How electricity works in Isle of Man.
Isle of Man electricity 2026: Manx Utilities as sole utility, 29.5p/kWh, gas-fired Pulrose plant, 65 MW GB interconnector, 9.7p export tariff and smart meters.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Pound sterling (Isle of Man pound at par) (GBP) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Isle of Man energy at a glance.
Key figures for households in Isle of Man. Each one links to its source on the full overview below.
Electricity price.
0.295 GBP per kWh for households, including taxes. Figures for 2026.
Household use.
3,518 kWh a year for a typical household. Figures for 2024-25.
Renewable share.
0.6% of electricity from renewable sources. Figures for 2024-25.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Isle of Man.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Isle of Man below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Isle of Man requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Isle of Man.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Isle of Man, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Isle of Man, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Isle of Man.
The energy market in Isle of Man, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
The Isle of Man is a self-governing Crown Dependency with its own electricity legislation, and it sits outside the Great Britain electricity market. A single statutory board of the Isle of Man Government, Manx Utilities, generates, transmits, distributes and sells all public electricity on the Island. There is no retail competition and no separate network operator, meter operator or supplier: one organisation owns the power stations, the 33 kV, 11 kV and 400 V networks, the meters and the customer account.
Most electricity is made from natural gas at the Pulrose combined cycle gas turbine (CCGT) station in Douglas, supplied through Manx Utilities’ own gas pipeline. In 2024-25 Pulrose produced 416.9 GWh, 86% of the electricity Manx Utilities generated or bought. A 104 km AC subsea cable to Bispham in north-west England, in service since 2000, lets Manx Utilities import power from Great Britain and sell surplus generation into it: in 2024-25 it imported 39.7 GWh and exported 112.6 GWh, so the Island was a net exporter. Hydro and an energy-from-waste plant supply the small remainder.
Households pay a single published tariff of 29.5p per kWh plus 25.5p a day from 1 April 2026, with 0% VAT on domestic supplies. Manx Utilities says a typical home using 2,700 kWh a year pays £937. Homes with hardwired solar PV, wind or hydro can sell exported electricity to Manx Utilities at 9.7p per kWh under the Sustainable Generation tariff, up to 10 kW of export capacity, but nothing may be connected without Manx Utilities’ written approval. Tynwald’s Climate Change Plan 2022–2027 commits Manx Utilities to decarbonising the power system by 2030; onshore wind, utility solar and a second interconnector are still at planning or feasibility stage in 2026.
Energy snapshot.
Headline figures for electricity in Isle of Man. Each shows its data year and links to its source.
- Population84,975 peopleSource 252025
- Households37,220 householdsSource 242021
- Average household size2.22 people/householdSource 242021
- Electricity use per household3,518 kWh/yrSource 42024-25
- Household price (GBP)0.295 GBP/kWhSource 12026
- Household price (EUR)0.348 EUR/kWhSource 332026
- Renewable electricity share0.6%Source 42024-25
- Solar capacityNot identified from a reliable public source.
- Wind capacity0 GWSource 42024-25
- Energy storage capacityNot identified from a reliable public source.
- Smart-meter share50%Source 4Mar 2025
- Market structure
- Vertically integrated
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- No independent electricity regulator; Manx Utilities (a statutory board) sets tariffs under a Pricing Strategy approved by Tynwald. CURA regulates gas tariffs and telecoms only.
- System operator
- Manx Utilities
- Distribution networks
- Single network owner and operator: Manx Utilities runs the 33 kV transmission, 11 kV distribution and 400 V low-voltage networks across the whole Island.
- Currency
- Pound sterling (Isle of Man pound at par) (GBP)
- Voltage and frequency
- 230 V (+10%/−6%) / 50 Hz
Electricity prices in Isle of Man.
- Household price (GBP)
- 0.295 GBP/kWh (2026)Source 1Standard domestic unit rate from 1 April 2026, with a standing charge of 25.5p a day. Domestic VAT is 0%. A 1% prompt-settlement discount applies if a bill is paid within 12 working days. At 2,700 kWh a year the all-in average is about 32.9p/kWh (derived from Manx Utilities’ £937 typical bill).
- Household price (EUR)
- 0.348 EUR/kWh (2026)Source 33Converted from 29.5p/kWh at the ECB euro reference rate of €1 = £0.84763 on 9 October 2026.
- Typical annual electricity bill
- 937 GBP/yr (2026-27)Source 2Manx Utilities’ figure for a typical domestic customer using 2,700 kWh a year at the 1 April 2026 tariff (up £14 from £923). At the 2024-25 average domestic consumption of about 3,500 kWh the bill would be higher.
There is one supplier and one set of published tariffs. Manx Utilities reviews tariffs annually and applies changes from 1 April under a five-year Pricing Strategy approved by Tynwald in December 2024, which links annual changes to inflation. For April 2026 the Board limited the electricity increase to 1.5%, below the 2.9% CPI figure the strategy would normally have applied.
What is on the bill
A domestic bill has two elements: a unit rate per kWh and a daily standing charge, which Manx Utilities says recovers a contribution to its fixed costs and the metering. Domestic electricity carries VAT at 0%; Manx Utilities notes that VAT may return to 5% in April 2027. Business supplies pay 20% VAT unless they use under 33 units a day. There are no separate network, policy or environmental levies of the kind seen on GB bills, because one body recovers all its costs through the tariff.
Fuel cost adjustment
Manx Utilities can add a Fuel Cost Adjustment to the unit rate to reflect variable generation fuel costs without changing the published tariff. It was introduced during the energy crisis and remains under quarterly review. During that crisis Manx Utilities absorbed around £40 million of exceptional wholesale costs rather than pass them straight to bills. It buys a large share of its gas in advance; about 75% of 2026-27 gas needs had been secured by March 2026.
