How electricity works in Ireland.
Ireland electricity market 2026: prices, ESB Networks, EirGrid, MPRN, smart meters, Clean Export Guarantee, licensing, all-island SEM, renewables and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Ireland energy at a glance.
Key figures for households in Ireland. Each one links to its source on the full overview below.
Electricity price.
0.404 EUR per kWh for households, including taxes. Figures for 2025-H2.
Household use.
3,228 kWh a year for a typical household. Figures for 2025.
Renewable share.
50% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Ireland.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Ireland below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Ireland requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Ireland.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Ireland, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Ireland, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Ireland.
The energy market in Ireland, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
Ireland shares an all-island wholesale electricity market, the Single Electricity Market (SEM), with Northern Ireland. EirGrid runs the transmission system in Ireland, ESB Networks is the single distribution system operator for the whole country, and the Commission for Regulation of Utilities (CRU) regulates both, together with the competitive retail market in which 11 suppliers sell to households.
Irish households paid the highest average electricity price in the EU in the second half of 2025: €0.4042/kWh including taxes, according to Eurostat. There is no regulated price cap; each supplier sets its own unit rates and standing charges, and network charges make up about 30% of a typical bill.
Half of the electricity generated in Ireland in 2025 came from renewable sources, mostly wind, with gas providing most of the rest. Solar capacity passed 3 GW in August 2026, more than 200,000 homes have solar panels, and over 2 million smart meters had been fitted by September 2025.
Energy snapshot.
Headline figures for electricity in Ireland. Each shows its data year and links to its source.
- Population5,458,600 peopleSource 1April 2025
- Households1,841,152 householdsSource 22022
- Average household size2.74 people/householdSource 22022
- Electricity use per household3,228 kWh/yrSource 72025
- Household price (EUR)0.404 EUR/kWhSource 92025-H2
- Renewable electricity share50%Source 82025
- Solar capacity3 GWSource 36August 2026
- Wind capacity5.09 GWSource 27end 2025
- Energy storage capacity0.8 GWSource 41mid-2026
- Smart-meter share80%Source 13September 2025
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Developing
- Regulator
- Commission for Regulation of Utilities (CRU); SEM Committee for the all-island wholesale market
- System operator
- EirGrid (transmission system operator)
- Distribution networks
- One national DSO, ESB Networks, which also owns the transmission assets
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in Ireland.
- Household price (EUR)
- 0.404 EUR/kWh (2025-H2)Source 9Eurostat average household price, consumption band 2,500–5,000 kWh/yr, all taxes and levies included (standing charges spread over the kWh). Highest in the EU for that period.
- Typical annual electricity bill
- 1,305 EUR/yr (2025-H2 prices)Source 9Derived: Eurostat’s H2 2025 all-in price (€0.4042/kWh) multiplied by the 2025 median residential consumption of 3,228 kWh (CSO). Not an official bill figure; actual bills depend on supplier, tariff, urban or rural standing charge and discounts.
Household price trend (EUR per kWh).Source 10
| 2019-H1 | 0.2423 EUR/kWh |
|---|---|
| 2019-H2 | 0.2546 EUR/kWh |
| 2020-H1 | 0.2409 EUR/kWh |
| 2020-H2 | 0.2616 EUR/kWh |
| 2021-H1 | 0.2555 EUR/kWh |
| 2021-H2 | 0.2974 EUR/kWh |
| 2022-H1 | 0.2324 EUR/kWh |
| 2022-H2 | 0.3225 EUR/kWh |
| 2023-H1 | 0.2735 EUR/kWh |
| 2023-H2 | 0.3794 EUR/kWh |
| 2024-H1 | 0.259 EUR/kWh |
| 2024-H2 | 0.3046 EUR/kWh |
| 2025-H1 | 0.3231 EUR/kWh |
| 2025-H2 | 0.4042 EUR/kWh |
What makes up the price
An Irish electricity bill combines the supplier’s unit rate and standing charge with network charges, the Public Service Obligation (PSO) levy and VAT. The CRU estimates network charges (distribution and transmission use of system) at about 30% of a typical household bill. For 2026/27 the CRU approved network charges that add about €41.25 a year (€3.44 a month) for a typical domestic customer from 1 October 2026, reflecting the Price Review 6 investment programme, while the PSO levy for households falls 66% to €0.51 a month.
Taxes and levies
Electricity carries a reduced VAT rate of 9%, which Budget 2026 extended until 31 December 2030. The PSO levy funds support for renewable and other generation that the market does not cover; it is shown as a fixed monthly charge rather than per kWh. Eurostat data show taxes and levies added about €0.04/kWh to the average price in the second half of 2025 (€0.3608/kWh excluding all taxes, €0.4042/kWh including them).
Urban and rural standing charges
Standing charges differ between urban and rural customers because ESB Networks applies separate distribution tariff groups to them, and rural networks serve fewer customers per kilometre of line. Suppliers pass this through, so a rural home usually pays a higher daily standing charge than an urban home on the same plan.
Trend and government credits
Eurostat’s half-yearly price series for Ireland swings sharply between 2022 and 2025. One reason is that one-off universal electricity credits paid by the government were counted against the price in the periods in which they were paid. Budget 2026 did not include a further universal credit, which is part of why the average price rose 32.7% year on year to €0.4042/kWh in H2 2025. Wholesale prices in the SEM depend heavily on gas because gas still produces almost half of Irish electricity. Wind Energy Ireland reported an average December 2025 wholesale price of €108.48/MWh, with windy days averaging €76.41/MWh and calm days €148.55/MWh.
Affordability
In February 2026, 316,000 domestic electricity customers were in arrears, with average arrears of €492. The CRU applies winter disconnection moratoria and requires suppliers to offer repayment plans; 124,000 customers were on the vulnerable customer register.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Variable | Yes | Standard unit rate plans that suppliers can change. There is no government or regulator price cap; the CRU monitors prices but does not set retail tariffs. |
| Fixed | Yes | Most suppliers offer 12-month or longer fixed-price contracts, often with discounts or cashback for new customers. |
| Time-of-use | Yes | Every supplier must offer a Standard Smart Tariff to smart-meter customers with day (08:00–17:00 and 19:00–23:00), peak (17:00–19:00) and night (23:00–08:00) rates. Many also offer EV tariffs with cheap overnight hours and weekend free-electricity periods. Older 24-hour and day/night meters remain in use. |
| Dynamic | Yes | From June 2026 suppliers with more than 200,000 customers (Bord Gáis Energy, Electric Ireland, Energia, PrepayPower/Yuno and SSE Airtricity) must offer a dynamic price tariff. It has 48 half-hour prices linked to the day-ahead market, published the day before, with peaks capped and alerts for price spikes. |
| Prepayment | Yes | Pay-as-you-go electricity is available from several suppliers, including smart pay-as-you-go through ESB Networks smart meters, without a separate keypad meter. |
| Other | Yes | Clean Export Guarantee (CEG) export tariffs pay microgenerators for every metered kWh exported. Suppliers set the rate, and the first €400 a year is exempt from income tax. |
Household prices compared with neighbouring countries (EUR per kWh).
