How electricity works in France.
France electricity market 2026: regulated Tarif Bleu, Enedis and RTE, the 14-digit PRM, Linky meters, solar surplus buy-back, licensing, flexibility and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Euro (EUR) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
France energy at a glance.
Key figures for households in France. Each one links to its source on the full overview below.
Electricity price.
0.2 EUR per kWh for households, including taxes. Figures for from 1 Aug 2026.
Household use.
4,500 kWh a year for a typical household. Figures for 2026.
Renewable share.
27% of electricity from renewable sources. Figures for 2025.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in France.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for France below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications France requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in France.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in France, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in France, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in France.
The energy market in France, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 1 October 2026.
On this page22 sections
France has a liberalised electricity market built around a dominant nuclear fleet. Retail supply is open to competition, but households can still choose the regulated sales tariffs (tarifs réglementés de vente, TRVE, sold as EDF’s Tarif Bleu), which the energy regulator CRE proposes and the government approves. At 31 March 2026 some 19.37 million residential customers in mainland France were on the regulated tariff.
Since 1 August 2026 the regulated Base tariff costs 20.01 euro cents per kWh including all taxes for 3 and 6 kVA connections, plus a fixed monthly subscription that depends on the contracted power. RTE runs the high-voltage transmission grid; Enedis operates about 95% of the distribution network, with 114 local distribution companies covering the rest. Almost every home has a 14-digit delivery-point number (PRM) and, in the Enedis area, a Linky smart meter.
Low-carbon sources produced 95.2% of French electricity in 2025 and renewables 27.0%. Nuclear supplied 373 TWh, solar capacity passed hydropower for the first time, and France exported a record net 92.3 TWh. Major 2026 changes include the end of the ARENH nuclear access scheme, a new centralised capacity mechanism, a much lower buy-back tariff for small solar installations and a gradual move of off-peak hours into the middle of the day.
Energy snapshot.
Headline figures for electricity in France. Each shows its data year and links to its source.
- Population69,082,000 peopleSource 131 Jan 2026
- Households30,907,289 householdsSource 142022
- Average household size2.14 people/householdSource 152023
- Electricity use per household4,500 kWh/yrSource 22026
- Household price (EUR)0.2 EUR/kWhSource 1from 1 Aug 2026
- Renewable electricity share27%Source 82025
- Solar capacity34 GWSource 11end Q2 2026
- Wind capacity26.7 GWSource 1230 June 2026
- Energy storage capacity1.6 GWSource 9end 2025
- Smart-meter share96.5%Source 52025
- Market structure
- Fully liberalised
- Homes can export to the grid
- Yes
- Home equipment in grid services
- Yes
- Regulator
- Commission de régulation de l’énergie (CRE)
- System operator
- RTE (Réseau de Transport d’Électricité)
- Distribution networks
- Enedis serves about 95% of the network; 114 local distribution companies (ELDs) serve the rest, five of them with more than 100,000 customers
- Currency
- Euro (EUR)
- Voltage and frequency
- 230 V / 50 Hz
Electricity prices in France.
- Household price (EUR)
- 0.2 EUR/kWh (from 1 Aug 2026)Source 1Regulated Tarif Bleu, Base option, 3 and 6 kVA, all taxes included (VAT 20%). Plus a subscription of €15.86/month at 6 kVA.
- Typical annual electricity bill
- 1,072 EUR/yr (from 1 Aug 2026)Source 2Average regulated-tariff residential bill at 4.5 MWh/yr, all taxes included, up from €1,046 (about +€26/yr).
Household price trend (EUR per kWh).Source 7
| 2019-S1 | 0.1778 EUR/kWh |
|---|---|
| 2019-S2 | 0.1913 EUR/kWh |
| 2020-S1 | 0.1893 EUR/kWh |
| 2020-S2 | 0.1958 EUR/kWh |
| 2021-S1 | 0.1946 EUR/kWh |
| 2021-S2 | 0.2022 EUR/kWh |
| 2022-S1 | 0.2092 EUR/kWh |
| 2022-S2 | 0.2204 EUR/kWh |
| 2023-S1 | 0.23 EUR/kWh |
| 2023-S2 | 0.2591 EUR/kWh |
| 2024-S1 | 0.2847 EUR/kWh |
| 2024-S2 | 0.2926 EUR/kWh |
| 2025-S1 | 0.2671 EUR/kWh |
| 2025-S2 | 0.2561 EUR/kWh |
A French electricity bill has three parts: energy supply, network access and taxes. The network part is the TURPE tariff, set by CRE and passed through by every supplier; it rose by 3.04% for distribution on 1 August 2026. Taxes include the electricity excise duty (accise, formerly CSPE) of 30.62 €/MWh for customers up to 36 kVA from 1 August 2026, the CTA contribution that funds network-industry pensions, and VAT. VAT is now 20% on both the subscription and consumption.
Regulated tariffs are built by CRE using a cost-stacking method: wholesale energy, capacity, network, retail costs and a margin. CRE proposed a 2.5% average increase for 1 August 2026, mainly because of the TURPE increase and the first costs of the new capacity mechanism. The government approved it and EDF’s new price grid has applied from that date. At the end of 2024, 42% of residential sites were on market offers.
Price trend
Household prices rose sharply between 2022 and early 2024, despite a government tariff shield that limited regulated-tariff increases. Eurostat’s all-taxes price for typical households (2,500–5,000 kWh) peaked at 0.2926 €/kWh in the second half of 2024. It eased to 0.2561 €/kWh in the second half of 2025 Regulated tariffs in Corsica and the overseas non-interconnected zones (ZNI) are kept in line with mainland tariffs through national tariff equalisation (péréquation).
