How electricity works in Jamaica.
Jamaica electricity 2026: JPS single buyer, OUR tariffs, net billing at avoided cost, 10 kW rooftop cap, smart meters, licensing, 50% renewables target and reforms.
This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Jamaican dollar (JMD) where they relate to prices.
Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.
Jamaica energy at a glance.
Key figures for households in Jamaica. Each one links to its source on the full overview below.
Electricity price.
54.5 JMD per kWh for households, including taxes. Figures for Bill for October 2025 consumption.
Household use.
1,844 kWh a year for a typical household. Figures for 2023.
Renewable share.
12.6% of electricity from renewable sources. Figures for 2024.
Selling back to the grid.
Can homes export electricity? Yes. Details are in the export section below.
Four things to check in Jamaica.
Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.
Check the local rules.
Read the connection, export and permission rules for Jamaica below, and ask your local grid operator if anything is unclear.
Choose a qualified installer.
Look for an installer listed on an official register, with the certifications Jamaica requires for the work.
Look at current schemes.
Check which support schemes are open now. Closed or scheduled schemes are labelled as such.
Talk to your energy supplier.
Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.
Schemes, rules and certifications in Jamaica.
The full detail sits in the sections below. Each item shows its status and links to the official source.
Support schemes.
Grants, tax relief and export payments in Jamaica, each labelled Active, Scheduled or Closed.
Connection and export.
How equipment is connected to the grid in Jamaica, and the steps to export electricity.
Standards and certifications.
The technical standards and installer certifications that apply to energy equipment in Jamaica.
The energy market in Jamaica, in detail.
Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.
Profile last updated 9 October 2026.
On this page22 sections
Jamaica has one island-wide grid with no links to other countries. The Jamaica Public Service Company Limited (JPS), a private company whose two majority shareholders are Korea’s East-West Power and Japan’s Marubeni, holds the all-island Electricity Licence, 2016. Under it JPS owns and runs the transmission and distribution network, dispatches the system, is the only retail supplier and acts as the “Single Buyer” that purchases power from independent power producers (IPPs). In 2023 JPS’s own plants produced about a quarter of the electricity sent to the grid and IPPs the rest. The Office of Utilities Regulation (OUR) sets tariffs, and the Ministry of Energy, Transport and Telecommunications issues licences and plans the system.
Generation depends on imported fuel. In 2023 natural gas produced 60% of grid electricity and heavy fuel oil 29%, while hydro, wind and solar together supplied about 10%. Household tariffs pass fuel and IPP costs through monthly, so bills are high: the OUR put a typical 165 kWh monthly residential bill at about J$9,000 before a 7% rise in December 2025. Losses are also high. JPS reported that 27.86% of net generation in 2023 was lost, about 20 percentage points of it to theft and other non-technical causes.
The sector is changing. Hurricane Melissa struck in October 2025, cutting sales by about 30% and leaving some customers without power into 2026. The Government has said it will not renew JPS’s licence on its current terms when it expires on 8 July 2027 and is negotiating a new one. Its target is 50% renewable electricity by 2030. Households with renewable systems of up to 10 kW can sell surplus power to JPS under a licensed “net billing” arrangement, paid at JPS’s avoided fuel cost plus 15%.
Energy snapshot.
Headline figures for electricity in Jamaica. Each shows its data year and links to its source.
- Population2,774,538 peopleSource 12022 census
- Households881,078 householdsSource 32011 census
- Average household size3.1 people/householdSource 32011 census
- Electricity use per household1,844 kWh/yrSource 102023
- Household price (JMD)54.5 JMD/kWhSource 8Bill for October 2025 consumption
- Household price (EUR)0.304 EUR/kWhSource 44Bill for October 2025 consumption
- Renewable electricity share12.6%Source 402024
- Solar capacity0.117 GWSource 412024
- Wind capacity0.102 GWSource 412024
- Energy storage capacity0.025 GW (16.6 MWh)Source 102019 commissioning
- Smart-meter share76%Source 10End of 2023
- Market structure
- Single buyer
- Homes can export to the grid
- Yes
- Home equipment in grid services
- No
- Regulator
- Office of Utilities Regulation (OUR)
- System operator
- Jamaica Public Service Company Limited (JPS), holder of the all-island licence, as System Operator and Single Buyer
- Distribution networks
- One island-wide distribution network owned and operated by JPS; no other distribution companies
- Currency
- Jamaican dollar (JMD)
- Voltage and frequency
- 110/220 V / 50 Hz
Electricity prices in Jamaica.
- Household price (JMD)
- 54.5 JMD/kWh (Bill for October 2025 consumption)Source 8Derived: the OUR’s example of an average residential customer using 165 kWh a month with a bill of about J$9,000 (9,000 ÷ 165). This includes the customer charge, non-fuel energy charges, fuel and IPP charges. Bills for November 2025 consumption rose by about 7% (J$655 on that example). In the OUR’s 2023 tariff determination a 214 kWh bill came to J$11,858 (J$55.4/kWh) at July 2023 fuel prices.
- Household price (EUR)
- 0.304 EUR/kWh (Bill for October 2025 consumption)Source 44Converted from J$54.5/kWh at J$179.68 per euro, the mid-point of the Bank of Jamaica counter rates for 9 October 2026 (buying 179.2745, selling 180.0854).
- Typical annual electricity bill
- 108,000 JMD/yr (Bill for October 2025 consumption)Source 8Derived: the OUR’s average monthly residential bill of about J$9,000 (165 kWh) × 12. Fuel and IPP charges change every month, so this is indicative.
How the bill is built
Jamaican household bills have two parts. The non-fuel part covers JPS’s own costs of the network, its power stations and customer service. It is a monthly customer charge plus a two-block energy rate, cheap for the first 100 kWh and much dearer above that. The OUR sets these rates under the revenue-cap rules of the Electricity Licence, 2016: a five-year rate review fixes the revenue target, and annual reviews adjust it for inflation, efficiency and a quality-of-service factor. The 2023 annual review raised non-fuel rates by about 4.8% and the overall average bill by 1.6%. JPS had asked for 4.9% on the overall bill.
The second part is pass-through. The fuel charge recovers the cost of gas, heavy fuel oil and diesel burned by JPS and the IPPs, adjusted monthly. The IPP charge recovers payments under power purchase agreements. In the OUR’s 214 kWh example from July 2023, fuel and IPP charges came to J$7,162 of a J$11,858 bill, about 60%. Tariffs are set in Jamaican dollars but refer to a base exchange rate to the US dollar, so devaluation also feeds through.