- Ireland€0.404
- United Kingdom€0.308
- France€0.2
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,228 kWh/yr (2025)Source 7Median metered residential consumption per meter (2,278,989 residential meters). Kildare had the highest county median (3,846 kWh) and Donegal the lowest (2,630 kWh). Suppliers quote estimated annual bills on a higher standard assumption set by the CRU.
- Average daily use per household
- 8.8 kWh/day (2025)Source 7Derived: median annual residential consumption of 3,228 kWh divided by 365. The quarterly median ranged from 907 kWh (January–March) to 625 kWh (July–September).
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 6,574 kWh/person/yr (all sectors) (2025)Source 8Derived: total grid supply of 35,884 GWh in 2025 (CSO) divided by the April 2025 population of 5,458,600 (CSO).
- Heat pumps
- 19,583 units (2020 – July 2026)Source 50Heat pumps installed in existing homes with SEAI support since 2020; excludes heat pumps in new-build homes, which Census 2022 found in more than 40% of homes built since 2016. The 2030 target is 400,000 in existing buildings.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 134,475 electric vehicles on the road (end June 2026)Source 49CSO figures: 4% of the 3.34 million licensed vehicles. Battery-electric cars were 24% of new car registrations in the first half of 2026.
- Electric cooking
- Not identified from a reliable public source.
How households use electricity
The median Irish home with a residential meter used 3,228 kWh of electricity in 2025, down 1% on 2024. Use is strongly seasonal: the median household used 907 kWh in the first quarter and 625 kWh in the third. Consumption is highest in commuter counties around Dublin, such as Kildare (median 3,846 kWh), and lowest in Donegal (2,630 kWh), where more homes heat with oil or solid fuel.
Electricity is the main central-heating fuel in only about 12% of homes; oil (39%) and natural gas (33%) dominate, according to Census 2022. That is changing in new homes: Building Regulations require a share of renewable energy in new dwellings, and Census 2022 found that more than 40% of homes built since 2016 have a heat pump and about 30% have solar panels.
Electric vehicles and heat pumps
Electric vehicle use is rising quickly: 134,475 EVs were on the road at the end of June 2026, up 39% in a year, and battery-electric cars took 24% of new car sales in the first half of 2026. Heat pump retrofits in existing homes are much slower. Fewer than 20,000 have been installed with SEAI grants since 2020, against a 2030 target of 400,000.
National demand
Total grid supply was 35,884 GWh in 2025.
Housing and households.
- Dwellings
- 2,112,121 dwellings (2022)Source 3Total housing stock, of which about 1.85 million were occupied and 163,433 vacant.
- Owner-occupied
- 66% (2022)Source 437% owned outright, 29% with a mortgage or loan.
- Private rented
- 18% (2022)Source 4
- Social or public housing
- 10% (2022)Source 48% rented from a local authority and 2% from a voluntary or co-operative housing body.
- Houses
- 87% (2022)Source 4Share of occupied homes that are houses; 41% of homes are detached and 25% semi-detached.
- Apartments and flats
- 13% (2022)Source 4
- Urban population
- 63.6% (2022)Source 6CSO urban–rural classification (cities, satellite urban towns and independent urban towns).
Ireland’s housing is dominated by owner-occupied houses. Two-thirds of households own their home, and only 13% live in apartments, which are concentrated in Dublin and the other cities. 41% of homes are detached, a high share by European standards that reflects one-off rural housing, so many homes have their own roof, garden and off-street parking for solar panels, heat pumps and EV chargers.
Rented homes make up about 28% of households: 18% from private landlords and about 10% social housing from local authorities and approved housing bodies. Tenants usually need the landlord’s consent for solar panels or batteries, and SEAI grants are generally claimed by the property owner. About 36% of people live in rural areas, which affects network costs (rural standing charges are higher) and the share of homes heated with oil.
Census 2022 recorded 119,300 homes (6%) with solar panels. The figure has grown quickly since then: by August 2026 the government reported more than 200,000 homes with solar panels.
How the grid works in Ireland.
- TransmissionEirGrid
- DistributionOne national DSO, ESB Networks, which also owns the transmission assets
- MeteringESB Networks Meter Registration System Operator (MRSO) and Retail Market Design Service (RMDS), ESB Networks
- Supply8 or more retail suppliers
Physical flow
Large gas-fired stations, wind farms, grid-scale solar and the interconnectors to Great Britain feed EirGrid’s 400 kV, 220 kV and 110 kV transmission network. ESB Networks takes power from transmission substations into a distribution network at 38 kV, 20 kV and 10 kV, and then through local transformers to the 230 V single-phase supply used by almost all homes. Many rural homes are served by long overhead lines, and three-phase supply is mainly found on farms and commercial premises.
Ireland is one synchronous system with Northern Ireland, joined by a north–south tie line, and connected to Great Britain by two HVDC interconnectors: the East West Interconnector (500 MW, 2012) and Greenlink (500 MW, commercial operation from 2025), giving about 1 GW of interconnection. The 700 MW Celtic Interconnector to France is under construction and expected in late 2028.
Commercial flow
Generators sell into the all-island SEM through the SEMOpx day-ahead and intraday markets and the balancing market. Suppliers buy wholesale power, pay transmission and distribution use-of-system charges, and bill households. A capacity market run by EirGrid and SONI pays generators, storage and demand-side units for being available, and system services contracts pay for frequency response, reserve and inertia.