Customers without a Linky meter pay extra: on the regulated tariff, €40.08 a year before tax where a meter could be fitted but was not, and €25.62 a year where no reading has been sent for more than 12 months. Self-producers who export pay a €9.84 a year supplement.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Tarif Bleu (TRVE) sold only by EDF and local incumbent suppliers. Base option at 20.01 c€/kWh TTC for 3–6 kVA; the 9–36 kVA Base option (19.85 c€/kWh) is closed to new subscribers. |
| Time-of-use | Yes | Heures Pleines / Heures Creuses (peak/off-peak): 21.42 c€ and 15.89 c€/kWh TTC on the regulated tariff, with eight off-peak hours a day set by the distribution network operator. CRE proposed opening this option to 3 kVA customers. |
| Other | Yes | Tempo (regulated critical-peak tariff): RTE assigns each day a colour. On 300 blue days the rates are 13.56/16.54 c€; on 43 white days 15.36/19.21 c€; on 22 red days 16.15 c€ off-peak and 72.95 c€/kWh peak. |
| Fixed | Yes | Market offers with a fixed price for the contract term. Some fix only the energy component before tax; others also fix the subscription. |
| Variable | Yes | Market offers indexed to the regulated tariff, to wholesale prices or to a supplier’s own formula. Many are sold as “green” offers backed by guarantees of origin. |
| Dynamic | Yes | Suppliers with more than 200,000 customers must offer customers up to 36 kVA a dynamic contract. At least 50% of the energy price follows day-ahead or intraday prices, at least hourly, with a monthly bill cap set by CRE. |
Household prices compared with neighbouring countries (EUR per kWh).
- Germany€0.37
- Belgium€0.35
- Italy€0.316
- United Kingdom€0.308
- Switzerland€0.292
- Spain€0.267
- Luxembourg€0.267
- France€0.2
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 4,500 kWh/yr (2026)Source 2Average consumption CRE uses for a regulated-tariff residential customer when stating bill impacts. CRE also reports 143.1 TWh consumed by 34.79 million residential sites in 2024.
- Average daily use per household
- 12.3 kWh/day (2026)Source 2Derived by dividing CRE’s 4.5 MWh/yr reference consumption by 365.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- Not identified from a reliable public source.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 2,865,320 vehicles (end July 2026)Source 32Plug-in cars and light commercial vehicles on the road: 1,964,022 battery-electric and 901,298 plug-in hybrid. Battery-electric cars took 35.4% of new car registrations in July 2026.
- Electric cooking
- Not identified from a reliable public source.
CRE uses 4.5 MWh a year as its reference residential consumption, and residential sites as a whole used 143.1 TWh in 2024. Demand is strongly temperature-sensitive, so winter peaks are high: national peak demand reached 88 GW in 2025, the highest since 2021.
Electrification is growing. Electric vehicles reached about 2.87 million plug-in vehicles in July 2026, and the main renovation grant (MaPrimeRénov’) was refocused on heat pumps from 1 September 2026 for single-measure works. National electricity consumption was 451 TWh in 2025 after adjusting for weather (446.2 TWh unadjusted), still below pre-2020 levels.
Housing and households.
- Dwellings
- 38,400,000 dwellings (1 Jan 2025)Source 17France excluding Mayotte. 82.5% are primary residences (31.7 million).
- Owner-occupied
- 57.4% (2025)Source 16Share of primary residences, provisional.
- Private rented
- 23.1% (2025)Source 16
- Social or public housing
- 17.3% (2025)Source 16HLM (social landlord) tenants. A further 2.2% live rent-free.
- Houses
- 54.4% (1 Jan 2025)Source 17Individual houses as a share of all dwellings.
- Apartments and flats
- 45.6% (1 Jan 2025)Source 17Derived as 100% minus the 54.4% share of individual houses.
- Urban population
- Not identified from a reliable public source.
Just over half of French dwellings are individual houses, and most owner-occupiers live in houses, especially outside large cities. These detached and semi-detached homes are where most residential rooftop solar and heat pumps are installed. Apartments dominate in Paris and other large cities. About 14.5% of the housing stock is in the Paris urban area and 21.4% in rural communes.
Social housing is substantial at 17.3% of primary residences. Apartment buildings run as co-ownerships (copropriétés) need a general-assembly vote for shared works such as roof solar or charging points. Collective self-consumption lets a building or neighbourhood share local solar output through a legal entity registered with the distribution network operator.
How the grid works in France.
- TransmissionRTE
- DistributionEnedis serves about 95% of the network; 114 local distribution companies (ELDs) serve the rest, five of them with more than 100,000 customers
- MeteringDistribution network operator (Enedis or the local ELD)
- Supply3 or more retail suppliers
Electricity flows from mostly nuclear, hydro and growing wind and solar plants through RTE’s transmission network to substations, where Enedis or a local distribution company takes over and delivers it at medium and low voltage, under concession contracts with local authorities. France is a large net exporter, exporting about 99% of the time in 2025, and acts as a transit hub between the Iberian Peninsula, Britain, Belgium, Germany, Switzerland and Italy.
