Source 9Per capita consumption of electrical energy in the Ministry of Energy key figures for 2024. The World Bank gives 1,858 kWh for 2023.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- 20.1 % of households (2013/14)Source 24Share of households owning or with access to an air conditioner in the 2013/14 Household Expenditure and Income Survey (harmonised by the Economic Research Forum). This is old data and ownership has grown since; no newer national figure was found.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- 0 % of households (main cooking fuel) (2013/14)Source 25In the 2013/14 survey 99.9% of households cooked mainly with gas (LPG cylinders) and none reported electricity as their main cooking fuel. No newer figure was found.
Homes are the largest user of electricity. The EMRC recorded 9,070.6 GWh of residential and regular-use consumption in 2025, 45% of the 20,230.4 GWh sold, down from 9,418.85 GWh (46%) in 2024. Total consumption fell by about 0.7% in 2025. Industry took 18%, agriculture and water pumping 15% and commerce and hotels 12%.
Demand peaks on summer evenings, driven by air conditioning, and rises again during winter cold spells when electric heating is used. NEPCO recorded 4,220 MW on 4 August 2026 against about 4,400 MW of available generation. The ministry recorded annual peaks of 4,240 MW in 2023 and 4,100 MW in 2024.
Water heating is often solar: in 2013/14 about 74% of households owned a solar, gas or electric water heater, and the Renewable Energy Fund estimates solar water heater penetration at about 24%. Cooking relies almost entirely on LPG cylinders, so electricity use in Jordanian homes is dominated by cooling, lighting, refrigeration and appliances.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 72 % of households (2013/14)Source 22Household Expenditure and Income Survey 2013/14. A further 3.6% lived in accommodation provided free.
- Private rented
- 24.4 % of households (2013/14)Source 22
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 29.3 % of households (2013/14)Source 23Houses (28.6%) and villas (0.7%) combined, by household, in the 2013/14 survey.
- Apartments and flats
- 70.7 % of households (2013/14)Source 23
- Urban population
- 93.2 % of population (2025)Source 27World Bank (UN World Urbanization Prospects) estimate.
Most Jordanians live in flats in low and mid-rise concrete blocks, especially in Amman, Zarqa and Irbid. In 2013/14 about 71% of households lived in apartments and 29% in houses or villas, and 72% owned their home. These are the latest national survey figures available in harmonised form.
Flat concrete roofs suit solar panels and solar water heaters, but in a block the roof is shared. The distribution companies require a recent title deed for the site and, where relevant, a certified no-objection from the site owner or from the other meter owners before a rooftop system can be connected.
How the grid works in Jordan.
- TransmissionNational Electric Power Company (NEPCO)
- DistributionThree private distribution companies with exclusive territories that also supply and bill customers: JEPCO (centre), IDECO (north) and EDCO (south, east and Jordan Valley)
- MeteringDistribution companies
- Supply3 or more retail suppliers
Physical flow
Most power comes from gas-fired combined-cycle plants, many privately owned, together with the Attarat oil shale plant and a large fleet of wind and solar farms. NEPCO carries it over the transmission system (above 33 kV) to substations where the distribution companies take it down to 33 kV, 11 kV and 400/230 V. The distribution system is defined in the EMRC rules as the network at 33 kV or below.
Commercial flow
Generators sell to NEPCO, NEPCO sells to the distribution companies at bulk tariffs, and the distribution companies bill end users at the EMRC retail tariff. Some utility-scale solar plants sell directly to a distribution company. Customers with their own renewable systems trade only with their distribution company, through net value billing, wheeling or export-all/import-all arrangements set by Regulation No. 58 of 2024.
Cross-border links
Jordan’s grid has been synchronised with Egypt since 1999 through a 400 kV submarine cable across the Gulf of Aqaba (550 MW), with studies to raise it to 2,000 MW. A 132 kV, 40 MW line to Al-Rutba in Iraq was commissioned on 30 March 2024, and a 400 kV second phase of 150–200 MW to Al-Qaim is under way. Jordan exported 227.9 GWh in January–July 2026, mainly to the Jerusalem District Electricity Company in the West Bank and to Iraq.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy and Mineral Resources (MEMR) | Sets energy policy and the 2025–2035 energy strategy, procures large renewable and storage projects through direct proposals and tenders, and negotiates interconnections. Coordinates with the Cabinet on any move from the single-buyer model to a competitive market. |
| Regulator | Energy and Minerals Regulatory Commission (EMRC) | Issues licences for generation, storage, transmission, distribution and supply, licenses renewable energy service companies and EV charging stations, sets all tariffs, and issues the guideline for connecting renewable systems to the distribution network. Had issued 170 renewable energy service provider licences by the end of 2025. |
| TSO | National Electric Power Company (NEPCO) | State-owned owner of the 400 kV and 132 kV transmission grid and the national control centre. Acts as single buyer from conventional and renewable generators, sells to the distribution companies and large customers, and operates the links with Egypt, Iraq and the West Bank. |
| DSO | Jordanian Electric Power Company (JEPCO) | Distribution and supply for Amman, Zarqa, Madaba and Balqa. 1,680,986 subscriptions in 2025, about 64% of the national total. |
| DSO | Irbid District Electricity Company (IDECO) | Distribution and supply in the north: Irbid, Ajloun, Jerash and Mafraq. 660,297 subscriptions in 2025. |
| DSO | Electricity Distribution Company (EDCO) | Distribution and supply in the south, east and Jordan Valley, including Aqaba, Karak, Tafileh and Ma’an. 281,174 subscriptions in 2025. |
| Supplier | JEPCO, IDECO and EDCO (as retailers) | Each distribution company is also the only retail supplier in its area. The 2025 law creates retail and wholesale supply licences, but no competing household supplier exists. |
| Metering | Distribution companies | Own, install, read and replace meters, including the bidirectional meters fitted for solar customers. Meters must meet the EMRC meter approval conditions. |
Compared with the UK system.