How prices compare
Manx Utilities said in March 2026 that its tariff had been below the GB Ofgem default tariff cap but would sit above it from April 2026, after the GB cap was cut when some policy costs moved to taxation. Billing is quarterly in arrears for most homes, and price changes apply from the first full billing quarter after 1 April rather than pro rata.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Standard domestic (billed quarterly): 29.5p/kWh plus 25.5p a day from 1 April 2026. £1.50 off each quarterly bill for paying by Direct Debit with e-billing; 1% prompt-settlement discount. |
| Prepayment | Yes | SmarterPAYG on a smart meter at the same 29.5p/kWh and 25.5p/day, with the 1% discount and 0% VAT built in. Top up through the SmarterLiving app, web portal or shops; maximum balance £250. |
| Off-peak | Limited | Comfy Heat two-rate tariff for homes heated only by electricity: 29.5p peak, 17.4p off-peak for 8 hours (00:00–06:00 and 14:00–16:00 GMT; 01:00–07:00 and 15:00–17:00 in summer time), standing charge 25.5p/day. Not available with gas, oil or hybrid heat pump heating. |
| Time-of-use | Limited | Domestic EV tariff for homes with off-street parking and a hardwired charge point: 29.5p peak, 19.7p off-peak 00:00–07:00 GMT (01:00–08:00 in summer time), standing charge 25.5p/day. |
| Other | Yes | Basic domestic tariff for customers who opt out of a smart meter (meter fitted without its communications module): 29.5p/kWh plus a higher 74.3p a day to cover manual reading. |
| Dynamic | No | No dynamic or half-hourly wholesale-linked tariff is offered; Manx Utilities changes tariffs once a year. |
Household prices compared with neighbouring countries (EUR per kWh).
- Ireland€0.404
- Isle of Man€0.348
- United Kingdom€0.308
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 3,518 kWh/yr (2024-25)Source 4Derived: 154 million kWh of domestic electricity sales divided by the 43,774 homes Manx Utilities supplied in 2024-25. Manx Utilities uses 2,700 kWh a year as its "typical domestic customer" for tariff comparisons.
- Average daily use per household
- 9.6 kWh/day (2024-25)Source 4Derived from average domestic consumption of about 3,518 kWh a year (154 GWh across 43,774 homes). Manx Utilities’ typical-customer figure of 2,700 kWh a year equals about 7.4 kWh a day.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 4,380 kWh/person/yr (2024-25)Source 4Derived: Island demand of 372.2 GWh (all sectors, including works power and network losses) divided by the 84,975 population estimate for 2025.
- Heat pumps
- 794 households (2021)Source 242.1% of households reported a heat pump at the 2021 census. Manx Utilities had 567 customers on heat-pump arrangements in March 2025 and had itself installed 144 heat pumps.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- 1,214 households with at least one EV (2021)Source 243.3% of households in 2021. Manx Utilities had 988 customers on EV tariffs (931 domestic) and 133 public charging sockets in March 2025.
- Electric cooking
- Not identified from a reliable public source.
Manx Utilities sold 329 GWh of electricity on the Island in 2024-25: 154 GWh to homes, 55 GWh to non-domestic customers, 120 GWh to industrial customers and 1 GWh for public lighting. Domestic sales rose slightly from 148 GWh the year before, but Manx Utilities reports that overall electricity demand has been declining. Island demand including losses was 372.2 GWh.
Electricity is a minority heating fuel. At the 2021 census 50% of households used mains gas for central heating and 39.4% used oil; 1,766 households had electric central heating. Mains gas reaches about 20,000 customers through Manx Utilities’ pipeline network, with retail gas sold by Manx Gas. Since 1 January 2025 fossil-fuel heating has been banned in new buildings, so new homes are expected to use heat pumps or other electric heating.
Average demand on the Island system is about 40 MW across the year, and summer minimum demand is below 25 MW, according to Manx Utilities. Electric vehicles are supported by a domestic EV tariff and a public charging network run by Manx Utilities; work on the Island’s first ultra-rapid public charger at Douglas Sea Terminal began in July 2026.
Housing and households.
- Dwellings
- Not identified from a reliable public source.
- Owner-occupied
- 64.2% (2021)Source 24Derived: 14,549 owned outright (39.1%) plus 9,333 buying with a mortgage or loan (25.1%), out of 37,220 households.
- Private rented
- 18.2% (2021)Source 246,784 households.
- Social or public housing
- 15.7% (2021)Source 24Derived: 5,862 households renting in the public sector out of 37,220.
- Houses
- 81.2% (2021)Source 24Derived: detached 14,119 (37.9%), semi-detached 8,716 (23.4%) and terraced 7,405 (19.9%) households out of 37,220.
- Apartments and flats
- 18.7% (2021)Source 24Derived: purpose-built flats 4,870, flats in converted houses 1,571 and flats in commercial buildings 520, out of 37,220 households.
- Urban population
- Not identified from a reliable public source.
Housing on the Isle of Man is dominated by houses rather than flats: more than 80% of resident households live in a detached, semi-detached or terraced house, and detached houses alone account for nearly 38%. Owner-occupation is about 64%, and the share owned outright rose from 33.7% in 2011 to 39.1% in 2021 as the population aged.
Households are getting smaller (2.22 people on average in 2021, down from 2.28 in 2016), so the number of households rose faster than the population. Government retrofit work has focused on typical Manx property types such as stone cottages, Victorian terraces and 1970s bungalows. The high share of detached and semi-detached houses with their own roofs is relevant for rooftop solar, but every connection still needs Manx Utilities’ approval.