Commercially, the customer contracts only with a supplier. The supplier holds a network-access contract with the distribution network operator (the GRD-F contract) and pays the TURPE on the customer’s behalf. It also buys energy wholesale or produces it, and belongs to a balance perimeter settled by RTE. Since 1 January 2026 the ARENH scheme, which gave suppliers regulated access to part of EDF’s nuclear output, has been replaced by the Versement Nucléaire Universel (VNU). Under the VNU, a share of EDF’s nuclear revenue above set thresholds is redistributed to all consumers.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry for Energy – Direction générale de l’énergie et du climat (DGEC) | Sets energy policy and the multi-year energy plan (PPE). Issues supplier and large-generation authorisations and sets feed-in tariffs by ministerial order. |
| Regulator | Commission de régulation de l’énergie (CRE) | Independent regulator. Sets the TURPE network tariffs, proposes regulated sales tariffs, approves RTE market rules, runs renewable tenders and monitors wholesale and retail markets. |
| TSO | RTE | Owns and runs the high-voltage transmission network and is the national system operator. Runs balancing, ancillary services, the capacity mechanism and Tempo day colours, and holds contracts with balance-responsible parties. |
| DSO | Enedis | EDF-group subsidiary, legally separate, running about 95% of the medium- and low-voltage network under municipal concessions. Owns and reads Linky meters, keeps PRM data and connects small generators. |
| DSO | Local distribution companies (ELDs) | 114 local companies serve the remaining 5% of the network, including Strasbourg Electricité Réseaux, réséda (Metz), SRD (Vienne), Gérédis (Deux-Sèvres) and GreenAlp (Grenoble). EDF SEI runs Corsica and overseas island grids. |
| Supplier | EDF and alternative suppliers | EDF sells the regulated Tarif Bleu alongside market offers. At the end of 2024, 30 national suppliers had at least one residential customer. |
| Metering | Distribution network operator (Enedis or the local ELD) | Metering is a regulated monopoly task of the local network operator, not a competitive service. The network operator owns, installs, reads and validates the meter and sends data to suppliers. |
| Settlement | RTE balance-responsible scheme | Each supplier, producer or trader belongs to a balance perimeter (responsable d’équilibre). RTE settles imbalances using metering data aggregated by distribution network operators. |
| Exchange | EPEX SPOT | Day-ahead and intraday power exchange for the French bidding zone, coupled with the rest of Europe. |
| Flexibility market | RTE capacity mechanism and balancing markets | Centralised capacity auction (first run on 6 July 2026), FCR/aFRR procurement, the balancing mechanism and NEBEF demand-response block trading. |
Compared with the UK system.
| UK concept | France equivalent | How it works |
|---|---|---|
| DNO | Gestionnaire de réseau de distribution (GRD): Enedis or a local ELD | Distribution is mostly one national company rather than regional licence areas. Municipalities (or their energy syndicates) own the low- and medium-voltage networks and grant concessions to Enedis; about 5% is run by local companies, often municipal. |
| National Grid / NESO | RTE | RTE is both transmission owner and system operator, so there is no ownership/operator split like Great Britain’s. It balances the system in real time, procures reserves, runs the capacity mechanism and publishes Tempo day colours. |
| MPAN | PRM / PDL (Point Référence Mesure / Point de Livraison) | A 14-digit number the network operator assigns to each delivery point. It is shown on the bill and the Linky display and stays with the dwelling when the occupant or supplier changes. Unlike the MPAN, it carries no profile class or region code. |
| MPRN | PCE (Point de Comptage et d’Estimation) for gas | Gas supply points have their own 14-digit PCE number from the gas distribution network operator (GRDF in most of France, whose smart meter is Gazpar). It appears on gas bills and is completely separate from the electricity PRM. |
| Meter operator | Network operator (no competitive meter operators) | Meters belong to the distribution network operator and are installed, maintained and read by it. Households cannot choose a meter operator or buy their own meter for billing. |
| Supplier | Fournisseur | Suppliers need a ministerial authorisation. They buy access to the network on the customer’s behalf and bill one combined amount including TURPE and taxes. Only incumbents may sell the regulated tariff. |
| Smart-meter infrastructure (DCC / SMETS2) | Linky system run by Enedis | Enedis rolled out and runs the Linky metering system as a regulated network asset. There is no independent data company like the DCC: Enedis collects the data itself and gives it to suppliers, RTE and third parties that have the customer’s consent. |
How a supply point is identified.
09876543210987 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Point Référence Mesure / Point de Livraison (PRM (also called PDL)) |
| Who issues it? | The distribution network operator: Enedis in about 95% of the country, otherwise the local distribution company |
| Format | A purely numeric 14-digit code identifying the delivery point (the dwelling’s connection) on the network. It encodes no tariff, profile or regional information. PRM is the name shown on the Linky meter; PDL is the older name and is still printed on many bills. |
| Length | 14 digits |
| Stays with the property when you switch supplier? | Yes |
| Where to find it | Top right of the electricity bill, often labelled “Point de livraison” or “Référence PDL/PRM”. On a Linky meter, press the “+” button to scroll through the screens until “Numéro de PRM” appears. The supplier can also provide it. |
| Electronic access | The customer can open a free Enedis online account linked to the PRM to see daily readings, maximum daily power and, once enabled, the 30-minute load curve. |
| Third-party access | Suppliers see contractual and billing data for their own customers. Other third parties (energy-services firms, installers, building managers) can get a customer’s data only with the customer’s explicit consent, through Enedis web portals or APIs. The 30-minute load curve is recorded and sent only once the customer has consented. |
| Who keeps the register | Each distribution network operator keeps its own reference register of delivery points, including meter, contracted power, supplier, balance perimeter and generation data. Enedis’s register covers most of France. |
| Register scope | Per DSO |
The PRM is how the French system knows a home exists. Each connection to the low-voltage network gets one 14-digit number when it is first connected. The number then stays with that delivery point for its whole life, whoever lives there and whichever supplier they use. Enedis describes it as the number that identifies the dwelling on the electricity network.
How it is used
Switching supplier needs only the PRM and the customer’s identity: the new supplier sends a request through the network operator’s systems, and the old contract ends automatically. Moving into an empty dwelling also starts with the PRM. The new occupant chooses a supplier, which asks the network operator to restart supply, usually remotely where a Linky meter is fitted. A rooftop solar connection request, a contracted-power change or a self-consumption agreement all refer to the same PRM. Where a home both consumes and exports, the injection is handled under a separate connection contract linked to the delivery point.