| UK concept | Jordan equivalent | How it works |
|---|---|---|
| DNO | Distribution licensee (JEPCO, IDECO or EDCO) | Three companies own the 33 kV and lower network in fixed territories, much like UK DNOs. The difference is that each one is also the sole retailer and billing company in its area, so the network owner and the supplier are the same company. |
| National Grid/NESO | NEPCO | NEPCO combines transmission ownership, system operation and the role of single buyer. It contracts with generators under long-term power purchase agreements and dispatches them centrally; there is no balancing market of the British kind. |
| MPAN | Subscription number (raqm al-ishtirak), also called the reference number | Each supply is identified by the subscription number issued by the distribution company, used together with the meter number. It is a company account reference held in that company’s own customer system; there is no national supply-point register or published national format. |
| MPRN | No household equivalent in most areas | Homes cook and heat mainly with LPG cylinders bought from distributors, so there is no gas supply point for most households. The 2025–2035 strategy plans to extend gas distribution networks in Amman and Zarqa. |
| Meter operator | The distribution company | There are no independent meter operators. The distribution company supplies and fits the meter, and the customer pays the actual cost of a bidirectional meter when connecting solar. |
| Supplier | The distribution company | There is no switching. The tariff is set by the EMRC and applied identically by all three companies. |
| Smart-meter infrastructure | Each distribution company’s own head-end | There is no central communications body like the DCC. Each company runs its own smart-meter rollout and systems, with progress reported to the government and the EMRC. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | Subscription number (raqm al-ishtirak) |
| Who issues it? | The distribution company serving the address (JEPCO, IDECO or EDCO) |
| Format | A numeric account reference assigned by the distribution company. The subsidy platform calls it the "subscription number (reference number)", and payment systems ask for it to be entered without symbols or spaces. No national structure is published, so no fictional example is given. |
| Length | Not published |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | On the electricity bill, next to the reference-number label for household accounts (business accounts also show a file number). It is also on the connection agreement for a solar system. |
| Electronic access | Customers can view and pay bills through the distribution company websites and apps, and through eFAWATEERcom, the national electronic bill payment service, using the reference number. The government subsidy platform (kahraba.gov.jo) uses the meter number plus the subscription number to link a meter to a family. |
| Third-party access | There is no regulated data-access scheme for third parties. A solar installer acts for the customer by presenting a bank- or notary-certified authorisation from the subscription owner, together with the owner’s identity document and the subscription details. |
| Who keeps the register | Each distribution company keeps its own customer and meter register. The EMRC collects statistics but does not hold a national supply-point database. |
| Register scope | Per DSO |
How a connection is identified
A home’s electricity supply is a "subscription" with the distribution company for its area, identified by the subscription number and the meter number. All dealings with the company, including solar applications, refer to the subscription: IDECO’s application checklist begins with the customer name, subscription number and town. Because the three companies are separate, the number only has meaning within the issuing company’s system.
When the property changes hands
The subscription belongs to the supply point and is transferred to the new owner or occupier rather than closed. Where a solar system is connected, the subscription and the connection agreement cannot be transferred without the distribution company’s consent; IDECO’s form for this (P02C-F18, April 2026) is signed by both the current and the new meter owner with their national numbers, and the new owner takes on the agreement. A subscription must be free of debt before a new renewable application can be made.
Payment references
eFAWATEERcom lets customers choose their distribution company and enter the bill reference number, without spaces or symbols, to pay through a bank or app. The same reference is used to register for the household subsidy, together with the meter number.
