Energy in Dominican Republic, explained.

How electricity works in Dominican Republic: prices, the grid and local rules. Olmack status: Not yet available. Information last checked 9 October 2026.

Olmack in Dominican Republic: Not yet available.Olmack is not offered in Dominican Republic yet. The market information on this page is provided for reference. Information last checked 9 October 2026.
Energy-market overview

How electricity works in Dominican Republic.

Dominican Republic electricity 2026: EDE tariffs, SENI generation mix, 583 MWp of net-metered solar, smart meters, Law 57-07 incentives and licensing.

This overview covers what electricity costs, how much a typical household uses, how the grid is run and regulated, and whether homes can send electricity back to the grid. Figures are shown in Dominican peso (DOP) where they relate to prices.

Each important figure links to its public source and states the year it refers to. Where no reliable public figure was found, the page says so. Unfamiliar terms are explained in our glossary.

At a glance

Dominican Republic energy at a glance.

Key figures for households in Dominican Republic. Each one links to its source on the full overview below.

  • Electricity price.

    8.88 DOP per kWh for households, including taxes. Figures for Aug 2025 – Jul 2026.

  • Household use.

    2,139 kWh a year for a typical household. Figures for Aug 2025 – Jul 2026.

  • Renewable share.

    21.8% of electricity from renewable sources. Figures for 2025.

  • Selling back to the grid.

    Can homes export electricity? Yes. Details are in the export section below.

Before you start

Four things to check in Dominican Republic.

Rules and schemes change. Use this page as a starting point, then confirm the details that matter to you.

  1. Check the local rules.

    Read the connection, export and permission rules for Dominican Republic below, and ask your local grid operator if anything is unclear.

  2. Choose a qualified installer.

    Look for an installer listed on an official register, with the certifications Dominican Republic requires for the work.

  3. Look at current schemes.

    Check which support schemes are open now. Closed or scheduled schemes are labelled as such.

  4. Talk to your energy supplier.

    Ask how new equipment, such as solar or a battery, could affect your tariff and any export payments.

Local detail

Schemes, rules and certifications in Dominican Republic.

The full detail sits in the sections below. Each item shows its status and links to the official source.

  • Support schemes.

    Grants, tax relief and export payments in Dominican Republic, each labelled Active, Scheduled or Closed.

  • Connection and export.

    How equipment is connected to the grid in Dominican Republic, and the steps to export electricity.

  • Standards and certifications.

    The technical standards and installer certifications that apply to energy equipment in Dominican Republic.

Full overview

The energy market in Dominican Republic, in detail.

Each figure shows the year it refers to and a numbered link to its public source, listed at the end of the page.

Profile last updated 9 October 2026.

On this page22 sections

The Dominican Republic runs a single national grid, the Sistema Eléctrico Nacional Interconectado (SENI), which covers most of the country. Private and state-owned plants sell power on a wholesale market run by the Organismo Coordinador (OC), the state company ETED operates the transmission network, and three state-owned distribution companies (EDEs) supply almost all homes. EDENORTE serves the north, EDESUR the south-west including much of Santo Domingo, and EDEESTE the east. Together they had 3.32 million active supply contracts in July 2026.

Generation still depends mainly on imported fuels. In 2025 natural gas produced 39.4% of the electricity injected into the SENI, coal 28.7% and fuel oil 10.1%. Hydro produced 6.1%, and wind, solar and biomass 15.7%, up 3.8 percentage points on 2024. Solar is growing fast: utility-scale solar plants reached 1,717 MW in May 2026, and another 583 MWp of rooftop and on-site systems were connected under the net metering programme.

The distribution companies lose a large share of the power they buy. Losses were 39.2% on a rolling 12-month basis in July 2026, and the government paid the EDEs USD 1,126.9 million in January–July 2026 to cover their deficit. Households pay regulated tariffs set by the Superintendencia de Electricidad (SIE). In the 12 months to July 2026 residential customers were billed an average of about DOP 8.9 per kWh. Around 60% of billed customers have remotely read (telemetered) meters, and EDEEste began fitting another 145,000 smart meters in August 2026.

Energy snapshot.

Headline figures for electricity in Dominican Republic. Each shows its data year and links to its source.

  • Population11,520,487 peopleSource 202025
  • Households3,158,726 householdsSource 72018 (estimate)
  • Average household sizeNot identified from a reliable public source.
  • Electricity use per household2,139 kWh/yrSource 4Aug 2025 – Jul 2026
  • Household price (DOP)8.88 DOP/kWhSource 4Aug 2025 – Jul 2026
  • Household price (EUR)0.135 EUR/kWhSource 24Aug 2025 – Jul 2026
  • Renewable electricity share21.8%Source 22025
  • Solar capacity2.3 GWSource 5May 2026
  • Wind capacity0.483 GWSource 5May 2026
  • Energy storage capacityNot identified from a reliable public source.
  • Smart-meter share60.3%Source 3July 2026
Market structure
Partially liberalised
Homes can export to the grid
Yes
Home equipment in grid services
Unknown
Regulator
Superintendencia de Electricidad (SIE)
System operator
Organismo Coordinador del SENI (OC) for dispatch and market settlement; Empresa de Transmisión Eléctrica Dominicana (ETED) for transmission
Distribution networks
Three state-owned regional distribution companies (EDENORTE, EDESUR, EDEESTE) plus a few small local distributors
Currency
Dominican peso (DOP)
Voltage and frequency
120/240 V / 60 Hz

Electricity prices in Dominican Republic.