Running a high-wind system
Because the island has limited interconnection and a small synchronous system, EirGrid limits the share of non-synchronous generation (wind, solar and HVDC imports) to 75% of demand at any one time. Combined with local network constraints, this meant 11.4% of available wind energy and 12.8% of available solar energy in Ireland was dispatched down in 2025.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Department of Climate, Energy and the Environment | Sets energy policy, the Climate Action Plan and renewable support schemes (RESS, SRESS, Microgeneration Support Scheme), and oversees SEAI and EirGrid policy. |
| Regulator | Commission for Regulation of Utilities (CRU) | Independent energy and water regulator. Licenses generation and supply, sets network revenues (Price Review 6, 2026–2030) and network tariffs, sets the PSO levy, regulates retail consumer protection and smart metering policy, and oversees electrical contractor safety through Safe Electric. |
| Regulator | SEM Committee | Joint decision-making body of the CRU and the Utility Regulator (Northern Ireland) for the all-island wholesale market: market rules, capacity market and system services. |
| TSO | EirGrid | State-owned transmission system operator. Plans and operates the 400, 220 and 110 kV grid, dispatches generation in real time, procures system services (DS3) and runs grid connection for large projects. It works with SONI, its Northern Ireland sister company. |
| DSO | ESB Networks | The single distribution system operator for all of Ireland and owner of both the distribution and transmission assets. Connects homes and businesses, owns and installs all meters, reads them, issues MPRNs and processes microgeneration and mini-generation connections. |
| Settlement | Single Electricity Market Operator (SEMO) | Joint venture of EirGrid and SONI that runs balancing market settlement and the capacity market for the all-island SEM. |
| Exchange | SEMOpx | Day-ahead and intraday power exchange for the SEM, operated by EirGrid and SONI. Since Brexit the SEM has not been coupled with the EU day-ahead market. |
| Data hub / registry | ESB Networks Meter Registration System Operator (MRSO) and Retail Market Design Service (RMDS) | Ring-fenced functions within ESB Networks that hold the national register of MPRNs and their registered supplier, process change of supplier, and maintain the retail market message rules all suppliers must follow. |
| Metering | ESB Networks | Meter ownership and installation are regulated activities of the DSO, not a competitive market. The National Smart Metering Programme replaced household meters with smart meters at no direct charge to the customer. |
| Supplier | Licensed electricity suppliers | Eleven suppliers sold to households in September 2026. They bill customers, set tariffs and pay Clean Export Guarantee export credits. |
Compared with the UK system.
| UK concept | Ireland equivalent | How it works |
|---|---|---|
| DNO | ESB Networks (single national DSO) | There are no regional DNOs. ESB Networks owns and operates the whole distribution network, from 38 kV down to the 230/400 V low-voltage network, across the country. Network tariffs are set nationally, with different tariff groups for urban and rural customers rather than by region. |
| National Grid/NESO | EirGrid (TSO) with ESB as transmission asset owner | EirGrid operates and plans the transmission system and dispatches generation, much like NESO, but does not own the wires: ESB owns the transmission assets and ESB Networks builds and maintains them. EirGrid and SONI jointly run the all-island market through SEMO. |
| MPAN | MPRN (Meter Point Reference Number) | An 11-digit number beginning with 10 that identifies each electricity connection point. Unlike the MPAN it has no supplementary top line for profile class or meter timing; tariff and meter configuration are held as separate data in the ESB Networks register. |
| MPRN | GPRN (Gas Point Registration Number) | Confusingly, in Ireland MPRN means the electricity meter point. Gas connections are identified separately by a GPRN issued by Gas Networks Ireland. |
| Meter operator | ESB Networks | No competitive meter operator market. ESB Networks owns, installs, reads and maintains all electricity meters, and suppliers cannot choose a different meter provider. |
| Supplier | Licensed supplier | Competitive retail market with free switching, licensed by the CRU. There is no default tariff cap; suppliers set prices freely but must follow CRU consumer protection rules and offer a Standard Smart Tariff. |
| Smart-meter infrastructure | ESB Networks National Smart Metering Programme | One DSO-run system instead of a DCC-type central body. Meters send data over mobile networks (2G or narrow-band 4G IoT) to ESB Networks, which passes readings to suppliers through the retail market systems. |
How a supply point is identified.
10 305 872 641 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Meter Point Reference Number (MPRN) |
| Who issues it? | ESB Networks, as distribution system operator, when a new electricity connection is created |
| Format | A purely numeric 11-digit number. The first two digits are always 10 for connections in Ireland; the remaining nine digits identify the individual connection point. |
| Length | 11 digits |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Printed in the top right-hand corner of the electricity bill. It is also shown in the ESB Networks online account. A new occupant can get it from the previous occupant, landlord or estate agent, or from ESB Networks by quoting the meter’s RM and serial numbers printed on the meter. |
| Electronic access | Customers can see their MPRN and download smart meter interval data through an ESB Networks online account, verified with the name and mobile number held by their supplier. Suppliers access MPRN data, meter readings and registrations through ESB Networks’ retail market systems. |
| Third-party access | The CRU’s Smart Meter Data Access Code (February 2025) sets the framework under which eligible parties with a lawful basis, such as customer consent, can access smart meter data. ESB Networks is still putting the systems in place. Installers, SEAI grant applications and price comparison sites normally get the MPRN from the customer. |
| Who keeps the register | ESB Networks’ Meter Registration System Operator (MRSO) holds the national register of MPRNs, their meter details and their registered supplier. The retail market rules are maintained by the Retail Market Design Service. |
| Register scope | National |
What the MPRN identifies
The MPRN is the unique reference for an electricity connection point and its meter. It belongs to the connection, not to the customer or supplier, so it stays with the property when people move house or switch supplier. A meter replacement, including the smart meter upgrade, does not change it. The meter itself is identified separately by its serial number, and ESB Networks records each meter’s configuration (24-hour, day/night or smart) against the MPRN.
How it is created and used
When ESB Networks energises a new connection it creates the MPRN in its central register. Every market process uses it: supplier switching, meter reading, billing, smart tariff sign-up, NC6 microgeneration notifications and SEAI solar grant applications, which require a valid MPRN. Because there is one DSO, there is one national register and no regional prefix to decode.
Switching supplier
To switch, a customer gives the new supplier their MPRN and a meter reading. The new supplier sends a change-of-supplier request to ESB Networks’ MRSO, which updates the registration. The customer does not need to contact the old supplier.
Gas and Northern Ireland
Gas supply points have a separate number, the GPRN, issued by Gas Networks Ireland. Northern Ireland, although part of the same wholesale market, has its own distribution operator (NIE Networks) and its own retail market and supply-point register.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Clean Export Guarantee (CEG): supplier-set payment for each metered kWh exported, credited to the bill; first €400 a year exempt from income tax until the end of 2028 |
| Is there net metering? | No. Imports and exports are measured and priced separately. Households pay the normal tariff for imported electricity and receive the CEG rate for each kWh they export. |
| How much are exports paid? | Each supplier sets its own CEG rate. A November 2025 comparison listed rates from about 16c to 25c per kWh including VAT at most suppliers, with one supplier paying more through a premium product. The first €400 a year of export income is exempt from income tax until 31 December 2028. |
| What size can a home connect without applying? | Microgeneration up to 6 kW (25 A) single-phase or 11 kW (16 A) three-phase can connect on the NC6 inform-and-fit basis. |
| What about larger systems? | Mini-generation, from 6 to 17 kVA single-phase or 11 to 50 kVA three-phase, needs an NC7 application and a connection offer from ESB Networks. The fee is €1,041.81 including VAT and offers typically take 8 to 10 weeks. Export capacity cannot exceed import capacity. Above 50 kW, projects follow the small-scale or standard generator connection processes. |
| Do I need a smart meter? | A smart meter is normally used to measure exports. Where one is not yet fitted, suppliers may pay on a deemed export quantity. |
| Can I share or sell my surplus to a neighbour? | Not yet in practice. Ireland transposed the EU electricity market design directive, which includes energy sharing, in July 2026, and the CRU is developing the detailed design for energy sharing and multiple supply contracts. |
Connecting a home system.