Subsidy link
The subsidised tariff attaches to one meter per eligible family, chosen by the head of the family on the government platform. Eligibility is decided by the platform after data checks, not by the distribution company, and support ends automatically on a change in family status or death. A family can apply to cancel support on one meter and register another, after settling arrears.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | Limited |
| Net billing | Yes |
| How exported electricity is paid | Net value billing. Under Regulation No. 58 of 2024 exports and imports are netted in three daily periods (05:00–17:00, 17:00–23:00, 23:00–05:00); surplus energy is credited at 50 fils/kWh for homes (40 fils for other sectors), net value is rolled forward in dinars month to month and reset at the end of each calendar year. No cash refunds are paid. |
| Which connection mechanisms can a household use? | Net value billing on the same site, zero export, and export-all/import-all on the same site. Off-site net value billing is limited to small and medium industry, agriculture and hotels (up to 50% of annual consumption). Only one renewable system is allowed per subscription. |
| What size of system is allowed at home? | Expected annual output may cover up to 100% of the last 12 months’ consumption, and the system may not exceed 16 A per phase. The government described this in 2024 as up to 3.6 kW single-phase or 10 kW three-phase. The DC/AC ratio is capped at 150% for single-phase and 120% for three-phase users. |
| Does solar affect the household subsidy? | Yes. A meter linked to a renewable system with an inverter larger than 3.6 kW single-phase cannot be registered for the subsidised tariff, so larger home systems move to the unsubsidised tariff. |
| Are there monthly grid charges? | Systems on net value billing or zero export pay a monthly network services fee per kW of inverter capacity set in Regulation No. 58 of 2024: JOD 1 per kW for households, 0 for small and medium industry and agriculture, and up to JOD 14 for some commercial categories. Export-all/import-all systems pay none. Older systems applied for before 1 June 2024 pay JOD 2 per kW. |
| Which inverter standards apply? | Inverters must have third-party test certificates showing compliance with ENA G98 for small systems (up to 16 A per phase) or ENA G99 for larger ones, plus IEC 62109 safety. Panels need IEC 61730. A G99 protection relay is required at 100 kW and above, and medium-voltage connections follow the EMRC IRR-DCC-MV code. |
| How many customer systems are connected? | At the end of 2025: 82,401 net metering systems (889 MW), 722 wheeling systems (337 MW), 10,014 same-site net value systems (41.3 MW), 50 export-all/import-all systems (2.072 MW) and 14 zero-export systems (0.818 MW). |
Connecting a home system.
- Choose an installer holding a valid EMRC licence for the design, supply, installation, operation, maintenance and testing of renewable systems.
- Check eligibility: the subscription must be debt-free, the system is sized from the last 12 bills (1 kW of solar is assumed to produce 150 kWh a month), and home systems may not exceed 16 A per phase. A single-phase home whose bills are too low can submit an expected-load estimate for up to 3.68 kVA.
- Submit the application (form P02C-F02 at IDECO) with identity documents, a recent title deed, land and site plans, any owner or co-owner no-objection, equipment datasheets, a single-line diagram, test certificates and the application fee (JOD 30 for small systems, refunded after commissioning).
- The distribution company confirms completeness within 5 working days and checks the technical limits within 10 working days; small systems fail the check if total generation on the substation would exceed 15% of its rating, in which case a paid connection study can be requested. Systems with batteries always receive a connection study.
- Install within 3 months of approval (extendable by up to 3 months), notify readiness and sign the 20-year connection agreement.
- The distribution company inspects within 15 working days (JOD 20 fee), fits the bidirectional meter at the customer’s cost and connects the system. Monthly bills then show exports, imports and the rolled-forward value.
Jordan’s rooftop solar framework is set by Regulation No. 58 of 2024 on connecting renewable energy facilities, issued under the Renewable Energy and Energy Efficiency Law No. 13 of 2012 and published in the Official Gazette on 2 September 2024. It replaced the earlier net metering rules for new applications from 1 June 2024; systems approved under the old rules keep their arrangements. The EMRC guideline turns the regulation into a step-by-step procedure with deadlines that each distribution company must follow.
For households the main route is net value billing. Instead of simple kWh netting, exports and imports are compared within three time windows each day. Surplus kWh in a window are valued at the regulated purchase price (50 fils/kWh for homes) and the resulting dinar credit offsets the bill. Credits roll forward month by month but are cleared at the end of December, apart from December’s own surplus, and cannot be paid out. Minimum charges, meter fees and other charges cannot be paid from the credit.
Under export-all/import-all the customer sells all output through a separate generation meter at the regulated price and buys all consumption at the normal tariff, without the network services fee. Zero export systems must be designed so that no electricity flows to the grid.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (self-generation, behind the meter) | No individual generation licence for systems connected through the distribution company under Regulation No. 58 of 2024 up to 1 MW; a connection agreement with the distribution company is required. Above 1 MW a generation licence from the EMRC and the approval of NEPCO are a condition of operation. | Distribution company; EMRC and NEPCO above 1 MW | The 2025 law treats self-generation as a category of generation, so detailed licensing instructions may change. |
| Generate electricity (utility-scale, selling to the grid) | Generation licence from the EMRC and a power purchase agreement with NEPCO or a distribution company, normally after a ministry tender or direct proposal. | EMRC; MEMR; NEPCO | NEPCO is the single buyer for transmission-connected plants. |
| Install or maintain renewable systems | The company must hold a valid EMRC licence for design, supply, installation, operation, maintenance and testing of renewable energy systems. 170 such licences were in force at the end of 2025 (79 class A, 28 class B and 63 class C). | EMRC | The distribution company asks for the licence and commercial registration of both the applicant and the installing company. |