How the grid works in Isle of Man.
- TransmissionManx Utilities, Manx Cable Company Limited
- DistributionSingle network owner and operator: Manx Utilities runs the 33 kV transmission, 11 kV distribution and 400 V low-voltage networks across the whole Island.
- MeteringManx Utilities
- Supply1 or more retail suppliers
Physical system
The Island’s electricity system has three levels: a 33 kV transmission network, which was largely rebuilt in the 1990s and 2000s, an 11 kV distribution network and the 400 V low-voltage network that serves homes. The Energy Strategy 2024 notes no obvious 33 kV capacity limits up to 2030, but more substantial issues at distribution and low voltage, where some assets are over 100 years old.
Generation is concentrated at Pulrose in Douglas, where an 88 MW CCGT opened in 2003 sits beside the older Pulrose D station, giving nearly 135 MW in total. Peel power station (nearly 40 MW) and the Pulrose diesel units provide back-up and load-management services. The 1.2 MW Sulby hydro station and an energy-from-waste plant run by an independent producer add small amounts of power. The CCGT reaches the end of its life in the mid-2030s.
The interconnector
The 104 km AC subsea cable from Port Skillion to Bispham, laid in 2000 by Manx Cable Company with National Grid, was the world’s longest AC subsea cable when built. Manx Utilities describes it as a 65 MW link to the 132 kV system in north-west England. It has been out of service for only 26 days in 25 years and reached 99.1% availability in 2024-25. Manx Utilities buys power when GB prices are lower than running Pulrose and sells surplus gas-fired generation into GB when that is profitable: 35% of what it generated in 2024-25 was exported.
Commercial flow
There is no wholesale market on the Island. Manx Utilities buys gas, generates, buys imports, and sells to every customer at its published tariffs. Because the Isle of Man is not part of the UK, Island generators cannot earn UK Renewables Obligation certificates, Contracts for Difference or REGOs, so power sold into GB earns only the GB wholesale price at the time. Manx Utilities says private generators would probably have to declare expected output and share balancing costs on the interconnector.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Department of Environment, Food and Agriculture (DEFA) | Responsible for Isle of Man energy policy, the Energy Strategy (2023, updated 2024), offshore energy policy and household energy schemes. Planning & Building Control also sits within DEFA. |
| Regulator | Tynwald (no independent electricity regulator) | There is no economic regulator for electricity. Manx Utilities’ five-year Pricing Strategy is approved by Tynwald, the Island’s parliament, which also approved the Climate Change Plan target to decarbonise power by 2030. The Communications and Utilities Regulatory Authority (CURA) regulates telecoms and, since 2022, domestic gas tariffs, but not electricity. |
| TSO | Manx Utilities | Statutory board of the Isle of Man Government that owns and operates the power stations, the 33 kV transmission network and the Island side of the interconnector, dispatches generation and trades power with Great Britain. Under the Electricity Act 1996 it must keep the network safe and stable and generate or buy electricity in the most economical way. |
| DSO | Manx Utilities | Also owns and runs the 11 kV distribution and 400 V low-voltage networks: about 540 km of overhead line and 1,380 km of underground cable. Handles all new connections, tariff changes and generation applications through its Electricity Network Enquiry process. |
| Supplier | Manx Utilities | The only electricity supplier. Bills about 43,800 homes and 6,000 businesses, runs SmarterPAYG prepayment and pays the Sustainable Generation export tariff. |
| Metering | Manx Utilities | Owns every meter and is replacing all of them (nearly 50,000) with smart meters that report over its own private low-power radio network. |
| System operator | Manx Cable Company Limited | Manx Utilities subsidiary responsible for operating and maintaining the 104 km AC subsea interconnector between the Isle of Man and north-west England, built in 2000 with National Grid. |
Compared with the UK system.
| UK concept | Isle of Man equivalent | How it works |
|---|---|---|
| DNO | Manx Utilities (network owner and operator) | There is no separate distribution company. Manx Utilities owns and runs every voltage level on the Island (33 kV, 11 kV and 400 V), so it is also the body that approves connections and generation. |
| National Grid/NESO | Manx Utilities control room at Pulrose | Manx Utilities balances the Island system itself, dispatching Pulrose, Peel and Sulby and scheduling flows on the interconnector. The interconnector is a distribution interconnector embedded in the GB network at 132 kV in north-west England; Manx Utilities trades across it with GB market participants and must declare and meet its positions to avoid imbalance penalties. |
| MPAN | Manx Utilities account number and meter number | No MPAN-style national supply number is used. Manx Utilities identifies a supply by the property, its meter number and the customer’s Manx Utilities account. There is no registration or switching system because there is only one supplier. |
| MPRN | Manx Gas customer account | Mains gas is retailed by Manx Gas to about 20,000 customers, supplied through Manx Utilities’ high-pressure pipeline. Manx Gas is a separate company whose domestic tariffs are regulated by CURA. No gas meter-point numbering scheme was verified. |
| Meter operator | Manx Utilities | Manx Utilities owns, installs and maintains all electricity meters. Smart meters are fitted free of charge; metering costs are recovered through the standard tariff. |
| Supplier | Manx Utilities (sole supplier) | Households cannot switch supplier. They choose between Manx Utilities tariffs (standard, Comfy Heat, EV, prepayment) and pay a minimum £200 + VAT engineering charge to move to a different tariff. |
| Smart-meter infrastructure | Manx Utilities private smart metering network | Unlike GB, there is no DCC or SMETS standard. Meters report over a dedicated, Manx Utilities-owned low-power network in the 2.4 GHz licence-free band, not the mobile network, and data is shown to customers in the SmarterLiving app at 30-minute resolution. |
How a supply point is identified.