Who keeps the data
There is no single national data hub like those in some Nordic countries. Enedis and each local distribution company keeps its own delivery-point register and metering data, under rules set by CRE and the Energy Code. Suppliers, aggregators and RTE receive the data they are entitled to through the network operator’s exchange systems. Gas delivery points use a separate identifier, the PCE.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | No |
| How exported electricity is paid | Regulated feed-in purchase (obligation d’achat) through EDF OA under the amended S21 order: since 5 June 2026, a single 1.1 c€/kWh (before VAT) for 0–100 kWc, indexed +2% a year for 20 years. Surplus can instead be sold to a market buyer. |
| Is there net metering? | No. Self-consumed power simply reduces what the household buys. Exported surplus is paid separately under a purchase contract and is not offset against imports. |
| What does exported power earn in 2026? | For connection requests filed from 5 June 2026, 1.1 c€/kWh before VAT for 0–100 kWc, rising 2% a year over a 20-year contract. Output above 1,600 kWh per kWc per year is not paid. Earlier contracts keep their original tariffs. |
| Can a small system export everything? | No. Systems of 9 kWc or less qualify for the purchase obligation only as self-consumption with surplus export, not full export. |
| What about larger systems? | Building-mounted systems above 100 kWc have been moved out of the open-access tariff into a simplified competitive tender (since 22 September 2025). Large ground-mounted plants compete in CRE tenders. |
| Which technical rules apply to inverters? | NF EN 50549-1 for low-voltage connections (replacing the German DIN VDE 0126-1-1 previously accepted). Wiring follows NF C 15-100 and the PV guide UTE C 15-712-1, checked by Consuel before connection. |
Connecting a home system.
- Check local planning rules and file a prior declaration (déclaration préalable) with the town hall for most rooftop systems.
- Have the system designed and installed, normally by a QualiPV/RGE-qualified installer if a feed-in contract or tax relief is sought.
- Submit a connection request online to Enedis (or the local network operator), choosing self-consumption with surplus export, full export (above 9 kWc only) or self-consumption without export.
- Accept the network operator’s connection proposal: a CRAE contract if any power will be exported, or a CACSI agreement if none will.
- Obtain the Consuel safety certificate. For Consuel requests from 1 January 2026, this includes an inverter certificate to NF EN 50549-1, tested under EN 50549-10.
- Request commissioning. With a Linky meter, export metering is usually activated remotely.
- Sign the purchase contract with EDF OA, or a contract with another buyer, for the exported surplus.
France supports small solar mainly through a regulated purchase obligation. EDF Obligation d’Achat (or the local distribution company’s purchasing arm) must buy surplus power at a tariff set by ministerial order and is compensated through the public energy service charges. The order of 1 June 2026 amended the 2021 “S21” order and made a big change. It replaced the old quarterly-degressive tariffs and the self-consumption investment premium (worth up to €80/kWc) with one low tariff of 1.1 c€/kWh for systems up to 100 kWc. It also ended the premium for new connection requests.
The aim is to make self-consumption, rather than export income, the main reason to install. The regulated retail price is about 20 c€/kWh, so each self-consumed kWh is worth roughly 18 times an exported one. This is why load shifting, hot-water diversion, EV charging and storage matter more for project economics. Residential systems up to 9 kWc may also qualify for 5.5% VAT since 1 October 2025, but only if the modules meet strict carbon-footprint and material-content criteria.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity | Renewable plants (solar, wind, biomass, biogas, geothermal, marine) up to 50 MW are deemed authorised; natural gas up to 20 MW; other fossil fuels except coal up to 10 MW. Larger plants, and all coal plants, need a ministerial operating authorisation. | Ministry for Energy (DGEC) | Separate planning and environmental permits still apply. Plants that win CRE tenders are authorised when they are selected. |
| Store electricity | No dedicated storage licence identified. Batteries connect under a standard connection contract with Enedis/ELD or RTE and pay TURPE network charges. | Network operator (connection); CRE (tariffs) | TURPE 7 work has looked at a dedicated injection-withdrawal component for storage. Home batteries behind the meter only need the household’s existing connection plus Consuel compliance. |
| Export to the grid | No licence. A connection and access contract (CRAE up to 36 kVA) with the network operator is needed, plus a Consuel certificate. | Enedis or local network operator | Self-consumption without any export uses a CACSI agreement instead. Each exporting installation must have its own dedicated meter. |
| Sell exported power | No licence for a household selling surplus under the purchase obligation or to a market buyer. The buyer must have a balance perimeter. | EDF OA (regulated buyer); market buyers | Feed-in eligibility generally needs proof of installer qualification (QualiPV/RGE). |
| Supply final customers | Ministerial authorisation for buying electricity for resale (Article L.333-1, Energy Code), based on technical, economic and financial capacity. | Ministry for Energy (DGEC), after CRE opinion within two months | Suppliers must also sign a network-access contract with each network operator and join a balance perimeter. |
| Collective self-consumption | No licence. Participants form a legal entity (personne morale organisatrice) that signs an agreement with the network operator and sends it the sharing keys. | Enedis or local network operator | Participants keep their own supplier for the remaining supply. |
| Aggregate demand response | Demand-response operators need RTE technical approval to trade curtailment blocks under the NEBEF rules. | RTE, under CRE-approved rules | Aggregated sites below 250 kW can be included in adjustment entities. |
| Wholesale trading | No supply authorisation needed for wholesale-only trading. A balance-responsible party contract with RTE is required, plus exchange membership if trading on EPEX SPOT. | RTE; CRE (REMIT market surveillance) | The L.333-1 authorisation covers sales to final customers and to network operators for their losses. |
| Balancing and ancillary services | Units or aggregates must be certified by RTE and sign the relevant participation contracts. The minimum offer for FCR and aFRR is 1 MW. | RTE | Aggregated and distributed reserve entities, including storage, are allowed. |
| Capacity provision | Production, storage and demand-response capacities are certified and contract with RTE through the centralised capacity auctions in force from 2026. | RTE, under CRE-approved rules | The first auction, on 6 July 2026, covered 1 November 2026 to 31 March 2027. |
| VPP / remote control of home assets | No specific licence. A VPP operator acts through one or more of the roles above (supplier, demand-response operator, balance-responsible party, reserve provider). | Depends on role: DGEC, RTE | Household consent and data-protection rules apply to accessing Linky data and controlling devices. |
France licenses activities by function, not with a single generation or supply licence. Small producers, including almost every household or commercial solar system, are deemed authorised and deal only with the network operator, Consuel and, if they sell surplus, EDF OA. Supplying customers is the main activity needing prior ministerial approval. Market roles such as demand response, reserves, capacity and balance responsibility are run by contracts and certification under RTE rules approved by CRE.