| Store electricity | Storage is a licensable activity under the General Electricity Law No. 10 of 2025. A customer may build and own storage to cover its own consumption after approval by the distribution company, without a separate licence. | EMRC; distribution company | Battery capacity does not count towards the allowed generating capacity or the network services fee. |
| Export to the grid | Only through one of the regulated mechanisms and a 20-year connection agreement with the distribution company. No licence for household systems. | Distribution company under EMRC rules | Export is compensated by bill credit, not cash, except under export-all/import-all where all output is credited. |
| Sell electricity to other consumers or supply at retail | Retail supply is a licensable activity under Law No. 10 of 2025. In practice only the three distribution companies are licensed to supply end users. | EMRC | No framework for peer-to-peer sales was identified. |
| Wheel own generation to another site | Permitted for eligible sectors through the off-site mechanism, paying wheeling charges (7 fils/kWh on the distribution network) and a loss factor set in Regulation No. 58 of 2024. | EMRC; distribution company; NEPCO | Households can only use same-site mechanisms. |
| Wholesale supply and trading | Law No. 10 of 2025 creates a wholesale supply licence: the wholesale supplier buys from licensed generators and sells to retail suppliers and large consumers. NEPCO performs this single-buyer role. | EMRC; Cabinet for any move to a competitive market | No date has been set for a competitive market. |
| Aggregation, VPP or balancing services | No licence category, market or framework for aggregators, virtual power plants or third-party balancing services was identified. | EMRC; NEPCO | NEPCO dispatches generation centrally. |
| Remote control of customer assets | No framework for third-party remote control was identified. The distribution company may disconnect a renewable system temporarily to protect grid stability, after informing the customer. | Distribution company | Set out in the EMRC connection guideline. |
| Operate public EV charging | Licence and permit from the EMRC for public charging stations. About 250 public stations were operating in mid-2026, with over 1,000 more in the licensing process. | EMRC | Charging tariffs are set by the EMRC. |
The General Electricity Law No. 10 of 2025 (dated 15 May 2025) lists the sector’s activities as generation (including self-generation), energy storage, transmission, transmission system operation, distribution, distribution system operation, and wholesale and retail supply, and requires a licence for each. It replaces the temporary legal framework that had applied since 2002 and gives the ministry and Cabinet the task of approving any transition from the single-buyer model to a competitive market.
For small renewable systems the practical rules are in Regulation No. 58 of 2024 and the EMRC connection guideline. The licensing burden falls on the installer, which must be EMRC-licensed, rather than on the household. Secondary instructions under the 2025 law were still being developed, so thresholds for storage and self-generation licences should be checked with the EMRC.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Balancing, reserve and frequency services | No | — | No | NEPCO. NEPCO dispatches contracted generators centrally as single buyer. No ancillary services market is open to distributed or aggregated assets. |
| Time-of-use tariffs (price-based demand shifting) | Restricted | — | No | EMRC. Peak, partial-peak and off-peak rates apply to EV charging (including home charging), telecoms, industry and optional water pumping. General household use is excluded. |
| Time-windowed netting for solar customers | Restricted | — | No | Distribution companies. Net value billing compares exports and imports in three daily periods, which gives batteries some value in shifting midday solar to the evening, but there is no payment for flexibility as such. |
| Central storage procurement | Developing | — | No | MEMR / NEPCO. The government plans a 100 MW, 4-hour battery project and a 450 MW pumped storage project at Mujib Dam. These are procured centrally, not through a market open to small assets. |
Jordan has no wholesale market, capacity market or demand-response market in which households or aggregators can take part. NEPCO balances the system with contracted plant and the interconnection with Egypt.
The policy direction is towards price signals rather than markets: the government’s July 2026 energy vision aims to cut peak demand by about 300 MW over three years and to bring time-of-use pricing to households once smart meters are installed. The distribution companies can also curtail customer renewable systems temporarily to protect the grid.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | National rollout well advanced: 91.3% installation reported for Q3 2025; JEPCO at 95% of subscriptions in mid-2026 |
| Reading interval | Not published |
| National installation rate | 91.3% (Q3 2025, Economic Modernisation Vision report) |
| End of 2024 (EMRC) | About 1.68 million smart meters, 69.3% of 2,422,537 subscribers |
| Installed in 2024 | 918,449 smart meters |
| JEPCO | 1.558 million of about 1.643 million subscriptions (95%), H1 2026 |
| Owner and operator | The distribution company |
| Solar customers | Bidirectional meter required, paid for by the customer |
The smart meter programme is run by each distribution company and is part of the government’s Economic Modernisation Vision. Installations accelerated sharply in 2024, when 918,449 meters were fitted against 352,264 in 2023. JEPCO says its meters allow remote reading and control, and it reported total losses of 11.38% in 2025, down from 12.26% in 2024.
Smart meters are the precondition the government has set for household time-of-use tariffs. The reading interval, the customer data-access arrangements and the communications technology used were not found in public sources.
Renewable electricity.
Electricity generation mix (2024).
- Natural gas: 58.1%
- Renewables (mainly solar and wind): 26.9%
- Oil shale: 15%
- Renewable electricity share
- 26.9% (2024)Source 9Share of 25,080.56 GWh generated in 2024 (Ministry of Energy annual report). The EMRC reports 7,114.5 GWh, or 27% of generation, from renewables in 2025.
- Home solar
- 82,401 net metering systems (all customer types) (End 2025)Source 11Net metering systems with 889 MW of capacity across all sectors; a household-only count was not published. JEPCO had 35,028 (488 MW), IDECO 32,139 (268 MW) and EDCO 15,234 (133 MW).
- Solar added each year
- Not identified from a reliable public source.
- Solar PV (utility-scale)
- 0.874 GW (End 2024)Source 9
- Wind
- 0.621 GW (End 2024)Source 9
- Customer-owned systems (net metering, net billing, wheeling)
- 1.321 GW (End 2024)Source 9873.6 MW net metering and net billing plus 447.2 MW wheeling. The EMRC counted 1,270 MW across all customer mechanisms at the end of 2025.