Account 48 120 375 (fictional)
Fictional example in the real format.
| Question | Answer |
|---|---|
| What is it called? | Manx Utilities account number and meter number |
| Who issues it? | Manx Utilities |
| Format | An 8-digit customer account number, plus the serial number of the meter at the property. Smart meters can be recognised by the letter "S" within the meter number. No MPAN-style supply-point number is used. |
| Length | 8 digits (account number); meter-number format not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | The account number is printed on bills, included in SmarterPAYG text-message alerts and shown on the help page of the SmarterLiving app. The meter number is shown on the meter itself. |
| Electronic access | Smart-meter customers can see their consumption at 30-minute resolution, balance and bills in the SmarterLiving app and web portal, using the email address registered with Manx Utilities. |
| Third-party access | A trusted friend or relative can be given permission to top up through the app or portal, or use the account number to top up in a shop. No framework for sharing meter data with third-party energy-service companies was identified. |
| Who keeps the register | Manx Utilities’ own customer and meter records. There is no separate national registry or data hub. |
| Register scope | National |
Because one organisation is network owner, meter owner and supplier, the Isle of Man has no need for a standard supply-point number that different companies can use to transfer a customer. A supply is identified internally by Manx Utilities from the property, the meter installed there and the customer’s account.
Account number
Each customer has a unique 8-digit Manx Utilities account number. It is printed on bills, and for prepayment (SmarterPAYG) customers it is given when the smart meter is fitted or when the account is switched to pay-as-you-go. It is what a shop needs to top up a prepayment account. Whether the same number stays with a property when occupiers change is not stated by Manx Utilities, so it should be treated as a customer account reference rather than a permanent property identifier.
Meter number
The meter stays at the property and is owned by Manx Utilities. When moving home, customers are asked to note the meter number and reading at both properties on the handover day and submit them through Manx Utilities’ online moving form; the supply is not disconnected when a property is vacated. A smart meter has the letter "S" in its meter number, and because smart meters can work for either standard billing or SmarterPAYG, people taking over a property with a smart meter are asked to phone Manx Utilities to make sure the supply continues.
Reading codes
Bills show a letter after each reading: for example A (actual), C (customer), E (estimated), M (remote reading) and S (smart meter read). New customers pay a refundable security deposit of £120 (or £200 for Comfy Heat customers) and set up a monthly Direct Debit.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Fixed export rate of 9.7p per kWh under Manx Utilities’ Domestic Sustainable Generation tariff, an add-on to the customer’s import tariff, for hardwired renewable systems with up to 10 kW export capacity. |
| Is there a size limit? | The Sustainable Generation tariff covers installations with a maximum export capacity of up to 10 kW, and Manx Utilities may reduce this after network studies if the installation could affect the network. |
| Which technologies qualify? | Hardwired renewable generation: solar PV, wind turbines, hydro generators or a combination. Plug-in devices do not qualify. |
| Which standards apply? | ENA Engineering Recommendations G98, G99 or G100, with equipment listed on the ENA Connect Direct database, and BS 7671 wiring regulations. |
| Can I use plug-in (balcony) solar? | Yes from 27 August 2026, with Manx Utilities’ consent: one kit per household of 800 W or less, listed as compliant on ENA Connect Direct, plugged directly into a socket with no extension leads or adapters. A smart meter is required. Plug-in systems are not paid the export tariff, and stand-alone plug-in batteries are not permitted. |
| Can I connect first and tell the utility later? | No. Because Isle of Man legislation differs from the UK, generation must not be connected to the Manx Utilities network until written approval has been received. The UK "connect and notify" route does not apply. |
Connecting a home system.
- Talk to a Part P–registered electrical contractor about the system; all domestic electrical work must be certified under Part P of the Building Regulations.
- Submit an Electricity Network Enquiry form to Manx Utilities with a photo of the meter position, details and data sheets for all equipment, and the relevant ENA EREC G98, G99 or G100 application form.
- Manx Utilities carries out network studies and issues a formal quotation; the minimum charge is £200 + VAT if no network work is needed.
- Accept the quotation; any network or service-cable work is carried out by Manx Utilities.
- Install the system, then provide type-test certification and the G98, G99 or G100 commissioning form.
- Connect only after written approval from Manx Utilities; the Sustainable Generation tariff then pays for exported units.
Households can export, but only with Manx Utilities’ prior written approval and on its terms. The Domestic Sustainable Generation tariff is an add-on to a normal import tariff that pays a fixed 9.7p for each exported kWh, about a third of the 29.5p import rate, so using solar output on site saves more than exporting it. There is no net metering. In March 2025 there were 200 Sustainable Generation customers (180 domestic and 20 small commercial).
