How electricity works in France: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 1 October 2026.

Olmack in France: Not yet available.Olmack is not offered in France yet. The market information on this page is provided for reference. Information last checked 1 October 2026.
Energy-market overview

How electricity works in France.

France electricity market 2026: regulated Tarif Bleu, Enedis and RTE, the 14-digit PRM, Linky meters, solar surplus buy-back, licensing, flexibility and reforms.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

France energy at a glance.

Key figures for households in France. Each one links to its source on the full overview below.

  • Electricity price.

    0.2 EUR per kWh for households, including taxes. Figures for from 1 Aug 2026.

  • Household use.

    4,500 kWh a year for a typical household. Figures for 2026.

  • Renewable share.

    27% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in France.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for France below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications France requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in France.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in France, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in France, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in France.

Full overview

The energy market in France, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 1 October 2026.

On this page22 sections

France has a liberalised electricity market built around a dominant nuclear fleet. Retail supply is open to competition, but households can still choose the regulated sales tariffs (tarifs réglementés de vente, TRVE, sold as EDF’s Tarif Bleu), which the energy regulator CRE proposes and the government approves. At 31 March 2026 some 19.37 million residential customers in mainland France were on the regulated tariff.

Since 1 August 2026 the regulated Base tariff costs 20.01 euro cents per kWh including all taxes for 3 and 6 kVA connections, plus a fixed monthly subscription that depends on the contracted power. RTE runs the high-voltage transmission grid; Enedis operates about 95% of the distribution network, with 114 local distribution companies covering the rest. Almost every home has a 14-digit delivery-point number (PRM) and, in the Enedis area, a Linky smart meter.

Low-carbon sources produced 95.2% of French electricity in 2025 and renewables 27.0%. Nuclear supplied 373 TWh, solar capacity passed hydropower for the first time, and France exported a record net 92.3 TWh. Major 2026 changes include the end of the ARENH nuclear access scheme, a new centralised capacity mechanism, a much lower buy-back tariff for small solar installations and a gradual move of off-peak hours into the middle of the day.

Energy snapshot.

Headline figures for electricity in France. Each shows its data year and links to its source.

Market structure
Fully liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Yes
Regulator
Commission de régulation de l’énergie (CRE)
System operator
RTE (Réseau de Transport d’Électricité)
Distribution networks
Enedis serves about 95% of the network; 114 local distribution companies (ELDs) serve the rest, five of them with more than 100,000 customers
Currency
Euro (EUR)
Voltage and frequency
230 V / 50 Hz

Electricity prices in France.

Household price (EUR)
0.2 EUR/kWh (from 1 Aug 2026)Source 1Regulated Tarif Bleu, Base option, 3 and 6 kVA, all taxes included (VAT 20%). Plus a subscription of €15.86/month at 6 kVA.
Typical annual electricity bill
1,072 EUR/yr (from 1 Aug 2026)Source 2Average regulated-tariff residential bill at 4.5 MWh/yr, all taxes included, up from €1,046 (about +€26/yr).

Household price trend (EUR per kWh).Source 7

0.1780.2350.2932019-S12025-S2
France household electricity price, EUR per kWh
2019-S10.1778 EUR/kWh
2019-S20.1913 EUR/kWh
2020-S10.1893 EUR/kWh
2020-S20.1958 EUR/kWh
2021-S10.1946 EUR/kWh
2021-S20.2022 EUR/kWh
2022-S10.2092 EUR/kWh
2022-S20.2204 EUR/kWh
2023-S10.23 EUR/kWh
2023-S20.2591 EUR/kWh
2024-S10.2847 EUR/kWh
2024-S20.2926 EUR/kWh
2025-S10.2671 EUR/kWh
2025-S20.2561 EUR/kWh

A French electricity bill has three parts: energy supply, network access and taxes. The network part is the TURPE tariff, set by CRE and passed through by every supplier; it rose by 3.04% for distribution on 1 August 2026. Taxes include the electricity excise duty (accise, formerly CSPE) of 30.62 €/MWh for customers up to 36 kVA from 1 August 2026, the CTA contribution that funds network-industry pensions, and VAT. VAT is now 20% on both the subscription and consumption.

Regulated tariffs are built by CRE using a cost-stacking method: wholesale energy, capacity, network, retail costs and a margin. CRE proposed a 2.5% average increase for 1 August 2026, mainly because of the TURPE increase and the first costs of the new capacity mechanism. The government approved it and EDF’s new price grid has applied from that date. At the end of 2024, 42% of residential sites were on market offers.

Price trend

Household prices rose sharply between 2022 and early 2024, despite a government tariff shield that limited regulated-tariff increases. Eurostat’s all-taxes price for typical households (2,500–5,000 kWh) peaked at 0.2926 €/kWh in the second half of 2024. It eased to 0.2561 €/kWh in the second half of 2025 Regulated tariffs in Corsica and the overseas non-interconnected zones (ZNI) are kept in line with mainland tariffs through national tariff equalisation (péréquation).