Household price (DOP)
8.88 DOP/kWh (Aug 2025 – Jul 2026)Source 4Derived average residential revenue per kWh: DOP 47,823.8 million billed for 5,384.7 GWh across EDENORTE (8.8), EDESUR (9.4) and EDEESTE (8.4). Bonoluz customers were billed an average of DOP 7.32/kWh. The average across all EDE customer types was DOP 10.24/kWh in January–July 2026.
Household price (EUR)
0.135 EUR/kWh (Aug 2025 – Jul 2026)Source 24Converted from DOP 8.88/kWh at DOP 58.88 per US dollar (Banco Central average for July 2026, as reported by MEM) and the ECB reference rate of USD 1.1206 per euro on 9 October 2026. Derived cross rate: about DOP 66.0 per euro.
Typical annual electricity bill
18,494 DOP/yr (Aug 2025 – Jul 2026)Source 4Derived: DOP 54,865.6 million billed to residential and Bonoluz customers, divided by 2,966,606 active contracts in July 2026. About DOP 1,540 a month, or roughly EUR 280 a year at the conversion used for priceEur. Includes suspended contracts, so the average for paying customers is likely to be higher.

How tariffs are set

Under the General Electricity Law (Law 125-01, amended by Law 186-07), the SIE sets regulated tariffs and network charges by resolution. Every user below 1 MW is a regulated customer of the distribution company in whose area they live. The EDEs publish SIE’s tariff schedule each month. The most recent tariff resolution cited by MEM was issued on 22 June 2026.

Rising-block structure

The residential BTS-1 tariff charges more per kWh as monthly consumption rises. MEM’s July 2026 data show an average billed price of DOP 6.8/kWh for customers using up to 200 kWh and DOP 13.2/kWh above 700 kWh. Most customers are in the cheapest band: 1.87 million of the 2.97 million BTS-1 contracts were in the 0–200 kWh band. Residential customers pay less on average than commercial (about DOP 12.3/kWh) and industrial (about DOP 12–13/kWh) customers.

Subsidy and losses

Tariffs do not cover costs. In January–July 2026 the EDEs paid an average of 15.95 US cents/kWh for the power they bought and billed customers 16.95 cents. However, 39.2% of the energy bought was lost or not billed, and the companies recovered only 58.0% of the energy cost in cash. The government covered the EDEs’ current deficit with USD 1,126.9 million in transfers over those seven months, up 34% on a year earlier.

Trends

The average price billed to all EDE customers has been broadly stable in peso terms: DOP 10.20/kWh in 2025 and DOP 10.24/kWh in January–July 2026. Higher purchase costs have instead been met largely by government transfers, which rose 34% year on year in January–July 2026.

Tariff types.

Tariff types.
TariffAvailableDetail
RegulatedYesBTS-1 and BTS-2: low-voltage residential tariffs for customers with less than 10 kW of contracted capacity, set by SIE resolution. BTS-1 is billed in consumption bands of 0–200, 201–300, 301–700 and over 700 kWh a month. In July 2026 the average billed per kWh rose from DOP 6.8 in the lowest band to DOP 13.2 above 700 kWh (MEM derived figures). EDEs publish SIE’s tariff schedule monthly.
OtherYesBonoluz: a separate residential customer category in EDE billing, charged lower average prices. 616,988 contracts were active in July 2026, and they were billed an average of DOP 7.3/kWh over the previous 12 months.
PrepaymentLimitedPrepaid meters are offered in some areas; the EDEs had 243,752 prepaid customers in July 2026. EDEEste presents them as having no late-payment interest or reconnection fees.
Time-of-useNoNo residential time-of-use tariff. Hourly tariffs (BTH, MTH) apply to low- and medium-voltage customers on demand-based tariffs; only 230 customers were on BTH in July 2026.
DynamicNoRegulated customers cannot buy at spot prices. Only non-regulated users (1 MW or more) can contract directly with generators.
FixedNoThere is no retail competition for households, so no competing fixed-price offers exist.

Household prices compared with neighbouring countries (EUR per kWh).

Household prices including taxes, converted to euros as stated on each country page.

Household electricity use.

Electricity use per household
2,139 kWh/yr (Aug 2025 – Jul 2026)Source 4Derived: 6,346.9 GWh billed to residential and Bonoluz customers by the three EDEs over the 12 months, divided by 2,966,606 active residential and Bonoluz contracts in July 2026. Active contracts include 12.5% suspended for non-payment, and theft is not billed, so actual use per connected home is likely to be higher. Customers on the BTS-1 residential tariff were billed an average of 225 kWh in July 2026.
Average daily use per household
5.9 kWh/day (Aug 2025 – Jul 2026)Source 4Derived from 2,139 kWh a year per active residential or Bonoluz contract.
Typical household peak demand
Not identified from a reliable public source.
Electricity use per person
2,072 kWh/person/yr (SENI injections, all sectors) (2025)Source 2Derived: 23,868.5 GWh injected into the SENI in 2025, divided by the World Bank population estimate of 11,520,487. Includes network losses and excludes self-generation and isolated systems.
Heat pumps
Not identified from a reliable public source.
Air conditioning
11.2 % of homes (2018)Source 7Share of households with at least one air conditioner (about 184,000 conventional and 186,000 inverter units). 88.9% of households had an electric fan.
Electric vehicles
Not identified from a reliable public source.
Electric cooking
1.9 % of homes (2018)Source 7Households with an electric hob/cooker. 84.1% cooked mainly with LPG stoves; firewood and charcoal remain common in rural homes.