Switching to the Sustainable Generation tariff carries Manx Utilities’ standard tariff-change charge of at least £200 + VAT, plus any network work its engineers find is needed. Larger private generators face a different position: Manx Utilities says applications to date add up to intermittent capacity far above the Island’s peak demand and the interconnector’s export capability, that applications will need to be prioritised, and that it believes renewable capacity should be offered through a fair competitive process.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity (household/small scale) | No generation licence identified; written approval from Manx Utilities is required before connection, under G98/G99/G100. | Manx Utilities | Export capacity up to 10 kW for the Sustainable Generation tariff. Plug-in solar up to 800 W also needs consent. |
| Generate electricity (utility scale) | Planning approval for ground-mounted schemes, a Consent Order for solar connected to the public power system, and a connection agreement with Manx Utilities. | DEFA Planning & Building Control; Manx Utilities; Tynwald for major public projects | Manx Utilities prefers a competitive process for new renewable capacity. Offshore projects in Manx waters are consented under the Marine Infrastructure Management Act 2016. |
| Store electricity (home battery) | No licence identified; hardwired systems need Manx Utilities’ approval through a Network Enquiry. Stand-alone plug-in batteries are not permitted. | Manx Utilities | A battery may be accepted as part of a compliant integrated plug-in solar kit. Existing PV or battery owners must contact Manx Utilities before adding plug-in solar. |
| Export electricity to the grid | Permitted only under an approved connection; paid via the Sustainable Generation tariff. | Manx Utilities | Fixed 9.7p/kWh; hardwired systems only. |
| Sell or supply electricity to consumers | Not open to competition: Manx Utilities is the sole supplier. No supply-licensing regime for third parties was identified. | Manx Utilities (statutory duties under the Electricity Act 1996) | Tariffs set by Manx Utilities under a Tynwald-approved Pricing Strategy. |
| Aggregate, run a VPP or offer grid services | No market or licence route exists; Manx Utilities balances the system itself. | Manx Utilities | Demand-side management is being considered in government strategy, but no third-party scheme is in place. |
| Wholesale trading and balancing | Carried out only by Manx Utilities, trading with GB market participants across the interconnector. | Manx Utilities | Island generation cannot access UK ROCs, CfDs or REGOs; private exports to GB would have to be arranged with Manx Utilities. |
| Remote control of customer assets | No framework identified; tariffs with fixed off-peak windows are the only load-shifting mechanism. | Manx Utilities | Customers on Comfy Heat and EV tariffs must time their own use to the meter clock. |
| Electrical installation work in homes | Must comply with Part P (Electrical Safety – Dwellings) of the Building Regulations; non-compliance is a criminal offence. | DEFA Planning & Building Control | Use a Part P competent-person-scheme electrician, or notify Building Control in advance and pay inspection fees. |
Licensing on the Isle of Man is short because the market is closed. The Electricity Act 1996, the Electricity Supply Regulations 1991 and the Gas and Electricity Act 2003 govern how Manx Utilities supplies electricity, and they give Manx Utilities control over what connects to its network. In practice the gatekeeper for every activity that touches the grid is Manx Utilities’ approval process, not a licence from a regulator.
For households this means two separate approvals: Part P building regulation compliance for the electrical work, and Manx Utilities’ written consent before any generator, battery or plug-in solar kit is connected. For larger projects, planning permission, Manx Utilities’ connection terms and, for publicly owned schemes, Tynwald approval decide whether a scheme proceeds. The Energy Strategy 2024 notes that regulatory arrangements with the UK would also be needed for some options, such as connecting the proposed Mooir Vannin offshore wind farm.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Wholesale and balancing (GB, via the interconnector) | No | — | No | Manx Utilities. Only Manx Utilities trades with GB market participants. It has also used Pulrose D and Peel to provide load-management services to the UK. Island households and small generators have no route to these markets. |
| Demand-side management on the Island | Developing | — | No | Manx Utilities. Government policy is to encourage demand-side management, and Manx Utilities is assessing ways to reduce peak demand. Today it is limited to fixed off-peak windows on the Comfy Heat and EV tariffs. |
There is no flexibility market on the Isle of Man. Manx Utilities balances the system using its own generation and the interconnector, and the only price signal households receive is a fixed off-peak period on two specialist tariffs.
Smart meters give Manx Utilities near-real-time visibility of network loading and voltage rise from rooftop generation for the first time. The Energy Strategy 2024 identifies microgrids, demand-side management and strategic network upgrades as areas to develop, and Manx Utilities is running feasibility work on flexible generation and on storage as an instant back-up for the interconnector. No date has been set for opening any of this to third parties.
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | Island-wide replacement of nearly 50,000 meters by Manx Utilities; over 24,000 installed by March 2025 and installation continuing in 2026. |
| Reading interval | 30 minutes (consumption shown in the SmarterLiving app) |
| Owner and installer | Manx Utilities |
| Communications | Private low-power network, 2.4 GHz licence-free band (not mobile) |
| Cost to customer | No installation charge; costs recovered through tariffs |
| Opt-out | Meter without comms module; Basic tariff with 74.3p/day standing charge |
| Prepayment | SmarterPAYG, same tariff as credit customers |
| In-home display | Not provided; SmarterLiving app and web portal instead |
Manx Utilities is replacing every electricity meter on the Island, domestic and business, with a smart meter. It says the old meters are no longer manufactured and that smart meters will end estimated bills and help integrate microgeneration and renewables. The meters send readings over a dedicated low-power network owned and operated by Manx Utilities, which does not depend on mobile signal. More than 24,000 had been fitted by 31 March 2025, and the focus is moving to businesses under the SmarterBusiness brand.
Customers who refuse a smart meter get the same meter without its communications module and move to the Basic tariff, which has a standing charge of 74.3p a day instead of 25.5p, to cover manual reading. Smart meters also make prepayment simpler: SmarterPAYG customers top up by card in the app or portal, or in shops using their account number, and a smart meter is a condition for connecting plug-in solar.
Renewable electricity.
Electricity generation mix (2024-25).