- Biogas and hydropower
- 0.023 GW (End 2024)Source 910 MW selling to distribution companies plus 13.4 MW at the Khirbet As-Samra wastewater plant.
Targets.
- 40% of electricity from renewables by 2035 (2025–2035 energy strategy, approved May 2026)
- Electricity network losses reduced to 8% by 2035
- Green hydrogen production from 2030, about 500,000 tonnes a year by 2035
- EVs at 60% of new car sales and a fleet of about 500,000
- 90,000 solar water heaters installed through the Renewable Energy Fund by 2035
Renewables rose from about 0.5% of generation at the end of 2014 to 26.92% in 2024, one of the fastest transitions in the region. Growth came in two waves: utility-scale wind and solar contracted by the ministry from 2012 onwards, and customer-owned rooftop and ground-mounted systems, which at 1,320.8 MW now exceed utility-scale solar.
Oil shale became a significant source after the Attarat plant (470 MW) entered service, reaching 15% of generation in 2024. Natural gas, mostly imported as LNG or from Egypt plus a small amount from the domestic Risha field, remains the main fuel. Domestic sources supplied 44% of electricity generation in 2024.
New utility-scale additions are being procured again, including a 200 MW solar plant and a 100 MW wind farm on a build-own-operate basis. Grid absorption of midday solar is the main constraint, which is why the strategy pairs further renewables with battery and pumped storage.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 0.013 GWh (2018)Source 41Al Badiya solar-plus-storage plant (12.6 MWh), selling to IDECO. No other operating grid-scale battery was identified.
Storage was recognised in primary legislation for the first time by the General Electricity Law No. 10 of 2025, which makes it a separate licensable activity and allows licensed generators, transmission and distribution companies to build storage, and individuals to build storage for their own use.
Behind the meter, Regulation No. 58 of 2024 allows customers to build and own storage to cover their own consumption with the distribution company’s approval. Battery capacity is treated as an attachment to the renewable system and does not count towards the permitted generating capacity or the network services fee. Any small system with storage requires a connection study (capped at JOD 200 for small systems with storage). Cells and systems need third-party certificates to IEC 62619 and IEC 63056; AC-coupled power conversion systems need IEC 62477-1 and G98/G99 or IRR-DCC-MV compliance, and DC-coupled charge controllers IEC 62109-1/2.
Storage projects.
- Al Badiya solar plus storage (Philadelphia Solar): 23 MW of solar with a 12.6 MWh lithium-ion battery near Mafraq; the second phase was grid-connected in 2018 under a PPA with IDECO.
- 100 MW, 4-hour battery project: Announced in the government’s July 2026 energy and sustainability vision as an upcoming project.
- Mujib Dam pumped storage (450 MW): Strategic pumped-storage hydropower project in the July 2026 vision and the 2025–2035 strategy.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Jordanian Electric Power Company (JEPCO) | 64% of subscriptions (1,680,986 of 2,622,457, 2025) | No | Limited | No | Yes |
| Irbid District Electricity Company (IDECO) | 25% of subscriptions (660,297, 2025) | No | Limited | No | Yes |
| Electricity Distribution Company (EDCO) | 11% of subscriptions (281,174, 2025) | No | Limited | No | Yes |
The three distribution companies are regional monopolies for both networks and retail supply, so the "suppliers" are fixed by address and all apply the same EMRC tariff. Shares above are of subscriptions, not of energy sold. Time-of-use is marked as limited because it is available only for EV charging and certain business sectors; export compensation is the regulated net value or export-all mechanism, not a company product.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy and Mineral Resources | Government | Energy policy, strategy, tenders and interconnections | Publishes the annual report with the generation mix and renewable capacity, and the 2025–2035 strategy. |
| Energy and Minerals Regulatory Commission (EMRC) | Regulator | Licensing, tariffs, renewable connection rules | Issues the tariff schedule, the renewable connection guideline, installer and EV charging licences, and sector statistics. |
| National Electric Power Company (NEPCO) | Transmission | Transmission owner, system operator and single buyer | Publishes daily peak loads, interconnection information and annual sales data. |
| JEPCO | Distribution | Distribution and supply in Amman, Zarqa, Madaba and Balqa | Largest distribution company and largest host of customer solar. |
| IDECO | Distribution | Distribution and supply in the north | Publishes the current renewable connection forms, checklists and the EMRC tariff and guideline documents. |
| EDCO | Distribution | Distribution and supply in the south, east and Jordan Valley | Serves Aqaba, Karak, Tafileh, Ma’an and the Jordan Valley. |
| Jordan Renewable Energy and Energy Efficiency Fund (JREEEF) | Renewable Energy | Household grants for solar water heaters and efficiency | Runs the 30% and 50% solar water heater support programmes. |
| Electricity subsidy platform | Consumer | Registration of meters for the subsidised household tariff | Where families register the meter that receives the subsidised tariff. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (small systems) | ENA EREC G98 (up to 16 A per phase) | Adopted by the EMRC | Inverter compliance must be shown by a test certificate from an internationally recognised third-party laboratory. |
| Grid connection (large systems) | ENA EREC G99; G99 protection relay at 100 kW and above | Adopted by the EMRC | Applies to systems not classed as small. |