Dominican households use modest amounts of grid electricity. Billing data imply about 2,100 kWh a year per residential contract, roughly 180 kWh a month, though this average is pulled down by suspended contracts and unbilled consumption. Demand peaks in the hot months: EDE purchases in July 2026 were 2,132 GWh, against 1,381 GWh in February.

Cooking is mainly done with LPG, so electricity use is driven by refrigerators (in 86.9% of homes in 2018), fans, washing machines, televisions and, increasingly, air conditioning. MEM’s 2018 survey found that 11.2% of households had air conditioning, about half of it inverter type.

Many homes have their own backup because of past supply interruptions. The 2018 survey found battery inverters in 19.9% of households (about 630,000 units, 922.7 MW). These charge from the grid and supply lights and appliances during outages. The EDEs’ “24-hour” programme gives continuous supply to circuits where customers pay their bills; 2.81 million contracts were on 24-hour circuits in July 2026.

Housing and households.

Dwellings
Not identified from a reliable public source.
Owner-occupied
Not identified from a reliable public source.
Private rented
Not identified from a reliable public source.
Social or public housing
Not identified from a reliable public source.
Houses
Not identified from a reliable public source.
Apartments and flats
Not identified from a reliable public source.
Urban population
72.5% (2025)Source 21

About 72% of Dominicans live in urban areas, mainly in Greater Santo Domingo and Santiago. MEM’s 2018 survey estimated that 2.7% of households were not connected to the public grid (1.4% in urban and 7.4% in rural areas). The World Bank reports access to electricity for 99.5% of the population in 2024.

Detailed census tables on dwelling type and tenure could not be checked for this profile. Electricity contracts are held by the occupant rather than by the property, so in rented homes the tenant normally holds the contract and pays the bill.

How the grid works in Dominican Republic.

  1. TransmissionOrganismo Coordinador del SENI (OC), Empresa de Transmisión Eléctrica Dominicana (ETED)
  2. DistributionThree state-owned regional distribution companies (EDENORTE, EDESUR, EDEESTE) plus a few small local distributors
  3. MeteringNot identified from a reliable public source.
  4. Supply3 or more retail suppliers

Physical system

The SENI had 7,432 MW of installed capacity in May 2026 (MEM). The largest sources were natural gas (2,268 MW), solar photovoltaic (1,717 MW), fuel oil (1,295 MW including diesel units), coal (1,064 MW), hydro (623 MW) and wind (483 MW). Average available capacity in May 2026 was 4,194 MW, against a monthly peak demand of 3,737 MW. Transmission losses were 1.97%.

Commercial flow

Generators sell to the distribution companies mainly under contracts: in July 2026 the EDEs bought 1,949.1 GWh under contracts and 182.9 GWh on the spot market. The OC calculates spot prices and settlements. The EDEs then sell to regulated customers at SIE tariffs, while non-regulated users of 1 MW or more contract directly with generators and pay network charges.

Losses and service

The distribution segment is the weak point. The EDEs billed only 7,257 GWh of the 12,072 GWh they bought in January–July 2026. Losses are lowest where meters are telemetered: EDESUR’s Distrito sector, where 97.8% of customers are telemetered, had losses of 13.1%. Supply is not continuous everywhere; circuits are graded by payment levels, and 2.81 million contracts were on 24-hour supply in July 2026.

Who does what.

Who does what.
RoleOrganisationWhat it does
MinistryMinisterio de Energía y Minas (MEM)Created by Law 100-13. Sets energy policy, oversees the state electricity companies through its Vice-Ministry of Electric Energy and publishes monthly performance reports on the EDEs and the SENI.
RegulatorSuperintendencia de Electricidad (SIE)Sets regulated tariffs and network charges, oversees compliance with technical and quality standards and handles consumer complaints (Law 125-01, Art. 24).
MinistryComisión Nacional de Energía (CNE)Energy planning body. Certifies projects for the renewable energy incentives in Law 57-07.
System operatorOrganismo Coordinador del SENI (OC)Plans and coordinates the dispatch of the interconnected system and calculates economic transactions on the wholesale market (Mercado Eléctrico Mayorista).
TSOEmpresa de Transmisión Eléctrica Dominicana (ETED)State transmission company. Under Law 125-01 transmission and hydro generation remain state-owned. It billed USD 81.4 million in transmission charges in January–July 2026.
DSOEDENORTE DominicanaState distribution company for the north (Santiago, Puerto Plata, La Vega, San Francisco and Valverde Mao sectors); 1,332,354 active contracts in July 2026.
DSOEDESUR DominicanaState distribution company for the Distrito Nacional, parts of Santo Domingo province and the south-west (San Cristóbal, Baní, San Juan, Barahona); 1,060,864 active contracts in July 2026.
DSOEDEESTEState distribution company for parts of Greater Santo Domingo and the east of the country; 931,283 active contracts in July 2026.
SupplierEGEHID and EGEPC (state generators)Not retail suppliers. Empresa de Generación Hidroeléctrica Dominicana runs the state hydro plants, and Empresa de Generación Eléctrica Punta Catalina (created by Law 365-22) runs the Punta Catalina coal plant. Both sell on the wholesale market.