Customers without a Linky meter pay extra: on the regulated tariff, €40.08 a year before tax where a meter could be fitted but was not, and €25.62 a year where no reading has been sent for more than 12 months. Self-producers who export pay a €9.84 a year supplement.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesTarif Bleu (TRVE) sold only by EDF and local incumbent suppliers. Base option at 20.01 c€/kWh TTC for 3–6 kVA; the 9–36 kVA Base option (19.85 c€/kWh) is closed to new subscribers.
Time-of-useYesHeures Pleines / Heures Creuses (peak/off-peak): 21.42 c€ and 15.89 c€/kWh TTC on the regulated tariff, with eight off-peak hours a day set by the distribution network operator. CRE proposed opening this option to 3 kVA customers.
OtherYesTempo (regulated critical-peak tariff): RTE assigns each day a colour. On 300 blue days the rates are 13.56/16.54 c€; on 43 white days 15.36/19.21 c€; on 22 red days 16.15 c€ off-peak and 72.95 c€/kWh peak.
FixedYesMarket offers with a fixed price for the contract term. Some fix only the energy component before tax; others also fix the subscription.
VariableYesMarket offers indexed to the regulated tariff, to wholesale prices or to a supplier’s own formula. Many are sold as “green” offers backed by guarantees of origin.
DynamicYesSuppliers with more than 200,000 customers must offer customers up to 36 kVA a dynamic contract. At least 50% of the energy price follows day-ahead or intraday prices, at least hourly, with a monthly bill cap set by CRE.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
4,500 kWh/yr (2026)Source 2Average consumption CRE uses for a regulated-tariff residential customer when stating bill impacts. CRE also reports 143.1 TWh consumed by 34.79 million residential sites in 2024.
Average daily use per household
12.3 kWh/day (2026)Source 2Derived by dividing CRE’s 4.5 MWh/yr reference consumption by 365.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
Not identified from a reliable public source.
Heat pumps
Not identified from a reliable public source.
Air conditioning
Not identified from a reliable public source.
Electric vehicles
2,865,320 vehicles (end July 2026)Source 32Plug-in cars and light commercial vehicles on the road: 1,964,022 battery-electric and 901,298 plug-in hybrid. Battery-electric cars took 35.4% of new car registrations in July 2026.
Electric cooking
Not identified from a reliable public source.

CRE uses 4.5 MWh a year as its reference residential consumption, and residential sites as a whole used 143.1 TWh in 2024. Demand is strongly temperature-sensitive, so winter peaks are high: national peak demand reached 88 GW in 2025, the highest since 2021.

Electrification is growing. Electric vehicles reached about 2.87 million plug-in vehicles in July 2026, and the main renovation grant (MaPrimeRénov’) was refocused on heat pumps from 1 September 2026 for single-measure works. National electricity consumption was 451 TWh in 2025 after adjusting for weather (446.2 TWh unadjusted), still below pre-2020 levels.

Housing and households.

Dwellings
38,400,000 dwellings (1 Jan 2025)Source 17France excluding Mayotte. 82.5% are primary residences (31.7 million).
Owner-occupied
57.4% (2025)Source 16Share of primary residences, provisional.
Private rented
23.1% (2025)Source 16
Social or public housing
17.3% (2025)Source 16HLM (social landlord) tenants. A further 2.2% live rent-free.
Houses
54.4% (1 Jan 2025)Source 17Individual houses as a share of all dwellings.
Apartments and flats
45.6% (1 Jan 2025)Source 17Derived as 100% minus the 54.4% share of individual houses.
Urban population
Not identified from a reliable public source.

Just over half of French dwellings are individual houses, and most owner-occupiers live in houses, especially outside large cities. These detached and semi-detached homes are where most residential rooftop solar and heat pumps are installed. Apartments dominate in Paris and other large cities. About 14.5% of the housing stock is in the Paris urban area and 21.4% in rural communes.

Social housing is substantial at 17.3% of primary residences. Apartment buildings run as co-ownerships (copropriétés) need a general-assembly vote for shared works such as roof solar or charging points. Collective self-consumption lets a building or neighbourhood share local solar output through a legal entity registered with the distribution network operator.

How the grid works in France.

  1. TransmissionRTE
  2. DistributionEnedis serves about 95% of the network; 114 local distribution companies (ELDs) serve the rest, five of them with more than 100,000 customers
  3. MeteringDistribution network operator (Enedis or the local ELD)
  4. Supply3 or more retail suppliers

Electricity flows from mostly nuclear, hydro and growing wind and solar plants through RTE’s transmission network to substations, where Enedis or a local distribution company takes over and delivers it at medium and low voltage, under concession contracts with local authorities. France is a large net exporter, exporting about 99% of the time in 2025, and acts as a transit hub between the Iberian Peninsula, Britain, Belgium, Germany, Switzerland and Italy.