Flexibility and grid services.
Aggregation of home equipment: Yes
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Frequency Containment Reserve (FCR, réserve primaire) | Yes | 1 MW | Yes | RTE. Procured through European cross-border FCR tenders. Batteries make up much of the French battery fleet’s current revenue base. |
| Automatic Frequency Restoration Reserve (aFRR, réserve secondaire) | Yes | 1 MW | Yes | RTE. Procured by tender. Distributed reserve entities made up of aggregated units, including storage, can be certified. |
| Balancing mechanism (mécanisme d’ajustement) | Yes | — | Yes | RTE. Manual upward and downward offers. Wind and solar capacity in the mechanism grew almost tenfold in a year, to 5.6 GW at the end of 2025. |
| NEBEF demand-response blocks | Yes | — | Yes | RTE. Approved demand-response operators sell curtailed consumption as energy on wholesale markets. The consumer’s supplier is compensated under a regulated scheme. |
| Capacity mechanism | Yes | — | Yes | RTE. Centralised since 2026. RTE contracts capacity directly in auctions; the first, on 6 July 2026, cleared at 28,183 €/MW for winter 2026–27. Costs are recovered from consumption from 1 November 2026. |
| Tempo and off-peak tariff signals | Yes | — | No | RTE (day colours) / network operator (off-peak hours). Not a market, but a mass household price signal: RTE sets 22 red days a year, and network operators move off-peak hours into the middle of the day. |
France has one of Europe’s longest-running demand-response frameworks. NEBEF lets independent aggregators sell curtailment directly on energy markets, and RTE opened its reserves and balancing mechanism to aggregated and distributed units. Price-responsive renewable output is growing fast: in 2025, solar and wind plants cut about 3 TWh of output during 513 hours of negative prices, mostly because the contract-for-difference support scheme rewards curtailment at negative prices.
Households take part mainly through tariff signals rather than markets. Tempo and the reform of off-peak hours encourage load shifting. Smart water heaters, EV chargers and home batteries can join through aggregators, but the 1 MW minimum bid size for reserves means home assets must be pooled.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| Services RTE portal | Rules, contracts and published results for reserves, the balancing mechanism, NEBEF and the capacity mechanism. |
| EPEX SPOT | Day-ahead and intraday wholesale trading for France. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Mass rollout finished in 2021; about 37.4 million Linky meters (96.5% of the Enedis area) installed by 2025 |
| Reading interval | Daily readings by default; 30-minute load curve recorded and sent once the customer consents |
| Meter name | Linky (Enedis) |
| Owner / operator | Distribution network operator (regulated); no competitive metering |
| Mass rollout | Late 2015 – end 2021 (34.3 million meters) |
| Project cost | About €4 billion (CRE) |
| Communications | Remote reading by Enedis; data shared with suppliers and consented third parties |
| Non-Linky surcharge | €6.48 before VAT every two months (network charge from 1 August 2025) |
Linky was rolled out by Enedis as a regulated network investment, not by suppliers. That made it faster and cheaper than supplier-led programmes: CRE reported 34.3 million meters fitted between late 2015 and the end of 2021 at about €4 billion, roughly €700 million under budget. By 2025, about 37.4 million meters were installed in the Enedis area. Customers who still refuse a Linky meter pay a fixed meter-management charge and extra reading fees.
Linky allows remote readings, remote contracted-power changes and remote reconnection, and lets network operators move off-peak hours by software. Local distribution companies run their own smart-meter deployments.
Renewable electricity.
Electricity generation mix (2025).
- Nuclear: 68.1%
- Hydro: 11.4%
- Onshore wind: 8%
- Solar: 6%
- Fossil (gas, coal, oil): 3.4%
- Bioenergy and waste: 2%
- Offshore wind: 1%
- Renewable electricity share
- 27% (2025)Source 8Renewable share of electricity production (RTE). Low-carbon share including nuclear was 95.2%.
- Home solar
- Not identified from a reliable public source.
- Solar added each year
- 5.9 GW (2025)Source 8A further 3.0 GW was connected in the first half of 2026 (SDES).
- Nuclear
- 63 GW (end 2025)Source 8Includes Flamanville 3 (1.6 GW), still being commissioned.
- Solar PV
- 34 GW (end Q2 2026)Source 11
- Hydro
- 25.7 GW (end 2025)Source 8
- Onshore wind
- 24.4 GW (30 June 2026)Source 12
- Offshore wind
- 2.3 GW (30 June 2026)Source 12
- Gas
- 12.4 GW (end 2025)Source 8
- Renewable thermal and waste
- 2.3 GW (end 2025)Source 8
Targets.
- PPE3 (Decree 2026-76 of 12 February 2026): 55–80 GW of solar PV by 2035.
- PPE3: 35–40 GW onshore wind and 15 GW offshore wind by 2035.
- PPE3: nuclear output of 380–420 TWh a year over 2030–2035; hydropower 28.7 GW.
- Renewable targets may be revised after 31 December 2028 depending on demand, low-carbon deployment and flexibility.
Nuclear dominates French generation, but renewables are growing in absolute terms. In 2025, solar output rose 33% to 32.9 TWh, and solar capacity (30.4 GW at year end) passed hydropower for the first time. Onshore wind growth has slowed for three years in a row, while offshore wind is expanding with new commercial parks and the first floating pilots. Fossil generation fell to 18.7 TWh, its lowest in about 75 years, and the carbon intensity of production was 19.6 gCO₂eq/kWh.