Recent movements
The OUR reports that the average price of electricity in US cents per kWh fell by 14% in 2023 because fuel was cheaper. Hurricane Melissa reversed that in late 2025. Natural gas was unavailable around the storm, JPS burned more expensive fuels and sales fell by about 30%, which raised the per-kWh fuel and IPP rates. With OUR’s agreement JPS deferred part of the increase. Bills for November 2025 consumption rose by about 7%, and the rest is being recovered over the following months. In June 2026 the Prime Minister said the JPS rate was about J$33 per kWh in March 2026 and about J$42 per kWh once other charges were added.
Why prices are high
Three things drive prices: imported fuel, high losses and a small island system. JPS reported system losses of 27.86% of net generation in 2023: 7.79% technical and 20.07% non-technical, mainly theft and unbilled use. The OUR calls this level “unacceptably high”. The Government’s stated aim in replacing the JPS licence is lower prices, with more renewables bought through competitive tenders.
Tariff types.
| Tariff | Available | Detail |
|---|---|---|
| Regulated | Yes | Rate 10 (residential, post-paid). Non-fuel rates in the OUR’s latest published tariff determination (2023 Annual Review, effective 9 August 2023): a monthly customer charge of J$603.54, J$8.31/kWh for the first 100 kWh and J$23.86/kWh above that. A fuel charge and an IPP charge are added per kWh and change monthly, and there is a small foreign-exchange adjustment. In July 2023 they were J$21.101 and J$12.365 per kWh. General Consumption Tax applies to larger residential bills: the OUR’s 150 kWh example carried none, while its 214 kWh example included J$549.90. |
| Prepayment | Yes | JPS’s prepaid (“pay as you go”) meters. Non-fuel prepaid rates approved by the OUR in 2023: J$15.72/kWh for the first 117 kWh in a 30-day cycle and J$23.86/kWh after that, so that the low-use discount of the post-paid tariff is kept. The IPP rate is shown separately on prepaid bills. |
| Time-of-use | Limited | Time-of-use rates with off-peak, part-peak and on-peak energy and demand charges exist only for large commercial and industrial customers (Rates 40, 50 and 70). There is no residential time-of-use tariff. |
| Dynamic | No | There is no wholesale spot market, so no dynamic or market-indexed retail tariff exists. The fuel and IPP charges are recalculated monthly under the Fuel Cost Adjustment Mechanism in the JPS licence. |
Household prices compared with neighbouring countries (EUR per kWh).
- Jamaica€0.304
- Dominican Republic€0.135
- Cuba€0
Household prices including taxes, converted to euros as stated on each country page.
Household electricity use.
- Electricity use per household
- 1,844 kWh/yr (2023)Source 10Derived: Rate 10 (residential) sales of 1,147,708 MWh divided by 622,392 residential accounts (OUR Annual Report 2023–2024, Tables 14 and 17). That is about 154 kWh a month; in December 2025 the OUR used 165 kWh a month as the average residential consumption.
- Average daily use per household
- 5.05 kWh/day (2023)Source 10Derived from 1,844 kWh a year per residential account.
- Typical household peak demand
- Not identified from a reliable public source.
- Electricity use per person
- 1,730 kWh/person/yr (all sectors) (2024)Source 40Ember electricity demand per capita (1.73 MWh), including self-generation by industry.
- Heat pumps
- Not identified from a reliable public source.
- Air conditioning
- Not identified from a reliable public source.
- Electric vehicles
- Not identified from a reliable public source.
- Electric cooking
- 1.8 % of households (2011 census)Source 615,508 of 881,089 households cooked mainly with electricity; 80.5% used LPG.
Household electricity use in Jamaica is low by international standards: about 154 kWh a month per residential account in 2023. Residential customers make up 89% of JPS’s accounts but bought only 34% of the energy it sold in 2023. Large commercial and industrial customers on Rates 40, 50 and 70, under 1% of accounts, bought about 46%.
Demand follows the heat. The system peaks in the summer evening (the 2023 record of 692 MW came at 8 pm on 12 July) and is lowest from December to February. Cooking is mostly with LPG. The Government’s 2022 resource plan assumed that electric vehicles would add about 3% to energy demand by 2030 and that distributed generation would reduce it by about 1%.
Access to electricity is near-universal: the World Bank puts it at 97.7% of the population in 2024. In 2011, 91.9% of households used electricity for lighting and 5.5% kerosene. The OUR notes that JPS’s non-technical losses are driven mainly by illegal users.
Housing and households.
- Dwellings
- 926,815 dwellings (2022 census (preliminary))Source 2Derived: sum of the 14 parish totals in STATIN’s preliminary population and dwelling counts by community.
- Owner-occupied
- 60.6% (2011 census)Source 5534,353 of 881,089 households owned their dwelling. A further 15.5% lived rent-free and 1.7% leased.
- Private rented
- 20.1% (2011 census)Source 5176,871 households rented. The census does not split private and public landlords.
- Social or public housing
- Not identified from a reliable public source.
- Houses
- 90.3 % of housing units (2011 census)Source 4642,650 of 711,331 housing units were separate detached houses; a further 7.6% were attached units.
- Apartments and flats
- Not identified from a reliable public source.
- Urban population
- 59.4 % of population (2025)Source 42
Most Jamaicans live in detached houses. In 2011 nine in ten housing units were separate detached houses and three in five households owned their home. Many occupiers do not hold registered title: the net billing licence process asks applicants who do not own the premises for a statutory declaration, a surveyor’s report, a lease or other proof of the right to use the property.
The population is concentrated in Kingston and St Andrew (672,904 people in 2022) and the neighbouring parish of St Catherine (542,763), which grew by 5.1% between the 2011 and 2022 censuses. Rural parishes such as St Elizabeth and Westmoreland, which Hurricane Melissa hit hardest in 2025, are dominated by detached houses on individual plots. Plots like these have room for rooftop solar but are exposed to hurricane damage.
How the grid works in Jamaica.
- TransmissionJamaica Public Service Company Limited (JPS), JPS (System Operator and Single Buyer)
- DistributionOne island-wide distribution network owned and operated by JPS; no other distribution companies
- MeteringJPS
- Supply1 or more retail suppliers
Physical system
The grid is a single island system. Bulk power moves on a 138 kV ring, about 382 km long, which feeds nine bulk substations. Twelve inter-bus transformers step it down to a 69 kV network that serves the load centres, including Kingston. Distribution runs at medium voltage to local transformers. Homes are supplied at 110 V or 110/220 V single phase, 50 Hz, under the Electricity Book of Codes. Larger users take three-phase 220 V delta or 415/240 V star supplies.