Commercially, the customer contracts only with a supplier. The supplier holds a network-access contract with the distribution network operator (the GRD-F contract) and pays the TURPE on the customer’s behalf. It also buys energy wholesale or produces it, and belongs to a balance perimeter settled by RTE. Since 1 January 2026 the ARENH scheme, which gave suppliers regulated access to part of EDF’s nuclear output, has been replaced by the Versement Nucléaire Universel (VNU). Under the VNU, a share of EDF’s nuclear revenue above set thresholds is redistributed to all consumers.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinistry for Energy – Direction générale de l’énergie et du climat (DGEC)Sets energy policy and the multi-year energy plan (PPE). Issues supplier and large-generation authorisations and sets feed-in tariffs by ministerial order.
RegulatorCommission de régulation de l’énergie (CRE)Independent regulator. Sets the TURPE network tariffs, proposes regulated sales tariffs, approves RTE market rules, runs renewable tenders and monitors wholesale and retail markets.
TSORTEOwns and runs the high-voltage transmission network and is the national system operator. Runs balancing, ancillary services, the capacity mechanism and Tempo day colours, and holds contracts with balance-responsible parties.
DSOEnedisEDF-group subsidiary, legally separate, running about 95% of the medium- and low-voltage network under municipal concessions. Owns and reads Linky meters, keeps PRM data and connects small generators.
DSOLocal distribution companies (ELDs)114 local companies serve the remaining 5% of the network, including Strasbourg Electricité Réseaux, réséda (Metz), SRD (Vienne), Gérédis (Deux-Sèvres) and GreenAlp (Grenoble). EDF SEI runs Corsica and overseas island grids.
SupplierEDF and alternative suppliersEDF sells the regulated Tarif Bleu alongside market offers. At the end of 2024, 30 national suppliers had at least one residential customer.
MeteringDistribution network operator (Enedis or the local ELD)Metering is a regulated monopoly task of the local network operator, not a competitive service. The network operator owns, installs, reads and validates the meter and sends data to suppliers.
SettlementRTE balance-responsible schemeEach supplier, producer or trader belongs to a balance perimeter (responsable d’équilibre). RTE settles imbalances using metering data aggregated by distribution network operators.
ExchangeEPEX SPOTDay-ahead and intraday power exchange for the French bidding zone, coupled with the rest of Europe.
Flexibility marketRTE capacity mechanism and balancing marketsCentralised capacity auction (first run on 6 July 2026), FCR/aFRR procurement, the balancing mechanism and NEBEF demand-response block trading.

Compared with the UK system.

Compared with the UK system.
UK conceptFrance equivalentHow it works
DNOGestionnaire de réseau de distribution (GRD): Enedis or a local ELDDistribution is mostly one national company rather than regional licence areas. Municipalities (or their energy syndicates) own the low- and medium-voltage networks and grant concessions to Enedis; about 5% is run by local companies, often municipal.
National Grid / NESORTERTE is both transmission owner and system operator, so there is no ownership/operator split like Great Britain’s. It balances the system in real time, procures reserves, runs the capacity mechanism and publishes Tempo day colours.
MPANPRM / PDL (Point Référence Mesure / Point de Livraison)A 14-digit number the network operator assigns to each delivery point. It is shown on the bill and the Linky display and stays with the dwelling when the occupant or supplier changes. Unlike the MPAN, it carries no profile class or region code.
MPRNPCE (Point de Comptage et d’Estimation) for gasGas supply points have their own 14-digit PCE number from the gas distribution network operator (GRDF in most of France, whose smart meter is Gazpar). It appears on gas bills and is completely separate from the electricity PRM.
Meter operatorNetwork operator (no competitive meter operators)Meters belong to the distribution network operator and are installed, maintained and read by it. Households cannot choose a meter operator or buy their own meter for billing.
SupplierFournisseurSuppliers need a ministerial authorisation. They buy access to the network on the customer’s behalf and bill one combined amount including TURPE and taxes. Only incumbents may sell the regulated tariff.
Smart-meter infrastructure (DCC / SMETS2)Linky system run by EnedisEnedis rolled out and runs the Linky metering system as a regulated network asset. There is no independent data company like the DCC: Enedis collects the data itself and gives it to suppliers, RTE and third parties that have the customer’s consent.

How a supply point is identified.

09876543210987 (fictional)

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Point Référence Mesure / Point de Livraison (PRM (also called PDL))
Who issues it?The distribution network operator: Enedis in about 95% of the country, otherwise the local distribution company
FormatA purely numeric 14-digit code identifying the delivery point (the dwelling’s connection) on the network. It encodes no tariff, profile or regional information. PRM is the name shown on the Linky meter; PDL is the older name and is still printed on many bills.
Length14 digits
Stays with the property when you switch supplier?Yes
Where to find itTop right of the electricity bill, often labelled “Point de livraison” or “Référence PDL/PRM”. On a Linky meter, press the “+” button to scroll through the screens until “Numéro de PRM” appears. The supplier can also provide it.
Electronic accessThe customer can open a free Enedis online account linked to the PRM to see daily readings, maximum daily power and, once enabled, the 30-minute load curve.
Third-party accessSuppliers see contractual and billing data for their own customers. Other third parties (energy-services firms, installers, building managers) can get a customer’s data only with the customer’s explicit consent, through Enedis web portals or APIs. The 30-minute load curve is recorded and sent only once the customer has consented.
Who keeps the registerEach distribution network operator keeps its own reference register of delivery points, including meter, contracted power, supplier, balance perimeter and generation data. Enedis’s register covers most of France.
Register scopePer DSO

The PRM is how the French system knows a home exists. Each connection to the low-voltage network gets one 14-digit number when it is first connected. The number then stays with that delivery point for its whole life, whoever lives there and whichever supplier they use. Enedis describes it as the number that identifies the dwelling on the electricity network.

How it is used

Switching supplier needs only the PRM and the customer’s identity: the new supplier sends a request through the network operator’s systems, and the old contract ends automatically. Moving into an empty dwelling also starts with the PRM. The new occupant chooses a supplier, which asks the network operator to restart supply, usually remotely where a Linky meter is fitted. A rooftop solar connection request, a contracted-power change or a self-consumption agreement all refer to the same PRM. Where a home both consumes and exports, the injection is handled under a separate connection contract linked to the delivery point.