| Medium-voltage connection | IRR-DCC-MV (connection code for intermittent renewables on the medium-voltage distribution network) | EMRC | Applies where the point of connection is at medium voltage; also referenced for storage converters. |
| Inverter safety | IEC 62109 | IEC | Third-party certificate required with the application. |
| PV modules | IEC 61730 | IEC | Module safety qualification. |
| Batteries | IEC 62619 and IEC 63056 | IEC | Required for any storage connected with a renewable system. |
| Storage converters | IEC 62477-1 (AC-coupled PCS); IEC 62109-1/2 (DC-coupled charge controllers) | IEC | AC-coupled systems must also meet G98, G99 or IRR-DCC-MV as applicable. |
| Anti-islanding and inspection | Annual disconnection test on loss of synchronism (EMRC guideline) | EMRC / distribution companies | The distribution company may test each year that the renewable and storage installation disconnects from the grid when synchronism is lost. |
| Installer accreditation | EMRC renewable energy service licence (classes A, B, C) | EMRC | Covers design, supply, installation, operation, maintenance and testing. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Distribution company approval and connection agreement | Yes | National | Application to JEPCO, IDECO or EDCO under the EMRC guideline, followed by inspection and a 20-year connection agreement. |
| Licensed installer | Yes | National | The installing company must hold a valid EMRC licence. |
| Proof of ownership or consent | Yes | Local | A recent title deed, land and site plans, and a bank- or notary-certified no-objection from the site owner or other meter owners where the roof is shared. |
| Occupancy permit or municipal no-objection | No | Local | Required for most sites, but residential subscriptions, places of worship and government bodies are exempt. |
| Generation licence and NEPCO approval | Limited | National | Only for systems above 1 MW. |
| Environmental approval | Limited | National | Ministry of Environment approval is listed for off-site and export-all ground sites, not for household rooftops. |
For a household rooftop system the distribution company process is the only formal permission. The guideline makes the applicant responsible for any other permits and codes, but exempts residential subscriptions from the municipal occupancy permit. Deadlines are fixed: 5 working days to confirm the file is complete, 10 working days for the technical check, and 15 working days to inspect once the system is ready.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net value billing for customer-owned renewables | Active | Net billing | Surplus within each netting period credited at 50 fils/kWh for homes and offset against the bill, with the network services fee for homes at JOD 1 per kW a month. | Applications from 1 June 2024 |
| Customs and sales tax exemption for renewable equipment | Active | Tax exemption | Regulation No. 58 of 2024 exempts listed renewable systems and components from customs duty and applies a zero sales-tax rate, including PV panels, inverters, solar water heaters and storage systems for renewable electricity with their charge controllers. | From September 2024 |
| JREEEF solar water heater support (50%) | Active | Grant | 50% of the cost for households with combined income up to JOD 750 a month and no more than one car, funded with JOD 5 million from Italy and aiming at about 12,000 systems over four years. A 30% support window continues alongside it. | Launched May 2025 |
| Subsidised household electricity tariff | Active | Tariff subsidy | Reduced block rates and a monthly credit of JOD 2.00–2.50 for one registered meter per eligible family. | — |
Data and connectivity.
- Fixed broadband
- 96.5 % of households with home internet (2024)Source 42Household ICT survey by the Ministry of Digital Economy and Entrepreneurship and the Department of Statistics. Includes mobile connections. In Q4 2025 fibre accounted for 652,200 connections, 79% of fixed broadband subscriptions.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- 320,700 5G subscriptions (End 2025)Source 43Telecommunications Regulatory Commission Q4 2025 report; subscriptions, not coverage.
Connectivity is high: 95.6% of individuals used the internet in 2024 and 97.5% of households owned a smartphone, which supports app-based monitoring of inverters and batteries over Wi-Fi or mobile data. Fixed broadband is shifting quickly to fibre.
The distribution companies’ smart meters report to their own head-end systems; the communications technology (RF mesh, PLC or cellular) is not published.
Grid conditions.
- National peak demand
- 4.22 GW (4 Aug 2026)Source 16NEPCO figure for 4 August 2026, with about 4.4 GW of available generation and an expected summer peak of about 4.8 GW in a moderate scenario. The ministry recorded annual peaks of 4.24 GW in 2023 and 4.10 GW in 2024.
- Annual electricity demand
- 20.2 TWh (2025)Source 12Electricity consumption billed by the distribution companies (20,230.4 GWh). Generation was 25.08 TWh in 2024, which includes network losses, large direct customers and exports.
- Generation capacity
- 7.1 GW (2023)Source 19Total installed capacity according to IRENA data cited by MEED; available capacity in summer 2026 was about 4.4 GW according to NEPCO.
- Interconnection
- 0.55 GW (2026)Source 18The 400 kV synchronous link with Egypt. Smaller links serve Iraq (40 MW at 132 kV since 2024, with a 150–200 MW 400 kV phase under construction), the West Bank (132 kV) and Lebanon/Syria. A 400 kV link with Saudi Arabia is under discussion.
- Curtailment
- Not identified from a reliable public source.