In 2021 the grid had 853 MW of firm capacity and 187 MW of wind and solar against a peak of 632 MW. Peak demand reached a record 692 MW in July 2023. Recent additions include the 194 MW South Jamaica Power Company gas/diesel combined-cycle plant (December 2019) and the 94 MW NFE–Jamalco combined heat and power plant at the alumina refinery (February 2020). Oil-fired plants owned by JPS and IPPs such as Jamaica Energy Partners make up much of the rest.
Commercial flow
Money flows through JPS. IPPs sell all their output to JPS under PPAs approved by the OUR. JPS passes their capacity and energy costs to customers through the IPP charge, and the fuel bill of all plants through the fuel charge. JPS earns its regulated return on the non-fuel tariff. Because the grid is islanded and the market has a single buyer, there is no spot price. Electricity is valued at contract prices and at JPS’s monthly short-term avoided fuel cost, which also sets the price paid for net billing exports.
Resilience
Hurricanes are the main threat to the network. After Hurricane Beryl in July 2024 the OUR directed JPS to restore all customers within a deadline. Hurricane Melissa in October 2025 caused far greater damage. JPS’s self-insurance fund for network damage was exhausted, and in November 2025 the Government lent JPS US$150 million to speed restoration. About 17,000 customers, mostly in Westmoreland and St Elizabeth, were still without power in February 2026. On 5 June 2026 an island-wide blackout occurred, and the OUR set up an internal team to investigate it.
Who does what.
| Role | Organisation | What it does |
|---|---|---|
| Ministry | Ministry of Energy, Transport and Telecommunications (METT) | Energy policy, the Integrated Resource Plan and licensing. The Minister grants electricity licences under the Electricity Act, 2015, including the net billing licences for rooftop systems. The Ministry was previously named the Ministry of Science, Energy, Telecommunications and Transport (MSETT). |
| Regulator | Office of Utilities Regulation (OUR) | Economic regulator for electricity, water and telecoms. Sets JPS’s non-fuel tariffs, approves power purchase agreements and the Standard Offer Contract, validates the monthly net billing rate, enforces guaranteed service standards and investigates events such as the island-wide blackout of 5 June 2026. |
| TSO | Jamaica Public Service Company Limited (JPS) | Owns and operates the 138 kV and 69 kV transmission system under the all-island Electricity Licence, 2016, which runs until 8 July 2027. |
| System operator | JPS (System Operator and Single Buyer) | Dispatches all generation, signs power purchase agreements with IPPs as the Single Buyer, and buys surplus power from net billing customers. |
| DSO | JPS | Sole distribution network operator for the whole island, serving 696,192 accounts at the end of 2023. |
| Supplier | JPS | The only retail supplier. A self-generator can wheel its own power over the grid to its own sites under the OUR’s wheeling framework, but there is no retail choice. |
| Metering | JPS | Installs, owns, reads and maintains all revenue meters, including smart and prepaid meters. Meter models must be approved by the Bureau of Standards Jamaica. |
| Ministry | Generation Procurement Entity (GPE) | Government body that runs competitive tenders for new generating capacity in line with the Integrated Resource Plan. Winning bidders receive generation licences from the Minister and PPAs with JPS. |
Compared with the UK system.
| UK concept | Jamaica equivalent | How it works |
|---|---|---|
| DNO | JPS (single all-island network) | There are no regional network companies. JPS owns and runs every distribution line on the island and is also the supplier, so the network and retail roles are combined in one licensed company. |
| National Grid/NESO | JPS as System Operator and Single Buyer | JPS operates the 138 kV/69 kV transmission ring and dispatches all power stations, including IPPs’ plants. Unlike NESO it is not independent of generation: it owns about a quarter of grid output and buys the rest under OUR-approved contracts. There is no wholesale market or balancing mechanism. |
| MPAN | JPS Customer No. and Premises No. | JPS bills show a customer number, a premises number and a meter number. Official forms such as the net billing and Standard Offer Contract applications ask for all three, but no published national standard defines their format. |
| MPRN | No equivalent for electricity | Jamaica has no piped gas network for homes. Cooking gas is LPG bought in cylinders, so there is no gas supply-point number. |
| Meter operator | JPS | JPS owns and maintains meters. Customers cannot appoint a meter operator. For net billing the customer pays for the bidirectional or smart meter, which JPS then owns. Meter accuracy disputes are handled under the OUR’s Meter Testing Administrative and Operational Protocol. |
| Supplier | JPS (sole supplier) | There is no supplier switching. Customers take service on post-paid or prepaid terms from JPS under the OUR’s regulated tariff and guaranteed standards. |
| Smart-meter infrastructure | JPS advanced metering programme | Smart meters are a JPS utility programme approved through the rate review, not a national roll-out with a central data company like the UK’s DCC. Data is held in JPS’s own systems and shown to customers through the MyJPS portal and app. |
How a supply point is identified.
| Question | Answer |
|---|---|
| What is it called? | JPS Premises Number (with Customer Number and Meter Number) (Premises No.) |
| Who issues it? | Jamaica Public Service Company Limited (JPS) |
| Format | JPS’s own account identifiers. The format is not published by JPS or the OUR, and no national numbering standard exists. |
| Length | Not published |
| Stays with the property when you switch supplier? | Not identified from a reliable public source. |
| Where to find it | On the JPS bill (tax invoice), which shows the Customer No., Premises No. and Meter No. The net billing application form asks for the “Customer No. & Premises No.” and a copy of a JPS invoice no older than three months. |
| Electronic access | Customers can see their account, bills and consumption on the MyJPS web portal and the MyJPS mobile app. |
| Third-party access | There is no regulated data-access scheme or registry open to third parties. Installers and applicants use the numbers on the customer’s own bill. JPS shares information with the Ministry and the OUR in licensing and complaint cases. |
| Who keeps the register | JPS’s customer information and billing system, which covers every grid connection on the island |
| Register scope | National |
Jamaica has no MPAN-style national supply-point number defined in regulation. A connection is identified by JPS, the only network company and supplier, in its own customer system. Each bill carries a customer number (the account holder), a premises number (the location supplied) and a meter number (the installed meter). Government and regulatory forms use these three together. The Ministry’s net billing application asks for the JPS customer category (residential Rate 10 or commercial), the customer and premises numbers, the meter number and the applicant’s tax registration number (TRN). The OUR’s Standard Offer Contract application asks for the customer number, premises number and existing meter number.
JPS does not publish the length or structure of these identifiers, so no example is shown here. Because the premises number is separate from the customer number, it identifies the location rather than the account holder. Whether it stays the same when a new occupier opens an account is not set out in any public rule.