- Choose an SEAI-registered solar company if you want the SEAI solar PV grant, and get grant approval before any work starts.
- The installer designs a system within the microgeneration limits (under 6 kW single-phase or 11 kW three-phase) using inverters type-tested to EN 50549 (or EN 50438).
- Install the system; the electrical work must be certified by a Registered Electrical Contractor under the Safe Electric scheme.
- The installer submits the NC6 microgeneration notification form to ESB Networks (“inform and fit”, free of charge), with the inverter protection settings.
- ESB Networks registers the export and notifies your supplier; a smart meter records exports in 30-minute intervals.
- Contact your supplier to start Clean Export Guarantee payments, which are credited against your bill.
- For grant-funded systems, complete within eight months of approval and submit the completion documents to SEAI for payment.
Ireland moved from having no domestic export payment to a regulated export guarantee in 2022 under the Microgeneration Support Scheme. Since then every supplier has had to pay its microgeneration customers for exported electricity, and the CRU’s June 2024 arrangements confirmed payment for every metered unit exported over the billing cycle.
Connection is simple for typical rooftop systems. Because ESB Networks is the only DSO, the NC6 form and protection settings are the same nationwide, and the installer, not the householder, notifies the network. More than 140,000 customers were generating their own electricity in September 2025, according to ESB Networks.
Rising dispatch-down of wind and solar and low midday prices on sunny days are making exported power less valuable on the wholesale market. That is one reason dynamic tariffs, home batteries and EV smart charging are attracting more interest from solar households.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Stations up to 1 MW are automatically authorised and need no licence application. Stations above 1 MW and up to 10 MW are authorised once the CRU acknowledges a notification. Above 10 MW, a full CRU authorisation to construct and licence to generate are required. | CRU | Electricity Regulation Act 1999 (as amended); S.I. 459 and 460 of 2022 introduced the 1–10 MW notification route. Rooftop solar and home batteries fall within the automatic authorisation. |
| Store electricity | Treated under the generation authorisation framework according to capacity. Home batteries need no licence; they connect behind the meter under ESB Networks’ rules. | CRU; ESB Networks or EirGrid for connection | Grid-scale batteries need planning permission, a connection agreement and market registration. A long-duration storage procurement mechanism is being developed with the CRU. |
| Export to the grid | No licence for microgeneration. Notify ESB Networks on form NC6 (under 6 kW single-phase, 11 kW three-phase) or apply on NC7 for mini-generation up to 50 kVA. | ESB Networks | Export payment comes from the household’s supplier under the Clean Export Guarantee. |
| Sell electricity to final customers (supply) | Anyone supplying electricity to a final customer needs a CRU supply licence (application fee €254), plus market entry through RMDS and SEMO. | CRU | Applies equally to all applicants regardless of size. Selling exported power to a neighbour is not yet possible; energy sharing is being designed by the CRU. |
| Wholesale trading | Participation in the SEM requires registration under the Trading and Settlement Code with SEMO, and membership of SEMOpx to trade on the exchange; licensed suppliers and generators register their units. | SEMO / SEMOpx; SEM Committee | All-island market shared with Northern Ireland. |
| Aggregate demand (demand side units) | Demand side unit operators register with EirGrid and in the SEM. A DSU must offer at least 4 MW, and each individual demand site in an aggregation can be no more than 10 MW. | EirGrid; SEMO | DSUs are mostly industrial and commercial sites today. Aggregated generator units are also recognised. Household-scale aggregation is not yet a standard market route. |
| Balancing and system services | Units must be registered in the SEM and contracted with EirGrid for DS3 system services; providers pass technical compliance tests. | EirGrid; SEM Committee | Current DS3 contracts are extended until the Day-Ahead System Services Auction goes live, or 30 September 2027 at the latest. |
| Local flexibility services to the DSO | No licence; providers qualify through ESB Networks’ flexibility procurement (for example the Demand Flexibility Product) and sign a services contract. | ESB Networks | Non-domestic Local Business Flex products are planned from the second half of 2026. |
| Operate a virtual power plant / remote control of home assets | No specific VPP licence. A company that also supplies the customer needs a supply licence; access to smart meter data must follow the Smart Meter Data Access Code and data protection law. | CRU (supply, data access) | Market access for aggregated small assets depends on DSU/AGU registration thresholds. |
| Carry out electrical installation work | Controlled electrical works, including solar PV and battery connections, must be done and certified by a Registered Electrical Contractor under the Safe Electric scheme. | CRU (Safe Electric) | A completion certificate is required before ESB Networks connects new or altered installations. SEAI grant work also requires an SEAI-registered company. |
Licensing in Ireland is light at household scale. Generators up to 1 MW are automatically authorised, so homes, farms and most commercial rooftops need no generation licence, only a network notification or connection agreement with ESB Networks. Supply is different: any business selling electricity to a final customer needs a CRU supply licence, whatever its size.
Electrical safety is regulated separately. The CRU designates the Safe Electric scheme, and only Registered Electrical Contractors may carry out and certify controlled works. In practice every solar PV, battery or EV charger installation must be certified by one.
Flexibility and grid services.
Aggregation of home equipment: Limited
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| DS3 system services (frequency response and reserve) | Yes | Unit registered in the SEM; DSUs at least 4 MW | Limited | EirGrid. Regulated tariff contracts pay batteries, generators and DSUs for fast frequency response, primary to tertiary reserve and ramping. Batteries are the main new providers. The contracts end at DASSA go-live or by 30 September 2027. |
| Day-Ahead System Services Auction (DASSA) | Developing | — | Limited | EirGrid / SONI. The competitive daily auction that will replace DS3 tariffs for reserve services. The most recently communicated go-live is May 2027. |
| Capacity market | Yes | DSUs at least 4 MW | Limited | EirGrid / SONI (SEMO). All-island auctions for reliability options are open to generators, storage and demand side units. The SEM Committee consulted on a redesigned capacity mechanism (“CRM 2.0”) in 2026. |
| Balancing and wholesale markets | Restricted | DSUs at least 4 MW | Limited | SEMO / SEMOpx. DSUs and aggregated generator units can be dispatched in the balancing market. Household assets take part only indirectly, through supplier tariffs. |
| ESB Networks Demand Flexibility Product | Yes | — | Yes | ESB Networks. Launched at the end of 2024 to buy medium-duration flexibility at set locations. Up to 109 MW was sought in the first round across 16 locations, with 15-year contracts and a goal of 500 MW over several years. |
| Beat the Peak (domestic and business) | Yes | — | No | ESB Networks. Behavioural demand response: households and businesses are encouraged and rewarded for reducing use during peak events. A non-domestic Local Business Flex initiative is planned from the second half of 2026 to 2030. |
Ireland has a long-established industrial demand response sector. Demand side units aggregate factories and commercial standby generators, and take part in the capacity market and system services. The 4 MW minimum and the design of the market rules mean that household batteries, heat pumps and EVs cannot yet be aggregated into the main markets in a standard way.