The third multi-year energy plan (PPE3), adopted by decree in February 2026, lowered some solar and onshore wind ambitions compared with earlier drafts and confirmed a nuclear-led strategy. Large renewables are supported through CRE tenders with contracts for difference. Small building-mounted solar uses the purchase obligation, which became much less generous in June 2026.
Energy storage.
- Home batteries
- 0.14 GW (end 2025)Source 9140 MW of small low-voltage batteries in homes and small businesses.
- Grid-scale storage
- 1.6 GW (end 2025)Source 9Total battery fleet in service. A little over 20 large batteries are on the transmission network; about 14 GW of projects were in the connection queue at the end of 2025.
Battery storage in France is still small compared with Germany, Italy or Great Britain, and mostly earns its money from frequency services. RTE counted 1.6 GW in service at the end of 2025. Most were megawatt-scale units on the distribution network, and home batteries totalled only 140 MW. Low retail-price volatility, an off-peak tariff structure built around nuclear and a feed-in system long focused on export explain the slow uptake in homes.
This is changing: the connection queue held about 14 GW of mostly large projects at the end of 2025. The new capacity mechanism includes storage, and the much lower solar buy-back tariff makes storing midday output more attractive than exporting it.
Storage projects.
- Pumped-storage hydro (STEP): France’s historical storage, included in its 25.7 GW of hydro capacity. Pumping consumption is netted out of renewable statistics.
- Transmission-connected batteries: A little over 20 large batteries at the end of 2025, mainly providing frequency services. Projects are trending larger, many over 100 MW.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| EDF | 19.37 million residential customers on the regulated Tarif Bleu (31 Mar 2026), plus market-offer customers | Unknown | Yes | Yes | Yes |
| TotalEnergies | — | Unknown | Yes | Yes | Unknown |
| ENGIE | — | Unknown | Yes | Yes | Unknown |
The residential market is highly concentrated. At the end of 2024 the three largest incumbent suppliers held 68% of residential sites and the three largest alternative suppliers 26%. 30 national suppliers had at least one residential customer. The annual residential switching rate was 9.4% in 2024. Linky meters are fitted by the network operator, not the supplier, so every supplier can offer smart-meter-based offers. Suppliers with more than 200,000 customers must offer a dynamic, spot-indexed contract.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry for Energy – DGEC | Government | Energy policy, PPE, purchase-obligation tariffs, supplier authorisation | Sets the legal and tariff framework for generation, supply and support schemes. |
| Commission de régulation de l’énergie (CRE) | Regulator | Energy regulator | Sets network tariffs, proposes regulated retail tariffs, approves market rules and runs tenders. |
| RTE | Transmission | Transmission system operator | Runs the grid, balancing, reserves, the capacity mechanism and publishes national electricity statistics. |
| Enedis | Distribution | Main distribution network operator and Linky meter operator | Issues PRMs, connects small generators and holds household metering data. |
| EDF Obligation d’Achat (EDF OA) | Market | Regulated buyer under the purchase obligation | Signs and pays feed-in contracts for small renewable producers. |
| Médiateur national de l’énergie | Consumer | Energy ombudsman and price-comparison service | Handles consumer disputes and runs the official offer comparator energie-info.fr. |
| Consuel | Solar | Electrical safety certification | Issues the safety certificate required before any new installation, including solar, is energised. |
| Qualit’EnR | Renewable Energy | Installer qualification body (QualiPV, QualiPAC and others) | Its qualifications give installers RGE status, which feed-in contracts and grants require. |
| Photovoltaique.info (Hespul) | Solar | Reference information service on PV rules | Tracks tariff orders, connection rules and technical standards for French PV. |
| Avere-France | Consumer | Electric mobility association | Publishes the monthly barometer of plug-in vehicle registrations and fleet. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Inverters / anti-islanding | NF EN 50549-1 (tested to EN 50549-10) | CENELEC / AFNOR; required by Enedis | Replaced DIN VDE 0126-1-1. Required for low-voltage installations with Consuel requests from 1 January 2026. |
| Low-voltage wiring | NF C 15-100 | AFNOR | The national standard for domestic electrical installations. |
| PV installations | UTE C 15-712-1 guide | UTE / AFNOR | Design and installation rules for grid-connected PV systems. |
| Safety certification | Consuel attestation de conformité | Consuel | Needed before the network operator commissions a new production installation. |
| Grid connection (EU) | Requirements for Generators network code (RfG) | European Commission / ENTSO-E | Applied through the network operators’ published technical reference documents. |
| Installer accreditation | QualiPV / RGE | Qualit’EnR (and other approved bodies) | Proof of installer qualification is generally required for an S21 purchase contract. |
| Product criteria for reduced VAT | Order of 8 September 2025 (Art. 278-0 bis CGI) | Ministry of Economy / tax administration | Modules under 530 kgCO₂eq/kWc, silver under 14 mg/W, lead under 0.1%, cadmium under 0.01%, certified by an accredited body. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Planning: prior declaration (déclaration préalable) | Limited | Local | Usually needed for rooftop PV because it changes a building’s appearance. Filed with the town hall under the local urban plan. |
| Heritage approval (Architecte des Bâtiments de France) | Limited | Local | Needed near listed monuments and in protected areas, and can restrict or refuse visible panels. |
| Network connection contract | Yes | National | CRAE for any export up to 36 kVA, or CACSI for self-consumption without export, from Enedis or the local network operator. |
| Consuel safety certificate | Yes | National | Needed before commissioning; includes the NF EN 50549 inverter certificate. |
| Generation authorisation | No | National | Renewable plants up to 50 MW are deemed authorised. |
| Co-ownership vote | Limited | Local | Works on shared parts of apartment buildings need approval by the co-owners’ general assembly. |
A household solar system needs no energy licence. The administrative path is planning (town hall), safety (Consuel) and connection (network operator), plus a purchase contract if surplus is sold. Heritage zones are the main local constraint, and the national rules on the Consuel certificate and inverter conformity were tightened in 2026.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Purchase obligation for surplus solar (S21, amended) | Active | Feed-in tariff | For connection requests from 5 June 2026: 1.1 c€/kWh before VAT for 0–100 kWc, +2% a year, for 20 years; systems up to 9 kWc must self-consume and export surplus only; output above 1,600 kWh/kWc/yr is unpaid. | From 5 Jun 2026 |
| Self-consumption investment premium (prime à l’autoconsommation) | Closed | Grant | Abolished for connection requests from 5 June 2026; earlier contracts keep it. | Until 4 Jun 2026 |
| Reduced VAT on residential PV | Active | VAT relief | 5.5% VAT on supplying and installing PV up to 9 kWc in homes, if the equipment meets the carbon-footprint and material criteria of the order of 8 September 2025. | From 1 Oct 2025 |
| MaPrimeRénov’ (single-measure route) | Active | Grant | Income-tested renovation grant reopened under the 2026 finance law. From 1 September 2026 the single-measure route is refocused on air-to-water and ground-source heat pumps (plus heat-network connection); hot-water heat pumps are no longer covered. | 2026 |
| Chèque énergie | Active | Bill support | Means-tested energy voucher of €48–277 (average €153), sent automatically to about 4.5 million households from April 2026; requests possible until 31 December 2026. | 2026 campaign |
| Versement Nucléaire Universel (VNU) | Active | Bill rebate mechanism | Redistributes part of EDF’s nuclear revenue above 78 €/MWh (50%) and 110 €/MWh (90%) to all consumers. The 2026 rebate rate is €0/MWh because revenue was forecast below the first threshold. | From 1 Jan 2026 |
Data and connectivity.