Because JPS is also the supplier, the identifiers are not used for switching, as MPANs are in Britain. They are used for billing, outage reporting, meter exchanges, guaranteed-standard claims and connecting generation. In net billing the premises shown on the JPS invoice must match the address on the property title and on the electrical single-line drawing. The Ministry then issues the licence for that site and JPS fits an export-capable meter there.
Sending electricity to the grid.
| Question | Answer |
|---|---|
| Can homes export electricity? | Yes |
| Net metering | No |
| Net billing | Yes |
| How exported electricity is paid | Monthly net billing rate validated by the OUR: JPS’s short-term variable avoided (fuel) cost plus a 15% renewable premium, e.g. J$19.979/kWh for July 2025 |
| Is it net metering? | No. Imports are billed at the normal retail tariff. Exports are paid separately at the monthly net billing rate, which is much lower than the retail price: J$19.171/kWh in June 2025 and J$21.289/kWh in December 2024. |
| What size of system qualifies? | Up to 10 kW for residential customers and 100 kW for commercial customers. The Standard Offer Contract covers renewable facilities of up to 100 kW. In May 2026 the Minister said these limits were under review, including adding battery storage. |
| Is a licence needed? | Yes. Under the Electricity Act, 2015 a self-generator needs an electricity licence and a Standard Offer Contract before selling surplus power, although generating for one’s own use without connecting to the grid is exempt. |
| How long is the contract? | Five years from the commercial operation date under the OUR-approved Standard Offer Contract, extendable by agreement. |
| What metering is used? | A bidirectional or smart meter with memory and remote reading, or separate import and export meters. The customer pays for it; JPS owns and maintains it. |
Connecting a home system.
- Confirm eligibility: a JPS customer in good standing with a renewable system of up to 10 kW (residential) or 100 kW (commercial).
- Have a licensed electrician or registered engineer prepare a single-line diagram and bill of quantities, using a Bureau of Standards Jamaica-listed inverter.
- Submit the net billing application to the Ministry with the JPS invoice and proof of identity and of the right to use the property; after preliminary review, pay the J$19,000 non-refundable processing fee.
- After technical and legal review, pay the application fee of J$1,800 per kW of permitted export and any licence fee, and receive the net billing licence from the Minister.
- Have the installation certified by a licensed electrical inspector.
- Sign the Standard Offer Contract with JPS; JPS installs a bidirectional or smart meter (paid for by the customer, owned by JPS) and commissions the connection.
Jamaica’s export scheme is called net billing. It was set up under the Electricity Act, 2015 and the Electricity (Net Billing) Regulations, 2022, which the House of Representatives approved in July 2022. It is open only to renewable self-generators. The Ministry licenses the system, JPS buys the surplus under the OUR’s Standard Offer Contract, and the OUR validates the export price each month. The price reflects only the fuel JPS avoids burning, plus 15%. So exports earn well under half the retail price, and the scheme favours using solar power on site rather than exporting it.
Take-up has been modest. By 31 July 2022 the Ministry had issued 1,026 net billing licences for 22.4 MW, of which 741 (13.35 MW) had been commissioned by JPS. In March 2025 the Minister reported 436 new systems with 8.5 MW licensed under the 2022 Regulations. In May 2026 the Minister announced plans to add 100 MW of distributed renewables through a strengthened net billing programme. They include a fully online application platform due by December 2026 and talks with JPS on raising the size limits and adding battery storage.
Licensing and approvals.
Requirements depend on the activity. The table sets out what each activity needs and who grants it.
| Activity | Licence or registration | Authority | Notes |
|---|---|---|---|
| Generate electricity for supply to the grid | Electricity licence from the Minister, normally awarded after a GPE competitive tender (non-exclusive generation licence) plus an OUR-approved PPA with JPS | Minister responsible for energy; GPE; OUR | Exceptions to competitive procurement need a Cabinet decision (e.g. emergency). JPS had a right of first refusal to replace 171.5 MW of retiring plant. |
| Self-generation for own use (not connected for export) | No electricity licence if the generator does not connect to the grid for net billing or wheeling; installation must still be certified by a licensed electrical inspector | Government Electrical Regulator (installation safety) | Section 8(2) of the Electricity Act, 2015 exempts generation for a person’s exclusive use unless they enter net billing or wheeling or connect to a line. |
| Export / sell surplus from a home system (net billing) | Net billing licence from the Minister plus a Standard Offer Contract with JPS; up to 10 kW residential and 100 kW commercial; renewable sources only | Ministry of Energy, Transport and Telecommunications; JPS; OUR | J$19,000 processing fee and J$1,800 per kW application fee; BSJ-approved inverter required. |
| Store electricity | No separate storage licence category in the Electricity Act, 2015. Grid-scale storage is procured with generation through GPE tenders. Storage interconnection requirements in the Electricity Book of Codes are “reserved” (not yet written) | Minister; GPE; OUR | Behind-the-meter batteries need only electrical installation approval unless they are part of a licensed net billing system. |
| Wheel own power to another own site | Generation licence plus payment of the OUR-set use-of-system (wheeling) charge; sale to third parties not allowed except to entities more than 50% owned, if an OUR study finds a capacity need | Minister; OUR; JPS (Single Buyer) | Wheeling tariff methodology determined by the OUR in July 2020. |
| Supply / retail sale to other customers | JPS holds the all-island licence covering transmission, distribution and supply; the OUR’s list of electricity licensees shows no other supply licensee | Minister; OUR | The Act allows supply licences to be exclusive or non-exclusive; the terms after July 2027 are being negotiated. |
| Wholesale trading | Not possible: there is no wholesale market or exchange | — | All grid generation is sold to JPS as Single Buyer under PPAs. |
| Balancing and ancillary services | Only by contract between the System Operator (JPS) and qualified generators, with OUR approval and without breaching PPAs | JPS (System Operator); OUR | Distribution Code DSC 7.3.5. No open procurement. |
| Aggregation, VPP or demand response | No framework. The Supply Code section on customers providing demand response is “reserved” | OUR (future code) | — |
| Remote control of customer assets | No specific rules; would fall under the Standard Offer Contract and System Operator instructions for connected generators | JPS; OUR | The System Operator may refuse or limit access for technical reasons, with written reasons within 48 hours. |
| Electrical installation work | Registration as an electrician with the Government Electrical Regulator in Category 1 (all voltages), 2 (up to 1 kV, 500 kVA) or 3 (250 V single phase, 150 kVA); certification by a licensed private electrical inspector | Government Electrical Regulator (GER) | Electricity (Electrical Work Registration and Licensing) Regulations, 2020. |
The Electricity Act, 2015 makes it an offence to generate, transmit, distribute, dispatch or supply electricity without a licence from the Minister. Generation licences are non-exclusive. Transmission, distribution, supply and dispatch licences may be exclusive, and in practice all four are held by JPS. New generating capacity is meant to come through competitive tenders run by the Generation Procurement Entity against the Integrated Resource Plan. The OUR must approve the resulting PPA with JPS.