- Natural gas (Pulrose CCGT): 93.7%
- Energy from waste: 5.3%
- Hydro (Sulby): 0.6%
- Diesel (Pulrose and Peel): 0.4%
- Renewable electricity share
- 0.6% (2024-25)Source 4Derived: Sulby hydro (2.6 GWh) as a share of the 445.1 GWh generated on the Island in 2024-25 (Pulrose gas 416.9, energy from waste 23.7, hydro 2.6, diesel 1.9). The renewable part of the energy-from-waste output and small rooftop systems are not reported separately and are excluded. The Island was a net exporter in 2024-25 (112.6 GWh exported, 39.7 GWh imported), so a generation share is used. Manx Utilities also imported 10.9 GWh of certified green electricity from Great Britain to back its green tariff.
- Home solar
- 631 households (2021)Source 241.7% of households reported solar panels at the 2021 census; 415 had solar water heating.
- Solar added each year
- Not identified from a reliable public source.
- Gas and diesel (Pulrose)
- 0.135 GW (2026)Source 5"Nearly 135 MW", including the 88 MW CCGT and Pulrose D.
- Diesel (Peel)
- 0.04 GW (2026)Source 5"Nearly 40 MW".
- Hydro (Sulby)
- 0.001 GW (2026)Source 5Two 600 kW turbines.
- Solar PV
- Not identified from a reliable public source.
- Wind
- 0 GW (2024-25)Source 4No utility-scale wind in operation.
Targets.
- Decarbonise the Island’s electricity system by 2030 (Climate Change Plan 2022–2027, approved by Tynwald in 2022).
- Net zero greenhouse gas emissions by 2050 (Climate Change Act).
- Original Island Plan objectives: 20 MW onshore wind and 10 MW of solar on public buildings and car parks by 2026, and a new interconnector by 2030. These dates have slipped: neither the wind farm nor a second interconnector had reached a final decision by August 2026.
Renewables supply very little of the Island’s electricity. Sulby hydro gave 2.6 GWh in 2024-25, under 1% of generation, and the rest of local output came from natural gas, the energy-from-waste plant and a little diesel. Manx Utilities estimates the carbon intensity of Island electricity at 0.41 kg CO2/kWh, with Pulrose producing more than 99% of its generation emissions.
Manx Utilities’ Energy Transition Programme is meant to deliver the 2030 target. The Cair Vie onshore wind farm at Earystane is at pre-application stage; in May 2026 Manx Utilities said a planning application was being prepared and that nothing had been approved or procured. Other onshore wind sites have been ruled out for the foreseeable future. On solar, planning approval for a rooftop array at the National Sports Centre was granted in August 2026, and ground-mounted (Balladoole) and floating (Sulby Reservoir) solar are under feasibility study.
Offshore wind is a separate, larger opportunity. Ørsted holds an agreement for lease for the Mooir Vannin project in Manx waters, to be consented under the Marine Infrastructure Management Act 2016. The government is exploring whether its link to the GB grid could also serve as a second interconnector, but says technical, commercial and UK regulatory issues remain.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- Not identified from a reliable public source.
Storage is at the study stage. Manx Utilities’ 2024-25 annual report says that alternatives to an early second interconnector, including battery storage to back up the existing cable instantly and changes to trading strategy, have been investigated. Its 2026 programme updates describe market engagement but no investment decision.
For homes, hardwired batteries go through the same Network Enquiry approval as generators. Stand-alone plug-in batteries are not permitted, although a battery built into a compliant plug-in solar kit may be accepted.
Storage projects.
- Flexible generation and storage feasibility (Manx Utilities): Ongoing feasibility and market engagement on technologies that could add flexibility, stability and resilience, including battery storage as an instant back-up to the interconnector. No commitment to a specific project.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Manx Utilities | 100% (sole supplier) | Limited | Limited | No | Yes |
Manx Utilities is the only electricity supplier on the Isle of Man. Its 2024-25 annual report mentions a "guaranteed green tariff", backed by 10.9 GWh of green electricity imported from Great Britain, but no domestic green tariff is listed on its current domestic tariff page, so availability is shown as limited. Business customers have separate tariffs, including maximum-demand tariffs for supplies above 50 kVA.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Department of Environment, Food and Agriculture – Energy Policy Team | Government | Energy policy and Energy Strategy | Sets the Island’s energy policy, offshore energy work and household energy schemes. |
| Net Zero Isle of Man | Government | Government climate and home-energy information | Publishes updates on the Heat Wise Home scheme and clean-heat rules for new buildings. |
| Planning & Building Control (DEFA) | Government | Planning permission and building regulations, including Part P | Decides planning for ground-mounted and conservation-area solar and keeps the list of Part P electrical contractors. |
| Manx Utilities | Distribution | Vertically integrated electricity, gas transmission, water and wastewater utility | Generator, network owner, system operator, meter owner and sole supplier; approves every grid connection. |
| Manx Cable Company Limited | Transmission | Interconnector owner-operator (Manx Utilities subsidiary) | Operates and maintains the subsea link to Great Britain. |
| Communications and Utilities Regulatory Authority (CURA) | Regulator | Telecoms regulator and domestic gas tariff regulator | The Island’s utilities regulator, but its powers cover gas tariffs and telecoms, not electricity. |
| Statistics Isle of Man | Government | Census and population statistics | Source for household, housing and heating data. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid connection of generation | ENA EREC G98, G99 and G100 | Energy Networks Association (applied by Manx Utilities) | Applied as on GB networks, but with prior written approval from Manx Utilities rather than connect-and-notify. |
| Inverter and device compliance | ENA Connect Direct type-test register | Energy Networks Association | Plug-in solar kits must be listed as compliant; type-test certificates are required for PV. |
| Wiring | BS 7671 IET Wiring Regulations | IET / BSI | All equipment must meet the current edition; EV charge points included. |
| Installer competence | Part P (Electrical Safety – Dwellings), Building Regulations | Isle of Man Government (Building Control) | Work certified by a Part P competent-person-scheme electrician, or notified to Building Control in advance. UK installer certification schemes for incentives do not apply. |
| Supply characteristics | General Conditions for the Supply of Electricity (Revision 8, 2023) | Manx Utilities | 230 V +10%/−6%, 50 Hz ±0.5 Hz; Test Certificate and Connection Form needed for new loads and alterations. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Manx Utilities written approval | Yes | National | Required before connecting any generation, including plug-in solar. Applied for through an Electricity Network Enquiry; minimum £200 + VAT for a tariff change. |