Compared with the UK system.

Compared with the UK system.
UK conceptDominican Republic equivalentHow it works
DNOEDENORTE, EDESUR, EDEESTEThree state-owned regional distribution companies, each owning the network and acting as the only retail supplier to regulated customers in its area. A few small local distributors, such as Luz y Fuerza Las Terrenas and Progreso del Limón, also operate.
National Grid/NESOETED (transmission) and the Organismo Coordinador (dispatch and settlement)ETED owns and operates the high-voltage network. The OC dispatches plants and settles the wholesale market. The SENI has no interconnectors.
MPANEDE supply contract (contrato)There is no national supply-point number. Each EDE identifies the supply by a contract in its own commercial system, linked to the supply address, the tariff and contracted capacity, and the meter.
MPRNNo equivalentHomes cook mainly with bottled LPG rather than piped gas, so no gas supply-point register exists.
Meter operatorThe EDEEach distribution company installs, reads and maintains meters in its area, including its telemetered and prepaid meters. There is no competitive meter operator market.
SupplierThe local EDEHouseholds cannot switch supplier. Only users of 1 MW or more (Usuarios No Regulados) can buy directly from generators.
Smart-meter infrastructureEDE telemetering systemsThere is no central data company like the DCC. Each EDE runs its own telemetering platform. EDENORTE’s, for example, uses encrypted GPRS, radio-frequency and power-line links.

How a supply point is identified.

Fictional: contract 5203418; tariff BTS-1; contracted capacity 3 kW; meter 2108836415

Fictional example in the real format.

How a supply point is identified.
QuestionAnswer
What is it called?Supply contract (contrato de suministro)
Who issues it?The distribution company (EDENORTE, EDESUR or EDEESTE) when a supply contract is signed
FormatNumeric contract identifier in the EDE’s commercial system, linked to the supply address, the tariff and contracted capacity, and the meter number. The EDEs do not publish a numbering standard.
LengthNot published; set by each EDE
Stays with the property when you switch supplier?Not identified from a reliable public source.
Where to find itOn the electricity bill, which shows the contract holder’s name, the supply location, the billing address, the contracted tariff and capacity, meter readings and three months of consumption history (EDEEste bill guide).
Electronic accessEach EDE has an online office and app for bills, payments and consumption queries (for example EDESUR’s Oficina Virtual with a consumption enquiry). EDENORTE says authorised telemetered customers can view read-only meter data online.
Third-party accessNo open data hub or standard third-party access was identified. Net metering applications are made by the customer, with the installer’s documents, to the EDE’s net metering office.
Who keeps the registerEach EDE’s commercial (customer) system; the EDEs’ joint council (Consejo Unificado) consolidates their data for MEM reporting
Register scopePer DSO

The Dominican Republic has no national supply-point identifier like the UK’s MPAN. Each of the three distribution companies serves a fixed area and is the only supplier to regulated customers there, so the supply is identified by the contract in that company’s own commercial system. MEM statistics count customers as contracts: 3,324,501 were active in July 2026, of which 3,023,984 were billed.

A contract records the holder, the supply address, the tariff (for example BTS-1 for homes under 10 kW) and the contracted capacity, and is linked to a meter. The bill shows these details with the readings, billing period (27–31 days) and payment barcode. Where there is no meter, the EDE estimates consumption: 249,493 customers had no meter in July 2026, half of them in EDEEste’s area.

Because contracts are held by the occupant, a new tenant or owner normally signs a new contract. Whether the identifier stays with the address is not documented publicly, and the EDEs do not publish their numbering format, so the fictional example shows the fields rather than a confirmed structure.

Sending electricity to the grid.

Sending electricity to the grid.
QuestionAnswer
Can homes export electricity?Yes
Net meteringYes
Net billingUnknown
How exported electricity is paidNet metering programme run by each EDE. Law 57-07 (Art. 20) obliges distributors to buy surplus renewable output from regulated and non-regulated users at prices regulated by the SIE; the detailed crediting rules of the current regulation could not be verified
Who can join net metering?EDEEste describes its programme as open to customers below 1 MW. Users of 1 MW or more are non-regulated users under Law 125-01.
Is there a new regulation?EDENORTE published a “Nuevo Reglamento de Generación Distribuida” (new distributed generation regulation) on its net metering page on 19 February 2026. Its detailed terms could not be verified for this profile.
How much distributed generation is connected?MEM reports 583 MWp under the net metering programme in May 2026, up from 458 MWp in July 2025.
Are inverters covered by tax incentives?Law 57-07 lists synchronous inverters for exporting net metering surplus to the grid among the equipment eligible for exemption from import duties and ITBIS (VAT).

Connecting a home system.

  1. Choose an installer and a licensed engineer to design the system; equipment must meet efficiency requirements and carry a manufacturer warranty of at least five years (EDEEste).
  2. Submit the application file to the EDE’s net metering office. EDEEste lists 17 documents, including the client’s authorisation, project specifications and signed drawings, equipment certifications, the engineer’s credentials, the interconnection agreement form and the net metering agreement.
  3. The EDE evaluates the documents and the capacity of the local network (transformer details form part of the file).
  4. The EDE approves the interconnection and signs the net metering agreement. EDEEste does not charge for the process, and timescales depend on network conditions.