Small consumers mainly meet licensing through net billing. Anyone exporting from a rooftop system needs a licence, while off-grid or non-exporting self-generation is exempt. Electrical safety is regulated separately. Since 2020 the Government Electrical Regulator in the Ministry registers electricians in three categories and licenses private electrical inspectors, whose certificate JPS needs before it connects an installation.
Flexibility and grid services.
Aggregation of home equipment: No
| Market or service | Access for home equipment | Minimum size | Via an aggregator | Detail |
|---|---|---|---|---|
| Ancillary services (frequency, voltage, reserve) | No | — | No | JPS (System Operator). Provided by JPS plants, contracted generators and JPS’s 24.5 MW hybrid energy storage system. The Distribution Code lets the System Operator contract with generators for ancillary services, subject to OUR approval. There is no market and no route for customer assets. |
| Demand response | No | — | No | JPS / OUR. The Electricity Book of Codes reserves a section for customers providing demand response, but no rules have been written. |
| Utility-scale renewables + storage tenders | Restricted | Utility scale (projects of tens of MW) | No | Generation Procurement Entity. The second tranche, up to 300 MW of renewables and 150 MW of battery storage on 20-year build-own-operate PPAs, is due to be issued in Q4 2026. It is open to IPPs, not to distributed assets. |
Jamaica has no flexibility, balancing or wholesale market. JPS, as System Operator, keeps the system balanced with its own plants and contracted generators, so household batteries, EV chargers and flexible loads cannot earn revenue for grid services. Aggregators and virtual power plants have no legal framework. The relevant parts of the Electricity Book of Codes, on storage interconnection and on demand response, are marked “reserved”.
Storage is entering through central procurement. The 2022 Integrated Resource Plan identified 493 MW of two-hour batteries needed over 20 years. The GPE’s RFI in March 2026 proposed 110 MW / 220 MWh of lithium iron phosphate batteries. Its September 2026 market update raised this to up to 150 MW, open to any proven technology. The Government’s planned White Paper on Electricity Sector Reform and the new JPS licence could change this structure.
Flexibility and aggregation platforms.
| Platform or aggregator | What it does |
|---|---|
| GPE renewable energy and BESS procurement | Competitive tenders for grid-scale renewable generation and battery storage. |
Smart meters.
| Fact | Value |
|---|---|
| Smart-meter rollout | JPS utility programme: over 570,000 advanced meters installed; over 76% of connections smart by end-2023 |
| Reading interval | Not published |
| Owner and operator | JPS |
| Coverage | Over 76% of service connections (end of 2023, OUR) |
| Approved meter models | Bureau of Standards Jamaica list includes Hexing, Itron Sentinel, GE I-210+c, ENT and Cashpower models |
| Prepaid option | Yes, JPS “pay as you go” meters on the Rate 10 prepaid tariff |
| Metering standards | ANSI C12 series (Electricity Book of Codes) |
| Customer access | MyJPS web portal and mobile app |
Smart metering in Jamaica is run by JPS, not by a national programme. The OUR approved a system-wide advanced metering programme in the 2019–2024 rate review. By the end of 2023 JPS had installed more than 570,000 advanced meters and over 76% of connections were smart.
The roll-out drew complaints that new meters had raised bills. The OUR investigated a sample of 308 accounts and reported in August 2020 that the advanced meters appeared to be working satisfactorily. It found that large increases after a meter change were more likely due to old meters having under-recorded, and announced closer monitoring of meter installations. Net billing customers need a bidirectional or smart meter, which they pay for and JPS owns.
Renewable electricity.
Electricity generation mix (2024).
- Natural gas: 56.9%
- Oil (HFO and diesel): 30.5%
- Wind: 5.9%
- Solar: 3.1%
- Hydro: 2.4%
- Bioenergy: 1.2%
- Renewable electricity share
- 12.6% (2024)Source 40Ember yearly data: wind 5.9%, solar 3.1%, hydro 2.4%, bioenergy 1.2% of 4.92 TWh. Ember’s figure includes self-generation such as bagasse at sugar factories. For the JPS grid alone the OUR reports 10.19% in 2023 (475 GWh of 4,665 GWh), down from 11.81% in 2022 because of weak wind and drought. Jamaica has no interconnection, so generation and consumption shares are the same.
- Home solar
- 22.4 MW (licensed net billing capacity) (31 July 2022)Source 251,026 net billing licences, of which 741 systems (13.35 MW) were commissioned. Covers commercial as well as residential systems and excludes non-exporting rooftop solar, for which no count exists.
- Solar added each year
- Not identified from a reliable public source.
- Solar PV
- 0.117 GW (2024)Source 41
- Wind
- 0.102 GW (2024)Source 41
- Bioenergy
- 0.032 GW (2024)Source 41Mostly bagasse-fired cogeneration at sugar factories.
- Hydro
- 0.03 GW (2024)Source 41JPS’s run-of-river plants total 28.66 MW (OUR).
Targets.
- 50% of electricity from renewable sources by 2030 (Renewable Portfolio Standard raised from 30% in 2018; 2022 Integrated Resource Plan)
- 400 MW of new utility-scale renewables: 99.83 MW of solar awarded in November 2024 (due by 2027) plus up to 300 MW with 150 MW of storage in the tender due in Q4 2026
- 100 MW of additional distributed renewables through an expanded net billing programme (announced May 2026)
Jamaica’s renewable share has hardly moved in a decade. Grid generation from wind, hydro and solar was 11.66% in 2019 and 10.19% in 2023, when weak wind at the Wigton and BMR wind farms and drought at JPS’s hydro plants cut output. That is below the 15% that the National Energy Policy targeted for 2020. Ember’s 2024 figure of 12.6% also counts bagasse burned at sugar factories. In May 2026 the Minister put the current renewable share at about 15%.
Growth is planned through central tenders. The GPE’s first tranche in 2023 attracted 484 MW of offers for 100 MW, and 99.83 MW of solar went to Wigton Energy and Sunterra Energy at an average of US$61.58/MWh. Both projects have generation licences and are due by 2027. A second tranche of up to 300 MW of renewables with 150 MW of batteries is due in Q4 2026. The Government says these projects, together with the replacement of retiring fossil units, are needed to reach 50% by 2030.
Solar resources are strong, with global horizontal irradiance of 5–7 kWh/m² a day over most of the island according to studies cited in the IRP. The main constraints are fossil-fuel PPAs, the single-buyer structure, the low export price for rooftop systems and hurricane risk. Ahead of the 2025 hurricane season the Minister urged solar installers and customers to design for storms, with secure battery storage and durable mounting.