That is starting to change. The Directive (EU) 2024/1711 transposition in July 2026 introduced rights to energy sharing and multiple supply contracts and new provisions on flexible connections. EirGrid’s programmes include demand response and a planned “demand consumption unit” in balancing market reform. ESB Networks is buying local flexibility through long-term contracts, and dynamic tariffs from June 2026 give households a price signal to shift demand.
For now, most household flexibility comes through supplier tariffs: the Standard Smart Tariff peak band from 17:00 to 19:00, cheap night and EV rates, weekend free-electricity offers and dynamic half-hourly prices.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| EirGrid DS3 / FASS programme | Procurement of system services and the move to competitive auctions. |
| ESB Networks flexibility services | Local flexibility tenders, the Demand Flexibility Product and Beat the Peak programmes. |
| SEMO | Market registration, balancing market settlement and capacity auctions. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Over 2 million smart meters installed by ESB Networks by September 2025, covering more than 80% of households; installed by default on new connections |
| Reading interval | 30 minutes |
| Programme | National Smart Metering Programme, started 2019 |
| Responsible party | ESB Networks (DSO); no supplier-led installation |
| Cost to customer | No direct charge; funded through network tariffs |
| Communications | 2G or narrow-band 4G IoT mobile networks; daily register reads sent around midnight |
| Interval data | 30-minute readings, sent every two hours where the customer has chosen to share them with the supplier |
| Customer data access | ESB Networks online account with downloadable interval data |
| Third-party access | CRU Smart Meter Data Access Code (February 2025), being implemented |
| In-home display / HAN | Not enabled at installation; CRU consulted in 2025 on near real-time data access |
Ireland’s rollout is run entirely by the network operator. ESB Networks owns, installs and reads every meter, so households do not ask their supplier for a smart meter. The programme began in 2019 and reached 2 million installations in September 2025, and it now extends to three-phase whole-current meters.
Every smart meter records consumption, and export where there is microgeneration, in 30-minute intervals. Households choose how much data their supplier receives: customers on a smart tariff share interval data, while others can keep monthly or bi-monthly reads. Smart meters made smart pay-as-you-go, time-of-use and dynamic tariffs possible, and they measure CEG export payments.
The meters were installed without an active home area network, so near real-time data in the home is not yet available as standard. The CRU consulted in June 2025 on updating how customers can get near real-time data. Since December 2025, S.I. 589/2025 has required ESB Networks to publish non-personal smart meter data reports.
Renewable electricity.
Electricity generation mix (2025).
- Gas: 47.4%
- Wind: 40.2%
- Solar (grid-scale): 3.8%
- Hydro: 2.2%
- Waste: 2%
- Peat and biomass: 1.7%
- Coal: 1.5%
- Other renewables: 0.6%
- Oil: 0.5%
- Other: 0.2%
- Renewable electricity share
- 50% (2025)Source 8Share of grid-scale electricity generated in Ireland (CSO). Wind alone was 40% of generation. Excludes rooftop solar used on site.
- Home solar
- 200,000 homes with solar panels (August 2026)Source 36Government figure: more than 200,000 homes, with over 120,000 SEAI solar PV grants paid. Census 2022 recorded 119,300.
- Solar added each year
- 1 GW (Nov 2025 – Aug 2026)Source 36Installed solar capacity rose from 2 GW (November 2025) to 3 GW (August 2026). Not a calendar-year figure.
- Onshore wind
- 5.09 GW (end 2025)Source 27
- Solar PV (all)
- 3 GW (August 2026)Source 36
- Offshore wind
- Not identified from a reliable public source.
- Battery storage (grid-scale)
- 0.8 GW (mid-2026)Source 41
Targets.
- 80% renewable electricity by 2030 (Climate Action Plan 2025).
- 9 GW onshore wind, 8 GW solar and at least 5 GW offshore wind by 2030.
- EirGrid aims to run the system with up to 95% renewable electricity at any one time by 2030.
- 400,000 heat pumps in existing buildings and 500,000 home retrofits to BER B2 by 2030.
Wind first, solar catching up
Wind is the backbone of Irish renewable electricity. It generated 11,782 GWh, 40% of Irish generation, in 2025, and set a new peak of 3,898 MW on 14 February 2026. All of it is onshore so far; none of the 2030 offshore wind target is yet operating.
Solar has grown very quickly from a standing start. The first grid-scale solar farm connected in 2022, and grid-scale solar produced 1,101 GWh in 2025, 51% more than in 2024. Utility-scale output passed 1 GW for the first time on 20 April 2026 and 1.3 GW on 24 August 2026. Rooftop solar is not fully counted in official generation statistics.
Fossil fuels
Gas generated 47% of electricity in 2025. Coal ended in mid-2025: July 2025 was the first full month without coal after Moneypoint stopped coal generation. Net imports through the interconnectors met 17% of grid supply in 2025.
Constraints
Renewable growth is held back by grid capacity. In 2025, 11.4% of available wind energy and 12.8% of available solar energy in Ireland were dispatched down because of local network constraints and system-wide curtailment. The northwest and midlands were the most affected areas.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 0.8 GW (mid-2026)Source 41More than 800 MW of grid-scale batteries; a further 2.3 GW has planning permission and connection contracts.
Batteries are already an important part of how the Irish system is balanced. Most of the 800 MW-plus installed since 2018 are short-duration units earning DS3 system services revenue for fast frequency response and reserve. Battery discharge on the transmission system reached a record 396 MW on 15 December 2025.
The next stage is longer-duration storage to absorb surplus wind and reduce dispatch-down. Four-hour projects are now being built, and a consultancy study for Energy Storage Ireland in June 2026 estimated that 2 GW of additional storage by the early 2030s could cut wasted wind and solar energy by 11%.
Home batteries are usually sold alongside rooftop solar. They are not grant-funded on their own and need no licence, but the electrical installation must be certified by a Registered Electrical Contractor and included in the NC6 notification where the system can export.
Storage projects.
- Turlough Hill: ESB’s 292 MW pumped-hydro station in County Wicklow, Ireland’s only pumped storage.