Households and businesses can connect solar systems and export surplus power under the net metering programme (medición neta) run by each EDE. Law 57-07 obliges distributors to buy surplus renewable electricity from regulated and non-regulated users at prices regulated by the SIE, with transactions governed by Law 125-01 and its regulation.

The programme has grown quickly. MEM’s monthly bulletins show installed net-metered capacity rising from 458 MWp in July 2025 to 528 MWp in August 2025, 563 MWp in December 2025 and 583 MWp in April–May 2026. In 2018, according to CNE data cited by MEM, residential net-metered systems generated 25.9 GWh.

EDENORTE published a new distributed generation regulation in February 2026. This profile could not verify its terms, including size limits, how surplus credits are valued and whether annual surpluses are paid out, because the SIE and CNE websites were not accessible. Applicants should check the current rules with their EDE.

Licensing and approvals.

Requirements depend on the activity. The table sets out what each activity needs and who grants it.

Licensing and approvals.
ActivityLicence or registrationAuthorityNotes
Generate electricity for own use with renewables (net metering)No concession; net metering agreement and interconnection approval from the EDE for customers below 1 MWEDE; SIE (rules)CNE approval is needed to claim the self-producer tax credit under Law 57-07.
Install a solar or battery systemDesign and documents signed by a licensed engineer; certified equipment with a warranty of at least five yearsEDE (net metering office)Requirements listed by EDEEste.
Generate and sell to the gridLaw 125-01: generation does not need a concession below the demand threshold set in the regulation, but a definitive concession granted by the Executive is required above it; renewable projects also need CNE approval to receive Law 57-07 incentivesExecutive (concession); SIE (processes applications); CNE (incentives)Generation companies take part in the wholesale market coordinated by the OC.
Hydro generation and transmissionReserved to the stateLaw 125-01, Art. 41No concession or authorisation may be granted to private hydro generators or transmission companies.
Store electricityNo specific storage licence identified; behind-the-meter batteries are installed under net metering and interconnection rulesSIE; EDEMEM said in April 2025 that rules on battery incentives and arbitrage needed review.
Export to the gridNet metering agreement with the EDEEDESurplus is bought at prices regulated by the SIE (Law 57-07).
Supply / retail electricityConcession needed for the public distribution service; the three EDEs serve regulated customers in their areasExecutive; SIENon-regulated users (1 MW or more since 2011) can buy directly from generators and pay a 10% system technical-service contribution.
Wholesale tradingRegistration as a market agent on the Mercado Eléctrico Mayorista; generators, distributors, self-producers and co-generators selling surplus and non-regulated users take partOC; SIEMost volume is traded under contracts, the rest on the spot market.
Aggregate / virtual power plant / balancing servicesNo framework for aggregators or distributed resources in balancing identifiedOC; SIE
Remote control of customer assetsNo rules identified; EDEs remotely disconnect and reconnect telemetered metersEDE

Law 125-01 separates generation, transmission and distribution. Generation and transmission do not need a concession in systems below a demand threshold set in the regulation, but above it companies need a definitive concession, granted by the Executive after the SIE has examined the application (Law 125-01, Art. 24). The public distribution service always needs a concession. Hydro generation and transmission remain state-owned.

For households the practical requirements are those of the net metering programme: a licensed engineer’s design, certified equipment and an interconnection and net metering agreement with the local EDE. Companies and householders seeking the tax incentives of Law 57-07 must have their projects approved by the CNE.

Flexibility and grid services.

Aggregation of home equipment: Unknown

Flexibility and grid services.
Market or serviceAccess for home equipmentMinimum sizeVia an aggregatorDetail
Wholesale spot market (Mercado Eléctrico Mayorista)Restricted—UnknownOrganismo Coordinador (OC). Generators, distributors, self-producers and co-generators selling surplus, and non-regulated users of 1 MW or more take part. No route for aggregated household resources was identified.
Balancing and ancillary servicesUnknown—UnknownOC. Frequency regulation is provided by conventional plants. No participation route for distributed resources was identified.

The Dominican Republic has a wholesale market with a spot component, but it is open only to large players. Households and small businesses are regulated customers of their EDE and can take part only through net metering. No demand response, aggregation or virtual power plant scheme for distributed batteries or solar was identified.

MEM said in April 2025 that the country needed to review its rules to make battery use efficient, including through arbitrage, and that the year’s generation tender would include storage. These are policy statements rather than a market open to distributed resources.

Smart meters.

Smart meters.
FactValue
Smart-meter rollout60.3% of billed customers telemetered in July 2026; EDEEste began installing 145,000 smart meters in August 2026
Reading intervalNot published
Telemetered customers1,824,904 of 3,023,984 billed customers (60.3%), July 2026, covering about 74% of energy billed
By distributorEDEESTE 82.8% (745,361), EDENORTE 53.5% (692,588), EDESUR 46.6% (386,955)
New deploymentEDEEste: 145,000 smart meters starting in Higüey (August 2026), prioritising high-loss circuits
CommunicationsEDENORTE system: encrypted GPRS, RF and PLC links
Customers without a meter249,493 (July 2026)
Prepaid customers243,752 (July 2026)

Remote metering in the Dominican Republic is driven mainly by the fight against losses. Each EDE runs its own telemetering system, which records consumption and alarms for tampering. Telemetered customers can be disconnected and reconnected remotely. Areas with high telemetering have far lower losses: in EDESUR’s Distrito sector 97.8% of customers are telemetered and losses were 13.1%, against 39.2% for the EDEs as a whole.