Energy storage.
- Home batteries
- Not identified from a reliable public source.
- Grid-scale storage
- 16.6 MWh (24.5 MW) (2019 commissioning)Source 10JPS hybrid energy storage system (HESS) commissioned in December 2019.
Grid storage in Jamaica so far is one JPS system: a 24.5 MW / 16.6 MWh hybrid energy storage system commissioned in December 2019. Planned storage is centrally procured. The 2022 Integrated Resource Plan foresees 493 MW of two-hour batteries over 20 years, and the GPE’s tender due in Q4 2026 includes up to 150 MW.
No data on home batteries are published. Outages, a common reason for buying back-up storage, have been long: JPS’s average customer was without supply for about 2,403 minutes in 2023, and some customers waited months for reconnection after Hurricane Melissa. Batteries are not yet part of the net billing framework and the Book of Codes has no interconnection rules for storage. In May 2026 the Ministry said it was reviewing how to bring battery storage into net billing.
Storage projects.
- JPS hybrid energy storage system: 24.5 MW / 16.6 MWh hybrid energy storage system, commissioned in December 2019.
- GPE second-tranche tender: Up to 150 MW of battery or other proven storage alongside up to 300 MW of renewables, RFP expected in Q4 2026.
- Integrated Resource Plan storage pathway: 493 MW of two-hour battery storage identified over the 20-year plan to integrate 50% variable renewables.
Electricity suppliers.
| Supplier | Market share | Renewable tariff | Time of use | Dynamic | Export tariff |
|---|---|---|---|---|---|
| Jamaica Public Service Company Limited (JPS) | Sole licensed supplier (696,192 accounts at end-2023) | No | Limited | No | Yes |
JPS is the only electricity retailer in Jamaica, so customers cannot switch supplier. Its tariffs are regulated by the OUR in classes: Rate 10 residential, Rate 20 small commercial, Rates 40, 50 and 70 large commercial and industrial at low and medium voltage, and Rate 60 for street lighting. Time-of-use options exist only for the large classes. Large users can generate their own power and wheel it to their other sites, and a few industrial sites, such as the Jamalco refinery, run their own combined heat and power plants.
JPS’s licence expires on 8 July 2027. The Government has said it will not renew it on the existing terms. It holds the right under the licence to acquire the business at expiry, and Cabinet approved Heads of Terms for a new licence in May 2026. The Minister has said that other companies have approached the Government and that it will seek another provider internationally if no agreement is reached with JPS.
Key organisations.
| Organisation | Category | What it does | Why it matters |
|---|---|---|---|
| Ministry of Energy, Transport and Telecommunications | Government | Energy policy, Integrated Resource Plan, electricity and net billing licences | Issues every electricity licence, including rooftop net billing licences, and publishes the national energy balance. |
| Office of Utilities Regulation (OUR) | Regulator | Economic regulator | Sets JPS tariffs, approves PPAs and the Standard Offer Contract, and validates the monthly net billing rate. |
| Jamaica Public Service Company Limited (JPS) | Transmission | Integrated utility: network, system operator, Single Buyer, supplier | Connects every customer and every generator and buys all grid power. |
| Generation Procurement Entity (GPE) | Market | Competitive procurement of new generation and storage | Runs the renewable and battery tenders through which new grid-scale capacity is added. |
| Government Electrical Regulator (GER) | Government | Registers electricians and licenses electrical inspectors | Installers must be registered and installations certified before JPS will connect them. |
| Bureau of Standards Jamaica (BSJ) | Metering | National standards body | Approves meter models and lists the inverters accepted for net billing applications. |
| Wigton Energy Limited | Renewable Energy | Renewable generator | Operates the Wigton wind farms and won part of the 2024 solar award. |
| Statistical Institute of Jamaica (STATIN) | Government | National statistics office | Census data on population, housing, tenure and household fuel use. |
Technical standards.
| Area | Standard | Issued by | Notes |
|---|---|---|---|
| Grid codes | Jamaica Electricity Book of Codes (Generation, Transmission, Distribution and Supply Codes) | OUR / System Operator | Sets 50 Hz ± 0.2 Hz, supply voltages and connection and metering rules. Sections for storage interconnection and demand response are reserved. |
| Small-generator connection | Standard Offer Contract for renewable facilities up to 100 kW | OUR (determination of 2012) | Technical, metering and insurance terms for net billing customers; five-year term. |
| Inverters | Bureau of Standards Jamaica listing and certificate | Bureau of Standards Jamaica | Net billing applications must include the BSJ listing and certificate of the inverter. |
| Metering | ANSI C12.1, C12.10, C12.20; BSJ-approved smart meter list | OUR (Book of Codes); BSJ | Small generators below 100 kW may use separate import/export meters or a bidirectional smart meter. |
| Installer accreditation | Electricity (Electrical Work Registration and Licensing) Regulations, 2020 | Government Electrical Regulator | Electrician Categories 1–3; licensed private electrical inspectors certify installations. |
Permissions.
| Permission | Required | Level | Detail |
|---|---|---|---|
| Net billing licence (to export) | Yes | National | Issued by the Minister for renewable systems up to 10 kW residential / 100 kW commercial. |
| Electrical inspection certificate | Yes | National | A licensed electrical inspector must certify the installation before JPS connects it. |
| JPS connection and Standard Offer Contract | Limited | National | Needed only for systems that export; JPS installs the export-capable meter. |
| Proof of property rights | Yes | National | Title, lease, or statutory declarations and surveyor’s report where the applicant does not own the premises. |
| Planning / building approval for rooftop PV | Unknown | Local | No specific planning rule for rooftop solar was identified in the sources reviewed. |
For a household, the main permissions are the net billing licence and the electrical inspection. A system that does not export needs only a certified electrical installation. A system that exports also needs the Ministry’s licence, the processing and per-kW fees and a Standard Offer Contract with JPS. Applicants must show that the address on their JPS bill, their property title and their wiring diagram match.
Support schemes, taxes and incentives.
| Scheme | Status | Type | Detail | Period |
|---|---|---|---|---|
| Net billing (Standard Offer Contract) | Active | Export payment | Exports from renewable systems up to 10 kW (residential) or 100 kW (commercial) are bought by JPS at the OUR-validated monthly avoided fuel cost plus 15% (J$19.979/kWh in July 2025). Imports are billed at the normal tariff. | Since 2012 (Regulations 2022) |
| Lifeline energy block in Rate 10 | Active | Regulated tariff structure | The first 100 kWh a month (117 kWh on prepaid) is charged at a much lower non-fuel rate than higher use, which benefits low-consumption households. | — |
Data and connectivity.