- Knockanure BESS, County Kerry: 170 MW / 680 MWh four-hour battery with a 110 kV connection, granted planning permission in October 2025, among the first long-duration batteries in Ireland.
- Long Duration Energy Storage programme: EirGrid has recommended an LDES procurement mechanism to the CRU, and a decision was awaited in mid-2026.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Electric Ireland | — | Yes | Yes | Yes | Yes |
| SSE Airtricity | — | Yes | Yes | Yes | Yes |
| Bord Gáis Energy | — | Yes | Yes | Yes | Yes |
| Energia | — | Yes | Yes | Yes | Yes |
| PrepayPower / Yuno Energy | — | Unknown | Yes | Yes | Yes |
| Flogas | — | Unknown | Yes | Unknown | Yes |
| Pinergy | — | Unknown | Yes | Unknown | Yes |
| Community Power | — | Yes | Unknown | Unknown | Unknown |
Eleven suppliers serve Irish households: Bord Gáis Energy, Community Power, Ecopower, Electric Ireland, Energia, Flogas, Pinergy, PrepayPower, SSE Airtricity, Waterpower and Yuno Energy. Electric Ireland, the retail arm of state-owned ESB, is the largest. The five suppliers with more than 200,000 customers each had to offer a dynamic tariff by 1 June 2026.
All suppliers pay microgenerators under the Clean Export Guarantee and offer smart tariffs to smart-meter customers. Several small suppliers specialise in renewable or community-owned electricity. The CRU’s 2026 interim retail market review found that competition is working, with meaningful rivalry in the domestic market.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Department of Climate, Energy and the Environment | Government | Energy policy ministry | Owns the Climate Action Plan, renewable support schemes and microgeneration policy. |
| Sustainable Energy Authority of Ireland (SEAI) | Government | National energy agency | Runs the solar PV, heat pump and home energy upgrade grants, keeps the register of grant-approved companies and publishes national energy statistics. |
| Commission for Regulation of Utilities (CRU) | Regulator | Energy regulator | Licensing, network tariffs, retail market rules, CEG arrangements, smart meter data access and electrical safety oversight. |
| EirGrid | Transmission | Transmission system operator | Operates the grid, publishes real-time and monthly system data, and procures system services. |
| ESB Networks | Distribution | Distribution system operator and meter owner | Issues MPRNs, connects microgeneration (NC6/NC7) and runs the smart metering programme. |
| SEMO / SEMOpx | Market | All-island market operator and power exchange | Wholesale, balancing and capacity market operations for Ireland and Northern Ireland. |
| Wind Energy Ireland | Renewable Energy | Wind industry association | Publishes wind output, dispatch-down and wholesale price analysis. |
| Solar Ireland | Solar | Solar industry association | Represents rooftop and utility-scale solar companies. |
| Micro-Renewable Energy Federation (MREF) | Renewable Energy | Microgeneration industry body | Represents small-scale renewable installers and campaigns on microgeneration policy. |
| Energy Storage Ireland | Storage | Storage industry association | Publishes storage deployment and pipeline figures. |
| Safe Electric | Consumer | Electrical safety regulatory scheme | Register of Registered Electrical Contractors entitled to certify solar, battery and EV charger installations. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection (micro) | ESB Networks NC6 microgeneration notification and conditions | ESB Networks | Inform-and-fit for under 6 kW single-phase / 11 kW three-phase, with specified protection settings. |
| Grid connection (mini) | ESB Networks NC7 mini-generation application | ESB Networks | 6–17 kVA single-phase, 11–50 kVA three-phase; export capacity no greater than import capacity. |
| Inverters and protection | EN 50549-1 (or legacy EN 50438) | CENELEC | Generators must be type-tested to one of these standards; protection settings are declared on the NC6. |
| Wiring rules | I.S. 10101 National Rules for Electrical Installations | NSAI | Applies to the AC installation of solar PV, batteries and EV chargers. |
| Installer certification | Registered Electrical Contractor and completion certificate (Safe Electric) | CRU | A validated completion certificate must reach ESB Networks before new or altered installations are connected. |
| Grant installer registration | SEAI Solar PV scheme registered companies and technical requirements | SEAI | Grant-funded work must use an SEAI-registered company and meet the scheme’s technical rules. |
| Large generators | EirGrid Grid Code and ESB Networks Distribution Code; EU Requirements for Generators (Regulation 2016/631) | EirGrid / ESB Networks / CRU | Apply to transmission and larger distribution-connected generation and storage. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Planning permission for rooftop solar on a house | Limited | National | Exempt since October 2022 with no limit on roof area, subject to conditions on height above the roof and distance from the edge. Different rules apply in designated Solar Safeguarding Zones and for protected structures. |
| Wall-mounted or free-standing panels | Limited | National | Exempt up to a 25 m² area under the 2022 exemptions; larger installations need planning permission. |
| DSO notification or approval | Yes | National | NC6 notification for microgeneration (no approval needed before fitting); NC7 application and connection offer for mini-generation; formal connection application above 50 kW. |
| Generation authorisation or licence | No | National | Automatically authorised up to 1 MW. |
| Electrical certification | Yes | National | Work certified by a Registered Electrical Contractor (Safe Electric). |
| Landlord or management company consent | Limited | Local | Needed for tenants and for apartments with shared roofs. |
Since S.I. 493 of 2022 took effect in October 2022, homeowners can cover their whole roof with solar panels without planning permission, provided the panels stay close to the roof plane and back from the edges. Solar Safeguarding Zones, set by S.I. 492 of 2022 around airports and other sensitive sites, keep stricter limits.
The network side is the same everywhere because there is only one DSO. Microgeneration is notified after installation, while mini-generation and larger systems need an ESB Networks connection offer before work proceeds.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| SEAI Solar PV grant (homes) | Active | Grant | €700 per kWp for the first 2 kWp plus €200 per kWp up to 4 kWp, a maximum of €1,800, kept at that level for 2026. Homes built before 2021 only; approval needed before work starts, using an SEAI-registered company, with installation completed within eight months. | 2026 |
| Clean Export Guarantee | Active | Export payment | Suppliers must pay microgenerators for every metered kWh exported, at a rate they set; credited to the bill. | — |
| Income tax exemption on microgeneration export income | Active | Tax relief | The first €400 a year of CEG income is exempt from income tax. | Extended to 31 December 2028 (Finance Act 2025) |
| Reduced VAT on electricity | Active | VAT relief | 9% VAT on electricity and gas bills instead of the standard 23%. | Extended to 31 December 2030 (Budget 2026) |
| Small-scale Renewable Electricity Support Scheme (SRESS) | Active | Feed-in tariff | Fixed 15-year export tariffs without an auction for community, farm and SME projects above 50 kW. A further phase was expected in 2026. | — |
| SEAI heat pump and home energy upgrade grants | Active | Grant | Grants for heat pumps, insulation and deep retrofits; applications rose 251% in the first half of 2026 compared with 2025. | — |
| Universal household electricity credits | Closed | Bill credit | One-off credits paid in previous years; Budget 2026 did not include a further round. | — |
Data and connectivity.