The grid copes with summer peaks of over 4 GW but has to absorb a very large amount of midday solar from both utility plants and roughly 1.3 GW of customer systems. This is why the connection rules limit small systems to 15% of the rating of each distribution substation, why net value billing values exports by time of day, and why the strategy now prioritises battery and pumped storage and combined-cycle gas units between 2027 and 2030.
Network losses remain high in parts of the distribution system: the EMRC reported distribution losses of 11.85% and transmission losses of 1.76% in 2024, and the strategy aims for total losses of 8% by 2035.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| General Electricity Law No. 10 of 2025 | Current | 15 May 2025 | New framework law licensing generation (including self-generation), storage, transmission, system operation, distribution and wholesale and retail supply, and allowing a future move from the single-buyer model. Secondary instructions are still being issued. |
| Regulation No. 58 of 2024 on renewable connections and exemptions | Current | 2 September 2024 | Replaced net metering for new applications with net value billing, zero export and export-all/import-all; set the 50 fils/kWh household export credit, network services fees and tax exemptions including storage. |
| Energy Strategy 2025–2035 | Current | Approved 3 May 2026 | 40% renewable electricity by 2035, storage, combined-cycle expansion 2027–2030, losses of 8% by 2035, EV and green hydrogen targets. |
| Time-of-use tariffs for households | Upcoming | After smart meter rollout; no date set | The strategy refers to time-of-use tariffs across sectors from September 2026 and the July 2026 government vision commits to household time-of-use pricing once smart meters are complete, but the EMRC said on 2 July 2026 that no decision had been issued for households. |
| Grid-scale storage projects | Upcoming | Not dated | A 100 MW, 4-hour battery project and the 450 MW Mujib Dam pumped storage scheme. |
| Iraq interconnection phase two and Saudi link | Upcoming | Not confirmed | A 400 kV, 150–200 MW extension to Al-Qaim in Iraq (expected by the ministry for Q3 2025, status not confirmed) and a 400 kV link with Saudi Arabia still subject to technical and commercial agreement. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Low | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | High | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | 82,401 net metering systems (889 MW) at the end of 2025 against about 2.6 million electricity subscriptions, with a regulated household export credit and a codified connection procedure. |
| Distributed energy market | Medium | Customer-owned systems total about 1.3 GW and four connection mechanisms plus wheeling exist, but there is no aggregation, peer-to-peer trading or market access for distributed assets. |
| Grid flexibility market | Low | NEPCO dispatches centrally as single buyer; there is no wholesale, ancillary or demand-response market, and time-of-use pricing excludes general household use. |
| Energy storage adoption | Low | One operating grid-scale battery (12.6 MWh) identified; home batteries are permitted and tax-exempt but uncounted, and large projects are still planned. |
| Renewable growth environment | High | Renewable share rose from about 0.5% in 2014 to 26.92% in 2024, with a 40% target for 2035 and new solar, wind and storage procurement. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 44 sources
- EMRC electricity tariff schedule effective 1 July 2024 (Arabic). Energy and Minerals Regulatory Commission (hosted by IDECO), 2024. accessed 1 October 2026.
- Jordan electricity bills crisis: government response (tariff blocks confirmed). Attaqa, 2026. accessed 1 October 2026.
- First segment power consumers make up 58% of consumers — EMRC. Jordan News, 2022. accessed 1 October 2026.
- Jordan sets fuel price difference charge at zero (September 2026). Jordan News, 2026. accessed 1 October 2026.
- Time-based electricity tariffs implemented. Jordan News, 2024. accessed 1 October 2026.
- EMRC denies applying time-based electricity tariff to residential sector. Jordan News Agency (Petra), 2026. accessed 1 October 2026.
- Government adopts a new vision for energy and sustainability. Jordan News, 2026. accessed 1 October 2026.
- Jordan approves 2025–2035 energy strategy to expand gas and renewables. Enerdata, 2026. accessed 1 October 2026.
- Annual Report 2024. Ministry of Energy and Mineral Resources, 2025. accessed 1 October 2026.
- On the 80th Independence Day: energy security tops royal priorities (end-2025 renewable capacity). Jordan News, 2026. accessed 1 October 2026.
- Grid-connected renewable energy systems continue to expand in 2025 (EMRC annual report). Jordan News, 2026. accessed 1 October 2026.
- Jordan’s electricity consumption falls 0.7% in 2025. Jordan News, 2026. accessed 1 October 2026.
- 29,636 cases of electricity theft detected in Jordan last year (EMRC 2024 annual report: smart meters, losses). Jordan News, 2025. accessed 1 October 2026.
- Smart electricity meters installed in 91.3% of Jordanian households. Jordan News, 2025. accessed 1 October 2026.
- JEPCO installs 1.56 million smart meters, reaching 95% of total subscriptions. Jordan News, 2026. accessed 1 October 2026.
- Electricity load records 4,220 MW on Tuesday. Jordan News, 2026. accessed 1 October 2026.
- Jordan’s electricity exports rise 8.3% in first seven months of 2026. Jordan News, 2026. accessed 1 October 2026.
- Electrical interconnection. National Electric Power Company. accessed 1 October 2026.
- Jordan to seek 200MW solar interest. MEED, 2025. accessed 1 October 2026.