| Planning permission (rooftop solar) | Limited | National | Rooftop installations may not need planning permission if they meet permitted-development criteria; restrictions apply in conservation areas. |
| Planning permission (ground-mounted solar) | Yes | National | Ground-mounted solar projects require planning approval. |
| Building regulations (Part P) | Yes | National | Domestic electrical work must comply with Part P and be certified by a registered electrician, or notified to Building Control before work starts. |
| Consent Order | Limited | National | Manx Utilities states that solar installations connected to the public power system require a Consent Order; its solar FAQ addresses utility-scale projects, and the requirement for small domestic systems is not spelt out. |
The Island has one planning authority, within DEFA, and one network company, so permissions are the same everywhere on the Island. The key difference from Great Britain is that no generator may be connected on a notify-afterwards basis: Manx Utilities must approve the equipment first. Plug-in solar applications are free; hardwired systems moving to the export tariff pay the standard tariff-change charge.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Domestic Sustainable Generation tariff | Active | Export payment | Fixed 9.7p per exported kWh for hardwired solar PV, wind or hydro with up to 10 kW export capacity. Plug-in solar does not qualify. | — |
| 0% VAT on domestic electricity | Active | VAT relief | Domestic electricity is zero-rated for VAT. Manx Utilities notes VAT may return to 5% in April 2027. | — |
| Heat Wise Home scheme | Scheduled | Grant | Approved by Tynwald on 23 July 2026 but not yet open. It will support air-source heat pumps, radiator upgrades, insulation, glazing, ventilation and smaller efficiency measures. Run by DEFA with Manx Utilities. | — |
| Energy Efficiency Scheme | Closed | Grant (free materials) | Free energy-saving materials worth up to £820 per eligible household, plus up to £525 towards installation. Closed to new applications after 24 August 2026; installations and claims for approved vouchers are being completed in October 2026. | 2022 – 2026 |
| UK schemes (Smart Export Guarantee, Boiler Upgrade Scheme, ROCs, CfDs) | Closed | Not available | The Isle of Man is not eligible for UK renewable incentives such as feed-in tariffs, Renewables Obligation certificates or Contracts for Difference. | — |
Data and connectivity.
- Fixed broadband
- Not identified from a reliable public source.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Smart meters do not rely on public telecoms: Manx Utilities runs its own low-power radio network in the 2.4 GHz licence-free band. Customers see their data through the SmarterLiving app or web portal. Manx Utilities also owns a fibre-optic cable laid beside the power interconnector, and its subsidiary e-llan Communications was set up to use spare capacity on it (it is now listed as dormant).
Fibre broadband has been rolled out under the National Broadband Plan, with Manx Telecom as the delivery partner and government funding for nine intervention zones where the commercial case was weak.
Grid conditions.
- National peak demand
- Not identified from a reliable public source.
- Annual electricity demand
- 0.372 TWh (2024-25)Source 4Island demand including works power and network losses (372.2 GWh). Sales to Island customers were 329 GWh.
- Generation capacity
- 0.176 GW (2026)Source 5Derived: Pulrose (nearly 135 MW) + Peel (nearly 40 MW) + Sulby hydro (1.2 MW). Excludes the independently owned energy-from-waste plant, whose capacity is not stated.
- Interconnection
- 0.065 GW (2026)Source 6Manx Utilities describes the subsea cable as 65 MW; its developer guidance refers to export capacity on the "existing 60MW interconnector".
- Curtailment
- Not identified from a reliable public source.
The system is small: average demand is about 40 MW, and summer minimum demand is below 25 MW. That makes it sensitive to large blocks of variable generation. Manx Utilities has received connection enquiries adding up to far more intermittent capacity than the Island’s peak demand and the interconnector’s export capability, and says firm capacity may be needed to cover imbalances.
Reliability is generally good. Customer minutes lost were 36.5 in 2024-25, nine of them caused by storms Darragh and Éowyn. Manx Utilities is also studying how to restore supply more quickly after a major outage (black start) and how to keep the system stable as the generation mix changes.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| Plug-in solar permitted with consent | Current | 27 August 2026 | One plug-in solar kit of up to 800 W per household, ENA Connect Direct-listed, with Manx Utilities’ approval and a smart meter. No export payment. |
| April 2026 electricity tariff | Current | 1 April 2026 | 1.5% increase to 29.5p/kWh and 25.5p/day, below the CPI-linked 2.9% allowed by the Tynwald-approved Pricing Strategy. |
| Fossil-fuel heating banned in new buildings | Current | 1 January 2025 | New houses, extensions and commercial buildings must use a permitted clean-heat alternative, raising future electric heating demand. |
| Heat Wise Home scheme launch | Upcoming | Opening date not announced (approved 23 July 2026) | Support for air-source heat pumps and insulation, replacing the Energy Efficiency Scheme. |
| Possible return of VAT on domestic electricity | Upcoming | April 2027 | Manx Utilities notes that domestic VAT may return to 5% from 0%. |
| Cair Vie onshore wind farm planning application | Upcoming | Not yet submitted (May 2026) | Planned 20 MW wind farm at Earystane; needs planning consent and Tynwald consideration before procurement. |
| Decarbonised electricity target and future interconnection | Upcoming | 2030 | Target to decarbonise the power system by 2030. A second interconnector, flexible clean generation and storage are under feasibility study, with no final investment decision as of August 2026. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Medium | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Medium | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | 1.7% of households had solar panels in 2021 (631); 200 Sustainable Generation export customers in March 2025. |
| Distributed energy market | Low | Export allowed only with prior approval, capped at 10 kW for the tariff and paid a fixed 9.7p/kWh; plug-in solar only permitted from August 2026. |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market on the Island; Manx Utilities alone trades with GB. |
| Energy storage adoption | Low | No grid-scale storage operating; batteries only at feasibility stage; stand-alone plug-in batteries not permitted. |
| Renewable growth environment | Low | Under 1% of 2024-25 generation from hydro; planned wind and solar projects still at planning or feasibility stage in 2026. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 33 sources
- Domestic tariffs. Manx Utilities, 2026. accessed 9 October 2026.