- Fixed broadband
- 95.5 % of households with internet access (2025)Source 11Eurostat household internet access. Fixed very-high-capacity network coverage was 89.0% of households and FTTP 84.5% (DESI 2026, reference year 2025).
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- 96.3 % of households (basic 5G coverage) (2025)Source 12
Smart meters communicate over public mobile networks. Some use only 2G and others can also use narrow-band 4G channels designed for the Internet of Things. Meters send daily readings around midnight and check their connection about every two hours, and interval data goes to the supplier every two hours where the customer has opted in.
Fixed broadband is widespread, and the state-backed National Broadband Plan is extending fibre to rural areas, which helps app-based control of inverters, batteries, heat pumps and EV chargers. Because the meters have no active home area network, local monitoring usually relies on inverter or clamp-meter data sent over home Wi-Fi.
Grid conditions.
- National peak demand
- 6.02 GW (8 January 2025)Source 30All-time record of 6,024 MW at 17:47, the first peak above 6,000 MW. Weekend records were set again in January and February 2026.
- Annual electricity demand
- 35.9 TWh (2025)Source 8Total grid supply of 35,884 GWh, including net imports of 6,130 GWh.
- Generation capacity
- Not identified from a reliable public source.
- Interconnection
- 1 GW (2025)Source 38East West Interconnector (500 MW) plus Greenlink (500 MW) to Great Britain. Excludes the north–south link with Northern Ireland and the Celtic Interconnector under construction.
- Curtailment
- 11.4 % of available wind energy dispatched down (2025)Source 271,476 GWh of wind dispatched down in Ireland (constraints plus curtailment); solar 12.8% (160 GWh). All-island wind figure 13.4%.
Demand is growing, driven mainly by electrification, and peaks on winter evenings between 17:00 and 18:00. The highest hourly average supply in 2025 was 5.26 GWh between 17:00 and 18:00 in November. Meeting those peaks still relies on gas plant and imports, because winter evening peaks often coincide with low wind.
Grid capacity is the main constraint on new renewables. The northwest and midlands have the highest dispatch-down, and connection queues are long for large projects. Price Review 6 provides about €18.9 billion of network investment over 2026–2030 to reinforce the grid.
More EU interconnection should help. The Celtic Interconnector will give Ireland its first direct link with the EU market, and EirGrid plans to re-couple the SEM with the European day-ahead and intraday markets, with testing planned from 2027.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Dynamic price tariffs | Current | June 2026 | Suppliers with more than 200,000 customers must offer a half-hourly dynamic tariff linked to the day-ahead market, with capped peaks and advance price-spike alerts. |
| EU electricity market design directive transposed | Current | 10 July 2026 | Directive (EU) 2024/1711 was transposed, introducing rights to energy sharing and multiple supply contracts, stronger consumer protections and flexible connection provisions. The CRU is now developing the detailed design. |
| 2026/27 network charges and PSO levy | Current | 1 October 2026 | Network charges add about €41.25 a year for a typical household, while the domestic PSO levy falls 66% to €0.51 a month. |
| Price Review 6 (2026–2030) | Current | 2026 | Network investment programme of about €18.9 billion over five years to reinforce transmission and distribution for renewables, electrification and demand growth. |
| Large energy user connection policy and private wires | Current | December 2025 onwards | A private wires framework allowing direct lines in defined cases is due to start operating in the second half of 2026. |
| Day-Ahead System Services Auction (DASSA) | Upcoming | May 2027 (latest published target) | Competitive daily procurement of reserve services replaces DS3 regulated tariffs, which run until DASSA go-live or 30 September 2027 at the latest. |
| Re-coupling the SEM with EU markets | Upcoming | Testing from 2027 | EirGrid and RTE have re-planned single day-ahead and intraday coupling around the delayed Celtic Interconnector. |
| Celtic Interconnector to France | Upcoming | Q4 2028 | 700 MW HVDC link, Ireland’s first direct connection to the EU grid, delayed from 2026–2027. |
| Smart meter data access and near real-time data | Upcoming | 2026–2027 | ESB Networks is putting in place the systems for the Smart Meter Data Access Code, and the CRU is reviewing how customers get near real-time data. |
| RESS 6 auction | Upcoming | December 2026 | The next Renewable Electricity Support Scheme auction for utility-scale wind and solar. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Medium | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | High | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | High | More than 200,000 homes with solar panels by August 2026, over 120,000 SEAI grants paid, 31,000 grant applications in January–July 2026 (up 76%), no planning permission needed for rooftop systems, and paid exports under the CEG. |
| Distributed energy market | Medium | 134,475 EVs (4% of vehicles) and fewer than 20,000 grant-supported heat-pump retrofits; more than 140,000 microgeneration customers (September 2025). |
| Grid flexibility market | Medium | Established DSU sector in the capacity market and DS3 services, but a 4 MW minimum; household aggregation not yet standard; DSO flexibility and dynamic tariffs started in 2024–2026. |
| Energy storage adoption | Medium | More than 800 MW of grid-scale batteries and a 2.3 GW pipeline; no official count of home batteries, which receive no grant. |
| Renewable growth environment | High | Renewables 50% of generation in 2025; solar up from 2 GW to 3 GW in under a year; 80% renewable electricity target for 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 52 sources
- Population and Migration Estimates, April 2025. Central Statistics Office, 2025. accessed 1 October 2026.
- Census of Population 2022 – Summary Results: Household Size and Marital Status. Central Statistics Office, 2023. accessed 1 October 2026.
- Census of Population 2022 Profile 2 – Housing in Ireland: Key Findings. Central Statistics Office, 2023. accessed 1 October 2026.
- Ireland and Northern Ireland: A Joint Census Publication 2021–2022 – Housing. Central Statistics Office. accessed 1 October 2026.
- Census of Population 2022 – Summary Results: Dwelling Characteristics. Central Statistics Office, 2023. accessed 1 October 2026.
- Urban and Rural Life in Ireland 2025: Age, Sex and Geographical Distribution. Central Statistics Office, 2025. accessed 1 October 2026.
- Metered Electricity Consumption 2025: Residential. Central Statistics Office, 2026. accessed 1 October 2026.
- Electricity Supply by Source 2025: Key Findings. Central Statistics Office, 2026. accessed 1 October 2026.
- Electricity price statistics. Eurostat, 2026. accessed 1 October 2026.
- Electricity prices for household consumers – bi-annual data (nrg_pc_204), band 2,500–4,999 kWh, all taxes included. Eurostat, 2026. accessed 1 October 2026.