- Kingdom’s population surpasses 12 million, expected to reach 12.14 million by end of 2026 — DoS. Jordan News Agency (Petra), 2026. accessed 1 October 2026.
- Number of households in Jordan exceeds 2.4 million (Department of Statistics). Roya News, 2025. accessed 1 October 2026.
- HEIS 2013/14 — tenure of dwelling. Economic Research Forum / Department of Statistics, 2014. accessed 1 October 2026.
- HEIS 2013/14 — type of dwelling. Economic Research Forum / Department of Statistics, 2014. accessed 1 October 2026.
- HEIS 2013/14 — has an air conditioner. Economic Research Forum / Department of Statistics, 2014. accessed 1 October 2026.
- HEIS 2013/14 — source of energy for cooking. Economic Research Forum / Department of Statistics, 2014. accessed 1 October 2026.
- HEIS 2013/14 — has a water heater. Economic Research Forum / Department of Statistics, 2014. accessed 1 October 2026.
- Urban population (% of total population) — Jordan. World Bank, 2025. accessed 1 October 2026.
- Electric power consumption (kWh per capita) — Jordan. World Bank, 2023. accessed 1 October 2026.
- Regulation No. 58 of 2024 on connecting renewable energy facilities to the electricity system and exempting renewable energy and energy efficiency systems (Official Gazette 5948, Arabic). Government of Jordan (hosted by IDECO), 2024. accessed 1 October 2026.
- EMRC guideline for connecting renewable energy facilities to the distribution system (Arabic). Energy and Minerals Regulatory Commission (hosted by IDECO), 2024. accessed 1 October 2026.
- Checklist of information required for a renewable energy connection application (P02C-F02 Rev B, 16 April 2026). Irbid District Electricity Company, 2026. accessed 1 October 2026.
- Form for transferring ownership of a subscription with a renewable energy system (P02C-F18 Rev A, 16 April 2026). Irbid District Electricity Company, 2026. accessed 1 October 2026.
- Jordan approves new renewable energy connection and exemption system (four mechanisms). Attaqa, 2024. accessed 1 October 2026.
- Jordan approves 500 renewable energy systems under the new regulation (3.6 kW / 10 kW, JOD 1 network fee). Attaqa, 2024. accessed 1 October 2026.
- How to register on the Jordan electricity subsidy platform (meter number and subscription/reference number). Attaqa, 2022. accessed 1 October 2026.
- Enquiring about electricity bills in Amman (eFAWATEERcom reference number). Mawdoo3. accessed 1 October 2026.
- Law No. 10 of 2025 — General Electricity Law. InforMEA (UNEP), 2025. accessed 1 October 2026.
- Jordan’s new electricity law encourages investment in energy storage. ESS News, 2024. accessed 1 October 2026.
- Applications for electric vehicle charging station licences down 27%. Jordan News, 2026. accessed 1 October 2026.
- Jordan launches 50% solar water heater support programme. Attaqa, 2025. accessed 1 October 2026.
- First Middle Eastern utility-scale solar-plus-storage plant comes online. pv magazine, 2019. accessed 1 October 2026.
- Ministry of Digital Economy and Entrepreneurship announces results of the 2024 Household ICT Usage and Access Survey. Government of Jordan, 2025. accessed 1 October 2026.
- Jordan’s digital shift: 5G subscriptions soar 184% as fiber dominates fixed internet (TRC Q4 2025). Jordan News Agency (Petra), 2026. accessed 1 October 2026.
- Foreign exchange rates (1 October 2026). Central Bank of Jordan, 2026. accessed 1 October 2026.
Questions about energy in Jordan.
Registered Jordanian households pay 50 fils per kWh for the first 300 kWh a month, 100 fils for 301–600 kWh and 200 fils above 600 kWh, with a monthly credit of JOD 2.00–2.50 for moderate users. Unregistered households pay 120 fils per kWh up to 1,000 kWh. At the Central Bank of Jordan rate on 1 October 2026, 50 fils is about EUR 0.062 and 120 fils about EUR 0.150.
Your supplier depends on where you live: JEPCO covers Amman, Zarqa, Madaba and Balqa; IDECO covers Irbid, Ajloun, Jerash and Mafraq; EDCO covers the south, east and Jordan Valley. They are regional monopolies, so switching is not possible.
Yes, through net value billing with your distribution company. Exports and imports are compared in three daily periods, surplus is credited at 50 fils per kWh for homes and offset against your bills, and unused credit expires at the end of the calendar year. There are no cash payments.
The subscription number (also called the reference number) issued by your distribution company and printed on your bill. It is used with your meter number for solar applications, bill payment and subsidy registration. There is no national meter-point register.
Its expected output may cover up to 100% of the last 12 months’ consumption and it may not exceed 16 A per phase, described by the government as about 3.6 kW single-phase or 10 kW three-phase. Systems with inverters above 3.6 kW single-phase lose eligibility for the subsidised tariff.
Yes, with the distribution company’s approval. Battery capacity does not count against your solar limit, a connection study is required, and batteries must be certified to IEC 62619 and IEC 63056. Storage systems for renewable electricity are exempt from customs duty and sales tax.
Renewables produced 26.92% of electricity in 2024, natural gas 58.08% and oil shale 15%. The 2025–2035 energy strategy targets 40% renewables by 2035.