Who keeps the data

There is no single national data hub like those in some Nordic countries. Enedis and each local distribution company keeps its own delivery-point register and metering data, under rules set by CRE and the Energy Code. Suppliers, aggregators and RTE receive the data they are entitled to through the network operator’s exchange systems. Gas delivery points use a separate identifier, the PCE.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringNo
Net billingNo
How exported electricity is paidRegulated feed-in purchase (obligation d’achat) through EDF OA under the amended S21 order: since 5 June 2026, a single 1.1 c€/kWh (before VAT) for 0–100 kWc, indexed +2% a year for 20 years. Surplus can instead be sold to a market buyer.
Is there net metering?No. Self-consumed power simply reduces what the household buys. Exported surplus is paid separately under a purchase contract and is not offset against imports.
What does exported power earn in 2026?For connection requests filed from 5 June 2026, 1.1 c€/kWh before VAT for 0–100 kWc, rising 2% a year over a 20-year contract. Output above 1,600 kWh per kWc per year is not paid. Earlier contracts keep their original tariffs.
Can a small system export everything?No. Systems of 9 kWc or less qualify for the purchase obligation only as self-consumption with surplus export, not full export.
What about larger systems?Building-mounted systems above 100 kWc have been moved out of the open-access tariff into a simplified competitive tender (since 22 September 2025). Large ground-mounted plants compete in CRE tenders.
Which technical rules apply to inverters?NF EN 50549-1 for low-voltage connections (replacing the German DIN VDE 0126-1-1 previously accepted). Wiring follows NF C 15-100 and the PV guide UTE C 15-712-1, checked by Consuel before connection.

Connecting a home system.

  1. Check local planning rules and file a prior declaration (déclaration préalable) with the town hall for most rooftop systems.
  2. Have the system designed and installed, normally by a QualiPV/RGE-qualified installer if a feed-in contract or tax relief is sought.
  3. Submit a connection request online to Enedis (or the local network operator), choosing self-consumption with surplus export, full export (above 9 kWc only) or self-consumption without export.
  4. Accept the network operator’s connection proposal: a CRAE contract if any power will be exported, or a CACSI agreement if none will.
  5. Obtain the Consuel safety certificate. For Consuel requests from 1 January 2026, this includes an inverter certificate to NF EN 50549-1, tested under EN 50549-10.
  6. Request commissioning. With a Linky meter, export metering is usually activated remotely.
  7. Sign the purchase contract with EDF OA, or a contract with another buyer, for the exported surplus.

France supports small solar mainly through a regulated purchase obligation. EDF Obligation d’Achat (or the local distribution company’s purchasing arm) must buy surplus power at a tariff set by ministerial order and is compensated through the public energy service charges. The order of 1 June 2026 amended the 2021 “S21” order and made a big change. It replaced the old quarterly-degressive tariffs and the self-consumption investment premium (worth up to €80/kWc) with one low tariff of 1.1 c€/kWh for systems up to 100 kWc. It also ended the premium for new connection requests.

The aim is to make self-consumption, rather than export income, the main reason to install. The regulated retail price is about 20 c€/kWh, so each self-consumed kWh is worth roughly 18 times an exported one. This is why load shifting, hot-water diversion, EV charging and storage matter more for project economics. Residential systems up to 9 kWc may also qualify for 5.5% VAT since 1 October 2025, but only if the modules meet strict carbon-footprint and material-content criteria.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricityRenewable plants (solar, wind, biomass, biogas, geothermal, marine) up to 50 MW are deemed authorised; natural gas up to 20 MW; other fossil fuels except coal up to 10 MW. Larger plants, and all coal plants, need a ministerial operating authorisation.Ministry for Energy (DGEC)Separate planning and environmental permits still apply. Plants that win CRE tenders are authorised when they are selected.
Store electricityNo dedicated storage licence identified. Batteries connect under a standard connection contract with Enedis/ELD or RTE and pay TURPE network charges.Network operator (connection); CRE (tariffs)TURPE 7 work has looked at a dedicated injection-withdrawal component for storage. Home batteries behind the meter only need the household’s existing connection plus Consuel compliance.
Export to the gridNo licence. A connection and access contract (CRAE up to 36 kVA) with the network operator is needed, plus a Consuel certificate.Enedis or local network operatorSelf-consumption without any export uses a CACSI agreement instead. Each exporting installation must have its own dedicated meter.
Sell exported powerNo licence for a household selling surplus under the purchase obligation or to a market buyer. The buyer must have a balance perimeter.EDF OA (regulated buyer); market buyersFeed-in eligibility generally needs proof of installer qualification (QualiPV/RGE).
Supply final customersMinisterial authorisation for buying electricity for resale (Article L.333-1, Energy Code), based on technical, economic and financial capacity.Ministry for Energy (DGEC), after CRE opinion within two monthsSuppliers must also sign a network-access contract with each network operator and join a balance perimeter.
Collective self-consumptionNo licence. Participants form a legal entity (personne morale organisatrice) that signs an agreement with the network operator and sends it the sharing keys.Enedis or local network operatorParticipants keep their own supplier for the remaining supply.
Aggregate demand responseDemand-response operators need RTE technical approval to trade curtailment blocks under the NEBEF rules.RTE, under CRE-approved rulesAggregated sites below 250 kW can be included in adjustment entities.
Wholesale tradingNo supply authorisation needed for wholesale-only trading. A balance-responsible party contract with RTE is required, plus exchange membership if trading on EPEX SPOT.RTE; CRE (REMIT market surveillance)The L.333-1 authorisation covers sales to final customers and to network operators for their losses.
Balancing and ancillary servicesUnits or aggregates must be certified by RTE and sign the relevant participation contracts. The minimum offer for FCR and aFRR is 1 MW.RTEAggregated and distributed reserve entities, including storage, are allowed.
Capacity provisionProduction, storage and demand-response capacities are certified and contract with RTE through the centralised capacity auctions in force from 2026.RTE, under CRE-approved rulesThe first auction, on 6 July 2026, covered 1 November 2026 to 31 March 2027.
VPP / remote control of home assetsNo specific licence. A VPP operator acts through one or more of the roles above (supplier, demand-response operator, balance-responsible party, reserve provider).Depends on role: DGEC, RTEHousehold consent and data-protection rules apply to accessing Linky data and controlling devices.