EDEEste began a new deployment of 145,000 smart meters in Higüey in August 2026, to be extended to other eastern areas and Santo Domingo. It says customers will gradually get daily, weekly and monthly consumption data. EDENORTE says authorised customers can already view read-only data from its telemetering system online. No time-of-use tariffs for households are based on these meters.

Renewable electricity.

Electricity generation mix (2025).

  • Natural gas: 39.4%
  • Coal: 28.7%
  • Wind, solar and biomass: 15.7%
  • Fuel oil: 10.1%
  • Hydro: 6.1%
Source 2
Renewable electricity share
21.8% (2025)Source 2Derived: non-conventional renewables (wind, solar and biomass) 15.7% plus hydro 6.1% of the 23,868.5 GWh injected into the SENI. The share was 24.1% in January–July 2026. Net-metered rooftop generation consumed on site is not included. The SENI has no international interconnection, so generation and consumption shares are the same.
Home solar
Not identified from a reliable public source.
Solar added each year
Not identified from a reliable public source.
Utility-scale solar
1.717 GW (May 2026)Source 5Esperanza 2 (48.29 MW) was added in May 2026.
Distributed solar (net metering)
0.583 GWp (May 2026)Source 5
Wind
0.483 GW (May 2026)Source 5
Hydro
0.623 GW (May 2026)Source 5
Biomass
0.03 GW (May 2026)Source 5

Targets.

  • 30% renewable participation by 2030 (MEM, April 2025)
  • Law 57-07 aimed for 25% of electricity needs from renewables by 2025 and at least 10% of distributors’ purchases by 2015

Renewables produced 21.8% of the electricity injected into the SENI in 2025: hydro 6.1% and wind, solar and biomass 15.7%. The non-conventional share rose by 3.8 percentage points in a year and reached 17.8% in January–July 2026. Including hydro, renewables supplied 26.8% in May 2026 (MEM).

Solar is now the second-largest technology by installed capacity after natural gas, with 1,717 MW of utility plants in May 2026 (23% of SENI capacity), plus 583 MWp of net-metered systems. Wind contributes 483 MW. Hydro capacity (623 MW) is state-owned.

Law 57-07 set a goal of 25% of electricity needs from renewables by 2025. MEM now cites a target of 30% by 2030 and is reviewing Law 57-07 alongside a reform of the General Electricity Law and a planned energy transition law. Fossil capacity is also expanding: MEM expects the Manzanillo gas project in Montecristi to add about 2,167 MW.

Energy storage.

Home batteries
630,000 household backup inverters with batteries (2018)Source 719.9% of households, 922.7 MW of inverter capacity. These are mainly grid-charged backup systems for outages rather than solar batteries.
Grid-scale storage
Not identified from a reliable public source.

Batteries in Dominican homes have traditionally been backup systems. In 2018 one in five households had an inverter with batteries that charges from the grid and runs lights and appliances during supply cuts, a response to past rationing. No published figure shows how many solar-plus-battery systems are now connected under net metering.

Law 57-07 lists long-life stationary batteries among equipment eligible for import duty exemption. For the grid, MEM said in April 2025 that the year’s tender would include storage and that battery incentives and arbitrage rules needed review. No official figure on grid-scale storage capacity in operation was identified.

Electricity suppliers.

Electricity suppliers.
SupplierMarket shareRenewable tariffTime of useDynamicExport tariff
EDENORTE Dominicana1,332,354 active contracts (40% of EDE customers), July 2026NoLimitedNoYes
EDESUR Dominicana1,060,864 active contracts (32%), July 2026NoLimitedNoYes
EDEESTE931,283 active contracts (28%), July 2026NoLimitedNoYes

Households cannot choose their supplier: each is served by the state-owned EDE for its area at SIE tariffs. Time-of-use is marked Limited because hourly tariffs exist only for demand-metered business customers. The competitive parts of the market are generation, where private companies own most plants and sell under contracts and on the spot market, and supply to non-regulated users of 1 MW or more. Behind the meter, solar installers compete to supply net-metered systems.

Key organisations.

Key organisations.
OrganisationCategoryWhat it doesWhy it matters
Ministerio de Energía y Minas (MEM)GovernmentEnergy ministryPublishes monthly performance, commercial and generation reports on the electricity sector.
Superintendencia de Electricidad (SIE)RegulatorElectricity regulatorSets tariffs and technical rules, including for distributed generation.
Comisión Nacional de Energía (CNE)GovernmentEnergy planning and renewable incentivesCertifies projects for Law 57-07 tax incentives.
Organismo Coordinador del SENI (OC)MarketDispatch and wholesale market settlementPublishes operating data and annual reports on the interconnected system.
Empresa de Transmisión Eléctrica Dominicana (ETED)TransmissionState transmission companyOwns and operates the high-voltage grid.
EDENORTE, EDESUR and EDEESTEDistributionState distribution and supply companiesHandle connections, metering, billing and net metering applications.
Asociación Dominicana de la Industria Eléctrica (ADIE)MarketElectricity industry associationPublishes studies on the electricity market, renewable integration and service quality.