- Fixed broadband
- 17.2 fixed broadband subscriptions per 100 people (Q4 2025)Source 19Down from 18.36 in Q3 2025 after Hurricane Melissa damaged networks.
- 4G coverage
- Not identified from a reliable public source.
- 5G coverage
- Not identified from a reliable public source.
Mobile networks dominate. Mobile broadband subscriptions reached 87 per 100 people at the end of 2025, against 17 per 100 for fixed broadband. The OUR regulates both, alongside electricity, through the same Office.
JPS’s smart meters communicate over the utility’s own systems, and customers see their data through the MyJPS portal and app. No public information was found on the communication protocols used for smart meters, inverters or demand response.
Grid conditions.
- National peak demand
- 0.692 GW (2023 (12 July, record))Source 10Up from 643.7 MW in 2022. In June 2026 the Prime Minister put typical peak demand at 650–700 MW.
- Annual electricity demand
- 4.665 TWh (net generation to the JPS grid) (2023)Source 10Billed sales were 3.365 TWh; 27.86% was lost. Ember puts total generation, including self-generation, at 4.92 TWh in 2024.
- Generation capacity
- 1.04 GW (2021)Source 25853 MW firm (JPS and IPP thermal and hydro) plus 187 MW of wind and solar connected to the grid. Excludes industrial self-generation.
- Interconnection
- 0 GW (2024)Source 40Jamaica’s grid is isolated; Ember records zero net imports.
- Curtailment
- Not identified from a reliable public source.
Jamaica’s system is small and isolated, with peak demand of about 650–700 MW and no interconnection to absorb shocks. It must carry its own reserves, and a single large fault can black out the island, as on 5 June 2026. The 2022 IRP studied what the transmission grid needs to take renewables from 12.5% to 50%, with battery storage for stability. It recommended a new Old Harbour–Three Miles 138 kV line to strengthen supply into Kingston.
Reliability has been weak. Average outage duration (SAIDI) rose from about 1,400 minutes per customer in 2019 to 2,403 minutes in 2023, well above the OUR’s target of 1,313 minutes. The OUR says JPS’s performance in 2021 and 2022 led to financial penalties through the tariff quality factor, and that 2023 implies penalties too. Hurricanes add to this: JPS’s guaranteed standards were suspended from 24 October to 31 December 2025 after Hurricane Melissa.
Grid and capacity maps.
Regulatory changes.
| Change | Status | Date | Detail |
|---|---|---|---|
| JPS all-island licence expires; new licence under negotiation | Upcoming | 8 July 2027 | The Government gave notice in July 2025 that it will not renew the licence on existing terms. Cabinet approved Heads of Terms for a new licence in May 2026, and negotiations with JPS were continuing in July 2026, alongside a back-up plan to seek another provider. |
| White Paper on Electricity Sector Reform and review of the Electricity Act | Upcoming | Draft under review (May 2026) | The Minister said the Electricity Act and regulatory framework will be reviewed to give effect to the new licence regime; the White Paper goes to Parliament after Cabinet approval. |
| GPE tender for 300 MW renewables and 150 MW storage | Upcoming | RFP expected Q4 2026 | Technology-neutral storage; 20-year build-own-operate PPAs; follows an RFI in March 2026. |
| Online net billing platform and review of size limits | Upcoming | Platform by December 2026 | The Ministry is also reviewing licence fees, the 10 kW / 100 kW caps and the inclusion of battery storage in net billing. |
| 99.83 MW of new solar from the first GPE tranche | Upcoming | Completion expected by 2027 | Awarded to Wigton Energy and Sunterra Energy in November 2024. |
| Recovery of deferred fuel and IPP costs after Hurricane Melissa | Current | From December 2025 | JPS, with the OUR, spread higher post-hurricane fuel and IPP costs over several months instead of applying them at once. |
Market indicators.
Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.
| Indicator | Level | Basis |
|---|---|---|
| Electricity cost | High | Low below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros). |
| Household electricity use | Low | Low below 2,500 kWh a year, high at 5,000 kWh or more (average use per household). |
| Renewable share | Low | Low below 30%, high at 60% or more (renewable share of electricity). |
| Smart-meter adoption | Medium | Low below 30%, high at 80% or more (share of meters that are smart). |
| Home solar adoption | Low | 1,026 net billing licences for 22.4 MW by July 2022 and 436 systems (8.5 MW) licensed under the 2022 Regulations by March 2025, against about 622,000 residential accounts; systems capped at 10 kW. |
| Distributed energy market | Low | Net billing supplied about 0.12% of grid generation in 2023 (OUR); exports earn only the avoided fuel cost plus 15%. |
| Grid flexibility market | Low | No wholesale, balancing or flexibility market; demand response and storage interconnection rules in the Book of Codes are reserved; JPS is the single buyer. |
| Energy storage adoption | Low | One 24.5 MW / 16.6 MWh utility system; no published data on home batteries; 150 MW of storage still to be tendered. |
| Renewable growth environment | Medium | Renewable share stuck at 10–13% since 2019, but 99.83 MW of solar is under construction for 2027 and a 300 MW + 150 MW storage tender is due in Q4 2026 toward a 50% target for 2030. |
Sources.
Public sources used for this profile, with the date each was accessed.
Show all 44 sources
- Population Census 2022: Population Change by Parish. Statistical Institute of Jamaica (STATIN), 2022. accessed 9 October 2026.
- Population Census 2022: Population and Dwelling Counts by Community (Preliminary). Statistical Institute of Jamaica (STATIN), 2022. accessed 9 October 2026.
- Number of Households by Parish: 2001 and 2011. Statistical Institute of Jamaica (STATIN), 2011. accessed 9 October 2026.
- 2011 Census: Number of Housing Units by Type of Housing Unit by Parish. Statistical Institute of Jamaica (STATIN), 2011. accessed 9 October 2026.
- 2011 Census: Number of Households by Tenure of Dwelling. Statistical Institute of Jamaica (STATIN), 2011. accessed 9 October 2026.
- 2011 Census: Number of Households by Type of Fuel Used for Cooking by Parish. Statistical Institute of Jamaica (STATIN), 2011. accessed 9 October 2026.
- 2011 Census: Number of Households by Source of Lighting by Parish. Statistical Institute of Jamaica (STATIN), 2011. accessed 9 October 2026.
- Media release: JPS Customers with Supply to see Moderate Bill Adjustments (15 December 2025). Office of Utilities Regulation, 2025. accessed 9 October 2026.