France licenses activities by function, not with a single generation or supply licence. Small producers, including almost every household or commercial solar system, are deemed authorised and deal only with the network operator, Consuel and, if they sell surplus, EDF OA. Supplying customers is the main activity needing prior ministerial approval. Market roles such as demand response, reserves, capacity and balance responsibility are run by contracts and certification under RTE rules approved by CRE.

Flexibility and grid services.

Aggregation of home equipment: Yes

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Frequency Containment Reserve (FCR, réserve primaire)Yes1 MWYesRTE. Procured through European cross-border FCR tenders. Batteries make up much of the French battery fleet’s current revenue base.
Automatic Frequency Restoration Reserve (aFRR, réserve secondaire)Yes1 MWYesRTE. Procured by tender. Distributed reserve entities made up of aggregated units, including storage, can be certified.
Balancing mechanism (mécanisme d’ajustement)Yes—YesRTE. Manual upward and downward offers. Wind and solar capacity in the mechanism grew almost tenfold in a year, to 5.6 GW at the end of 2025.
NEBEF demand-response blocksYes—YesRTE. Approved demand-response operators sell curtailed consumption as energy on wholesale markets. The consumer’s supplier is compensated under a regulated scheme.
Capacity mechanismYes—YesRTE. Centralised since 2026. RTE contracts capacity directly in auctions; the first, on 6 July 2026, cleared at 28,183 €/MW for winter 2026–27. Costs are recovered from consumption from 1 November 2026.
Tempo and off-peak tariff signalsYes—NoRTE (day colours) / network operator (off-peak hours). Not a market, but a mass household price signal: RTE sets 22 red days a year, and network operators move off-peak hours into the middle of the day.

France has one of Europe’s longest-running demand-response frameworks. NEBEF lets independent aggregators sell curtailment directly on energy markets, and RTE opened its reserves and balancing mechanism to aggregated and distributed units. Price-responsive renewable output is growing fast: in 2025, solar and wind plants cut about 3 TWh of output during 513 hours of negative prices, mostly because the contract-for-difference support scheme rewards curtailment at negative prices.

Households take part mainly through tariff signals rather than markets. Tempo and the reform of off-peak hours encourage load shifting. Smart water heaters, EV chargers and home batteries can join through aggregators, but the 1 MW minimum bid size for reserves means home assets must be pooled.

Flexibility and aggregation platforms.

Flexibility and aggregation platforms.
Platform or aggregatorWhat it does
Services RTE portalRules, contracts and published results for reserves, the balancing mechanism, NEBEF and the capacity mechanism.
EPEX SPOTDay-ahead and intraday wholesale trading for France.

Smart meters.

Smart meters.
FactValue
Smart-meter rolloutMass rollout finished in 2021; about 37.4 million Linky meters (96.5% of the Enedis area) installed by 2025
Reading intervalDaily readings by default; 30-minute load curve recorded and sent once the customer consents
Meter nameLinky (Enedis)
Owner / operatorDistribution network operator (regulated); no competitive metering
Mass rolloutLate 2015 – end 2021 (34.3 million meters)
Project costAbout €4 billion (CRE)
CommunicationsRemote reading by Enedis; data shared with suppliers and consented third parties
Non-Linky surcharge€6.48 before VAT every two months (network charge from 1 August 2025)

Linky was rolled out by Enedis as a regulated network investment, not by suppliers. That made it faster and cheaper than supplier-led programmes: CRE reported 34.3 million meters fitted between late 2015 and the end of 2021 at about €4 billion, roughly €700 million under budget. By 2025, about 37.4 million meters were installed in the Enedis area. Customers who still refuse a Linky meter pay a fixed meter-management charge and extra reading fees.

Linky allows remote readings, remote contracted-power changes and remote reconnection, and lets network operators move off-peak hours by software. Local distribution companies run their own smart-meter deployments.

Renewable electricity.

Electricity generation mix (2025).

  • Nuclear: 68.1%
  • Hydro: 11.4%
  • Onshore wind: 8%
  • Solar: 6%
  • Fossil (gas, coal, oil): 3.4%
  • Bioenergy and waste: 2%
  • Offshore wind: 1%
Source 9
Renewable electricity share
27% (2025)Source 8Renewable share of electricity production (RTE). Low-carbon share including nuclear was 95.2%.
Home solar
Not identified from a reliable public source.
Solar added each year
5.9 GW (2025)Source 8A further 3.0 GW was connected in the first half of 2026 (SDES).
Nuclear
63 GW (end 2025)Source 8Includes Flamanville 3 (1.6 GW), still being commissioned.
Solar PV
34 GW (end Q2 2026)Source 11
Hydro
25.7 GW (end 2025)Source 8
Onshore wind
24.4 GW (30 June 2026)Source 12
Offshore wind
2.3 GW (30 June 2026)Source 12
Gas
12.4 GW (end 2025)Source 8
Renewable thermal and waste
2.3 GW (end 2025)Source 8

Targets.

  • PPE3 (Decree 2026-76 of 12 February 2026): 55–80 GW of solar PV by 2035.
  • PPE3: 35–40 GW onshore wind and 15 GW offshore wind by 2035.
  • PPE3: nuclear output of 380–420 TWh a year over 2030–2035; hydropower 28.7 GW.
  • Renewable targets may be revised after 31 December 2028 depending on demand, low-carbon deployment and flexibility.