- Level of internet access – households (isoc_ci_in_h). Eurostat, 2025. accessed 1 October 2026.
- State of the Digital Decade 2026 – Ireland country report (Council document 10476/26 ADD 15). European Commission / Council of the EU, 2026. accessed 1 October 2026.
- ESB Networks reaches milestone of over two million smart meters installed nationwide. ESB Networks, 2025. accessed 1 October 2026.
- Find your MPRN. ESB Networks. accessed 1 October 2026.
- Smart Meter Data Access Code. ESB Networks. accessed 1 October 2026.
- Smart meters: technology. ESB Networks. accessed 1 October 2026.
- Mini-generation. ESB Networks. accessed 1 October 2026.
- Certification process. ESB Networks. accessed 1 October 2026.
- ESB Networks announces one gigawatt of energy storage now available on Ireland’s electricity network. ESB Networks, 2024. accessed 1 October 2026.
- Microgeneration – consumer information. Commission for Regulation of Utilities. accessed 1 October 2026.
- Dynamic Price Tariffs for electricity. Commission for Regulation of Utilities, 2026. accessed 1 October 2026.
- Electricity Generation licences and authorisations. Commission for Regulation of Utilities. accessed 1 October 2026.
- Electricity Supply licences. Commission for Regulation of Utilities. accessed 1 October 2026.
- CRU approves 2026/27 electricity network charges and reduced PSO Levy. Commission for Regulation of Utilities, 2026. accessed 1 October 2026.
- Opening Statement: Joint Oireachtas Committee on Climate, Environment and Energy, 13 May 2026. Commission for Regulation of Utilities, 2026. accessed 1 October 2026.
- Smart Meter Upgrade – Access to Near Real Time Metering Data Consultation. Commission for Regulation of Utilities, 2025. accessed 1 October 2026.
- Annual Renewable Energy Constraint and Curtailment Report 2025. EirGrid / SONI, 2026. accessed 1 October 2026.
- Renewables provided 44% of electricity in December. EirGrid, 2026. accessed 1 October 2026.
- Multiple renewable energy records in Ireland in first half of 2026. EirGrid, 2026. accessed 1 October 2026.
- New electricity demand records set during cold snap. EirGrid, 2025. accessed 1 October 2026.
- 42% of electricity came from renewable sources in September. EirGrid, 2025. accessed 1 October 2026.
- Demand side management. EirGrid. accessed 1 October 2026.
- Future Markets Newsletter, Issue 34, July 2026. EirGrid / SONI, 2026. accessed 1 October 2026.
- System Services Regulated Arrangements to FASS – The Gap: Decision Paper (SEM-25-031). SEM Committee, 2025. accessed 1 October 2026.
- Irish wind farms provided a third of our power in 2025. Wind Energy Ireland, 2026. accessed 1 October 2026.
- Ireland’s PV capacity reaches 3 GW. pv magazine, 2026. accessed 1 October 2026.
- Irish electricity generation by grid-scale PV up 51% in 2025. pv magazine, 2026. accessed 1 October 2026.
- Irish and UK grids linked via 500 MW subsea HVDC cable. pv magazine, 2025. accessed 1 October 2026.
- Ireland introduces planning exemptions for rooftop solar. pv magazine, 2022. accessed 1 October 2026.
- Celtic Interconnector delayed until 2028, deepening energy concerns. Irish Examiner, 2026. accessed 1 October 2026.
- Ireland’s grid-scale storage growth: 800 MW connected, 2.3 GW in the pipeline. ESS News, 2026. accessed 1 October 2026.
- Which supplier has the best microgeneration rates in Ireland?. Selectra Ireland, 2025. accessed 1 October 2026.
- Irish electricity suppliers at a glance. Selectra Ireland, 2026. accessed 1 October 2026.
- Dynamic electricity tariffs – everything you need to know. Bonkers.ie. accessed 1 October 2026.
- Continuation of SEAI’s €1,800 grants for rooftop solar into 2026 welcomed. Irish Farmers Journal, 2025. accessed 1 October 2026.
- Ireland confirms €1,800 cap for 2026 residential solar grants. PVTIME, 2025. accessed 1 October 2026.
- Budget 2026 – VAT. BDO Ireland, 2025. accessed 1 October 2026.
- Opposition wants fresh round of household electricity credits in Budget 2026. The Irish Times, 2025. accessed 1 October 2026.
- Number of electric cars still lags behind Government target despite surge in popularity. Irish Examiner, 2026. accessed 1 October 2026.
- New figures reveal just how far the Government is behind in key climate targets. Irish Examiner, 2026. accessed 1 October 2026.
- Climate Action Plan 2025 (CAP25). International Energy Agency – Policies database, 2026. accessed 1 October 2026.
- Ireland opens fixed tariff scheme for small-scale solar projects. pv magazine, 2024. accessed 1 October 2026.
Questions about energy in Ireland.
Eurostat put the average household price at €0.4042 per kWh, including taxes and levies, in the second half of 2025, the highest in the EU. There is no price cap: each supplier sets its own unit rates and daily standing charges, rural standing charges are higher than urban ones, and VAT is 9%.
The MPRN (Meter Point Reference Number). It is an 11-digit number that always starts with 10, issued by ESB Networks for each electricity connection. It is printed in the top right-hand corner of your electricity bill and stays with the property when you move or switch supplier.
Yes. Under the Clean Export Guarantee your supplier pays you for every kWh your smart meter records as exported, at a rate the supplier sets. Your installer notifies ESB Networks on form NC6 for systems under 6 kW single-phase or 11 kW three-phase, and the first €400 a year of export income is tax-free until the end of 2028.
Usually not. Since October 2022, rooftop solar on houses is exempt from planning permission with no limit on roof area, provided the panels stay close to the roof and back from the edges. Solar Safeguarding Zones and protected structures have stricter rules.
ESB Networks runs the distribution network for the whole country and owns all electricity meters, whichever supplier you use. EirGrid operates the high-voltage transmission grid. Faults and power cuts are reported to ESB Networks, not your supplier.
The SEAI solar PV grant pays €700 per kWp for the first 2 kWp and €200 per kWp up to 4 kWp, a maximum of €1,800, for homes built before 2021. You must get approval before work starts and use an SEAI-registered company. Batteries are not grant-funded.
Yes. From June 2026 the five suppliers with more than 200,000 customers must offer a dynamic tariff whose price changes every half-hour in line with the wholesale market. Prices for the next day are published in advance and peaks are capped. You need a smart meter.
In 2025, renewables provided half of the electricity generated in Ireland, according to the CSO. Wind generated 40%, solar 4% and hydro about 2%, with gas producing 47%. The government target is 80% renewable electricity by 2030.