Technical standards.

Technical standards.
AreaStandardIssued byNotes
Net metering documentationEDE net metering file: engineer-signed design, equipment certification, manufacturer warranty of at least five years, interconnection and net metering agreementsEDEs, under SIE rulesSpecific inverter or anti-islanding standards were not verified.
Distributed generation regulationNuevo Reglamento de Generación Distribuida (published by EDENORTE, February 2026)Electricity sector authoritiesTerms not verified for this profile.
Service qualityResolution SIE-56-02 (quality of distribution service: SAIFI, SAIDI, CAIDI)SIECited by MEM in its distribution bulletin.
Equipment eligible for incentivesLaw 57-07, Art. 9: PV panels, stationary batteries, inverters, wind and hydro turbines, solar water heatersCongress; CNE

Permissions.

Permissions.
PermissionRequiredLevelDetail
EDE interconnection and net metering agreementYesRegionalApplication to the local EDE’s net metering office with the documentation it lists; free of charge at EDEEste, with timing subject to network conditions.
CNE certification for tax incentivesLimitedNationalOnly needed to claim Law 57-07 incentives such as the self-producer income tax credit.
Generation concessionNoNationalNot needed for household self-generation; required for larger generation above the threshold in the Law 125-01 regulation.

For a household solar system the main step is the EDE’s net metering approval, based on documents prepared by a licensed engineer. Local building permits for rooftop systems were not verified for this profile.

Support schemes, taxes and incentives.

Support schemes, taxes and incentives.
SchemeStatusTypeDetailPeriod
Net metering (medición neta)ActiveNet meteringCustomers below 1 MW can connect renewable systems and have surplus taken by their EDE. Law 57-07 obliges distributors to buy surplus at SIE-regulated prices. A new distributed generation regulation was published in February 2026.—
Import duty and ITBIS exemption for renewable equipment (Law 57-07, Art. 9)ActiveTax exemptionAs enacted, 100% exemption from import duties, ITBIS (VAT) and sales taxes on listed equipment such as PV panels, inverters and stationary batteries, on CNE recommendation. Later tax legislation may have changed the terms; check current rules with the CNE.—
Self-producer income tax credit (Law 57-07, Art. 12)ActiveTax creditAs enacted, owners or tenants of homes and businesses that install renewable self-supply systems approved by the CNE can receive a one-off income tax credit of up to 75% of the equipment cost, used over three years at 33.33% a year. The current percentage may have been changed by later tax legislation and could not be verified.—
Income tax exemption for renewable generators (Law 57-07, Art. 10)ClosedTax exemptionTen-year income tax exemption for approved renewable generation companies, with a maximum validity to 2020.Until 2020
Community renewable projects (Law 57-07, Art. 13)ActiveConcessional financeCommunity organisations and cooperatives developing renewable projects of up to 500 kW for community use can obtain finance at the lowest market rates for up to 75% of the cost.—

Data and connectivity.

Fixed broadband
11.2 fixed broadband subscriptions per 100 people (2024)Source 23
4G coverage
Not identified from a reliable public source.
5G coverage
Not identified from a reliable public source.

Fixed broadband reaches about 11 subscriptions per 100 people, so most households rely on mobile data. The EDEs’ telemetering systems use their own communications: EDENORTE’s combines GPRS mobile data, radio frequency and power-line carrier links, all encrypted. Customers use EDE apps and online offices for bills and consumption data.

Grid conditions.

National peak demand
3.737 GW (May 2026 (monthly peak))Source 5Peak on 7 May 2026, up 3.88% on May 2025. The OC’s forecast maximum demand for 2026 is 3,992 MW (resolution OC-02-2026).
Annual electricity demand
23.9 TWh (SENI injections) (2025)Source 223,868.5 GWh injected into the SENI, up 799.9 GWh on 2024.
Generation capacity
7.432 GW (May 2026)Source 5Installed capacity of plants connected to the SENI; MEM’s chart of capacity by source totals 7,480 MW. Average available capacity in May 2026 was 4,194 MW.
Interconnection
Not identified from a reliable public source.
Curtailment
Not identified from a reliable public source.

Demand is growing steadily: SENI injections rose 3.5% in 2025 and 5.5% in January–July 2026. Installed capacity of 7.4 GW is about twice peak demand, but average availability was only about 4.2 GW in May 2026 because of variable renewables and plant outages. The system is isolated, so reserves must come from domestic plants.

Variable output already shapes operation. MEM notes that availability peaks during hours of solar radiation and that fuel-oil and gas plants provide flexibility when solar and wind fluctuate. Transmission losses are low (1.97% in May 2026); the large losses are in distribution.

Grid and capacity maps.

Regulatory changes.

Regulatory changes.
ChangeStatusDateDetail
New distributed generation regulationCurrentFebruary 2026EDENORTE published the “Nuevo Reglamento de Generación Distribuida” on its net metering page on 19 February 2026. Its terms were not verified for this profile.
EDEEste smart meter deploymentCurrentFrom August 2026145,000 smart meters with remote reading and remote connection, starting in Higüey and extending to other eastern areas and Santo Domingo.
Reform of the electricity and renewable energy lawsUpcomingNot scheduledMEM is working on amendments to Law 125-01, a review of Law 57-07 and a new energy transition law (announced April 2025).
30% renewables by 2030Upcoming2030Government target cited by MEM in April 2025, with tenders including renewables and storage.
CDEEE wound up; Punta Catalina company createdCurrent2020–2022Decree 342-20 ordered the liquidation of the state holding CDEEE, and Law 365-22 created the Punta Catalina generation company (EGEPC) as part of a sector reform.