Nuclear dominates French generation, but renewables are growing in absolute terms. In 2025, solar output rose 33% to 32.9 TWh, and solar capacity (30.4 GW at year end) passed hydropower for the first time. Onshore wind growth has slowed for three years in a row, while offshore wind is expanding with new commercial parks and the first floating pilots. Fossil generation fell to 18.7 TWh, its lowest in about 75 years, and the carbon intensity of production was 19.6 gCO₂eq/kWh.

The third multi-year energy plan (PPE3), adopted by decree in February 2026, lowered some solar and onshore wind ambitions compared with earlier drafts and confirmed a nuclear-led strategy. Large renewables are supported through CRE tenders with contracts for difference. Small building-mounted solar uses the purchase obligation, which became much less generous in June 2026.

Energy storage.

Home batteries
0.14 GW (end 2025)Source 9140 MW of small low-voltage batteries in homes and small businesses.
Grid-scale storage
1.6 GW (end 2025)Source 9Total battery fleet in service. A little over 20 large batteries are on the transmission network; about 14 GW of projects were in the connection queue at the end of 2025.

Battery storage in France is still small compared with Germany, Italy or Great Britain, and mostly earns its money from frequency services. RTE counted 1.6 GW in service at the end of 2025. Most were megawatt-scale units on the distribution network, and home batteries totalled only 140 MW. Low retail-price volatility, an off-peak tariff structure built around nuclear and a feed-in system long focused on export explain the slow uptake in homes.

This is changing: the connection queue held about 14 GW of mostly large projects at the end of 2025. The new capacity mechanism includes storage, and the much lower solar buy-back tariff makes storing midday output more attractive than exporting it.

Storage projects.

  • Pumped-storage hydro (STEP): France’s historical storage, included in its 25.7 GW of hydro capacity. Pumping consumption is netted out of renewable statistics.
  • Transmission-connected batteries: A little over 20 large batteries at the end of 2025, mainly providing frequency services. Projects are trending larger, many over 100 MW.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
EDF19.37 million residential customers on the regulated Tarif Bleu (31 Mar 2026), plus market-offer customersUnknownYesYesYes
TotalEnergies—UnknownYesYesUnknown
ENGIE—UnknownYesYesUnknown

The residential market is highly concentrated. At the end of 2024 the three largest incumbent suppliers held 68% of residential sites and the three largest alternative suppliers 26%. 30 national suppliers had at least one residential customer. The annual residential switching rate was 9.4% in 2024. Linky meters are fitted by the network operator, not the supplier, so every supplier can offer smart-meter-based offers. Suppliers with more than 200,000 customers must offer a dynamic, spot-indexed contract.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministry for Energy – DGECGovernmentEnergy policy, PPE, purchase-obligation tariffs, supplier authorisationSets the legal and tariff framework for generation, supply and support schemes.
Commission de régulation de l’énergie (CRE)RegulatorEnergy regulatorSets network tariffs, proposes regulated retail tariffs, approves market rules and runs tenders.
RTETransmissionTransmission system operatorRuns the grid, balancing, reserves, the capacity mechanism and publishes national electricity statistics.
EnedisDistributionMain distribution network operator and Linky meter operatorIssues PRMs, connects small generators and holds household metering data.
EDF Obligation d’Achat (EDF OA)MarketRegulated buyer under the purchase obligationSigns and pays feed-in contracts for small renewable producers.
Médiateur national de l’énergieConsumerEnergy ombudsman and price-comparison serviceHandles consumer disputes and runs the official offer comparator energie-info.fr.
ConsuelSolarElectrical safety certificationIssues the safety certificate required before any new installation, including solar, is energised.
Qualit’EnRRenewable EnergyInstaller qualification body (QualiPV, QualiPAC and others)Its qualifications give installers RGE status, which feed-in contracts and grants require.
Photovoltaique.info (Hespul)SolarReference information service on PV rulesTracks tariff orders, connection rules and technical standards for French PV.
Avere-FranceConsumerElectric mobility associationPublishes the monthly barometer of plug-in vehicle registrations and fleet.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Inverters / anti-islandingNF EN 50549-1 (tested to EN 50549-10)CENELEC / AFNOR; required by EnedisReplaced DIN VDE 0126-1-1. Required for low-voltage installations with Consuel requests from 1 January 2026.
Low-voltage wiringNF C 15-100AFNORThe national standard for domestic electrical installations.
PV installationsUTE C 15-712-1 guideUTE / AFNORDesign and installation rules for grid-connected PV systems.
Safety certificationConsuel attestation de conformitéConsuelNeeded before the network operator commissions a new production installation.
Grid connection (EU)Requirements for Generators network code (RfG)European Commission / ENTSO-EApplied through the network operators’ published technical reference documents.
Installer accreditationQualiPV / RGEQualit’EnR (and other approved bodies)Proof of installer qualification is generally required for an S21 purchase contract.
Product criteria for reduced VATOrder of 8 September 2025 (Art. 278-0 bis CGI)Ministry of Economy / tax administrationModules under 530 kgCO₂eq/kWc, silver under 14 mg/W, lead under 0.1%, cadmium under 0.01%, certified by an accredited body.

Permissions.