- Fixed broadband
- 95.3 % of premises FTTH-connectable (end June 2026)Source 3343.1 million of 45.2 million premises; 28.1 million fibre subscriptions.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Fibre is now the dominant fixed access, covering 95.3% of premises and making up 85% of internet subscriptions in mid-2026. Arcep counted more than 73,900 5G sites in metropolitan France at 31 March 2026. Linky meters are read remotely by the network operator and do not use the household’s broadband.
Grid conditions.
- National peak demand
- 88 GW (2025)Source 8Highest since 2021.
- Annual electricity demand
- 451 TWh (2025)Source 8Adjusted for weather and calendar effects; 446.2 TWh unadjusted.
- Generation capacity
- 164.5 GW (end 2025)Source 8
- Interconnection
- Not identified from a reliable public source.
- Curtailment
- 3 TWh (2025)Source 9RTE estimate of wind (1.3 TWh) and solar (1.6 TWh) output cut during 513 hours of negative prices.
The French system now faces the opposite of its 2022 crisis. Nuclear output has recovered, demand remains flat and solar is growing fast, so midday surpluses and negative prices are increasingly common: there were 513 negative-price hours in 2025, up from 352. France was a net exporter about 99% of the time and is a major transit corridor. RTE plans large interconnection growth to Spain, Britain and Italy.
Connection queues are long for large loads (about 30 GW reserved) and for batteries (about 14 GW). Capareseau publishes renewable hosting capacity by area.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| End of ARENH, start of the Versement Nucléaire Universel | Current | 1 Jan 2026 | Regulated access to EDF nuclear output ended on 31 December 2025. It was replaced by a revenue-sharing mechanism with thresholds of 78 and 110 €/MWh (2026 rebate set at zero). |
| Single 1.1 c€/kWh buy-back tariff for small solar | Current | 5 Jun 2026 | The order of 1 June 2026 replaced degressive S21 tariffs and abolished the self-consumption premium for systems up to 100 kWc. |
| PPE3 multi-year energy plan | Current | 13 Feb 2026 | Decree 2026-76 sets 2035 ranges for solar (55–80 GW), onshore wind (35–40 GW) and offshore wind (15 GW), with a review after 2028. |
| Regulated tariff and network tariff update | Current | 1 Aug 2026 | TRVE +2.5% on average (Base 20.01 c€/kWh), TURPE +3.04% for distribution, and the excise duty cut to 30.62 €/MWh. |
| New centralised capacity mechanism costs on bills | Upcoming | 1 Nov 2026 | Capacity contracted by RTE in the July 2026 auction is financed through consumption from 1 November 2026. CRE will address the previous mechanism’s shortfall in the February 2027 regulated-tariff update. |
| Off-peak hours moved to midday | Upcoming | Nov 2026 – Nov 2027 | Remaining HP/HC customers move to seasonal off-peak hours: at least 5 consecutive night hours, plus afternoon hours (11:00–17:00) in summer. About 11 million customers are affected. |
| NF EN 50549 inverter certification for small producers | Current | 1 Jan 2026 | Installations up to 36 kVA filing a Consuel request from 2026 need an NF EN 50549-1 certificate tested to EN 50549-10. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | Medium | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | High | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Medium | 34.0 GW of PV (all sizes) by mid-2026 with 5.9 GW added in 2025, but the June 2026 reform cut the buy-back tariff to 1.1 c€/kWh and removed the investment premium. |
| Distributed energy market | Medium | 2.87 million plug-in vehicles (July 2026) and widespread electric heating, but only 140 MW of home batteries at the end of 2025 (RTE). |
| Grid flexibility market | High | NEBEF demand-response trading, aggregated FCR/aFRR from 1 MW, a centralised capacity mechanism open to storage and demand response, and mass Tempo/off-peak price signals. |
| Energy storage adoption | Low | 1.6 GW of batteries in service at the end of 2025, of which 140 MW in homes and small businesses (RTE), though about 14 GW is queued. |
| Renewable growth environment | Medium | Renewables 27.0% of production in 2025; solar +33% in output, onshore wind additions slowing for a third year; PPE3 targets revised slightly downward. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 36 sources
- Grille de prix de l’offre de fourniture d’électricité « Tarif Bleu » – applicable au 1er août 2026. EDF, 2026. accessed 1 October 2026.