Market indicators.

Neutral descriptions of the market, each with the evidence behind it. They do not rank countries.

Market indicators.
IndicatorLevelBasis
Electricity costLowLow below €0.15 per kWh, high at €0.30 or more (household price including taxes, converted to euros).
Household electricity useLowLow below 2,500 kWh a year, high at 5,000 kWh or more (average use per household).
Renewable shareLowLow below 30%, high at 60% or more (renewable share of electricity).
Smart-meter adoptionMediumLow below 30%, high at 80% or more (share of meters that are smart).
Home solar adoptionMedium583 MWp connected under net metering by May 2026, up 125 MWp since July 2025 (MEM); number of systems not published.
Distributed energy marketMediumNet-metered capacity equals about 8% of SENI installed capacity; one in five households had backup inverters in 2018 (MEM survey).
Grid flexibility marketLowThe wholesale and spot markets are limited to large agents; no aggregation or demand response route for distributed resources identified.
Energy storage adoptionLowNo official data on solar batteries or grid-scale storage; household batteries are mainly grid-charged backup inverters.
Renewable growth environmentHighWind, solar and biomass rose from 11.9% to 15.7% of generation in 2025 and 17.8% in January–July 2026; utility solar reached 1,717 MW (MEM).

Sources.

Public sources used for this profile, with the date each was accessed.

Show all 25 sources
  1. Informe de Desempeño Empresas Eléctricas Estatales, julio 2026. Ministerio de Energía y Minas, 2026. accessed 9 October 2026.
  2. Informe de Desempeño Empresas Eléctricas Estatales, diciembre 2025. Ministerio de Energía y Minas, 2026. accessed 9 October 2026.
  3. Boletín de Distribución y Comercialización de Energía, julio 2026. Ministerio de Energía y Minas, 2026. accessed 9 October 2026.
  4. Informe de Gestión Comercial de las EDE, julio 2026. Ministerio de Energía y Minas, 2026. accessed 9 October 2026.
  5. Boletín de Generación y Gestión de Energía, mayo 2026. Ministerio de Energía y Minas, 2026. accessed 9 October 2026.
  6. Boletín de Generación y Gestión de Energía, julio 2025 (458 MWp net metering). Ministerio de Energía y Minas, 2025. accessed 9 October 2026.
  7. Encuesta energética, Tomo II: Sector residencial (2018 data). Ministerio de Energía y Minas, 2020. accessed 9 October 2026.
  8. República Dominicana trabaja en la modernización de las leyes de energía para acelerar la transición energética. Ministerio de Energía y Minas, 2025. accessed 9 October 2026.
  9. Ley No. 57-07 sobre Incentivo al Desarrollo de Fuentes Renovables de Energía y sus Regímenes Especiales. Ministerio de Energía y Minas, 2007. accessed 9 October 2026.
  10. Ley General de Electricidad No. 125-01 (modificada por la Ley 186-07). Ministerio de Energía y Minas, 2007. accessed 9 October 2026.
  11. Marco legal: Leyes (incl. Ley 365-22) and Decretos (incl. Decreto 342-20). Ministerio de Energía y Minas. accessed 9 October 2026.
  12. Medición Neta (incl. Nuevo Reglamento de Generación Distribuida). EDENORTE Dominicana, 2026. accessed 9 October 2026.
  13. Programa Medición Neta. EDEESTE. accessed 9 October 2026.
  14. EDEEste inicia despliegue de 145 mil medidores inteligentes. EDEESTE, 2026. accessed 9 October 2026.
  15. ¿Cómo leer su factura?. EDEESTE. accessed 9 October 2026.
  16. Sistema de energía prepago. EDEESTE. accessed 9 October 2026.
  17. Sistema de telemedidas. EDENORTE Dominicana. accessed 9 October 2026.
  18. Tarifas. EDENORTE Dominicana. accessed 9 October 2026.
  19. Tarifa eléctrica (monthly SIE tariff schedules). EDESUR Dominicana, 2026. accessed 9 October 2026.
  20. Population, total — Dominican Republic (SP.POP.TOTL). World Bank, 2025. accessed 9 October 2026.
  21. Urban population (% of total) — Dominican Republic (SP.URB.TOTL.IN.ZS). World Bank, 2025. accessed 9 October 2026.
  22. Access to electricity (% of population) — Dominican Republic (EG.ELC.ACCS.ZS). World Bank, 2024. accessed 9 October 2026.
  23. Fixed broadband subscriptions (per 100 people) — Dominican Republic (IT.NET.BBND.P2). World Bank, 2024. accessed 9 October 2026.
  24. ECB euro reference exchange rate: US dollar (USD). European Central Bank, 2026. accessed 9 October 2026.
  25. Asociación Dominicana de la Industria Eléctrica. ADIE. accessed 9 October 2026.

Questions about energy in Dominican Republic.

Talk to us about Olmack in Dominican Republic.Tell us about your home, housing portfolio or school estate in Dominican Republic. We'll explain what is possible there now.