Permissions.
PermissionRequiredLevelDetail
Planning: prior declaration (déclaration préalable)LimitedLocalUsually needed for rooftop PV because it changes a building’s appearance. Filed with the town hall under the local urban plan.
Heritage approval (Architecte des Bâtiments de France)LimitedLocalNeeded near listed monuments and in protected areas, and can restrict or refuse visible panels.
Network connection contractYesNationalCRAE for any export up to 36 kVA, or CACSI for self-consumption without export, from Enedis or the local network operator.
Consuel safety certificateYesNationalNeeded before commissioning; includes the NF EN 50549 inverter certificate.
Generation authorisationNoNationalRenewable plants up to 50 MW are deemed authorised.
Co-ownership voteLimitedLocalWorks on shared parts of apartment buildings need approval by the co-owners’ general assembly.

A household solar system needs no energy licence. The administrative path is planning (town hall), safety (Consuel) and connection (network operator), plus a purchase contract if surplus is sold. Heritage zones are the main local constraint, and the national rules on the Consuel certificate and inverter conformity were tightened in 2026.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Purchase obligation for surplus solar (S21, amended)ActiveFeed-in tariffFor connection requests from 5 June 2026: 1.1 c€/kWh before VAT for 0–100 kWc, +2% a year, for 20 years; systems up to 9 kWc must self-consume and export surplus only; output above 1,600 kWh/kWc/yr is unpaid.From 5 Jun 2026
Self-consumption investment premium (prime à l’autoconsommation)ClosedGrantAbolished for connection requests from 5 June 2026; earlier contracts keep it.Until 4 Jun 2026
Reduced VAT on residential PVActiveVAT relief5.5% VAT on supplying and installing PV up to 9 kWc in homes, if the equipment meets the carbon-footprint and material criteria of the order of 8 September 2025.From 1 Oct 2025
MaPrimeRénov’ (single-measure route)ActiveGrantIncome-tested renovation grant reopened under the 2026 finance law. From 1 September 2026 the single-measure route is refocused on air-to-water and ground-source heat pumps (plus heat-network connection); hot-water heat pumps are no longer covered.2026
Chèque énergieActiveBill supportMeans-tested energy voucher of €48–277 (average €153), sent automatically to about 4.5 million households from April 2026; requests possible until 31 December 2026.2026 campaign
Versement Nucléaire Universel (VNU)ActiveBill rebate mechanismRedistributes part of EDF’s nuclear revenue above 78 €/MWh (50%) and 110 €/MWh (90%) to all consumers. The 2026 rebate rate is €0/MWh because revenue was forecast below the first threshold.From 1 Jan 2026

Data and connectivity.

Fixed broadband
95.3 % of premises FTTH-connectable (end June 2026)Source 3343.1 million of 45.2 million premises; 28.1 million fibre subscriptions.
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fibre is now the dominant fixed access, covering 95.3% of premises and making up 85% of internet subscriptions in mid-2026. Arcep counted more than 73,900 5G sites in metropolitan France at 31 March 2026. Linky meters are read remotely by the network operator and do not use the household’s broadband.

Grid conditions.

National peak demand
88 GW (2025)Source 8Highest since 2021.
Annual electricity demand
451 TWh (2025)Source 8Adjusted for weather and calendar effects; 446.2 TWh unadjusted.
Generation capacity
164.5 GW (end 2025)Source 8
Interconnection
Not identified from a reliable public source.
Curtailment
3 TWh (2025)Source 9RTE estimate of wind (1.3 TWh) and solar (1.6 TWh) output cut during 513 hours of negative prices.

The French system now faces the opposite of its 2022 crisis. Nuclear output has recovered, demand remains flat and solar is growing fast, so midday surpluses and negative prices are increasingly common: there were 513 negative-price hours in 2025, up from 352. France was a net exporter about 99% of the time and is a major transit corridor. RTE plans large interconnection growth to Spain, Britain and Italy.

Connection queues are long for large loads (about 30 GW reserved) and for batteries (about 14 GW). Capareseau publishes renewable hosting capacity by area.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
End of ARENH, start of the Versement Nucléaire UniverselCurrent1 Jan 2026Regulated access to EDF nuclear output ended on 31 December 2025. It was replaced by a revenue-sharing mechanism with thresholds of 78 and 110 €/MWh (2026 rebate set at zero).
Single 1.1 c€/kWh buy-back tariff for small solarCurrent5 Jun 2026The order of 1 June 2026 replaced degressive S21 tariffs and abolished the self-consumption premium for systems up to 100 kWc.
PPE3 multi-year energy planCurrent13 Feb 2026Decree 2026-76 sets 2035 ranges for solar (55–80 GW), onshore wind (35–40 GW) and offshore wind (15 GW), with a review after 2028.
Regulated tariff and network tariff updateCurrent1 Aug 2026TRVE +2.5% on average (Base 20.01 c€/kWh), TURPE +3.04% for distribution, and the excise duty cut to 30.62 €/MWh.
New centralised capacity mechanism costs on billsUpcoming1 Nov 2026Capacity contracted by RTE in the July 2026 auction is financed through consumption from 1 November 2026. CRE will address the previous mechanism’s shortfall in the February 2027 regulated-tariff update.
Off-peak hours moved to middayUpcomingNov 2026 – Nov 2027Remaining HP/HC customers move to seasonal off-peak hours: at least 5 consecutive night hours, plus afternoon hours (11:00–17:00) in summer. About 11 million customers are affected.
NF EN 50549 inverter certification for small producersCurrent1 Jan 2026Installations up to 36 kVA filing a Consuel request from 2026 need an NF EN 50549-1 certificate tested to EN 50549-10.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costMediumLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useMediumLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionHighLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMedium34.0 GW of PV (all sizes) by mid-2026 with 5.9 GW added in 2025, but the June 2026 reform cut the buy-back tariff to 1.1 c€/kWh and removed the investment premium.
Distributed energy marketMedium2.87 million plug-in vehicles (July 2026) and widespread electric heating, but only 140 MW of home batteries at the end of 2025 (RTE).
Grid flexibility marketHighNEBEF demand-response trading, aggregated FCR/aFRR from 1 MW, a centralised capacity mechanism open to storage and demand response, and mass Tempo/off-peak price signals.
Energy storage adoptionLow1.6 GW of batteries in service at the end of 2025, of which 140 MW in homes and small businesses (RTE), though about 14 GW is queued.
Renewable growth environmentMediumRenewables 27.0% of production in 2025; solar +33% in output, onshore wind additions slowing for a third year; PPE3 targets revised slightly downward.