- Jamaica Public Service Company Limited Annual Review 2023: Determination Notice (2023/ELE/012/DET.001). Office of Utilities Regulation, 2023. accessed 9 October 2026.
- OUR Annual Report 2023–2024 (electricity system performance indicators). Office of Utilities Regulation, 2024. accessed 9 October 2026.
- List of Licensees in the Electricity Sector – 2025. Office of Utilities Regulation, 2025. accessed 9 October 2026.
- Public notice: validation of Net Billing energy rates, December 2024. Office of Utilities Regulation, 2025. accessed 9 October 2026.
- Net Billing/Standard Offer Contract (SOC) rate for June and July 2025. Office of Utilities Regulation, 2025. accessed 9 October 2026.
- Quarterly Performance Report 2025 October to December. Office of Utilities Regulation, 2026. accessed 9 October 2026.
- Media release: OUR Sets Up Internal Team for JPS Blackout Investigation (12 June 2026). Office of Utilities Regulation, 2026. accessed 9 October 2026.
- Jamaica Electricity Book of Codes. Office of Utilities Regulation, 2016. accessed 9 October 2026.
- Determination Notice: JPS Standard Offer Contract for renewable energy facilities up to 100 kW. Office of Utilities Regulation, 2012. accessed 9 October 2026.
- Media release: OUR Concludes Investigation on JPS Advanced (Smart) Meters (26 August 2020). Office of Utilities Regulation, 2020. accessed 9 October 2026.
- Telecommunications Market Information Report: October – December 2025. Office of Utilities Regulation, 2026. accessed 9 October 2026.
- Net Billing Application Requirements and Process. Ministry of Science, Energy, Telecommunications and Transport. accessed 9 October 2026.
- Net Billing Application Form (V2.0). Ministry of Science, Energy, Telecommunications and Transport. accessed 9 October 2026.
- Net Billing Fact Sheet. Ministry of Science, Energy, Telecommunications and Transport. accessed 9 October 2026.
- List of BSJ-Approved Smart Meters. Ministry of Science, Energy, Telecommunications and Transport. accessed 9 October 2026.
- National Energy Balance 2024. Ministry of Science, Energy, Telecommunications and Transport, 2025. accessed 9 October 2026.
- 2022 Jamaica Integrated Resource Plan – 2018 IRP Review and Update. Ministry of Science, Energy, Telecommunications and Transport, 2024. accessed 9 October 2026.
- The Electricity Act, 2015 (text published by the Ministry). Ministry of Science, Energy, Telecommunications and Transport, 2015. accessed 9 October 2026.
- The Electricity (Electrical Work Registration and Licensing) Regulations, 2020. Ministry of Science, Energy, Telecommunications and Transport, 2020. accessed 9 October 2026.
- Government Electrical Regulator. Ministry of Energy, Transport and Telecommunications. accessed 9 October 2026.
- GPE Launches Largest Renewable Energy Tender. Generation Procurement Entity, 2026. accessed 9 October 2026.
- 220 MW Renewable Energy / 110 MW BESS RFI Launch Session. Generation Procurement Entity, 2026. accessed 9 October 2026.
- Market Update: Competitive Procurement Process for Renewable Energy and BESS (September 2026). Generation Procurement Entity, 2026. accessed 9 October 2026.
- Gov’t to End Current JPS Licence in 2027 (1 July 2025). Jamaica Information Service, 2025. accessed 9 October 2026.
- Cabinet Approves New JPS Licence Terms (6 May 2026). Jamaica Information Service, 2026. accessed 9 October 2026.
- Energy Minister Provides Update on Negotiations for New Electricity Licence (16 July 2026). Jamaica Information Service, 2026. accessed 9 October 2026.
- Gov’t Committed to Transforming Energy Architecture to Drive Down Costs – PM (18 June 2026). Jamaica Information Service, 2026. accessed 9 October 2026.
- Cabinet Approves US$150-Million Loan to JPS to Speed Up Restoration Efforts (26 November 2025). Jamaica Information Service, 2025. accessed 9 October 2026.
- Additional 7,000 JPS Customers to Receive Power in Two Weeks (12 February 2026). Jamaica Information Service, 2026. accessed 9 October 2026.
- House Approves Electricity (Net Billing) Regulations (27 July 2022). Jamaica Information Service, 2022. accessed 9 October 2026.
- Jamaica Making Progress in Meeting 50 Per Cent Renewable Energy Target (19 March 2025). Jamaica Information Service, 2025. accessed 9 October 2026.
- Yearly Electricity Data (Jamaica rows, 2024). Ember, 2024. accessed 9 October 2026.
- Energy Profile: Jamaica. IRENA, 2025. accessed 9 October 2026.
- Urban population (% of total population) – Jamaica. World Bank, 2025. accessed 9 October 2026.
- Access to electricity (% of population) – Jamaica. World Bank, 2024. accessed 9 October 2026.
- BOJ Counter Rates (9 October 2026). Bank of Jamaica, 2026. accessed 9 October 2026.
Questions about energy in Jamaica.
According to the OUR, an average household using 165 kWh a month paid about J$9,000 a month in late 2025, roughly J$54.5 per kWh (about €0.30) including all charges. Bills for November 2025 rose about 7% after Hurricane Melissa raised fuel costs. Prices move every month with the fuel and IPP charges.
Only the Jamaica Public Service Company (JPS), which holds the all-island licence until 8 July 2027. JPS runs the grid, dispatches all power stations and buys the output of independent producers. The Office of Utilities Regulation regulates its tariffs.
Yes, through net billing. You need a net billing licence from the Ministry of Energy, Transport and Telecommunications, a certified installation with a BSJ-listed inverter and a Standard Offer Contract with JPS. Systems are limited to 10 kW for homes. Exports are paid at JPS’s avoided fuel cost plus 15%, about J$20 per kWh in mid-2025, and imports are billed at the normal tariff.
There is no national supply-point number. JPS identifies each connection by the customer number, premises number and meter number printed on the bill, and official forms such as the net billing application ask for these. JPS does not publish their format.
Yes. JPS has installed more than 570,000 advanced meters, and over 76% of connections had smart meters at the end of 2023. The meters also support prepaid service. Customers can view their usage on the MyJPS portal and app.
Not if the system only supplies your own home and is not connected for export. You still need a registered electrician and an electrical inspector’s certificate. If you want to export to the grid you need a net billing licence, which costs a J$19,000 processing fee plus J$1,800 per kW.
50% of electricity from renewables by 2030. Renewables supplied about 10% of grid generation in 2023 (12.6% in 2024 including bagasse, per Ember). New solar plants are due by 2027, and a tender for up to 300 MW of renewables with 150 MW of storage is planned for late 2026.