- Manx Utilities confirms April 2026 tariff update. Manx Utilities, 2026. accessed 9 October 2026.
- Your electricity bill explained. Manx Utilities, 2026. accessed 9 October 2026.
- Annual Report & Financial Statements 2024/2025. Manx Utilities, 2025. accessed 9 October 2026.
- Power stations. Manx Utilities. accessed 9 October 2026.
- Subsea cable. Manx Utilities. accessed 9 October 2026.
- Manx Utilities Celebrates 25 Years of Subsea Power Interconnection. Manx Utilities, 2026. accessed 9 October 2026.
- Information for developers. Manx Utilities. accessed 9 October 2026.
- Transition Programme. Manx Utilities. accessed 9 October 2026.
- Cair Vie Updates. Manx Utilities, 2026. accessed 9 October 2026.
- Future Electricity Interconnection. Manx Utilities, 2026. accessed 9 October 2026.
- Planning Approval Secured for National Sports Centre Rooftop Solar Project. Manx Utilities, 2026. accessed 9 October 2026.
- Solar Projects – Frequently Asked Questions. Manx Utilities, 2026. accessed 9 October 2026.
- Plug-In Solar. Manx Utilities, 2026. accessed 9 October 2026.
- Electricity network enquiry. Manx Utilities. accessed 9 October 2026.
- Moving property. Manx Utilities. accessed 9 October 2026.
- About SmarterPAYG. Manx Utilities. accessed 9 October 2026.
- About smart meters. Manx Utilities. accessed 9 October 2026.
- Smart metering FAQ. Manx Utilities. accessed 9 October 2026.
- The installation plan. Manx Utilities. accessed 9 October 2026.
- General Conditions for the Supply of Electricity (Revision 8). Manx Utilities, 2023. accessed 9 October 2026.
- Test certificate and connection form. Manx Utilities. accessed 9 October 2026.
- Manx Utilities structure. Manx Utilities, 2026. accessed 9 October 2026.
- 2021 Isle of Man Census Report Part II. Statistics Isle of Man, 2021. accessed 9 October 2026.
- Isle of Man Population Report 2025. Statistics Isle of Man, 2025. accessed 9 October 2026.
- Energy Strategy 2024 (GD 2024/0112). Isle of Man Government / Tynwald, 2024. accessed 9 October 2026.
- Regulating Energy – technical guidance implications for the Isle of Man. Isle of Man Government. accessed 9 October 2026.
- Clean heat installations required in new builds from 2025. Isle of Man Government, 2024. accessed 9 October 2026.
- Energy Efficiency Grant Scheme. Isle of Man Government (DEFA), 2026. accessed 9 October 2026.
- Update on the Heat Wise Home Scheme. Net Zero Isle of Man, 2026. accessed 9 October 2026.
- About Us. Communications and Utilities Regulatory Authority. accessed 9 October 2026.
- Broadband. Communications and Utilities Regulatory Authority. accessed 9 October 2026.
- Euro foreign exchange reference rates (9 October 2026). European Central Bank, 2026. accessed 9 October 2026.
Questions about energy in Isle of Man.
From 1 April 2026 Manx Utilities charges households 29.5p per kWh plus a standing charge of 25.5p a day, with 0% VAT. It puts a typical home using 2,700 kWh a year at £937.
No. Manx Utilities, a statutory board of the Isle of Man Government, is the only supplier and also runs the power stations and the network. You can choose between its tariffs, such as standard, prepayment (SmarterPAYG), Comfy Heat or the EV tariff.
Yes, with Manx Utilities’ written approval. Hardwired solar PV, wind or hydro systems with up to 10 kW export capacity can join the Domestic Sustainable Generation tariff, which pays 9.7p per exported kWh. Systems must meet ENA G98, G99 or G100.
No. The Island has its own legislation and a single utility. A subsea cable to north-west England lets Manx Utilities import from and export to Great Britain, but Island generators cannot access UK schemes such as ROCs, Contracts for Difference or the Smart Export Guarantee.
There isn’t one. With only one supplier, Manx Utilities identifies supplies by its own records: an 8-digit customer account number on your bill and the meter number on your meter (smart meters include the letter "S").
Yes from 27 August 2026, but only with Manx Utilities’ consent: one kit of 800 W or less per home, listed on ENA Connect Direct, plugged straight into a socket, and a smart meter is required. Plug-in kits do not earn the export tariff.
Mainly the gas-fired Pulrose power station in Douglas (86% of supply in 2024-25), plus imports from Great Britain (8%), an energy-from-waste plant (5%) and Sulby hydro (1%). The Island exported more electricity to GB than it imported.