- La CRE propose une évolution du niveau moyen des TRVE de +2,5 % TTC au 1er août 2026. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
- Délibération n°2026-147 du 15 juillet 2026 – tarifs réglementés de vente d’électricité. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
- La CRE publie l’évolution annuelle des TURPE au 1er août 2026. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
- Rapport annuel à la Commission européenne (31 juillet 2025). Commission de régulation de l’énergie, 2025. accessed 1 October 2026.
- La CRE constate les paramètres de financement du nouveau mécanisme de capacité pour la période de livraison 2026-2027. Commission de régulation de l’énergie, 2026. accessed 1 October 2026.
- Electricity prices for household consumers – bi-annual data (nrg_pc_204), band DC, all taxes. Eurostat, 2026. accessed 1 October 2026.
- Bilan électrique 2025 – principaux résultats. RTE, 2026. accessed 1 October 2026.
- Bilan électrique 2025 – rapport complet. RTE, 2026. accessed 1 October 2026.
- SDDR 2025 – fiche 11 : interconnexions. RTE, 2025. accessed 1 October 2026.
- Tableau de bord : solaire photovoltaïque – deuxième trimestre 2026. SDES, Ministry for Ecological Transition, 2026. accessed 1 October 2026.
- Tableau de bord : éolien – deuxième trimestre 2026. SDES, Ministry for Ecological Transition, 2026. accessed 1 October 2026.
- Bilan démographique 2025. INSEE, 2026. accessed 1 October 2026.
- Ménages selon la taille en 2022. INSEE, 2025. accessed 1 October 2026.
- Taille des ménages – données annuelles de 1968 à 2023. INSEE, 2025. accessed 1 October 2026.
- Statut d’occupation des résidences principales – données annuelles de 1982 à 2025. INSEE, 2025. accessed 1 October 2026.
- Parc de logements au 1er janvier 2025 (Insee Focus 359). INSEE, 2025. accessed 1 October 2026.
- Où trouver le numéro point de livraison (PDL) du compteur Linky ?. Enedis. accessed 1 October 2026.
- J’accède à mes données de mesure. Enedis. accessed 1 October 2026.
- Facturation pour la relève des compteurs : ce qu’il faut savoir. Enedis, 2025. accessed 1 October 2026.
- Installer des panneaux solaires : étapes, démarches, raccordement avec Enedis et mise en service. Enedis. accessed 1 October 2026.
- Arrêté du 1er juin 2026 modifiant l’arrêté du 6 octobre 2021 (S21). Légifrance, 2026. accessed 1 October 2026.
- [Arrêté S21] Détail des modifications et nouveau tarif unique. Photovoltaique.info (Hespul), 2026. accessed 1 October 2026.
- Raccordement au réseau : passage à la NF EN50549 – fin de dérogation pour les installations ≤36 kVA. Photovoltaique.info (Hespul), 2026. accessed 1 October 2026.
- TVA – taux réduits – livraison et installation d’équipements de production d’électricité utilisant l’énergie radiative du soleil. BOFiP-Impôts, 2025. accessed 1 October 2026.
- France’s 2026–2035 energy roadmap (PPE3). DLA Piper, 2026. accessed 1 October 2026.
- Arrêté du 27 mars 2026 fixant le tarif unitaire de minoration du VNU pour 2026. Légifrance, 2026. accessed 1 October 2026.
- Autorisation d’exploiter une installation de production d’électricité. Ministry for Ecological Transition. accessed 1 October 2026.
- Autorisation d’achat d’électricité pour revente. Ministry for Ecological Transition. accessed 1 October 2026.
- Providing frequency ancillary services. RTE Services Portal. accessed 1 October 2026.
- Nouvelles heures creuses. EDF, 2026. accessed 1 October 2026.
- Baromètre Avere-France / Colombus Consulting – juillet 2026. Avere-France, 2026. accessed 1 October 2026.
- Observatoire du haut et très haut débit – T2 2026. Arcep, 2026. accessed 1 October 2026.
- Comment bénéficier du chèque énergie ?. Ministry of the Economy, 2026. accessed 1 October 2026.
- Relevé de compteur gaz / numéro PCE. GRDF. accessed 1 October 2026.
- MaPrimeRénov’ pour une rénovation par geste. France Rénov’ / Anah, 2026. accessed 1 October 2026.
Questions about energy in France.
On the regulated Tarif Bleu, Base option, electricity costs 20.01 c€/kWh including taxes from 1 August 2026 for 3–6 kVA connections, plus a subscription of €15.86 a month at 6 kVA. CRE puts the average regulated bill at about €1,072 a year for 4.5 MWh.
The PRM (Point Référence Mesure), also called PDL (Point de Livraison): a 14-digit number issued by Enedis or the local distribution company that identifies the dwelling’s connection. It is on the bill and on the Linky meter display, and it stays with the property.
Yes. Under the purchase obligation, EDF OA buys exported surplus under a 20-year contract. For connection requests from 5 June 2026 the tariff is 1.1 c€/kWh for systems up to 100 kWc. Systems up to 9 kWc can only export surplus, not their full output. There is no net metering.
RTE runs the transmission network and the national system. Enedis runs about 95% of the distribution network, and 114 local distribution companies such as Strasbourg Electricité Réseaux and GreenAlp run the rest. CRE regulates them all.
Linky is the network operator’s standard meter. Customers who have not had one fitted pay a meter-management charge of €6.48 before tax every two months, plus extra reading fees if no reading is sent for 12 months.
No energy licence is needed. You normally need a planning declaration from the town hall, a Consuel safety certificate, and a connection agreement with Enedis (CRAE if exporting, CACSI if not).
A regulated critical-peak option. RTE classifies each day as blue (300 days), white (43) or red (22). On red days peak power costs 72.95 c€/kWh, while blue days are cheaper than the Base tariff.