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 36 sources
  1. Grille de prix de l’offre de fourniture d’électricité « Tarif Bleu » – applicable au 1er août 2026. EDF, 2026. accessed 1 October 2026.
  2. La CRE propose une évolution du niveau moyen des TRVE de +2,5 % TTC au 1er août 2026. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
  3. Délibération n°2026-147 du 15 juillet 2026 – tarifs réglementés de vente d’électricité. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
  4. La CRE publie l’évolution annuelle des TURPE au 1er août 2026. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
  5. Rapport annuel à la Commission européenne (31 juillet 2025). Commission de régulation de l’énergie, 2025. accessed 1 October 2026.
  6. La CRE constate les paramètres de financement du nouveau mécanisme de capacité pour la période de livraison 2026-2027. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
  7. Electricity prices for household consumers – bi-annual data (nrg_pc_204), band DC, all taxes. Eurostat, 2026. accessed 1 October 2026.
  8. Bilan électrique 2025 – principaux résultats. RTE, 2026. accessed 1 October 2026.
  9. Bilan électrique 2025 – rapport complet. RTE, 2026. accessed 1 October 2026.
  10. SDDR 2025 – fiche 11 : interconnexions. RTE, 2025. accessed 1 October 2026.
  11. Tableau de bord : solaire photovoltaïque – deuxième trimestre 2026. SDES, Ministry for Ecological Transition, 2026. accessed 1 October 2026.
  12. Tableau de bord : éolien – deuxième trimestre 2026. SDES, Ministry for Ecological Transition, 2026. accessed 1 October 2026.
  13. Bilan démographique 2025. INSEE, 2026. accessed 1 October 2026.
  14. Ménages selon la taille en 2022. INSEE, 2025. accessed 1 October 2026.
  15. Taille des ménages – données annuelles de 1968 à 2023. INSEE, 2025. accessed 1 October 2026.
  16. Statut d’occupation des résidences principales – données annuelles de 1982 à 2025. INSEE, 2025. accessed 1 October 2026.
  17. Parc de logements au 1er janvier 2025 (Insee Focus 359). INSEE, 2025. accessed 1 October 2026.
  18. Où trouver le numéro point de livraison (PDL) du compteur Linky ?. Enedis. accessed 1 October 2026.
  19. J’accède à mes données de mesure. Enedis. accessed 1 October 2026.
  20. Facturation pour la relève des compteurs : ce qu’il faut savoir. Enedis, 2025. accessed 1 October 2026.
  21. Installer des panneaux solaires : étapes, démarches, raccordement avec Enedis et mise en service. Enedis. accessed 1 October 2026.
  22. Arrêté du 1er juin 2026 modifiant l’arrêté du 6 octobre 2021 (S21). Légifrance, 2026. accessed 1 October 2026.
  23. [Arrêté S21] Détail des modifications et nouveau tarif unique. Photovoltaique.info (Hespul), 2026. accessed 1 October 2026.
  24. Raccordement au réseau : passage à la NF EN50549 – fin de dérogation pour les installations ≤36 kVA. Photovoltaique.info (Hespul), 2026. accessed 1 October 2026.
  25. TVA – taux réduits – livraison et installation d’équipements de production d’électricité utilisant l’énergie radiative du soleil. BOFiP-Impôts, 2025. accessed 1 October 2026.
  26. France’s 2026–2035 energy roadmap (PPE3). DLA Piper, 2026. accessed 1 October 2026.
  27. Arrêté du 27 mars 2026 fixant le tarif unitaire de minoration du VNU pour 2026. Légifrance, 2026. accessed 1 October 2026.
  28. Autorisation d’exploiter une installation de production d’électricité. Ministry for Ecological Transition. accessed 1 October 2026.
  29. Autorisation d’achat d’électricité pour revente. Ministry for Ecological Transition. accessed 1 October 2026.
  30. Providing frequency ancillary services. RTE Services Portal. accessed 1 October 2026.
  31. Nouvelles heures creuses. EDF, 2026. accessed 1 October 2026.
  32. Baromètre Avere-France / Colombus Consulting – juillet 2026. Avere-France, 2026. accessed 1 October 2026.
  33. Observatoire du haut et très haut débit – T2 2026. Arcep, 2026. accessed 1 October 2026.
  34. Comment bénéficier du chèque énergie ?. Ministry of the Economy, 2026. accessed 1 October 2026.
  35. Relevé de compteur gaz / numéro PCE. GRDF. accessed 1 October 2026.
  36. MaPrimeRénov’ pour une rénovation par geste. France Rénov’ / Anah, 2026. accessed 1 October 2026.

Questions about energy in France.